Tonight’s Agenda

          • Schedule
          • Overview of 6th Site (Crescent Harbor North)
          • Public Comments Summary
          • Overview of 2010 Rate Study
          • Briefly Summarize Workshop Presentation
          • Questions?




Oh910i1-8594.pptx/2
Schedule




Oh910i1-8594.pptx/3
Schedule - Council Actions & Deadlines

          • April 18 - Action on Resolution
          • August 14 - Resolution on final, preferred site
          • October 16 - Resolution on phasing plan
          • December 18 - Resolution on facility plan for
            submittal to Department of Ecology
          • December 31, 2012 - Required facility plan
            submittal deadline
          • December 31, 2014 - Required engineering
            design plan submittal deadline

Oh910i1-8594.pptx/4
Overview of 6th Site




Oh910i1-8594.pptx/5
Six Sites Included in Resolution 12-05




Oh910i1-8594.pptx/6
Crescent Harbor North Site Map




Oh910i1-8594.pptx/7
Summary of Public Comment




Oh910i1-8594.pptx/8
Public Input from April 11, 2012
     • Continue public involvement throughout process
     • 4 written comments received
               – 2 in favor of Crescent Harbor North
               – 2 in favor of Windjammer
     • Unwritten feedback:
               – Site-specific conditions at Crescent Harbor North
                 must be addressed
                      • Drainage, wet lowland areas
                      • Aesthetics/screening are important
                      • Be consistent with rural land use
               – Maintain affordability of sewer rates
               – Take a long-term view for the project
Oh910i1-8594.pptx/9
Overview of 2010 Rate Study




Oh910i1-8594.pptx/10
2010 Wastewater Rate Study
     • Cost of Service Analysis
               – Differing costs for different customer classes
     • Accounted for Capital projects listed in 20 year
       Comprehensive plan
     • Includes an assumed $70 million capital expense
       for wastewater plant
               – Now listed in CIP but was not listed during
                 development of rate study
     • Council adopted recommendations for
       progressive rate increases in water, sewer and
       storm drainage (Ord 1587)
Oh910i1-8594.pptx/11
2010 Wastewater Rate Study- Assumptions

     • 6% Interest rate on standard revenue bond
     • Standard 20 year payback period on bond
     • No adjustment to connection/capacity charges
     • Assumes full $70million expenditure between
       2016 and 2017 for plant construction
     • Assumes no contribution from outside sources or
       funding partners (US Navy, grants etc)




Oh910i1-8594.pptx/12
2010 Wastewater Rate Study
                           Average Single-Family Monthly Bill - Projected Rate Increases

                       Year 1     Year 2     Year 3     Year 4     Year 5    Year 6     Year 7     Year 8      Year 9
         $70 Million     $40.00     $42.00     $47.00     $52.00    $57.50     $64.75     $72.85    $81.95       $92.20



          $100.00

           $90.00

           $80.00

           $70.00

           $60.00

           $50.00
                                                                                                                            $70 Million
           $40.00

           $30.00

           $20.00

           $10.00

             $0.00
                       Year 1     Year 2     Year 3     Year 4      Year 5     Year 6     Year 7      Year 8       Year 9




Oh910i1-8594.pptx/13
2010 Wastewater Rate Study
                                Average Single-Family Monthly Bill - Projected Rate Increases

                       Year 1       Year 2      Year 3        Year 4       Year 5       Year 6      Year 7     Year 8     Year 9
       $70 Million        $40.00       $42.00     $47.00        $52.00       $57.50       $64.75      $72.85     $81.95      $92.20
       $90 Million        $40.00       $42.00        $47.00       $52.65     $60.55       $69.65      $80.10     $96.10    $115.30
       $95 Million        $40.00       $42.00        $47.00       $52.65     $60.55       $71.15      $83.60    $100.30    $120.35


           $140.00



           $120.00



           $100.00


                                                                                                                               $70 Million
             $80.00


                                                                                                                               $90 Million
             $60.00


                                                                                                                               $95 Million
             $40.00



             $20.00



               $0.00
                       Year 1      Year 2   Year 3       Year 4     Year 5     Year 6      Year 7     Year 8    Year 9



Oh910i1-8594.pptx/14
2010 Wastewater Rate Study       Average Single-Family Monthly Bill - Projected Rate Increases

                         Year 1         Year 2      Year 3      Year 4        Year 5       Year 6       Year 7      Year 8     Year 9
       $40 Million          $40.00         $42.00      $44.10      $47.65       $51.45        $55.55       $61.10     $67.20      $73.90
       $50 Million          $40.00         $42.00      $45.15      $49.20       $53.65        $59.00       $64.90     $71.40      $78.55
       $60 Million          $40.00         $42.00      $45.55      $50.35       $55.65        $61.50       $67.95     $75.10      $83.00
       $70 Million          $40.00         $42.00      $47.00      $52.00       $57.50        $64.75       $72.85     $81.95      $92.20
       $80 Million          $40.00         $42.00      $47.00      $52.00       $58.50        $67.25       $77.35     $88.95     $102.30
       $90 Million          $40.00         $42.00      $47.00      $52.65       $60.55        $69.65       $80.10     $96.10     $115.30
       $95 Million          $40.00         $42.00      $47.00      $52.65       $60.55        $71.15       $83.60    $100.30     $120.35
       $100 Million         $40.00         $42.00      $47.00      $54.05       $62.15        $73.05       $85.85    $103.00     $123.60

         $140.00


         $120.00


         $100.00
                                                                                                                                       $40 Million
                                                                                                                                       $50 Million
           $80.00                                                                                                                      $60 Million
                                                                                                                                       $70 Million
           $60.00                                                                                                                      $80 Million
                                                                                                                                       $90 Million
                                                                                                                                       $95 Million
           $40.00
                                                                                                                                       $100 Million


           $20.00


             $0.00
                       Year 1        Year 2    Year 3     Year 4     Year 5       Year 6       Year 7      Year 8     Year 9


Oh910i1-8594.pptx/15
April 11 Workshop Summary




Oh910i1-8594.pptx/16
Alternatives Presented on April 11, 2012

                       Site         Process                  Discharge
    Crescent Harbor North             MBR (1)                 Oak Harbor

    Crescent Harbor                   MBR (1)                 Oak Harbor

    Windjammer                         MBR                    Oak Harbor

    Old City Shops                     MBR                    Oak Harbor

    Beachview Farm                    MBR (1)                 Oak Harbor

    Marina/Seaplane Base               MBR                    Oak Harbor

    (1) Activated Sludge (AS) possible to reduce cost of initial phase.


Oh910i1-8594.pptx/17
Full TBL+ Summary of Sites/Alternatives
                        Project Through Year 2030
                        MBR at all Site

                                 E3
                                 E2
No. of TBL+ Objectives Met




                                 E1          E2
                                 S3          E1           E2         E2           E2
                                 S2          S3           E1         E1           E1
                                 S1          S2           S3         S1           S2          E2
                                 F3          S1           S2         F3           S1          E1
                                 F2          F3           S1         F2           F2          S3           E2
                                 F1          F2           F3         F1           F1          S2           E1
                                 T3          F1           F2         T3           T3          S1           S1
                                 T2          T2           F1         T2           T2          F3           F3
                                 T1          T1           T1         T1           T1          T1           T1

                                Ideal      Crescent     Crescent  Windjammer   Old City    Beachview    Marina / 
                             Alternative Harbor North    Harbor                 Shops        Farm       Seaplane 
                                                                                                          Base


Oh910i1-8594.pptx/18
Project Cost Summary for Year 2030
                          MBR Process at All Sites
                         $100

                          $90

                          $80

                          $70
Project Cost, Millions




                          $60                                                                        Effluent Pipeline

                                                                                                     In water work
                          $50
                                                                                                     Sewage Conveyance -
                          $40                                                                        Ultimate
                                                                                                     Sewage Conveyance -
                          $30                                                                        Initial
                                                                                                     WWTP - Site
                          $20
                                                                                                     WWTP - Solids

                          $10                                                                        WWTP - Liquids

                           $0
                                Windjammer   Old City   Crescent   Crescent Marina / Sea Beachview
                                             Shops       Harbor     Harbor     Plane       Farm
                                                                    North
          Oh910i1-8594.pptx/19
Projects are “phased-in” over time in several
     ways…
     • Phase-in WWTP capacity
               – Design for lower flows/loads now; expand to meet
                 higher flows/loads in the future
     • Phase-in WWTP components
               – Build new liquid stream now; defer solids treatment
                 (i.e. continue to use existing Seaplane Base Lagoon)
     • Phase-in WWTP “performance”
               – Design for less restrictive permit limits now;
                 expand to meet more restrictive limits in the future
     • Phase-in wastewater conveyance
               – “Just-in-time” installation/expansion of pipes/pumps for
                 wastewater
Oh910i1-8594.pptx/20
Project Cost Summary
     Potential Phase 1 and Year 2030
     $100
                                                Ultimate        Phase 1
       $95


       $90


       $85


       $80


       $75


       $70


       $65


       $60
                       Windjammer   Beachview     Crescent      Crescent Old City Shops Marina/Sea
                         (MBR)      Farm (AS)   Harbor N. (AS) Harbor (AS)   (MBR)      Plan (MBR)
Oh910i1-8594.pptx/21
Recommended Alternatives

     1. Consider two sites for further evaluation:
               –       Windjammer Park
               –       Crescent Harbor North
     2. Develop final alternatives around membrane
        bioreactor (MBR) process
               –       Consider AS at Crescent Harbor North
     3. Discharge treated effluent through new outfall into
        Oak Harbor Bay
               –       Evaluate opportunities for beneficial reuse




Oh910i1-8594.pptx/22
Final Thoughts
            Our recommendation is based on the following
            key points:
     • Windjammer MBR
               – Best opportunity to complete an initial phase below $70M
                 target while controlling long-term cost
               – Highest quality treated water for current and future
                 environmental protection
               – Required to justify decision to use more expensive
                 alternative
     • Crescent Harbor North AS
               – Meets defined “Social” objectives for the Project
               – Very close to the lowest Phase 1 / Ultimate cost
               – Defined site acquisition and permitting process
Oh910i1-8594.pptx/23
Next Steps Following Council Direction
     • Develop information to directly compare and
       differentiate sites
               – “Master Plan” concepts at each location:
                       • Where on the site could the facility go?
                       • How would/could adjacent property fit in?
               – Added detail for the community:
                       • What might the facility look like?
                       • What kind of neighbor would this facility be?
               – Updated cost information:
                       • Finalize estimated costs for “engineering” elements
                       • Fine-tune “site-specific” costs
               – Compare Phase 1, long-term rate impacts
Oh910i1-8594.pptx/24
Questions?




Oh910i1-8594.pptx/25

Weitere ähnliche Inhalte

Was ist angesagt?

Fy13 council budget_presentation
Fy13 council budget_presentationFy13 council budget_presentation
Fy13 council budget_presentation
montpelier
 
Attachment A Memo 2015
Attachment A Memo 2015Attachment A Memo 2015
Attachment A Memo 2015
Ken Belliveau
 

Was ist angesagt? (8)

Cincinnati's approach for a city of the future
Cincinnati's approach for a city of the futureCincinnati's approach for a city of the future
Cincinnati's approach for a city of the future
 
Water Talks: A Bay-Delta Fix: Impacts to Your Water Supply and Wallet Overview
Water Talks: A Bay-Delta Fix: Impacts to Your Water Supply and Wallet OverviewWater Talks: A Bay-Delta Fix: Impacts to Your Water Supply and Wallet Overview
Water Talks: A Bay-Delta Fix: Impacts to Your Water Supply and Wallet Overview
 
Policy Context and Sustainable Drainage Issues and Application - Paul Stewart...
Policy Context and Sustainable Drainage Issues and Application - Paul Stewart...Policy Context and Sustainable Drainage Issues and Application - Paul Stewart...
Policy Context and Sustainable Drainage Issues and Application - Paul Stewart...
 
Fy13 council budget_presentation
Fy13 council budget_presentationFy13 council budget_presentation
Fy13 council budget_presentation
 
Sir thomas circle
Sir thomas circleSir thomas circle
Sir thomas circle
 
Viability Session 2: The role of viability in plan-making and development man...
Viability Session 2: The role of viability in plan-making and development man...Viability Session 2: The role of viability in plan-making and development man...
Viability Session 2: The role of viability in plan-making and development man...
 
Attachment A Memo 2015
Attachment A Memo 2015Attachment A Memo 2015
Attachment A Memo 2015
 
WHCRWA Town Hall 2012 - Fall
WHCRWA Town Hall 2012 - FallWHCRWA Town Hall 2012 - Fall
WHCRWA Town Hall 2012 - Fall
 

Andere mochten auch

C5 Council Workshop Presentation 7-27-11
C5 Council Workshop Presentation 7-27-11C5 Council Workshop Presentation 7-27-11
C5 Council Workshop Presentation 7-27-11
publicinvolvement
 
March 9, 2011 City Council Workshop
March 9, 2011 City Council WorkshopMarch 9, 2011 City Council Workshop
March 9, 2011 City Council Workshop
publicinvolvement
 
C5 council workshop 111128_final
C5 council workshop 111128_finalC5 council workshop 111128_final
C5 council workshop 111128_final
publicinvolvement
 
130306 City Council Workshop
130306 City Council Workshop130306 City Council Workshop
130306 City Council Workshop
publicinvolvement
 
C8 nov20 city council meeting 121120_final
C8 nov20 city council meeting 121120_finalC8 nov20 city council meeting 121120_final
C8 nov20 city council meeting 121120_final
publicinvolvement
 
August 24 Clean Water Facility Planning Public Forum
August 24 Clean Water Facility Planning Public ForumAugust 24 Clean Water Facility Planning Public Forum
August 24 Clean Water Facility Planning Public Forum
publicinvolvement
 
April 12 Planning Public Forum
April 12 Planning Public ForumApril 12 Planning Public Forum
April 12 Planning Public Forum
publicinvolvement
 

Andere mochten auch (20)

C5 Council Workshop Presentation 7-27-11
C5 Council Workshop Presentation 7-27-11C5 Council Workshop Presentation 7-27-11
C5 Council Workshop Presentation 7-27-11
 
T5 further refine alts min
T5 further refine alts minT5 further refine alts min
T5 further refine alts min
 
March 9, 2011 City Council Workshop
March 9, 2011 City Council WorkshopMarch 9, 2011 City Council Workshop
March 9, 2011 City Council Workshop
 
C5 council workshop 111128_final
C5 council workshop 111128_finalC5 council workshop 111128_final
C5 council workshop 111128_final
 
130306 City Council Workshop
130306 City Council Workshop130306 City Council Workshop
130306 City Council Workshop
 
Oh workshop02 full_final
Oh workshop02 full_finalOh workshop02 full_final
Oh workshop02 full_final
 
2015 0617 workshop_presentation_outfall_draft_brm
2015 0617 workshop_presentation_outfall_draft_brm2015 0617 workshop_presentation_outfall_draft_brm
2015 0617 workshop_presentation_outfall_draft_brm
 
Oak Harbor Design Open House summary
Oak Harbor Design Open House summaryOak Harbor Design Open House summary
Oak Harbor Design Open House summary
 
Oak Harbor Design Open House
Oak Harbor Design Open HouseOak Harbor Design Open House
Oak Harbor Design Open House
 
C8 nov20 city council meeting 121120_final
C8 nov20 city council meeting 121120_finalC8 nov20 city council meeting 121120_final
C8 nov20 city council meeting 121120_final
 
August 24 Clean Water Facility Planning Public Forum
August 24 Clean Water Facility Planning Public ForumAugust 24 Clean Water Facility Planning Public Forum
August 24 Clean Water Facility Planning Public Forum
 
Design charrette council presentation
Design charrette council presentationDesign charrette council presentation
Design charrette council presentation
 
Oak Harbor Good Neighbor Plan
Oak Harbor Good Neighbor PlanOak Harbor Good Neighbor Plan
Oak Harbor Good Neighbor Plan
 
140416 oak_harbor_workshp_presentation
140416 oak_harbor_workshp_presentation140416 oak_harbor_workshp_presentation
140416 oak_harbor_workshp_presentation
 
Oak Harbor Wastewater Treatment Facility: Resolution 15-34, Community Room
Oak Harbor Wastewater Treatment Facility: Resolution 15-34, Community RoomOak Harbor Wastewater Treatment Facility: Resolution 15-34, Community Room
Oak Harbor Wastewater Treatment Facility: Resolution 15-34, Community Room
 
Oak Harbor Rate Study
Oak Harbor Rate StudyOak Harbor Rate Study
Oak Harbor Rate Study
 
April 12 Planning Public Forum
April 12 Planning Public ForumApril 12 Planning Public Forum
April 12 Planning Public Forum
 
Special Workshop presentation on Finance
Special Workshop presentation on FinanceSpecial Workshop presentation on Finance
Special Workshop presentation on Finance
 
Windjammer Park Integration Plan - Council presentation
Windjammer Park Integration Plan - Council presentationWindjammer Park Integration Plan - Council presentation
Windjammer Park Integration Plan - Council presentation
 
Windjammer Park Integration Plan Community Advisory Group meeting 4
Windjammer Park Integration Plan Community Advisory Group meeting 4Windjammer Park Integration Plan Community Advisory Group meeting 4
Windjammer Park Integration Plan Community Advisory Group meeting 4
 

Ähnlich wie C6 further refine_alts_council_4-18_rev1

Claude Resources Inc. PDAC 2013 Presentation
Claude Resources Inc. PDAC 2013 PresentationClaude Resources Inc. PDAC 2013 Presentation
Claude Resources Inc. PDAC 2013 Presentation
Claude Resources Inc.
 
Aslo 2012
Aslo 2012Aslo 2012
Aslo 2012
emmats
 
Q3 2012 Conference Call and Webcast Presentation
Q3  2012 Conference Call and Webcast PresentationQ3  2012 Conference Call and Webcast Presentation
Q3 2012 Conference Call and Webcast Presentation
Claude Resources Inc.
 
Regional demographic charts for fbidc website 2012
Regional demographic charts for fbidc website 2012Regional demographic charts for fbidc website 2012
Regional demographic charts for fbidc website 2012
jfreeman809
 
Claude Resources Inc. Q4 2012 Conference Call and Webcast Presentation
Claude Resources Inc. Q4 2012 Conference Call and Webcast PresentationClaude Resources Inc. Q4 2012 Conference Call and Webcast Presentation
Claude Resources Inc. Q4 2012 Conference Call and Webcast Presentation
Claude Resources Inc.
 
Marketplace Networks and Exchanges
Marketplace Networks and ExchangesMarketplace Networks and Exchanges
Marketplace Networks and Exchanges
Dung Tri
 
Potential Gross Income (PGI) EstimatorPlease Only Change ite.docx
Potential Gross Income (PGI) EstimatorPlease Only Change ite.docxPotential Gross Income (PGI) EstimatorPlease Only Change ite.docx
Potential Gross Income (PGI) EstimatorPlease Only Change ite.docx
ChantellPantoja184
 
Ameri Veri Cr Projected Savings Chart V101612
Ameri Veri Cr Projected Savings Chart V101612Ameri Veri Cr Projected Savings Chart V101612
Ameri Veri Cr Projected Savings Chart V101612
Julian Pace, MHA
 

Ähnlich wie C6 further refine_alts_council_4-18_rev1 (20)

Car Net Business Plan
Car Net Business PlanCar Net Business Plan
Car Net Business Plan
 
2010 HAR REALTOR® Expo- Ted Jones, PhD
2010 HAR REALTOR® Expo- Ted Jones, PhD2010 HAR REALTOR® Expo- Ted Jones, PhD
2010 HAR REALTOR® Expo- Ted Jones, PhD
 
Social Media Marketing Budget Template
Social Media Marketing Budget TemplateSocial Media Marketing Budget Template
Social Media Marketing Budget Template
 
"INTRODUCCION DE NUEVAS ESPECIES PARA LA PRODUCCION DE FLORES A CAMPO ABIERTO"
"INTRODUCCION DE NUEVAS ESPECIES PARA LA PRODUCCION DE FLORES A CAMPO ABIERTO""INTRODUCCION DE NUEVAS ESPECIES PARA LA PRODUCCION DE FLORES A CAMPO ABIERTO"
"INTRODUCCION DE NUEVAS ESPECIES PARA LA PRODUCCION DE FLORES A CAMPO ABIERTO"
 
Public Relations Budget Template
Public Relations Budget Template Public Relations Budget Template
Public Relations Budget Template
 
Claude Resources Inc. PDAC 2013 Presentation
Claude Resources Inc. PDAC 2013 PresentationClaude Resources Inc. PDAC 2013 Presentation
Claude Resources Inc. PDAC 2013 Presentation
 
Aslo 2012
Aslo 2012Aslo 2012
Aslo 2012
 
Q3 2012 Conference Call and Webcast Presentation
Q3  2012 Conference Call and Webcast PresentationQ3  2012 Conference Call and Webcast Presentation
Q3 2012 Conference Call and Webcast Presentation
 
Calc pao.meza
Calc pao.mezaCalc pao.meza
Calc pao.meza
 
Calc pao.meza
Calc pao.mezaCalc pao.meza
Calc pao.meza
 
Regional demographic charts for fbidc website 2012
Regional demographic charts for fbidc website 2012Regional demographic charts for fbidc website 2012
Regional demographic charts for fbidc website 2012
 
Predicting the Housing Market with Buyer & Seller Psychology (Predictive Anal...
Predicting the Housing Market with Buyer & Seller Psychology (Predictive Anal...Predicting the Housing Market with Buyer & Seller Psychology (Predictive Anal...
Predicting the Housing Market with Buyer & Seller Psychology (Predictive Anal...
 
Claude Resources Inc. Q4 2012 Conference Call and Webcast Presentation
Claude Resources Inc. Q4 2012 Conference Call and Webcast PresentationClaude Resources Inc. Q4 2012 Conference Call and Webcast Presentation
Claude Resources Inc. Q4 2012 Conference Call and Webcast Presentation
 
15. flujo de caja
15. flujo de caja15. flujo de caja
15. flujo de caja
 
Marketplace Networks and Exchanges
Marketplace Networks and ExchangesMarketplace Networks and Exchanges
Marketplace Networks and Exchanges
 
Public Service Loan Forgiveness November 2011
Public Service Loan Forgiveness November 2011Public Service Loan Forgiveness November 2011
Public Service Loan Forgiveness November 2011
 
Potential Gross Income (PGI) EstimatorPlease Only Change ite.docx
Potential Gross Income (PGI) EstimatorPlease Only Change ite.docxPotential Gross Income (PGI) EstimatorPlease Only Change ite.docx
Potential Gross Income (PGI) EstimatorPlease Only Change ite.docx
 
GDC13 crowdfunding numbers and trends
GDC13 crowdfunding numbers and trendsGDC13 crowdfunding numbers and trends
GDC13 crowdfunding numbers and trends
 
Ameri Veri Cr Projected Savings Chart V101612
Ameri Veri Cr Projected Savings Chart V101612Ameri Veri Cr Projected Savings Chart V101612
Ameri Veri Cr Projected Savings Chart V101612
 
2012 National Governors Association Growing State Economies Summit
2012 National Governors Association Growing State Economies Summit2012 National Governors Association Growing State Economies Summit
2012 National Governors Association Growing State Economies Summit
 

Mehr von publicinvolvement

2015 04-07 city-council_workshop_presentation
2015 04-07 city-council_workshop_presentation2015 04-07 city-council_workshop_presentation
2015 04-07 city-council_workshop_presentation
publicinvolvement
 
130306 city council workshop revised
130306 city council workshop revised130306 city council workshop revised
130306 city council workshop revised
publicinvolvement
 

Mehr von publicinvolvement (18)

Guaranteed Maximum Price Amendment #13
Guaranteed Maximum Price Amendment #13Guaranteed Maximum Price Amendment #13
Guaranteed Maximum Price Amendment #13
 
Presentation of Windjammer Park 60% Design to City Council
Presentation of Windjammer Park 60% Design to City CouncilPresentation of Windjammer Park 60% Design to City Council
Presentation of Windjammer Park 60% Design to City Council
 
Preview of Windjammer Park 30% Design to City Council
Preview of Windjammer Park 30% Design to City CouncilPreview of Windjammer Park 30% Design to City Council
Preview of Windjammer Park 30% Design to City Council
 
Windjammer Park Phase 1 Design Open House
Windjammer Park Phase 1 Design Open HouseWindjammer Park Phase 1 Design Open House
Windjammer Park Phase 1 Design Open House
 
Oak Harbor City Council Meeting: GMP 9
Oak Harbor City Council Meeting: GMP 9Oak Harbor City Council Meeting: GMP 9
Oak Harbor City Council Meeting: GMP 9
 
Presentation of Windjammer Park Integration Plan to City Council
Presentation of Windjammer Park Integration Plan to City CouncilPresentation of Windjammer Park Integration Plan to City Council
Presentation of Windjammer Park Integration Plan to City Council
 
Windjammer Park Integration Plan Community Advisory Group meeting 5
Windjammer Park Integration Plan Community Advisory Group meeting 5Windjammer Park Integration Plan Community Advisory Group meeting 5
Windjammer Park Integration Plan Community Advisory Group meeting 5
 
Community Advisory Group meeting 5
Community Advisory Group meeting 5Community Advisory Group meeting 5
Community Advisory Group meeting 5
 
Oak Harbor City Council Workshop: Design Update
Oak Harbor City Council Workshop: Design UpdateOak Harbor City Council Workshop: Design Update
Oak Harbor City Council Workshop: Design Update
 
Oak Harbor Clean Water Facility GMP #7
Oak Harbor Clean Water Facility GMP #7Oak Harbor Clean Water Facility GMP #7
Oak Harbor Clean Water Facility GMP #7
 
Oak Harbor Windjammer Park Integration Plan
Oak Harbor Windjammer Park Integration Plan Oak Harbor Windjammer Park Integration Plan
Oak Harbor Windjammer Park Integration Plan
 
Oak Harbor Community Advisory Group meeing 2 and public open house
Oak Harbor Community Advisory Group meeing 2 and public open houseOak Harbor Community Advisory Group meeing 2 and public open house
Oak Harbor Community Advisory Group meeing 2 and public open house
 
Windjammer Park Integration Plan CAG meeting 1
Windjammer Park Integration Plan CAG meeting 1Windjammer Park Integration Plan CAG meeting 1
Windjammer Park Integration Plan CAG meeting 1
 
60% Design and Cost Estimate
60% Design and Cost Estimate60% Design and Cost Estimate
60% Design and Cost Estimate
 
Clean Water Facility 60% Cost Estimate Preview
Clean Water Facility 60% Cost Estimate PreviewClean Water Facility 60% Cost Estimate Preview
Clean Water Facility 60% Cost Estimate Preview
 
150604 Oak Harbor Wastewater Treatment Plant Update
150604 Oak Harbor Wastewater Treatment Plant Update150604 Oak Harbor Wastewater Treatment Plant Update
150604 Oak Harbor Wastewater Treatment Plant Update
 
2015 04-07 city-council_workshop_presentation
2015 04-07 city-council_workshop_presentation2015 04-07 city-council_workshop_presentation
2015 04-07 city-council_workshop_presentation
 
130306 city council workshop revised
130306 city council workshop revised130306 city council workshop revised
130306 city council workshop revised
 

Kürzlich hochgeladen

Call Girls In Goa 9316020077 Goa Call Girl By Indian Call Girls Goa
Call Girls In Goa  9316020077 Goa  Call Girl By Indian Call Girls GoaCall Girls In Goa  9316020077 Goa  Call Girl By Indian Call Girls Goa
Call Girls In Goa 9316020077 Goa Call Girl By Indian Call Girls Goa
sexy call girls service in goa
 
Low Rate Young Call Girls in Surajpur Greater Noida ✔️☆9289244007✔️☆ Female E...
Low Rate Young Call Girls in Surajpur Greater Noida ✔️☆9289244007✔️☆ Female E...Low Rate Young Call Girls in Surajpur Greater Noida ✔️☆9289244007✔️☆ Female E...
Low Rate Young Call Girls in Surajpur Greater Noida ✔️☆9289244007✔️☆ Female E...
SofiyaSharma5
 
Beautiful 😋 Call girls in Lahore 03210033448
Beautiful 😋 Call girls in Lahore 03210033448Beautiful 😋 Call girls in Lahore 03210033448
Beautiful 😋 Call girls in Lahore 03210033448
ont65320
 
Karnal Call Girls 8860008073 Dyal Singh Colony Call Girls Service in Karnal E...
Karnal Call Girls 8860008073 Dyal Singh Colony Call Girls Service in Karnal E...Karnal Call Girls 8860008073 Dyal Singh Colony Call Girls Service in Karnal E...
Karnal Call Girls 8860008073 Dyal Singh Colony Call Girls Service in Karnal E...
Apsara Of India
 
Desi Bhabhi Call Girls In Goa 💃 730 02 72 001💃desi Bhabhi Escort Goa
Desi Bhabhi Call Girls  In Goa  💃 730 02 72 001💃desi Bhabhi Escort GoaDesi Bhabhi Call Girls  In Goa  💃 730 02 72 001💃desi Bhabhi Escort Goa
Desi Bhabhi Call Girls In Goa 💃 730 02 72 001💃desi Bhabhi Escort Goa
russian goa call girl and escorts service
 
Nayabad Call Girls ✔ 8005736733 ✔ Hot Model With Sexy Bhabi Ready For Sex At ...
Nayabad Call Girls ✔ 8005736733 ✔ Hot Model With Sexy Bhabi Ready For Sex At ...Nayabad Call Girls ✔ 8005736733 ✔ Hot Model With Sexy Bhabi Ready For Sex At ...
Nayabad Call Girls ✔ 8005736733 ✔ Hot Model With Sexy Bhabi Ready For Sex At ...
aamir
 
Russian Escorts Agency In Goa 💚 9316020077 💚 Russian Call Girl Goa
Russian Escorts Agency In Goa  💚 9316020077 💚 Russian Call Girl GoaRussian Escorts Agency In Goa  💚 9316020077 💚 Russian Call Girl Goa
Russian Escorts Agency In Goa 💚 9316020077 💚 Russian Call Girl Goa
sexy call girls service in goa
 
Call Girls Chirag Delhi Delhi WhatsApp Number 9711199171
Call Girls Chirag Delhi Delhi WhatsApp Number 9711199171Call Girls Chirag Delhi Delhi WhatsApp Number 9711199171
Call Girls Chirag Delhi Delhi WhatsApp Number 9711199171
Delhi Call Girls 📞9899900591 ✔️ High Profile Service 100% Safe
 

Kürzlich hochgeladen (20)

Independent Joka Escorts ✔ 8250192130 ✔ Full Night With Room Online Booking 2...
Independent Joka Escorts ✔ 8250192130 ✔ Full Night With Room Online Booking 2...Independent Joka Escorts ✔ 8250192130 ✔ Full Night With Room Online Booking 2...
Independent Joka Escorts ✔ 8250192130 ✔ Full Night With Room Online Booking 2...
 
Top Rated Pune Call Girls Pimpri Chinchwad ⟟ 6297143586 ⟟ Call Me For Genuin...
Top Rated  Pune Call Girls Pimpri Chinchwad ⟟ 6297143586 ⟟ Call Me For Genuin...Top Rated  Pune Call Girls Pimpri Chinchwad ⟟ 6297143586 ⟟ Call Me For Genuin...
Top Rated Pune Call Girls Pimpri Chinchwad ⟟ 6297143586 ⟟ Call Me For Genuin...
 
Call Girls In Goa 9316020077 Goa Call Girl By Indian Call Girls Goa
Call Girls In Goa  9316020077 Goa  Call Girl By Indian Call Girls GoaCall Girls In Goa  9316020077 Goa  Call Girl By Indian Call Girls Goa
Call Girls In Goa 9316020077 Goa Call Girl By Indian Call Girls Goa
 
Low Rate Young Call Girls in Surajpur Greater Noida ✔️☆9289244007✔️☆ Female E...
Low Rate Young Call Girls in Surajpur Greater Noida ✔️☆9289244007✔️☆ Female E...Low Rate Young Call Girls in Surajpur Greater Noida ✔️☆9289244007✔️☆ Female E...
Low Rate Young Call Girls in Surajpur Greater Noida ✔️☆9289244007✔️☆ Female E...
 
Beautiful 😋 Call girls in Lahore 03210033448
Beautiful 😋 Call girls in Lahore 03210033448Beautiful 😋 Call girls in Lahore 03210033448
Beautiful 😋 Call girls in Lahore 03210033448
 
Karnal Call Girls 8860008073 Dyal Singh Colony Call Girls Service in Karnal E...
Karnal Call Girls 8860008073 Dyal Singh Colony Call Girls Service in Karnal E...Karnal Call Girls 8860008073 Dyal Singh Colony Call Girls Service in Karnal E...
Karnal Call Girls 8860008073 Dyal Singh Colony Call Girls Service in Karnal E...
 
Top Rated Kolkata Call Girls Khardah ⟟ 6297143586 ⟟ Call Me For Genuine Sex S...
Top Rated Kolkata Call Girls Khardah ⟟ 6297143586 ⟟ Call Me For Genuine Sex S...Top Rated Kolkata Call Girls Khardah ⟟ 6297143586 ⟟ Call Me For Genuine Sex S...
Top Rated Kolkata Call Girls Khardah ⟟ 6297143586 ⟟ Call Me For Genuine Sex S...
 
College Call Girls New Alipore - For 7001035870 Cheap & Best with original Ph...
College Call Girls New Alipore - For 7001035870 Cheap & Best with original Ph...College Call Girls New Alipore - For 7001035870 Cheap & Best with original Ph...
College Call Girls New Alipore - For 7001035870 Cheap & Best with original Ph...
 
Desi Bhabhi Call Girls In Goa 💃 730 02 72 001💃desi Bhabhi Escort Goa
Desi Bhabhi Call Girls  In Goa  💃 730 02 72 001💃desi Bhabhi Escort GoaDesi Bhabhi Call Girls  In Goa  💃 730 02 72 001💃desi Bhabhi Escort Goa
Desi Bhabhi Call Girls In Goa 💃 730 02 72 001💃desi Bhabhi Escort Goa
 
5* Hotels Call Girls In Goa {{07028418221}} Call Girls In North Goa Escort Se...
5* Hotels Call Girls In Goa {{07028418221}} Call Girls In North Goa Escort Se...5* Hotels Call Girls In Goa {{07028418221}} Call Girls In North Goa Escort Se...
5* Hotels Call Girls In Goa {{07028418221}} Call Girls In North Goa Escort Se...
 
Nayabad Call Girls ✔ 8005736733 ✔ Hot Model With Sexy Bhabi Ready For Sex At ...
Nayabad Call Girls ✔ 8005736733 ✔ Hot Model With Sexy Bhabi Ready For Sex At ...Nayabad Call Girls ✔ 8005736733 ✔ Hot Model With Sexy Bhabi Ready For Sex At ...
Nayabad Call Girls ✔ 8005736733 ✔ Hot Model With Sexy Bhabi Ready For Sex At ...
 
↑Top Model (Kolkata) Call Girls Behala ⟟ 8250192130 ⟟ High Class Call Girl In...
↑Top Model (Kolkata) Call Girls Behala ⟟ 8250192130 ⟟ High Class Call Girl In...↑Top Model (Kolkata) Call Girls Behala ⟟ 8250192130 ⟟ High Class Call Girl In...
↑Top Model (Kolkata) Call Girls Behala ⟟ 8250192130 ⟟ High Class Call Girl In...
 
2k Shot Call girls Laxmi Nagar Delhi 9205541914
2k Shot Call girls Laxmi Nagar Delhi 92055419142k Shot Call girls Laxmi Nagar Delhi 9205541914
2k Shot Call girls Laxmi Nagar Delhi 9205541914
 
VIP Call Girls Nagpur Megha Call 7001035870 Meet With Nagpur Escorts
VIP Call Girls Nagpur Megha Call 7001035870 Meet With Nagpur EscortsVIP Call Girls Nagpur Megha Call 7001035870 Meet With Nagpur Escorts
VIP Call Girls Nagpur Megha Call 7001035870 Meet With Nagpur Escorts
 
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur EscortsCall Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
 
Call Girl Nashik Saloni 7001305949 Independent Escort Service Nashik
Call Girl Nashik Saloni 7001305949 Independent Escort Service NashikCall Girl Nashik Saloni 7001305949 Independent Escort Service Nashik
Call Girl Nashik Saloni 7001305949 Independent Escort Service Nashik
 
Behala ( Call Girls ) Kolkata ✔ 6297143586 ✔ Hot Model With Sexy Bhabi Ready ...
Behala ( Call Girls ) Kolkata ✔ 6297143586 ✔ Hot Model With Sexy Bhabi Ready ...Behala ( Call Girls ) Kolkata ✔ 6297143586 ✔ Hot Model With Sexy Bhabi Ready ...
Behala ( Call Girls ) Kolkata ✔ 6297143586 ✔ Hot Model With Sexy Bhabi Ready ...
 
Russian Escorts Agency In Goa 💚 9316020077 💚 Russian Call Girl Goa
Russian Escorts Agency In Goa  💚 9316020077 💚 Russian Call Girl GoaRussian Escorts Agency In Goa  💚 9316020077 💚 Russian Call Girl Goa
Russian Escorts Agency In Goa 💚 9316020077 💚 Russian Call Girl Goa
 
Call Girls Chirag Delhi Delhi WhatsApp Number 9711199171
Call Girls Chirag Delhi Delhi WhatsApp Number 9711199171Call Girls Chirag Delhi Delhi WhatsApp Number 9711199171
Call Girls Chirag Delhi Delhi WhatsApp Number 9711199171
 
👙 Kolkata Call Girls Park Circus 💫💫7001035870 Model escorts Service
👙  Kolkata Call Girls Park Circus 💫💫7001035870 Model escorts Service👙  Kolkata Call Girls Park Circus 💫💫7001035870 Model escorts Service
👙 Kolkata Call Girls Park Circus 💫💫7001035870 Model escorts Service
 

C6 further refine_alts_council_4-18_rev1

  • 1. Oak Harbor Facilities Plan City Council Meeting April 17, 2012 Oh910i1-8594.pptx/1
  • 2. Tonight’s Agenda • Schedule • Overview of 6th Site (Crescent Harbor North) • Public Comments Summary • Overview of 2010 Rate Study • Briefly Summarize Workshop Presentation • Questions? Oh910i1-8594.pptx/2
  • 4. Schedule - Council Actions & Deadlines • April 18 - Action on Resolution • August 14 - Resolution on final, preferred site • October 16 - Resolution on phasing plan • December 18 - Resolution on facility plan for submittal to Department of Ecology • December 31, 2012 - Required facility plan submittal deadline • December 31, 2014 - Required engineering design plan submittal deadline Oh910i1-8594.pptx/4
  • 5. Overview of 6th Site Oh910i1-8594.pptx/5
  • 6. Six Sites Included in Resolution 12-05 Oh910i1-8594.pptx/6
  • 7. Crescent Harbor North Site Map Oh910i1-8594.pptx/7
  • 8. Summary of Public Comment Oh910i1-8594.pptx/8
  • 9. Public Input from April 11, 2012 • Continue public involvement throughout process • 4 written comments received – 2 in favor of Crescent Harbor North – 2 in favor of Windjammer • Unwritten feedback: – Site-specific conditions at Crescent Harbor North must be addressed • Drainage, wet lowland areas • Aesthetics/screening are important • Be consistent with rural land use – Maintain affordability of sewer rates – Take a long-term view for the project Oh910i1-8594.pptx/9
  • 10. Overview of 2010 Rate Study Oh910i1-8594.pptx/10
  • 11. 2010 Wastewater Rate Study • Cost of Service Analysis – Differing costs for different customer classes • Accounted for Capital projects listed in 20 year Comprehensive plan • Includes an assumed $70 million capital expense for wastewater plant – Now listed in CIP but was not listed during development of rate study • Council adopted recommendations for progressive rate increases in water, sewer and storm drainage (Ord 1587) Oh910i1-8594.pptx/11
  • 12. 2010 Wastewater Rate Study- Assumptions • 6% Interest rate on standard revenue bond • Standard 20 year payback period on bond • No adjustment to connection/capacity charges • Assumes full $70million expenditure between 2016 and 2017 for plant construction • Assumes no contribution from outside sources or funding partners (US Navy, grants etc) Oh910i1-8594.pptx/12
  • 13. 2010 Wastewater Rate Study Average Single-Family Monthly Bill - Projected Rate Increases Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 $70 Million $40.00 $42.00 $47.00 $52.00 $57.50 $64.75 $72.85 $81.95 $92.20 $100.00 $90.00 $80.00 $70.00 $60.00 $50.00 $70 Million $40.00 $30.00 $20.00 $10.00 $0.00 Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Oh910i1-8594.pptx/13
  • 14. 2010 Wastewater Rate Study Average Single-Family Monthly Bill - Projected Rate Increases Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 $70 Million $40.00 $42.00 $47.00 $52.00 $57.50 $64.75 $72.85 $81.95 $92.20 $90 Million $40.00 $42.00 $47.00 $52.65 $60.55 $69.65 $80.10 $96.10 $115.30 $95 Million $40.00 $42.00 $47.00 $52.65 $60.55 $71.15 $83.60 $100.30 $120.35 $140.00 $120.00 $100.00 $70 Million $80.00 $90 Million $60.00 $95 Million $40.00 $20.00 $0.00 Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Oh910i1-8594.pptx/14
  • 15. 2010 Wastewater Rate Study Average Single-Family Monthly Bill - Projected Rate Increases Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 $40 Million $40.00 $42.00 $44.10 $47.65 $51.45 $55.55 $61.10 $67.20 $73.90 $50 Million $40.00 $42.00 $45.15 $49.20 $53.65 $59.00 $64.90 $71.40 $78.55 $60 Million $40.00 $42.00 $45.55 $50.35 $55.65 $61.50 $67.95 $75.10 $83.00 $70 Million $40.00 $42.00 $47.00 $52.00 $57.50 $64.75 $72.85 $81.95 $92.20 $80 Million $40.00 $42.00 $47.00 $52.00 $58.50 $67.25 $77.35 $88.95 $102.30 $90 Million $40.00 $42.00 $47.00 $52.65 $60.55 $69.65 $80.10 $96.10 $115.30 $95 Million $40.00 $42.00 $47.00 $52.65 $60.55 $71.15 $83.60 $100.30 $120.35 $100 Million $40.00 $42.00 $47.00 $54.05 $62.15 $73.05 $85.85 $103.00 $123.60 $140.00 $120.00 $100.00 $40 Million $50 Million $80.00 $60 Million $70 Million $60.00 $80 Million $90 Million $95 Million $40.00 $100 Million $20.00 $0.00 Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Oh910i1-8594.pptx/15
  • 16. April 11 Workshop Summary Oh910i1-8594.pptx/16
  • 17. Alternatives Presented on April 11, 2012 Site Process Discharge Crescent Harbor North MBR (1) Oak Harbor Crescent Harbor MBR (1) Oak Harbor Windjammer MBR Oak Harbor Old City Shops MBR Oak Harbor Beachview Farm MBR (1) Oak Harbor Marina/Seaplane Base MBR Oak Harbor (1) Activated Sludge (AS) possible to reduce cost of initial phase. Oh910i1-8594.pptx/17
  • 18. Full TBL+ Summary of Sites/Alternatives Project Through Year 2030 MBR at all Site E3 E2 No. of TBL+ Objectives Met E1 E2 S3 E1 E2 E2 E2 S2 S3 E1 E1 E1 S1 S2 S3 S1 S2 E2 F3 S1 S2 F3 S1 E1 F2 F3 S1 F2 F2 S3 E2 F1 F2 F3 F1 F1 S2 E1 T3 F1 F2 T3 T3 S1 S1 T2 T2 F1 T2 T2 F3 F3 T1 T1 T1 T1 T1 T1 T1 Ideal  Crescent  Crescent  Windjammer Old City  Beachview  Marina /  Alternative Harbor North Harbor Shops Farm Seaplane  Base Oh910i1-8594.pptx/18
  • 19. Project Cost Summary for Year 2030 MBR Process at All Sites $100 $90 $80 $70 Project Cost, Millions $60 Effluent Pipeline In water work $50 Sewage Conveyance - $40 Ultimate Sewage Conveyance - $30 Initial WWTP - Site $20 WWTP - Solids $10 WWTP - Liquids $0 Windjammer Old City Crescent Crescent Marina / Sea Beachview Shops Harbor Harbor Plane Farm North Oh910i1-8594.pptx/19
  • 20. Projects are “phased-in” over time in several ways… • Phase-in WWTP capacity – Design for lower flows/loads now; expand to meet higher flows/loads in the future • Phase-in WWTP components – Build new liquid stream now; defer solids treatment (i.e. continue to use existing Seaplane Base Lagoon) • Phase-in WWTP “performance” – Design for less restrictive permit limits now; expand to meet more restrictive limits in the future • Phase-in wastewater conveyance – “Just-in-time” installation/expansion of pipes/pumps for wastewater Oh910i1-8594.pptx/20
  • 21. Project Cost Summary Potential Phase 1 and Year 2030 $100 Ultimate Phase 1 $95 $90 $85 $80 $75 $70 $65 $60 Windjammer Beachview Crescent Crescent Old City Shops Marina/Sea (MBR) Farm (AS) Harbor N. (AS) Harbor (AS) (MBR) Plan (MBR) Oh910i1-8594.pptx/21
  • 22. Recommended Alternatives 1. Consider two sites for further evaluation: – Windjammer Park – Crescent Harbor North 2. Develop final alternatives around membrane bioreactor (MBR) process – Consider AS at Crescent Harbor North 3. Discharge treated effluent through new outfall into Oak Harbor Bay – Evaluate opportunities for beneficial reuse Oh910i1-8594.pptx/22
  • 23. Final Thoughts Our recommendation is based on the following key points: • Windjammer MBR – Best opportunity to complete an initial phase below $70M target while controlling long-term cost – Highest quality treated water for current and future environmental protection – Required to justify decision to use more expensive alternative • Crescent Harbor North AS – Meets defined “Social” objectives for the Project – Very close to the lowest Phase 1 / Ultimate cost – Defined site acquisition and permitting process Oh910i1-8594.pptx/23
  • 24. Next Steps Following Council Direction • Develop information to directly compare and differentiate sites – “Master Plan” concepts at each location: • Where on the site could the facility go? • How would/could adjacent property fit in? – Added detail for the community: • What might the facility look like? • What kind of neighbor would this facility be? – Updated cost information: • Finalize estimated costs for “engineering” elements • Fine-tune “site-specific” costs – Compare Phase 1, long-term rate impacts Oh910i1-8594.pptx/24