SlideShare ist ein Scribd-Unternehmen logo
1 von 36
Downloaden Sie, um offline zu lesen
Vancouver Resource
Investment Conference 2015
January 18-19, 2015
TSX P I NYSE PPP I 2
This presentation may contain “forward-looking” statements within the meaning of Canadian securities legislation and the United States
Private Securities Litigation Reform Act of 1995. Forward-looking statements relate to future events or the anticipated performance of the
Company and reflect management’s expectations or beliefs regarding such future events and anticipated performance. In certain cases,
forward-looking statements can be identified by the use of words such as “plans”, “expects”, “is expected”, “budget”, “scheduled”,
”estimates”, ”forecasts”, ”intends”, ”anticipates” or “believes”, or variations of such words and phrases or statements that certain actions,
events or results “may”, ”could”, “would”, ”might”, or “will be taken”, “occur” or “be achieved”, or the negative of these words or
comparable terminology. By their very nature forward-looking statements involve known and unknown risks, uncertainties and other
factors which may cause the actual performance of the Company to be materially different from any anticipated performance expressed or
implied by the forward-looking statements. Such factors include various risks related to the Company’s operations, including, without
limitation, fluctuations in spot and forward markets for gold, silver and other metals, fluctuations in currency markets, changes in national
and local governments in Mexico and the speculative nature of mineral exploration and development, risks associated with obtaining
necessary exploitation and environmental licenses and permits, and the presence of laws that may impose restrictions on mining. A
complete list of risk factors are described in the Company’s annual information form and will be detailed from time to time in the
Company’s continuous disclosure, all of which are, or will be available, for review on SEDAR at www.sedar.com.
This presentation uses the terms “measured resources”, “indicated resources” and “inferred resources”. The Company advises readers
that although these terms are recognized and required by Canadian regulations (under National Instrument 43-101 Standards of
Disclosure for Mineral Projects (“NI 43-101”), the United States Securities and Exchange Commission does not recognize them. Readers
are cautioned not to assume that any part or all of the mineral deposits in these categories will ever be converted in to reserves. In
addition, “inferred resources” have a great amount of uncertainty as to their existence, and economic and legal feasibility. It cannot be
assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules, estimates of
inferred mineral resources may not form the basis of feasibility or pre-feasibility studies, or economic studies, except for a Preliminary
Assessment as defined under NI43-101. Investors are cautioned not to assume that part or all of an inferred resource exists, or is
economically or legally mineable.
Although the Company has attempted to identify important factors that could cause actual performance to differ materially from that
described in forward-looking statements, there may be other factors that cause its performance not to be as anticipated. The Company
neither intends nor assumes any obligation to update these forward-looking statements or information to reflect changes in assumptions
or circumstances other than required by applicable law. There can be no assurance that forward-looking statements will prove to be
accurate, as actual results and future events could differ materially from those currently anticipated. Accordingly, readers should not
place undue reliance on forward-looking statements.
Unless otherwise indicated, all dollar values herein are in US$.
Cautionary Statement
TSX P I NYSE PPP I 3
Investment Highlights
Producing in America’s Top Mining Jurisdictions
Experienced Board and Management
Strong Financial Position
Established Growth Profile from Assets in Production
Track Record of Delivering on Stakeholder Commitments
GROWTHIN 3 YEARS2
145%
DEBT/TOTAL CAP.3
11%
220koz–240koz
CANADA & MEXICO1
+200years
INDUSTRY EXPERIENCE
38%
3 YR RETURN
TSX P I NYSE PPP I 4
Corporate Office
(Toronto)
Producing in America’s Top Mining Jurisdictions
#5* Mexico
Producing Mine
Development Project
Exploration Property
71%
29%
Mexico Canada
75%
25%
Production & Reserves by Region
2014E Production1 Gold Reserves
* Based on 2014 Behre Dolbear Report “2014 Ranking of Countries for Mining Investment”.
#1* Canada
o Operating in two of the most attractive
mining jurisdictions* globally with:
 Long mining history
 Government stability
 Established permitting process
o Located in areas with:
 Existing infrastructure
 Skilled local workforce
 Suppliers
 Community support
Black Fox Mine
Grey Fox Property
San Dimas Mine
Cerro Del Gallo Project
Ventanas Property
LOW RISK PROFILE
TSX P I NYSE PPP I 5
505
660
1,582
2,120
300
500
700
900
1,100
1,300
1,500
1,700
1,900
2,100
2,300
2011 2012 2013 2014*
102
111
143
230
80
100
120
140
160
180
200
220
240
2011 2012 2013 2014E
125%
GROWTH
320%
GROWTH
Established Growth Profile
Production1
(AuEq koz) Gold Reserves (koz) Gold M&I Resources (koz)
577
780
1,932
3,143
300
800
1,300
1,800
2,300
2,800
3,300
2011 2012 2013 2014
445%
GROWTH
• As at September 2014
• See slides 27, 28, 29 & 30
• As at September 2014
• See slides 27, 28, 29 & 30
HISTORIC GROWTH
TSX P I NYSE PPP I 6
Established Growth Profile
111
143
160 165
190
70
90
100
50
2012 2013 2014E 2015E 2016E
Cerro del Gallo
Black Fox
San Dimas
340-360
220-240
250-270
Targeted Production Growth Profile (AuEq koz)
1,4
2
2014 Revised Guidance Black Fox San Dimas Total
Production1
(AuEq koz)
65-75 155-165 220-240
Cash cost5
($ per AuEq oz)
$850-
$900
$600-
$650
$675-
$725
Capital Expenditures
($ millions)
$36.0 $38.3 $85.3*
Exploration
($ millions)
$18.5 $15.7 $36.2*
* Includes Cerro del Gallo. See final slide for footnotes.
o Organic growth from assets in production
o Disciplined approach to cost management
o Focused on productivity improvements
o Committed to exploration and development
FUTURE GROWTH
TSX P I NYSE PPP I
Experienced Board and Management
7
Joseph Conway | President & CEO
30 Years of Experience
► Appointed CEO in June 2010
► Former CEO, President and Director of
IAMGOLD and Repadre Capital
Wendy Kaufman | CFO
20 Years of Experience
► Appointed CFO in September 2014
► Former VP, Finance and Treasury of
Inmet Mining Corp.
Wade Nesmith | Chairman
► Founder of Primero
► Founding and current director of Silver
Wheaton
200+ Years of
Combined Industry
Experience
Entrepreneurs
BOARD OF DIRECTORS
MANAGEMENT
David Demers | Director 2,3,4,5
► Founder, CEO and Director Westport
Innovations
► Director of Cummins Westport and
Juniper Engines
Grant Edey | Director 3,5
► President & CEO, Khan Resources
► Former Director of Breakwater Resources,
Queenstake Resources, Santa Cruz Gold,
CFO, IAMGOLD
Rohan Hazelton | Director 1
► VP, Strategy, Goldcorp
► Formerly with Wheaton River and
Deloitte & Touche LLP
Proven Track Record of
Asset Turnaround
Capital Markets
Expertise
Disciplined Approach to
Business Development
Eduardo Luna | Director 1
► Former Chairman and CEO of Silver
Wheaton, Executive VP of Goldcorp and
Luismin (San Dimas)
► Former President of Mexican Mining
Chamber
Brad Marchant | Director 1
► Co-founder of Triton Mining Corporation
► Founder of BioteQ Environmental
Technologies Inc.
Robert Quartermain | Director 2,3
► Founder and President & CEO, Pretium
Resources
► Former President of Silver Standard
Resources
Michael Riley | Director 2,5
► Chartered accountant with more than 26
years of accounting experience
► Chair of Primero Audit Committee
TSX P I NYSE PPP I 8
$67MSTRONG Liquidity
Financial Position
Source: 2014E-2016E Operating Cash Flow – Capital IQ consensus CFPS multiplied by
current 160 million shares outstanding.
$78M3
PRUDENT Debt Level
September 30, 2014
Consensus Estimated Operating Cash Flow ($ millions)
Exchanges
TSX:P
NYSE:PPP
Balance Sheet (September 30, 2014)
Cash
Line of Credit6
Total Liquidity
Convertible Debenture
(6.5%, due March 2016, $14 conversion)
Line of Credit Draw Down6
(Due May 2017)
Total Debt3
$22 million
$45 million
~$67 million
$48 million
$30 million
$78 million
Capital Structure
Common Shares Outstanding 7
Fully Diluted 8
Market Cap. At Dec 31, 2014
160 million
190 million
C$715 million
$72 $79
$115
$155
$0
$50
$100
$150
$200
2013 2014E 2015E 2016E
TSX P I NYSE PPP I 9
Track Record of Delivering on Stakeholder Commitments
Peer Shareholder Returns*
-100%
-80%
-60%
-40%
-20%
0%
20%
40%
60%
P AGI AR AUQ BTO NGD Index
3-Year
2-Year
1-Year
3Year
2Year
1Year
1.9
1.5
1.1
0
0.5
1
1.5
2
2011 2012 2013
Primero All Injury Frequency Rate
SHAREHOLDERS
Superior Value Creation
ENVIRONMENT
Certified “Clean Industry”
COMMUNITY
Awarded “Socially Responsible Company”
SAFETY
Lowering All Injury Frequency Rate
S&P/
TSX Gold
* Source: Thomson One
TSX P I NYSE PPP I 10
Growth Pipeline of Currently Producing Mines and Advanced Projects
PRODUCTION
San Dimas
Platform
OPTIMIZATION
Black Fox
EXPANSION
San Dimas
3,000 TPD
DEVELOPMENT
Cerro del
Gallo
OVERVIEW
ASSET
EXPLORATION
Grey Fox
TSX P I NYSE PPP I 11
SAN DIMAS
A Flagship Asset
o Expansion to 2,500 TPD completed Q1 2014
o On track to meet 2014 guidance
o Expansion to 3,000 TPD announced
o Trialing 7 day, 12-hour shifts to optimize mine
throughput
o Tunnels connecting Central Block to Graben will
increase efficiency and reduce costs
Location
Mine Type
Ownership
Durango, Mexico
Underground, Gold & Silver
100% (silver stream)
2
Proven & Probable Gold Reserves (koz)
(4.9M tonnes at 5.5 g/t)
870
Measured & Indicated Gold Resources (koz)
(Inclusive of Reserves) (4.3M tonnes at 7.2 g/t)
997
Inferred Gold Resources (koz)
(7.3M tonnes at 4.2 g/t)
998
2014E Production
1
(AuEq koz) 155-165
2014E Cash Costs
5
($/AuEq oz) $600-$650
540
560
580
600
620
640
660
680
700
-
50,000
100,000
150,000
200,000
2011 2012 2013 2014E
Production (AuEq oz)
Cash Costs ($/AuEq oz)
See final slide for footnotes.
San Dimas Annual Production
57%
GROWTH
TSX P I NYSE PPP I 12
-
500
1,000
1,500
2,000
2,500
3,000
3,500
Q3 2010 Q3 2012 Q3 2014 Q3 2016E
San Dimas Mill Throughput (TPD)
Construction Mill expansion to 3,000 TPD will begin Q1 2015 and is expected to be completed by Q2 2016
Capital Cost Currently estimated at $26.4 million, including a 30% contingency
After-tax IRR9 is expected to be 78% with a 12 month payback period10
Production An estimated increase by more than 30% over 2014 to approximately 215,000 gold
equivalent ounces
Cash Cost Expected to drop by ~$50 per ounce from current levels
SAN DIMAS
Expansion to 3,000 TPD
89%
GROWTH
See final slide for footnotes.
TSX P I NYSE PPP I 13
Proven History of Reserve & Resource Growth
SAN DIMAS
Significant Exploration Upside with Low Finding Costs
o 2014: $15.7 million, 80,000 metres of drilling
o Victoria vein Gold Reserves increased to 195,000 oz at 11.5 g/t
505
660
870
577
780
997
704
762
998
2011 2012 2013
P&P Reserves ( Au Koz)
M&I Resources (Au Koz)
Inferred Resources (Au Koz)
Low Finding Cost Per Ounce
247 311
$53.0
$34.7
2012 2013
P&P Reserves Discoverd (Koz Au)
P&P Discovery Cost(US$/oz Au)
(M&I Resources Include Mineral Reserves)
See slides 27, 28, 29 & 30
TSX P I NYSE PPP I 14
BLACK FOX
Established Jurisdiction with Proven Depth Potential
Over 200 Million Ounces of Historical Production
Note: Based on public data, average depth of listed mines is 1,633 metres.
TSX P I NYSE PPP I 15
Location
Mine Type
Ownership
Timmins, Ontario
Open-Pit & Underground, Gold
100% (8% gold stream)
11
Proven & Probable Gold Reserves (koz)
(3.8M tonnes at 4.3 g/t)
538
Measured & Indicated Gold Resources (koz)
(Inclusive of Reserves) (4.0M tonnes at 5.1 g/t)
653
Inferred Gold Resources (koz)
(0.7M tonnes at 7.6 g/t)
168
2014E Production (AuEq koz) 65-75
2014E Cash Costs
5
($/AuEq oz) $850-$900
-
200
400
600
800
1,000
1,200
1,400
1,600
-
5,000
10,000
15,000
20,000
25,000
30,000
Q1 2013 Q2 2013 Q3 2013 Q4 2013 Q1 2014 Q2 2014
Production (oz) Cash Costs ($/oz)
See final slide for footnotes.
Black Fox Quarterly Production
Primero Acquisition
o 2014 total budget of $53 million
o Positive exploration drilling results to date
o Short term focus on underground development,
definition and delineation drilling to increase
underground throughput
o Optimization plan in place to improve operational
processes and reduce costs
BLACK FOX
Turnaround Opportunity to Create Value
TSX P I NYSE PPP I 16
BLACK FOX
Focused on Reserve & Resource Development
Lateral & Depth Expansion
645-01-W
40.7 gpt/26.8m
Incl. 103.2gpt/8.3m
645-34-W
18.1 gpt/37.8m
Incl. 39.4gpt/10.3m
645-34-W
645-01-W
TSX P I NYSE PPP I 17
o 2014:
 $10.0 million program, 76,400 metres of
definition and delineation drilling
 45,000 metres of exploration drilled to date
 Complete Phase 3 metallurgical study
 Explore between Black Fox and Grey Fox
o Positive Exploration Results to date from
underground and open pit targets
Location
Ownership
4 km from Black Fox, Ontario
100% (no stream)
Measured & Indicated Gold Resources (koz)
(5.3M tonnes at 3.3 g/t)
558
Inferred Gold Resources (koz)
(1.6M tonnes at 4.4 g/t)
219
GREY FOX
Promising Exploration Project
Grey Fox Exploration Results
Grey Fox
TSX P I NYSE PPP I 18
Q1 2015
Reserve and Resource
Update
Including 226,000
metres of 2014 drilling
Q1 2015
Black Fox Complex Exploration
Update
Drilling from 500 metre level
exploration drift at depth
Q3 2014
San Dimas Operating at
2,500 TPD
Increases annual
production rate to
165,000AuEq oz
Q3 2014
San Dimas 3,000 TPD
Decision
Expansion decision
announced
Catalysts and News Flow
Q4 2015
Grey Fox Scoping
Study
Q4 2014
San Dimas
Exploration Update
Extended top
producing veins



TSX P I NYSE PPP I 19
Investment Highlights
Producing in America’s Top Mining Jurisdictions
Experienced Board and Management
Strong Financial Position
Established Growth Profile from Assets in Production
Track Record of Delivering on Stakeholder Commitments
GROWTHIN 3 YEARS2
145%
DEBT/TOTAL CAP.3
11%
220koz–240koz
CANADA & MEXICO1
+200years
INDUSTRY EXPERIENCE
38%
3 YR RETURN
APPENDICES
TSX P I NYSE PPP I 21
Third Quarter 2014 Combined Operating Results
*See final slide for footnotes.
Q3 2014 Q3 2013
Gold equivalent production
1
(gold equivalent ounces)
59,673 41,998
Gold production
(ounces)
51,464 31,791
Silver production
1
(million ounces)
1.41 1.62
All-in Sustaining Costs
5
($ per gold ounce)
$1,154 $974
Cash cost
5
($ per AuEq ounce)
$689 $516
Cash cost
5
– by-product
($ per gold ounce)
$596 $252 -
10,000
20,000
30,000
40,000
50,000
60,000
70,000
Q3 2013 Q3 2014
+42%
Production
(AuEq ounces)
TSX P I NYSE PPP I 22
Third Quarter 2014 Financial Results
(US$ thousands, except per share
amounts)
Q3 2014 Q3 2013
Revenues 75,503 53,793
Earnings from Mine Operations 6,184 22,960
Net income (loss) (105,904) 10,080
EPS
($ per share)
(0.66) 0.09
Adjusted net income
11
259 10,959
Adjusted EPS
11
($ per share)
0.00 0.09
Operating cash flows
12
before changes in working capital
21,704 20,926
CFPS
12
($ per share)
0.14 0.18 -
10
20
30
40
50
60
70
80
Q3 2013 Q3 2014
+40%
See final slide for footnotes.
Revenues
($millions)
TSX P I NYSE PPP I 23
Primero sells 50% of annual silver production
above 6.0 million ounces at spot
o Remainder sold at ~$4 per ounce under silver
purchase agreement
o Threshold commences August 6 to following
August 5
o Expansion anticipated to generate meaningful
silver spot sales post August 6, 2014
25%
75%
Silver Gold
SAN DIMAS
Silver Purchase Agreement
BLACK FOX
Gold Streaming Agreement
Primero sells 8% of annual gold production at
Black Fox at ~$509 per ounce
o Primero streams 6.3% from the Black Fox
Extension which includes the Pike River Property
o Gold is sold at $500 per ounce subject to
inflationary adjustment beginning in 2013, not to
exceed 2% per annum
o The Grey Fox exploration property is not subject to
any gold streaming agreements
Silver as Percentage of
2013E Revenue
See final slide for footnotes.
TSX P I NYSE PPP I 24
SAN DIMAS
District-Wide Exploration Potential
SW NE
3,000 m.
2,000 m.
1,000 m.
Source: San Dimas Geology Office
WEST BLOCK
2014 Exploration
SAN ANTONIO
Mined 1987-2002
CENTRAL BLOCK
Mined 2002-Current
TAYOLTITA BLOCK
Mined 1975-Current
ARANA
HANGING WALL
SINALOA
GRABEN
Mined 2012-Current
2014 EXPLORATION PROGRAM
Drilling for Extensions of Known Veins
Longitudinal Cross Section
3,000 m.
2,000 m.
1,000 m.
Mineralization – Ore Bodies
Extension of the
Favorable Horizon
Potential
Intrusive
Faults
LEGEND
Kilometers
0 1 2
TSX P I NYSE PPP I 25
Focus on Responsible Mining
HEALTH AND SAFETY
o We understand that our most important assets are
our people and their safety is our number one
priority
o We maintain world-class health and safety
policies
ENVIRONMENT
o San Dimas is certified as “Clean Industry” by
PROFEPA (Mexican EPA)
o We utilize sustainable green technologies where
possible - Primero’s own hydroelectric dam
supplies the majority of San Dimas Mine’s power
COMMUNITY
o We treat our local communities as our partners
o We focus on understanding our local communities
goals and providing local opportunities
o We promote local education with awards for the
local technical college in San Dimas
TSX P I NYSE PPP I
Stock Performance & Significant Events
26
0
10
20
30
-80%
-60%
-40%
-20%
0%
20%
40%
60%
80%
8/13/2010 2/13/2011 8/13/2011 2/13/2012 8/13/2012 2/13/2013 8/13/2013 2/13/2014 8/13/2014
Volume(Millions)
P-T Volume
Primero IPO,
Begins Trading
on the TSX, and
Finalizes San
Dimas
Acquisition
Primero
Announces
Brigus Gold
Acquisition
Primero Added
to S&P/TSX
Composite Index
Primero
Announces San
Dimas Expansion
Plan Phase 1
Primero
Begins
Trading on
the NYSE Primero Announces
Acquisition of Cerro
Del Gallo
Primero
Announce
s APA
Ruling
Spot Gold
Hits 4-
Year Low
TSX P I NYSE PPP I 27
Classification
Tonnage
(Million Tonnes)
Gold Grade (G/T)
Silver Grade
(G/ T)
Contained Gold
(000 Ounces)
Contained Silver
(000 Ounces)
Mineral Reserves
Proven &
Probable
4.893 5.5 315 870 49,479
Mineral Resources
Measured &
Indicated
4.282 7.2 419 997 57,713
Inferred 7,333 4.2 310 998 72,647
Notes to Mineral Reserve Statement:
Cutoff grade of 2.7 grams per tonne (”g/t”) gold equivalent (“AuEq”) based on total operating cost of US$104.97/t. Metal prices assumed are gold US$1,250 per
troy ounce and silver US$20 per troy ounce. Silver supply contract obligations have been referenced in determining overall vein reserve estimate viability.
Processing recovery factors for gold and silver of 97% and 94% assumed.
Exchange rate assumed is 13 pesos/US$1.00.
The Mineral Reserve estimates were prepared under the supervision of Mr. Gabriel Voicu P.Geo., Vice President, Geology and Exploration, Primero and a QP for
the purposes of National Instrument 43-101 (“NI 43-101”).
Notes to Mineral Resource Statement:
Mineral Resources are total and include those resources converted to Mineral Reserves.
A 2.0g/t AuEq cutoff grade is applied and the gold equivalent is calculated at a gold price of US$1,300 per troy ounce and a silver price of US$20 per troy ounce.
A constant bulk density of 2.7 tonnes/m3 has been used.
The Mineral Resource estimates were prepared by Mr. Rodney Webster MAusIMM, MAIG and Mr. J. Morton Shannon P.Geo., both of AMC Mining Consultants
(Canada) Ltd. and a QP for the purposes of NI 43-101.
Additional exploration potential was estimated at 6-10 million tonnes at grade ranges of 3-5 grams per tonne of gold and 200-400 grams per tonne of silver as of
December 31, 2011. It should be noted that these targets are conceptual in nature. There has been insufficient exploration to define an associated Mineral Resource
and it is uncertain if further exploration will result in the target being delineated as a Mineral Resource.
SAN DIMAS
Mineral Resources and Mineral Reserves
(December 31, 2013, Mineral Resources include Mineral Reserves)
TSX P I NYSE PPP I 28
Notes to Black Fox Mineral Reserve estimate:
1. Mineral Reserves stated as at December 31, 2013.
2. Open pit cut-off grade of 1.0 g/t Au and underground cut-off grade of 3.4 g/t.
3. Gold price assumed is US$1,250 per troy ounce.
4. Processing gold recovery factor 94% assumed.
5. Harold Brisson, PhD, Eng. is the Qualified Person for the Black Fox Complex Mineral Resource estimates.
Notes to Black Fox Mineral Resource estimate:
1. Mineral Reserves stated as at December 31, 2013.
2. Open pit cut-off grade of 0.9 g/t Au and underground cut-off grade of 3.0 g/t.
3. Gold price assumed is US$1,300 per troy ounce and exchange rate of US$1.00=C$1.10 was used in the gold cut-off grade calculations.
4. Detailed footnotes can be found in the NI 43-101 Technical Report titled “TECHNICAL REPORT ON THE MINERAL RESOURCE AND MINERAL RESERVE ESTIMATES FOR
THE BLACK FOX COMPLEX”, dated June 30, 2014 and filed on www.sedar.com.
BLACK FOX
Mineral Resources and Mineral Reserves
(December 31, 2013, Mineral Resources include Mineral Reserves)
Classification
Tonnage
(Tonnes)
Gold Grade
(G/T)
Cont. Gold
(Ounces)
Proven & Probable Reserves
Open Pit 1,468,500 3.7 173,900
Underground 1,663,900 6.3 339,100
Stockpile 716,200 1.1 24,700
Total 3,848,700 4.3 537,700
Measured & Indicated Resources, Including Reserves
Open Pit 1,423,900 4.0 182,518
Underground 1,852,800 7.5 445,336
Stockpile 716,200 1.1 24,706
Total 3,992,800 5.1 652,560
Inferred Resources
Open Pit 364,100 5.8 67,897
Underground 326,300 9.5 99,889
Total 690,400 7.6 167,786
TSX P I NYSE PPP I 29
Classification
Cut-off
Grade
(G/T Au)
Potential Material
Tonnes
(Million
Tonnes)
CAPPED Au
(G/T)
Contained Gold
(000 Ounces)
Indicated Resources
>3.0 Underground 1.394 5.4 243,041
>0.9 Open Pit 3.882 2.5 314,615
Total Indicated Resources 5.276 3.3 557,655
Inferred Resources
>3.0 Underground 1.065 5.1 175,511
>0.9 Open Pit 0.486 2.8 43,309
Total Inferred Resources 1.552 4.4 218,820
Notes to Grey Fox Mineral Resource estimate:
1. Mineral Reserves stated as at 31 December 2013.
2. Open pit cut-off grade of 0.9 g/t Au and underground cut-off grade of 3.0 g/t
3. Gold price assumed is US$1,300 per troy ounce and exchange rate of US$1.00=C$1.10 was used in the gold cut-off grade calculations.
4. Detailed footnotes can be found in the NI 43-101 Technical Report titled “TECHNICAL REPORT ON THE MINERAL RESOURCE AND MINERAL RESERVE ESTIMATES FOR
THE BLACK FOX COMPLEX”, dated June 30, 2014 and filed on www.sedar.com.
5. Harold Brisson, PhD, Eng. is the Qualified Person for the Black Fox Complex Mineral Resource estimates.
GREY FOX
Mineral Resources
December 31, 2013
TSX P I NYSE PPP I 30
Category M Tonnes
Au
(g/t)
Au
(M ozs)
Ag
(g/t)
Ag
(M ozs)
Cu
(%)
Cu
(M lbs)
Au Eq
(g/t)
AuEq
(M oz)
Proven 28.2 0.71 0.64 15.1 13.7 0.08 50.2 1.15 1.05
Probable 4.0 0.54 0.07 13.2 1.7 0.07 6.2 0.93 0.12
Proven & Probable 32.2 0.69 0.71 14.8 15.3 0.08 56.4 1.14 1.18
Category M Tonnes
Au
(g/t)
Au
(M ozs)
Ag
(g/t)
Ag
(M ozs)
Cu
(%)
Cu
(M lbs)
Au Eq
(g/t)
AuEq
(M oz)
Measured 39.9 0.61 0.78 13.8 17.71 0.10 88.8 1.07 1.37
Indicated 8.0 0.55 0.14 11.0 2.83 0.08 14.6 0.92 0.24
Measured & Indicated 47.9 0.60 0.92 13.3 20.55 0.1 103.4 1.06 1.64
Total Resources Within the Gold Domain2
Phase I Heap Leach In-Pit Proven and Probable Reserves3
In-Pit Resources (excluding Proven and Probable Reserves)4,5
Category M Tonnes
Au
(g/t)
Au
(M ozs)
Ag
(g/t)
Ag
(M ozs)
Cu
(%)
Cu
(M lbs)
Au Eq
(g/t)
AuEq
(M oz)
Measured 129 0.54 2.24 12.0 49.8 0.09 256.0 0.94 3.91
Indicated 80 0.38 0.98 8.0 20.6 0.08 141.1 0.69 1.77
Measured & Indicated 209 0.48 3.22 11.0 70.3 0.08 396.9 0.83 5.58
Inferred 20 0.3 0.19 7.0 4.5 0.09 39.7 0.59 0.38
1. “Technical Report First Stage Heap Leach Feasibility Study, Cerro del Gallo Gold Silver Project, Guanajuato, Mexico” June 2012 (“Feasibility Study”). Gold equivalent
ounces calculated by Cerro Resources using gold, silver and copper prices of US$1,341/oz, US$25.58/oz and US$7,582/t respectively.
2. These resources are reported using internal cut-off grade of 0.2 g/tAu as per Feasibility Study, 2012 and Golder Associates Technical Report, 2008.
3. These reserves are reported using internal cut-off grades of 0.24 and 0.29 gAuEq/t for weathered and partially oxidized, respectively.
4. These resources are reported using internal cut-off grades of 0.24, 0.29, and 0.34 gAuEq/t for weathered, partially oxidized, and fresh material resp.
5. See note 7 in January 23, 2013 News Release “Primero achieves 2012 Guidance and Provides 2013 Outlook”.
CERRO DEL GALLO
Reserves and In-Pit Resources1
TSX P I NYSE PPP I 31
Executive Management
Tamara Brown | VP, Investor Relations
 Former Director Investor Relations for IAMGOLD
 Former partner of a Toronto based, boutique
investment bank and professional engineer in mining
industry
H. Maura Lendon | VP, Chief General Counsel and
Corporate Secretary
 Former Senior Vice President, Chief Legal Officer
and Corporate Secretary of HudBay Minerals Inc.;
Chief Counsel Canada, Chief Privacy Officer -
Canada of AT&T
David Sandison | VP, Corporate Development
 Former VP, Corporate Development of
Clarity Capital ; Director, Corporate Development
Xstrata Zinc Canada ; Director Business
Development, Noranda/Falconbridge; Former EVP,
Noranda Chile
Louis Toner | VP, Project Development &
Construction
 Over 30 Years of Engineering and Construction
experience, formerly held Senior Project
Management roles with BBA Inc. and Lafarge
Canada Inc.
James Mallory | VP, Corporate Responsibility
 Over 35 Years of mining experience
 Former VP, Vice-President, Operations & Social
Responsibility at South American Silver
 13 Years of experience in Latin America
Gabriel Voicu | VP, Geology and Exploration
 25 Years of mining experience, formerly held senior
technical and exploration positions with Cambior
and IAMGOLD
Wendy Kaufman| Chief Financial Officer
 20 Years of experience
 Appointed CFO in September 2014
 Former VP, Finance and Treasure of Inmet Mining
Corporation
Joseph Conway | President & CEO
 30 Years of experience
 Appointed President and CEO in June 2010
 Former CEO, President & Director of IAMGOLD and
Repadre Capital
TSX P I NYSE PPP I 32
Board of Directors
Board Committees:
1. Health, Safety and Environment 2. Human Resources 3. Governance and Nominating 4. Lead Director 5. Audit
David Demers | Director 2, 3, 4, 5
o Founder, CEO and Director Westport Innovations
o Director of Cummins Westport and
Juniper Engines
Grant Edey | Director 3, 4, 5
o President & CEO, Khan Resources Inc.
o Former Director of Breakwater Resources, former
director of Queenstake Resources, Santa Cruz Gold
o Former CFO, IAMGOLD
Michael Riley | Director 2, 5
o Chartered accountant with more than 26 years of
accounting experience
o Chair of Primero Audit Committee
Brad Marchant | Director 1
o Co-founder of Triton Mining Corporation
o Founder of BioteQ Environmental Technologies
Inc.
Rohan Hazelton | Director 1
o VP, Strategy, Goldcorp
o Formerly with Wheaton River and Deloitte &
Touche LLP
Robert Quartermain | Director 2, 3
o Founder and President & CEO, Pretivm Resources
o Former President and CEO of Silver Standard
Wade Nesmith | Chairman
o Founder of Primero
o Founding and current director of Silver Wheaton
Eduardo Luna | Director 1
o Former EVP & President, Mexico. Former
Chairman and CEO of Silver Wheaton, Executive
VP of Goldcorp and Luismin S.A. de C.V. (San
Dimas) and President of Mexican Mining Chamber
and the Silver Institute
Joseph Conway | Director
see Executive Management
TSX P I NYSE PPP I 33
This presentation has been prepared in accordance with the requirements of Canadian provincial securities laws which differ from the requirements of
U.S. securities laws. Unless otherwise indicated, all mineral reserve and resource estimates included in this presentation have been prepared in
accordance with Canadian National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”) and the Canadian Institute of Mining,
Metallurgy and Petroleum classification systems. NI 43-101 is a rule developed by the Canadian Securities Administrators that establishes standards for
all public disclosure an issuer makes of scientific and technical information concerning mineral projects. These standards differ significantly from the
requirements of the United States Securities and Exchange Commission (the “SEC”), and reserve and resource estimates disclosed in this presentation
may not be comparable to similar information disclosed by U.S. companies.
The mineral reserve estimates in this presentation have been calculated in accordance with NI 43-101, as required by Canadian securities regulatory
authorities. For United States reporting purposes, SEC Industry Guide 7 under the United States Securities Exchange Act of 1934, as amended, as
interpreted by Staff of the SEC, applies different standards in order to classify mineralization as a reserve. As a result, the definition of “probable
reserves” used in NI 43-101 differs from the definition in the SEC Industry Guide 7. Under SEC standards, mineralization may not be classified as a
“reserve” unless the determination has been made that the mineralization could be economically and legally produced or extracted at the time the
reserve determination is made. Among other things, all necessary permits would be required to be in hand or issuance imminent in order to classify
mineralized material as reserves under the SEC standards. Accordingly, mineral reserve estimates contained in this presentation may not qualify as
“reserves” under SEC standards.
In addition, this presentation uses the terms “indicated resources” and “inferred resources” to comply with the reporting standards in Canada. The
Company advises United States investors that while those terms are recognized and required by Canadian regulations, the SEC does not recognize them.
United States investors are cautioned not to assume that any part or all of the mineral deposits in these categories will ever be converted into mineral
reserves. Further, “inferred resources” have a great amount of uncertainty as to their existence and as to whether they can be mined legally or
economically. Therefore, United States investors are also cautioned not to assume that all or any part of the “inferred resources” exist. In accordance
with Canadian securities laws, estimates of “inferred resources” cannot form the basis of feasibility or other economic studies. It cannot be assumed that
all or any part of “indicated resources” or “inferred resources” will ever be upgraded to a higher category or are economically or legally mineable. In
addition, disclosure of “contained ounces” is permitted disclosure under Canadian securities laws; however, the SEC only permits issuers to report
mineralization as in place tonnage and grade without reference to unit measures.
NI 43-101 also permits the inclusion of disclosure regarding the potential quantity and grade, expressed as ranges, of a target for further exploration
provided that the disclosure (i) states with equal prominence that the potential quantity and grade is conceptual in nature, that there has been
insufficient exploration to define a mineral resource and that it is uncertain if further exploration will result in the target being delineated as a mineral
resources, and (ii) states the basis on which the disclosed potential quantity and grade has been determined. Disclosure regarding exploration potential
has been included in this presentation. United States investors are cautioned that disclosure of such exploration potential is conceptual in nature by
definition and there is no assurance that exploration will result in any category of NI 43-101 mineral resources being identified.
Notes to Investors Regarding the Use of Resources
TSX P I NYSE PPP I 34
1. “Gold equivalent ounces” include silver production converted to a gold equivalent based on consensus estimated commodity prices; accounts for the San
Dimas silver purchase agreement. Silver production is subject to a silver purchase agreement. The silver purchase agreement dictates that until August 6,
2014 Primero will deliver to Silver Wheaton a per annum amount equal to the first 3.5 million ounces of silver produced at San Dimas and 50% of any excess at
$4.16 per ounce (increasing by 1% per year). Thereafter Primero will deliver to Silver Wheaton a per annum amount equal to the first 6.0 million ounces of
silver produced at San Dimas and 50% of any excess at $4.20 per ounce (increasing by 1% per year). The Company will receive silver spot prices only after the
annual threshold amount has been delivered. Black Fox is subject to a gold purchase agreement under which Sandstorm is entitled to 8% of production at the
Black Fox mine and 6.3% at the Black Fox Extension.
2. Based on 2013 actual production, 2014 guidance and projected 2015 estimated production.
3. $48.1 million senior unsecured convertible debenture (acquired from Brigus, with a 6.5% coupon an effective conversion price of $14.00 and an expiry of
March 2016); and $30 million draw down from line of credit. Excludes capital leases.
4. Assumes San Dimas operates at least at 3,000 TPD from end of Q2 2016; and Primero management estimates for Black Fox production, based on 2,200-2,300
TPD operation and underground throughput increasing to 1,000 TPD by the end of 2015 & assumes that Cerro Del Gallo begins production mid-2016, with half
a year of production in 2016 of 50,000 AuEq. Oz.
5. Cash costs and All-in Sustaining Costs are non-GAAP measures. Refer to the Company’s third quarter 2014 MD&A for a reconciliation to operating expenses.
Note the calculation of all-in sustaining costs at San Dimas changed with the acquisition of a second producing asset and subsequently do not include
corporate G&A.
6. The Company closed a $75 million line of credit on May 23, 2014 and has drawn down $30 million as of September 30, 2014.
7. During the nine months ended September 30 2014, the Company issued 41,340,347 common shares as consideration for the acquisition of Brigus, 1,919,744
common shares upon the exercise of stock options; and 1,000,000 common shares pursuant to a flow through agreement.
8. Fully diluted shares include 20.8 million warrants with an exercise price of Cdn$8.00 per share, expiring on July 20, 2015; and 9.5 million options with an
average exercise price of Cdn$6.26.
9. Major assumptions include a flat gold price per ounce of $1,300, a flat silver price per ounce of $22.
10. The Company currently estimates that expanding the San Dimas mill to 3,000 TPD will require approximately $26.4 million of capital investment, with
approximately $6 million expenditure expected in 2014 and the remainder spread over the following eighteen months. As a result of the preliminary nature of
the capital assessment a contingency factor of 30% has been included in the capital estimate.
11. Adjusted net income/earnings and adjusted net income/earnings per share are non-GAAP measures. Neither of these non-GAAP performance measures has
any standardized meaning and is therefore unlikely to be comparable to other measures presented by other issuers. The Company believes that, in addition to
conventional measures prepared in accordance with GAAP, the Company and certain investors use this information to evaluate the Company’s performance.
Accordingly, it is intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared
in accordance with GAAP. Refer to the Company’s third quarter 2014 MD&A for a reconciliation of adjusted net income/earnings to reported net income.
12. “Operating cash flow” is operating cash flow before working capital changes. This and operating cash flows before working capital changes per share (CFPS)
are non-GAAP measures which the Company believes provides a better indicator of the Company’s ability to generate cash flow from its mining operations.
See the Company’s third quarter 2014 MD&A for a reconciliation of operating cash flows to GAAP.
Footnotes
TSX P I NYSE PPP I 35
Notes
PRIMERO MINING CORP.
79 Wellington St. West, Suite 2100
Toronto, ON M5K 1H1
T 416 814 3160 TF 877 619 3160
www.primeromining.com
Tamara Brown
Vice President, Investor Relations
T 416 814 3168
info@primeromining.com
Vancouver Resource
Investment Conference 2015
January 18-19, 2015

Weitere ähnliche Inhalte

Was ist angesagt?

Dgc 16 02_09-10 - corporate presentation
Dgc 16 02_09-10 - corporate presentationDgc 16 02_09-10 - corporate presentation
Dgc 16 02_09-10 - corporate presentationDetourGold
 
BMO Capital Markets Global Metals & Mining Conference
BMO Capital Markets Global Metals & Mining Conference BMO Capital Markets Global Metals & Mining Conference
BMO Capital Markets Global Metals & Mining Conference yamanagold2016
 
Ssri - June 2017 Corporate Presentation
Ssri - June 2017 Corporate PresentationSsri - June 2017 Corporate Presentation
Ssri - June 2017 Corporate PresentationSilverStandard
 
European Gold Forum 2017
European Gold Forum 2017European Gold Forum 2017
European Gold Forum 2017yamanagold2016
 
Corporate Presentation - April 2015
Corporate Presentation - April 2015Corporate Presentation - April 2015
Corporate Presentation - April 2015primero_mining
 
Q1 2017 Conference call Presentation
Q1 2017 Conference call PresentationQ1 2017 Conference call Presentation
Q1 2017 Conference call Presentationyamanagold2016
 
2019.02.20 probe metals presentation reformatted 16 9
2019.02.20 probe metals presentation reformatted 16 92019.02.20 probe metals presentation reformatted 16 9
2019.02.20 probe metals presentation reformatted 16 9Probe Gold
 
2019.02.20 probe metals presentation reformatted 16 9
2019.02.20 probe metals presentation reformatted 16 92019.02.20 probe metals presentation reformatted 16 9
2019.02.20 probe metals presentation reformatted 16 9Probe Gold
 
teranga gold swiss mining presentation
teranga gold swiss mining presentationteranga gold swiss mining presentation
teranga gold swiss mining presentationTeranga Gold
 
2019.03.28 probe metals presentation
2019.03.28 probe metals presentation2019.03.28 probe metals presentation
2019.03.28 probe metals presentationProbe Gold
 
2019.03.28 probe metals presentation reformatted 16 9
2019.03.28 probe metals presentation reformatted 16 92019.03.28 probe metals presentation reformatted 16 9
2019.03.28 probe metals presentation reformatted 16 9Probe Gold
 
2019.02.12 probe metals presentation reformatted 16 9
2019.02.12 probe metals presentation reformatted 16 92019.02.12 probe metals presentation reformatted 16 9
2019.02.12 probe metals presentation reformatted 16 9Probe Gold
 
DFS Technical Presentation & Webcast
DFS Technical Presentation & WebcastDFS Technical Presentation & Webcast
DFS Technical Presentation & Webcastasanko6699
 
2019.06.05 probe metals presentation
2019.06.05 probe metals presentation 2019.06.05 probe metals presentation
2019.06.05 probe metals presentation Probe Gold
 
2019.03.28 probe metals presentation final
2019.03.28 probe metals presentation final2019.03.28 probe metals presentation final
2019.03.28 probe metals presentation finalProbe Gold
 

Was ist angesagt? (17)

2015 yeq4results.16feb2016.vfinal
2015 yeq4results.16feb2016.vfinal2015 yeq4results.16feb2016.vfinal
2015 yeq4results.16feb2016.vfinal
 
Egf meetings presentation final
Egf meetings presentation finalEgf meetings presentation final
Egf meetings presentation final
 
Dgc 16 02_09-10 - corporate presentation
Dgc 16 02_09-10 - corporate presentationDgc 16 02_09-10 - corporate presentation
Dgc 16 02_09-10 - corporate presentation
 
BMO Capital Markets Global Metals & Mining Conference
BMO Capital Markets Global Metals & Mining Conference BMO Capital Markets Global Metals & Mining Conference
BMO Capital Markets Global Metals & Mining Conference
 
Ssri - June 2017 Corporate Presentation
Ssri - June 2017 Corporate PresentationSsri - June 2017 Corporate Presentation
Ssri - June 2017 Corporate Presentation
 
European Gold Forum 2017
European Gold Forum 2017European Gold Forum 2017
European Gold Forum 2017
 
Corporate Presentation - April 2015
Corporate Presentation - April 2015Corporate Presentation - April 2015
Corporate Presentation - April 2015
 
Q1 2017 Conference call Presentation
Q1 2017 Conference call PresentationQ1 2017 Conference call Presentation
Q1 2017 Conference call Presentation
 
2019.02.20 probe metals presentation reformatted 16 9
2019.02.20 probe metals presentation reformatted 16 92019.02.20 probe metals presentation reformatted 16 9
2019.02.20 probe metals presentation reformatted 16 9
 
2019.02.20 probe metals presentation reformatted 16 9
2019.02.20 probe metals presentation reformatted 16 92019.02.20 probe metals presentation reformatted 16 9
2019.02.20 probe metals presentation reformatted 16 9
 
teranga gold swiss mining presentation
teranga gold swiss mining presentationteranga gold swiss mining presentation
teranga gold swiss mining presentation
 
2019.03.28 probe metals presentation
2019.03.28 probe metals presentation2019.03.28 probe metals presentation
2019.03.28 probe metals presentation
 
2019.03.28 probe metals presentation reformatted 16 9
2019.03.28 probe metals presentation reformatted 16 92019.03.28 probe metals presentation reformatted 16 9
2019.03.28 probe metals presentation reformatted 16 9
 
2019.02.12 probe metals presentation reformatted 16 9
2019.02.12 probe metals presentation reformatted 16 92019.02.12 probe metals presentation reformatted 16 9
2019.02.12 probe metals presentation reformatted 16 9
 
DFS Technical Presentation & Webcast
DFS Technical Presentation & WebcastDFS Technical Presentation & Webcast
DFS Technical Presentation & Webcast
 
2019.06.05 probe metals presentation
2019.06.05 probe metals presentation 2019.06.05 probe metals presentation
2019.06.05 probe metals presentation
 
2019.03.28 probe metals presentation final
2019.03.28 probe metals presentation final2019.03.28 probe metals presentation final
2019.03.28 probe metals presentation final
 

Andere mochten auch

Primero q4 2014 presentation 2015 final
Primero q4 2014 presentation 2015 finalPrimero q4 2014 presentation 2015 final
Primero q4 2014 presentation 2015 finalprimero_mining
 
Tugas eksplorasi tambang energi unconventional
Tugas eksplorasi tambang energi unconventional Tugas eksplorasi tambang energi unconventional
Tugas eksplorasi tambang energi unconventional Sylvester Saragih
 
ndep.org - A WordPress Case Study
ndep.org - A WordPress Case Studyndep.org - A WordPress Case Study
ndep.org - A WordPress Case Studykeithdevon
 
Seminar58 castro presentation_3
Seminar58 castro presentation_3Seminar58 castro presentation_3
Seminar58 castro presentation_3Dev Rao
 
Fpg Trustee Financial Planning V3 Hires
Fpg Trustee Financial Planning V3 HiresFpg Trustee Financial Planning V3 Hires
Fpg Trustee Financial Planning V3 Hiresaclifton
 
36kr no.94
36kr no.9436kr no.94
36kr no.94Gina Gu
 
【官方正版】红米发布会精华版Ppt
【官方正版】红米发布会精华版Ppt【官方正版】红米发布会精华版Ppt
【官方正版】红米发布会精华版PptGina Gu
 
Wade.Go Introduction Speech - SFD HCMC 2014
Wade.Go Introduction Speech - SFD HCMC 2014Wade.Go Introduction Speech - SFD HCMC 2014
Wade.Go Introduction Speech - SFD HCMC 2014Nguyễn Thành Hải
 
Dps stages of development
Dps  stages of developmentDps  stages of development
Dps stages of developmentchaggarg1
 

Andere mochten auch (20)

Council australia-inc
Council australia-incCouncil australia-inc
Council australia-inc
 
Dampak industri
Dampak industriDampak industri
Dampak industri
 
Primero q4 2014 presentation 2015 final
Primero q4 2014 presentation 2015 finalPrimero q4 2014 presentation 2015 final
Primero q4 2014 presentation 2015 final
 
Tugas eksplorasi tambang energi unconventional
Tugas eksplorasi tambang energi unconventional Tugas eksplorasi tambang energi unconventional
Tugas eksplorasi tambang energi unconventional
 
ndep.org - A WordPress Case Study
ndep.org - A WordPress Case Studyndep.org - A WordPress Case Study
ndep.org - A WordPress Case Study
 
Presentation excavator
Presentation excavatorPresentation excavator
Presentation excavator
 
Seminar58 castro presentation_3
Seminar58 castro presentation_3Seminar58 castro presentation_3
Seminar58 castro presentation_3
 
Fpg Trustee Financial Planning V3 Hires
Fpg Trustee Financial Planning V3 HiresFpg Trustee Financial Planning V3 Hires
Fpg Trustee Financial Planning V3 Hires
 
Ton pare no te nas
Ton pare no te nasTon pare no te nas
Ton pare no te nas
 
36kr no.94
36kr no.9436kr no.94
36kr no.94
 
O Dialogo nº 197
O Dialogo nº 197O Dialogo nº 197
O Dialogo nº 197
 
DLIS Versión Final SLSH
DLIS Versión Final SLSHDLIS Versión Final SLSH
DLIS Versión Final SLSH
 
About iv network hawaii 2
About iv network hawaii 2About iv network hawaii 2
About iv network hawaii 2
 
Mass test
Mass testMass test
Mass test
 
2012 aug 28 issue 60
2012 aug 28 issue 602012 aug 28 issue 60
2012 aug 28 issue 60
 
【官方正版】红米发布会精华版Ppt
【官方正版】红米发布会精华版Ppt【官方正版】红米发布会精华版Ppt
【官方正版】红米发布会精华版Ppt
 
Wade.Go Introduction Speech - SFD HCMC 2014
Wade.Go Introduction Speech - SFD HCMC 2014Wade.Go Introduction Speech - SFD HCMC 2014
Wade.Go Introduction Speech - SFD HCMC 2014
 
Metallurgi 2
Metallurgi 2Metallurgi 2
Metallurgi 2
 
4 minutes office exercises
4 minutes office exercises4 minutes office exercises
4 minutes office exercises
 
Dps stages of development
Dps  stages of developmentDps  stages of development
Dps stages of development
 

Ähnlich wie Primero 2015-cambridge-house-final v001-f69ux4

Corporate Presentation - April 2015
Corporate Presentation - April 2015Corporate Presentation - April 2015
Corporate Presentation - April 2015primero_mining
 
Corporate Presentation - BMO 2015 Global Metals & Mining Conference
Corporate Presentation - BMO 2015 Global Metals & Mining ConferenceCorporate Presentation - BMO 2015 Global Metals & Mining Conference
Corporate Presentation - BMO 2015 Global Metals & Mining Conferenceprimero_mining
 
24. Conferencia Mundial sobre Metales y Mineria de BMO Capital Markets
24. Conferencia Mundial sobre Metales y Mineria de BMO Capital Markets24. Conferencia Mundial sobre Metales y Mineria de BMO Capital Markets
24. Conferencia Mundial sobre Metales y Mineria de BMO Capital Marketsprimero_mining
 
Corporate Presentation - PDAC 2015
Corporate Presentation - PDAC 2015Corporate Presentation - PDAC 2015
Corporate Presentation - PDAC 2015primero_mining
 
Primero q1 2015 presentation final
Primero q1 2015 presentation finalPrimero q1 2015 presentation final
Primero q1 2015 presentation finalprimero_mining
 
Primero Second Quarter 2015 Results
Primero Second Quarter 2015 ResultsPrimero Second Quarter 2015 Results
Primero Second Quarter 2015 Resultsprimero_mining
 
Primero bmo conference presentation 2015 final v2
Primero bmo conference presentation 2015 final v2Primero bmo conference presentation 2015 final v2
Primero bmo conference presentation 2015 final v2primero_mining
 
RBC Capital Markets 2015 Global Mining & Materials Conference
RBC Capital Markets 2015 Global Mining & Materials ConferenceRBC Capital Markets 2015 Global Mining & Materials Conference
RBC Capital Markets 2015 Global Mining & Materials Conferenceprimero_mining
 
Primero corporate presentation march 2014 v2
Primero corporate presentation march 2014 v2Primero corporate presentation march 2014 v2
Primero corporate presentation march 2014 v2primero_mining
 
The BIG Event - Canadian Mining Expo
The BIG Event - Canadian Mining ExpoThe BIG Event - Canadian Mining Expo
The BIG Event - Canadian Mining Expoprimero_mining
 
Primero 2014 bmo conference final
Primero 2014 bmo conference finalPrimero 2014 bmo conference final
Primero 2014 bmo conference finalprimero_mining
 
Primero q1 2014 presentation final
Primero q1 2014 presentation finalPrimero q1 2014 presentation final
Primero q1 2014 presentation finalprimero_mining
 
Scotiabank Mining for Margin Conference
Scotiabank Mining for Margin ConferenceScotiabank Mining for Margin Conference
Scotiabank Mining for Margin ConferenceAuRico Gold
 
06 17-14 rbc capital market mining and metals conference v001-l7z7wa
06 17-14 rbc capital market mining and metals conference v001-l7z7wa06 17-14 rbc capital market mining and metals conference v001-l7z7wa
06 17-14 rbc capital market mining and metals conference v001-l7z7waAuRico Gold
 
05 29-14 toronto marketing
05 29-14 toronto marketing05 29-14 toronto marketing
05 29-14 toronto marketingAuRico Gold
 
Montreal Marketing
Montreal MarketingMontreal Marketing
Montreal MarketingAuRico Gold
 
BMO Sales Desk Presentation
BMO Sales Desk PresentationBMO Sales Desk Presentation
BMO Sales Desk PresentationAuRico Gold
 
05 19-14 european marketing
05 19-14 european marketing05 19-14 european marketing
05 19-14 european marketingAuRico Gold
 
04 28-14 winnipeg marketing
04 28-14 winnipeg marketing04 28-14 winnipeg marketing
04 28-14 winnipeg marketingAuRico Gold
 

Ähnlich wie Primero 2015-cambridge-house-final v001-f69ux4 (20)

Corporate Presentation - April 2015
Corporate Presentation - April 2015Corporate Presentation - April 2015
Corporate Presentation - April 2015
 
Corporate Presentation - BMO 2015 Global Metals & Mining Conference
Corporate Presentation - BMO 2015 Global Metals & Mining ConferenceCorporate Presentation - BMO 2015 Global Metals & Mining Conference
Corporate Presentation - BMO 2015 Global Metals & Mining Conference
 
24. Conferencia Mundial sobre Metales y Mineria de BMO Capital Markets
24. Conferencia Mundial sobre Metales y Mineria de BMO Capital Markets24. Conferencia Mundial sobre Metales y Mineria de BMO Capital Markets
24. Conferencia Mundial sobre Metales y Mineria de BMO Capital Markets
 
Corporate Presentation - PDAC 2015
Corporate Presentation - PDAC 2015Corporate Presentation - PDAC 2015
Corporate Presentation - PDAC 2015
 
Primero q1 2015 presentation final
Primero q1 2015 presentation finalPrimero q1 2015 presentation final
Primero q1 2015 presentation final
 
Primero Second Quarter 2015 Results
Primero Second Quarter 2015 ResultsPrimero Second Quarter 2015 Results
Primero Second Quarter 2015 Results
 
Primero bmo conference presentation 2015 final v2
Primero bmo conference presentation 2015 final v2Primero bmo conference presentation 2015 final v2
Primero bmo conference presentation 2015 final v2
 
RBC Capital Markets 2015 Global Mining & Materials Conference
RBC Capital Markets 2015 Global Mining & Materials ConferenceRBC Capital Markets 2015 Global Mining & Materials Conference
RBC Capital Markets 2015 Global Mining & Materials Conference
 
Primero corporate presentation march 2014 v2
Primero corporate presentation march 2014 v2Primero corporate presentation march 2014 v2
Primero corporate presentation march 2014 v2
 
The BIG Event - Canadian Mining Expo
The BIG Event - Canadian Mining ExpoThe BIG Event - Canadian Mining Expo
The BIG Event - Canadian Mining Expo
 
Primero 2014 bmo conference final
Primero 2014 bmo conference finalPrimero 2014 bmo conference final
Primero 2014 bmo conference final
 
Primero q1 2014 presentation final
Primero q1 2014 presentation finalPrimero q1 2014 presentation final
Primero q1 2014 presentation final
 
Scotiabank Mining for Margin Conference
Scotiabank Mining for Margin ConferenceScotiabank Mining for Margin Conference
Scotiabank Mining for Margin Conference
 
06 17-14 rbc capital market mining and metals conference v001-l7z7wa
06 17-14 rbc capital market mining and metals conference v001-l7z7wa06 17-14 rbc capital market mining and metals conference v001-l7z7wa
06 17-14 rbc capital market mining and metals conference v001-l7z7wa
 
05 29-14 toronto marketing
05 29-14 toronto marketing05 29-14 toronto marketing
05 29-14 toronto marketing
 
Montreal Marketing
Montreal MarketingMontreal Marketing
Montreal Marketing
 
Toronto Marketing
Toronto MarketingToronto Marketing
Toronto Marketing
 
BMO Sales Desk Presentation
BMO Sales Desk PresentationBMO Sales Desk Presentation
BMO Sales Desk Presentation
 
05 19-14 european marketing
05 19-14 european marketing05 19-14 european marketing
05 19-14 european marketing
 
04 28-14 winnipeg marketing
04 28-14 winnipeg marketing04 28-14 winnipeg marketing
04 28-14 winnipeg marketing
 

Mehr von primero_mining

Primero Q3 2014 Presentation
Primero Q3 2014 PresentationPrimero Q3 2014 Presentation
Primero Q3 2014 Presentationprimero_mining
 
Primero san-dimas-site-visit-sept v001-o70rly
Primero san-dimas-site-visit-sept v001-o70rlyPrimero san-dimas-site-visit-sept v001-o70rly
Primero san-dimas-site-visit-sept v001-o70rlyprimero_mining
 
Primero denver presentation
Primero denver presentationPrimero denver presentation
Primero denver presentationprimero_mining
 
Primero baml presentation sept 2014
Primero baml presentation sept 2014Primero baml presentation sept 2014
Primero baml presentation sept 2014primero_mining
 
Primero q2 2014 presentation
Primero q2 2014 presentationPrimero q2 2014 presentation
Primero q2 2014 presentationprimero_mining
 
Primero Corporate Presentation - July 2014
Primero Corporate Presentation - July 2014Primero Corporate Presentation - July 2014
Primero Corporate Presentation - July 2014primero_mining
 
Black fox site visit june 19
Black fox site visit june 19Black fox site visit june 19
Black fox site visit june 19primero_mining
 
Black fox site visit june 5
Black fox site visit june 5Black fox site visit june 5
Black fox site visit june 5primero_mining
 
Primero corporate presentation may 2014 v2
Primero corporate presentation may 2014 v2Primero corporate presentation may 2014 v2
Primero corporate presentation may 2014 v2primero_mining
 
Primero corporate presentation may 2014 merrill lynch conferencev2
Primero corporate presentation may 2014 merrill lynch conferencev2Primero corporate presentation may 2014 merrill lynch conferencev2
Primero corporate presentation may 2014 merrill lynch conferencev2primero_mining
 

Mehr von primero_mining (11)

Primero 2014-csr-web
Primero 2014-csr-webPrimero 2014-csr-web
Primero 2014-csr-web
 
Primero Q3 2014 Presentation
Primero Q3 2014 PresentationPrimero Q3 2014 Presentation
Primero Q3 2014 Presentation
 
Primero san-dimas-site-visit-sept v001-o70rly
Primero san-dimas-site-visit-sept v001-o70rlyPrimero san-dimas-site-visit-sept v001-o70rly
Primero san-dimas-site-visit-sept v001-o70rly
 
Primero denver presentation
Primero denver presentationPrimero denver presentation
Primero denver presentation
 
Primero baml presentation sept 2014
Primero baml presentation sept 2014Primero baml presentation sept 2014
Primero baml presentation sept 2014
 
Primero q2 2014 presentation
Primero q2 2014 presentationPrimero q2 2014 presentation
Primero q2 2014 presentation
 
Primero Corporate Presentation - July 2014
Primero Corporate Presentation - July 2014Primero Corporate Presentation - July 2014
Primero Corporate Presentation - July 2014
 
Black fox site visit june 19
Black fox site visit june 19Black fox site visit june 19
Black fox site visit june 19
 
Black fox site visit june 5
Black fox site visit june 5Black fox site visit june 5
Black fox site visit june 5
 
Primero corporate presentation may 2014 v2
Primero corporate presentation may 2014 v2Primero corporate presentation may 2014 v2
Primero corporate presentation may 2014 v2
 
Primero corporate presentation may 2014 merrill lynch conferencev2
Primero corporate presentation may 2014 merrill lynch conferencev2Primero corporate presentation may 2014 merrill lynch conferencev2
Primero corporate presentation may 2014 merrill lynch conferencev2
 

Kürzlich hochgeladen

Corporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdfCorporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdfProbe Gold
 
Q1 Quarterly Update - April 16, 2024.pdf
Q1 Quarterly Update - April 16, 2024.pdfQ1 Quarterly Update - April 16, 2024.pdf
Q1 Quarterly Update - April 16, 2024.pdfProbe Gold
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024CollectiveMining1
 
Basic Accountants in|TaxlinkConcept.pdf
Basic  Accountants in|TaxlinkConcept.pdfBasic  Accountants in|TaxlinkConcept.pdf
Basic Accountants in|TaxlinkConcept.pdftaxlinkcpa
 
WheelTug PLC Pitch Deck | Investor Insights | April 2024
WheelTug PLC Pitch Deck | Investor Insights | April 2024WheelTug PLC Pitch Deck | Investor Insights | April 2024
WheelTug PLC Pitch Deck | Investor Insights | April 2024Hector Del Castillo, CPM, CPMM
 
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 60009654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000Sapana Sha
 
slideshare_2404_presentation materials_en.pdf
slideshare_2404_presentation materials_en.pdfslideshare_2404_presentation materials_en.pdf
slideshare_2404_presentation materials_en.pdfsansanir
 
The resilient U.S. late-cycle expansion contributed to a stalling pattern in ...
The resilient U.S. late-cycle expansion contributed to a stalling pattern in ...The resilient U.S. late-cycle expansion contributed to a stalling pattern in ...
The resilient U.S. late-cycle expansion contributed to a stalling pattern in ...Kumaran637735
 
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书Fir La
 
the 25 most beautiful words for a loving and lasting relationship.pdf
the 25 most beautiful words for a loving and lasting relationship.pdfthe 25 most beautiful words for a loving and lasting relationship.pdf
the 25 most beautiful words for a loving and lasting relationship.pdfFrancenel Paul
 
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024Osisko Gold Royalties Ltd
 
Nicola Mining Inc. Corporate Presentation April 2024
Nicola Mining Inc. Corporate Presentation April 2024Nicola Mining Inc. Corporate Presentation April 2024
Nicola Mining Inc. Corporate Presentation April 2024nicola_mining
 
The Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanityThe Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanityJohanAspro
 
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCRSapana Sha
 

Kürzlich hochgeladen (20)

Call Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCR
Call Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCRCall Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCR
Call Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCR
 
Corporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdfCorporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdf
 
Q1 Quarterly Update - April 16, 2024.pdf
Q1 Quarterly Update - April 16, 2024.pdfQ1 Quarterly Update - April 16, 2024.pdf
Q1 Quarterly Update - April 16, 2024.pdf
 
young Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Service
young Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Serviceyoung Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Service
young Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Service
 
young call girls in Hauz Khas,🔝 9953056974 🔝 escort Service
young call girls in Hauz Khas,🔝 9953056974 🔝 escort Serviceyoung call girls in Hauz Khas,🔝 9953056974 🔝 escort Service
young call girls in Hauz Khas,🔝 9953056974 🔝 escort Service
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024
 
Basic Accountants in|TaxlinkConcept.pdf
Basic  Accountants in|TaxlinkConcept.pdfBasic  Accountants in|TaxlinkConcept.pdf
Basic Accountants in|TaxlinkConcept.pdf
 
WheelTug PLC Pitch Deck | Investor Insights | April 2024
WheelTug PLC Pitch Deck | Investor Insights | April 2024WheelTug PLC Pitch Deck | Investor Insights | April 2024
WheelTug PLC Pitch Deck | Investor Insights | April 2024
 
young call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Service
young call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Service
young call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Service
 
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 60009654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
 
slideshare_2404_presentation materials_en.pdf
slideshare_2404_presentation materials_en.pdfslideshare_2404_presentation materials_en.pdf
slideshare_2404_presentation materials_en.pdf
 
Model Call Girl in Uttam Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Uttam Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Uttam Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Uttam Nagar Delhi reach out to us at 🔝9953056974🔝
 
The resilient U.S. late-cycle expansion contributed to a stalling pattern in ...
The resilient U.S. late-cycle expansion contributed to a stalling pattern in ...The resilient U.S. late-cycle expansion contributed to a stalling pattern in ...
The resilient U.S. late-cycle expansion contributed to a stalling pattern in ...
 
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
 
the 25 most beautiful words for a loving and lasting relationship.pdf
the 25 most beautiful words for a loving and lasting relationship.pdfthe 25 most beautiful words for a loving and lasting relationship.pdf
the 25 most beautiful words for a loving and lasting relationship.pdf
 
young call girls in Yamuna Vihar 🔝 9953056974 🔝 Delhi escort Service
young  call girls in   Yamuna Vihar 🔝 9953056974 🔝 Delhi escort Serviceyoung  call girls in   Yamuna Vihar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Yamuna Vihar 🔝 9953056974 🔝 Delhi escort Service
 
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
 
Nicola Mining Inc. Corporate Presentation April 2024
Nicola Mining Inc. Corporate Presentation April 2024Nicola Mining Inc. Corporate Presentation April 2024
Nicola Mining Inc. Corporate Presentation April 2024
 
The Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanityThe Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanity
 
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
 

Primero 2015-cambridge-house-final v001-f69ux4

  • 1. Vancouver Resource Investment Conference 2015 January 18-19, 2015
  • 2. TSX P I NYSE PPP I 2 This presentation may contain “forward-looking” statements within the meaning of Canadian securities legislation and the United States Private Securities Litigation Reform Act of 1995. Forward-looking statements relate to future events or the anticipated performance of the Company and reflect management’s expectations or beliefs regarding such future events and anticipated performance. In certain cases, forward-looking statements can be identified by the use of words such as “plans”, “expects”, “is expected”, “budget”, “scheduled”, ”estimates”, ”forecasts”, ”intends”, ”anticipates” or “believes”, or variations of such words and phrases or statements that certain actions, events or results “may”, ”could”, “would”, ”might”, or “will be taken”, “occur” or “be achieved”, or the negative of these words or comparable terminology. By their very nature forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual performance of the Company to be materially different from any anticipated performance expressed or implied by the forward-looking statements. Such factors include various risks related to the Company’s operations, including, without limitation, fluctuations in spot and forward markets for gold, silver and other metals, fluctuations in currency markets, changes in national and local governments in Mexico and the speculative nature of mineral exploration and development, risks associated with obtaining necessary exploitation and environmental licenses and permits, and the presence of laws that may impose restrictions on mining. A complete list of risk factors are described in the Company’s annual information form and will be detailed from time to time in the Company’s continuous disclosure, all of which are, or will be available, for review on SEDAR at www.sedar.com. This presentation uses the terms “measured resources”, “indicated resources” and “inferred resources”. The Company advises readers that although these terms are recognized and required by Canadian regulations (under National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”), the United States Securities and Exchange Commission does not recognize them. Readers are cautioned not to assume that any part or all of the mineral deposits in these categories will ever be converted in to reserves. In addition, “inferred resources” have a great amount of uncertainty as to their existence, and economic and legal feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or pre-feasibility studies, or economic studies, except for a Preliminary Assessment as defined under NI43-101. Investors are cautioned not to assume that part or all of an inferred resource exists, or is economically or legally mineable. Although the Company has attempted to identify important factors that could cause actual performance to differ materially from that described in forward-looking statements, there may be other factors that cause its performance not to be as anticipated. The Company neither intends nor assumes any obligation to update these forward-looking statements or information to reflect changes in assumptions or circumstances other than required by applicable law. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those currently anticipated. Accordingly, readers should not place undue reliance on forward-looking statements. Unless otherwise indicated, all dollar values herein are in US$. Cautionary Statement
  • 3. TSX P I NYSE PPP I 3 Investment Highlights Producing in America’s Top Mining Jurisdictions Experienced Board and Management Strong Financial Position Established Growth Profile from Assets in Production Track Record of Delivering on Stakeholder Commitments GROWTHIN 3 YEARS2 145% DEBT/TOTAL CAP.3 11% 220koz–240koz CANADA & MEXICO1 +200years INDUSTRY EXPERIENCE 38% 3 YR RETURN
  • 4. TSX P I NYSE PPP I 4 Corporate Office (Toronto) Producing in America’s Top Mining Jurisdictions #5* Mexico Producing Mine Development Project Exploration Property 71% 29% Mexico Canada 75% 25% Production & Reserves by Region 2014E Production1 Gold Reserves * Based on 2014 Behre Dolbear Report “2014 Ranking of Countries for Mining Investment”. #1* Canada o Operating in two of the most attractive mining jurisdictions* globally with:  Long mining history  Government stability  Established permitting process o Located in areas with:  Existing infrastructure  Skilled local workforce  Suppliers  Community support Black Fox Mine Grey Fox Property San Dimas Mine Cerro Del Gallo Project Ventanas Property LOW RISK PROFILE
  • 5. TSX P I NYSE PPP I 5 505 660 1,582 2,120 300 500 700 900 1,100 1,300 1,500 1,700 1,900 2,100 2,300 2011 2012 2013 2014* 102 111 143 230 80 100 120 140 160 180 200 220 240 2011 2012 2013 2014E 125% GROWTH 320% GROWTH Established Growth Profile Production1 (AuEq koz) Gold Reserves (koz) Gold M&I Resources (koz) 577 780 1,932 3,143 300 800 1,300 1,800 2,300 2,800 3,300 2011 2012 2013 2014 445% GROWTH • As at September 2014 • See slides 27, 28, 29 & 30 • As at September 2014 • See slides 27, 28, 29 & 30 HISTORIC GROWTH
  • 6. TSX P I NYSE PPP I 6 Established Growth Profile 111 143 160 165 190 70 90 100 50 2012 2013 2014E 2015E 2016E Cerro del Gallo Black Fox San Dimas 340-360 220-240 250-270 Targeted Production Growth Profile (AuEq koz) 1,4 2 2014 Revised Guidance Black Fox San Dimas Total Production1 (AuEq koz) 65-75 155-165 220-240 Cash cost5 ($ per AuEq oz) $850- $900 $600- $650 $675- $725 Capital Expenditures ($ millions) $36.0 $38.3 $85.3* Exploration ($ millions) $18.5 $15.7 $36.2* * Includes Cerro del Gallo. See final slide for footnotes. o Organic growth from assets in production o Disciplined approach to cost management o Focused on productivity improvements o Committed to exploration and development FUTURE GROWTH
  • 7. TSX P I NYSE PPP I Experienced Board and Management 7 Joseph Conway | President & CEO 30 Years of Experience ► Appointed CEO in June 2010 ► Former CEO, President and Director of IAMGOLD and Repadre Capital Wendy Kaufman | CFO 20 Years of Experience ► Appointed CFO in September 2014 ► Former VP, Finance and Treasury of Inmet Mining Corp. Wade Nesmith | Chairman ► Founder of Primero ► Founding and current director of Silver Wheaton 200+ Years of Combined Industry Experience Entrepreneurs BOARD OF DIRECTORS MANAGEMENT David Demers | Director 2,3,4,5 ► Founder, CEO and Director Westport Innovations ► Director of Cummins Westport and Juniper Engines Grant Edey | Director 3,5 ► President & CEO, Khan Resources ► Former Director of Breakwater Resources, Queenstake Resources, Santa Cruz Gold, CFO, IAMGOLD Rohan Hazelton | Director 1 ► VP, Strategy, Goldcorp ► Formerly with Wheaton River and Deloitte & Touche LLP Proven Track Record of Asset Turnaround Capital Markets Expertise Disciplined Approach to Business Development Eduardo Luna | Director 1 ► Former Chairman and CEO of Silver Wheaton, Executive VP of Goldcorp and Luismin (San Dimas) ► Former President of Mexican Mining Chamber Brad Marchant | Director 1 ► Co-founder of Triton Mining Corporation ► Founder of BioteQ Environmental Technologies Inc. Robert Quartermain | Director 2,3 ► Founder and President & CEO, Pretium Resources ► Former President of Silver Standard Resources Michael Riley | Director 2,5 ► Chartered accountant with more than 26 years of accounting experience ► Chair of Primero Audit Committee
  • 8. TSX P I NYSE PPP I 8 $67MSTRONG Liquidity Financial Position Source: 2014E-2016E Operating Cash Flow – Capital IQ consensus CFPS multiplied by current 160 million shares outstanding. $78M3 PRUDENT Debt Level September 30, 2014 Consensus Estimated Operating Cash Flow ($ millions) Exchanges TSX:P NYSE:PPP Balance Sheet (September 30, 2014) Cash Line of Credit6 Total Liquidity Convertible Debenture (6.5%, due March 2016, $14 conversion) Line of Credit Draw Down6 (Due May 2017) Total Debt3 $22 million $45 million ~$67 million $48 million $30 million $78 million Capital Structure Common Shares Outstanding 7 Fully Diluted 8 Market Cap. At Dec 31, 2014 160 million 190 million C$715 million $72 $79 $115 $155 $0 $50 $100 $150 $200 2013 2014E 2015E 2016E
  • 9. TSX P I NYSE PPP I 9 Track Record of Delivering on Stakeholder Commitments Peer Shareholder Returns* -100% -80% -60% -40% -20% 0% 20% 40% 60% P AGI AR AUQ BTO NGD Index 3-Year 2-Year 1-Year 3Year 2Year 1Year 1.9 1.5 1.1 0 0.5 1 1.5 2 2011 2012 2013 Primero All Injury Frequency Rate SHAREHOLDERS Superior Value Creation ENVIRONMENT Certified “Clean Industry” COMMUNITY Awarded “Socially Responsible Company” SAFETY Lowering All Injury Frequency Rate S&P/ TSX Gold * Source: Thomson One
  • 10. TSX P I NYSE PPP I 10 Growth Pipeline of Currently Producing Mines and Advanced Projects PRODUCTION San Dimas Platform OPTIMIZATION Black Fox EXPANSION San Dimas 3,000 TPD DEVELOPMENT Cerro del Gallo OVERVIEW ASSET EXPLORATION Grey Fox
  • 11. TSX P I NYSE PPP I 11 SAN DIMAS A Flagship Asset o Expansion to 2,500 TPD completed Q1 2014 o On track to meet 2014 guidance o Expansion to 3,000 TPD announced o Trialing 7 day, 12-hour shifts to optimize mine throughput o Tunnels connecting Central Block to Graben will increase efficiency and reduce costs Location Mine Type Ownership Durango, Mexico Underground, Gold & Silver 100% (silver stream) 2 Proven & Probable Gold Reserves (koz) (4.9M tonnes at 5.5 g/t) 870 Measured & Indicated Gold Resources (koz) (Inclusive of Reserves) (4.3M tonnes at 7.2 g/t) 997 Inferred Gold Resources (koz) (7.3M tonnes at 4.2 g/t) 998 2014E Production 1 (AuEq koz) 155-165 2014E Cash Costs 5 ($/AuEq oz) $600-$650 540 560 580 600 620 640 660 680 700 - 50,000 100,000 150,000 200,000 2011 2012 2013 2014E Production (AuEq oz) Cash Costs ($/AuEq oz) See final slide for footnotes. San Dimas Annual Production 57% GROWTH
  • 12. TSX P I NYSE PPP I 12 - 500 1,000 1,500 2,000 2,500 3,000 3,500 Q3 2010 Q3 2012 Q3 2014 Q3 2016E San Dimas Mill Throughput (TPD) Construction Mill expansion to 3,000 TPD will begin Q1 2015 and is expected to be completed by Q2 2016 Capital Cost Currently estimated at $26.4 million, including a 30% contingency After-tax IRR9 is expected to be 78% with a 12 month payback period10 Production An estimated increase by more than 30% over 2014 to approximately 215,000 gold equivalent ounces Cash Cost Expected to drop by ~$50 per ounce from current levels SAN DIMAS Expansion to 3,000 TPD 89% GROWTH See final slide for footnotes.
  • 13. TSX P I NYSE PPP I 13 Proven History of Reserve & Resource Growth SAN DIMAS Significant Exploration Upside with Low Finding Costs o 2014: $15.7 million, 80,000 metres of drilling o Victoria vein Gold Reserves increased to 195,000 oz at 11.5 g/t 505 660 870 577 780 997 704 762 998 2011 2012 2013 P&P Reserves ( Au Koz) M&I Resources (Au Koz) Inferred Resources (Au Koz) Low Finding Cost Per Ounce 247 311 $53.0 $34.7 2012 2013 P&P Reserves Discoverd (Koz Au) P&P Discovery Cost(US$/oz Au) (M&I Resources Include Mineral Reserves) See slides 27, 28, 29 & 30
  • 14. TSX P I NYSE PPP I 14 BLACK FOX Established Jurisdiction with Proven Depth Potential Over 200 Million Ounces of Historical Production Note: Based on public data, average depth of listed mines is 1,633 metres.
  • 15. TSX P I NYSE PPP I 15 Location Mine Type Ownership Timmins, Ontario Open-Pit & Underground, Gold 100% (8% gold stream) 11 Proven & Probable Gold Reserves (koz) (3.8M tonnes at 4.3 g/t) 538 Measured & Indicated Gold Resources (koz) (Inclusive of Reserves) (4.0M tonnes at 5.1 g/t) 653 Inferred Gold Resources (koz) (0.7M tonnes at 7.6 g/t) 168 2014E Production (AuEq koz) 65-75 2014E Cash Costs 5 ($/AuEq oz) $850-$900 - 200 400 600 800 1,000 1,200 1,400 1,600 - 5,000 10,000 15,000 20,000 25,000 30,000 Q1 2013 Q2 2013 Q3 2013 Q4 2013 Q1 2014 Q2 2014 Production (oz) Cash Costs ($/oz) See final slide for footnotes. Black Fox Quarterly Production Primero Acquisition o 2014 total budget of $53 million o Positive exploration drilling results to date o Short term focus on underground development, definition and delineation drilling to increase underground throughput o Optimization plan in place to improve operational processes and reduce costs BLACK FOX Turnaround Opportunity to Create Value
  • 16. TSX P I NYSE PPP I 16 BLACK FOX Focused on Reserve & Resource Development Lateral & Depth Expansion 645-01-W 40.7 gpt/26.8m Incl. 103.2gpt/8.3m 645-34-W 18.1 gpt/37.8m Incl. 39.4gpt/10.3m 645-34-W 645-01-W
  • 17. TSX P I NYSE PPP I 17 o 2014:  $10.0 million program, 76,400 metres of definition and delineation drilling  45,000 metres of exploration drilled to date  Complete Phase 3 metallurgical study  Explore between Black Fox and Grey Fox o Positive Exploration Results to date from underground and open pit targets Location Ownership 4 km from Black Fox, Ontario 100% (no stream) Measured & Indicated Gold Resources (koz) (5.3M tonnes at 3.3 g/t) 558 Inferred Gold Resources (koz) (1.6M tonnes at 4.4 g/t) 219 GREY FOX Promising Exploration Project Grey Fox Exploration Results Grey Fox
  • 18. TSX P I NYSE PPP I 18 Q1 2015 Reserve and Resource Update Including 226,000 metres of 2014 drilling Q1 2015 Black Fox Complex Exploration Update Drilling from 500 metre level exploration drift at depth Q3 2014 San Dimas Operating at 2,500 TPD Increases annual production rate to 165,000AuEq oz Q3 2014 San Dimas 3,000 TPD Decision Expansion decision announced Catalysts and News Flow Q4 2015 Grey Fox Scoping Study Q4 2014 San Dimas Exploration Update Extended top producing veins   
  • 19. TSX P I NYSE PPP I 19 Investment Highlights Producing in America’s Top Mining Jurisdictions Experienced Board and Management Strong Financial Position Established Growth Profile from Assets in Production Track Record of Delivering on Stakeholder Commitments GROWTHIN 3 YEARS2 145% DEBT/TOTAL CAP.3 11% 220koz–240koz CANADA & MEXICO1 +200years INDUSTRY EXPERIENCE 38% 3 YR RETURN
  • 21. TSX P I NYSE PPP I 21 Third Quarter 2014 Combined Operating Results *See final slide for footnotes. Q3 2014 Q3 2013 Gold equivalent production 1 (gold equivalent ounces) 59,673 41,998 Gold production (ounces) 51,464 31,791 Silver production 1 (million ounces) 1.41 1.62 All-in Sustaining Costs 5 ($ per gold ounce) $1,154 $974 Cash cost 5 ($ per AuEq ounce) $689 $516 Cash cost 5 – by-product ($ per gold ounce) $596 $252 - 10,000 20,000 30,000 40,000 50,000 60,000 70,000 Q3 2013 Q3 2014 +42% Production (AuEq ounces)
  • 22. TSX P I NYSE PPP I 22 Third Quarter 2014 Financial Results (US$ thousands, except per share amounts) Q3 2014 Q3 2013 Revenues 75,503 53,793 Earnings from Mine Operations 6,184 22,960 Net income (loss) (105,904) 10,080 EPS ($ per share) (0.66) 0.09 Adjusted net income 11 259 10,959 Adjusted EPS 11 ($ per share) 0.00 0.09 Operating cash flows 12 before changes in working capital 21,704 20,926 CFPS 12 ($ per share) 0.14 0.18 - 10 20 30 40 50 60 70 80 Q3 2013 Q3 2014 +40% See final slide for footnotes. Revenues ($millions)
  • 23. TSX P I NYSE PPP I 23 Primero sells 50% of annual silver production above 6.0 million ounces at spot o Remainder sold at ~$4 per ounce under silver purchase agreement o Threshold commences August 6 to following August 5 o Expansion anticipated to generate meaningful silver spot sales post August 6, 2014 25% 75% Silver Gold SAN DIMAS Silver Purchase Agreement BLACK FOX Gold Streaming Agreement Primero sells 8% of annual gold production at Black Fox at ~$509 per ounce o Primero streams 6.3% from the Black Fox Extension which includes the Pike River Property o Gold is sold at $500 per ounce subject to inflationary adjustment beginning in 2013, not to exceed 2% per annum o The Grey Fox exploration property is not subject to any gold streaming agreements Silver as Percentage of 2013E Revenue See final slide for footnotes.
  • 24. TSX P I NYSE PPP I 24 SAN DIMAS District-Wide Exploration Potential SW NE 3,000 m. 2,000 m. 1,000 m. Source: San Dimas Geology Office WEST BLOCK 2014 Exploration SAN ANTONIO Mined 1987-2002 CENTRAL BLOCK Mined 2002-Current TAYOLTITA BLOCK Mined 1975-Current ARANA HANGING WALL SINALOA GRABEN Mined 2012-Current 2014 EXPLORATION PROGRAM Drilling for Extensions of Known Veins Longitudinal Cross Section 3,000 m. 2,000 m. 1,000 m. Mineralization – Ore Bodies Extension of the Favorable Horizon Potential Intrusive Faults LEGEND Kilometers 0 1 2
  • 25. TSX P I NYSE PPP I 25 Focus on Responsible Mining HEALTH AND SAFETY o We understand that our most important assets are our people and their safety is our number one priority o We maintain world-class health and safety policies ENVIRONMENT o San Dimas is certified as “Clean Industry” by PROFEPA (Mexican EPA) o We utilize sustainable green technologies where possible - Primero’s own hydroelectric dam supplies the majority of San Dimas Mine’s power COMMUNITY o We treat our local communities as our partners o We focus on understanding our local communities goals and providing local opportunities o We promote local education with awards for the local technical college in San Dimas
  • 26. TSX P I NYSE PPP I Stock Performance & Significant Events 26 0 10 20 30 -80% -60% -40% -20% 0% 20% 40% 60% 80% 8/13/2010 2/13/2011 8/13/2011 2/13/2012 8/13/2012 2/13/2013 8/13/2013 2/13/2014 8/13/2014 Volume(Millions) P-T Volume Primero IPO, Begins Trading on the TSX, and Finalizes San Dimas Acquisition Primero Announces Brigus Gold Acquisition Primero Added to S&P/TSX Composite Index Primero Announces San Dimas Expansion Plan Phase 1 Primero Begins Trading on the NYSE Primero Announces Acquisition of Cerro Del Gallo Primero Announce s APA Ruling Spot Gold Hits 4- Year Low
  • 27. TSX P I NYSE PPP I 27 Classification Tonnage (Million Tonnes) Gold Grade (G/T) Silver Grade (G/ T) Contained Gold (000 Ounces) Contained Silver (000 Ounces) Mineral Reserves Proven & Probable 4.893 5.5 315 870 49,479 Mineral Resources Measured & Indicated 4.282 7.2 419 997 57,713 Inferred 7,333 4.2 310 998 72,647 Notes to Mineral Reserve Statement: Cutoff grade of 2.7 grams per tonne (”g/t”) gold equivalent (“AuEq”) based on total operating cost of US$104.97/t. Metal prices assumed are gold US$1,250 per troy ounce and silver US$20 per troy ounce. Silver supply contract obligations have been referenced in determining overall vein reserve estimate viability. Processing recovery factors for gold and silver of 97% and 94% assumed. Exchange rate assumed is 13 pesos/US$1.00. The Mineral Reserve estimates were prepared under the supervision of Mr. Gabriel Voicu P.Geo., Vice President, Geology and Exploration, Primero and a QP for the purposes of National Instrument 43-101 (“NI 43-101”). Notes to Mineral Resource Statement: Mineral Resources are total and include those resources converted to Mineral Reserves. A 2.0g/t AuEq cutoff grade is applied and the gold equivalent is calculated at a gold price of US$1,300 per troy ounce and a silver price of US$20 per troy ounce. A constant bulk density of 2.7 tonnes/m3 has been used. The Mineral Resource estimates were prepared by Mr. Rodney Webster MAusIMM, MAIG and Mr. J. Morton Shannon P.Geo., both of AMC Mining Consultants (Canada) Ltd. and a QP for the purposes of NI 43-101. Additional exploration potential was estimated at 6-10 million tonnes at grade ranges of 3-5 grams per tonne of gold and 200-400 grams per tonne of silver as of December 31, 2011. It should be noted that these targets are conceptual in nature. There has been insufficient exploration to define an associated Mineral Resource and it is uncertain if further exploration will result in the target being delineated as a Mineral Resource. SAN DIMAS Mineral Resources and Mineral Reserves (December 31, 2013, Mineral Resources include Mineral Reserves)
  • 28. TSX P I NYSE PPP I 28 Notes to Black Fox Mineral Reserve estimate: 1. Mineral Reserves stated as at December 31, 2013. 2. Open pit cut-off grade of 1.0 g/t Au and underground cut-off grade of 3.4 g/t. 3. Gold price assumed is US$1,250 per troy ounce. 4. Processing gold recovery factor 94% assumed. 5. Harold Brisson, PhD, Eng. is the Qualified Person for the Black Fox Complex Mineral Resource estimates. Notes to Black Fox Mineral Resource estimate: 1. Mineral Reserves stated as at December 31, 2013. 2. Open pit cut-off grade of 0.9 g/t Au and underground cut-off grade of 3.0 g/t. 3. Gold price assumed is US$1,300 per troy ounce and exchange rate of US$1.00=C$1.10 was used in the gold cut-off grade calculations. 4. Detailed footnotes can be found in the NI 43-101 Technical Report titled “TECHNICAL REPORT ON THE MINERAL RESOURCE AND MINERAL RESERVE ESTIMATES FOR THE BLACK FOX COMPLEX”, dated June 30, 2014 and filed on www.sedar.com. BLACK FOX Mineral Resources and Mineral Reserves (December 31, 2013, Mineral Resources include Mineral Reserves) Classification Tonnage (Tonnes) Gold Grade (G/T) Cont. Gold (Ounces) Proven & Probable Reserves Open Pit 1,468,500 3.7 173,900 Underground 1,663,900 6.3 339,100 Stockpile 716,200 1.1 24,700 Total 3,848,700 4.3 537,700 Measured & Indicated Resources, Including Reserves Open Pit 1,423,900 4.0 182,518 Underground 1,852,800 7.5 445,336 Stockpile 716,200 1.1 24,706 Total 3,992,800 5.1 652,560 Inferred Resources Open Pit 364,100 5.8 67,897 Underground 326,300 9.5 99,889 Total 690,400 7.6 167,786
  • 29. TSX P I NYSE PPP I 29 Classification Cut-off Grade (G/T Au) Potential Material Tonnes (Million Tonnes) CAPPED Au (G/T) Contained Gold (000 Ounces) Indicated Resources >3.0 Underground 1.394 5.4 243,041 >0.9 Open Pit 3.882 2.5 314,615 Total Indicated Resources 5.276 3.3 557,655 Inferred Resources >3.0 Underground 1.065 5.1 175,511 >0.9 Open Pit 0.486 2.8 43,309 Total Inferred Resources 1.552 4.4 218,820 Notes to Grey Fox Mineral Resource estimate: 1. Mineral Reserves stated as at 31 December 2013. 2. Open pit cut-off grade of 0.9 g/t Au and underground cut-off grade of 3.0 g/t 3. Gold price assumed is US$1,300 per troy ounce and exchange rate of US$1.00=C$1.10 was used in the gold cut-off grade calculations. 4. Detailed footnotes can be found in the NI 43-101 Technical Report titled “TECHNICAL REPORT ON THE MINERAL RESOURCE AND MINERAL RESERVE ESTIMATES FOR THE BLACK FOX COMPLEX”, dated June 30, 2014 and filed on www.sedar.com. 5. Harold Brisson, PhD, Eng. is the Qualified Person for the Black Fox Complex Mineral Resource estimates. GREY FOX Mineral Resources December 31, 2013
  • 30. TSX P I NYSE PPP I 30 Category M Tonnes Au (g/t) Au (M ozs) Ag (g/t) Ag (M ozs) Cu (%) Cu (M lbs) Au Eq (g/t) AuEq (M oz) Proven 28.2 0.71 0.64 15.1 13.7 0.08 50.2 1.15 1.05 Probable 4.0 0.54 0.07 13.2 1.7 0.07 6.2 0.93 0.12 Proven & Probable 32.2 0.69 0.71 14.8 15.3 0.08 56.4 1.14 1.18 Category M Tonnes Au (g/t) Au (M ozs) Ag (g/t) Ag (M ozs) Cu (%) Cu (M lbs) Au Eq (g/t) AuEq (M oz) Measured 39.9 0.61 0.78 13.8 17.71 0.10 88.8 1.07 1.37 Indicated 8.0 0.55 0.14 11.0 2.83 0.08 14.6 0.92 0.24 Measured & Indicated 47.9 0.60 0.92 13.3 20.55 0.1 103.4 1.06 1.64 Total Resources Within the Gold Domain2 Phase I Heap Leach In-Pit Proven and Probable Reserves3 In-Pit Resources (excluding Proven and Probable Reserves)4,5 Category M Tonnes Au (g/t) Au (M ozs) Ag (g/t) Ag (M ozs) Cu (%) Cu (M lbs) Au Eq (g/t) AuEq (M oz) Measured 129 0.54 2.24 12.0 49.8 0.09 256.0 0.94 3.91 Indicated 80 0.38 0.98 8.0 20.6 0.08 141.1 0.69 1.77 Measured & Indicated 209 0.48 3.22 11.0 70.3 0.08 396.9 0.83 5.58 Inferred 20 0.3 0.19 7.0 4.5 0.09 39.7 0.59 0.38 1. “Technical Report First Stage Heap Leach Feasibility Study, Cerro del Gallo Gold Silver Project, Guanajuato, Mexico” June 2012 (“Feasibility Study”). Gold equivalent ounces calculated by Cerro Resources using gold, silver and copper prices of US$1,341/oz, US$25.58/oz and US$7,582/t respectively. 2. These resources are reported using internal cut-off grade of 0.2 g/tAu as per Feasibility Study, 2012 and Golder Associates Technical Report, 2008. 3. These reserves are reported using internal cut-off grades of 0.24 and 0.29 gAuEq/t for weathered and partially oxidized, respectively. 4. These resources are reported using internal cut-off grades of 0.24, 0.29, and 0.34 gAuEq/t for weathered, partially oxidized, and fresh material resp. 5. See note 7 in January 23, 2013 News Release “Primero achieves 2012 Guidance and Provides 2013 Outlook”. CERRO DEL GALLO Reserves and In-Pit Resources1
  • 31. TSX P I NYSE PPP I 31 Executive Management Tamara Brown | VP, Investor Relations  Former Director Investor Relations for IAMGOLD  Former partner of a Toronto based, boutique investment bank and professional engineer in mining industry H. Maura Lendon | VP, Chief General Counsel and Corporate Secretary  Former Senior Vice President, Chief Legal Officer and Corporate Secretary of HudBay Minerals Inc.; Chief Counsel Canada, Chief Privacy Officer - Canada of AT&T David Sandison | VP, Corporate Development  Former VP, Corporate Development of Clarity Capital ; Director, Corporate Development Xstrata Zinc Canada ; Director Business Development, Noranda/Falconbridge; Former EVP, Noranda Chile Louis Toner | VP, Project Development & Construction  Over 30 Years of Engineering and Construction experience, formerly held Senior Project Management roles with BBA Inc. and Lafarge Canada Inc. James Mallory | VP, Corporate Responsibility  Over 35 Years of mining experience  Former VP, Vice-President, Operations & Social Responsibility at South American Silver  13 Years of experience in Latin America Gabriel Voicu | VP, Geology and Exploration  25 Years of mining experience, formerly held senior technical and exploration positions with Cambior and IAMGOLD Wendy Kaufman| Chief Financial Officer  20 Years of experience  Appointed CFO in September 2014  Former VP, Finance and Treasure of Inmet Mining Corporation Joseph Conway | President & CEO  30 Years of experience  Appointed President and CEO in June 2010  Former CEO, President & Director of IAMGOLD and Repadre Capital
  • 32. TSX P I NYSE PPP I 32 Board of Directors Board Committees: 1. Health, Safety and Environment 2. Human Resources 3. Governance and Nominating 4. Lead Director 5. Audit David Demers | Director 2, 3, 4, 5 o Founder, CEO and Director Westport Innovations o Director of Cummins Westport and Juniper Engines Grant Edey | Director 3, 4, 5 o President & CEO, Khan Resources Inc. o Former Director of Breakwater Resources, former director of Queenstake Resources, Santa Cruz Gold o Former CFO, IAMGOLD Michael Riley | Director 2, 5 o Chartered accountant with more than 26 years of accounting experience o Chair of Primero Audit Committee Brad Marchant | Director 1 o Co-founder of Triton Mining Corporation o Founder of BioteQ Environmental Technologies Inc. Rohan Hazelton | Director 1 o VP, Strategy, Goldcorp o Formerly with Wheaton River and Deloitte & Touche LLP Robert Quartermain | Director 2, 3 o Founder and President & CEO, Pretivm Resources o Former President and CEO of Silver Standard Wade Nesmith | Chairman o Founder of Primero o Founding and current director of Silver Wheaton Eduardo Luna | Director 1 o Former EVP & President, Mexico. Former Chairman and CEO of Silver Wheaton, Executive VP of Goldcorp and Luismin S.A. de C.V. (San Dimas) and President of Mexican Mining Chamber and the Silver Institute Joseph Conway | Director see Executive Management
  • 33. TSX P I NYSE PPP I 33 This presentation has been prepared in accordance with the requirements of Canadian provincial securities laws which differ from the requirements of U.S. securities laws. Unless otherwise indicated, all mineral reserve and resource estimates included in this presentation have been prepared in accordance with Canadian National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”) and the Canadian Institute of Mining, Metallurgy and Petroleum classification systems. NI 43-101 is a rule developed by the Canadian Securities Administrators that establishes standards for all public disclosure an issuer makes of scientific and technical information concerning mineral projects. These standards differ significantly from the requirements of the United States Securities and Exchange Commission (the “SEC”), and reserve and resource estimates disclosed in this presentation may not be comparable to similar information disclosed by U.S. companies. The mineral reserve estimates in this presentation have been calculated in accordance with NI 43-101, as required by Canadian securities regulatory authorities. For United States reporting purposes, SEC Industry Guide 7 under the United States Securities Exchange Act of 1934, as amended, as interpreted by Staff of the SEC, applies different standards in order to classify mineralization as a reserve. As a result, the definition of “probable reserves” used in NI 43-101 differs from the definition in the SEC Industry Guide 7. Under SEC standards, mineralization may not be classified as a “reserve” unless the determination has been made that the mineralization could be economically and legally produced or extracted at the time the reserve determination is made. Among other things, all necessary permits would be required to be in hand or issuance imminent in order to classify mineralized material as reserves under the SEC standards. Accordingly, mineral reserve estimates contained in this presentation may not qualify as “reserves” under SEC standards. In addition, this presentation uses the terms “indicated resources” and “inferred resources” to comply with the reporting standards in Canada. The Company advises United States investors that while those terms are recognized and required by Canadian regulations, the SEC does not recognize them. United States investors are cautioned not to assume that any part or all of the mineral deposits in these categories will ever be converted into mineral reserves. Further, “inferred resources” have a great amount of uncertainty as to their existence and as to whether they can be mined legally or economically. Therefore, United States investors are also cautioned not to assume that all or any part of the “inferred resources” exist. In accordance with Canadian securities laws, estimates of “inferred resources” cannot form the basis of feasibility or other economic studies. It cannot be assumed that all or any part of “indicated resources” or “inferred resources” will ever be upgraded to a higher category or are economically or legally mineable. In addition, disclosure of “contained ounces” is permitted disclosure under Canadian securities laws; however, the SEC only permits issuers to report mineralization as in place tonnage and grade without reference to unit measures. NI 43-101 also permits the inclusion of disclosure regarding the potential quantity and grade, expressed as ranges, of a target for further exploration provided that the disclosure (i) states with equal prominence that the potential quantity and grade is conceptual in nature, that there has been insufficient exploration to define a mineral resource and that it is uncertain if further exploration will result in the target being delineated as a mineral resources, and (ii) states the basis on which the disclosed potential quantity and grade has been determined. Disclosure regarding exploration potential has been included in this presentation. United States investors are cautioned that disclosure of such exploration potential is conceptual in nature by definition and there is no assurance that exploration will result in any category of NI 43-101 mineral resources being identified. Notes to Investors Regarding the Use of Resources
  • 34. TSX P I NYSE PPP I 34 1. “Gold equivalent ounces” include silver production converted to a gold equivalent based on consensus estimated commodity prices; accounts for the San Dimas silver purchase agreement. Silver production is subject to a silver purchase agreement. The silver purchase agreement dictates that until August 6, 2014 Primero will deliver to Silver Wheaton a per annum amount equal to the first 3.5 million ounces of silver produced at San Dimas and 50% of any excess at $4.16 per ounce (increasing by 1% per year). Thereafter Primero will deliver to Silver Wheaton a per annum amount equal to the first 6.0 million ounces of silver produced at San Dimas and 50% of any excess at $4.20 per ounce (increasing by 1% per year). The Company will receive silver spot prices only after the annual threshold amount has been delivered. Black Fox is subject to a gold purchase agreement under which Sandstorm is entitled to 8% of production at the Black Fox mine and 6.3% at the Black Fox Extension. 2. Based on 2013 actual production, 2014 guidance and projected 2015 estimated production. 3. $48.1 million senior unsecured convertible debenture (acquired from Brigus, with a 6.5% coupon an effective conversion price of $14.00 and an expiry of March 2016); and $30 million draw down from line of credit. Excludes capital leases. 4. Assumes San Dimas operates at least at 3,000 TPD from end of Q2 2016; and Primero management estimates for Black Fox production, based on 2,200-2,300 TPD operation and underground throughput increasing to 1,000 TPD by the end of 2015 & assumes that Cerro Del Gallo begins production mid-2016, with half a year of production in 2016 of 50,000 AuEq. Oz. 5. Cash costs and All-in Sustaining Costs are non-GAAP measures. Refer to the Company’s third quarter 2014 MD&A for a reconciliation to operating expenses. Note the calculation of all-in sustaining costs at San Dimas changed with the acquisition of a second producing asset and subsequently do not include corporate G&A. 6. The Company closed a $75 million line of credit on May 23, 2014 and has drawn down $30 million as of September 30, 2014. 7. During the nine months ended September 30 2014, the Company issued 41,340,347 common shares as consideration for the acquisition of Brigus, 1,919,744 common shares upon the exercise of stock options; and 1,000,000 common shares pursuant to a flow through agreement. 8. Fully diluted shares include 20.8 million warrants with an exercise price of Cdn$8.00 per share, expiring on July 20, 2015; and 9.5 million options with an average exercise price of Cdn$6.26. 9. Major assumptions include a flat gold price per ounce of $1,300, a flat silver price per ounce of $22. 10. The Company currently estimates that expanding the San Dimas mill to 3,000 TPD will require approximately $26.4 million of capital investment, with approximately $6 million expenditure expected in 2014 and the remainder spread over the following eighteen months. As a result of the preliminary nature of the capital assessment a contingency factor of 30% has been included in the capital estimate. 11. Adjusted net income/earnings and adjusted net income/earnings per share are non-GAAP measures. Neither of these non-GAAP performance measures has any standardized meaning and is therefore unlikely to be comparable to other measures presented by other issuers. The Company believes that, in addition to conventional measures prepared in accordance with GAAP, the Company and certain investors use this information to evaluate the Company’s performance. Accordingly, it is intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with GAAP. Refer to the Company’s third quarter 2014 MD&A for a reconciliation of adjusted net income/earnings to reported net income. 12. “Operating cash flow” is operating cash flow before working capital changes. This and operating cash flows before working capital changes per share (CFPS) are non-GAAP measures which the Company believes provides a better indicator of the Company’s ability to generate cash flow from its mining operations. See the Company’s third quarter 2014 MD&A for a reconciliation of operating cash flows to GAAP. Footnotes
  • 35. TSX P I NYSE PPP I 35 Notes
  • 36. PRIMERO MINING CORP. 79 Wellington St. West, Suite 2100 Toronto, ON M5K 1H1 T 416 814 3160 TF 877 619 3160 www.primeromining.com Tamara Brown Vice President, Investor Relations T 416 814 3168 info@primeromining.com Vancouver Resource Investment Conference 2015 January 18-19, 2015