Handrail Anatomy
                   (One example from many acceptable solutions)




(a) Boundary joist: Must be H3 treated. The boundary joist is fixed to the perimeter of the
      deck to give a neat finish and if the boundary joist is required to support the handrail,
      then it must be fixed to the joists using 2/M12x100mm coach screws with 50x50 washers
      and also with nail plates fixed to top and bottom of joists.
(b) Baluster (handrail post): The baluster is fixed to the boundary joist using 2/M12 bolts with
      50x50 washers. The bolts should be 25mm from top and bottom of the boundary joist.
      The size of the baluster depends on the handrail structure and the baluster spacing. For
      example, if the top rail is 150x50 as shown in the diagram above and the balusters are
      2000mm apart, then the balusters must be 100x100. If the balusters are 1800mm apart,
      then the baluster can be 100x75.
(c) Top rail: The height from the deck to the top of top rail must be at least 1000mm. The top
    rail is fixed to the balusters with 100mm galvanised nails. (minimum of 2 nails for baluster
    spans up to 1400mm and a minimum of 3 nails for spans above 1400mm.
(d) Blocking: The blocking (50x50) is fixed to the underside of the top rail and is used to
    support the palings.
(e) Bottom rail: The top of the bottom rail must not be higher than 150mm from the deck.
    The bottom rail is fixed to the balusters using 3 galvanised nails penetrating no less than
    50mm into the baluster and the size of the bottom rail depends on the baluster spacing.
    For example, If the baluster spacing is up to 1700mm then the bottom rail should be
    100x50, if the baluster spacing is up to 1800mm then the bottom rail should be 150x50,
    and if the baluster spacing is up to 2000mm then the bottom rail should be 100x75.
(f)   Palings: Palings should be 25mm thick timber and at least 65mm wide, and have a
maximum gap between palings of 100mm. The palings are fixed to the top and bottom
rails with:
(1) Two 60mm x 2.8mm shank diameter nails if the paling is 200mm wide or less.
(1) Two 60mm x 2.8mm shank diameter nails at 150mm centres if the palings are wider
than 200mm.

Weitere ähnliche Inhalte

Ähnlich wie Handrail anatomy

Design-Of-concrete-Structure MCQ.pdf
Design-Of-concrete-Structure MCQ.pdfDesign-Of-concrete-Structure MCQ.pdf
Design-Of-concrete-Structure MCQ.pdfAsifHameed33
 
Cvl013 tutorial 05 (1)
Cvl013 tutorial 05 (1)Cvl013 tutorial 05 (1)
Cvl013 tutorial 05 (1)Bayezid Faroqi
 
Pile cap two pile laod 50 t desigh and drawing
Pile cap  two pile laod 50 t  desigh and drawingPile cap  two pile laod 50 t  desigh and drawing
Pile cap two pile laod 50 t desigh and drawingRAJESH JAIN
 
Two pile group
Two pile groupTwo pile group
Two pile groupNaOzas
 
Column uniaxial axial loaded column design
Column  uniaxial axial loaded column designColumn  uniaxial axial loaded column design
Column uniaxial axial loaded column designUmarSaba1
 
How to build a retaining wall
How to build a retaining wallHow to build a retaining wall
How to build a retaining wallPraveen Sudarsan
 
Structural engineering and irrigation drawing.pptx
Structural engineering and irrigation drawing.pptxStructural engineering and irrigation drawing.pptx
Structural engineering and irrigation drawing.pptxSTRUCTURALDYNAMICS
 
Assignment shear and bending
Assignment shear and bendingAssignment shear and bending
Assignment shear and bendingYatin Singh
 
Slabs Beam Reinforcement Detailing
Slabs Beam Reinforcement DetailingSlabs Beam Reinforcement Detailing
Slabs Beam Reinforcement DetailingMake Mannan
 
Assignment 1 cie 252
Assignment 1 cie 252Assignment 1 cie 252
Assignment 1 cie 252Brian Mphanza
 
DSR chap4 shear and bond pdf.pptxxxxxxxxxxxxxxxxxxxxxx
DSR chap4 shear and bond pdf.pptxxxxxxxxxxxxxxxxxxxxxxDSR chap4 shear and bond pdf.pptxxxxxxxxxxxxxxxxxxxxxx
DSR chap4 shear and bond pdf.pptxxxxxxxxxxxxxxxxxxxxxxADITYAPILLAI29
 
Guidelines for construction of masonry with siporex
Guidelines for construction of masonry with siporexGuidelines for construction of masonry with siporex
Guidelines for construction of masonry with siporexPriya Raj
 
Mechanics of solids1
Mechanics of solids1Mechanics of solids1
Mechanics of solids1jntuworld
 

Ähnlich wie Handrail anatomy (20)

Handrail anatomy
Handrail anatomyHandrail anatomy
Handrail anatomy
 
Design-Of-concrete-Structure MCQ.pdf
Design-Of-concrete-Structure MCQ.pdfDesign-Of-concrete-Structure MCQ.pdf
Design-Of-concrete-Structure MCQ.pdf
 
Cvl013 tutorial 05 (1)
Cvl013 tutorial 05 (1)Cvl013 tutorial 05 (1)
Cvl013 tutorial 05 (1)
 
All about decking
All about deckingAll about decking
All about decking
 
Two Pile Group.pdf
Two Pile Group.pdfTwo Pile Group.pdf
Two Pile Group.pdf
 
Two Pile Group.pdf
Two Pile Group.pdfTwo Pile Group.pdf
Two Pile Group.pdf
 
Pile cap two pile laod 50 t desigh and drawing
Pile cap  two pile laod 50 t  desigh and drawingPile cap  two pile laod 50 t  desigh and drawing
Pile cap two pile laod 50 t desigh and drawing
 
Two pile group
Two pile groupTwo pile group
Two pile group
 
pile group
pile grouppile group
pile group
 
Column uniaxial axial loaded column design
Column  uniaxial axial loaded column designColumn  uniaxial axial loaded column design
Column uniaxial axial loaded column design
 
All about decking
All about deckingAll about decking
All about decking
 
How to build a retaining wall
How to build a retaining wallHow to build a retaining wall
How to build a retaining wall
 
Structural engineering and irrigation drawing.pptx
Structural engineering and irrigation drawing.pptxStructural engineering and irrigation drawing.pptx
Structural engineering and irrigation drawing.pptx
 
Assignment shear and bending
Assignment shear and bendingAssignment shear and bending
Assignment shear and bending
 
Slabs Beam Reinforcement Detailing
Slabs Beam Reinforcement DetailingSlabs Beam Reinforcement Detailing
Slabs Beam Reinforcement Detailing
 
x.pdf
x.pdfx.pdf
x.pdf
 
Assignment 1 cie 252
Assignment 1 cie 252Assignment 1 cie 252
Assignment 1 cie 252
 
DSR chap4 shear and bond pdf.pptxxxxxxxxxxxxxxxxxxxxxx
DSR chap4 shear and bond pdf.pptxxxxxxxxxxxxxxxxxxxxxxDSR chap4 shear and bond pdf.pptxxxxxxxxxxxxxxxxxxxxxx
DSR chap4 shear and bond pdf.pptxxxxxxxxxxxxxxxxxxxxxx
 
Guidelines for construction of masonry with siporex
Guidelines for construction of masonry with siporexGuidelines for construction of masonry with siporex
Guidelines for construction of masonry with siporex
 
Mechanics of solids1
Mechanics of solids1Mechanics of solids1
Mechanics of solids1
 

Mehr von Praveen Sudarsan

Mehr von Praveen Sudarsan (20)

How to install pvc downpipes
How to install pvc downpipesHow to install pvc downpipes
How to install pvc downpipes
 
How to hang wallpaper
How to hang wallpaperHow to hang wallpaper
How to hang wallpaper
 
How to construct a suimple garden pond
How to construct a suimple garden pondHow to construct a suimple garden pond
How to construct a suimple garden pond
 
How to build a raised formal pool
How to build a raised formal poolHow to build a raised formal pool
How to build a raised formal pool
 
How to build a deck
How to build a deckHow to build a deck
How to build a deck
 
How a lighting circuit works
How a lighting circuit worksHow a lighting circuit works
How a lighting circuit works
 
Home security
Home securityHome security
Home security
 
Heat guns
Heat gunsHeat guns
Heat guns
 
How to avoid the cowboy builder
How to avoid the cowboy builderHow to avoid the cowboy builder
How to avoid the cowboy builder
 
General do it yourself safety comments
General do it yourself safety commentsGeneral do it yourself safety comments
General do it yourself safety comments
 
Garage floor insulation
Garage floor insulationGarage floor insulation
Garage floor insulation
 
Foundations for light garden walls
Foundations for light garden wallsFoundations for light garden walls
Foundations for light garden walls
 
Fixing to plasterboard and plasterboard fixings
Fixing to plasterboard and plasterboard fixingsFixing to plasterboard and plasterboard fixings
Fixing to plasterboard and plasterboard fixings
 
Fixing to lathe & plaster
Fixing to lathe & plasterFixing to lathe & plaster
Fixing to lathe & plaster
 
Fitting a mortice latch
Fitting a mortice latchFitting a mortice latch
Fitting a mortice latch
 
Fit extra electrical sockets
Fit extra electrical socketsFit extra electrical sockets
Fit extra electrical sockets
 
Fit a toilet and bidet
Fit a toilet and bidetFit a toilet and bidet
Fit a toilet and bidet
 
Fit a bath and wash basin
Fit a bath and wash basinFit a bath and wash basin
Fit a bath and wash basin
 
Fireplace
FireplaceFireplace
Fireplace
 
Electrical safety
Electrical safetyElectrical safety
Electrical safety
 

Handrail anatomy

  • 1. Handrail Anatomy (One example from many acceptable solutions) (a) Boundary joist: Must be H3 treated. The boundary joist is fixed to the perimeter of the deck to give a neat finish and if the boundary joist is required to support the handrail, then it must be fixed to the joists using 2/M12x100mm coach screws with 50x50 washers and also with nail plates fixed to top and bottom of joists. (b) Baluster (handrail post): The baluster is fixed to the boundary joist using 2/M12 bolts with 50x50 washers. The bolts should be 25mm from top and bottom of the boundary joist. The size of the baluster depends on the handrail structure and the baluster spacing. For example, if the top rail is 150x50 as shown in the diagram above and the balusters are 2000mm apart, then the balusters must be 100x100. If the balusters are 1800mm apart, then the baluster can be 100x75. (c) Top rail: The height from the deck to the top of top rail must be at least 1000mm. The top rail is fixed to the balusters with 100mm galvanised nails. (minimum of 2 nails for baluster spans up to 1400mm and a minimum of 3 nails for spans above 1400mm. (d) Blocking: The blocking (50x50) is fixed to the underside of the top rail and is used to support the palings. (e) Bottom rail: The top of the bottom rail must not be higher than 150mm from the deck. The bottom rail is fixed to the balusters using 3 galvanised nails penetrating no less than 50mm into the baluster and the size of the bottom rail depends on the baluster spacing. For example, If the baluster spacing is up to 1700mm then the bottom rail should be 100x50, if the baluster spacing is up to 1800mm then the bottom rail should be 150x50, and if the baluster spacing is up to 2000mm then the bottom rail should be 100x75. (f) Palings: Palings should be 25mm thick timber and at least 65mm wide, and have a
  • 2. maximum gap between palings of 100mm. The palings are fixed to the top and bottom rails with: (1) Two 60mm x 2.8mm shank diameter nails if the paling is 200mm wide or less. (1) Two 60mm x 2.8mm shank diameter nails at 150mm centres if the palings are wider than 200mm.