Preparing a WBS ,[object Object]
Preparing a WBS ,[object Object]
Building a WBS ,[object Object]
WBS: Structure ,[object Object],[object Object],Level 1   ,[object Object],[object Object],[object Object],[object Object],[object Object]
WBS: Structure ,[object Object],[object Object],[object Object],Level 1   Level 2  
WBS: Structure ,[object Object],[object Object],Level 1   Level 2   Level 3  
WBS: Structure ,[object Object],Level 4 of the WBS will enable us to manage the project as desired.  All of our contractors fit into specific elements at level 4, and so do all specific departments. As with the previous Levels, note the WBS codes that have been assigned to the tasks and their relationship to the previous Level .  Level 4   Level 3      Level 1    Level 2
WBS: Structure ,[object Object],[object Object]
Work Breakdown Structure (WBS) Tree ,[object Object],[object Object],1 ACME Housing Corporation  1.1 New Home Construction   1.1.1 Concrete  1.1.1.1 Pour Foundation 1.1.1.2 Install Patio 1.1.1.3 Pour Stairway 1.1.2 Framing 1.1.2.1 Frame Exterior Walls 1.1.2.2 Frame Interior Walls 1.1.2.3 Install Roofing Trusses 1.1.3 Plumbing 1.1.3.1 Install Water Lines 1.1.3.2 Install Gas Lines 1.1.3.3 Install B/K Fixtures 1.1.4 Electrical 1.1.4.1 Install Wiring 1.1.4.2 Install Outlets/Switches 1.1.4.3 Install Fixtures 1.1.5 Interior 1.1.5.1 Install Drywall 1.1.5.2 Install Carpets 1.1.5.3 Install Painting 1.1.6 Roofing 1.1.6.1 Install Felt 1.1.6.2 Install Shingles 1.1.6.3 Install Vents
WBS and Earned Value ,[object Object],[object Object],[object Object],[object Object]
WBS Dictionary ,[object Object],[object Object],[object Object],[object Object],[object Object]
Organization Breakdown Structure (OBS) ,[object Object],With the relationships and responsibilities defined, the second and final step is to merge the WBS and OBS. Take a look on the next page. CONCRETE PERF DEPT 6010 M. Manning MASONRY PERF DEPT 6020 T. Greams TEST PERF DEPT 6030 K. Neumann CIVIL RESP DEPT R. Kelly CARPENTRY PERF DEPT 5010 R. Sites ROOFING PERF DEPT 5020 Y. Taylor DRYWALL PERF DEPT 5030 D. Smith STRUCTURAL RESP DEPT P. Tate PERF DEPT 4010 S. Johnson HOOKUP/TIE-IN PERF DEPT 4020 P. Ottis ELECTICAL RESP DEPT J. Sims WATER/SEWER PERF DEPT 3010 K. Wells GAS PERF DEPT 3020 R. Oriely PLUMBING RESP DEPT R. Lee PROJECT OFFICE RESP DEPT B. Smithers WIRING
Responsibility Assignment Matrix (RAM) ,[object Object],Responsibility  Assignment Matrix Responsibility  Assignment Matrix specific project tasks.  It is at this point that the project manager develops control accounts or work package.  Control accounts and work packages will be discussed in Module 4.  Lets look at what the RAM may look like on the ACME house construction project on the next page.
Responsibility Assignment Matrix (RAM) ,[object Object],[object Object],[object Object],[object Object]
Responsibility Assignment Matrix (RAM) ,[object Object],[object Object]
Responsibility Assignment Matrix (RAM) ,[object Object]

Weitere ähnliche Inhalte

Was ist angesagt?

PROJECT SCHEDULE
PROJECT SCHEDULEPROJECT SCHEDULE
PROJECT SCHEDULEAjeesh Mk
 
What is a Work Breakdown Structure?
What is a Work Breakdown Structure?What is a Work Breakdown Structure?
What is a Work Breakdown Structure?Kenny Hirschmann
 
Work breakdown structure in project management ppt by kiran j
Work breakdown structure in project management ppt by kiran jWork breakdown structure in project management ppt by kiran j
Work breakdown structure in project management ppt by kiran jIIT delhi
 
work breakdown structure
work breakdown structurework breakdown structure
work breakdown structureStefan Csosz
 
Work breakdown Structure
Work breakdown StructureWork breakdown Structure
Work breakdown StructureNicola2903
 
Delay analysis ... wise after the event.
Delay analysis ... wise after the event.Delay analysis ... wise after the event.
Delay analysis ... wise after the event.Tim Lloyd
 
03 Construction Project Planning and Scheduling
03 Construction Project Planning and Scheduling03 Construction Project Planning and Scheduling
03 Construction Project Planning and Schedulingakashpadole
 
Project Charter Summery
Project Charter SummeryProject Charter Summery
Project Charter SummeryDerek Cooksey
 
09. Project Cost Management
09. Project Cost Management09. Project Cost Management
09. Project Cost ManagementBhuWan Khadka
 
Project cost management PMBOK 5th Edition
Project cost management PMBOK 5th EditionProject cost management PMBOK 5th Edition
Project cost management PMBOK 5th Editionpankajsh10
 
Project on construction of 3 block house report
Project on construction of 3 block house reportProject on construction of 3 block house report
Project on construction of 3 block house reportHagi Sahib
 
Creating a work breakdown structure with microsoft project
Creating a work breakdown structure with microsoft projectCreating a work breakdown structure with microsoft project
Creating a work breakdown structure with microsoft projectNirtiSingla
 
Fast Tracking a Project and Project Crashing.ppt
Fast Tracking a Project and Project Crashing.pptFast Tracking a Project and Project Crashing.ppt
Fast Tracking a Project and Project Crashing.pptJo Balucanag - Bitonio
 
Project scheduling and resource levelling_Construction Management
Project scheduling and resource levelling_Construction Management Project scheduling and resource levelling_Construction Management
Project scheduling and resource levelling_Construction Management A Makwana
 

Was ist angesagt? (20)

PROJECT SCHEDULE
PROJECT SCHEDULEPROJECT SCHEDULE
PROJECT SCHEDULE
 
What is a Work Breakdown Structure?
What is a Work Breakdown Structure?What is a Work Breakdown Structure?
What is a Work Breakdown Structure?
 
Work Breakdown Structure
Work Breakdown StructureWork Breakdown Structure
Work Breakdown Structure
 
Work breakdown structure in project management ppt by kiran j
Work breakdown structure in project management ppt by kiran jWork breakdown structure in project management ppt by kiran j
Work breakdown structure in project management ppt by kiran j
 
work breakdown structure
work breakdown structurework breakdown structure
work breakdown structure
 
WBS and OBS
WBS and OBSWBS and OBS
WBS and OBS
 
Work breakdown Structure
Work breakdown StructureWork breakdown Structure
Work breakdown Structure
 
Delay analysis ... wise after the event.
Delay analysis ... wise after the event.Delay analysis ... wise after the event.
Delay analysis ... wise after the event.
 
03 Construction Project Planning and Scheduling
03 Construction Project Planning and Scheduling03 Construction Project Planning and Scheduling
03 Construction Project Planning and Scheduling
 
Project Scheduling
Project SchedulingProject Scheduling
Project Scheduling
 
Project Charter Summery
Project Charter SummeryProject Charter Summery
Project Charter Summery
 
Project cost control
Project cost controlProject cost control
Project cost control
 
09. Project Cost Management
09. Project Cost Management09. Project Cost Management
09. Project Cost Management
 
Project cost management PMBOK 5th Edition
Project cost management PMBOK 5th EditionProject cost management PMBOK 5th Edition
Project cost management PMBOK 5th Edition
 
Project on construction of 3 block house report
Project on construction of 3 block house reportProject on construction of 3 block house report
Project on construction of 3 block house report
 
project management
project managementproject management
project management
 
Creating a work breakdown structure with microsoft project
Creating a work breakdown structure with microsoft projectCreating a work breakdown structure with microsoft project
Creating a work breakdown structure with microsoft project
 
Fast Tracking a Project and Project Crashing.ppt
Fast Tracking a Project and Project Crashing.pptFast Tracking a Project and Project Crashing.ppt
Fast Tracking a Project and Project Crashing.ppt
 
Construction Management - New Trends
Construction Management - New TrendsConstruction Management - New Trends
Construction Management - New Trends
 
Project scheduling and resource levelling_Construction Management
Project scheduling and resource levelling_Construction Management Project scheduling and resource levelling_Construction Management
Project scheduling and resource levelling_Construction Management
 

Ähnlich wie Work Breakdown Structure

Lec 05 wbs & obs 1
Lec 05 wbs & obs 1Lec 05 wbs & obs 1
Lec 05 wbs & obs 1SAJID ALI RUK
 
1 Work Breakdown Structures (WBS) 2 WBS .docx
1 Work Breakdown Structures (WBS) 2 WBS .docx1 Work Breakdown Structures (WBS) 2 WBS .docx
1 Work Breakdown Structures (WBS) 2 WBS .docxSONU61709
 
Copyright © 2000 Artemis Management SystemsCreating The Wo.docx
Copyright © 2000 Artemis Management SystemsCreating The Wo.docxCopyright © 2000 Artemis Management SystemsCreating The Wo.docx
Copyright © 2000 Artemis Management SystemsCreating The Wo.docxvanesaburnand
 
Untitled document (24).pdf
Untitled document (24).pdfUntitled document (24).pdf
Untitled document (24).pdfAsadUllah174251
 
Top 7 WBS Mistakes Project Managers Make
Top 7 WBS Mistakes Project Managers MakeTop 7 WBS Mistakes Project Managers Make
Top 7 WBS Mistakes Project Managers Makejoshnankivel
 
WBS-final-1.Project Management and Ethics.pptx
WBS-final-1.Project Management and Ethics.pptxWBS-final-1.Project Management and Ethics.pptx
WBS-final-1.Project Management and Ethics.pptxFillHackjack
 
WORK BREAKDOWN STRUCTURE, JOB LAYOUT & LINE OF BALANCE
WORK BREAKDOWN STRUCTURE, JOB LAYOUT & LINE OF BALANCEWORK BREAKDOWN STRUCTURE, JOB LAYOUT & LINE OF BALANCE
WORK BREAKDOWN STRUCTURE, JOB LAYOUT & LINE OF BALANCEAditi Garg
 
Work Breakdown Structure Aritrya Kumar.pptx
Work Breakdown Structure Aritrya Kumar.pptxWork Breakdown Structure Aritrya Kumar.pptx
Work Breakdown Structure Aritrya Kumar.pptxARITRYAKUMAR
 
The Work Breakdown Structure: Lack Of A Good One Already Sets Your Project Up...
The Work Breakdown Structure: Lack Of A Good One Already Sets Your Project Up...The Work Breakdown Structure: Lack Of A Good One Already Sets Your Project Up...
The Work Breakdown Structure: Lack Of A Good One Already Sets Your Project Up...Ed Kozak
 
Describe different ways to develop a WBS and explain why it is often s.docx
Describe different ways to develop a WBS and explain why it is often s.docxDescribe different ways to develop a WBS and explain why it is often s.docx
Describe different ways to develop a WBS and explain why it is often s.docxcliftonl1
 
Vb tutorial
Vb tutorialVb tutorial
Vb tutorialjayguyab
 
Project management with ms project 2007
Project management with ms project 2007Project management with ms project 2007
Project management with ms project 2007Fasil Ayele
 
Unit 3 WorkBreakdownStructure.ppt related to project management
Unit 3 WorkBreakdownStructure.ppt related to project managementUnit 3 WorkBreakdownStructure.ppt related to project management
Unit 3 WorkBreakdownStructure.ppt related to project managementtanishkagupta907
 

Ähnlich wie Work Breakdown Structure (20)

Lec 05 wbs & obs 1
Lec 05 wbs & obs 1Lec 05 wbs & obs 1
Lec 05 wbs & obs 1
 
1 Work Breakdown Structures (WBS) 2 WBS .docx
1 Work Breakdown Structures (WBS) 2 WBS .docx1 Work Breakdown Structures (WBS) 2 WBS .docx
1 Work Breakdown Structures (WBS) 2 WBS .docx
 
Copyright © 2000 Artemis Management SystemsCreating The Wo.docx
Copyright © 2000 Artemis Management SystemsCreating The Wo.docxCopyright © 2000 Artemis Management SystemsCreating The Wo.docx
Copyright © 2000 Artemis Management SystemsCreating The Wo.docx
 
Untitled document (24).pdf
Untitled document (24).pdfUntitled document (24).pdf
Untitled document (24).pdf
 
Top 7 WBS Mistakes Project Managers Make
Top 7 WBS Mistakes Project Managers MakeTop 7 WBS Mistakes Project Managers Make
Top 7 WBS Mistakes Project Managers Make
 
WBS-final-1.Project Management and Ethics.pptx
WBS-final-1.Project Management and Ethics.pptxWBS-final-1.Project Management and Ethics.pptx
WBS-final-1.Project Management and Ethics.pptx
 
WORK BREAKDOWN STRUCTURE, JOB LAYOUT & LINE OF BALANCE
WORK BREAKDOWN STRUCTURE, JOB LAYOUT & LINE OF BALANCEWORK BREAKDOWN STRUCTURE, JOB LAYOUT & LINE OF BALANCE
WORK BREAKDOWN STRUCTURE, JOB LAYOUT & LINE OF BALANCE
 
1
11
1
 
Work Breakdown Structure Aritrya Kumar.pptx
Work Breakdown Structure Aritrya Kumar.pptxWork Breakdown Structure Aritrya Kumar.pptx
Work Breakdown Structure Aritrya Kumar.pptx
 
Chapter 4 slides
Chapter 4 slidesChapter 4 slides
Chapter 4 slides
 
Final_Module_2.ppt
Final_Module_2.pptFinal_Module_2.ppt
Final_Module_2.ppt
 
The Work Breakdown Structure: Lack Of A Good One Already Sets Your Project Up...
The Work Breakdown Structure: Lack Of A Good One Already Sets Your Project Up...The Work Breakdown Structure: Lack Of A Good One Already Sets Your Project Up...
The Work Breakdown Structure: Lack Of A Good One Already Sets Your Project Up...
 
Describe different ways to develop a WBS and explain why it is often s.docx
Describe different ways to develop a WBS and explain why it is often s.docxDescribe different ways to develop a WBS and explain why it is often s.docx
Describe different ways to develop a WBS and explain why it is often s.docx
 
Lect 3 wbs&obs
Lect 3 wbs&obs Lect 3 wbs&obs
Lect 3 wbs&obs
 
Vb tutorial
Vb tutorialVb tutorial
Vb tutorial
 
Vb tutorial
Vb tutorialVb tutorial
Vb tutorial
 
Project management with ms project 2007
Project management with ms project 2007Project management with ms project 2007
Project management with ms project 2007
 
Work Breakdown Structure
Work Breakdown StructureWork Breakdown Structure
Work Breakdown Structure
 
Babu 143
Babu 143Babu 143
Babu 143
 
Unit 3 WorkBreakdownStructure.ppt related to project management
Unit 3 WorkBreakdownStructure.ppt related to project managementUnit 3 WorkBreakdownStructure.ppt related to project management
Unit 3 WorkBreakdownStructure.ppt related to project management
 

Mehr von project management

Mehr von project management (12)

Work Breakdown Structure Use This
Work Breakdown Structure Use ThisWork Breakdown Structure Use This
Work Breakdown Structure Use This
 
Wbs For Building Project
Wbs For Building ProjectWbs For Building Project
Wbs For Building Project
 
Wbs Building Use This
Wbs Building Use ThisWbs Building Use This
Wbs Building Use This
 
Excel Project Management
Excel Project ManagementExcel Project Management
Excel Project Management
 
Chap 6 Developing A Project Plan
Chap 6 Developing A Project PlanChap 6 Developing A Project Plan
Chap 6 Developing A Project Plan
 
Chap 5 Estimating Project Times
Chap 5 Estimating Project TimesChap 5 Estimating Project Times
Chap 5 Estimating Project Times
 
Chap 4 Defining A Project
Chap 4 Defining A ProjectChap 4 Defining A Project
Chap 4 Defining A Project
 
Chap 3 Organization Structure
Chap 3 Organization StructureChap 3 Organization Structure
Chap 3 Organization Structure
 
Project Initiation Process
Project Initiation ProcessProject Initiation Process
Project Initiation Process
 
Project Management Techniques
Project Management TechniquesProject Management Techniques
Project Management Techniques
 
Chap 1 Modern Project Management
Chap 1 Modern Project ManagementChap 1 Modern Project Management
Chap 1 Modern Project Management
 
Chap 2 Organization Strategy
Chap 2 Organization StrategyChap 2 Organization Strategy
Chap 2 Organization Strategy
 

Kürzlich hochgeladen

Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...ZurliaSoop
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...pradhanghanshyam7136
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxVishalSingh1417
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsMebane Rash
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfSherif Taha
 
Third Battle of Panipat detailed notes.pptx
Third Battle of Panipat detailed notes.pptxThird Battle of Panipat detailed notes.pptx
Third Battle of Panipat detailed notes.pptxAmita Gupta
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxAmanpreet Kaur
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701bronxfugly43
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17Celine George
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.christianmathematics
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseAnaAcapella
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and ModificationsMJDuyan
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxVishalSingh1417
 

Kürzlich hochgeladen (20)

Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
Third Battle of Panipat detailed notes.pptx
Third Battle of Panipat detailed notes.pptxThird Battle of Panipat detailed notes.pptx
Third Battle of Panipat detailed notes.pptx
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Asian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptxAsian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptx
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 

Work Breakdown Structure

  • 1.
  • 2.
  • 3.
  • 4.
  • 5.
  • 6.
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
  • 12.
  • 13.
  • 14.
  • 15.
  • 16.

Hinweis der Redaktion

  1. Same graphic from previous page.
  2. Same graphic from previous page.
  3. Picture of people building a house.
  4. Picture of a house with the name ACME House WBS to the right. There is a box with the ACME Housing Corporation in it with the WBS code number 1. This is relating to the Level 1 of the WBS.
  5. This graphic builds on the graphic from the previous page. There is a box with the ACME Housing Corporation in it with the WBS code number 1. This is relating to the Level 1 of the WBS. There is a box below that one with the title of house and the WBS code number 1.1. This is relating to the Level 2 of the WBS.
  6. This graphic builds on the graphic from the previous page. Beneath the house box are six boxes with Concrete 1.1.1, Framing 1.1.2, Plumbing 1.1.3, Electrical 1.1.4, Interior 1.1.5 and Roofing 1.1.6. These boxes represent Level 3 of our WBS.
  7. This graphic builds on the graphic from the previous page. Beneath the Level 3 boxes are Level 4 boxes which represent the task for this project. The Level 4 task are: Under Concrete, Pour Foundation 1.1.1.1, Install Patio 1.1.1.2, Pour Stairway 1.1.1.3. Under Framing, Frame Exterior Walls 1.1.2.1, Frame Interior Walls 1.1.2.2, Install Roofing Trusses 1.1.2.3. Under Plumbing, Install Water Lines 1.1.3.1, Install Gas Lines 1.1.3.2, Install B/K Fixtures 1.1.3.3. Under Electrical Install Wiring 1.1.4.1, Install Outlets/Switches 1.1.4.2, Install Fixtures 1.1.4.3. Under Interior, Install Drywall 1.1.5.1, Install Carpets 1.1.5.2, Painting 1.1.5.3. Under Roofing, Install Felt 1.1.6.1, Install Shingles 1.1.6.2, Install Vents 1.1.6.3.
  8. Same graphic from the previous page showing the WBS
  9. This is a picture of the organization chart for ACME Housing Corporation. The top of the Organizational chart starts with the project office. The next level down is the Civil, Structural, Electrical, and Plumbing departments. Beneath the Civil is the Concrete, Masonry and Testing departments. Beneath the Structural is the Carpentry, Roofing and Drywall departments. Beneath the Electrical is the Wiring and Hookup/Tie-in departments. Beneath the Plumbing is the Water/Sewer and Gas departments.
  10. This graphic is showing that the intersection of the WBS and OBS is the Responsibility Assignment Matrix. It shows the WBS from the previous pages and the OBS from the previous page. The OBS is sideways and to the left and below the WBS. This are arrows coming out of the bottom of both the WBS and OBS. Where the arrows from the WBS and OBS cross, there is the words Responsibility Assignment Matrix.
  11. This graphic represents a RAM. The lowest level of the WBS appears across the top. The lowest level of the OBS appears on the vertical axis. The vertical axis also lists the responsible manager. There is an x underneath WBS element and across from the OBS responsible for a given task.
  12. Same graphic from the previous page showing the RAM.
  13. This graphic is the same as the RAM on the previous page except that the x’s have been replaced with hours need for a given task