Estimating Project Times and Costs
Estimating Projects  ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Why Estimating Time and Cost Are Important… A Short List   EXHIBIT 5.1 ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Factors Influencing the Quality of Estimates Quality of Estimates Project Duration People Project Structure and Organization Padding Estimates Organization Culture Other (Nonproject) Factors Planning Horizon
Estimating Guidelines for Times,  Costs, and Resources ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Macro versus Micro Estimating TABLE 5.1 Conditions for Preferring Top-Down or Bottom-up Time and Cost Estimates Condition  Macro Estimates  Micro Estimates Strategic decision making  X  Cost and time important  X High uncertainty  X Internal, small project  X Fixed-price contract  X Customer wants details  X Unstable scope  X
Estimating Projects: Preferred Approach ,[object Object],[object Object],[object Object],[object Object],[object Object]
Methods for Estimating Project  Times and Costs ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Project Estimate Times Costs
Apportion Method of Allocating Project Costs Using a (High Level) Work Breakdown Structure FIGURE 5.1
Simplified Basic Function Point Count Process for a Prospective Project or Deliverable: Example TABLE 5.2 To pick nits: In this approach we are looking at durations, not costs (Which is dangerous before we take the considerations of Ch 6)
Example: Function Point Count Method TABLE 5.3
Methods for Estimating Project  Times and Costs (cont’d) ,[object Object],[object Object],[object Object],[object Object],[object Object]
Example: Support Cost Estimate Worksheet-  (about as detailed as it gets!) Based on FIGURE 5.2 ,[object Object],[object Object],[object Object]
Phase Estimating over Product Life Cycle FIGURE 5.3
Level of Detail ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Developing Budgets ,[object Object],[object Object],[object Object],[object Object],[object Object]
Three Views of Cost Accrual FIGURE 5.5
Types of Costs ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Example: Contract Bid Summary Costs FIGURE 5.6 Direct costs  $80,000 Direct overhead  $20,000 G&A overhead (20%)  $20,000 Profit (20%)  $24,000 Total bid  $144,000
Refining Estimates ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Refining Estimates (cont’d) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Creating a Database for Estimating FIGURE 5.7 Estimating Database Templates
Refining Estimates ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Refining Estimates… ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Example: Firewall Project ,[object Object],[object Object],[object Object],[object Object]

More Related Content

What's hot

Defining The Project
Defining The ProjectDefining The Project
Defining The ProjectEarl Tongol
 
Leadership: Being an Effective Project Manager
Leadership: Being an Effective Project ManagerLeadership: Being an Effective Project Manager
Leadership: Being an Effective Project ManagerEarl Tongol
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project ManagementWaleed Elnaggar
 
Project management
Project managementProject management
Project managementSimran Kaur
 
Lecture-8-Scheduling-Resources-and-Cost.pptx
Lecture-8-Scheduling-Resources-and-Cost.pptxLecture-8-Scheduling-Resources-and-Cost.pptx
Lecture-8-Scheduling-Resources-and-Cost.pptxTecnicoItca
 
Chapter 1 An Overview Of Project Management
Chapter 1  An Overview Of Project ManagementChapter 1  An Overview Of Project Management
Chapter 1 An Overview Of Project ManagementMahesh Bendigeri
 
05. Project And Organizational Structure
05. Project And Organizational Structure05. Project And Organizational Structure
05. Project And Organizational StructureBhuWan Khadka
 
Project Termination
Project TerminationProject Termination
Project TerminationSajjad Sayed
 
introduction to project management
introduction to project management introduction to project management
introduction to project management Shivam Singhal
 
Managing project teams
Managing project teamsManaging project teams
Managing project teamsRagunath K
 
Project management: defining the project
Project management: defining the projectProject management: defining the project
Project management: defining the projectOscar Vadillo
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk ManagementMarkos Mulat G
 
An Introduction to Project Management
An Introduction to Project Management An Introduction to Project Management
An Introduction to Project Management Krishna Kant
 
5. project management – application (2)
5. project management – application (2)5. project management – application (2)
5. project management – application (2)Dania Abdel-aziz
 
PROJECT SCHEDULE
PROJECT SCHEDULEPROJECT SCHEDULE
PROJECT SCHEDULEAjeesh Mk
 

What's hot (20)

Defining The Project
Defining The ProjectDefining The Project
Defining The Project
 
Leadership: Being an Effective Project Manager
Leadership: Being an Effective Project ManagerLeadership: Being an Effective Project Manager
Leadership: Being an Effective Project Manager
 
Project management structures
Project management structuresProject management structures
Project management structures
 
Project Management
Project ManagementProject Management
Project Management
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Management
 
Project management
Project managementProject management
Project management
 
Lecture-8-Scheduling-Resources-and-Cost.pptx
Lecture-8-Scheduling-Resources-and-Cost.pptxLecture-8-Scheduling-Resources-and-Cost.pptx
Lecture-8-Scheduling-Resources-and-Cost.pptx
 
Chapter 1 An Overview Of Project Management
Chapter 1  An Overview Of Project ManagementChapter 1  An Overview Of Project Management
Chapter 1 An Overview Of Project Management
 
Project Planning
Project PlanningProject Planning
Project Planning
 
05. Project And Organizational Structure
05. Project And Organizational Structure05. Project And Organizational Structure
05. Project And Organizational Structure
 
Project Termination
Project TerminationProject Termination
Project Termination
 
introduction to project management
introduction to project management introduction to project management
introduction to project management
 
Managing project teams
Managing project teamsManaging project teams
Managing project teams
 
Project Planning & Management
Project Planning & ManagementProject Planning & Management
Project Planning & Management
 
Project management: defining the project
Project management: defining the projectProject management: defining the project
Project management: defining the project
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 
An Introduction to Project Management
An Introduction to Project Management An Introduction to Project Management
An Introduction to Project Management
 
5. project management – application (2)
5. project management – application (2)5. project management – application (2)
5. project management – application (2)
 
PROJECT SCHEDULE
PROJECT SCHEDULEPROJECT SCHEDULE
PROJECT SCHEDULE
 
Project selection
Project selectionProject selection
Project selection
 

Similar to Chap 5 Estimating Project Times

Top Pillars | Cost & Time Management by Salameh Mahasneh
Top Pillars | Cost & Time Management by Salameh MahasnehTop Pillars | Cost & Time Management by Salameh Mahasneh
Top Pillars | Cost & Time Management by Salameh MahasnehTop Pillars
 
Chapter7 database management system.pptx
Chapter7 database management system.pptxChapter7 database management system.pptx
Chapter7 database management system.pptxMohammedNouh7
 
Project management (A Basic Approach)
Project management (A Basic Approach)Project management (A Basic Approach)
Project management (A Basic Approach)Jed Concepcion
 
Mmi entrepreneurship 6
Mmi entrepreneurship 6Mmi entrepreneurship 6
Mmi entrepreneurship 6gatecomro
 
L06 cost management
L06 cost managementL06 cost management
L06 cost managementAsa Chan
 
Software Project Cost Management and estimation
Software Project Cost Management and estimationSoftware Project Cost Management and estimation
Software Project Cost Management and estimationssuser9d62d6
 
Information Technology Project Management
Information Technology Project ManagementInformation Technology Project Management
Information Technology Project ManagementGoutama Bachtiar
 
NCV 3 Project Management Hands-On Support Slide Show - Module 4
NCV 3 Project Management Hands-On Support Slide Show - Module 4NCV 3 Project Management Hands-On Support Slide Show - Module 4
NCV 3 Project Management Hands-On Support Slide Show - Module 4Future Managers
 
The project plan
The project planThe project plan
The project planVatsalaPG
 
Cost management
Cost managementCost management
Cost managementshkadry
 
con_mangt-lec4-project_costppt.ppt
con_mangt-lec4-project_costppt.pptcon_mangt-lec4-project_costppt.ppt
con_mangt-lec4-project_costppt.pptsheryl90
 
con_mangt-lec4-project_costppt.ppt
con_mangt-lec4-project_costppt.pptcon_mangt-lec4-project_costppt.ppt
con_mangt-lec4-project_costppt.pptsheryl90
 
engineering economics lect 8-10 final.pptx
engineering economics lect 8-10 final.pptxengineering economics lect 8-10 final.pptx
engineering economics lect 8-10 final.pptxDr. ABEER KHALID MANSOUR
 
Project mangement part 1
Project mangement part 1Project mangement part 1
Project mangement part 1ghulam MUSTAFA
 

Similar to Chap 5 Estimating Project Times (20)

Chap005
Chap005Chap005
Chap005
 
Project Management
Project ManagementProject Management
Project Management
 
Top Pillars | Cost & Time Management by Salameh Mahasneh
Top Pillars | Cost & Time Management by Salameh MahasnehTop Pillars | Cost & Time Management by Salameh Mahasneh
Top Pillars | Cost & Time Management by Salameh Mahasneh
 
Project Mangement
Project MangementProject Mangement
Project Mangement
 
Chapter7 database management system.pptx
Chapter7 database management system.pptxChapter7 database management system.pptx
Chapter7 database management system.pptx
 
Project management (A Basic Approach)
Project management (A Basic Approach)Project management (A Basic Approach)
Project management (A Basic Approach)
 
Project Management
Project ManagementProject Management
Project Management
 
Mmi entrepreneurship 6
Mmi entrepreneurship 6Mmi entrepreneurship 6
Mmi entrepreneurship 6
 
L06 cost management
L06 cost managementL06 cost management
L06 cost management
 
Software Project Cost Management and estimation
Software Project Cost Management and estimationSoftware Project Cost Management and estimation
Software Project Cost Management and estimation
 
MIS Project management
MIS Project managementMIS Project management
MIS Project management
 
Information Technology Project Management
Information Technology Project ManagementInformation Technology Project Management
Information Technology Project Management
 
NCV 3 Project Management Hands-On Support Slide Show - Module 4
NCV 3 Project Management Hands-On Support Slide Show - Module 4NCV 3 Project Management Hands-On Support Slide Show - Module 4
NCV 3 Project Management Hands-On Support Slide Show - Module 4
 
The project plan
The project planThe project plan
The project plan
 
Cost management
Cost managementCost management
Cost management
 
con_mangt-lec4-project_costppt.ppt
con_mangt-lec4-project_costppt.pptcon_mangt-lec4-project_costppt.ppt
con_mangt-lec4-project_costppt.ppt
 
con_mangt-lec4-project_costppt.ppt
con_mangt-lec4-project_costppt.pptcon_mangt-lec4-project_costppt.ppt
con_mangt-lec4-project_costppt.ppt
 
engineering economics lect 8-10 final.pptx
engineering economics lect 8-10 final.pptxengineering economics lect 8-10 final.pptx
engineering economics lect 8-10 final.pptx
 
Project mangement part 1
Project mangement part 1Project mangement part 1
Project mangement part 1
 
PMBOK7-201-300.pdf
PMBOK7-201-300.pdfPMBOK7-201-300.pdf
PMBOK7-201-300.pdf
 

More from project management

More from project management (7)

Work Breakdown Structure Use This
Work Breakdown Structure Use ThisWork Breakdown Structure Use This
Work Breakdown Structure Use This
 
Wbs For Building Project
Wbs For Building ProjectWbs For Building Project
Wbs For Building Project
 
Wbs Building Use This
Wbs Building Use ThisWbs Building Use This
Wbs Building Use This
 
Excel Project Management
Excel Project ManagementExcel Project Management
Excel Project Management
 
Project Initiation Process
Project Initiation ProcessProject Initiation Process
Project Initiation Process
 
Project Management Techniques
Project Management TechniquesProject Management Techniques
Project Management Techniques
 
Work Breakdown Structure
Work Breakdown StructureWork Breakdown Structure
Work Breakdown Structure
 

Recently uploaded

Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
General AI for Medical Educators April 2024
General AI for Medical Educators April 2024General AI for Medical Educators April 2024
General AI for Medical Educators April 2024Janet Corral
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfAyushMahapatra5
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...fonyou31
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Disha Kariya
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajanpragatimahajan3
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxVishalSingh1417
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingTeacherCyreneCayanan
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 

Recently uploaded (20)

Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
General AI for Medical Educators April 2024
General AI for Medical Educators April 2024General AI for Medical Educators April 2024
General AI for Medical Educators April 2024
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajan
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writing
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 

Chap 5 Estimating Project Times

  • 2.
  • 3.
  • 4. Factors Influencing the Quality of Estimates Quality of Estimates Project Duration People Project Structure and Organization Padding Estimates Organization Culture Other (Nonproject) Factors Planning Horizon
  • 5.
  • 6. Macro versus Micro Estimating TABLE 5.1 Conditions for Preferring Top-Down or Bottom-up Time and Cost Estimates Condition Macro Estimates Micro Estimates Strategic decision making X Cost and time important X High uncertainty X Internal, small project X Fixed-price contract X Customer wants details X Unstable scope X
  • 7.
  • 8.
  • 9. Apportion Method of Allocating Project Costs Using a (High Level) Work Breakdown Structure FIGURE 5.1
  • 10. Simplified Basic Function Point Count Process for a Prospective Project or Deliverable: Example TABLE 5.2 To pick nits: In this approach we are looking at durations, not costs (Which is dangerous before we take the considerations of Ch 6)
  • 11. Example: Function Point Count Method TABLE 5.3
  • 12.
  • 13.
  • 14. Phase Estimating over Product Life Cycle FIGURE 5.3
  • 15.
  • 16.
  • 17. Three Views of Cost Accrual FIGURE 5.5
  • 18.
  • 19. Example: Contract Bid Summary Costs FIGURE 5.6 Direct costs $80,000 Direct overhead $20,000 G&A overhead (20%) $20,000 Profit (20%) $24,000 Total bid $144,000
  • 20.
  • 21.
  • 22. Creating a Database for Estimating FIGURE 5.7 Estimating Database Templates
  • 23.
  • 24.
  • 25.

Editor's Notes

  1. More sophisticated version of Apportioning Now we start to break down by WBS for the next couple…. 3 levels
  2. Used in software more- consider all the major parameters and rate the complexity…. These parameters I haven’t personally worked with, we will assume as given. (You don’t have to memorize them). From them you can see that fields and interfaces are generally greater considerations…. Presumably this is the 2 nd or 3 rd tier of a WBS So if have 15 low comp inputs, 5 avg outputs 10 avg inquiries 30 high files and 20 avg interfaces, 30+30+40+360+200 = 660. Over half cost due to files (Answer on next page)
  3. 660 function points If 5 function points per person month, that’s 132 person months, if a person costs $4k/mo (low- must not be US) = $528K If have 10 people working on this, that’s 13.2 months.
  4. Note- here we are switching to TIMES not costs. Still need to take into account some material from Ch6. 3 different estimators polled. Can see their estimates agreed more on engineering and base maps then on coordinate utilities, although he latter is mainly high because a difference of 1 day is significant when the task is so small. (But in reality it is sometimes these little tasks that get away).
  5. Start in Phase 1 with only top-down estimate, then start flushing out details as we get into later into the project. (Sort of a 1x1 matrix here)
  6. All three start out at 0 and end up at $6,000 . The project manager commits the costs before they are actually used. The budgeted cost occurs a bit later, but before actual costs. This may be an issue for shoestring companies, or for jobs that are so huge, that the time value of money of the difference [ (scheduled-budget = payment from client) – actual cost ] can make a project effectively a money loser even if the total cost and payments were as expected. So want to make sure actual cost is below budget, or factor this in as an additional cost!
  7. Don’t forget the profit margin when making a bid. 20% might be a bit low, IMHO Also, G&A of 20% is somewhat low 25%
  8. We use the same weighting structure Click on excel to see- but have 1290 function points, of which 58% are interface related Takes 258 person months (assume $5K/mo, means a $1,290,000 project ….woooo!) - so 43 mon with 6per team, 12.9 with 20per team ASSUMING everything scales In reality, may lose some team functionality once we get too large!