What Is The 710 Tunnel?
             • The Tunnel
               Would Extend
               The Long Beach
               Freeway (I-710)
               Into The Heart Of
               Pasadena.
710 Tunnel Basics
          • Twin, 4.5 mile
            long bores from
            Alhambra to
            Pasadena.

          • No Exits Between
            Valley Bl. And The
            I-210.
710 Tunnel Basics
Large “Cut And Cover” And Trench Portal Areas
710 Tunnel Basics
160,000 To 200,000 Cars And Trucks Per Day
710 Tunnel Basics
Tolls: $5 To $15 Per Trip
Inside The 710 Tunnel
Twin, 60 foot diameter tunnels, each with four
    lanes of traffic, stacked two-over-two
Inside The 710 Tunnel
Twin, 60 foot diameter tunnels, each with four
    lanes of traffic, stacked two-over-two
710 Tunnel Hazards
• Tunnel Crosses Four Named Earthquake
  Faults.
• Tunnel Punches Through Two Aquifers.
• Cars And Trucks Will Have To Navigate A
  Nearly 4% Grade For Two Miles.
The Tunnel In Pasadena
           • Tunnel Portal Near
             Huntington Hospital.
           • 100 To 200 Foot
             Exhaust Ventilation
             Towers Between
             Huntington And
             Maranatha H.S.
           • All Tunnel Traffic To
             And From Central
             Pasadena Must Enter
             Or Exit At Lake Or
             Mountain Avenues.
The Tunnel In Pasadena
           • 160,000 To 200,000
             Cars And Trucks
             Through The Tunnel
             Each Day.
           • Significant Traffic
             Increase On I-210 In
             Northwest Pasadena.
           • Significant Traffic
             Heading To Exits At
             Lake, Mountain, And
             San Rafael/Linda
             Vista.
How Will The Tunnel Be Built?
How Will The Tunnel Be Built?
• Nine To Eleven Years Of Construction.
• Massive Trench And Staging Area
  Between Old Pasadena And Huntington
  Hospital.
• Long-Term Closures Of Major Streets
  And Bridges, Including Del Mar, Green,
  And (Likely) Colorado.
How Will The Tunnel Be Built?
 The Tunnel Will Cause Widespread Disruption
How Will The Tunnel Be Built?
At Least 200 Million
Cubic Feet Of Dirt
Removed.

                         450,000
                         Truckloads
                         Of Dirt.

Steel, Gravel, Cement,
And Other Building
Supplies Trucked To
Pasadena Every Day.
How Will The Tunnel Be Built?
Construction Issues Include:
    • Dust And Diesel Pollution.
    • Noise And Vibration.
    • Subsidence.
    • Significant Truck Traffic.
    • Disruption To The Tournament Of Roses.
    • Permanent Closure Of Ramps To Del Mar
      And California.
    • Long-Term Closures Of Roads Around
      Huntington Hospital And West Side Of
      Old Pasadena.
How Much
Will It Cost?
Tunnel Myth 1
“The Tunnel Will
 Ease Congestion”
Congestion Without 710   Congestion With 710 Tunnel
       Tunnel
Remember What They Said The
Last Time A “Gap” Was Closed
Remember What They Said The
Last Time A “Gap” Was Closed
Tunnel Myth 2
“The 710 Tunnel Will
 Complete The
 Freeway System.”
There Are Many So-Called
  “Gaps” In The System
Tunnel Myth 3
“There Won’t Be A
 Lot Of Trucks.”
710 Would Funnel More Trucks
And Traffic Through Pasadena
710 Would Funnel More Trucks
And Traffic Through Pasadena
Trucks Head North
Even More 710 Traffic And
    Trucks May Be Coming
• Metro Has Released
  Draft EIR For “710
  South” From Long
  Beach To SR 60.
• Up To 14 Lanes Pointed
  Directly Toward
  Pasadena.
• No Freight-By-Rail
  Alternative Has Been
  Considered.
• Final EIR Expected In
  2013.
16% To 20% Of All Tunnel
  Traffic May Be Trucks
Tunnel Myth 4
“The Tunnel Will
 Reduce Pollution.”
The Tunnel Will Increase
     Pollution In Pasadena
• The Tunnel will vent only at its ends,
  concentrating 4.5 miles of freeway exhaust to
  stacks located between Huntington Hospital
  and Old Town.
• No Tunnel in the United States uses smog
  reducing technology, and prior Tunnel studies
  have questioned their feasibility.
• Tunnel will increase congestion on large
  portions of I-210 and SR-134, including next
  Muir High School, Roosevelt Elementary, and
  other critical locations.
Reducing Congestion Does Not
   Equate To Reducing Pollution




 Once Speeds Reach About 15 MPH, Pollution
        Per Mile Tends To Increase.
Facility Specific Speed Correction Factors, Draft, U.S. EPA, Report Number M6.SPD.002, August 1999
Is This The Right Direction?
Tunnel Myth 5
“Metro Hasn’t
 Chosen The
 Tunnel, Yet.”
Metro Is Studying Alternatives
Bus Rapid Transit (BRT-6)   Light Rail (LRT-4)
Metro Is Studying Alternatives
                                 Transportation Systems
           Bus Service         Management / Transportation
                                  Demand Management




                                 Signal and Parking
   Intersection Improvements
But The Deck May Be Stacked




       33 43   45   42   50
Because It’s About Moving Cars
And Trucks Through Pasadena
There Are Better
    Choices.
Metro Has Failed To Adequately
 Consider Green Alternatives
• Metro Gold Line Improvements (Grade
  Separations, Express Train Passing
  Tracks, Extension To Claremont And
  Ontario Airport).
• Rail Improvements For Goods (Use 710
  Funds To Complete Alameda Corridor
  And Move Freight By Train).
• Other Low-Build Alternatives (i.e.,
  congestion pricing).
Metro Has Not Considered Gold
      Line Improvements
Metro Has Not Considered Rail
       Improvements
Which Is Your Pasadena?

Weitere ähnliche Inhalte

Ähnlich wie Revised pasadena presentation 10 8 12

Fec blogger presentation
Fec blogger presentationFec blogger presentation
Fec blogger presentationFCCRichard
 
EWB: Adventure in Giving Back
EWB: Adventure in Giving BackEWB: Adventure in Giving Back
EWB: Adventure in Giving BackEWBChicago
 
Florida East Coast Raiway Past & Future
Florida East Coast Raiway Past & FutureFlorida East Coast Raiway Past & Future
Florida East Coast Raiway Past & FutureFCCRichard
 
Transport-Rev-Intro.pptx
Transport-Rev-Intro.pptxTransport-Rev-Intro.pptx
Transport-Rev-Intro.pptxEski Pie
 
Hoover dam bypass bridge
Hoover dam bypass bridgeHoover dam bypass bridge
Hoover dam bypass bridgeBismillah Arif
 
Trackless Trams: Integrating Innovative Transit and Urban Regeneration
Trackless Trams:Integrating Innovative Transit and Urban RegenerationTrackless Trams:Integrating Innovative Transit and Urban Regeneration
Trackless Trams: Integrating Innovative Transit and Urban RegenerationJason Boissonneault
 
HSH - The Hydrogen Super Highway Elevated Maglev Rail System
HSH - The Hydrogen Super Highway Elevated Maglev Rail SystemHSH - The Hydrogen Super Highway Elevated Maglev Rail System
HSH - The Hydrogen Super Highway Elevated Maglev Rail SystemJustin Sutton
 
Trinity River Corridor Project
Trinity  River Corridor ProjectTrinity  River Corridor Project
Trinity River Corridor ProjectSean Merrell
 
Pacific Northwest HSR Cascades Corridor Plan_ BAZELEY
Pacific Northwest HSR Cascades Corridor Plan_ BAZELEYPacific Northwest HSR Cascades Corridor Plan_ BAZELEY
Pacific Northwest HSR Cascades Corridor Plan_ BAZELEYRoger Bazeley, USA
 
Jan. 21, 2015 City Council Presentation 2015 Capital Improvement Projects
Jan. 21, 2015 City Council Presentation 2015 Capital Improvement Projects Jan. 21, 2015 City Council Presentation 2015 Capital Improvement Projects
Jan. 21, 2015 City Council Presentation 2015 Capital Improvement Projects City of Corona
 
Final public meeting presentation
Final public meeting presentationFinal public meeting presentation
Final public meeting presentationGunn Communications
 
California High Speed Rail Project Overview
California High Speed Rail Project OverviewCalifornia High Speed Rail Project Overview
California High Speed Rail Project OverviewVoice Malaysia
 
East West Link Royal Park West Portal Design to be Finalised
East West Link Royal Park West Portal Design to be FinalisedEast West Link Royal Park West Portal Design to be Finalised
East West Link Royal Park West Portal Design to be FinalisedTony Smith
 
Public Open House - Finch West LRT
Public Open House - Finch West LRTPublic Open House - Finch West LRT
Public Open House - Finch West LRTCrosstown TO
 
May 4 presentation re: Johnwoods closure
May 4 presentation re: Johnwoods closureMay 4 presentation re: Johnwoods closure
May 4 presentation re: Johnwoods closureStittsvilleCentral.ca
 
Finch MSF EA Consultation July 7, 2014
Finch MSF EA Consultation July 7, 2014Finch MSF EA Consultation July 7, 2014
Finch MSF EA Consultation July 7, 2014Crosstown TO
 
Transatlantic tunnel-floating-tunnel
Transatlantic tunnel-floating-tunnelTransatlantic tunnel-floating-tunnel
Transatlantic tunnel-floating-tunnelAglaia Connect
 

Ähnlich wie Revised pasadena presentation 10 8 12 (20)

Fec blogger presentation
Fec blogger presentationFec blogger presentation
Fec blogger presentation
 
EWB: Adventure in Giving Back
EWB: Adventure in Giving BackEWB: Adventure in Giving Back
EWB: Adventure in Giving Back
 
Florida East Coast Raiway Past & Future
Florida East Coast Raiway Past & FutureFlorida East Coast Raiway Past & Future
Florida East Coast Raiway Past & Future
 
Transport-Rev-Intro.pptx
Transport-Rev-Intro.pptxTransport-Rev-Intro.pptx
Transport-Rev-Intro.pptx
 
Hoover dam bypass bridge
Hoover dam bypass bridgeHoover dam bypass bridge
Hoover dam bypass bridge
 
Trackless Trams: Integrating Innovative Transit and Urban Regeneration
Trackless Trams:Integrating Innovative Transit and Urban RegenerationTrackless Trams:Integrating Innovative Transit and Urban Regeneration
Trackless Trams: Integrating Innovative Transit and Urban Regeneration
 
HSH - The Hydrogen Super Highway Elevated Maglev Rail System
HSH - The Hydrogen Super Highway Elevated Maglev Rail SystemHSH - The Hydrogen Super Highway Elevated Maglev Rail System
HSH - The Hydrogen Super Highway Elevated Maglev Rail System
 
Trinity River Corridor Project
Trinity  River Corridor ProjectTrinity  River Corridor Project
Trinity River Corridor Project
 
Pacific Northwest HSR Cascades Corridor Plan_ BAZELEY
Pacific Northwest HSR Cascades Corridor Plan_ BAZELEYPacific Northwest HSR Cascades Corridor Plan_ BAZELEY
Pacific Northwest HSR Cascades Corridor Plan_ BAZELEY
 
Oakwood Avenue Bump-outs (panels)
Oakwood Avenue Bump-outs (panels)Oakwood Avenue Bump-outs (panels)
Oakwood Avenue Bump-outs (panels)
 
Jan. 21, 2015 City Council Presentation 2015 Capital Improvement Projects
Jan. 21, 2015 City Council Presentation 2015 Capital Improvement Projects Jan. 21, 2015 City Council Presentation 2015 Capital Improvement Projects
Jan. 21, 2015 City Council Presentation 2015 Capital Improvement Projects
 
Final public meeting presentation
Final public meeting presentationFinal public meeting presentation
Final public meeting presentation
 
Beaches to Bay
Beaches to Bay Beaches to Bay
Beaches to Bay
 
California High Speed Rail Project Overview
California High Speed Rail Project OverviewCalifornia High Speed Rail Project Overview
California High Speed Rail Project Overview
 
East West Link Royal Park West Portal Design to be Finalised
East West Link Royal Park West Portal Design to be FinalisedEast West Link Royal Park West Portal Design to be Finalised
East West Link Royal Park West Portal Design to be Finalised
 
Public Open House - Finch West LRT
Public Open House - Finch West LRTPublic Open House - Finch West LRT
Public Open House - Finch West LRT
 
May 4 presentation re: Johnwoods closure
May 4 presentation re: Johnwoods closureMay 4 presentation re: Johnwoods closure
May 4 presentation re: Johnwoods closure
 
Lower Don Valley Trail 2015 Construction
Lower Don Valley Trail 2015 ConstructionLower Don Valley Trail 2015 Construction
Lower Don Valley Trail 2015 Construction
 
Finch MSF EA Consultation July 7, 2014
Finch MSF EA Consultation July 7, 2014Finch MSF EA Consultation July 7, 2014
Finch MSF EA Consultation July 7, 2014
 
Transatlantic tunnel-floating-tunnel
Transatlantic tunnel-floating-tunnelTransatlantic tunnel-floating-tunnel
Transatlantic tunnel-floating-tunnel
 

Mehr von peggydrouet

Sr710 cost benefit analysis comments 7 7 15 liu
Sr710 cost benefit analysis comments 7 7 15 liuSr710 cost benefit analysis comments 7 7 15 liu
Sr710 cost benefit analysis comments 7 7 15 liupeggydrouet
 
2015 06 18 governing_bd agendapkt
2015 06 18 governing_bd agendapkt2015 06 18 governing_bd agendapkt
2015 06 18 governing_bd agendapktpeggydrouet
 
2015 06 11 transportation_comm agendapkt
2015 06 11 transportation_comm agendapkt2015 06 11 transportation_comm agendapkt
2015 06 11 transportation_comm agendapktpeggydrouet
 
Scag nop comment letter
Scag nop comment letterScag nop comment letter
Scag nop comment letterpeggydrouet
 
15 4 23_bogaard_togarcetti_vote
15 4 23_bogaard_togarcetti_vote15 4 23_bogaard_togarcetti_vote
15 4 23_bogaard_togarcetti_votepeggydrouet
 
15 4 23_bogaard_togarcetti_vote(1)
15 4 23_bogaard_togarcetti_vote(1)15 4 23_bogaard_togarcetti_vote(1)
15 4 23_bogaard_togarcetti_vote(1)peggydrouet
 
15 4 23_bogaard_togarcetti_vote
15 4 23_bogaard_togarcetti_vote15 4 23_bogaard_togarcetti_vote
15 4 23_bogaard_togarcetti_votepeggydrouet
 
Sr710 tac meeting
Sr710 tac meetingSr710 tac meeting
Sr710 tac meetingpeggydrouet
 
Sr 710 north eir eis tac mtg #14-draft agenda (feb 2014)
Sr 710 north eir eis tac mtg #14-draft agenda (feb 2014)Sr 710 north eir eis tac mtg #14-draft agenda (feb 2014)
Sr 710 north eir eis tac mtg #14-draft agenda (feb 2014)peggydrouet
 
Tac meeting no.13_111313
Tac meeting no.13_111313Tac meeting no.13_111313
Tac meeting no.13_111313peggydrouet
 
State senate transpo hearings 11 13-13 backgroundpaper
State senate transpo hearings 11 13-13 backgroundpaperState senate transpo hearings 11 13-13 backgroundpaper
State senate transpo hearings 11 13-13 backgroundpaperpeggydrouet
 
Long beachcc agenda100113
Long beachcc agenda100113Long beachcc agenda100113
Long beachcc agenda100113peggydrouet
 
Sr710 study update_power_point final final
Sr710 study update_power_point final finalSr710 study update_power_point final final
Sr710 study update_power_point final finalpeggydrouet
 
159197331 presentation-on-work-hour-exemptions
159197331 presentation-on-work-hour-exemptions159197331 presentation-on-work-hour-exemptions
159197331 presentation-on-work-hour-exemptionspeggydrouet
 
130806 ceqa lead agency_24_jun04
130806 ceqa lead agency_24_jun04130806 ceqa lead agency_24_jun04
130806 ceqa lead agency_24_jun04peggydrouet
 
Senator liu et_all_response_041513_final
Senator liu et_all_response_041513_finalSenator liu et_all_response_041513_final
Senator liu et_all_response_041513_finalpeggydrouet
 
Freeway toll roads
Freeway toll roadsFreeway toll roads
Freeway toll roadspeggydrouet
 

Mehr von peggydrouet (20)

Sr710 cost benefit analysis comments 7 7 15 liu
Sr710 cost benefit analysis comments 7 7 15 liuSr710 cost benefit analysis comments 7 7 15 liu
Sr710 cost benefit analysis comments 7 7 15 liu
 
2015 06 18 governing_bd agendapkt
2015 06 18 governing_bd agendapkt2015 06 18 governing_bd agendapkt
2015 06 18 governing_bd agendapkt
 
2015 06 11 transportation_comm agendapkt
2015 06 11 transportation_comm agendapkt2015 06 11 transportation_comm agendapkt
2015 06 11 transportation_comm agendapkt
 
Scag nop comment letter
Scag nop comment letterScag nop comment letter
Scag nop comment letter
 
15 4 23_bogaard_togarcetti_vote
15 4 23_bogaard_togarcetti_vote15 4 23_bogaard_togarcetti_vote
15 4 23_bogaard_togarcetti_vote
 
15 4 23_bogaard_togarcetti_vote(1)
15 4 23_bogaard_togarcetti_vote(1)15 4 23_bogaard_togarcetti_vote(1)
15 4 23_bogaard_togarcetti_vote(1)
 
15 4 23_bogaard_togarcetti_vote
15 4 23_bogaard_togarcetti_vote15 4 23_bogaard_togarcetti_vote
15 4 23_bogaard_togarcetti_vote
 
Pasadena
Pasadena Pasadena
Pasadena
 
100814ctcagenda
100814ctcagenda100814ctcagenda
100814ctcagenda
 
Sr710 tac meeting
Sr710 tac meetingSr710 tac meeting
Sr710 tac meeting
 
710napkin front
710napkin front710napkin front
710napkin front
 
Sr 710 north eir eis tac mtg #14-draft agenda (feb 2014)
Sr 710 north eir eis tac mtg #14-draft agenda (feb 2014)Sr 710 north eir eis tac mtg #14-draft agenda (feb 2014)
Sr 710 north eir eis tac mtg #14-draft agenda (feb 2014)
 
Tac meeting no.13_111313
Tac meeting no.13_111313Tac meeting no.13_111313
Tac meeting no.13_111313
 
State senate transpo hearings 11 13-13 backgroundpaper
State senate transpo hearings 11 13-13 backgroundpaperState senate transpo hearings 11 13-13 backgroundpaper
State senate transpo hearings 11 13-13 backgroundpaper
 
Long beachcc agenda100113
Long beachcc agenda100113Long beachcc agenda100113
Long beachcc agenda100113
 
Sr710 study update_power_point final final
Sr710 study update_power_point final finalSr710 study update_power_point final final
Sr710 study update_power_point final final
 
159197331 presentation-on-work-hour-exemptions
159197331 presentation-on-work-hour-exemptions159197331 presentation-on-work-hour-exemptions
159197331 presentation-on-work-hour-exemptions
 
130806 ceqa lead agency_24_jun04
130806 ceqa lead agency_24_jun04130806 ceqa lead agency_24_jun04
130806 ceqa lead agency_24_jun04
 
Senator liu et_all_response_041513_final
Senator liu et_all_response_041513_finalSenator liu et_all_response_041513_final
Senator liu et_all_response_041513_final
 
Freeway toll roads
Freeway toll roadsFreeway toll roads
Freeway toll roads
 

Kürzlich hochgeladen

VIP Girls Available Call or WhatsApp 9711199012
VIP Girls Available Call or WhatsApp 9711199012VIP Girls Available Call or WhatsApp 9711199012
VIP Girls Available Call or WhatsApp 9711199012ankitnayak356677
 
IndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global NewsIndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global NewsIndiaWest2
 
Quiz for Heritage Indian including all the rounds
Quiz for Heritage Indian including all the roundsQuiz for Heritage Indian including all the rounds
Quiz for Heritage Indian including all the roundsnaxymaxyy
 
Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.NaveedKhaskheli1
 
Top 10 Wealthiest People In The World.pdf
Top 10 Wealthiest People In The World.pdfTop 10 Wealthiest People In The World.pdf
Top 10 Wealthiest People In The World.pdfauroraaudrey4826
 
Opportunities, challenges, and power of media and information
Opportunities, challenges, and power of media and informationOpportunities, challenges, and power of media and information
Opportunities, challenges, and power of media and informationReyMonsales
 
Brief biography of Julius Robert Oppenheimer
Brief biography of Julius Robert OppenheimerBrief biography of Julius Robert Oppenheimer
Brief biography of Julius Robert OppenheimerOmarCabrera39
 
Referendum Party 2024 Election Manifesto
Referendum Party 2024 Election ManifestoReferendum Party 2024 Election Manifesto
Referendum Party 2024 Election ManifestoSABC News
 
complaint-ECI-PM-media-1-Chandru.pdfra;;prfk
complaint-ECI-PM-media-1-Chandru.pdfra;;prfkcomplaint-ECI-PM-media-1-Chandru.pdfra;;prfk
complaint-ECI-PM-media-1-Chandru.pdfra;;prfkbhavenpr
 
Manipur-Book-Final-2-compressed.pdfsal'rpk
Manipur-Book-Final-2-compressed.pdfsal'rpkManipur-Book-Final-2-compressed.pdfsal'rpk
Manipur-Book-Final-2-compressed.pdfsal'rpkbhavenpr
 
57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdf57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdfGerald Furnkranz
 
Rohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for JusticeRohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for JusticeAbdulGhani778830
 
AP Election Survey 2024: TDP-Janasena-BJP Alliance Set To Sweep Victory
AP Election Survey 2024: TDP-Janasena-BJP Alliance Set To Sweep VictoryAP Election Survey 2024: TDP-Janasena-BJP Alliance Set To Sweep Victory
AP Election Survey 2024: TDP-Janasena-BJP Alliance Set To Sweep Victoryanjanibaddipudi1
 

Kürzlich hochgeladen (13)

VIP Girls Available Call or WhatsApp 9711199012
VIP Girls Available Call or WhatsApp 9711199012VIP Girls Available Call or WhatsApp 9711199012
VIP Girls Available Call or WhatsApp 9711199012
 
IndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global NewsIndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global News
 
Quiz for Heritage Indian including all the rounds
Quiz for Heritage Indian including all the roundsQuiz for Heritage Indian including all the rounds
Quiz for Heritage Indian including all the rounds
 
Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.
 
Top 10 Wealthiest People In The World.pdf
Top 10 Wealthiest People In The World.pdfTop 10 Wealthiest People In The World.pdf
Top 10 Wealthiest People In The World.pdf
 
Opportunities, challenges, and power of media and information
Opportunities, challenges, and power of media and informationOpportunities, challenges, and power of media and information
Opportunities, challenges, and power of media and information
 
Brief biography of Julius Robert Oppenheimer
Brief biography of Julius Robert OppenheimerBrief biography of Julius Robert Oppenheimer
Brief biography of Julius Robert Oppenheimer
 
Referendum Party 2024 Election Manifesto
Referendum Party 2024 Election ManifestoReferendum Party 2024 Election Manifesto
Referendum Party 2024 Election Manifesto
 
complaint-ECI-PM-media-1-Chandru.pdfra;;prfk
complaint-ECI-PM-media-1-Chandru.pdfra;;prfkcomplaint-ECI-PM-media-1-Chandru.pdfra;;prfk
complaint-ECI-PM-media-1-Chandru.pdfra;;prfk
 
Manipur-Book-Final-2-compressed.pdfsal'rpk
Manipur-Book-Final-2-compressed.pdfsal'rpkManipur-Book-Final-2-compressed.pdfsal'rpk
Manipur-Book-Final-2-compressed.pdfsal'rpk
 
57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdf57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdf
 
Rohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for JusticeRohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for Justice
 
AP Election Survey 2024: TDP-Janasena-BJP Alliance Set To Sweep Victory
AP Election Survey 2024: TDP-Janasena-BJP Alliance Set To Sweep VictoryAP Election Survey 2024: TDP-Janasena-BJP Alliance Set To Sweep Victory
AP Election Survey 2024: TDP-Janasena-BJP Alliance Set To Sweep Victory
 

Revised pasadena presentation 10 8 12

  • 1. The 710 Tunnel Threatens Pasadena October 8, 2012 No Action Committee No710.com www.srnapasadena.org
  • 2. What Is The 710 Tunnel? • The Tunnel Would Extend The Long Beach Freeway (I-710) Into The Heart Of Pasadena.
  • 3. 710 Tunnel Basics • Twin, 4.5 mile long bores from Alhambra to Pasadena. • No Exits Between Valley Bl. And The I-210.
  • 4. 710 Tunnel Basics Large “Cut And Cover” And Trench Portal Areas
  • 5. 710 Tunnel Basics 160,000 To 200,000 Cars And Trucks Per Day
  • 6. 710 Tunnel Basics Tolls: $5 To $15 Per Trip
  • 7. Inside The 710 Tunnel Twin, 60 foot diameter tunnels, each with four lanes of traffic, stacked two-over-two
  • 8. Inside The 710 Tunnel Twin, 60 foot diameter tunnels, each with four lanes of traffic, stacked two-over-two
  • 9. 710 Tunnel Hazards • Tunnel Crosses Four Named Earthquake Faults. • Tunnel Punches Through Two Aquifers. • Cars And Trucks Will Have To Navigate A Nearly 4% Grade For Two Miles.
  • 10. The Tunnel In Pasadena • Tunnel Portal Near Huntington Hospital. • 100 To 200 Foot Exhaust Ventilation Towers Between Huntington And Maranatha H.S. • All Tunnel Traffic To And From Central Pasadena Must Enter Or Exit At Lake Or Mountain Avenues.
  • 11. The Tunnel In Pasadena • 160,000 To 200,000 Cars And Trucks Through The Tunnel Each Day. • Significant Traffic Increase On I-210 In Northwest Pasadena. • Significant Traffic Heading To Exits At Lake, Mountain, And San Rafael/Linda Vista.
  • 12. How Will The Tunnel Be Built?
  • 13. How Will The Tunnel Be Built? • Nine To Eleven Years Of Construction. • Massive Trench And Staging Area Between Old Pasadena And Huntington Hospital. • Long-Term Closures Of Major Streets And Bridges, Including Del Mar, Green, And (Likely) Colorado.
  • 14. How Will The Tunnel Be Built? The Tunnel Will Cause Widespread Disruption
  • 15. How Will The Tunnel Be Built? At Least 200 Million Cubic Feet Of Dirt Removed. 450,000 Truckloads Of Dirt. Steel, Gravel, Cement, And Other Building Supplies Trucked To Pasadena Every Day.
  • 16. How Will The Tunnel Be Built? Construction Issues Include: • Dust And Diesel Pollution. • Noise And Vibration. • Subsidence. • Significant Truck Traffic. • Disruption To The Tournament Of Roses. • Permanent Closure Of Ramps To Del Mar And California. • Long-Term Closures Of Roads Around Huntington Hospital And West Side Of Old Pasadena.
  • 18. Tunnel Myth 1 “The Tunnel Will Ease Congestion”
  • 19. Congestion Without 710 Congestion With 710 Tunnel Tunnel
  • 20. Remember What They Said The Last Time A “Gap” Was Closed
  • 21. Remember What They Said The Last Time A “Gap” Was Closed
  • 22.
  • 23.
  • 24. Tunnel Myth 2 “The 710 Tunnel Will Complete The Freeway System.”
  • 25. There Are Many So-Called “Gaps” In The System
  • 26. Tunnel Myth 3 “There Won’t Be A Lot Of Trucks.”
  • 27. 710 Would Funnel More Trucks And Traffic Through Pasadena
  • 28. 710 Would Funnel More Trucks And Traffic Through Pasadena
  • 30. Even More 710 Traffic And Trucks May Be Coming • Metro Has Released Draft EIR For “710 South” From Long Beach To SR 60. • Up To 14 Lanes Pointed Directly Toward Pasadena. • No Freight-By-Rail Alternative Has Been Considered. • Final EIR Expected In 2013.
  • 31. 16% To 20% Of All Tunnel Traffic May Be Trucks
  • 32. Tunnel Myth 4 “The Tunnel Will Reduce Pollution.”
  • 33. The Tunnel Will Increase Pollution In Pasadena • The Tunnel will vent only at its ends, concentrating 4.5 miles of freeway exhaust to stacks located between Huntington Hospital and Old Town. • No Tunnel in the United States uses smog reducing technology, and prior Tunnel studies have questioned their feasibility. • Tunnel will increase congestion on large portions of I-210 and SR-134, including next Muir High School, Roosevelt Elementary, and other critical locations.
  • 34. Reducing Congestion Does Not Equate To Reducing Pollution Once Speeds Reach About 15 MPH, Pollution Per Mile Tends To Increase. Facility Specific Speed Correction Factors, Draft, U.S. EPA, Report Number M6.SPD.002, August 1999
  • 35. Is This The Right Direction?
  • 36. Tunnel Myth 5 “Metro Hasn’t Chosen The Tunnel, Yet.”
  • 37. Metro Is Studying Alternatives Bus Rapid Transit (BRT-6) Light Rail (LRT-4)
  • 38. Metro Is Studying Alternatives Transportation Systems Bus Service Management / Transportation Demand Management Signal and Parking Intersection Improvements
  • 39. But The Deck May Be Stacked 33 43 45 42 50
  • 40. Because It’s About Moving Cars And Trucks Through Pasadena
  • 41. There Are Better Choices.
  • 42. Metro Has Failed To Adequately Consider Green Alternatives • Metro Gold Line Improvements (Grade Separations, Express Train Passing Tracks, Extension To Claremont And Ontario Airport). • Rail Improvements For Goods (Use 710 Funds To Complete Alameda Corridor And Move Freight By Train). • Other Low-Build Alternatives (i.e., congestion pricing).
  • 43. Metro Has Not Considered Gold Line Improvements
  • 44. Metro Has Not Considered Rail Improvements
  • 45. Which Is Your Pasadena?