United Nations
UNECE Team of Specialists on PPP’s

Key Issues in PPP Procurement
Pedro Neves | Genève | 5-6 February 2013
Key issues in PPP procurement

Vision, Trust, Governance & Implementation

PPP is above all a question of trust, “crossing the bridge”, understanding others.
The goal will always be to provide public services to the communities.
A way to implement quality of life

Vision and Strategy should guide short and long term public interest.
goal > to improve quality of to Sustainable Development
Road map life

Governance will be the key on how Vision and Trust are ensured.

Procurement is therefore a link on the implementation process.
It is an essential link, but not an end in itself!
Interpreting, choosing, ensuring “services”
Key issues in PPP procurement

From Vision to Implementation
Millennium Development Goals
Sustainable Development
Constitution
National Legislation
goal > to improve quality of life

Country Assistant Strategy

National Long Term Development Plan
Government Plans
Sectorial Plans
Priority Projects
Key issues in PPP procurement

From Procurement to Implementation

Community Needs
Social Fingerprint
Positive Environment Footprint
goal > to improve quality of life

Economic Sustainability

Bankability

Priority Projects
Key issues in PPP procurement

From Public Interest to Implementation

National
Strategy

Public
goal > to improve quality of life
Procurement
Public
Interest

Procurement is an essential link to promote quality of life
Key issues in PPP Procurement

Matching Public and Private “Forces”

Public

• Strategy

Private

• Dynamics

Defending public interest > Ensuring implementation
Key issues in PPP Procurement

Community & Political Support ; Environment & Bankability

Community interest
Political alignment
Environmental footprint
Bankability

Lack of communication
Lack of social understanding
No value for money
Lack of funds
Oversize
White elephants

Vision > Goals > Strategy > Communication > People, Planet & Profit
Key issues in PPP Procurement

PPP’s Model Vary With Sector and Geography

•
•
•
•

Roads
Railway
Airports
Ports

•
•
•
•
•

Power
Telecom
Water & Sewage
Solid waste
Gas

Social

Mobility

Infrastructure

Utilities

Real
Estate

Identifying the infrastructure needs > Defining

•
•
•
•

Health
Education
Safety
Culture & Sports

•
•
•
•
•

Housing
Retail
Services
Tourism
Logistics & Industry

the priorities!
Key issues in PPP Procurement

The PPP Menu

BOT
EPC

F
Garanties

Market
Concept

PM

Civil

Equity

FEED

HQS

Mechanical

Mezzanine

Detailed

Budget

Electrical

Debt

Land
acquisition

contractor

Automation

ECA
PRI

OM
Invoicing
Customer Svc
Safety
Marketing
PM

FM
Life cycle
Preventive
Curative
Turn around

Identifying the “Boxes” … PPP is not only about financing !
Key issues in PPP Procurement

Ambition and Budget > Feasibility Issues

Ministry
of Finance

Line
Ministry

Budget

Priority
Projects

Common
goal
Cross Government understanding & long-term interest essential implementation
Key issues in PPP Procurement

Complementing State with Private Funding

State
Budget

Private
Funding

Infrastructure
Needs
Ensuring financial solutions between public and private funding
Key issues in PPP Procurement

Simplify the Implementation Solution

Study > Transform > Provide

Goal is to provide the service not the studies!

Identifying the
needs and
defining goals
and strategy

Launching PPP
process to
implement one
stop shop
solution

Managing the
public interest,
economic
growth,
environmental
and social
sustainability

Transforming Quality of Life into a rational and measurable process
Key issues in PPP Procurement

Each Country Has Its Own PPP DNA
Confirm:
• Need
• Delivery time
• Source of funds
• Ownership & Governance model
• Partner experience & spirit

Privatization
JV solution

Concession

Management
contract

EPC
solution

Choosing the model that delivers the wanted public service in due time!
Key issues in PPP Procurement

“To Be or Not to Be” In The Same Room!

Implicit

Explicit

model

model

1 goal

1 goal

1 Public
organization

1 Private
SPV

JV
% Public

JV
% Private

Implicit versus explicit model of implementing the same goal
Key issues in PPP Procurement

AG Experience

Energy & Power

>

• 21 GW of production (existing and under construction)
• 493 km of transmission and distribution

Environment

>

• 199 water treatment plants
• 227 wastewater treatment plants

Telecom

>

• 42 million clients of land lines
• 203 million clients of mobile lines

Road
Concessions

>

• 2.672 km of roads, bridges and tunnels

Railway & Metro

>

• 188 km of rail existing and awarded

Airports

>

• 2 airports for 25 million passengers per year (under
construction)

Municipalities

>

• Daily interaction with 1,149 municipalities
Key issues in PPP Procurement

Ensuring Infrastructure Solutions

Ensuring Infrastructure Solutions
for Public and Private Partners

is Our Core Business and Way of Life

pedro.neves@agnet.com.br
Andrade Gutierrez Group

Background

EXPERIENCE

CAPACITY

•

Over 60 years of experience

•

Engineering & Construction

•

650 projects completed in 38 countries

•

Telecommunications

•

+ 220,000 workforce

•

Power Generation & Distribution

•

Concessions of Public Infrastructures

•

Project Financing

INTERNATIONAL PRESENCE

FINANCIAL STRENGTH

•

America

•

Turnover: US$ 9.7 billion in 2011

•

Europe

•

EBITDA: US$ 1,829 billion in 2011

•

Africa

•

Middle East & Asia
Andrade Gutierrez Group

International Presence
Andrade Gutierrez Group

Culture & Human Resources

AG Group
Construction

51,878

Concessions

23,111

Telecommunications

147,04

Total

Outsourced labor

222,793

94,368

Source: Annual Report 2011
Andrade Gutierrez Group

Experience
CONSTRUCTION

ENVIRONMENT

ENERGY

 Hydro Power Plants

 Hydroelectric

 Thermo Power Plants

 Thermoelectric

 Water
distribution

 Nuclear Power Plants

 Nuclear



Sewage network

 Transmission Lines

 Transmission
Lines



Wastewater
treatment plants

 Industrial Plants
 Refineries
 Steel Mills
 Pipelines
 Tunnels
 Shipyards
 Ports
 Subways
 Water/Waste &
Urbanization
 Dams
 Airports
 Roads
 Railways
 Buildings

TELECOM

CONCESSIONS

 Mobile

 Roads

 Broadband

 Subways

 Contact
Centres

 Water &
Wastewater

 Airports

HEALTHCARE
 Logistics
Andrade Gutierrez Group

Experience
SUBWAYS

HYDROELECTRIC PLANTS

REFINERIES

Projects: 27
Total extension: 102.82 km

Projects: 22
Installed capacity: 38.3GW

Projects: 20

RAILWAYS

THERMOELECTRIC PLANTS

GAS PIPELINES

Projects: 22
Total extension: 953 km

Projects: 4
Installed capacity: 2 GW

Projects: 11
Total extens.: 1,050 km

PORTS

BUILDINGS

Projects: 38
Docks, piers and quays: 984,300 m2

Projects: 68
Built area: 2,909,000 m2

AIRPORTS
Projects: 18
Total runway extension:
1,282,000 m2

IRRIGATION
Projects: 22
Canals: 548 km

ROADS, BRIDGES AND VIADUCTS

SANITATION

Projects: 313
Total extension: 17,585 km

Projects: 79
Construction and rectification
of canals: 170 km

MINING AND STEEL
Projects: 13

SHIPYARDS
Projects: 1

STADES
Projects: 4
Number of seats:
192,000

NUCLEAR POWER PLANTS
Projects: 3
Installed capacity:1.7 GW

DRILLING AND COMPLETION OF OIL
AND GAS WELLS
Projects: 72 (on land and sea)

Source: Annual Report 2011
Andrade Gutierrez Group

Concessions (PPP’s, BOTS’s, DBFO’s)
HIGHWAYS

In Portugal:
In Brazil:

240 km of highways
2,432 km of highways

CCR is the largest private group operating road concessions in Latin America

RAILWAYS

Railways

165 km of lines for high-speed train in Portugal

SUBWAYS

Subways

12.8 km of subway

AIRPORTS

San José Airport, Costa Rica
5.4 millions passengers in 2010

New Quito International Airport, Ecuador
Concession: 35 years
Andrade Gutierrez Group

Concessions (PPP’s, BOTS’s, DBFO’s)
ENERGY

# 1 Power Integrated Utility in Brazil

6,896 MW

Power generation

8,861 Km

Power transmission

485,046 Km

Electricity distribution

Covering

805

municipalities

Supplying

30

million citizens

Operating

65

power plants

3rd Largest Hydroelectric Power Plant in Brazil
(in terms of guaranteed power output)
Installed capacity of 3,150 MW
BOT contract
AG holds a 12.4% stake of Santo Antônio Energia
Power generation to supply 44 million citizens

Santo Antônio
Energia
Andrade Gutierrez Group

Concessions (PPP’s, BOTS’s, DBFO’s)
ENVIRONMENT

Covering

344

municipalities

Supplying

9.5

million citizens

Operating

177

water treatment plants

Operating

225

waste water treatment plants

Water supply and sewage management in the Port of Santos

LOGISTIC

LOGIMED
The company, entirely owned by AG, provides all the logistics and supply chains
of materials, medicines, orthopedic and prosthetic devices for hospitals though
innovative solutions and technologies.
Andrade Gutierrez Group

Telecommunications



Landlines:

43 million lines



Mobile phones:

69.7 million clients



Optical Fibre Network

1,062 km



Largest contact centre company in Brazil



More than 70 corporate clients



34 contact centers



116,000 employees
Andrade Gutierrez Group

OLYMPIC PARK – RIO 2016
Project area:
1.18 million m²

More than
2.500 workers

16 sports
modalities

Client: City of Rio de Janeiro - Brazil
Contract value: US$ 675,500,000

PUBLIC-PRIVATE PARTNERSHIP FOR THE CONSTRUCTION
OF THE MAIN SITE OF RIO 2016 OLYMPIC GAMES

July 2012 – June 2027

ANDRADE GUTIERREZ OWNS 1/3 OF THE SPECIAL PURPOSE VEHICLE (SPV) “RIO MAIS”
Contacts - Andrade Gutierrez – Main Offices
 Brazil

 South America

 Middle East and Asia

• Rio de Janeiro
Andrade Gutierrez S.A.
Praia de Botafogo, 300 4º andar
22250-040 Rio de Janeiro RJ, Brazil
[phone] +55 21 2211 8000

• Argentina - Buenos Aires
Edificio Torre Prourban - Av. Libertador,
498 24º piso Sur CABA C1001ABR
[phone]: 00 31 54 11 5352-0100

• UAE - Abu Dhabi
P.O. BOX 42787
Office nº 204 – Building C-169
Zone 19/02 -East Defense Road
United Arab Emirates
[phone]: +971 2 643 1996

• São Paulo
Construtora Andrade Gutierrez
R. Dr. Geraldo Campos Moreira 375
04571-020 São Paulo SP, Brazil
[phone] +55 11 5502 2000

 Europe
• Portugal - Lisbon
Lagoas Park Edifício 6, Piso 1
2740-244 Lisbon, Portugal
[phone] +351 218 432 594
• Greece - Athens
314-316, Sigrou Avenue
17673, Kallithea – Athens, Greece
[phone]: +30 210 95 65 534
• Spain - Madrid
Plaza de Angel Carbajo nº6
Entreplanta Derecha
28020 Madrid, Spain
[phone]: +34 915 715 045

• Venezuela - Caracas
Av. Venezuela, Torre Lamaletto, Piso 1,
El Rosal, Caracas - 1060 - Venezuela
[phone]: 00 351 291 206 230
• Equador – Quito
Calle General Duma N47-248 y Las
Violetas - Sector Monteserrin
[phone]: 00 31 59 32 246 4440
• Rep. Dominicana - Sto Domingo
Avenida 27 de Febrero No. 495, Torre
Forum Piso 12
[phone]: 00 31 1 809 563 0071/ 809 563
0072
• Peru – Lima
Calle Francisco Graña nº 155 Urb. Santa
Catalina – La Victoria
[phone]: 00 31 511 415 0630

www.agsa.com.br
www.agsa.com.br

• Qatar – Doha
Palm Tower – Cornish area
Majlis Al-Tawoon Street
34th Floor Office 4
P.O. BOX 17965 Doha
Qatar
[phone]: +974 4483 8460
• India – Gurgaon, NCR
H304, Park View City 2
Gurgaon-Sohna Road
Gurgaon, Haryana 122 002
[phone]: +911 244 00 78 84
• Kingdom of Saudi Arabia, Riyadh
Olaya St, Siricon Bldg, 7th Floor
P.O. BOX 67356
Riyadh, Kingdom of Saudi Arabia

28
Contacts - Andrade Gutierrez – Main Offices
 Africa
• Angola - Luanda
Bairro do Benfica – Sector Talatona
Zona Residencial 6B, Via AL4A,
nº ZR6B Samba – Luanda, Angola
[phone]: +244 222 405 394

• Libya - Tripoli
Alseyaheya - As Fhan Road A73
Tripoli, Libya
[phone]: +218 917 877 306

• Republic of Guinea - Conakry
Immeuble Résidence Jeannine
Rue D.I. 017 Camayenne
B.P. 1419 Conakry, Rep. of Guinea
[phone]: +224 669 342 80

• Algeria – Algiers
13 Rue les Palmiers,Jardin des Pins,
El Biar - 16.406 Algiers, Algeria
[phone]: + 213 21 91 52 56

• Mali - Bamako
Immeuble du Patronat – CNPM
2ème étage de l’aile sud
Hamdallaye ACI 2000
Bamako, Mali

• Rep. of the Congo - Brazzaville
129, Rue de Reims - Centre
B.P. 943 Brazzaville
Rep. of the Congo
[phone]: +242 622 16 06

• Cameroon - Yaoundé
Immueble Credit Foncier du Cameroun
3ème Etage – Porte 321
B.P. 7422 Yaoundé, Cameroon
[phone]: +237 223 08 86

• Mauritania - Nouakchott
Rue 42-066 llot 19, Salle 105
B.P. 5627 Nouakchott, Mauritania
[phone]: +222 524 46 30

• Tanzania – Dar es Salaam
plot 435, Mahando St. Cliffton’s Plazza
The Village Walk, Units 315 & 316
P.O.Box 506 Oysterbay,
Dar es Salaam Tanzania
[phone]: +242 622 16 06

• Equatorial Guinea – Batta Litoral
Calle Udubuandjolo (Bisa) S/N
Al lado de Iglesia de Salesianos
Batta Litoral, Equatorial Guinea
[phone]: +240 53 48 49

• Mozambique - Maputo
Av. do Zimbabwe, 560
Maputo, Mozambique
[phone]: +258 21 492 754/5

• Ghana - Accra
5 Alima Ave. Ap. 13
Accra, Ghana
[phone]: +233 200 185 162

www.agsa.com.br
www.agsa.com.br

29

Weitere ähnliche Inhalte

Andere mochten auch (13)

Mandura partner
Mandura partnerMandura partner
Mandura partner
 
California Baking School
California Baking SchoolCalifornia Baking School
California Baking School
 
I believe
I believeI believe
I believe
 
Almacenamiento de suministros
Almacenamiento de suministrosAlmacenamiento de suministros
Almacenamiento de suministros
 
ก่อกำเนิด
ก่อกำเนิดก่อกำเนิด
ก่อกำเนิด
 
Mandura
ManduraMandura
Mandura
 
ADinesh
ADineshADinesh
ADinesh
 
El cocherito leré
El cocherito leréEl cocherito leré
El cocherito leré
 
กลุ่มยาแก้ไข้ ลดความร้อนสะเดา
กลุ่มยาแก้ไข้ ลดความร้อนสะเดากลุ่มยาแก้ไข้ ลดความร้อนสะเดา
กลุ่มยาแก้ไข้ ลดความร้อนสะเดา
 
Fuel quiz 2
Fuel quiz 2Fuel quiz 2
Fuel quiz 2
 
Ropspowerpoint
RopspowerpointRopspowerpoint
Ropspowerpoint
 
Presentazione Maremma Toscana Experience - Workshop Amsterdam 6 nov 2014
Presentazione Maremma Toscana Experience - Workshop Amsterdam 6 nov 2014Presentazione Maremma Toscana Experience - Workshop Amsterdam 6 nov 2014
Presentazione Maremma Toscana Experience - Workshop Amsterdam 6 nov 2014
 
manual global mapper
manual global mappermanual global mapper
manual global mapper
 

Ähnlich wie 2 un geneva february 5th 2013 specialists on ppp

UK Cities and the Impact of Covid 19
UK Cities and the Impact of Covid 19UK Cities and the Impact of Covid 19
UK Cities and the Impact of Covid 194 All of Us
 
5G - Enabled Road and Rail Transport Trials in the West Midlands
5G - Enabled Road and Rail Transport Trials in the West Midlands5G - Enabled Road and Rail Transport Trials in the West Midlands
5G - Enabled Road and Rail Transport Trials in the West MidlandsKTN
 
Oia ICT Presentation
Oia ICT PresentationOia ICT Presentation
Oia ICT PresentationPravin Karde
 
UK E-Gov: An Overview
UK E-Gov: An OverviewUK E-Gov: An Overview
UK E-Gov: An OverviewGordon Lu
 
Infrastructure Seminar | The Infrastructure Systems competition scope | Harsh...
Infrastructure Seminar | The Infrastructure Systems competition scope | Harsh...Infrastructure Seminar | The Infrastructure Systems competition scope | Harsh...
Infrastructure Seminar | The Infrastructure Systems competition scope | Harsh...Invest Northern Ireland
 
Digital as an enabler for climate action
Digital as an enabler for climate actionDigital as an enabler for climate action
Digital as an enabler for climate actionSoren Gigler
 
2024_Dominion Presentación_Corporativa_Larga (ENG).pdf
2024_Dominion Presentación_Corporativa_Larga (ENG).pdf2024_Dominion Presentación_Corporativa_Larga (ENG).pdf
2024_Dominion Presentación_Corporativa_Larga (ENG).pdfNomen Nescio
 
Impact and Value During and After Construction - Tiago de Barros Correia, Brazil
Impact and Value During and After Construction - Tiago de Barros Correia, BrazilImpact and Value During and After Construction - Tiago de Barros Correia, Brazil
Impact and Value During and After Construction - Tiago de Barros Correia, BrazilOECD Governance
 
5G Digital Transformation Strategy in Nokia Hellas
5G Digital Transformation Strategy in Nokia Hellas5G Digital Transformation Strategy in Nokia Hellas
5G Digital Transformation Strategy in Nokia HellasSpilios Georgakopoulos
 
Digital Tranformation Strategy(5G) in Nokia Hellas
Digital Tranformation Strategy(5G) in Nokia HellasDigital Tranformation Strategy(5G) in Nokia Hellas
Digital Tranformation Strategy(5G) in Nokia HellasSpilios Georgakopoulos
 
Christiana Siambekou - National Documentation Centre (EKT)
Christiana Siambekou - National Documentation Centre (EKT)Christiana Siambekou - National Documentation Centre (EKT)
Christiana Siambekou - National Documentation Centre (EKT)WWW.ERFC.GR
 
BT Future Cities overview - Digital Health and Well-Being Festival
BT Future Cities overview - Digital Health and Well-Being Festival BT Future Cities overview - Digital Health and Well-Being Festival
BT Future Cities overview - Digital Health and Well-Being Festival Digital Health Enterprise Zone
 
Ghana: PPP and PFI
Ghana: PPP and PFIGhana: PPP and PFI
Ghana: PPP and PFITony Hagan .
 
Disruptive Technology 2016
Disruptive Technology 2016Disruptive Technology 2016
Disruptive Technology 20164 All of Us
 

Ähnlich wie 2 un geneva february 5th 2013 specialists on ppp (20)

UK Cities and the Impact of Covid 19
UK Cities and the Impact of Covid 19UK Cities and the Impact of Covid 19
UK Cities and the Impact of Covid 19
 
5G - Enabled Road and Rail Transport Trials in the West Midlands
5G - Enabled Road and Rail Transport Trials in the West Midlands5G - Enabled Road and Rail Transport Trials in the West Midlands
5G - Enabled Road and Rail Transport Trials in the West Midlands
 
Oia ICT Presentation
Oia ICT PresentationOia ICT Presentation
Oia ICT Presentation
 
PCPMar2015
PCPMar2015PCPMar2015
PCPMar2015
 
UK E-Gov: An Overview
UK E-Gov: An OverviewUK E-Gov: An Overview
UK E-Gov: An Overview
 
Infrastructure Seminar | The Infrastructure Systems competition scope | Harsh...
Infrastructure Seminar | The Infrastructure Systems competition scope | Harsh...Infrastructure Seminar | The Infrastructure Systems competition scope | Harsh...
Infrastructure Seminar | The Infrastructure Systems competition scope | Harsh...
 
Digital as an enabler for climate action
Digital as an enabler for climate actionDigital as an enabler for climate action
Digital as an enabler for climate action
 
2024_Dominion Presentación_Corporativa_Larga (ENG).pdf
2024_Dominion Presentación_Corporativa_Larga (ENG).pdf2024_Dominion Presentación_Corporativa_Larga (ENG).pdf
2024_Dominion Presentación_Corporativa_Larga (ENG).pdf
 
Impact and Value During and After Construction - Tiago de Barros Correia, Brazil
Impact and Value During and After Construction - Tiago de Barros Correia, BrazilImpact and Value During and After Construction - Tiago de Barros Correia, Brazil
Impact and Value During and After Construction - Tiago de Barros Correia, Brazil
 
The Digital Agenda for Europe
The Digital Agenda for EuropeThe Digital Agenda for Europe
The Digital Agenda for Europe
 
5G Digital Transformation Strategy in Nokia Hellas
5G Digital Transformation Strategy in Nokia Hellas5G Digital Transformation Strategy in Nokia Hellas
5G Digital Transformation Strategy in Nokia Hellas
 
Digital Tranformation Strategy(5G) in Nokia Hellas
Digital Tranformation Strategy(5G) in Nokia HellasDigital Tranformation Strategy(5G) in Nokia Hellas
Digital Tranformation Strategy(5G) in Nokia Hellas
 
Christiana Siambekou - National Documentation Centre (EKT)
Christiana Siambekou - National Documentation Centre (EKT)Christiana Siambekou - National Documentation Centre (EKT)
Christiana Siambekou - National Documentation Centre (EKT)
 
BT Future Cities overview - Digital Health and Well-Being Festival
BT Future Cities overview - Digital Health and Well-Being Festival BT Future Cities overview - Digital Health and Well-Being Festival
BT Future Cities overview - Digital Health and Well-Being Festival
 
Sustainable Energy Roadmaps
Sustainable Energy RoadmapsSustainable Energy Roadmaps
Sustainable Energy Roadmaps
 
Smart Cities 2019
Smart Cities 2019 Smart Cities 2019
Smart Cities 2019
 
Ghana: PPP and PFI
Ghana: PPP and PFIGhana: PPP and PFI
Ghana: PPP and PFI
 
E governance
E governance E governance
E governance
 
Benefits Highlight Report
Benefits Highlight ReportBenefits Highlight Report
Benefits Highlight Report
 
Disruptive Technology 2016
Disruptive Technology 2016Disruptive Technology 2016
Disruptive Technology 2016
 

Kürzlich hochgeladen

The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxmbikashkanyari
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFChandresh Chudasama
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Peter Ward
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
Chapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditChapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditNhtLNguyn9
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environmentelijahj01012
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Americas Got Grants
 

Kürzlich hochgeladen (20)

The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDF
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
Chapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditChapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal audit
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environment
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...
 

2 un geneva february 5th 2013 specialists on ppp

  • 1. United Nations UNECE Team of Specialists on PPP’s Key Issues in PPP Procurement Pedro Neves | Genève | 5-6 February 2013
  • 2. Key issues in PPP procurement Vision, Trust, Governance & Implementation PPP is above all a question of trust, “crossing the bridge”, understanding others. The goal will always be to provide public services to the communities. A way to implement quality of life Vision and Strategy should guide short and long term public interest. goal > to improve quality of to Sustainable Development Road map life Governance will be the key on how Vision and Trust are ensured. Procurement is therefore a link on the implementation process. It is an essential link, but not an end in itself! Interpreting, choosing, ensuring “services”
  • 3. Key issues in PPP procurement From Vision to Implementation Millennium Development Goals Sustainable Development Constitution National Legislation goal > to improve quality of life Country Assistant Strategy National Long Term Development Plan Government Plans Sectorial Plans Priority Projects
  • 4. Key issues in PPP procurement From Procurement to Implementation Community Needs Social Fingerprint Positive Environment Footprint goal > to improve quality of life Economic Sustainability Bankability Priority Projects
  • 5. Key issues in PPP procurement From Public Interest to Implementation National Strategy Public goal > to improve quality of life Procurement Public Interest Procurement is an essential link to promote quality of life
  • 6. Key issues in PPP Procurement Matching Public and Private “Forces” Public • Strategy Private • Dynamics Defending public interest > Ensuring implementation
  • 7. Key issues in PPP Procurement Community & Political Support ; Environment & Bankability Community interest Political alignment Environmental footprint Bankability Lack of communication Lack of social understanding No value for money Lack of funds Oversize White elephants Vision > Goals > Strategy > Communication > People, Planet & Profit
  • 8. Key issues in PPP Procurement PPP’s Model Vary With Sector and Geography • • • • Roads Railway Airports Ports • • • • • Power Telecom Water & Sewage Solid waste Gas Social Mobility Infrastructure Utilities Real Estate Identifying the infrastructure needs > Defining • • • • Health Education Safety Culture & Sports • • • • • Housing Retail Services Tourism Logistics & Industry the priorities!
  • 9. Key issues in PPP Procurement The PPP Menu BOT EPC F Garanties Market Concept PM Civil Equity FEED HQS Mechanical Mezzanine Detailed Budget Electrical Debt Land acquisition contractor Automation ECA PRI OM Invoicing Customer Svc Safety Marketing PM FM Life cycle Preventive Curative Turn around Identifying the “Boxes” … PPP is not only about financing !
  • 10. Key issues in PPP Procurement Ambition and Budget > Feasibility Issues Ministry of Finance Line Ministry Budget Priority Projects Common goal Cross Government understanding & long-term interest essential implementation
  • 11. Key issues in PPP Procurement Complementing State with Private Funding State Budget Private Funding Infrastructure Needs Ensuring financial solutions between public and private funding
  • 12. Key issues in PPP Procurement Simplify the Implementation Solution Study > Transform > Provide Goal is to provide the service not the studies! Identifying the needs and defining goals and strategy Launching PPP process to implement one stop shop solution Managing the public interest, economic growth, environmental and social sustainability Transforming Quality of Life into a rational and measurable process
  • 13. Key issues in PPP Procurement Each Country Has Its Own PPP DNA Confirm: • Need • Delivery time • Source of funds • Ownership & Governance model • Partner experience & spirit Privatization JV solution Concession Management contract EPC solution Choosing the model that delivers the wanted public service in due time!
  • 14. Key issues in PPP Procurement “To Be or Not to Be” In The Same Room! Implicit Explicit model model 1 goal 1 goal 1 Public organization 1 Private SPV JV % Public JV % Private Implicit versus explicit model of implementing the same goal
  • 15. Key issues in PPP Procurement AG Experience Energy & Power > • 21 GW of production (existing and under construction) • 493 km of transmission and distribution Environment > • 199 water treatment plants • 227 wastewater treatment plants Telecom > • 42 million clients of land lines • 203 million clients of mobile lines Road Concessions > • 2.672 km of roads, bridges and tunnels Railway & Metro > • 188 km of rail existing and awarded Airports > • 2 airports for 25 million passengers per year (under construction) Municipalities > • Daily interaction with 1,149 municipalities
  • 16. Key issues in PPP Procurement Ensuring Infrastructure Solutions Ensuring Infrastructure Solutions for Public and Private Partners is Our Core Business and Way of Life pedro.neves@agnet.com.br
  • 17. Andrade Gutierrez Group Background EXPERIENCE CAPACITY • Over 60 years of experience • Engineering & Construction • 650 projects completed in 38 countries • Telecommunications • + 220,000 workforce • Power Generation & Distribution • Concessions of Public Infrastructures • Project Financing INTERNATIONAL PRESENCE FINANCIAL STRENGTH • America • Turnover: US$ 9.7 billion in 2011 • Europe • EBITDA: US$ 1,829 billion in 2011 • Africa • Middle East & Asia
  • 19. Andrade Gutierrez Group Culture & Human Resources AG Group Construction 51,878 Concessions 23,111 Telecommunications 147,04 Total Outsourced labor 222,793 94,368 Source: Annual Report 2011
  • 20. Andrade Gutierrez Group Experience CONSTRUCTION ENVIRONMENT ENERGY  Hydro Power Plants  Hydroelectric  Thermo Power Plants  Thermoelectric  Water distribution  Nuclear Power Plants  Nuclear  Sewage network  Transmission Lines  Transmission Lines  Wastewater treatment plants  Industrial Plants  Refineries  Steel Mills  Pipelines  Tunnels  Shipyards  Ports  Subways  Water/Waste & Urbanization  Dams  Airports  Roads  Railways  Buildings TELECOM CONCESSIONS  Mobile  Roads  Broadband  Subways  Contact Centres  Water & Wastewater  Airports HEALTHCARE  Logistics
  • 21. Andrade Gutierrez Group Experience SUBWAYS HYDROELECTRIC PLANTS REFINERIES Projects: 27 Total extension: 102.82 km Projects: 22 Installed capacity: 38.3GW Projects: 20 RAILWAYS THERMOELECTRIC PLANTS GAS PIPELINES Projects: 22 Total extension: 953 km Projects: 4 Installed capacity: 2 GW Projects: 11 Total extens.: 1,050 km PORTS BUILDINGS Projects: 38 Docks, piers and quays: 984,300 m2 Projects: 68 Built area: 2,909,000 m2 AIRPORTS Projects: 18 Total runway extension: 1,282,000 m2 IRRIGATION Projects: 22 Canals: 548 km ROADS, BRIDGES AND VIADUCTS SANITATION Projects: 313 Total extension: 17,585 km Projects: 79 Construction and rectification of canals: 170 km MINING AND STEEL Projects: 13 SHIPYARDS Projects: 1 STADES Projects: 4 Number of seats: 192,000 NUCLEAR POWER PLANTS Projects: 3 Installed capacity:1.7 GW DRILLING AND COMPLETION OF OIL AND GAS WELLS Projects: 72 (on land and sea) Source: Annual Report 2011
  • 22. Andrade Gutierrez Group Concessions (PPP’s, BOTS’s, DBFO’s) HIGHWAYS In Portugal: In Brazil: 240 km of highways 2,432 km of highways CCR is the largest private group operating road concessions in Latin America RAILWAYS Railways 165 km of lines for high-speed train in Portugal SUBWAYS Subways 12.8 km of subway AIRPORTS San José Airport, Costa Rica 5.4 millions passengers in 2010 New Quito International Airport, Ecuador Concession: 35 years
  • 23. Andrade Gutierrez Group Concessions (PPP’s, BOTS’s, DBFO’s) ENERGY # 1 Power Integrated Utility in Brazil 6,896 MW Power generation 8,861 Km Power transmission 485,046 Km Electricity distribution Covering 805 municipalities Supplying 30 million citizens Operating 65 power plants 3rd Largest Hydroelectric Power Plant in Brazil (in terms of guaranteed power output) Installed capacity of 3,150 MW BOT contract AG holds a 12.4% stake of Santo Antônio Energia Power generation to supply 44 million citizens Santo Antônio Energia
  • 24. Andrade Gutierrez Group Concessions (PPP’s, BOTS’s, DBFO’s) ENVIRONMENT Covering 344 municipalities Supplying 9.5 million citizens Operating 177 water treatment plants Operating 225 waste water treatment plants Water supply and sewage management in the Port of Santos LOGISTIC LOGIMED The company, entirely owned by AG, provides all the logistics and supply chains of materials, medicines, orthopedic and prosthetic devices for hospitals though innovative solutions and technologies.
  • 25. Andrade Gutierrez Group Telecommunications  Landlines: 43 million lines  Mobile phones: 69.7 million clients  Optical Fibre Network 1,062 km  Largest contact centre company in Brazil  More than 70 corporate clients  34 contact centers  116,000 employees
  • 26. Andrade Gutierrez Group OLYMPIC PARK – RIO 2016 Project area: 1.18 million m² More than 2.500 workers 16 sports modalities Client: City of Rio de Janeiro - Brazil Contract value: US$ 675,500,000 PUBLIC-PRIVATE PARTNERSHIP FOR THE CONSTRUCTION OF THE MAIN SITE OF RIO 2016 OLYMPIC GAMES July 2012 – June 2027 ANDRADE GUTIERREZ OWNS 1/3 OF THE SPECIAL PURPOSE VEHICLE (SPV) “RIO MAIS”
  • 27. Contacts - Andrade Gutierrez – Main Offices  Brazil  South America  Middle East and Asia • Rio de Janeiro Andrade Gutierrez S.A. Praia de Botafogo, 300 4º andar 22250-040 Rio de Janeiro RJ, Brazil [phone] +55 21 2211 8000 • Argentina - Buenos Aires Edificio Torre Prourban - Av. Libertador, 498 24º piso Sur CABA C1001ABR [phone]: 00 31 54 11 5352-0100 • UAE - Abu Dhabi P.O. BOX 42787 Office nº 204 – Building C-169 Zone 19/02 -East Defense Road United Arab Emirates [phone]: +971 2 643 1996 • São Paulo Construtora Andrade Gutierrez R. Dr. Geraldo Campos Moreira 375 04571-020 São Paulo SP, Brazil [phone] +55 11 5502 2000  Europe • Portugal - Lisbon Lagoas Park Edifício 6, Piso 1 2740-244 Lisbon, Portugal [phone] +351 218 432 594 • Greece - Athens 314-316, Sigrou Avenue 17673, Kallithea – Athens, Greece [phone]: +30 210 95 65 534 • Spain - Madrid Plaza de Angel Carbajo nº6 Entreplanta Derecha 28020 Madrid, Spain [phone]: +34 915 715 045 • Venezuela - Caracas Av. Venezuela, Torre Lamaletto, Piso 1, El Rosal, Caracas - 1060 - Venezuela [phone]: 00 351 291 206 230 • Equador – Quito Calle General Duma N47-248 y Las Violetas - Sector Monteserrin [phone]: 00 31 59 32 246 4440 • Rep. Dominicana - Sto Domingo Avenida 27 de Febrero No. 495, Torre Forum Piso 12 [phone]: 00 31 1 809 563 0071/ 809 563 0072 • Peru – Lima Calle Francisco Graña nº 155 Urb. Santa Catalina – La Victoria [phone]: 00 31 511 415 0630 www.agsa.com.br www.agsa.com.br • Qatar – Doha Palm Tower – Cornish area Majlis Al-Tawoon Street 34th Floor Office 4 P.O. BOX 17965 Doha Qatar [phone]: +974 4483 8460 • India – Gurgaon, NCR H304, Park View City 2 Gurgaon-Sohna Road Gurgaon, Haryana 122 002 [phone]: +911 244 00 78 84 • Kingdom of Saudi Arabia, Riyadh Olaya St, Siricon Bldg, 7th Floor P.O. BOX 67356 Riyadh, Kingdom of Saudi Arabia 28
  • 28. Contacts - Andrade Gutierrez – Main Offices  Africa • Angola - Luanda Bairro do Benfica – Sector Talatona Zona Residencial 6B, Via AL4A, nº ZR6B Samba – Luanda, Angola [phone]: +244 222 405 394 • Libya - Tripoli Alseyaheya - As Fhan Road A73 Tripoli, Libya [phone]: +218 917 877 306 • Republic of Guinea - Conakry Immeuble Résidence Jeannine Rue D.I. 017 Camayenne B.P. 1419 Conakry, Rep. of Guinea [phone]: +224 669 342 80 • Algeria – Algiers 13 Rue les Palmiers,Jardin des Pins, El Biar - 16.406 Algiers, Algeria [phone]: + 213 21 91 52 56 • Mali - Bamako Immeuble du Patronat – CNPM 2ème étage de l’aile sud Hamdallaye ACI 2000 Bamako, Mali • Rep. of the Congo - Brazzaville 129, Rue de Reims - Centre B.P. 943 Brazzaville Rep. of the Congo [phone]: +242 622 16 06 • Cameroon - Yaoundé Immueble Credit Foncier du Cameroun 3ème Etage – Porte 321 B.P. 7422 Yaoundé, Cameroon [phone]: +237 223 08 86 • Mauritania - Nouakchott Rue 42-066 llot 19, Salle 105 B.P. 5627 Nouakchott, Mauritania [phone]: +222 524 46 30 • Tanzania – Dar es Salaam plot 435, Mahando St. Cliffton’s Plazza The Village Walk, Units 315 & 316 P.O.Box 506 Oysterbay, Dar es Salaam Tanzania [phone]: +242 622 16 06 • Equatorial Guinea – Batta Litoral Calle Udubuandjolo (Bisa) S/N Al lado de Iglesia de Salesianos Batta Litoral, Equatorial Guinea [phone]: +240 53 48 49 • Mozambique - Maputo Av. do Zimbabwe, 560 Maputo, Mozambique [phone]: +258 21 492 754/5 • Ghana - Accra 5 Alima Ave. Ap. 13 Accra, Ghana [phone]: +233 200 185 162 www.agsa.com.br www.agsa.com.br 29