The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
Design ManagementSeminar
1. Working at the interface between design and construction Peter Demian Lecturer in Construction Management Department of Civil and Building Engineering Loughborough University
2.
3.
4.
5.
6.
7.
8. First Principles: Design Management 1/5 Managing≠doing Designing≠construction ? ? CONSTRUCTION ? ? DESIGN MANAGING DOING
9. First Principles: Design Management 2/5 A long time ago… Architect/ Masterbuilder Workmen or labourers CONSTRUCTION Architect/ Masterbuilder Architect/ Masterbuilder DESIGN MANAGING DOING
10. First Principles: Design Management 3/5 Recently… Const./Proj. Manager or General Contractor Subcontractors CONSTRUCTION Architect/ Engineer Architect/ Engineer DESIGN MANAGING DOING
11. First Principles: Design Management 4/5 The future… Const./Proj. Manager or General Contractor Subcontractors CONSTRUCTION The Design Manager Architect/ Engineer + Others DESIGN MANAGING DOING
12.
13.
14. Who Contributes to the Design? CONTRIBUTION STAGE Brief Detail Concept and Scheme Specialist Engineering Design Construction Client Architect Engineer Specialist Gray and Hughes 2001. Fig 9
20. Level of Influence Feasibility Brief Design Construction Utilisation Chapter 10 of “Professional Construction Management” by Barrie and Paulson (1992) Project Phase Level of Influence 0% 100% Decreasing Influence Increasing Expenditure Cumulative Cost of Project
21. Design Manager Imposes Freezes Feasibility Brief Design Construction Utilisation Chapter 10 of “Professional Construction Management” by Barrie and Paulson (1992) Project Phase 0% 100% Decreasing Influence Increasing Expenditure Cumulative Cost of Project Cost of change BRIEF FREEZE DESIGN FREEZE