TENDERING & BIDDING:          After the project proposals have been cleared by the Ministry, the Executing Agency would invite tenders and commence work on the projects. The well-established procedure for tendering, through competitive bidding, would be followed for all projects.  All the projects scrutinised by the STA and cleared by the Ministry, will be tendered as such, and no changes shall be made in the work. The States will follow the Standard Bidding Document, prescribed by the Ministry of Rural Development, for all the tenders.      All State level formalities relating to issue of tender notice, finalisation of tender and award of works should be completed within 120 days of clearance of the project proposals  failing which it will be deemed that the works in question have been cancelled. A report on the circumstances in which the work could not be awarded must be sent to the National Rural Roads Development Agency (NRRDA). The State Government would also stand to lose that amount.       In case the value of tenders received is above the estimate that has been cleared by the Ministry, the difference (tender premium) will be borne by the State Government.    The tendering work is to be done through the established procedure of competitive bidding. The standard bidding document (SBD) for PMGSY (approved by NRRDA) has to be adopted for all the tenders. PMGSY places high emphasis on time and quality. The tendering and contracting process and the time period has to be strictly followed as per the relevant clauses of SBD. Bidding is done in two packet system. To attract right contractors and for healthy competition, packaging of two or more road projects is allowed. Excess / deficit in tendered amount has to be adjusted at the district level under intimation to the NRRDA provided that in any particular package the excess / deficit does not exceed 10%  If the excess / deficient in tendered amount is not adjusted within the district, the same can be adjusted at the State level at BRRDA under intimation to NRRDA. In case the value of tenders received is above the estimate that has been cleared by the Ministry, the difference (tender premium) pooled for the entire State has be borne by the State Government Latest Tenders: 1)Executive Engineer, PWD(R&B), Santirbazar Division, Santirbazar,South Tripura  Estimated Cost of Construction  Rs. 3,44,59,000 ,Estimated Cost of Maintenance  Rs. 43,28,000 and time Allowed for completion (in months) is 12 monthd. 2)Chief Engineer PWD Rajasthan, Jaipur invites on behalf of Chief Engineer PWD Rajasthan, Jaipur sealed percentage Rate tenders from approved and eligible Contractors registered  Estimated Cost of Construction  Rs. 1,43,50,000 and it is completed in 9 months. 3)Superintending Engineer, PMGSY Circle, PWD, Meerut on behalf of Governor of UP sealed percentage Rate tenders from approved and eligible Contractors registered with UP PWD, UP RES, class A, or equivalent category up to 05:00 hours on 30-06-2010 for construction of maintenance for five years after construction. ORGANISATION OF PROJECT TEAM: Organizations can be defined as groups of people who must coordinate their activities in order to meet organizational objectives.  In order to ensure efficient and streamlined execution of works under PMGSY, various capacity enhancement measures have been suggested as an adjunct to the programme. These are required to be put in place for effective management. Generally, even though PMGSY is primarily aimed at providing new connectivity, at the sectoral level it seeks the development and strengthening of the rural roads sector through systematic planning and management of the entire network, and the institutional strengthening and capacity enhancement is in furtherance of these broader sectoral objectives as well. 1. STATE LEVEL AGENCIESSetting up and operationalisation of an effective state level agency with responsibility to PMGSY specifically, and for the rural roads network generally is a key component to institutional development. 1.1 Executing Agencies:   State Government identifies a suitable agency having a presence in all the districts and having established competence in executing time-bound road construction work. These agencies shall be designated as Executing Agencies. These could be the Public Works Department/Rural Engineering Services/Rural Engineering Organisation/Rural Works Department/ Zilla Parishads/ Panchayati Raj Institutions. 1.2 Nodal Department: Each State Government nominate a Department as the Nodal Department. The Nodal Department have overall responsibility for the implementation of PMGSY in the State. All communication between the MoRD and the State Government done  through the Nodal Department/State level Agency. The Nodal Department shall normally be the State Department responsible for rural roads. 1.3 Chief Executive Officer  : The Chief Executive Officer of the Agency needs Senior Officer of the Nodal/ Executing Department preferably with a presence in the State Secretariat hierarchy. 1.4 Financial Controller: The Agency appoint a Financial Controller, to oversee the operationalisation of the rural roads accounting system. The Agency maintain centralized accounts, which is  accessed by the Programme Implementing Units (PIU) and the Financial Controller’s primary responsibility is to enforcement of accounting standards and arranging the auditing thereof. 1.5 Empowered Officer : The Agency has an Empowered Officer .The officer is  responsible for operational management of the project funds and need to be a senior officer (generally of the rank of Chief Engineer), familiar with Project Management of PMGSY.  1.6 IT Nodal officer : The Agency has a State IT Nodal officer in order to oversee the regularity and accuracy of the data being furnished by the Programme Implementation Units (PIU) and will be responsible to oversee the upkeep of the hardware and software as well as the IT training requirements of the personnel dealing with the PMGSY.  1.7 State Quality Coordinator (SQC) :The Agency has a senior Engineer  to function as State Quality Coordinator (SQC) at the state level. His function is to oversee the satisfactory functioning of Quality Management mechanism within the State.  2 .PROGRAMME IMPLEMENTATION UNIT (PIU)The Programme Implementation Units (PIU) are the basic units for project planning, execution and accounting. A PIU  consist of one or more Engineering Divisions, appropriately headed by an Executive Engineer or Superintending Engineer. The PIU is directly responsible for contracting implementation and Quality Management of PMGSY works. The PIU also be the financial and accounting centre at the field level. 3. STATE LEVEL STANDING COMMITTEEA State Level Standing Committee (SLSC) set up preferably under the chairmanship of the Chief Secretary will be responsible for close and effective monitoring of the programme and to oversee the timely and proper execution of works .The SLSC needs to comprise all the main stakeholders in the programme, including: Secretaries of the Programme Departments (Rural Development and PWD). Secretaries of the Transport, Finance, Forests & Environment and IT Departments. State Informatics Officer (NIC) and State Technical Agencies (STAs). Since the primary purpose of PMGSY  is to enable basic access to the rural hinterland and thus increase the tempo of economic activity and reach of social services, the SLSC’s role is crucial to exploiting the development potential created by the new assets. 4. STATE TECHNICAL AGENCIESWhile States are primarily responsible for the programme, in view of the need to enhance technical inputs for design and techno-economic innovation, State Technical Agencies have been appointed by NRRDA to assist the States. The main functions of the Agencies are: Verification of the District Rural Roads Plan prepared by the district Programme Implementation Unit (PIU). Post-Scrutiny of Core Network. Scrutiny of the Detailed Project Reports for road works prepared by the District PIU. Providing requisite technical support to the PIUs in design, particularly in CD works. Undertaking normal tests of parameters for road design and Quality Control tests for District Programme Implementation Units and State Quality Control Mechanism. Training and R&D Monitoring. The Agencies will be selected for appointment on the basis of recommendation of the State Government. In order to qualify. Members of STA should have a Civil engineering background and qualifications including one or more with specialization in Traffic/ Transportation/Highway Engineering. The Agency should have a well established laboratory with adequate testing facilities; and The Agency should have the infrastructure/facility necessary for organising training programmes. 5 .MANAGEMENT AND MONITORING SYSTEMBecause PMGSY depends on clear and detailed procedures, with inbuilt time and quality parameters, monitoring and management of the programme is not only systematic but also highly amenable to computerization. PROJECT SCHUDLING: The scheduling of activities is one of the major requirements of the program office after a program go-ahead. There are certain guidelines that should be followed in the preparation of the schedule: ,[object Object]
The exact sequence of work should be defined through a   networking which interrelationship between events can be identified.
Schedules should be directly relatable to the work breakdown structure. The minimum requirement should be to show where and when all tasks start and finish.
All schedules must identify the time constraints and, if possible should identify those resources required for each event.
Tendering
Tendering

More Related Content

Similar to Tendering

Rmtsp 2721303 170900713008_bhavya
Rmtsp 2721303 170900713008_bhavyaRmtsp 2721303 170900713008_bhavya
Rmtsp 2721303 170900713008_bhavyaBhavya Patel
 
Methodology for DPR & PMC Road works.pdf
Methodology  for DPR & PMC Road works.pdfMethodology  for DPR & PMC Road works.pdf
Methodology for DPR & PMC Road works.pdfWapcosLimited3
 
Csr 2014-khyber-pakhtunkhwa
Csr 2014-khyber-pakhtunkhwaCsr 2014-khyber-pakhtunkhwa
Csr 2014-khyber-pakhtunkhwaIftikhar Mahmood
 
Integrated Development of Small & Medium Towns (IDSMT) Scheme
 	Integrated Development of Small & Medium Towns (IDSMT) Scheme  	Integrated Development of Small & Medium Towns (IDSMT) Scheme
Integrated Development of Small & Medium Towns (IDSMT) Scheme RAJKUMARPOREL
 
Amrut by Gajanand Ram (Town Planner)
Amrut  by Gajanand  Ram (Town Planner)Amrut  by Gajanand  Ram (Town Planner)
Amrut by Gajanand Ram (Town Planner)urbanranchi
 
Ap dung cac cong cu PRA
Ap dung cac cong cu PRAAp dung cac cong cu PRA
Ap dung cac cong cu PRAforeman
 
Monitoring and Evaluation Framework
Monitoring and Evaluation FrameworkMonitoring and Evaluation Framework
Monitoring and Evaluation FrameworkMichelle Joja
 
Monitoring Evaluation And Reporting
Monitoring  Evaluation And  ReportingMonitoring  Evaluation And  Reporting
Monitoring Evaluation And Reportingirwansyah.yahya
 
SENSITIZATION TRAINING ON MID-TERM REVIEW.pptx
SENSITIZATION TRAINING ON MID-TERM REVIEW.pptxSENSITIZATION TRAINING ON MID-TERM REVIEW.pptx
SENSITIZATION TRAINING ON MID-TERM REVIEW.pptxGEORGEKABONGAH1
 
Performance Audit of GBPWD.pptx
Performance Audit of GBPWD.pptxPerformance Audit of GBPWD.pptx
Performance Audit of GBPWD.pptxsheikhInayat5
 
Monitoring evaluation-and-reporting-1299571066-phpapp02 (1)
Monitoring evaluation-and-reporting-1299571066-phpapp02 (1)Monitoring evaluation-and-reporting-1299571066-phpapp02 (1)
Monitoring evaluation-and-reporting-1299571066-phpapp02 (1)V-cool Ndayak
 
1 GHANA MINISTRY OF ROADS AND HIGHWAYS 2013
1 GHANA MINISTRY OF ROADS AND HIGHWAYS 20131 GHANA MINISTRY OF ROADS AND HIGHWAYS 2013
1 GHANA MINISTRY OF ROADS AND HIGHWAYS 2013Philip Ryan
 
DILG-DBM-JOINT-MEMORANDUM-CIRCULAR-NO.-2017-2.pdf
DILG-DBM-JOINT-MEMORANDUM-CIRCULAR-NO.-2017-2.pdfDILG-DBM-JOINT-MEMORANDUM-CIRCULAR-NO.-2017-2.pdf
DILG-DBM-JOINT-MEMORANDUM-CIRCULAR-NO.-2017-2.pdfCDSCaviteDILG
 
Unnat bharat
Unnat bharatUnnat bharat
Unnat bharatP.L. Dhar
 
Jisc fe and skills project (csg briefing paper 1)
Jisc fe and skills project (csg briefing paper 1)Jisc fe and skills project (csg briefing paper 1)
Jisc fe and skills project (csg briefing paper 1)Tony Toole
 
Project tittle
Project tittleProject tittle
Project tittle09p61a0513
 

Similar to Tendering (20)

Rmtsp 2721303 170900713008_bhavya
Rmtsp 2721303 170900713008_bhavyaRmtsp 2721303 170900713008_bhavya
Rmtsp 2721303 170900713008_bhavya
 
Methodology for DPR & PMC Road works.pdf
Methodology  for DPR & PMC Road works.pdfMethodology  for DPR & PMC Road works.pdf
Methodology for DPR & PMC Road works.pdf
 
Dippca report
Dippca  reportDippca  report
Dippca report
 
Csr 2014-khyber-pakhtunkhwa
Csr 2014-khyber-pakhtunkhwaCsr 2014-khyber-pakhtunkhwa
Csr 2014-khyber-pakhtunkhwa
 
Summary udpfi
Summary udpfiSummary udpfi
Summary udpfi
 
Integrated Development of Small & Medium Towns (IDSMT) Scheme
 	Integrated Development of Small & Medium Towns (IDSMT) Scheme  	Integrated Development of Small & Medium Towns (IDSMT) Scheme
Integrated Development of Small & Medium Towns (IDSMT) Scheme
 
Amrut by Gajanand Ram (Town Planner)
Amrut  by Gajanand  Ram (Town Planner)Amrut  by Gajanand  Ram (Town Planner)
Amrut by Gajanand Ram (Town Planner)
 
Ap dung cac cong cu PRA
Ap dung cac cong cu PRAAp dung cac cong cu PRA
Ap dung cac cong cu PRA
 
CV Nimisha
CV NimishaCV Nimisha
CV Nimisha
 
Selma_CV1
Selma_CV1Selma_CV1
Selma_CV1
 
Monitoring and Evaluation Framework
Monitoring and Evaluation FrameworkMonitoring and Evaluation Framework
Monitoring and Evaluation Framework
 
Monitoring Evaluation And Reporting
Monitoring  Evaluation And  ReportingMonitoring  Evaluation And  Reporting
Monitoring Evaluation And Reporting
 
SENSITIZATION TRAINING ON MID-TERM REVIEW.pptx
SENSITIZATION TRAINING ON MID-TERM REVIEW.pptxSENSITIZATION TRAINING ON MID-TERM REVIEW.pptx
SENSITIZATION TRAINING ON MID-TERM REVIEW.pptx
 
Performance Audit of GBPWD.pptx
Performance Audit of GBPWD.pptxPerformance Audit of GBPWD.pptx
Performance Audit of GBPWD.pptx
 
Monitoring evaluation-and-reporting-1299571066-phpapp02 (1)
Monitoring evaluation-and-reporting-1299571066-phpapp02 (1)Monitoring evaluation-and-reporting-1299571066-phpapp02 (1)
Monitoring evaluation-and-reporting-1299571066-phpapp02 (1)
 
1 GHANA MINISTRY OF ROADS AND HIGHWAYS 2013
1 GHANA MINISTRY OF ROADS AND HIGHWAYS 20131 GHANA MINISTRY OF ROADS AND HIGHWAYS 2013
1 GHANA MINISTRY OF ROADS AND HIGHWAYS 2013
 
DILG-DBM-JOINT-MEMORANDUM-CIRCULAR-NO.-2017-2.pdf
DILG-DBM-JOINT-MEMORANDUM-CIRCULAR-NO.-2017-2.pdfDILG-DBM-JOINT-MEMORANDUM-CIRCULAR-NO.-2017-2.pdf
DILG-DBM-JOINT-MEMORANDUM-CIRCULAR-NO.-2017-2.pdf
 
Unnat bharat
Unnat bharatUnnat bharat
Unnat bharat
 
Jisc fe and skills project (csg briefing paper 1)
Jisc fe and skills project (csg briefing paper 1)Jisc fe and skills project (csg briefing paper 1)
Jisc fe and skills project (csg briefing paper 1)
 
Project tittle
Project tittleProject tittle
Project tittle
 

Recently uploaded

Pitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckPitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckHajeJanKamps
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environmentelijahj01012
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
Interoperability and ecosystems: Assembling the industrial metaverse
Interoperability and ecosystems:  Assembling the industrial metaverseInteroperability and ecosystems:  Assembling the industrial metaverse
Interoperability and ecosystems: Assembling the industrial metaverseSiemens
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFChandresh Chudasama
 
20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdfChris Skinner
 
Environmental Impact Of Rotary Screw Compressors
Environmental Impact Of Rotary Screw CompressorsEnvironmental Impact Of Rotary Screw Compressors
Environmental Impact Of Rotary Screw Compressorselgieurope
 
NAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataNAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
Planetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifePlanetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifeBhavana Pujan Kendra
 
Excvation Safety for safety officers reference
Excvation Safety for safety officers referenceExcvation Safety for safety officers reference
Excvation Safety for safety officers referencessuser2c065e
 
Technical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamTechnical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamArik Fletcher
 
14680-51-4.pdf Good quality CAS Good quality CAS
14680-51-4.pdf  Good  quality CAS Good  quality CAS14680-51-4.pdf  Good  quality CAS Good  quality CAS
14680-51-4.pdf Good quality CAS Good quality CAScathy664059
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfShashank Mehta
 
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxGo for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxRakhi Bazaar
 
EUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersEUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersPeter Horsten
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Americas Got Grants
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 
WSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfWSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfJamesConcepcion7
 
Jewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreJewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreNZSG
 

Recently uploaded (20)

Pitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckPitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deck
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environment
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
Interoperability and ecosystems: Assembling the industrial metaverse
Interoperability and ecosystems:  Assembling the industrial metaverseInteroperability and ecosystems:  Assembling the industrial metaverse
Interoperability and ecosystems: Assembling the industrial metaverse
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDF
 
20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf
 
Environmental Impact Of Rotary Screw Compressors
Environmental Impact Of Rotary Screw CompressorsEnvironmental Impact Of Rotary Screw Compressors
Environmental Impact Of Rotary Screw Compressors
 
NAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataNAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors Data
 
Planetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifePlanetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in Life
 
Excvation Safety for safety officers reference
Excvation Safety for safety officers referenceExcvation Safety for safety officers reference
Excvation Safety for safety officers reference
 
Technical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamTechnical Leaders - Working with the Management Team
Technical Leaders - Working with the Management Team
 
14680-51-4.pdf Good quality CAS Good quality CAS
14680-51-4.pdf  Good  quality CAS Good  quality CAS14680-51-4.pdf  Good  quality CAS Good  quality CAS
14680-51-4.pdf Good quality CAS Good quality CAS
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdf
 
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxGo for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
 
EUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersEUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exporters
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
WSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfWSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdf
 
Jewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreJewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource Centre
 

Tendering

  • 1.
  • 2. The exact sequence of work should be defined through a networking which interrelationship between events can be identified.
  • 3. Schedules should be directly relatable to the work breakdown structure. The minimum requirement should be to show where and when all tasks start and finish.
  • 4. All schedules must identify the time constraints and, if possible should identify those resources required for each event.