MARINE ENGINEERING DIVING SERVICES
 
The specification given  in this document is best to our knowledge and IS NOT GAURANTEE, clients need to inspect 
the system and satisfy themselves. MEDS shall not be liable for any discrepancies in between technical data sheets 
SATURATION DIVING SYSTEM (300 MSW)
SETIA SELAM II
DOC. NO : SETIA SELAM II/SPECS DATE: 11.05.2010
DOCUMENT NAME : Saturation Diving System (300 MSW) Setia Selam II Rev. No : 00
APPROVED / REVIEWED BY
REV.
STATUS
DATE
REVISION
DESCRIPTION
NO OF
PAGE
Prepared
By
Reviewed
By
Approved
By
00 11.05.2010
Reviewed and Revised
whole documents
HSC AC SR
against actual. 
MARINE ENGINEERING DIVING SERVICES
Saturation Diving System (300 MSW) 2
SETIA SELAM II
Contents
CHAPTER 1 Engineering Department 3
CHAPTER 2 General Description 3
2.1 System Description 3
2.2 Data Sheet 3
CHAPTER 3 Detailed Description 4
3.1 Chambers 4
3.2 Diving Bell 4
3.3 Umbilical (Hoses) 5
3.4 Gas Absorbers/ Scrubb 5
3.5 Type of Heating 6
3.6 Electrical Installation 7
3.7 Viewports in Pressure Vessels for Human Occupancy 7
3.8 Masks in Pressure Vessels for Human Occupancy 8
3.9 Fire Protection 8
3.10 Sanitary System 9
3.11 Communication System 10
3.12 Bell Handling System 11
3.13 Hyperbaric Evacuation 11
CHAPTER 4 Saturation System Equipments 13
4.1 Main Chamber 13
4.2 TUP 14
4.3 Additional Chamber
4.3.1 Main Lock 15
4.3.2 Entrance 16
4.4 Hyperbaric Rescue Chamber (HRC) 17
4.5 Diving Bell 19
4.6 Bell Handling System 21
4.7 Heating and Cooling Container 22
4.8 Diving SAT Control 23
4.9 Bell Umbilical System 25
ers
System
Lock
MARINE ENGINEERING DIVING SERVICES
Saturation Diving System (300 MSW) 3
SETIA SELAM II
CHAPTER 1: ENGINEERING DEPT
Author’s: HSC
Subject: Description of equipments
Date of issue: 11-05-2010
Design Code: DNV – Det Norsk Veritas
CHAPTER 2: GENERAL DESCRIPTION
2.1 System Description
The equipment is intended for:
 Performing saturation diving down to 300 msw,
 Accommodating a maximum of 12 divers working by shift of 3 divers (2 divers + 1 bellman).
The proposed modular system is built around a main structure housing the 6-person chamber,
the TUP, the diving bell and its handling system. A 3-person chamber with twin lock and a
Hyperbaric Evacuation Chamber complement the system. The ancillary equipments are mostly
incorporated into containers.
The use of the Additional Chamber as a decompression lock enables 24hr diving schedule
indefinitely.
The HRC is designed for 12 persons. It is used as a 3-person living chamber in normal
conditions.
The bell can be used to perform observation dive at atmospheric pressure down to 300 msw.
2.2 Data Sheet
Transferable system, to be installed in a safe area with respect to explosive gas-air mix (not in
zone 0, 1 or 2, as defined in IMO (MODU) code)
Maximum number of divers: 12
Maximum operating depth: 300 msw
Maximum operating time: unlimited
Maximum observation depth bell: 300 msw
Range of ambient temperature:
air: -10°C to +50°C
water: 0°C to +30°C
Maximum significant wave height: 2 m
MARINE ENGINEERING DIVING SERVICES
Saturation Diving System (300 MSW) 4
SETIA SELAM II
CHAPTER 3: DETAILED DESCRIPTION
3.1 Chambers
Designation
TL
or
SL
Design
Pressure
(bar)
Internal
diameter
(mm)
Shell t
(mm)
Corr.
alow.
(mm)
Total
Volume
(m
3
)
No of
Divers
Trunk
size
(mm)
Design
code
Shell
material
Relief
Valve
setting
(bar)
Main Chamber SL 30.3 2400 25 1 25 6 700 DNV P295GH 31
TUP SL 30.3 2400 25 1 10 2 700 DNV P295GH 31
Additional
Chamber
TL 30.3 2200 23 1 14+5 3+2 700 DNV P295GH 31
HRC SL 30.3 2200 23 1 15 3 (12) 700 DNV P295GH 31
3.2 Diving Bell
Internal
Design
Pressure
(bar)
External
Design
Pressure
(bar)
Internal
diameter
(mm)
Shell t
(mm)
Corr.
alow.
(mm)
Total
Volume
(m
3
)
No of
Divers
Lateral
Trunk
size
(mm)
Water
Access
Trunk
size (mm)
Design
code
Shell
material
Relief
Valve
setting
(bar)
30.3 30.3 1900 15 1 6 3 700 800 DNV P295GH 31
MARINE ENGINEERING DIVING SERVICES
Saturation Diving System (300 MSW) 5
SETIA SELAM II
3.3 Umbilical (Hoses)
Minimum size of the Umbilical basket (8-shape winding): Housed in = 20” Standard Container
Frame Work
3.4 Gas Absorbers / Scrubbers
No. Type designation Gas being absorbed Absorbing agent Location Capacity
1 Scrubber CO2 Soda lime Main Chamber 24h / 6p
1 Scrubber CO2 Soda lime
Add. Chamber
Main Lock
48h / 3p
1 Scrubber CO2 Soda lime HRC 48h / 3p
2 Scrubber CO2 Soda lime Main Chamber 8h / 6p
1 Scrubber CO2 Soda lime TUP 48h / 1p
Designation
Length
(m)
Bell 330
Diver #1 50
Diver #2 50
Bellman 55
MARINE ENGINEERING DIVING SERVICES
Saturation Diving System (300 MSW) 6
SETIA SELAM II
No. Type designation Gas being absorbed Absorbing agent Location Capacity
1 Scrubber CO2 Soda lime
Add. Chamber
Main Lock
16h / 3p
1 Scrubber CO2 Soda lime
Add. Chamber
Entrance Lock
48h / 1p
3 Scrubber CO2 Soda lime HRC 8h / 12p
2 Scrubber CO2 Soda lime Diving Bell 32h / 3p
3.5 Type Of Heating
Chambers Bell
Exchanger in each chamber with
individual electric fans
SWH Comanex 180 kW / 800 L / 45 L/min
With backup pumps and heat resistance
The exchangers are connected to 2 heating units and 2 cooling units.
A connection panel for the sea water is located on the Diver Heating Unit container.
Water flow needed for the SWH: 45 L/min
MARINE ENGINEERING DIVING SERVICES
Saturation Diving System (300 MSW) 7
SETIA SELAM II
3.6 Electrical Installation
The main electrical panel is located on the Machinery container.
Main power supply from 440 V / 60 Hz
Maximum Nominal Load (kW) 300
Emergency power supply from 250
Type of cables permanently installed in inner system Hyperbaric power cable
Voltages / Frequencies :
Bell lighting 24V DC Chambers lighting 24V DC
Bell internal power 24V DC max Chambers internal power 24V DC max
Bell heating Fan only (24V) Chambers heating Fan only (24V)
Bell external power 250V AC max Handling 440V AC
Electrical Penetrators
Type Jupiter connectors
Self-contained emergency power for bell :
Type : Lithium battery
3.7 Viewports In Pressure Vessels For Human Occupancy
MARINE ENGINEERING DIVING SERVICES
Saturation Diving System (300 MSW) 8
SETIA SELAM II
Diameter Certificate No. Chamber / Bell No. Compartment
Number of
windows
220mm Altuglass Main Chamber 4
220mm Altuglass TUP 3
220mm Altuglass Add. Chamber Main Lock 3
220mm Altuglass Add. Chamber Entrance Lock 1
220mm Altuglass HRC 3
220mm Altuglass Diving Bell 7
3.8 Masks In Pressure Vessels For Human Occupancy
Chamber / Bell
No.
Compartment Number of
masks
Type of masks
Main Chamber 7 Oral Nasal with Dump valves
TUP 4 Oral Nasal with Dump valves
Add. Chamber Main Lock 4 Oral Nasal with Dump valves
Add. Chamber Entrance Lock 2 Oral Nasal with Dump valves
HRC 13 Oral Nasal with Dump valves
Diving Bell 3 Oral Nasal with Dump valves
3.9 Fire Protection
Transferable system, to be installed in a safe area with respect to explosive gas-air mix (not in
zone 0, 1 or 2, as defined in IMO (MODU) code).
A connection panel for the outer system and the inner system is located on the External of Main
Skid.
Since a fire is not likely to occur deeper than 60 meters, the 2 systems are to be supplied with
10 bar pressure water.
Water flow needed for the outer system : 40 L/min
Water flow needed for the inner system : 40 L/min
MARINE ENGINEERING DIVING SERVICES
Saturation Diving System (300 MSW) 9
SETIA SELAM II
3.10 Sanitary System
A connection panel for hot and cold fresh water is located on the External/Machinery (Diver Hot
Water).
Water flow needed for the cold water system : 20 L/min
Water flow needed for the hot water system : 20 L/min
Toilet
Installed in :
TUP, Additional Chamber Entrance Lock and HRC
Type of arrangement preventing flushing the toilet unintentionally :
Interlock
Volume sanitary tank : 3 L3
Pressure sanitary tank (bar) : 30
MARINE ENGINEERING DIVING SERVICES
Saturation Diving System (300 MSW) 10
SETIA SELAM II
Sanitary Water
Wash basin :
TUP, Additional Chamber Entrance Lock
Principle of operation : Electric
Shower : TUP Principle of operation : Electric
Type of arrangement preventing flushing the water unintentionally :
Volume sanitary tank : 3 L3
Pressure sanitary tank (bar) : 30
3.11 Communication System
TV Camera installed at : In each Lock + 1 (Bell Mating)
+ 1 (Winch + Umb. basket)
Type of system between control stand and bridge : VHF / Hand wired Telephone
DP alarm details : Tandem with ship
Type of through water communication : Subcom
Other surveillance systems : SPT chamber and medical lock
main chamber and annexe
MARINE ENGINEERING DIVING SERVICES
Saturation Diving System (300 MSW) 11
SETIA SELAM II
3.12 Bell Handling System
Working Load (kN) :
100
Dimension of hoisting
wire (mm) : 32
Type of locking
mechanism : Hook
Heave compensator :
No
Design load (kN) :
200
Min. breaking load (kN) :
Emergency means
of recovery : Guide
lines and free ascent
Designed for seastate:
sign. Wave height < 2m
Static test load (kN) :
200
Type of secondary lifting
: Guide lines
Certification : DNV
3.13 HYPERBARIC EVACUATION SYSTEM
Launching system : Vessel crane / HRC Skid
HES Chamber : HRC described above
Dimension of mating flange : 700 mm
MARINE ENGINEERING DIVING SERVICES
Saturation Diving System (300 MSW) 12
SETIA SELAM II
Shape of mating flange : Hinge Type, Round
Dimension of medical lock: diameter 250 mm. No possibility bigger diameter
Weight of Hyperbaric Evacuation Unit (HEU) (kN) : 130 kN
Specifications on navigational aids : 37.5 khz
Specifications on emergency connectors : Quick Connectors
No. of divers the system is rated for : 12
Remarks :
Prior to launching the HRC, the following shall be done :
- disconnect the external regeneration
- disconnect the gas connections (mixture and 02)
- disconnect the electrical connections with the system
- disconnect the communication connections with the Control Stand
- disconnect the sanitary water
- disconnect the heating water
- disconnect water deluge
MARINE ENGINEERING DIVING SERVICES
Saturation Diving System (300 MSW) 13
SETIA SELAM II
CHAPTER 4 : SATURATION SYSTEM EQUIPMENTS
4.1 Main Chamber
Items Designation QTY
1
Horizontal pressure vessel :
inside diameter 2400 mm ; length approx.6000 mm
One compartment
Working pressure : 300 msw internal
1
2 Man way 700 mm 2
3 View ports 4
3 bis Retro projection View port 1
4
Medical lock Diameter 400 mm – long 400 mm
and SPT
1
5 Removable flooring 1
6 Foldable table + 3 seats 1
7 Bunks 198x80 cm with led light 6
8 Pressurization and decompression circuit 1
9 Relief valve and sound alarm 1
10 O2 make up circuit 1
11
External regeneration
(Humidity regulation and CO2 absorption)
1
12 CO2 scrubbers 2
13 Oral Nasal Breathing Masks (BIBS) 7
14 Dump valves 7
15
Second stage dump valve
(for up to 4 dump valves)
2
16 Emergency respiratory unit 6
17
Under the floor exchanger with individual
electric fan (temperature regulation)
1
18 10 bar water deluge 1
19
Drain off system for evacuation of
condensation and fluids
1
20 Hyperbaric fire extinguisher 1
21 LED light at the top of chamber 2
22 Individual light + headset per bunk 6
23 Survey micro camera 1
24 Communication - SPT 1
MARINE ENGINEERING DIVING SERVICES
Saturation Diving System (300 MSW) 14
SETIA SELAM II
25
Instrumentation
Pressure, hygrometry and temperature gauges
Hygrometry and temperature sensor
O2 analyser
CO2 analyser
O2 sensor
O2 hyperbaric monitor
1
1
1
1
1
1
4.2 TUP
Items Designation QTY
1
Vertical pressure vessel : inside diameter 2400 mm ; height approx. 3000 mm
One compartment
Working pressure : 300 msw internal
1
2 Man way 700 mm 4
3 View ports 3
4 Removable flooring 1
5 Folding seat 2
6 Pressurization and decompression circuit 1
7 Relief valve and sound alarm 1
8 O2 make up circuit 1
9 CO2 scrubbers 1
10 Oral Nasal Breathing Masks (BIBS) 2
11 Dump valves 2
12 Second stage dump valve (for up to 4 dump valves) 1
13 Emergency respiratory unit 3
14 Exchanger with individual electric fan (temperature regulation) 1
15 Shower hose and head 1
16 Wash basin 1
17 Toilet bowl 1
18 10 bar water deluge 1
19 Drain off system for evacuation of condensation and fluids 1
20 Hyperbaric fire extinguisher 1
21 LED light at the top of chamber 2
22 Survey micro camera 1
23 Communication - SPT 1
MARINE ENGINEERING DIVING SERVICES
Saturation Diving System (300 MSW) 15
SETIA SELAM II
24
Instrumentation
Pressure, hygrometry and temperature gauges
Temperature sensor
O2 analyser
CO2 analyser
1
1
1
1
4.3 Additional Chamber
4.3.1 Main Lock
Items Designation QTY
1
Horizontal pressure vessel : inside diameter 2200 mm ; length approx. 6000 mm
Twin lock chamber
Working pressure : 300 msw internal
1
2 Man way 700 mm 3
3 View ports 3
3 bis Retro projection View port 1
4 Medical lock Diameter 400 mm – long 400 mm and SPT 1
5 Removable flooring 1
6 Foldable table + 1 seat 1
7 Bunks 198x80 cm with led light 3
8 Pressurization and decompression circuit 1
9 Relief valve and sound alarm 1
10 O2 make up circuit 1
MARINE ENGINEERING DIVING SERVICES
Saturation Diving System (300 MSW) 16
SETIA SELAM II
11 External regeneration (Humidity regulation and CO2 absorption) 1
12 CO2 scrubbers 1
13 Oral Nasal Breathing Masks (BIBS) 4
14 Dump valves 4
15 Second stage dump valve (for up to 4 dump valves) 1
16 Emergency respiratory unit 4
17 Under the floor exchanger with individual electric fan (temperature regulation) 1
18 10 bar water deluge 1
19 Drain off system for evacuation of condensation and fluids 1
20 Hyperbaric fire extinguisher 1
21 LED light at the top of chamber 2
22 Individual light + headset per bunk 3
23 Survey micro camera 1
24 Communication - SPT 1
25
Instrumentation
Pressure, hygrometry and temperature gauges
Hygrometry and temperature sensor
O2 analyser
CO2 analyser
O2 sensor
O2 hyperbaric monitor
1
1
1
1
1
1
4.3.2 Entrance Lock
Items Designation QTY
1 View ports 1
2 Removable flooring 1
3 Pressurization and decompression circuit 1
4 Relief valve and sound alarm 1
5 O2 make up circuit 1
6 CO2 scrubbers 1
7 Oral Nasal Breathing Masks (BIBS) 2
8 Dump valves 2
9 Second stage dump valve (for up to 4 dump valves) 1
10 Emergency respiratory unit 2
11 Under the floor exchanger with individual electric fan (temperature regulation) 1
12 Toilet bowl 1
13 Wash basin 1
MARINE ENGINEERING DIVING SERVICES
Saturation Diving System (300 MSW) 17
SETIA SELAM II
14 10 bar water deluge 1
15 Drain off system for evacuation of condensation and fluids 1
16 Hyperbaric fire extinguisher 1
17 LED light at the top of chamber 1
18 Survey micro camera 1
19 Communication - SPT 1
20
Instrumentation
Pressure, hygrometry and temperature gauges
Temperature sensor
O2 analyser
CO2 analyser
O2 sensor
O2 hyperbaric monitor
1
1
1
1
1
1
4.4 Hyperbaric Rescue Chamber (HRC)
MARINE ENGINEERING DIVING SERVICES
Saturation Diving System (300 MSW) 18
SETIA SELAM II
Items Designation QTY
1
Horizontal pressure vessel : inside diameter 2200 mm ; length approx. 4400 mm
One compartment
Working pressure : 300 msw internal
The chamber and outside equipment protected by a tubular cage
1
2 Man way 700 mm – TUP and exit 2
3 View ports 3
3 bis Retro projection View port 1
4 Medical lock Diameter 250 mm – long 250 mm – No possibility bigger 1
5 Removable flooring 1
6 Seating with safety belt and protection helmet 12
7 Pressurization and decompression circuit 1
8 Relief valve and sound alarm 1
9 O2 make up circuit 1
10 O2 Manifold (manual addition) 1
11 CO2 scrubbers 3
12 Oral Nasal Breathing Masks (BIBS) 4
13 Dump valves 4
14 Second stage dump valve (for up to 4 dump valves) 3
15 Emergency respiratory unit 13
16 Medical kit 1
17 Survival suit 1
18 Heat exchanger with individual electric fan (temperature regulation) 1
19 Drain off system for evacuation of condensation and fluids 1
20 Toilet bowl (Emergency use only) 1
21 10 bar water deluge 1
22 Hyperbaric fire extinguisher 1
23 LED light at the top of the chamber 2
24 Survey micro camera 1
25 Communication - SPT, VHF radio for emergency 1
36 Lithium battery container 1
27 Bunks with led light 3
28
Instrumentation
Pressure, hygrometry and temperature gauges
Hygrometry and temperature sensor
O2 analyser
CO2 analyser
1
1
1
1
MARINE ENGINEERING DIVING SERVICES
Saturation Diving System (300 MSW) 19
SETIA SELAM II
O2 sensor
O2 hyperbaric monitor
1
1
29 Auxiliary handling point 1
30 Strobe light and radar reflector 1
4.5 Diving Bell
Items Designation QTY
1
Spherical pressure resistant hull : inside diameter 1900 mm ; height approx. 3000
mm
Volume approx. 6m3
Working pressure : 300 msw internal and external
The hull and outside equipment protected by a tubular cage :
diameter 2500 mm ; height approx. 3500 mm
1
2
Man way 700 mm – TUP
Man way 800 mm – Sea water – 2 compensated doors
1
1
3 View ports 7
4 Medical lock Diameter 150 mm – long 150 mm 1
5 Folding seats 3
MARINE ENGINEERING DIVING SERVICES
Saturation Diving System (300 MSW) 20
SETIA SELAM II
6 Pressurization and decompression circuit 1
7 Breathing mixture storage 200 bar – 77L 7
8 Breathing mixture storage 200 bar – 14L 2
9 O2 storage 200 bar – 77L 1
10 O2 storage 200 bar – 5L 1
11 Relief valve 1
12 O2 make up circuit 1
13 O2 Manifold (manual addition) 1
14 CO2 scrubbers 2
15 Oral Nasal Breathing Masks (BIBS) 4
16 Emergency respiratory unit 3
17 Medical kit 1
18 Survival suit 3
19 Heat exchanger with individual electric fan (temperature regulation) 1
20 Drain off system for evacuation of condensation and fluids 1
21 Hyperbaric fire extinguisher 0
22 LED light at the top of bell 2
23 External projector 250 W – 230 V – 30 bar 3
24 Lithium battery container 1
25 Survey micro camera 1
26 Communication - SPT 1
27 Umbilical junction box 1
28 Electrical inside junction box 1
29
Instrumentation
Pressure, temperature gauges
O2 analyser
CO2 analyser
O2 sensor
O2 hyperbaric monitor
1
1
1
1
1
MARINE ENGINEERING DIVING SERVICES
Saturation Diving System (300 MSW) 21
SETIA SELAM II
4.6 Bell Handling System
Items Designation QTY
1 A Frame with two hydraulics rams 1
2 Bell winch 1
3 Guide line winches 2
4 Structure supporting winches 1
5
Control of winches, A frame, and power
packs in dive control hydraulic container
1
6 Main hydraulic module 1
7 Back up hydraulic module 1
8
Guiding device for bell mating in front of
TUP
1
9
Lighting devices for illumination of areas
essential to all operations
6
MARINE ENGINEERING DIVING SERVICES
Saturation Diving System (300 MSW) 22
SETIA SELAM II
4.7 Heating And Cooling Container
MARINE ENGINEERING DIVING SERVICES
Saturation Diving System (300 MSW) 23
SETIA SELAM II
Items Designation QTY
1 Heating unit to supply hot water in Environmental Control Unit and Sanitary use 1
2 Back up Heating unit 1
3 Cooling unit to supply cool water in Environmental Control Unit and 1
4 Back up Cooling unit 1
5 Diver Heating unit 1
4.8 Diving Sat Control
MARINE ENGINEERING DIVING SERVICES
Saturation Diving System (300 MSW) 24
SETIA SELAM II
Items Designation QTY
1
One container at the SAT control with one door and windows using security lock -
windows open outside – insulated and air conditioned
1
2 Gas circuits and depth measurements 1
3 Gas analysis 1
4 Communication and video – Connected phone with the bridge 1
5 Electrical circuits and Extinguisher 1
6 Temperature regulation 1
7 DP Alarm in container control and hydraulic control 1
Chambers and HRC : Each pressurized compartment with a panel
8 Internal pressure measurement 1
9 Pressurisation 1
10 Gas distribution to BIBS 1
11 Decompression 1
12 O2 make up 1
13 Gas analysis panel for each chambers 4
14 Communications and Video for each chambers with screen using 4 windows 4
15 Electrical circuits and Extinguisher 4
16 Temperature regulations 4
Diving bell :
17 2 consoles : handling control and SDC control / monitoring equipment
18 Gas circuits and depth measurement 1
19 Gas analysis 1
20 Communication and video 1
21 Electrical circuits 1
22 Temperature regulations 1
MARINE ENGINEERING DIVING SERVICES
Saturation Diving System (300 MSW) 25
SETIA SELAM II
Gas Handling System
23 Gas panels – A set of panels and manifolds 1
24 WORKSHOP and STORAGE CONTAINER 1
4.9 Bell Umbilical System
Items Designation QTY
1 Umbilical Friction sheave 1
2 Umbilical basket 1

Weitere ähnliche Inhalte

Andere mochten auch

Osteogénesis Imperfecta k
Osteogénesis Imperfecta kOsteogénesis Imperfecta k
Osteogénesis Imperfecta kKidaly1993
 
Security in digital voting system
Security in digital voting systemSecurity in digital voting system
Security in digital voting systemMadlena Pavlova
 
ใบงานที่ 11 แผ่นพับ
ใบงานที่ 11 แผ่นพับใบงานที่ 11 แผ่นพับ
ใบงานที่ 11 แผ่นพับRank Saharath
 
Investigating the potential of Big Data Analyticv2
Investigating   the potential  of Big  Data Analyticv2Investigating   the potential  of Big  Data Analyticv2
Investigating the potential of Big Data Analyticv2Madlena Pavlova
 

Andere mochten auch (8)

Bluetooth technology
Bluetooth technologyBluetooth technology
Bluetooth technology
 
บทที่ 6
บทที่  6บทที่  6
บทที่ 6
 
Osteogénesis Imperfecta k
Osteogénesis Imperfecta kOsteogénesis Imperfecta k
Osteogénesis Imperfecta k
 
บทที่ 6
บทที่  6บทที่  6
บทที่ 6
 
Security in digital voting system
Security in digital voting systemSecurity in digital voting system
Security in digital voting system
 
ใบงานที่ 11 แผ่นพับ
ใบงานที่ 11 แผ่นพับใบงานที่ 11 แผ่นพับ
ใบงานที่ 11 แผ่นพับ
 
P iaget
P iagetP iaget
P iaget
 
Investigating the potential of Big Data Analyticv2
Investigating   the potential  of Big  Data Analyticv2Investigating   the potential  of Big  Data Analyticv2
Investigating the potential of Big Data Analyticv2
 

Ähnlich wie Setia selam-ii-meds

Copy of 563050-TSHD 650-ES (SPEC-DAM - 3479100 - 1 - A) - 1.PPTX
Copy of 563050-TSHD 650-ES (SPEC-DAM - 3479100 - 1 - A) - 1.PPTXCopy of 563050-TSHD 650-ES (SPEC-DAM - 3479100 - 1 - A) - 1.PPTX
Copy of 563050-TSHD 650-ES (SPEC-DAM - 3479100 - 1 - A) - 1.PPTXMrbThinh
 
160621 Experience of Shipboard firefighting with Cutting Extinguishers (v 1.0)
160621 Experience of Shipboard firefighting with Cutting Extinguishers (v 1.0)160621 Experience of Shipboard firefighting with Cutting Extinguishers (v 1.0)
160621 Experience of Shipboard firefighting with Cutting Extinguishers (v 1.0)Anders Trewe
 
Sat 10 system information brochure 17-8-16
Sat 10 system information brochure 17-8-16Sat 10 system information brochure 17-8-16
Sat 10 system information brochure 17-8-16Bimal Bosmia
 
PROPOSAL OF 1x30MVA SILICON METAL FURNACE PROJECT
PROPOSAL OF 1x30MVA SILICON METAL FURNACE PROJECTPROPOSAL OF 1x30MVA SILICON METAL FURNACE PROJECT
PROPOSAL OF 1x30MVA SILICON METAL FURNACE PROJECTGuo ke
 
Omnigrad m tr10 endress+hauser datasheet-modular rtd assembly temperature
Omnigrad m tr10 endress+hauser datasheet-modular rtd assembly temperatureOmnigrad m tr10 endress+hauser datasheet-modular rtd assembly temperature
Omnigrad m tr10 endress+hauser datasheet-modular rtd assembly temperatureENVIMART
 
Samsung tdb-dvm-s-water e-outdoor_dbeu-13082_da1
Samsung tdb-dvm-s-water e-outdoor_dbeu-13082_da1Samsung tdb-dvm-s-water e-outdoor_dbeu-13082_da1
Samsung tdb-dvm-s-water e-outdoor_dbeu-13082_da1Haluk TOSUN
 
Coiled Tubing Introduction and Basics.pdf
Coiled Tubing Introduction and Basics.pdfCoiled Tubing Introduction and Basics.pdf
Coiled Tubing Introduction and Basics.pdfsalem123gmaal
 
LINE WATER JET CLEANING works 2-1.R1 comp
LINE WATER JET CLEANING works   2-1.R1 compLINE WATER JET CLEANING works   2-1.R1 comp
LINE WATER JET CLEANING works 2-1.R1 compjohn marasigan
 
Burkert 6013 - 2/2 Solenoid Valve > นิวเมติก.com
Burkert 6013 - 2/2 Solenoid Valve > นิวเมติก.comBurkert 6013 - 2/2 Solenoid Valve > นิวเมติก.com
Burkert 6013 - 2/2 Solenoid Valve > นิวเมติก.comDNTMb Inc.
 
CCS 120 endress+hauser datasheet-sensor for total chlorine
CCS 120 endress+hauser datasheet-sensor for total chlorineCCS 120 endress+hauser datasheet-sensor for total chlorine
CCS 120 endress+hauser datasheet-sensor for total chlorineENVIMART
 
Dtc 8datasheet17.10.30rev0 web
Dtc 8datasheet17.10.30rev0 webDtc 8datasheet17.10.30rev0 web
Dtc 8datasheet17.10.30rev0 webAbul Lais Nalband
 
atlantic-rotterdam
atlantic-rotterdamatlantic-rotterdam
atlantic-rotterdamDick Vogel
 
Blood tube sealer mtbts02
Blood tube sealer mtbts02Blood tube sealer mtbts02
Blood tube sealer mtbts02huzaifa_ujjain
 

Ähnlich wie Setia selam-ii-meds (20)

CRAP PRESENTATION
CRAP PRESENTATIONCRAP PRESENTATION
CRAP PRESENTATION
 
Copy of 563050-TSHD 650-ES (SPEC-DAM - 3479100 - 1 - A) - 1.PPTX
Copy of 563050-TSHD 650-ES (SPEC-DAM - 3479100 - 1 - A) - 1.PPTXCopy of 563050-TSHD 650-ES (SPEC-DAM - 3479100 - 1 - A) - 1.PPTX
Copy of 563050-TSHD 650-ES (SPEC-DAM - 3479100 - 1 - A) - 1.PPTX
 
160621 Experience of Shipboard firefighting with Cutting Extinguishers (v 1.0)
160621 Experience of Shipboard firefighting with Cutting Extinguishers (v 1.0)160621 Experience of Shipboard firefighting with Cutting Extinguishers (v 1.0)
160621 Experience of Shipboard firefighting with Cutting Extinguishers (v 1.0)
 
Sat 10 system information brochure 17-8-16
Sat 10 system information brochure 17-8-16Sat 10 system information brochure 17-8-16
Sat 10 system information brochure 17-8-16
 
ev2-resistors
ev2-resistorsev2-resistors
ev2-resistors
 
Breezair tbs580
Breezair tbs580 Breezair tbs580
Breezair tbs580
 
PROPOSAL OF 1x30MVA SILICON METAL FURNACE PROJECT
PROPOSAL OF 1x30MVA SILICON METAL FURNACE PROJECTPROPOSAL OF 1x30MVA SILICON METAL FURNACE PROJECT
PROPOSAL OF 1x30MVA SILICON METAL FURNACE PROJECT
 
Omnigrad m tr10 endress+hauser datasheet-modular rtd assembly temperature
Omnigrad m tr10 endress+hauser datasheet-modular rtd assembly temperatureOmnigrad m tr10 endress+hauser datasheet-modular rtd assembly temperature
Omnigrad m tr10 endress+hauser datasheet-modular rtd assembly temperature
 
Swimmey data sheet_en
Swimmey data sheet_enSwimmey data sheet_en
Swimmey data sheet_en
 
Samsung tdb-dvm-s-water e-outdoor_dbeu-13082_da1
Samsung tdb-dvm-s-water e-outdoor_dbeu-13082_da1Samsung tdb-dvm-s-water e-outdoor_dbeu-13082_da1
Samsung tdb-dvm-s-water e-outdoor_dbeu-13082_da1
 
Coiled Tubing Introduction and Basics.pdf
Coiled Tubing Introduction and Basics.pdfCoiled Tubing Introduction and Basics.pdf
Coiled Tubing Introduction and Basics.pdf
 
LINE WATER JET CLEANING works 2-1.R1 comp
LINE WATER JET CLEANING works   2-1.R1 compLINE WATER JET CLEANING works   2-1.R1 comp
LINE WATER JET CLEANING works 2-1.R1 comp
 
Burkert 6013 - 2/2 Solenoid Valve > นิวเมติก.com
Burkert 6013 - 2/2 Solenoid Valve > นิวเมติก.comBurkert 6013 - 2/2 Solenoid Valve > นิวเมติก.com
Burkert 6013 - 2/2 Solenoid Valve > นิวเมติก.com
 
Level Limit Switch-Soliswitch FTE31
Level Limit Switch-Soliswitch FTE31Level Limit Switch-Soliswitch FTE31
Level Limit Switch-Soliswitch FTE31
 
Brooks Ar-Mite Low Flow Armored Flowmeter
Brooks Ar-Mite Low Flow Armored FlowmeterBrooks Ar-Mite Low Flow Armored Flowmeter
Brooks Ar-Mite Low Flow Armored Flowmeter
 
Conductivity Sensor for High-Temperature Applications W CLS 12
Conductivity Sensor for High-Temperature Applications W CLS 12Conductivity Sensor for High-Temperature Applications W CLS 12
Conductivity Sensor for High-Temperature Applications W CLS 12
 
CCS 120 endress+hauser datasheet-sensor for total chlorine
CCS 120 endress+hauser datasheet-sensor for total chlorineCCS 120 endress+hauser datasheet-sensor for total chlorine
CCS 120 endress+hauser datasheet-sensor for total chlorine
 
Dtc 8datasheet17.10.30rev0 web
Dtc 8datasheet17.10.30rev0 webDtc 8datasheet17.10.30rev0 web
Dtc 8datasheet17.10.30rev0 web
 
atlantic-rotterdam
atlantic-rotterdamatlantic-rotterdam
atlantic-rotterdam
 
Blood tube sealer mtbts02
Blood tube sealer mtbts02Blood tube sealer mtbts02
Blood tube sealer mtbts02
 

Kürzlich hochgeladen

Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991RKavithamani
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 

Kürzlich hochgeladen (20)

Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 

Setia selam-ii-meds

  • 1. MARINE ENGINEERING DIVING SERVICES   The specification given  in this document is best to our knowledge and IS NOT GAURANTEE, clients need to inspect  the system and satisfy themselves. MEDS shall not be liable for any discrepancies in between technical data sheets  SATURATION DIVING SYSTEM (300 MSW) SETIA SELAM II DOC. NO : SETIA SELAM II/SPECS DATE: 11.05.2010 DOCUMENT NAME : Saturation Diving System (300 MSW) Setia Selam II Rev. No : 00 APPROVED / REVIEWED BY REV. STATUS DATE REVISION DESCRIPTION NO OF PAGE Prepared By Reviewed By Approved By 00 11.05.2010 Reviewed and Revised whole documents HSC AC SR against actual. 
  • 2. MARINE ENGINEERING DIVING SERVICES Saturation Diving System (300 MSW) 2 SETIA SELAM II Contents CHAPTER 1 Engineering Department 3 CHAPTER 2 General Description 3 2.1 System Description 3 2.2 Data Sheet 3 CHAPTER 3 Detailed Description 4 3.1 Chambers 4 3.2 Diving Bell 4 3.3 Umbilical (Hoses) 5 3.4 Gas Absorbers/ Scrubb 5 3.5 Type of Heating 6 3.6 Electrical Installation 7 3.7 Viewports in Pressure Vessels for Human Occupancy 7 3.8 Masks in Pressure Vessels for Human Occupancy 8 3.9 Fire Protection 8 3.10 Sanitary System 9 3.11 Communication System 10 3.12 Bell Handling System 11 3.13 Hyperbaric Evacuation 11 CHAPTER 4 Saturation System Equipments 13 4.1 Main Chamber 13 4.2 TUP 14 4.3 Additional Chamber 4.3.1 Main Lock 15 4.3.2 Entrance 16 4.4 Hyperbaric Rescue Chamber (HRC) 17 4.5 Diving Bell 19 4.6 Bell Handling System 21 4.7 Heating and Cooling Container 22 4.8 Diving SAT Control 23 4.9 Bell Umbilical System 25 ers System Lock
  • 3. MARINE ENGINEERING DIVING SERVICES Saturation Diving System (300 MSW) 3 SETIA SELAM II CHAPTER 1: ENGINEERING DEPT Author’s: HSC Subject: Description of equipments Date of issue: 11-05-2010 Design Code: DNV – Det Norsk Veritas CHAPTER 2: GENERAL DESCRIPTION 2.1 System Description The equipment is intended for:  Performing saturation diving down to 300 msw,  Accommodating a maximum of 12 divers working by shift of 3 divers (2 divers + 1 bellman). The proposed modular system is built around a main structure housing the 6-person chamber, the TUP, the diving bell and its handling system. A 3-person chamber with twin lock and a Hyperbaric Evacuation Chamber complement the system. The ancillary equipments are mostly incorporated into containers. The use of the Additional Chamber as a decompression lock enables 24hr diving schedule indefinitely. The HRC is designed for 12 persons. It is used as a 3-person living chamber in normal conditions. The bell can be used to perform observation dive at atmospheric pressure down to 300 msw. 2.2 Data Sheet Transferable system, to be installed in a safe area with respect to explosive gas-air mix (not in zone 0, 1 or 2, as defined in IMO (MODU) code) Maximum number of divers: 12 Maximum operating depth: 300 msw Maximum operating time: unlimited Maximum observation depth bell: 300 msw Range of ambient temperature: air: -10°C to +50°C water: 0°C to +30°C Maximum significant wave height: 2 m
  • 4. MARINE ENGINEERING DIVING SERVICES Saturation Diving System (300 MSW) 4 SETIA SELAM II CHAPTER 3: DETAILED DESCRIPTION 3.1 Chambers Designation TL or SL Design Pressure (bar) Internal diameter (mm) Shell t (mm) Corr. alow. (mm) Total Volume (m 3 ) No of Divers Trunk size (mm) Design code Shell material Relief Valve setting (bar) Main Chamber SL 30.3 2400 25 1 25 6 700 DNV P295GH 31 TUP SL 30.3 2400 25 1 10 2 700 DNV P295GH 31 Additional Chamber TL 30.3 2200 23 1 14+5 3+2 700 DNV P295GH 31 HRC SL 30.3 2200 23 1 15 3 (12) 700 DNV P295GH 31 3.2 Diving Bell Internal Design Pressure (bar) External Design Pressure (bar) Internal diameter (mm) Shell t (mm) Corr. alow. (mm) Total Volume (m 3 ) No of Divers Lateral Trunk size (mm) Water Access Trunk size (mm) Design code Shell material Relief Valve setting (bar) 30.3 30.3 1900 15 1 6 3 700 800 DNV P295GH 31
  • 5. MARINE ENGINEERING DIVING SERVICES Saturation Diving System (300 MSW) 5 SETIA SELAM II 3.3 Umbilical (Hoses) Minimum size of the Umbilical basket (8-shape winding): Housed in = 20” Standard Container Frame Work 3.4 Gas Absorbers / Scrubbers No. Type designation Gas being absorbed Absorbing agent Location Capacity 1 Scrubber CO2 Soda lime Main Chamber 24h / 6p 1 Scrubber CO2 Soda lime Add. Chamber Main Lock 48h / 3p 1 Scrubber CO2 Soda lime HRC 48h / 3p 2 Scrubber CO2 Soda lime Main Chamber 8h / 6p 1 Scrubber CO2 Soda lime TUP 48h / 1p Designation Length (m) Bell 330 Diver #1 50 Diver #2 50 Bellman 55
  • 6. MARINE ENGINEERING DIVING SERVICES Saturation Diving System (300 MSW) 6 SETIA SELAM II No. Type designation Gas being absorbed Absorbing agent Location Capacity 1 Scrubber CO2 Soda lime Add. Chamber Main Lock 16h / 3p 1 Scrubber CO2 Soda lime Add. Chamber Entrance Lock 48h / 1p 3 Scrubber CO2 Soda lime HRC 8h / 12p 2 Scrubber CO2 Soda lime Diving Bell 32h / 3p 3.5 Type Of Heating Chambers Bell Exchanger in each chamber with individual electric fans SWH Comanex 180 kW / 800 L / 45 L/min With backup pumps and heat resistance The exchangers are connected to 2 heating units and 2 cooling units. A connection panel for the sea water is located on the Diver Heating Unit container. Water flow needed for the SWH: 45 L/min
  • 7. MARINE ENGINEERING DIVING SERVICES Saturation Diving System (300 MSW) 7 SETIA SELAM II 3.6 Electrical Installation The main electrical panel is located on the Machinery container. Main power supply from 440 V / 60 Hz Maximum Nominal Load (kW) 300 Emergency power supply from 250 Type of cables permanently installed in inner system Hyperbaric power cable Voltages / Frequencies : Bell lighting 24V DC Chambers lighting 24V DC Bell internal power 24V DC max Chambers internal power 24V DC max Bell heating Fan only (24V) Chambers heating Fan only (24V) Bell external power 250V AC max Handling 440V AC Electrical Penetrators Type Jupiter connectors Self-contained emergency power for bell : Type : Lithium battery 3.7 Viewports In Pressure Vessels For Human Occupancy
  • 8. MARINE ENGINEERING DIVING SERVICES Saturation Diving System (300 MSW) 8 SETIA SELAM II Diameter Certificate No. Chamber / Bell No. Compartment Number of windows 220mm Altuglass Main Chamber 4 220mm Altuglass TUP 3 220mm Altuglass Add. Chamber Main Lock 3 220mm Altuglass Add. Chamber Entrance Lock 1 220mm Altuglass HRC 3 220mm Altuglass Diving Bell 7 3.8 Masks In Pressure Vessels For Human Occupancy Chamber / Bell No. Compartment Number of masks Type of masks Main Chamber 7 Oral Nasal with Dump valves TUP 4 Oral Nasal with Dump valves Add. Chamber Main Lock 4 Oral Nasal with Dump valves Add. Chamber Entrance Lock 2 Oral Nasal with Dump valves HRC 13 Oral Nasal with Dump valves Diving Bell 3 Oral Nasal with Dump valves 3.9 Fire Protection Transferable system, to be installed in a safe area with respect to explosive gas-air mix (not in zone 0, 1 or 2, as defined in IMO (MODU) code). A connection panel for the outer system and the inner system is located on the External of Main Skid. Since a fire is not likely to occur deeper than 60 meters, the 2 systems are to be supplied with 10 bar pressure water. Water flow needed for the outer system : 40 L/min Water flow needed for the inner system : 40 L/min
  • 9. MARINE ENGINEERING DIVING SERVICES Saturation Diving System (300 MSW) 9 SETIA SELAM II 3.10 Sanitary System A connection panel for hot and cold fresh water is located on the External/Machinery (Diver Hot Water). Water flow needed for the cold water system : 20 L/min Water flow needed for the hot water system : 20 L/min Toilet Installed in : TUP, Additional Chamber Entrance Lock and HRC Type of arrangement preventing flushing the toilet unintentionally : Interlock Volume sanitary tank : 3 L3 Pressure sanitary tank (bar) : 30
  • 10. MARINE ENGINEERING DIVING SERVICES Saturation Diving System (300 MSW) 10 SETIA SELAM II Sanitary Water Wash basin : TUP, Additional Chamber Entrance Lock Principle of operation : Electric Shower : TUP Principle of operation : Electric Type of arrangement preventing flushing the water unintentionally : Volume sanitary tank : 3 L3 Pressure sanitary tank (bar) : 30 3.11 Communication System TV Camera installed at : In each Lock + 1 (Bell Mating) + 1 (Winch + Umb. basket) Type of system between control stand and bridge : VHF / Hand wired Telephone DP alarm details : Tandem with ship Type of through water communication : Subcom Other surveillance systems : SPT chamber and medical lock main chamber and annexe
  • 11. MARINE ENGINEERING DIVING SERVICES Saturation Diving System (300 MSW) 11 SETIA SELAM II 3.12 Bell Handling System Working Load (kN) : 100 Dimension of hoisting wire (mm) : 32 Type of locking mechanism : Hook Heave compensator : No Design load (kN) : 200 Min. breaking load (kN) : Emergency means of recovery : Guide lines and free ascent Designed for seastate: sign. Wave height < 2m Static test load (kN) : 200 Type of secondary lifting : Guide lines Certification : DNV 3.13 HYPERBARIC EVACUATION SYSTEM Launching system : Vessel crane / HRC Skid HES Chamber : HRC described above Dimension of mating flange : 700 mm
  • 12. MARINE ENGINEERING DIVING SERVICES Saturation Diving System (300 MSW) 12 SETIA SELAM II Shape of mating flange : Hinge Type, Round Dimension of medical lock: diameter 250 mm. No possibility bigger diameter Weight of Hyperbaric Evacuation Unit (HEU) (kN) : 130 kN Specifications on navigational aids : 37.5 khz Specifications on emergency connectors : Quick Connectors No. of divers the system is rated for : 12 Remarks : Prior to launching the HRC, the following shall be done : - disconnect the external regeneration - disconnect the gas connections (mixture and 02) - disconnect the electrical connections with the system - disconnect the communication connections with the Control Stand - disconnect the sanitary water - disconnect the heating water - disconnect water deluge
  • 13. MARINE ENGINEERING DIVING SERVICES Saturation Diving System (300 MSW) 13 SETIA SELAM II CHAPTER 4 : SATURATION SYSTEM EQUIPMENTS 4.1 Main Chamber Items Designation QTY 1 Horizontal pressure vessel : inside diameter 2400 mm ; length approx.6000 mm One compartment Working pressure : 300 msw internal 1 2 Man way 700 mm 2 3 View ports 4 3 bis Retro projection View port 1 4 Medical lock Diameter 400 mm – long 400 mm and SPT 1 5 Removable flooring 1 6 Foldable table + 3 seats 1 7 Bunks 198x80 cm with led light 6 8 Pressurization and decompression circuit 1 9 Relief valve and sound alarm 1 10 O2 make up circuit 1 11 External regeneration (Humidity regulation and CO2 absorption) 1 12 CO2 scrubbers 2 13 Oral Nasal Breathing Masks (BIBS) 7 14 Dump valves 7 15 Second stage dump valve (for up to 4 dump valves) 2 16 Emergency respiratory unit 6 17 Under the floor exchanger with individual electric fan (temperature regulation) 1 18 10 bar water deluge 1 19 Drain off system for evacuation of condensation and fluids 1 20 Hyperbaric fire extinguisher 1 21 LED light at the top of chamber 2 22 Individual light + headset per bunk 6 23 Survey micro camera 1 24 Communication - SPT 1
  • 14. MARINE ENGINEERING DIVING SERVICES Saturation Diving System (300 MSW) 14 SETIA SELAM II 25 Instrumentation Pressure, hygrometry and temperature gauges Hygrometry and temperature sensor O2 analyser CO2 analyser O2 sensor O2 hyperbaric monitor 1 1 1 1 1 1 4.2 TUP Items Designation QTY 1 Vertical pressure vessel : inside diameter 2400 mm ; height approx. 3000 mm One compartment Working pressure : 300 msw internal 1 2 Man way 700 mm 4 3 View ports 3 4 Removable flooring 1 5 Folding seat 2 6 Pressurization and decompression circuit 1 7 Relief valve and sound alarm 1 8 O2 make up circuit 1 9 CO2 scrubbers 1 10 Oral Nasal Breathing Masks (BIBS) 2 11 Dump valves 2 12 Second stage dump valve (for up to 4 dump valves) 1 13 Emergency respiratory unit 3 14 Exchanger with individual electric fan (temperature regulation) 1 15 Shower hose and head 1 16 Wash basin 1 17 Toilet bowl 1 18 10 bar water deluge 1 19 Drain off system for evacuation of condensation and fluids 1 20 Hyperbaric fire extinguisher 1 21 LED light at the top of chamber 2 22 Survey micro camera 1 23 Communication - SPT 1
  • 15. MARINE ENGINEERING DIVING SERVICES Saturation Diving System (300 MSW) 15 SETIA SELAM II 24 Instrumentation Pressure, hygrometry and temperature gauges Temperature sensor O2 analyser CO2 analyser 1 1 1 1 4.3 Additional Chamber 4.3.1 Main Lock Items Designation QTY 1 Horizontal pressure vessel : inside diameter 2200 mm ; length approx. 6000 mm Twin lock chamber Working pressure : 300 msw internal 1 2 Man way 700 mm 3 3 View ports 3 3 bis Retro projection View port 1 4 Medical lock Diameter 400 mm – long 400 mm and SPT 1 5 Removable flooring 1 6 Foldable table + 1 seat 1 7 Bunks 198x80 cm with led light 3 8 Pressurization and decompression circuit 1 9 Relief valve and sound alarm 1 10 O2 make up circuit 1
  • 16. MARINE ENGINEERING DIVING SERVICES Saturation Diving System (300 MSW) 16 SETIA SELAM II 11 External regeneration (Humidity regulation and CO2 absorption) 1 12 CO2 scrubbers 1 13 Oral Nasal Breathing Masks (BIBS) 4 14 Dump valves 4 15 Second stage dump valve (for up to 4 dump valves) 1 16 Emergency respiratory unit 4 17 Under the floor exchanger with individual electric fan (temperature regulation) 1 18 10 bar water deluge 1 19 Drain off system for evacuation of condensation and fluids 1 20 Hyperbaric fire extinguisher 1 21 LED light at the top of chamber 2 22 Individual light + headset per bunk 3 23 Survey micro camera 1 24 Communication - SPT 1 25 Instrumentation Pressure, hygrometry and temperature gauges Hygrometry and temperature sensor O2 analyser CO2 analyser O2 sensor O2 hyperbaric monitor 1 1 1 1 1 1 4.3.2 Entrance Lock Items Designation QTY 1 View ports 1 2 Removable flooring 1 3 Pressurization and decompression circuit 1 4 Relief valve and sound alarm 1 5 O2 make up circuit 1 6 CO2 scrubbers 1 7 Oral Nasal Breathing Masks (BIBS) 2 8 Dump valves 2 9 Second stage dump valve (for up to 4 dump valves) 1 10 Emergency respiratory unit 2 11 Under the floor exchanger with individual electric fan (temperature regulation) 1 12 Toilet bowl 1 13 Wash basin 1
  • 17. MARINE ENGINEERING DIVING SERVICES Saturation Diving System (300 MSW) 17 SETIA SELAM II 14 10 bar water deluge 1 15 Drain off system for evacuation of condensation and fluids 1 16 Hyperbaric fire extinguisher 1 17 LED light at the top of chamber 1 18 Survey micro camera 1 19 Communication - SPT 1 20 Instrumentation Pressure, hygrometry and temperature gauges Temperature sensor O2 analyser CO2 analyser O2 sensor O2 hyperbaric monitor 1 1 1 1 1 1 4.4 Hyperbaric Rescue Chamber (HRC)
  • 18. MARINE ENGINEERING DIVING SERVICES Saturation Diving System (300 MSW) 18 SETIA SELAM II Items Designation QTY 1 Horizontal pressure vessel : inside diameter 2200 mm ; length approx. 4400 mm One compartment Working pressure : 300 msw internal The chamber and outside equipment protected by a tubular cage 1 2 Man way 700 mm – TUP and exit 2 3 View ports 3 3 bis Retro projection View port 1 4 Medical lock Diameter 250 mm – long 250 mm – No possibility bigger 1 5 Removable flooring 1 6 Seating with safety belt and protection helmet 12 7 Pressurization and decompression circuit 1 8 Relief valve and sound alarm 1 9 O2 make up circuit 1 10 O2 Manifold (manual addition) 1 11 CO2 scrubbers 3 12 Oral Nasal Breathing Masks (BIBS) 4 13 Dump valves 4 14 Second stage dump valve (for up to 4 dump valves) 3 15 Emergency respiratory unit 13 16 Medical kit 1 17 Survival suit 1 18 Heat exchanger with individual electric fan (temperature regulation) 1 19 Drain off system for evacuation of condensation and fluids 1 20 Toilet bowl (Emergency use only) 1 21 10 bar water deluge 1 22 Hyperbaric fire extinguisher 1 23 LED light at the top of the chamber 2 24 Survey micro camera 1 25 Communication - SPT, VHF radio for emergency 1 36 Lithium battery container 1 27 Bunks with led light 3 28 Instrumentation Pressure, hygrometry and temperature gauges Hygrometry and temperature sensor O2 analyser CO2 analyser 1 1 1 1
  • 19. MARINE ENGINEERING DIVING SERVICES Saturation Diving System (300 MSW) 19 SETIA SELAM II O2 sensor O2 hyperbaric monitor 1 1 29 Auxiliary handling point 1 30 Strobe light and radar reflector 1 4.5 Diving Bell Items Designation QTY 1 Spherical pressure resistant hull : inside diameter 1900 mm ; height approx. 3000 mm Volume approx. 6m3 Working pressure : 300 msw internal and external The hull and outside equipment protected by a tubular cage : diameter 2500 mm ; height approx. 3500 mm 1 2 Man way 700 mm – TUP Man way 800 mm – Sea water – 2 compensated doors 1 1 3 View ports 7 4 Medical lock Diameter 150 mm – long 150 mm 1 5 Folding seats 3
  • 20. MARINE ENGINEERING DIVING SERVICES Saturation Diving System (300 MSW) 20 SETIA SELAM II 6 Pressurization and decompression circuit 1 7 Breathing mixture storage 200 bar – 77L 7 8 Breathing mixture storage 200 bar – 14L 2 9 O2 storage 200 bar – 77L 1 10 O2 storage 200 bar – 5L 1 11 Relief valve 1 12 O2 make up circuit 1 13 O2 Manifold (manual addition) 1 14 CO2 scrubbers 2 15 Oral Nasal Breathing Masks (BIBS) 4 16 Emergency respiratory unit 3 17 Medical kit 1 18 Survival suit 3 19 Heat exchanger with individual electric fan (temperature regulation) 1 20 Drain off system for evacuation of condensation and fluids 1 21 Hyperbaric fire extinguisher 0 22 LED light at the top of bell 2 23 External projector 250 W – 230 V – 30 bar 3 24 Lithium battery container 1 25 Survey micro camera 1 26 Communication - SPT 1 27 Umbilical junction box 1 28 Electrical inside junction box 1 29 Instrumentation Pressure, temperature gauges O2 analyser CO2 analyser O2 sensor O2 hyperbaric monitor 1 1 1 1 1
  • 21. MARINE ENGINEERING DIVING SERVICES Saturation Diving System (300 MSW) 21 SETIA SELAM II 4.6 Bell Handling System Items Designation QTY 1 A Frame with two hydraulics rams 1 2 Bell winch 1 3 Guide line winches 2 4 Structure supporting winches 1 5 Control of winches, A frame, and power packs in dive control hydraulic container 1 6 Main hydraulic module 1 7 Back up hydraulic module 1 8 Guiding device for bell mating in front of TUP 1 9 Lighting devices for illumination of areas essential to all operations 6
  • 22. MARINE ENGINEERING DIVING SERVICES Saturation Diving System (300 MSW) 22 SETIA SELAM II 4.7 Heating And Cooling Container
  • 23. MARINE ENGINEERING DIVING SERVICES Saturation Diving System (300 MSW) 23 SETIA SELAM II Items Designation QTY 1 Heating unit to supply hot water in Environmental Control Unit and Sanitary use 1 2 Back up Heating unit 1 3 Cooling unit to supply cool water in Environmental Control Unit and 1 4 Back up Cooling unit 1 5 Diver Heating unit 1 4.8 Diving Sat Control
  • 24. MARINE ENGINEERING DIVING SERVICES Saturation Diving System (300 MSW) 24 SETIA SELAM II Items Designation QTY 1 One container at the SAT control with one door and windows using security lock - windows open outside – insulated and air conditioned 1 2 Gas circuits and depth measurements 1 3 Gas analysis 1 4 Communication and video – Connected phone with the bridge 1 5 Electrical circuits and Extinguisher 1 6 Temperature regulation 1 7 DP Alarm in container control and hydraulic control 1 Chambers and HRC : Each pressurized compartment with a panel 8 Internal pressure measurement 1 9 Pressurisation 1 10 Gas distribution to BIBS 1 11 Decompression 1 12 O2 make up 1 13 Gas analysis panel for each chambers 4 14 Communications and Video for each chambers with screen using 4 windows 4 15 Electrical circuits and Extinguisher 4 16 Temperature regulations 4 Diving bell : 17 2 consoles : handling control and SDC control / monitoring equipment 18 Gas circuits and depth measurement 1 19 Gas analysis 1 20 Communication and video 1 21 Electrical circuits 1 22 Temperature regulations 1
  • 25. MARINE ENGINEERING DIVING SERVICES Saturation Diving System (300 MSW) 25 SETIA SELAM II Gas Handling System 23 Gas panels – A set of panels and manifolds 1 24 WORKSHOP and STORAGE CONTAINER 1 4.9 Bell Umbilical System Items Designation QTY 1 Umbilical Friction sheave 1 2 Umbilical basket 1