SlideShare ist ein Scribd-Unternehmen logo
1 von 24
Downloaden Sie, um offline zu lesen
Productivity Improvement through Right
Governance
Chandan Lal Patary
PMP
Development Manager
ABB
2|P a g e
Productivity Improvement through Right Governance
Contents
Abstract...................................................................................................................... 3
1.0 Introduction:...................................................................................................... 4
2.0 Governance and productivity:........................................................................... 7
2.1 Productivity improvement steps: ................................................................. 11
2.2 Project Classification................................................................................... 12
2.3 KAIZEN for effective Governance: .............................................................. 12
2.4 Data manipulation and Data authentication: ............................................... 13
2.5 Change Management.................................................................................. 18
2.6 Requirement Management:......................................................................... 19
2.7 Benefit Realization: ..................................................................................... 21
3.0 Conclusion...................................................................................................... 22
About the author....................................................................................................... 24
3|P a g e
Productivity Improvement through Right Governance
Abstract
This paper describe about the productivity improvement through Metrics driven
approach and by effective project governance. Every organization is looking for
maximizing the productivity year on year through various mechanisms. In Project
governance we ensure the program or project benefit and build the knowledge
assets for better productivity. Metrics based Governance activity if driven efficiently
will satisfy stakeholders as information will be transparent about the business
progress, which will minimize the failure risks with efficient decision making process.
Metrics collection, Analysis, taking action and put it into continuous practice will
improve productivity significantly.
This paper will explain below
a) What are the parameters relevant to productivity that need to be tracked for
effective Governance
b) How can an organization demonstrate customer satisfaction and effective value
for money with metrics driven approach
c) Effective change management and risk management to minimize down time and
increase productivity.
d) How effective requirement management, capturing effective requirements,
tracking requirements till completion, asking effective questions to create better
requirement is the way to maximize the productivity at the later period of time in
execution cycle.
e) How can we do the benefit realization and achieving results and link the same for
knowledge building and productivity.
4|P a g e
Productivity Improvement through Right Governance
1.0 Introduction:
Organizations are becoming more and more competitive to survive in the market.
Investors are becoming more and more cautious about the investment. Stakeholders
expect to realize the value for their investments as early as possible. What
organization can do in this situation? Execution speed might be the correct answer.
All investors expect innovative solution with minimal time frame. The moment
organization increases the speed, the chances for failure also increase if there is an
absence of data driven decision making. To maximize the customer satisfaction
organization needs to share the project or product or business data which satisfies
the customer’s curiosity about the project progress and output vs money invested.
The data should talk timeline, quality and how the budget has been utilized and other
vital parameters of the projects and its progress .Project governance will provide a
guideline considering all the factors which will drive the customer
satisfaction.Governanance data will change based on the product, domain, and
business which organizations are dealing with. Stakeholder needs to provide
feedback wherever correction required based on the data received. All
communication with stakeholders should base on quantifiable data as subjective
discussion creates confusion.
Figure 1: Cockpit Dashboard 1
The Figure 1: shows the cockpit dashboard for an aircraft. This picture
demonstrates the importance of the data for decision making. The display is
5|P a g e
Productivity Improvement through Right Governance
continuously sensing and feeding the guiding information to the pilot to take
corrective steps with speed and accuracy. In critical system decision making has to
be very fast based on the dashboard display information. Pilot has complete
information about each and every part of the aircraft from this cockpit display. How
can organization apply the same concept for each and every area inside the
organization?
Same applies to the hospital when patient is in ICU(Intensive Care Unit) ,doctor uses
PMS(patient Monitoring System) which is an embedded device and the device
continuously display the vital parameters of a patient to the doctors so that they can
take effective decision at the right time to save the patient’s life.
Figure 2: Display of the Patient Monitoring System used in ICU, demonstrating the
data driven decision making. This system extracts all the vital parameters from a
patient and displays the same to the doctor.
Figure 2: ICU Dashboard 1
Governance will produce dashboard data which can be a guiding force for the
decision making process. Organization should have the ability to take decision based
on the dashboard data show at the right time so that damage can be minimized.
Metrics based measurement and productivity has a tight link.
6|P a g e
Productivity Improvement through Right Governance
According to the definition of Productivity = Output/Input.
Productivity definition is very simple. Inputs are the resources to generate the
expected ouput. Resources are not abundant so everyone needs to be careful to
utilize the resources and maximize the output.
Though the definition is very simple but the real productivity has little to do with how
hard the staff works, how many hours they put in, or even how much output they
produce. Real productivity is measured by the business value that their work
generates for the organization.
Various questions appear when we look into the resource usages.
a) How can stakeholders know how efficiently resource utilization is happening?
b) How can stakeholders ensure optimum usage of the resources so that
productivity goes up?
c) How can stakeholders take decision to control the ambient factors which
influence the output?
Centralize Dashboard with critical data, accessible by all at any time, plays a
significant role for decision making.
7|P a g e
Productivity Improvement through Right Governance
2.0 Governance and productivity:
What does "Governance" mean: the process of decision-making and the process
by which decisions are implemented (or not implemented)?
Governance is a framework which enables management teams to make better
decisions about securing their critical information and Information Technology
infrastructure and protecting their intellectual capital.
Governance helps organizations to define who is responsible for what and how
Information Technology decisions are made. It enables Information Technology to
adhere to business objectives and maximize value from the investments. It can
protect against failures that result from the misalignment of Information Technology
and business strategies.
Project governance ensures that complex Information Technology projects deliver
the value expected of them, rather than an expensive and embarrassing failure. An
appropriate governance framework helps save money by ensuring that all
expenditure is appropriate for the risks being tackled. It also enables business
analysts to better understand and compare the way in which public companies
manage their technology investments.
Good governance is about both achieving desired results and achieving them in the
right way. Since the "right way" is largely shaped by the cultural norms and values of
the organization, there can be no universal template for good governance. Each
organization must tailor its own definition of good governance to suit its needs and
values
Effective Governance starts with a standard way to define the process. Every
business is unique, customer expectations are different. To start the right
governance team members need to discuss, communicate and list down the
expected flow to the governance.
Projects need to identify what should be the measurements parameters?
What are the goals and objectives?
8|P a g e
Productivity Improvement through Right Governance
What frequency all the artifacts data has to be collected?
Who will be the responsible team members to collect the data and who will be for
analyzing the data?
Who are the stakeholders and what level of information they should get and what
timeline?
Project team will get better results when project metrics are in balance.
For example, having only a metrics for speed or only a metric for accuracy would not
help the project very much. If measure only speed, project deliverable might work
poorly.
If projects measure only accuracy, projects may never finish. Metrics for both used
together, though, may create tension, provide the balance for the project needs to
deal with trade-offs and best achieve for project goals.
Measurement drives behavior, so organization can use positive data to recognize
and reward accomplishments. Negative information that project report (or threaten to
report) can be a powerful aid in helping to control the project.
Through data driven approach we can analyze the issue to achieve excellent
productivity.
Few questions appear when we talk about productivity
a) How can we ensure that what we produce is the right output at first time?
b) Can we do the frequent review with the stakeholders, change frequently based
on the input and quickly adapt with the new model?
c) Stabilizing the input, process and output criteria based on the discussion?
Everything is possible when we have right data to analyze. Diagnostic data in
dashboard should continuously display the current status and through that input
stakeholder should understand the health and can able to predict the future.
9|P a g e
Productivity Improvement through Right Governance
Every department in an organization should have dashboard to
Assurance, Development team, Architect team, testing team, supports team,
procurement team etc. so that organization can fine tune whenever and wherever
require.
Governance should align with the strategic plan of the organization. The gro
organization is expecting will fulfill when process output is same as expected
strategic output of the organization.
Figure 3: Data flow Diagram 1
Figure 3: Demonstrates the cycle of data flow which
effective decision making.
Looking again into the productivity dimension
Productivity is a derived metric:
Input is easy to measure (e.g., activity
Output and environm
Productivity Improvement through Right Governance
Every department in an organization should have dashboard to
Assurance, Development team, Architect team, testing team, supports team,
procurement team etc. so that organization can fine tune whenever and wherever
Governance should align with the strategic plan of the organization. The gro
organization is expecting will fulfill when process output is same as expected
strategic output of the organization.
: Demonstrates the cycle of data flow which organization can execute for
Looking again into the productivity dimension,
Productivity is a derived metric: function (output, input, environment)
is easy to measure (e.g., activity-based controlling)
environment are difficult to describe and measure.
Every department in an organization should have dashboard to display. Quality
Assurance, Development team, Architect team, testing team, supports team,
procurement team etc. so that organization can fine tune whenever and wherever
Governance should align with the strategic plan of the organization. The growth what
organization is expecting will fulfill when process output is same as expected
organization can execute for
function (output, input, environment)
are difficult to describe and measure.
10|P a g e
Productivity Improvement through Right Governance
Requirement management is one more area for the productivity improvement. As
requirements directly improve output, organizations need to look into the quantifiable
measurement of the output like product demo, code shipping rate, rate of bugs
closed in a cycle etc.
Benefit realization is the key to the productivity improvement. Every organization by
executing project acquires knowledge, produce reusable components which can be
reuse directly and save effort which will directly contribute into the productivity
improvement.
11|P a g e
Productivity Improvement through Right Governance
2.1 Productivity improvement steps:
Figure 4: Productivity improvement points
Understanding software productivity for a large system development requires
complex set of qualitative and quantitative data from multiple sources for analysis.
Effective Governance process starts with a vision. Organizations take actions to
effectively utilize the Governance framework and produce value through that.
Work culture,
people, ambient
Automate wherever
possible
Rapid Prototype, Demo,
Update
Waste reduction
Knowledge
Management
Drive for rework
reduction
Reduce over
production, over wait,
over preparation
Deploy Process
and continuous
mature the process
Generate more
reuse components
Improve
Productivity
12|P a g e
Productivity Improvement through Right Governance
Figure 4: Demonstrates the various factors which influence the productivity
improvement. Organization need to put special focus on all these aspects to
effectively collect the data on all those area and regularly monitoring for all the
collected data. Does it guarantee the improvement? Not really but it should be the
starting point for the improvement journey.
2.2 Project Classification
To start with effective Governance team needs to start with project classification.
In Information Technology projects, there are several types of tasks an organization
executes, Fresh Development projects, Minor enhancement, Maintenance project,
Support projects, Hardware and software involvement and many other categories.
Budget, number of resources play significant role in project classification.
Projects are locally or globally distributed?
Timeline of the project? One year/two year or multiyear project?
Which Technology the project is going to use? Open source? Propriety technology
Architectural maturity for the product?
Team Process maturity?
Several other factors need to consider for classification of the project.
All the above factors provide inputs for the categorization of a project.
Based on the project categories, measurement criteria changes and effective
monitoring and control mechanism differ. Organization needs to look into the
category of the project to identify right measurement parameters. Montior those
parameters for demonstrating quality output and continuous improvement.
2.3 KAIZEN for effective Governance:
Once governance process steps are identified, team need to demonstrate the
improvement with the defined process. Stable process provides good productivity.
Regular brainstorming with the team members and upper management involvement
to come up with different idea is essential. Team needs to identify which areas are
working well and where team needs changes to see what can be improved.
13|P a g e
Productivity Improvement through Right Governance
Dashboard has to be displayed in centralized area for every individual to see how
effectively each team is performing. Upper management should visit team members
to encourage and discuss as a surprise visit.
2.4 Data manipulation and Data authentication:
In metrics and measurement data is the key for effective decision making. If team is
working on manipulated data or not with the actual data consequence will be high
which will resultant into loss in business in multiple areas. Rework is the major loss
for the organization. When metrics are used to find fault and punish, people provide
them only grudgingly, and do whatever they can to provide results that demonstrate
no problems—whether that’s true or not. Gathering valid, useful information starts
with a meaningful commitment on your part to use the measures for process
improvement, good decision making, and project problem solving. If there is even a
suspicion that data gathered will be used to criticize, punish, or even embarrass
people, those responsible for reporting them will find a way to game the measures
and disguise what is going on.
Below figures explain different dimensions of the projects status through dashboard
irrespective of the project size. Any project has to break to manage efficiently,
manage through quantifiable measurement and metrics based management
philosophy. All these sample data may change based on the project, product,
domain or business. These sample dashboard data extracted from a software
project.
Figure 5: is a dashboard data which is located in centralized location for global team
to view. It demonstrates the health of the each scrum project and how they should
take corrective actions if required. The dashboard data is showing different
dimensions of the scrum projects and how each area is performing. There are more
to measure but team has chosen these are the basic parameters which ensure
project progress and guide them whenever there is any fault.
14|P a g e
Productivity Improvement through Right Governance
Figure 5: SCRUM project Dashboard
Figure 6: this picture demonstrates about the areas where team can focus to
improve the productivity. All these areas if not taken care properly can lead into
execution efficiency bottleneck. It will increase the waste or rework. All these areas
are the checkpoint for the productivity improvement journey.
Productivity Improvement through Right Governance
Figure 5: SCRUM project Dashboard
icture demonstrates about the areas where team can focus to
improve the productivity. All these areas if not taken care properly can lead into
execution efficiency bottleneck. It will increase the waste or rework. All these areas
productivity improvement journey.
icture demonstrates about the areas where team can focus to
improve the productivity. All these areas if not taken care properly can lead into
execution efficiency bottleneck. It will increase the waste or rework. All these areas
15|P a g e
Productivity Improvement through Right Governance
Figure 6: Dashboard contents
Figure 7: and Figure 8: is a typical dashboard for Quality Assurance team where
every granular information has been displayed to take corrective steps wherever
required. The pictures are sh
are the bottlenecks.
Productivity Improvement through Right Governance
: is a typical dashboard for Quality Assurance team where
every granular information has been displayed to take corrective steps wherever
required. The pictures are showing how testing activities are performing and where
: is a typical dashboard for Quality Assurance team where
every granular information has been displayed to take corrective steps wherever
owing how testing activities are performing and where
16|P a g e
Productivity Improvement through Right Governance
Figure 7: Dashboard for Quality Assurance
Productivity Improvement through Right Governance
Figure 7: Dashboard for Quality Assurance
17|P a g e
Productivity Improvement through Right Governance
Figure 8: Dashboard for Quality Assurance 2
Figure 9: Questionnaire can be used for Dashboard preparation. Effective and
efficient questions based on the product, domain, business, organizational vision will
help to prepare correct dashboard data. Every team should have data to assess
themselves every decided frequency level
Productivity Improvement through Right Governance
Figure 8: Dashboard for Quality Assurance 2
: Questionnaire can be used for Dashboard preparation. Effective and
uestions based on the product, domain, business, organizational vision will
help to prepare correct dashboard data. Every team should have data to assess
themselves every decided frequency level
: Questionnaire can be used for Dashboard preparation. Effective and
uestions based on the product, domain, business, organizational vision will
help to prepare correct dashboard data. Every team should have data to assess
18|P a g e
Productivity Improvement through Right Governance
Figure 9: Checklist for Dashboard
2.5 Change Management
Productivity is severely affected when there are many frequent change requests
coming at the middle of the project execution cycle. Based on the priority team need
to take up the change request and do the impact analysis. Teams need to measure
the change trend and on increasing of the trend proper investigation and corrective
steps are required.
Productivity Improvement through Right Governance
Figure 9: Checklist for Dashboard
Change Management
Productivity is severely affected when there are many frequent change requests
coming at the middle of the project execution cycle. Based on the priority team need
to take up the change request and do the impact analysis. Teams need to measure
rend and on increasing of the trend proper investigation and corrective
Productivity is severely affected when there are many frequent change requests
coming at the middle of the project execution cycle. Based on the priority team need
to take up the change request and do the impact analysis. Teams need to measure
rend and on increasing of the trend proper investigation and corrective
19|P a g e
Productivity Improvement through Right Governance
Figure 10: Change management Dashboard
Figure 10: is the change management tracking dashboard. It will provide information
to all the stakeholders how many times
should be done and scope change need to take care so that it does not affect
productivity. Change is an essential part efficient project execution but same has to
handle efficiently. Change process should be well
tool. Changes improve the product but decrease motivation level in team. Frequent
changes increase reworks and increase wastages if not manage with well thoughts
and good process.
2.6 Requirement Management:
The major consequence of requirement related problems are rework
something again that team thought was already done. Rework can consume 30 to 50
percent of team’s total development cost (Boehm and Papaccio 1988) and
requirements errors account for 70 to 85 percent of
1997).
Track requirements status, stakeholders need to know the requirement status to
predict the project progress. Review comments, review process, capturing the
comments have to be through tool and process so that effort mi
organizations are not losing any data in process. Version history has to track so that
any given time any version of the document can be reproduce. The following quote
from Fredrick Brooks illustrates why requirements are so important:
Productivity Improvement through Right Governance
Figure 10: Change management Dashboard
: is the change management tracking dashboard. It will provide information
to all the stakeholders how many times change has been requested. Impact analysis
should be done and scope change need to take care so that it does not affect
productivity. Change is an essential part efficient project execution but same has to
handle efficiently. Change process should be well documented and tracked through
tool. Changes improve the product but decrease motivation level in team. Frequent
changes increase reworks and increase wastages if not manage with well thoughts
Requirement Management:
ence of requirement related problems are rework
something again that team thought was already done. Rework can consume 30 to 50
percent of team’s total development cost (Boehm and Papaccio 1988) and
requirements errors account for 70 to 85 percent of the rework cost (Leffingwell
Track requirements status, stakeholders need to know the requirement status to
predict the project progress. Review comments, review process, capturing the
comments have to be through tool and process so that effort mi
organizations are not losing any data in process. Version history has to track so that
any given time any version of the document can be reproduce. The following quote
from Fredrick Brooks illustrates why requirements are so important:
: is the change management tracking dashboard. It will provide information
change has been requested. Impact analysis
should be done and scope change need to take care so that it does not affect
productivity. Change is an essential part efficient project execution but same has to
documented and tracked through
tool. Changes improve the product but decrease motivation level in team. Frequent
changes increase reworks and increase wastages if not manage with well thoughts
ence of requirement related problems are rework—doing
something again that team thought was already done. Rework can consume 30 to 50
percent of team’s total development cost (Boehm and Papaccio 1988) and
the rework cost (Leffingwell
Track requirements status, stakeholders need to know the requirement status to
predict the project progress. Review comments, review process, capturing the
comments have to be through tool and process so that effort minimizes and
organizations are not losing any data in process. Version history has to track so that
any given time any version of the document can be reproduce. The following quote
20|P a g e
Productivity Improvement through Right Governance
“The hardest part of building a software system is deciding precisely what to build.
No other part of the conceptual work is as difficult as establishing the detailed
technical requirements, including all of the interfaces to people, to machines, and to
other software systems. No other part of the work so cripples the resulting system if
done wrong. No other part is more difficult to rectify later” (Brooks 1995). To quote
Karl Wiegers (2004), “If you don’t get the requirements right, it doesn’t matter how
well you do anything else.”
Figure 11: Requirement Management Dashboard
Figure 11: Dashboard provides information to all the employees about the quality of
the requirements and raise alarms if any change require for a requirement.
Productivity Improvement through Right Governance
rdest part of building a software system is deciding precisely what to build.
No other part of the conceptual work is as difficult as establishing the detailed
technical requirements, including all of the interfaces to people, to machines, and to
tware systems. No other part of the work so cripples the resulting system if
done wrong. No other part is more difficult to rectify later” (Brooks 1995). To quote
Karl Wiegers (2004), “If you don’t get the requirements right, it doesn’t matter how
Figure 11: Requirement Management Dashboard
: Dashboard provides information to all the employees about the quality of
the requirements and raise alarms if any change require for a requirement.
rdest part of building a software system is deciding precisely what to build.
No other part of the conceptual work is as difficult as establishing the detailed
technical requirements, including all of the interfaces to people, to machines, and to
tware systems. No other part of the work so cripples the resulting system if
done wrong. No other part is more difficult to rectify later” (Brooks 1995). To quote
Karl Wiegers (2004), “If you don’t get the requirements right, it doesn’t matter how
: Dashboard provides information to all the employees about the quality of
the requirements and raise alarms if any change require for a requirement.
21|P a g e
Productivity Improvement through Right Governance
2.7 Benefit Realization:
Figure 12: Benefit Measurement Mind map
Any project execution should have Benefit Management and Measurement process
against Benefits. Organization need to measure the learning’s which should be
reused in next similar or related projects, as knowledge brin
improvement and execution speed. Upper management support requires realizing
the benefit effectively and capturing information for future. Resource availability and
dependent project realization has to handle efficiently. Knowledge manageme
should connect with benefit realization data. Leaders need to encourage team
members for contributing and achieve the knowledge management related
organizational goal.
Figure 12: is the sample flow for Benefit measurement. Individual Program can
come up with their own process flow for collecting the Benefit Management data and
share with other team.
Productivity Improvement through Right Governance
Benefit Realization:
Figure 12: Benefit Measurement Mind map
Any project execution should have Benefit Management and Measurement process
against Benefits. Organization need to measure the learning’s which should be
reused in next similar or related projects, as knowledge brings productivity
improvement and execution speed. Upper management support requires realizing
the benefit effectively and capturing information for future. Resource availability and
dependent project realization has to handle efficiently. Knowledge manageme
should connect with benefit realization data. Leaders need to encourage team
members for contributing and achieve the knowledge management related
: is the sample flow for Benefit measurement. Individual Program can
me up with their own process flow for collecting the Benefit Management data and
Any project execution should have Benefit Management and Measurement process
against Benefits. Organization need to measure the learning’s which should be
gs productivity
improvement and execution speed. Upper management support requires realizing
the benefit effectively and capturing information for future. Resource availability and
dependent project realization has to handle efficiently. Knowledge management data
should connect with benefit realization data. Leaders need to encourage team
members for contributing and achieve the knowledge management related
: is the sample flow for Benefit measurement. Individual Program can
me up with their own process flow for collecting the Benefit Management data and
22|P a g e
Productivity Improvement through Right Governance
3.0 Conclusion
Organizations need to create a culture where all team members would be eager to
contribute for the organizational growth. Leaders have to communicate the
organizational vision to all team members and build healthy, productive teams and
the same team members will contribute for excellent stakeholder value generation.
Leaders have to mentor, coach, communicate and build that culture into the blood of
the system.
At any given point of time any stakeholders wherever they involve should be able to
know through metrics what is going on? How it is going on? Why it is like that? What
steps are currently taken by whom? Expectation is: Total transparent system.
Organization need time to reach that stage but continuous drive has to exist from all
level and from all members.
Every team members have to own the organizational vision, mission and culture and
work for maximizing the productivity through innovation and maintain the speed of
execution excellence.
PMI has provided many guidelines for better project Governance. Effective
governance plan and execution of the same for achieving the excellent result with
continuous process improvement should be a part of organizational culture and
same resultant into a great productivity improvement. Data driven decision making
culture will help to minimize the waste reduction and improve productivity. Through
systematic knowledge management organization can maximize productivity and
measure improvement and demonstrate the same to stakeholders for excellent
customer satisfaction. When each and every team member makes these practices as
a habit and data driven decision making, data driven demonstration will be a part of
communication agenda than only organization will demonstrate value to
stakeholders. Organization can minimize several overheads and maximize the cost
benefit if organization has dashboard with data for different dimensions for all the
projects, products, units, divisions wherever applicable. Customer satisfaction will
increase when we identify, collect, share the data on continuous basis and improve
23|P a g e
Productivity Improvement through Right Governance
the process and output by collecting feedback from various stakeholders.
Organization has to look for data through governance framework for overproduction,
waiting time, non-value added processing, under-utilized people, excess movement,
over preparation etc. to take action and measure the productivity improvement
journey.
Finally by doing all the above mentioned metrics and measurement if organization
can reduce execution cycle time with expected quality output by 20-30% it will
create immense satisfaction to the investors.
24|P a g e
Productivity Improvement through Right Governance
About the author
Mr. Chandan Lal Patary Currently working as Development
Manager at ABB.
applications across various domains and has successfully
executed many Projects. Chandan has worked on domain like
Healthcare, Aerospace, Building automation, Power automation
under real time mission critical
development. Chandan has 14 years of IT experience. He is certified PMP from
2008 and he is a Green Belt certified holder. Chandan is an agile practioner and
Certified Scrum Master. Chandan holds a Bachelor’s
Technology (NIT-Agartala) in Electrical Engineering. He has completed one year
Executive General Management program from IIM
Productivity Improvement through Right Governance
Mr. Chandan Lal Patary Currently working as Development
Manager at ABB. He has deep experience in developing Software
applications across various domains and has successfully
executed many Projects. Chandan has worked on domain like
Healthcare, Aerospace, Building automation, Power automation
under real time mission critical product development to large scale application
development. Chandan has 14 years of IT experience. He is certified PMP from
2008 and he is a Green Belt certified holder. Chandan is an agile practioner and
Certified Scrum Master. Chandan holds a Bachelor’s from National Institute of
Agartala) in Electrical Engineering. He has completed one year
Executive General Management program from IIM-Bangalore in 2007.
Mr. Chandan Lal Patary Currently working as Development
He has deep experience in developing Software
applications across various domains and has successfully
executed many Projects. Chandan has worked on domain like
Healthcare, Aerospace, Building automation, Power automation
product development to large scale application
development. Chandan has 14 years of IT experience. He is certified PMP from
2008 and he is a Green Belt certified holder. Chandan is an agile practioner and
from National Institute of
Agartala) in Electrical Engineering. He has completed one year
Bangalore in 2007.

Weitere ähnliche Inhalte

Was ist angesagt?

Product development Strategy
Product development StrategyProduct development Strategy
Product development StrategyChandan Patary
 
STORIES YOU LIKED MOST
STORIES YOU LIKED MOSTSTORIES YOU LIKED MOST
STORIES YOU LIKED MOSTChandan Patary
 
Becoming Agile: Agile Transitions in Practice - Rashina Hoda - AgileNZ 2017
Becoming Agile: Agile Transitions in Practice - Rashina Hoda - AgileNZ 2017Becoming Agile: Agile Transitions in Practice - Rashina Hoda - AgileNZ 2017
Becoming Agile: Agile Transitions in Practice - Rashina Hoda - AgileNZ 2017AgileNZ Conference
 
Designing Effective Lean Transformations
Designing Effective Lean TransformationsDesigning Effective Lean Transformations
Designing Effective Lean TransformationsLean Enterprise Academy
 
The Agile Adoption Roadmap (Keynote by Tim Abbott)
The Agile Adoption Roadmap  (Keynote by Tim Abbott)The Agile Adoption Roadmap  (Keynote by Tim Abbott)
The Agile Adoption Roadmap (Keynote by Tim Abbott)Agile Days Middle East
 
Agile Transformation Case Studies
Agile Transformation Case StudiesAgile Transformation Case Studies
Agile Transformation Case StudiesChandan Patary
 
Understanding Lean Visions 2
Understanding Lean Visions 2Understanding Lean Visions 2
Understanding Lean Visions 2Rick Duncan
 
Agile Transformation: The Difference Between Success and Failure
Agile Transformation: The Difference Between Success and FailureAgile Transformation: The Difference Between Success and Failure
Agile Transformation: The Difference Between Success and FailureSunil Mundra
 
Agile Organization Why & How?
Agile Organization Why & How?Agile Organization Why & How?
Agile Organization Why & How?Adam Boczek
 
Business Agility Workshop Content
Business Agility Workshop ContentBusiness Agility Workshop Content
Business Agility Workshop ContentDavid Siegel
 
Change Lessons Learned - Implementing a Kanban System for Enterprise Agility
Change Lessons Learned - Implementing a Kanban System for Enterprise AgilityChange Lessons Learned - Implementing a Kanban System for Enterprise Agility
Change Lessons Learned - Implementing a Kanban System for Enterprise AgilityShoaib Shaukat
 
New Agile Ways of Working Remotely
New Agile Ways of Working RemotelyNew Agile Ways of Working Remotely
New Agile Ways of Working RemotelyDipesh Pala
 
Doing Agile Right - Transformation without Chaos - A summary
Doing Agile Right - Transformation without Chaos - A summaryDoing Agile Right - Transformation without Chaos - A summary
Doing Agile Right - Transformation without Chaos - A summaryRagavendra Prasath
 
Gateway to Agile - Frameworks at TCS/Jile May 8 2019
Gateway to Agile - Frameworks at TCS/Jile May 8 2019Gateway to Agile - Frameworks at TCS/Jile May 8 2019
Gateway to Agile - Frameworks at TCS/Jile May 8 2019Gervais Johnson, Advisor
 
Governing an agile enteprise
Governing an agile entepriseGoverning an agile enteprise
Governing an agile entepriseagilebydesign
 

Was ist angesagt? (20)

Product development Strategy
Product development StrategyProduct development Strategy
Product development Strategy
 
Lean Change Management
Lean Change ManagementLean Change Management
Lean Change Management
 
STORIES YOU LIKED MOST
STORIES YOU LIKED MOSTSTORIES YOU LIKED MOST
STORIES YOU LIKED MOST
 
Becoming Agile: Agile Transitions in Practice - Rashina Hoda - AgileNZ 2017
Becoming Agile: Agile Transitions in Practice - Rashina Hoda - AgileNZ 2017Becoming Agile: Agile Transitions in Practice - Rashina Hoda - AgileNZ 2017
Becoming Agile: Agile Transitions in Practice - Rashina Hoda - AgileNZ 2017
 
Designing Effective Lean Transformations
Designing Effective Lean TransformationsDesigning Effective Lean Transformations
Designing Effective Lean Transformations
 
The Agile Adoption Roadmap (Keynote by Tim Abbott)
The Agile Adoption Roadmap  (Keynote by Tim Abbott)The Agile Adoption Roadmap  (Keynote by Tim Abbott)
The Agile Adoption Roadmap (Keynote by Tim Abbott)
 
Lean Transformation Model
Lean Transformation ModelLean Transformation Model
Lean Transformation Model
 
Agile Transformation Case Studies
Agile Transformation Case StudiesAgile Transformation Case Studies
Agile Transformation Case Studies
 
Organizational agile transformation
Organizational agile transformationOrganizational agile transformation
Organizational agile transformation
 
Understanding Lean Visions 2
Understanding Lean Visions 2Understanding Lean Visions 2
Understanding Lean Visions 2
 
Agile Transformation: The Difference Between Success and Failure
Agile Transformation: The Difference Between Success and FailureAgile Transformation: The Difference Between Success and Failure
Agile Transformation: The Difference Between Success and Failure
 
Agile Organization Why & How?
Agile Organization Why & How?Agile Organization Why & How?
Agile Organization Why & How?
 
Challenges in doing Agile in IT Services
Challenges in doing Agile in IT ServicesChallenges in doing Agile in IT Services
Challenges in doing Agile in IT Services
 
Business Agility Workshop Content
Business Agility Workshop ContentBusiness Agility Workshop Content
Business Agility Workshop Content
 
Operational Excellence Consulting - Training Brochure
Operational Excellence Consulting - Training BrochureOperational Excellence Consulting - Training Brochure
Operational Excellence Consulting - Training Brochure
 
Change Lessons Learned - Implementing a Kanban System for Enterprise Agility
Change Lessons Learned - Implementing a Kanban System for Enterprise AgilityChange Lessons Learned - Implementing a Kanban System for Enterprise Agility
Change Lessons Learned - Implementing a Kanban System for Enterprise Agility
 
New Agile Ways of Working Remotely
New Agile Ways of Working RemotelyNew Agile Ways of Working Remotely
New Agile Ways of Working Remotely
 
Doing Agile Right - Transformation without Chaos - A summary
Doing Agile Right - Transformation without Chaos - A summaryDoing Agile Right - Transformation without Chaos - A summary
Doing Agile Right - Transformation without Chaos - A summary
 
Gateway to Agile - Frameworks at TCS/Jile May 8 2019
Gateway to Agile - Frameworks at TCS/Jile May 8 2019Gateway to Agile - Frameworks at TCS/Jile May 8 2019
Gateway to Agile - Frameworks at TCS/Jile May 8 2019
 
Governing an agile enteprise
Governing an agile entepriseGoverning an agile enteprise
Governing an agile enteprise
 

Ähnlich wie Productivity improvement through right governance

forrester-tei-rtd-432543
forrester-tei-rtd-432543forrester-tei-rtd-432543
forrester-tei-rtd-432543Jeremy Remus
 
Pert, cpm and other tools of project management for intrapreneurs
Pert, cpm and other tools of project management for  intrapreneurs  Pert, cpm and other tools of project management for  intrapreneurs
Pert, cpm and other tools of project management for intrapreneurs Dr. Trilok Kumar Jain
 
Pert, cpm and other tools of project management for intrapreneurs
Pert, cpm and other tools of project management for  intrapreneurs  Pert, cpm and other tools of project management for  intrapreneurs
Pert, cpm and other tools of project management for intrapreneurs Dr. Trilok Kumar Jain
 
Nintex Workflow for Sharepoint - Return on Investment Whitepaper by Forrester...
Nintex Workflow for Sharepoint - Return on Investment Whitepaper by Forrester...Nintex Workflow for Sharepoint - Return on Investment Whitepaper by Forrester...
Nintex Workflow for Sharepoint - Return on Investment Whitepaper by Forrester...David J Rosenthal
 
Universal Association Proposal
Universal Association ProposalUniversal Association Proposal
Universal Association ProposalCheryl Litwinczuk
 
How to Improve Time to Market w Existing Resources
How to Improve Time to Market w Existing ResourcesHow to Improve Time to Market w Existing Resources
How to Improve Time to Market w Existing ResourcesLiberteks
 
Fool With A Tool V2
Fool With A Tool V2Fool With A Tool V2
Fool With A Tool V2Linz1769
 
IndustryAnalyst_Report_-_Time__Attendance_Strategies_Beyond_Payroll_Accuracy_...
IndustryAnalyst_Report_-_Time__Attendance_Strategies_Beyond_Payroll_Accuracy_...IndustryAnalyst_Report_-_Time__Attendance_Strategies_Beyond_Payroll_Accuracy_...
IndustryAnalyst_Report_-_Time__Attendance_Strategies_Beyond_Payroll_Accuracy_...Patrick Ryan
 
How to Reach Peak Performance With the Product Management Organizational Heal...
How to Reach Peak Performance With the Product Management Organizational Heal...How to Reach Peak Performance With the Product Management Organizational Heal...
How to Reach Peak Performance With the Product Management Organizational Heal...Aggregage
 
PSY-520 Graduate StatisticsTopic 7 – MANOVA ProjectDirec.docx
PSY-520 Graduate StatisticsTopic 7 – MANOVA ProjectDirec.docxPSY-520 Graduate StatisticsTopic 7 – MANOVA ProjectDirec.docx
PSY-520 Graduate StatisticsTopic 7 – MANOVA ProjectDirec.docxwoodruffeloisa
 
Whitepaper - Effective Business Analysis
Whitepaper - Effective Business AnalysisWhitepaper - Effective Business Analysis
Whitepaper - Effective Business AnalysisPeter Bricknell
 

Ähnlich wie Productivity improvement through right governance (20)

Mit Great
Mit GreatMit Great
Mit Great
 
forrester-tei-rtd-432543
forrester-tei-rtd-432543forrester-tei-rtd-432543
forrester-tei-rtd-432543
 
Pert, cpm and other tools of project management for intrapreneurs
Pert, cpm and other tools of project management for  intrapreneurs  Pert, cpm and other tools of project management for  intrapreneurs
Pert, cpm and other tools of project management for intrapreneurs
 
Pert, cpm and other tools of project management for intrapreneurs
Pert, cpm and other tools of project management for  intrapreneurs  Pert, cpm and other tools of project management for  intrapreneurs
Pert, cpm and other tools of project management for intrapreneurs
 
BCSITv3.1
BCSITv3.1BCSITv3.1
BCSITv3.1
 
Capstone
CapstoneCapstone
Capstone
 
Nintex Workflow for Sharepoint - Return on Investment Whitepaper by Forrester...
Nintex Workflow for Sharepoint - Return on Investment Whitepaper by Forrester...Nintex Workflow for Sharepoint - Return on Investment Whitepaper by Forrester...
Nintex Workflow for Sharepoint - Return on Investment Whitepaper by Forrester...
 
Business analytics
Business analyticsBusiness analytics
Business analytics
 
ISS_5
ISS_5ISS_5
ISS_5
 
Bi in financial industry
Bi in financial industryBi in financial industry
Bi in financial industry
 
Bi in financial industry
Bi in financial industryBi in financial industry
Bi in financial industry
 
Universal Association Proposal
Universal Association ProposalUniversal Association Proposal
Universal Association Proposal
 
How to Improve Time to Market w Existing Resources
How to Improve Time to Market w Existing ResourcesHow to Improve Time to Market w Existing Resources
How to Improve Time to Market w Existing Resources
 
October_FP&A-Foresights
October_FP&A-ForesightsOctober_FP&A-Foresights
October_FP&A-Foresights
 
Fool With A Tool V2
Fool With A Tool V2Fool With A Tool V2
Fool With A Tool V2
 
IndustryAnalyst_Report_-_Time__Attendance_Strategies_Beyond_Payroll_Accuracy_...
IndustryAnalyst_Report_-_Time__Attendance_Strategies_Beyond_Payroll_Accuracy_...IndustryAnalyst_Report_-_Time__Attendance_Strategies_Beyond_Payroll_Accuracy_...
IndustryAnalyst_Report_-_Time__Attendance_Strategies_Beyond_Payroll_Accuracy_...
 
Managing financial resources
Managing financial resourcesManaging financial resources
Managing financial resources
 
How to Reach Peak Performance With the Product Management Organizational Heal...
How to Reach Peak Performance With the Product Management Organizational Heal...How to Reach Peak Performance With the Product Management Organizational Heal...
How to Reach Peak Performance With the Product Management Organizational Heal...
 
PSY-520 Graduate StatisticsTopic 7 – MANOVA ProjectDirec.docx
PSY-520 Graduate StatisticsTopic 7 – MANOVA ProjectDirec.docxPSY-520 Graduate StatisticsTopic 7 – MANOVA ProjectDirec.docx
PSY-520 Graduate StatisticsTopic 7 – MANOVA ProjectDirec.docx
 
Whitepaper - Effective Business Analysis
Whitepaper - Effective Business AnalysisWhitepaper - Effective Business Analysis
Whitepaper - Effective Business Analysis
 

Mehr von Chandan Patary

The Product Owner Guidebook.pptx
The Product Owner Guidebook.pptxThe Product Owner Guidebook.pptx
The Product Owner Guidebook.pptxChandan Patary
 
The Product Owner Guidebook_FREE_100pages.pdf
The Product Owner Guidebook_FREE_100pages.pdfThe Product Owner Guidebook_FREE_100pages.pdf
The Product Owner Guidebook_FREE_100pages.pdfChandan Patary
 
Scrum Master of the Universe.pptx
Scrum Master of the Universe.pptxScrum Master of the Universe.pptx
Scrum Master of the Universe.pptxChandan Patary
 
Question Bank for Agilist
Question Bank for AgilistQuestion Bank for Agilist
Question Bank for AgilistChandan Patary
 
A Guidebook of Coaching High-Performance team
A Guidebook of Coaching High-Performance teamA Guidebook of Coaching High-Performance team
A Guidebook of Coaching High-Performance teamChandan Patary
 
A Guidebook of Coaching High Performance Team 200 pages
A Guidebook of Coaching High Performance Team 200 pagesA Guidebook of Coaching High Performance Team 200 pages
A Guidebook of Coaching High Performance Team 200 pagesChandan Patary
 
The Agilist's Guidebook - First 150 Pages
The Agilist's Guidebook - First 150 PagesThe Agilist's Guidebook - First 150 Pages
The Agilist's Guidebook - First 150 PagesChandan Patary
 
The Scrum Master Guidebook - 150 pages
The Scrum Master Guidebook - 150 pagesThe Scrum Master Guidebook - 150 pages
The Scrum Master Guidebook - 150 pagesChandan Patary
 
We Can Lead - A Guidebook of Personal Leadership and Self-Coaching
We Can Lead - A Guidebook of Personal Leadership and Self-CoachingWe Can Lead - A Guidebook of Personal Leadership and Self-Coaching
We Can Lead - A Guidebook of Personal Leadership and Self-CoachingChandan Patary
 
We can Lead - A Guidebook of Personal Leadership & Self-Coaching
We can Lead - A Guidebook of Personal Leadership & Self-CoachingWe can Lead - A Guidebook of Personal Leadership & Self-Coaching
We can Lead - A Guidebook of Personal Leadership & Self-CoachingChandan Patary
 
We Can Lead - Book Chapters
We Can Lead - Book ChaptersWe Can Lead - Book Chapters
We Can Lead - Book ChaptersChandan Patary
 
The scrum master guidebook sample chapter
The scrum master guidebook sample chapterThe scrum master guidebook sample chapter
The scrum master guidebook sample chapterChandan Patary
 
The scrum master guidebook Chapter 2 sample
The scrum master guidebook  Chapter 2 sampleThe scrum master guidebook  Chapter 2 sample
The scrum master guidebook Chapter 2 sampleChandan Patary
 
Why The Scrum Master Guidebook
Why The Scrum Master GuidebookWhy The Scrum Master Guidebook
Why The Scrum Master GuidebookChandan Patary
 

Mehr von Chandan Patary (20)

25 coaching tools.pdf
25 coaching tools.pdf25 coaching tools.pdf
25 coaching tools.pdf
 
20 Coaching Tools.pdf
20 Coaching Tools.pdf20 Coaching Tools.pdf
20 Coaching Tools.pdf
 
Coaching Tools.pdf
Coaching Tools.pdfCoaching Tools.pdf
Coaching Tools.pdf
 
The Product Owner Guidebook.pptx
The Product Owner Guidebook.pptxThe Product Owner Guidebook.pptx
The Product Owner Guidebook.pptx
 
The Product Owner Guidebook_FREE_100pages.pdf
The Product Owner Guidebook_FREE_100pages.pdfThe Product Owner Guidebook_FREE_100pages.pdf
The Product Owner Guidebook_FREE_100pages.pdf
 
The Agile Guidebooks
The Agile GuidebooksThe Agile Guidebooks
The Agile Guidebooks
 
Scrum Master of the Universe.pptx
Scrum Master of the Universe.pptxScrum Master of the Universe.pptx
Scrum Master of the Universe.pptx
 
Question Bank for Agilist
Question Bank for AgilistQuestion Bank for Agilist
Question Bank for Agilist
 
Agility Checklist
Agility ChecklistAgility Checklist
Agility Checklist
 
A Guidebook of Coaching High-Performance team
A Guidebook of Coaching High-Performance teamA Guidebook of Coaching High-Performance team
A Guidebook of Coaching High-Performance team
 
A Guidebook of Coaching High Performance Team 200 pages
A Guidebook of Coaching High Performance Team 200 pagesA Guidebook of Coaching High Performance Team 200 pages
A Guidebook of Coaching High Performance Team 200 pages
 
The Agilist's Guidebook - First 150 Pages
The Agilist's Guidebook - First 150 PagesThe Agilist's Guidebook - First 150 Pages
The Agilist's Guidebook - First 150 Pages
 
The Scrum Master Guidebook - 150 pages
The Scrum Master Guidebook - 150 pagesThe Scrum Master Guidebook - 150 pages
The Scrum Master Guidebook - 150 pages
 
We Can Lead - A Guidebook of Personal Leadership and Self-Coaching
We Can Lead - A Guidebook of Personal Leadership and Self-CoachingWe Can Lead - A Guidebook of Personal Leadership and Self-Coaching
We Can Lead - A Guidebook of Personal Leadership and Self-Coaching
 
We can Lead - A Guidebook of Personal Leadership & Self-Coaching
We can Lead - A Guidebook of Personal Leadership & Self-CoachingWe can Lead - A Guidebook of Personal Leadership & Self-Coaching
We can Lead - A Guidebook of Personal Leadership & Self-Coaching
 
Why These Guidebooks
Why These GuidebooksWhy These Guidebooks
Why These Guidebooks
 
We Can Lead - Book Chapters
We Can Lead - Book ChaptersWe Can Lead - Book Chapters
We Can Lead - Book Chapters
 
The scrum master guidebook sample chapter
The scrum master guidebook sample chapterThe scrum master guidebook sample chapter
The scrum master guidebook sample chapter
 
The scrum master guidebook Chapter 2 sample
The scrum master guidebook  Chapter 2 sampleThe scrum master guidebook  Chapter 2 sample
The scrum master guidebook Chapter 2 sample
 
Why The Scrum Master Guidebook
Why The Scrum Master GuidebookWhy The Scrum Master Guidebook
Why The Scrum Master Guidebook
 

Kürzlich hochgeladen

VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...noida100girls
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 

Kürzlich hochgeladen (20)

VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 

Productivity improvement through right governance

  • 1. Productivity Improvement through Right Governance Chandan Lal Patary PMP Development Manager ABB
  • 2. 2|P a g e Productivity Improvement through Right Governance Contents Abstract...................................................................................................................... 3 1.0 Introduction:...................................................................................................... 4 2.0 Governance and productivity:........................................................................... 7 2.1 Productivity improvement steps: ................................................................. 11 2.2 Project Classification................................................................................... 12 2.3 KAIZEN for effective Governance: .............................................................. 12 2.4 Data manipulation and Data authentication: ............................................... 13 2.5 Change Management.................................................................................. 18 2.6 Requirement Management:......................................................................... 19 2.7 Benefit Realization: ..................................................................................... 21 3.0 Conclusion...................................................................................................... 22 About the author....................................................................................................... 24
  • 3. 3|P a g e Productivity Improvement through Right Governance Abstract This paper describe about the productivity improvement through Metrics driven approach and by effective project governance. Every organization is looking for maximizing the productivity year on year through various mechanisms. In Project governance we ensure the program or project benefit and build the knowledge assets for better productivity. Metrics based Governance activity if driven efficiently will satisfy stakeholders as information will be transparent about the business progress, which will minimize the failure risks with efficient decision making process. Metrics collection, Analysis, taking action and put it into continuous practice will improve productivity significantly. This paper will explain below a) What are the parameters relevant to productivity that need to be tracked for effective Governance b) How can an organization demonstrate customer satisfaction and effective value for money with metrics driven approach c) Effective change management and risk management to minimize down time and increase productivity. d) How effective requirement management, capturing effective requirements, tracking requirements till completion, asking effective questions to create better requirement is the way to maximize the productivity at the later period of time in execution cycle. e) How can we do the benefit realization and achieving results and link the same for knowledge building and productivity.
  • 4. 4|P a g e Productivity Improvement through Right Governance 1.0 Introduction: Organizations are becoming more and more competitive to survive in the market. Investors are becoming more and more cautious about the investment. Stakeholders expect to realize the value for their investments as early as possible. What organization can do in this situation? Execution speed might be the correct answer. All investors expect innovative solution with minimal time frame. The moment organization increases the speed, the chances for failure also increase if there is an absence of data driven decision making. To maximize the customer satisfaction organization needs to share the project or product or business data which satisfies the customer’s curiosity about the project progress and output vs money invested. The data should talk timeline, quality and how the budget has been utilized and other vital parameters of the projects and its progress .Project governance will provide a guideline considering all the factors which will drive the customer satisfaction.Governanance data will change based on the product, domain, and business which organizations are dealing with. Stakeholder needs to provide feedback wherever correction required based on the data received. All communication with stakeholders should base on quantifiable data as subjective discussion creates confusion. Figure 1: Cockpit Dashboard 1 The Figure 1: shows the cockpit dashboard for an aircraft. This picture demonstrates the importance of the data for decision making. The display is
  • 5. 5|P a g e Productivity Improvement through Right Governance continuously sensing and feeding the guiding information to the pilot to take corrective steps with speed and accuracy. In critical system decision making has to be very fast based on the dashboard display information. Pilot has complete information about each and every part of the aircraft from this cockpit display. How can organization apply the same concept for each and every area inside the organization? Same applies to the hospital when patient is in ICU(Intensive Care Unit) ,doctor uses PMS(patient Monitoring System) which is an embedded device and the device continuously display the vital parameters of a patient to the doctors so that they can take effective decision at the right time to save the patient’s life. Figure 2: Display of the Patient Monitoring System used in ICU, demonstrating the data driven decision making. This system extracts all the vital parameters from a patient and displays the same to the doctor. Figure 2: ICU Dashboard 1 Governance will produce dashboard data which can be a guiding force for the decision making process. Organization should have the ability to take decision based on the dashboard data show at the right time so that damage can be minimized. Metrics based measurement and productivity has a tight link.
  • 6. 6|P a g e Productivity Improvement through Right Governance According to the definition of Productivity = Output/Input. Productivity definition is very simple. Inputs are the resources to generate the expected ouput. Resources are not abundant so everyone needs to be careful to utilize the resources and maximize the output. Though the definition is very simple but the real productivity has little to do with how hard the staff works, how many hours they put in, or even how much output they produce. Real productivity is measured by the business value that their work generates for the organization. Various questions appear when we look into the resource usages. a) How can stakeholders know how efficiently resource utilization is happening? b) How can stakeholders ensure optimum usage of the resources so that productivity goes up? c) How can stakeholders take decision to control the ambient factors which influence the output? Centralize Dashboard with critical data, accessible by all at any time, plays a significant role for decision making.
  • 7. 7|P a g e Productivity Improvement through Right Governance 2.0 Governance and productivity: What does "Governance" mean: the process of decision-making and the process by which decisions are implemented (or not implemented)? Governance is a framework which enables management teams to make better decisions about securing their critical information and Information Technology infrastructure and protecting their intellectual capital. Governance helps organizations to define who is responsible for what and how Information Technology decisions are made. It enables Information Technology to adhere to business objectives and maximize value from the investments. It can protect against failures that result from the misalignment of Information Technology and business strategies. Project governance ensures that complex Information Technology projects deliver the value expected of them, rather than an expensive and embarrassing failure. An appropriate governance framework helps save money by ensuring that all expenditure is appropriate for the risks being tackled. It also enables business analysts to better understand and compare the way in which public companies manage their technology investments. Good governance is about both achieving desired results and achieving them in the right way. Since the "right way" is largely shaped by the cultural norms and values of the organization, there can be no universal template for good governance. Each organization must tailor its own definition of good governance to suit its needs and values Effective Governance starts with a standard way to define the process. Every business is unique, customer expectations are different. To start the right governance team members need to discuss, communicate and list down the expected flow to the governance. Projects need to identify what should be the measurements parameters? What are the goals and objectives?
  • 8. 8|P a g e Productivity Improvement through Right Governance What frequency all the artifacts data has to be collected? Who will be the responsible team members to collect the data and who will be for analyzing the data? Who are the stakeholders and what level of information they should get and what timeline? Project team will get better results when project metrics are in balance. For example, having only a metrics for speed or only a metric for accuracy would not help the project very much. If measure only speed, project deliverable might work poorly. If projects measure only accuracy, projects may never finish. Metrics for both used together, though, may create tension, provide the balance for the project needs to deal with trade-offs and best achieve for project goals. Measurement drives behavior, so organization can use positive data to recognize and reward accomplishments. Negative information that project report (or threaten to report) can be a powerful aid in helping to control the project. Through data driven approach we can analyze the issue to achieve excellent productivity. Few questions appear when we talk about productivity a) How can we ensure that what we produce is the right output at first time? b) Can we do the frequent review with the stakeholders, change frequently based on the input and quickly adapt with the new model? c) Stabilizing the input, process and output criteria based on the discussion? Everything is possible when we have right data to analyze. Diagnostic data in dashboard should continuously display the current status and through that input stakeholder should understand the health and can able to predict the future.
  • 9. 9|P a g e Productivity Improvement through Right Governance Every department in an organization should have dashboard to Assurance, Development team, Architect team, testing team, supports team, procurement team etc. so that organization can fine tune whenever and wherever require. Governance should align with the strategic plan of the organization. The gro organization is expecting will fulfill when process output is same as expected strategic output of the organization. Figure 3: Data flow Diagram 1 Figure 3: Demonstrates the cycle of data flow which effective decision making. Looking again into the productivity dimension Productivity is a derived metric: Input is easy to measure (e.g., activity Output and environm Productivity Improvement through Right Governance Every department in an organization should have dashboard to Assurance, Development team, Architect team, testing team, supports team, procurement team etc. so that organization can fine tune whenever and wherever Governance should align with the strategic plan of the organization. The gro organization is expecting will fulfill when process output is same as expected strategic output of the organization. : Demonstrates the cycle of data flow which organization can execute for Looking again into the productivity dimension, Productivity is a derived metric: function (output, input, environment) is easy to measure (e.g., activity-based controlling) environment are difficult to describe and measure. Every department in an organization should have dashboard to display. Quality Assurance, Development team, Architect team, testing team, supports team, procurement team etc. so that organization can fine tune whenever and wherever Governance should align with the strategic plan of the organization. The growth what organization is expecting will fulfill when process output is same as expected organization can execute for function (output, input, environment) are difficult to describe and measure.
  • 10. 10|P a g e Productivity Improvement through Right Governance Requirement management is one more area for the productivity improvement. As requirements directly improve output, organizations need to look into the quantifiable measurement of the output like product demo, code shipping rate, rate of bugs closed in a cycle etc. Benefit realization is the key to the productivity improvement. Every organization by executing project acquires knowledge, produce reusable components which can be reuse directly and save effort which will directly contribute into the productivity improvement.
  • 11. 11|P a g e Productivity Improvement through Right Governance 2.1 Productivity improvement steps: Figure 4: Productivity improvement points Understanding software productivity for a large system development requires complex set of qualitative and quantitative data from multiple sources for analysis. Effective Governance process starts with a vision. Organizations take actions to effectively utilize the Governance framework and produce value through that. Work culture, people, ambient Automate wherever possible Rapid Prototype, Demo, Update Waste reduction Knowledge Management Drive for rework reduction Reduce over production, over wait, over preparation Deploy Process and continuous mature the process Generate more reuse components Improve Productivity
  • 12. 12|P a g e Productivity Improvement through Right Governance Figure 4: Demonstrates the various factors which influence the productivity improvement. Organization need to put special focus on all these aspects to effectively collect the data on all those area and regularly monitoring for all the collected data. Does it guarantee the improvement? Not really but it should be the starting point for the improvement journey. 2.2 Project Classification To start with effective Governance team needs to start with project classification. In Information Technology projects, there are several types of tasks an organization executes, Fresh Development projects, Minor enhancement, Maintenance project, Support projects, Hardware and software involvement and many other categories. Budget, number of resources play significant role in project classification. Projects are locally or globally distributed? Timeline of the project? One year/two year or multiyear project? Which Technology the project is going to use? Open source? Propriety technology Architectural maturity for the product? Team Process maturity? Several other factors need to consider for classification of the project. All the above factors provide inputs for the categorization of a project. Based on the project categories, measurement criteria changes and effective monitoring and control mechanism differ. Organization needs to look into the category of the project to identify right measurement parameters. Montior those parameters for demonstrating quality output and continuous improvement. 2.3 KAIZEN for effective Governance: Once governance process steps are identified, team need to demonstrate the improvement with the defined process. Stable process provides good productivity. Regular brainstorming with the team members and upper management involvement to come up with different idea is essential. Team needs to identify which areas are working well and where team needs changes to see what can be improved.
  • 13. 13|P a g e Productivity Improvement through Right Governance Dashboard has to be displayed in centralized area for every individual to see how effectively each team is performing. Upper management should visit team members to encourage and discuss as a surprise visit. 2.4 Data manipulation and Data authentication: In metrics and measurement data is the key for effective decision making. If team is working on manipulated data or not with the actual data consequence will be high which will resultant into loss in business in multiple areas. Rework is the major loss for the organization. When metrics are used to find fault and punish, people provide them only grudgingly, and do whatever they can to provide results that demonstrate no problems—whether that’s true or not. Gathering valid, useful information starts with a meaningful commitment on your part to use the measures for process improvement, good decision making, and project problem solving. If there is even a suspicion that data gathered will be used to criticize, punish, or even embarrass people, those responsible for reporting them will find a way to game the measures and disguise what is going on. Below figures explain different dimensions of the projects status through dashboard irrespective of the project size. Any project has to break to manage efficiently, manage through quantifiable measurement and metrics based management philosophy. All these sample data may change based on the project, product, domain or business. These sample dashboard data extracted from a software project. Figure 5: is a dashboard data which is located in centralized location for global team to view. It demonstrates the health of the each scrum project and how they should take corrective actions if required. The dashboard data is showing different dimensions of the scrum projects and how each area is performing. There are more to measure but team has chosen these are the basic parameters which ensure project progress and guide them whenever there is any fault.
  • 14. 14|P a g e Productivity Improvement through Right Governance Figure 5: SCRUM project Dashboard Figure 6: this picture demonstrates about the areas where team can focus to improve the productivity. All these areas if not taken care properly can lead into execution efficiency bottleneck. It will increase the waste or rework. All these areas are the checkpoint for the productivity improvement journey. Productivity Improvement through Right Governance Figure 5: SCRUM project Dashboard icture demonstrates about the areas where team can focus to improve the productivity. All these areas if not taken care properly can lead into execution efficiency bottleneck. It will increase the waste or rework. All these areas productivity improvement journey. icture demonstrates about the areas where team can focus to improve the productivity. All these areas if not taken care properly can lead into execution efficiency bottleneck. It will increase the waste or rework. All these areas
  • 15. 15|P a g e Productivity Improvement through Right Governance Figure 6: Dashboard contents Figure 7: and Figure 8: is a typical dashboard for Quality Assurance team where every granular information has been displayed to take corrective steps wherever required. The pictures are sh are the bottlenecks. Productivity Improvement through Right Governance : is a typical dashboard for Quality Assurance team where every granular information has been displayed to take corrective steps wherever required. The pictures are showing how testing activities are performing and where : is a typical dashboard for Quality Assurance team where every granular information has been displayed to take corrective steps wherever owing how testing activities are performing and where
  • 16. 16|P a g e Productivity Improvement through Right Governance Figure 7: Dashboard for Quality Assurance Productivity Improvement through Right Governance Figure 7: Dashboard for Quality Assurance
  • 17. 17|P a g e Productivity Improvement through Right Governance Figure 8: Dashboard for Quality Assurance 2 Figure 9: Questionnaire can be used for Dashboard preparation. Effective and efficient questions based on the product, domain, business, organizational vision will help to prepare correct dashboard data. Every team should have data to assess themselves every decided frequency level Productivity Improvement through Right Governance Figure 8: Dashboard for Quality Assurance 2 : Questionnaire can be used for Dashboard preparation. Effective and uestions based on the product, domain, business, organizational vision will help to prepare correct dashboard data. Every team should have data to assess themselves every decided frequency level : Questionnaire can be used for Dashboard preparation. Effective and uestions based on the product, domain, business, organizational vision will help to prepare correct dashboard data. Every team should have data to assess
  • 18. 18|P a g e Productivity Improvement through Right Governance Figure 9: Checklist for Dashboard 2.5 Change Management Productivity is severely affected when there are many frequent change requests coming at the middle of the project execution cycle. Based on the priority team need to take up the change request and do the impact analysis. Teams need to measure the change trend and on increasing of the trend proper investigation and corrective steps are required. Productivity Improvement through Right Governance Figure 9: Checklist for Dashboard Change Management Productivity is severely affected when there are many frequent change requests coming at the middle of the project execution cycle. Based on the priority team need to take up the change request and do the impact analysis. Teams need to measure rend and on increasing of the trend proper investigation and corrective Productivity is severely affected when there are many frequent change requests coming at the middle of the project execution cycle. Based on the priority team need to take up the change request and do the impact analysis. Teams need to measure rend and on increasing of the trend proper investigation and corrective
  • 19. 19|P a g e Productivity Improvement through Right Governance Figure 10: Change management Dashboard Figure 10: is the change management tracking dashboard. It will provide information to all the stakeholders how many times should be done and scope change need to take care so that it does not affect productivity. Change is an essential part efficient project execution but same has to handle efficiently. Change process should be well tool. Changes improve the product but decrease motivation level in team. Frequent changes increase reworks and increase wastages if not manage with well thoughts and good process. 2.6 Requirement Management: The major consequence of requirement related problems are rework something again that team thought was already done. Rework can consume 30 to 50 percent of team’s total development cost (Boehm and Papaccio 1988) and requirements errors account for 70 to 85 percent of 1997). Track requirements status, stakeholders need to know the requirement status to predict the project progress. Review comments, review process, capturing the comments have to be through tool and process so that effort mi organizations are not losing any data in process. Version history has to track so that any given time any version of the document can be reproduce. The following quote from Fredrick Brooks illustrates why requirements are so important: Productivity Improvement through Right Governance Figure 10: Change management Dashboard : is the change management tracking dashboard. It will provide information to all the stakeholders how many times change has been requested. Impact analysis should be done and scope change need to take care so that it does not affect productivity. Change is an essential part efficient project execution but same has to handle efficiently. Change process should be well documented and tracked through tool. Changes improve the product but decrease motivation level in team. Frequent changes increase reworks and increase wastages if not manage with well thoughts Requirement Management: ence of requirement related problems are rework something again that team thought was already done. Rework can consume 30 to 50 percent of team’s total development cost (Boehm and Papaccio 1988) and requirements errors account for 70 to 85 percent of the rework cost (Leffingwell Track requirements status, stakeholders need to know the requirement status to predict the project progress. Review comments, review process, capturing the comments have to be through tool and process so that effort mi organizations are not losing any data in process. Version history has to track so that any given time any version of the document can be reproduce. The following quote from Fredrick Brooks illustrates why requirements are so important: : is the change management tracking dashboard. It will provide information change has been requested. Impact analysis should be done and scope change need to take care so that it does not affect productivity. Change is an essential part efficient project execution but same has to documented and tracked through tool. Changes improve the product but decrease motivation level in team. Frequent changes increase reworks and increase wastages if not manage with well thoughts ence of requirement related problems are rework—doing something again that team thought was already done. Rework can consume 30 to 50 percent of team’s total development cost (Boehm and Papaccio 1988) and the rework cost (Leffingwell Track requirements status, stakeholders need to know the requirement status to predict the project progress. Review comments, review process, capturing the comments have to be through tool and process so that effort minimizes and organizations are not losing any data in process. Version history has to track so that any given time any version of the document can be reproduce. The following quote
  • 20. 20|P a g e Productivity Improvement through Right Governance “The hardest part of building a software system is deciding precisely what to build. No other part of the conceptual work is as difficult as establishing the detailed technical requirements, including all of the interfaces to people, to machines, and to other software systems. No other part of the work so cripples the resulting system if done wrong. No other part is more difficult to rectify later” (Brooks 1995). To quote Karl Wiegers (2004), “If you don’t get the requirements right, it doesn’t matter how well you do anything else.” Figure 11: Requirement Management Dashboard Figure 11: Dashboard provides information to all the employees about the quality of the requirements and raise alarms if any change require for a requirement. Productivity Improvement through Right Governance rdest part of building a software system is deciding precisely what to build. No other part of the conceptual work is as difficult as establishing the detailed technical requirements, including all of the interfaces to people, to machines, and to tware systems. No other part of the work so cripples the resulting system if done wrong. No other part is more difficult to rectify later” (Brooks 1995). To quote Karl Wiegers (2004), “If you don’t get the requirements right, it doesn’t matter how Figure 11: Requirement Management Dashboard : Dashboard provides information to all the employees about the quality of the requirements and raise alarms if any change require for a requirement. rdest part of building a software system is deciding precisely what to build. No other part of the conceptual work is as difficult as establishing the detailed technical requirements, including all of the interfaces to people, to machines, and to tware systems. No other part of the work so cripples the resulting system if done wrong. No other part is more difficult to rectify later” (Brooks 1995). To quote Karl Wiegers (2004), “If you don’t get the requirements right, it doesn’t matter how : Dashboard provides information to all the employees about the quality of the requirements and raise alarms if any change require for a requirement.
  • 21. 21|P a g e Productivity Improvement through Right Governance 2.7 Benefit Realization: Figure 12: Benefit Measurement Mind map Any project execution should have Benefit Management and Measurement process against Benefits. Organization need to measure the learning’s which should be reused in next similar or related projects, as knowledge brin improvement and execution speed. Upper management support requires realizing the benefit effectively and capturing information for future. Resource availability and dependent project realization has to handle efficiently. Knowledge manageme should connect with benefit realization data. Leaders need to encourage team members for contributing and achieve the knowledge management related organizational goal. Figure 12: is the sample flow for Benefit measurement. Individual Program can come up with their own process flow for collecting the Benefit Management data and share with other team. Productivity Improvement through Right Governance Benefit Realization: Figure 12: Benefit Measurement Mind map Any project execution should have Benefit Management and Measurement process against Benefits. Organization need to measure the learning’s which should be reused in next similar or related projects, as knowledge brings productivity improvement and execution speed. Upper management support requires realizing the benefit effectively and capturing information for future. Resource availability and dependent project realization has to handle efficiently. Knowledge manageme should connect with benefit realization data. Leaders need to encourage team members for contributing and achieve the knowledge management related : is the sample flow for Benefit measurement. Individual Program can me up with their own process flow for collecting the Benefit Management data and Any project execution should have Benefit Management and Measurement process against Benefits. Organization need to measure the learning’s which should be gs productivity improvement and execution speed. Upper management support requires realizing the benefit effectively and capturing information for future. Resource availability and dependent project realization has to handle efficiently. Knowledge management data should connect with benefit realization data. Leaders need to encourage team members for contributing and achieve the knowledge management related : is the sample flow for Benefit measurement. Individual Program can me up with their own process flow for collecting the Benefit Management data and
  • 22. 22|P a g e Productivity Improvement through Right Governance 3.0 Conclusion Organizations need to create a culture where all team members would be eager to contribute for the organizational growth. Leaders have to communicate the organizational vision to all team members and build healthy, productive teams and the same team members will contribute for excellent stakeholder value generation. Leaders have to mentor, coach, communicate and build that culture into the blood of the system. At any given point of time any stakeholders wherever they involve should be able to know through metrics what is going on? How it is going on? Why it is like that? What steps are currently taken by whom? Expectation is: Total transparent system. Organization need time to reach that stage but continuous drive has to exist from all level and from all members. Every team members have to own the organizational vision, mission and culture and work for maximizing the productivity through innovation and maintain the speed of execution excellence. PMI has provided many guidelines for better project Governance. Effective governance plan and execution of the same for achieving the excellent result with continuous process improvement should be a part of organizational culture and same resultant into a great productivity improvement. Data driven decision making culture will help to minimize the waste reduction and improve productivity. Through systematic knowledge management organization can maximize productivity and measure improvement and demonstrate the same to stakeholders for excellent customer satisfaction. When each and every team member makes these practices as a habit and data driven decision making, data driven demonstration will be a part of communication agenda than only organization will demonstrate value to stakeholders. Organization can minimize several overheads and maximize the cost benefit if organization has dashboard with data for different dimensions for all the projects, products, units, divisions wherever applicable. Customer satisfaction will increase when we identify, collect, share the data on continuous basis and improve
  • 23. 23|P a g e Productivity Improvement through Right Governance the process and output by collecting feedback from various stakeholders. Organization has to look for data through governance framework for overproduction, waiting time, non-value added processing, under-utilized people, excess movement, over preparation etc. to take action and measure the productivity improvement journey. Finally by doing all the above mentioned metrics and measurement if organization can reduce execution cycle time with expected quality output by 20-30% it will create immense satisfaction to the investors.
  • 24. 24|P a g e Productivity Improvement through Right Governance About the author Mr. Chandan Lal Patary Currently working as Development Manager at ABB. applications across various domains and has successfully executed many Projects. Chandan has worked on domain like Healthcare, Aerospace, Building automation, Power automation under real time mission critical development. Chandan has 14 years of IT experience. He is certified PMP from 2008 and he is a Green Belt certified holder. Chandan is an agile practioner and Certified Scrum Master. Chandan holds a Bachelor’s Technology (NIT-Agartala) in Electrical Engineering. He has completed one year Executive General Management program from IIM Productivity Improvement through Right Governance Mr. Chandan Lal Patary Currently working as Development Manager at ABB. He has deep experience in developing Software applications across various domains and has successfully executed many Projects. Chandan has worked on domain like Healthcare, Aerospace, Building automation, Power automation under real time mission critical product development to large scale application development. Chandan has 14 years of IT experience. He is certified PMP from 2008 and he is a Green Belt certified holder. Chandan is an agile practioner and Certified Scrum Master. Chandan holds a Bachelor’s from National Institute of Agartala) in Electrical Engineering. He has completed one year Executive General Management program from IIM-Bangalore in 2007. Mr. Chandan Lal Patary Currently working as Development He has deep experience in developing Software applications across various domains and has successfully executed many Projects. Chandan has worked on domain like Healthcare, Aerospace, Building automation, Power automation product development to large scale application development. Chandan has 14 years of IT experience. He is certified PMP from 2008 and he is a Green Belt certified holder. Chandan is an agile practioner and from National Institute of Agartala) in Electrical Engineering. He has completed one year Bangalore in 2007.