ATM Improvement Project

  Andrew Phillips, MBA, SSMBB
Project Charter
• To find ways to improve the development and
  release of XFS base software.
• To measure the cost of poor quality ATM
  software.
• To measure, analysis, improve and control the
  delivery and implementation of ATM software.
Cost of poor quality
• A recent study of 4 defects for one of our major
  customers showed that to correct these defects was 3
  millions dollars for an average of $750,000 per defect.
• At a average of a little over 20 defects per month.
  These defects for this one customer cost a total of 183
  million dollars. Even if you calculate that the cost for
  these defects is highly skewed by 80% the cost for this
  one customer is still 36.6 million dollars. This
  customer represents. About 20% of ATM in the US so
  we are looking at a total cost of over 183 million dollars
  per year.
Current Process
Defects Analysis
•   monthly defects for the past year
•   32,6,39,5,35,5,12,32,34,14,13,17

•   Descriptive Statistics: monthly defects

•   Variable    N N* Mean SE Mean StDev Minimum Q1 Median Q3
•   monthly defects 12 0 20.33 3.77 13.05 5.00 7.50 15.50 33.50

•   Variable    Maximum
•   monthly defects 39.00

•   Goodness-of-Fit Test for Poisson Distribution

•   Data column: monthly defects

•   Poisson mean for monthly defects = 20.3333

•   monthly        Poisson       Contribution
•   defects Observed Probability Expected to Chi-Sq
•   <=17      7 0.272352 3.26822         4.261
•   18 - 23    0 0.492305 5.90766        5.908
•   24 - 31    0 0.225285 2.70342        2.703
•   >=32      5 0.010058 0.12070        197.250


•   N N* DF Chi-Sq P-Value
•   12 0 2 210.122 0.000
Control Charts
Analysis of Data
• Chi-Squared test shows the expected data
  does not fit the observe data. This means that
  even though the control chart shows a process
  in control it is not in control.
• Goal is to reduce defects by 75%. Reduce the
  average defects by an average of 20 to an
  average of 5
• This will save $137,250,00 per year.
Improve Process
• Increase a system test on top 20% of integration
  system before base software is released. This should
  reduce defects by 50%. We can pass this cost on to the
  customer by reducing the trips to ATM and downtime.
• Increase communication by users and developers by
  having user groups 3-4 times a year. This should
  reduce defects 10%
• Conduct a monthly defect meeting. XFS developers
  and integrators can communicate fixes. This can be a
  SharePoint site. This should reduce defects by 15%.
New Process
Total Annual Savings


Total cost of defects                  $183,000,000.00

Total savings                          $137,250,000.00




Cost of defects after changes           $45,750,000.00

Cost on changes                           2,500,000.00



Total Annual savings                   $134,750,000.00

More Related Content

Viewers also liked

Easy iPad Projects for Elementary Students
Easy iPad Projects for Elementary StudentsEasy iPad Projects for Elementary Students
Easy iPad Projects for Elementary StudentsKaren Bosch
 
automated teller machines
automated teller  machinesautomated teller  machines
automated teller machinestejinderubs
 
A T M (Automated Teller Machine)
A T M (Automated Teller Machine)A T M (Automated Teller Machine)
A T M (Automated Teller Machine)Networking
 
ATM System Description and functional and non- functional Requirements
ATM System Description and functional and non- functional RequirementsATM System Description and functional and non- functional Requirements
ATM System Description and functional and non- functional Requirementswajahat Gul
 
10 Slides to ATM
10 Slides to ATM10 Slides to ATM
10 Slides to ATMseanraz
 

Viewers also liked (9)

Easy iPad Projects for Elementary Students
Easy iPad Projects for Elementary StudentsEasy iPad Projects for Elementary Students
Easy iPad Projects for Elementary Students
 
Atm (bm)
Atm (bm)Atm (bm)
Atm (bm)
 
Ppt on atm machine
Ppt on atm machinePpt on atm machine
Ppt on atm machine
 
automated teller machines
automated teller  machinesautomated teller  machines
automated teller machines
 
ATM Banking
ATM BankingATM Banking
ATM Banking
 
A T M (Automated Teller Machine)
A T M (Automated Teller Machine)A T M (Automated Teller Machine)
A T M (Automated Teller Machine)
 
ATM System Description and functional and non- functional Requirements
ATM System Description and functional and non- functional RequirementsATM System Description and functional and non- functional Requirements
ATM System Description and functional and non- functional Requirements
 
10 Slides to ATM
10 Slides to ATM10 Slides to ATM
10 Slides to ATM
 
Atm System
Atm SystemAtm System
Atm System
 

Similar to ATM Improvement Project Cost Savings

Addressing the High Cost of Quality
Addressing the High Cost of QualityAddressing the High Cost of Quality
Addressing the High Cost of QualityEase Inc.
 
Six Sigma- Define & Measure_Sudhanshu.pdf
Six Sigma- Define & Measure_Sudhanshu.pdfSix Sigma- Define & Measure_Sudhanshu.pdf
Six Sigma- Define & Measure_Sudhanshu.pdfSudhanshuMittal20
 
Unleashing the Enormous Power of Service Desk KPIs
Unleashing the Enormous Power of Service Desk KPIsUnleashing the Enormous Power of Service Desk KPIs
Unleashing the Enormous Power of Service Desk KPIsMetricNet
 
IT Financial Management Series - Part 3: Drive Financial Transparency Across ...
IT Financial Management Series - Part 3: Drive Financial Transparency Across ...IT Financial Management Series - Part 3: Drive Financial Transparency Across ...
IT Financial Management Series - Part 3: Drive Financial Transparency Across ...UMT
 
Critical Checks for Pharmaceuticals and Healthcare: Validating Your Data Inte...
Critical Checks for Pharmaceuticals and Healthcare: Validating Your Data Inte...Critical Checks for Pharmaceuticals and Healthcare: Validating Your Data Inte...
Critical Checks for Pharmaceuticals and Healthcare: Validating Your Data Inte...Minitab, LLC
 
Improving Quality in the Supply Chain
Improving Quality in the Supply ChainImproving Quality in the Supply Chain
Improving Quality in the Supply ChainNext Level Purchasing
 
Man op tugas 1 ex business process reengineering
Man op tugas 1 ex business process reengineeringMan op tugas 1 ex business process reengineering
Man op tugas 1 ex business process reengineeringAninda Maharani
 
Understanding Managed Print Services
Understanding Managed Print ServicesUnderstanding Managed Print Services
Understanding Managed Print ServicesRJYoungCompany
 
Effective Cost Measurement through DMAIC.
Effective Cost Measurement through DMAIC.Effective Cost Measurement through DMAIC.
Effective Cost Measurement through DMAIC.Kaustav Lahiri
 
[Webinar] Unveiling the Benefits of Accounts Payable with The Institute of Fi...
[Webinar] Unveiling the Benefits of Accounts Payable with The Institute of Fi...[Webinar] Unveiling the Benefits of Accounts Payable with The Institute of Fi...
[Webinar] Unveiling the Benefits of Accounts Payable with The Institute of Fi...Anybill
 
The metrics that matter using scalability metrics for project planning of a d...
The metrics that matter using scalability metrics for project planning of a d...The metrics that matter using scalability metrics for project planning of a d...
The metrics that matter using scalability metrics for project planning of a d...Mary Chan
 
Statistical Process Control & Operations Management
Statistical Process Control & Operations ManagementStatistical Process Control & Operations Management
Statistical Process Control & Operations Managementajithsrc
 
Six_Sigma_Report_Template_v2 (2).pptx
Six_Sigma_Report_Template_v2 (2).pptxSix_Sigma_Report_Template_v2 (2).pptx
Six_Sigma_Report_Template_v2 (2).pptxPhngPhmTrung
 
Green sunlight final presentation
Green sunlight final presentationGreen sunlight final presentation
Green sunlight final presentation효종 남
 
Sales and Use Tax Process - Benchmarks and Best Practices for Manufacturers
Sales and Use Tax Process - Benchmarks and Best Practices for ManufacturersSales and Use Tax Process - Benchmarks and Best Practices for Manufacturers
Sales and Use Tax Process - Benchmarks and Best Practices for ManufacturersSovos
 
Innovize it for_db2_empowering the dba_april_2016
Innovize it for_db2_empowering the dba_april_2016Innovize it for_db2_empowering the dba_april_2016
Innovize it for_db2_empowering the dba_april_2016Eliezer Harkavi
 
Financial Statement Analysis
Financial Statement AnalysisFinancial Statement Analysis
Financial Statement AnalysisFaisal Hayat
 

Similar to ATM Improvement Project Cost Savings (20)

Addressing the High Cost of Quality
Addressing the High Cost of QualityAddressing the High Cost of Quality
Addressing the High Cost of Quality
 
Six Sigma- Define & Measure_Sudhanshu.pdf
Six Sigma- Define & Measure_Sudhanshu.pdfSix Sigma- Define & Measure_Sudhanshu.pdf
Six Sigma- Define & Measure_Sudhanshu.pdf
 
PayUp Insurance Charter (2)
PayUp Insurance Charter (2)PayUp Insurance Charter (2)
PayUp Insurance Charter (2)
 
Unleashing the Enormous Power of Service Desk KPIs
Unleashing the Enormous Power of Service Desk KPIsUnleashing the Enormous Power of Service Desk KPIs
Unleashing the Enormous Power of Service Desk KPIs
 
IT Financial Management Series - Part 3: Drive Financial Transparency Across ...
IT Financial Management Series - Part 3: Drive Financial Transparency Across ...IT Financial Management Series - Part 3: Drive Financial Transparency Across ...
IT Financial Management Series - Part 3: Drive Financial Transparency Across ...
 
Critical Checks for Pharmaceuticals and Healthcare: Validating Your Data Inte...
Critical Checks for Pharmaceuticals and Healthcare: Validating Your Data Inte...Critical Checks for Pharmaceuticals and Healthcare: Validating Your Data Inte...
Critical Checks for Pharmaceuticals and Healthcare: Validating Your Data Inte...
 
Improving Quality in the Supply Chain
Improving Quality in the Supply ChainImproving Quality in the Supply Chain
Improving Quality in the Supply Chain
 
Man op tugas 1 ex business process reengineering
Man op tugas 1 ex business process reengineeringMan op tugas 1 ex business process reengineering
Man op tugas 1 ex business process reengineering
 
Understanding Managed Print Services
Understanding Managed Print ServicesUnderstanding Managed Print Services
Understanding Managed Print Services
 
Effective Cost Measurement through DMAIC.
Effective Cost Measurement through DMAIC.Effective Cost Measurement through DMAIC.
Effective Cost Measurement through DMAIC.
 
Lean vs six sigma -jk
Lean vs six sigma  -jkLean vs six sigma  -jk
Lean vs six sigma -jk
 
[Webinar] Unveiling the Benefits of Accounts Payable with The Institute of Fi...
[Webinar] Unveiling the Benefits of Accounts Payable with The Institute of Fi...[Webinar] Unveiling the Benefits of Accounts Payable with The Institute of Fi...
[Webinar] Unveiling the Benefits of Accounts Payable with The Institute of Fi...
 
The metrics that matter using scalability metrics for project planning of a d...
The metrics that matter using scalability metrics for project planning of a d...The metrics that matter using scalability metrics for project planning of a d...
The metrics that matter using scalability metrics for project planning of a d...
 
Statistical Process Control & Operations Management
Statistical Process Control & Operations ManagementStatistical Process Control & Operations Management
Statistical Process Control & Operations Management
 
The SID
The SIDThe SID
The SID
 
Six_Sigma_Report_Template_v2 (2).pptx
Six_Sigma_Report_Template_v2 (2).pptxSix_Sigma_Report_Template_v2 (2).pptx
Six_Sigma_Report_Template_v2 (2).pptx
 
Green sunlight final presentation
Green sunlight final presentationGreen sunlight final presentation
Green sunlight final presentation
 
Sales and Use Tax Process - Benchmarks and Best Practices for Manufacturers
Sales and Use Tax Process - Benchmarks and Best Practices for ManufacturersSales and Use Tax Process - Benchmarks and Best Practices for Manufacturers
Sales and Use Tax Process - Benchmarks and Best Practices for Manufacturers
 
Innovize it for_db2_empowering the dba_april_2016
Innovize it for_db2_empowering the dba_april_2016Innovize it for_db2_empowering the dba_april_2016
Innovize it for_db2_empowering the dba_april_2016
 
Financial Statement Analysis
Financial Statement AnalysisFinancial Statement Analysis
Financial Statement Analysis
 

More from parsigma

Andrew Phillips Resume July 2016 LEAN
Andrew Phillips Resume July 2016 LEANAndrew Phillips Resume July 2016 LEAN
Andrew Phillips Resume July 2016 LEANparsigma
 
Andrew phillips resume july 2016 lean
Andrew phillips resume july 2016 leanAndrew phillips resume july 2016 lean
Andrew phillips resume july 2016 leanparsigma
 
Andrew Phillips Resume July 2016
Andrew Phillips Resume July  2016Andrew Phillips Resume July  2016
Andrew Phillips Resume July 2016parsigma
 
Andrew Phillips Resume February 2016
Andrew Phillips Resume February 2016Andrew Phillips Resume February 2016
Andrew Phillips Resume February 2016parsigma
 
Andrew Phillips Rresume February 2016
Andrew Phillips Rresume February 2016Andrew Phillips Rresume February 2016
Andrew Phillips Rresume February 2016parsigma
 
Andrew phillips resume february 2016
Andrew phillips resume february 2016Andrew phillips resume february 2016
Andrew phillips resume february 2016parsigma
 
Andrew phillips resume jan102013
Andrew phillips resume  jan102013Andrew phillips resume  jan102013
Andrew phillips resume jan102013parsigma
 
Wait time reduction
Wait time reductionWait time reduction
Wait time reductionparsigma
 

More from parsigma (8)

Andrew Phillips Resume July 2016 LEAN
Andrew Phillips Resume July 2016 LEANAndrew Phillips Resume July 2016 LEAN
Andrew Phillips Resume July 2016 LEAN
 
Andrew phillips resume july 2016 lean
Andrew phillips resume july 2016 leanAndrew phillips resume july 2016 lean
Andrew phillips resume july 2016 lean
 
Andrew Phillips Resume July 2016
Andrew Phillips Resume July  2016Andrew Phillips Resume July  2016
Andrew Phillips Resume July 2016
 
Andrew Phillips Resume February 2016
Andrew Phillips Resume February 2016Andrew Phillips Resume February 2016
Andrew Phillips Resume February 2016
 
Andrew Phillips Rresume February 2016
Andrew Phillips Rresume February 2016Andrew Phillips Rresume February 2016
Andrew Phillips Rresume February 2016
 
Andrew phillips resume february 2016
Andrew phillips resume february 2016Andrew phillips resume february 2016
Andrew phillips resume february 2016
 
Andrew phillips resume jan102013
Andrew phillips resume  jan102013Andrew phillips resume  jan102013
Andrew phillips resume jan102013
 
Wait time reduction
Wait time reductionWait time reduction
Wait time reduction
 

ATM Improvement Project Cost Savings

  • 1. ATM Improvement Project Andrew Phillips, MBA, SSMBB
  • 2. Project Charter • To find ways to improve the development and release of XFS base software. • To measure the cost of poor quality ATM software. • To measure, analysis, improve and control the delivery and implementation of ATM software.
  • 3. Cost of poor quality • A recent study of 4 defects for one of our major customers showed that to correct these defects was 3 millions dollars for an average of $750,000 per defect. • At a average of a little over 20 defects per month. These defects for this one customer cost a total of 183 million dollars. Even if you calculate that the cost for these defects is highly skewed by 80% the cost for this one customer is still 36.6 million dollars. This customer represents. About 20% of ATM in the US so we are looking at a total cost of over 183 million dollars per year.
  • 5. Defects Analysis • monthly defects for the past year • 32,6,39,5,35,5,12,32,34,14,13,17 • Descriptive Statistics: monthly defects • Variable N N* Mean SE Mean StDev Minimum Q1 Median Q3 • monthly defects 12 0 20.33 3.77 13.05 5.00 7.50 15.50 33.50 • Variable Maximum • monthly defects 39.00 • Goodness-of-Fit Test for Poisson Distribution • Data column: monthly defects • Poisson mean for monthly defects = 20.3333 • monthly Poisson Contribution • defects Observed Probability Expected to Chi-Sq • <=17 7 0.272352 3.26822 4.261 • 18 - 23 0 0.492305 5.90766 5.908 • 24 - 31 0 0.225285 2.70342 2.703 • >=32 5 0.010058 0.12070 197.250 • N N* DF Chi-Sq P-Value • 12 0 2 210.122 0.000
  • 7. Analysis of Data • Chi-Squared test shows the expected data does not fit the observe data. This means that even though the control chart shows a process in control it is not in control. • Goal is to reduce defects by 75%. Reduce the average defects by an average of 20 to an average of 5 • This will save $137,250,00 per year.
  • 8. Improve Process • Increase a system test on top 20% of integration system before base software is released. This should reduce defects by 50%. We can pass this cost on to the customer by reducing the trips to ATM and downtime. • Increase communication by users and developers by having user groups 3-4 times a year. This should reduce defects 10% • Conduct a monthly defect meeting. XFS developers and integrators can communicate fixes. This can be a SharePoint site. This should reduce defects by 15%.
  • 10. Total Annual Savings Total cost of defects $183,000,000.00 Total savings $137,250,000.00 Cost of defects after changes $45,750,000.00 Cost on changes 2,500,000.00 Total Annual savings $134,750,000.00