SlideShare ist ein Scribd-Unternehmen logo
1 von 53
Downloaden Sie, um offline zu lesen
MBA, PMP, B.Sc.(Civil Eng.) : PMO manager EWU-DIU omeralsayed@yahoo.com +249-1234 94 587
the processes necessary to purchase (or selling) or acquire products, services, or 
results needed from outside the project team. 
the contract management & change control processes required to develop & 
administer contracts or purchase orders.
controlling any contract issued by an outside organization (the buyer) that is acquiring 
deliverables from the project from the performing organization (the seller), and 
administering contractual obligations placed on the project team by the contract.
•documenting project procurement decisions, specifying the approach, and identifying potential sellers.
12.1 Plan Procurement Management
•obtaining seller responses, selecting a seller, and awarding a contract.
12.2 Conduct Procurements
•managing procurement relationships, monitoring contract performance, and making changes and 
corrections as appropriate.
12.3 Control Procurements
•completing each project procurement.
12.4 Close Procurements
• Contracts :
• legal documents between a buyer and a seller
• represents a mutually binding agreement that 
obligates :
• Contracts :
• legal documents between a buyer and a seller
• represents a mutually binding agreement that 
obligates :
Agreements (simple 
or complex), 
including :
the seller:
• to provide 
something of value 
the seller:
• to provide 
something of value 
the buyer :
• to provide monetary 
or other valuable 
compensation. 
the buyer :
• to provide monetary 
or other valuable 
compensation. 
Agreement Understanding
Subcontract
purchase 
order.
• a contractor, subcontractor, vendor, service provider, 
or supplier. 
• a contractor, subcontractor, vendor, service provider, 
or supplier. the seller :
• A client, customer, prime contractor, contractor, 
acquiring organization, service requestor, or purchaser. 
• A client, customer, prime contractor, contractor, 
acquiring organization, service requestor, or purchaser. the buyer:
BIDDER
SELECTED 
SOURCE
VENDOR
BUY & SELL 
if the acquisition is not just for shelf material, 
goods, or common products. In such cases:
The buyer becomes the customer, and is thus 
a key project stakeholder for the seller.
PROJECT
The seller’s project management team is concerned 
with all the processes of project management, not 
only with those of this Knowledge Area.
Terms and conditions of the contract become key 
inputs to many of the seller’s management 
processes.
it is assumed that :
◦ the buyer of an item for the project is assigned to 
the project team 
◦ the seller is organizationally external to the project 
team
setting a FIXED TOTAL PRICE for a defined product to be provided. 
May incorporate FINANCIAL INCENTIVES for achieving or exceeding 
selected project objectives
Sellers are legally obligated to complete such contracts, with 
possible financial damages if they do not. 
buyers need to PRECISELY SPECIFY the product or services being 
procured.
CHANGES in scope may be accommodated, with an INCREASE in 
contract PRICE.
1. Fixed‐price
2. Cost 
reimbursable. 
3. Time and 
Materials
the price :the price :
NOT subject to change 
unless the scope of work changes. 
Any cost increase due to 
adverse performance 
responsibility 
of the seller.
the buyer should 
precisely 
specify the 
product or
any changes to the 
specification 
can increase 
the costs to 
the buyer
gives the buyer and seller some flexibility in that
it allows for deviation 
from performance, 
with financial 
incentives tied to 
achieving agreed 
upon metrics. 
Typically such financial 
incentives are related to
cost, schedule, or 
technical performance 
of the seller. 
Performance targets are 
established at the outset, 
and the final contract 
price is determined 
after completion of all 
work based on the 
seller’s performance
Under FPIF contracts, a price ceiling is set, and all costs above the price ceiling are the 
responsibility of the seller, who is obligated to complete the work.
This contract type is used whenever the.
It is a fixed‐price 
contract, 
• but with a special provision 
allowing for pre 
defined
• final adjustments to the 
contract price 
due to changed 
conditions
• (inflation changes, or cost 
increases/decreases). 
needs to relate to some reliable financial index, to precisely adjust the final price.
intended to protect both buyer and seller from external conditions beyond their control
involves payments (cost reimbursements) to the seller for all legitimate actual costs incurred 
for completed work, plus a fee representing seller profit.
Three of the more common types of cost‐reimbursable contracts in use are 
Cost Plus Fixed Fee 
(CPFF)
Cost Plus Incentive 
Fee (CPIF)
Cost Plus Award 
Fee (CPAF).
a hybrid type of contractual arrangement that contain aspects of both cost‐reimbursable and 
fixed‐price contracts. 
•when a precise statement of work cannot be quickly prescribed. 
used for staff augmentation, acquisition 
of experts, and any outside support
•can be left open ended and may be subject to a cost increase for the buyer.resemble cost‐reimbursable contracts in
•Thus, T&M contracts can increase in contract value as if they were cost 
reimbursable
The full value and the exact quantity 
may not be defined at begging
•to prevent unlimited cost growth. 
Many organizations require not‐to‐
exceed values and time limits
(T&M)
CPPC
Cost + % 
of Cost
CPFF
Cost + 
Fixed 
Fee CPIF
Cost + 
Incentive 
Fee
FPI
Fixed 
Price 
Incentive
FFP
Firm 
Fixed 
price
SELLER‐RISKBuyer Risk
Inputs
Project management plan
Requirements
documentation
Risk register
Activity resource
requirements
Project schedule
Activity cost estimates
Stakeholder register
Enterprise environmental
factors
Organizational process
assets
Tools&Techniques
Make-or-buy analysis
Expert judgment
Market research
Meetings
Outputs
Procurement
management plan
Procurement statement of
work
Procurement documents
Source selection criteria
Make-or-buy decisions
Change requests
Project documents
updates
• Project scope statement, WBS, WBS Dictionary• Project scope statement, WBS, WBS Dictionary
12.1.1.1 Project Management Plan
• Important information about project requirements.
• Requirements with contractual and legal implications (HSE, performance, 
insurance, intellectual property rights, equal employment opportunity, licenses, 
and permits).
• Important information about project requirements.
• Requirements with contractual and legal implications (HSE, performance, 
insurance, intellectual property rights, equal employment opportunity, licenses, 
and permits).
12.1.1.2 Requirements Documentation
• provides the list of risks, along with the results of risk analysis and risk response 
planning.
• provides the list of risks, along with the results of risk analysis and risk response 
planning.
12.1.1.3 Risk Register
• contain information on specific needs such as people, equipment, or location.• contain information on specific needs such as people, equipment, or location.
12.1.1.4 Activity Resource Requirements
• contains information on required timelines or mandated deliverable dates.• contains information on required timelines or mandated deliverable dates.
12.1.1.5 Project Schedule
• Cost estimates developed by the procuring activity are used to evaluate the 
reasonableness of the bids or proposals received from potential sellers.
• Cost estimates developed by the procuring activity are used to evaluate the 
reasonableness of the bids or proposals received from potential sellers.
12.1.1.6 Activity Cost Estimates
• provides details on the project participants and their interests in the project.• provides details on the project participants and their interests in the project.
12.1.1.7 Stakeholder Register
•Marketplace conditions;
•Products, services, and results that are available in the marketplace;
•Suppliers, including past performance or reputation;
•Typical terms and conditions for products, services, and results or for the specific industry; and
•Unique local requirements.
•Marketplace conditions;
•Products, services, and results that are available in the marketplace;
•Suppliers, including past performance or reputation;
•Typical terms and conditions for products, services, and results or for the specific industry; and
•Unique local requirements.
12.1.1.8 Enterprise Environmental Factors
•Formal procurement policies, procedures, and guidelines. Most organizations have formal 
procurement
•policies and buying organizations. When such procurement support is not available, the project 
team should supply both the resources and the expertise to perform such procurement 
activities.
•Management systems that are considered in developing the procurement management plan 
and selecting the contractual relationships to be used.
•An established multi‐tier supplier system of prequalified sellers based on prior experience
•Formal procurement policies, procedures, and guidelines. Most organizations have formal 
procurement
•policies and buying organizations. When such procurement support is not available, the project 
team should supply both the resources and the expertise to perform such procurement 
activities.
•Management systems that are considered in developing the procurement management plan 
and selecting the contractual relationships to be used.
•An established multi‐tier supplier system of prequalified sellers based on prior experience
12.1.1.9 Organizational Process Assets
to determine whether particular work can best 
◦ be accomplished by the project team 
◦ or should be purchased from outside sources. 
existing capability may be committed to working on other
Budget 
constraints. 
Purchase or 
Lease. 
Make‐or‐Buy 
analysis 
Direct 
/indirect 
costs. 
Available 
contract
Risk sharing
12.1.2.2 Expert Judgment
• to assess the inputs to and 
outputs. 
• to develop proposals 
evaluate criteria
• services of legal staff.
12.1.2.3 Market Research
• examination of industry 
and specific vendor 
capabilities. 
• leverage information 
gained at conferences, to 
identify market 
capabilities.
• refine particular objectives 
to leverage maturing 
technologies while 
balancing risks.
12.1.2.4 Meetings
• In addition to Research 
meetings with potential 
bidders
• provide specific 
information to formulate 
a procurement strategy 
Types of contracts  Risk management issues;
independent estimates 
used/evaluation criteria;
team responsibilities
Standardized 
procurement documents
Managing multiple 
suppliers;
Coordinating 
procurement with other
constraints and 
assumptions 
long lead times
make‐or‐buy decisions & 
linking to Estimate 
Schedule
deliverables scheduled 
dates 
performance 
bonds/insurance (risk)
sellers WBS guides
Form/format 
procurement/contract 
SOW
Identifying prequalified 
sellers
Procurement metrics
 how goods and services will be acquired from outside.
 how the procurement processes will be managed from developing procurement documents through contract closure.
to be clear, complete, and concise.Written
any collateral services requireddescription of 
there are specific content and format In some application areas
develop from the project scope baseline and defines related contract scope. 
describes the procurement item in sufficient detail >> prospective sellers capable ?.
specifications
quantity 
desired
quality levels
performance 
data
period of 
performance
work location
other 
requirements.
selection decision based on price (commercial or standard 
items)
tender, or quotation 
other considerations (technical capability or approach). 
proposal 
request for 
information 
(RFI), 
invitation for 
bid (IFB),
request for 
proposal 
(RFP),
Request for 
quotation 
(RFQ), 
tender notice, 
invitation for 
negotiation, 
invitation for 
seller’s initial 
response. 
ONLY THE PURCHASE PRICE
if the procurement item is READILY available 
from a number of acceptable sellers. 
Purchase price = cost of the item + all ancillary 
expenses (delivery).
OTHER SELECTION CRITERIA
Understanding 
of need
Overall or life‐
cycle cost
Technical 
capability. 
Risk. 
Management 
approach. 
Technical 
approach. 
Warranty. 
Financial 
capacity
Production 
capacity and 
interest. 
Business size 
and type
Past 
performance 
of sellers. 
References. 
Intellectual 
property 
rights. 
Proprietary 
rights.
• whether particular work can best be accomplished by the project team or needs to be purchased 
from outside sources
12.1.3.5 Make‐or‐Buy Decisions
• A decision that involves procuring goods, services, or resources typically requires a change request.
12.1.3.6 Change Requests
• Requirements documentation,
• Requirements traceability matrix, and
• Risk register.
12.1.3.7 Project Documents Updates
Inputs
Procurement 
management plan
Procurement documents
Source selection criteria
Seller proposals
Project documents
Make‐or‐buy decisions
Procurement statement 
of work
Organizational process 
assets
Tools&Techniques
Bidder conference
Proposal evaluation 
techniques
Independent estimates
Expert judgment
Advertising
Analytical techniques
Procurement 
negotiations
Outputs
Selected sellers
Agreements
Resource calendars
Change requests
Project management plan 
updates
Project documents 
updates
•how the procurement processes will be managed from developing procurement documentation 
through contract closure.
•how the procurement processes will be managed from developing procurement documentation 
through contract closure.
12.2.1.1 Procurement Management Plan
•provide an audit trail for contracts and other agreements.•provide an audit trail for contracts and other agreements.
12.2.1.2 Procurement Documents
•include information on the supplier’s required capabilities, capacity, delivery dates, product 
cost, life‐cycle cost, technical expertise, and the approach to the contract.
•include information on the supplier’s required capabilities, capacity, delivery dates, product 
cost, life‐cycle cost, technical expertise, and the approach to the contract.
12.2.1.3 Source Selection Criteria
•form the basic information that will be used by an evaluation body to select one or more 
successful bidders (sellers).
•form the basic information that will be used by an evaluation body to select one or more 
successful bidders (sellers).
12.2.1.4 Seller Proposals
12.2.1.5 Project 
Documents
• the risk‐related 
contract decisions 
included within the risk 
register.
12.2.1.6 Make‐or‐Buy 
Decisions
• Factors that influence 
make‐or‐buy decisions 
may include:
12.2.1.7 Procurement 
Statement of Work
• provides suppliers with 
a clearly stated set of 
goals, requirements, 
and outcomes. 
• critical component of 
the procurement
• can be modified as 
needed until a final 
agreement is in place. 
• may include:
Core 
capabilities
Core 
capabilities
Value delivered 
by vendors
Value delivered 
by vendors
Risks cost‐
effective 
manner
Risks cost‐
effective 
manner
Capability 
internally vs. 
vendor
Capability 
internally vs. 
vendor
Specifications
Quantity 
desired,
Quality levels,
Performance 
data,
Period of 
performance,
Work location
Other 
requirements.
Contractor/vendor/pre‐bid conferences
meetings between the buyer & All prospective sellers 
a CLEAR AND 
COMMON 
UNDERSTANDING
of requirements
no bidders receive 
PREFERENTIAL
treatment. 
hear EVERY
question and every 
answer.
collecting 
questions from 
bidders 
arranging field 
visits
Pre‐Defined weighted criteria
seller responses
formal evaluation*
source selection
Adherence to submittal format 
described in the RFP.
Professional/technical 
competence 
Record of past performance.
Capabilities to meet required 
schedules and standards.
Approach to work.
Selection criteria
*12.2.2.4 Expert Judgment
Accomplished by a multi‐discipline review team 
(contracting, legal, finance, AC, ENG, R&D, etc.)
Org. independent estimate/outside 
professional estimator
proposed responses. 
Significant differences 
procurement SOW 
:deficient, ambiguous, 
and/or prospective 
sellers misunderstood 
/failed to respond fully to 
the procurement SOW
identify the readiness of a vendor 
to provide the desired end state,
determine the cost expected to support budgeting, 
avoid cost overruns due to changes. 
clarify the structure, requirements, and 
other terms of the purchases to be reflected 
in Final contract.
responsibilities, 
authority to make 
changes, 
applicable terms and 
governing law,
technical and business 
management approaches, 
proprietary rights, 
contract financing, 
technical solutions, 
Overall schedule, 
payments, and price. 
The project manager &PM team may provide assistance, and,
if needed, to add clarification of the project’s technical, quality,
and management requirements.
• to be in a competitive range based upon the proposal or bid 
evaluation, 
judged 
• a draft contract that will become the actual contract when 
an award is made. 
negotiated 
• of all complex, high‐value, high‐risk procurements prior to 
award.
Final senior management approval 
A procurement agreement includes terms and conditions, and 
other items.
Mutually binding legal agreement that obligates:
understanding
Contract/
subcontract
purchase order
Statement of work or deliverables,
Schedule baseline,
Performance reporting,
Period of performance,
Roles and responsibilities,
Seller’s place of performance,
Pricing,
Payment terms,
Place of delivery,
Inspection and acceptance criteria,
Warranty,
Product support,
Limitation of liability,
Fees and retainer,
Penalties,
Incentives,
Insurance and performance bonds,
Subordinate subcontractor approvals,
Change request handling, 
Termination clause and alternative
INPUTS
Project management 
plan
Procurement 
documents
Agreements
Approved change 
requests
Work performance 
reports
Work performance 
data
T&T
Contract change 
control system
Procurement 
performance reviews
Inspections and audits
Performance reporting
Payment systems
Claims administration
Records management 
system
OUTPUTS
Work performance 
information
Change requests
Project management 
plan updates
Project documents 
updates
Organizational process 
assets updates
• To authorize the seller’s work at the appropriate time.
Direct and Manage Project 
Work. 
• To inspect and verify the adequacy of the seller’s product.Control Quality. 
• To assure that changes are properly approved and that all those with 
a need to know are aware of such changes.
Perform Integrated Change 
Control. 
• To ensure that risks are mitigated.Control Risks. 
• monitoring payments to the seller.financial management 
12.3.1.1 Project 
Management Plan 
• how the procurement processes will be managed
12.3.1.2 Procurement 
Documents
• supporting records for administration of the procurement 
(contract awards and pSOW)
12.3.1.3 Agreements
• understandings between parties, including understanding of the 
duties of each party.
12.3.1.4 Approved 
Change Requests
• modifications to the terms and conditions (pSOW, pricing, 
descriptions of the products)
12.3.1.5 Work 
Performance Reports
• Technical documentation & Work performance information
12.3.1.6 Work 
Performance Data
• Quality standards satisfied, costs incurred invoices paid.
defines the process by which the procurement can be modified. 
structured review of the seller’s progress to deliver project scope and quality, 
within cost and on schedule, as compared to the contract.
review of 
seller‐prepared 
documentation 
buyer inspections quality audits conducted
performance review objective :
to identify performance
• successes or failures, progress with respect 
to the pSOW, and contract noncompliance
allow the buyer to quantify
• the seller’s demonstrated ability or inability 
to perform work. 
• verify compliance in the seller’s work processes or deliverables. 
12.3.2.3 Inspections and Audits 
• supplied by sellers ,evaluated against the agreement requirements &reported to provides 
information about how effectively the seller is achieving the contractual objectives.
12.3.2.4 Performance Reporting
• processed accordance with the terms of the contract by the accounts payable system 
after certification of satisfactory work by an authorized person on the project team. 
12.3.2.5 Payment Systems
Contested changes & potential constructive changes (claims, disputes, or appeals)Contested changes & potential constructive changes (claims, disputes, or appeals)
the buyer and seller cannot reach an agreement on compensation for the change 
cannot agree that a change has occurred. 
Documented Processed Monitored
managed 
accordance to 
the terms of 
the contract. 
If not 
Alternative 
Dispute 
Resolution 
(ADR)
used by the project manager used by the project manager 
to manage contract and procurement documentation and records. 
It consists of :
a specific set of processes,  related control functions, 
Automation tools
retrievable archive of contract 
documents and correspondence
PMIS
• to support later claims or new procurements. 
provides a basis for identification of current or potential problems 
• supports improved forecasting, risk management, and decision making. 
increases knowledge of the performance of the procurement, 
• there is a dispute with the vendor.
assist in the event 
• potential issues are addressed promptly to the satisfaction of all parties.
support improved communications with vendors 
•Requested but unresolved changes lead to a claim (uniquely identified and documented by project 
correspondence).
12.3.3.2 Change Requests
•Procurement management plan ‐ Schedule baseline ‐ Cost baseline.
12.3.3.3 Project Management Plan Updates
•procurement documentation (procurement contract with all supporting schedules, requested 
approved/unapproved contract changes)
12.3.3.4 Project Documents Updates
•Correspondence ‐ Payment schedules and requests ‐Seller performance evaluation documentation
12.3.3.5 Organizational Process Assets Updates
INPUTS
Project 
management 
plan
Procurement 
documents
T&T
Procurement 
audits
Procurement 
negotiations
Records 
management 
system
OUTPUTS
Closed 
procurements
Organizational 
process assets 
updates
12.4.1.1 Project Management Plan
• contains the procurement management plan, 
which provides the details and guidelines for 
closing out procurements.
12.4.1.2 Procurement Documents
• all procurement documentation is collected, 
indexed, and filed.
• Information on contract schedule, scope, quality, 
and cost performance along with all contract 
change documentation, payment records, and 
inspection results are cataloged. 
• lessons learned information ‐ evaluating 
contractors for future contracts.
12.4.2.1 Procurement 
Audits
• structured review of the 
procurement process to 
identify successes and 
failures that warrant 
recognition in the 
preparation or 
administration of other 
procurement contracts 
• structured review of the 
procurement process to 
identify successes and 
failures that warrant 
recognition in the 
preparation or 
administration of other 
procurement contracts 
12.4.2.2 Procurement 
Negotiations
• In all procurement 
relationships, the final 
equitable settlement of 
all outstanding issues, 
claims, and disputes by 
negotiation is a primary 
goal (if not >> ADR).
• In all procurement 
relationships, the final 
equitable settlement of 
all outstanding issues, 
claims, and disputes by 
negotiation is a primary 
goal (if not >> ADR).
12.4.2.3 Records 
Management System
• to manage contract and 
procurement 
documentation and 
records. 
• Contract documents and 
correspondence are 
archived through the 
records management 
system as part of the 
Close Procurements 
process.
• to manage contract and 
procurement 
documentation and 
records. 
• Contract documents and 
correspondence are 
archived through the 
records management 
system as part of the 
Close Procurements 
process.
12.4.3.1 Closed 
Procurements
• The buyer, provides the seller with formal written 
notice that the contract has been completed. 
• Requirements for formal procurement closure are 
usually defined in the terms and conditions of the 
contract and are included in the procurement 
management plan.
12.4.3.2 
Organizational 
Process Assets 
Updates
• Procurement file. 
• Deliverable acceptance. 
• Lessons learned documentation
Procurement management plan

Weitere ähnliche Inhalte

Was ist angesagt?

Project Management-Project procurement Management
Project Management-Project procurement ManagementProject Management-Project procurement Management
Project Management-Project procurement ManagementYogender Singh Rana
 
Contract management
Contract managementContract management
Contract managementNishant Rai
 
Contract Management - Generating Real Value from your Contracts
Contract Management - Generating Real Value from your ContractsContract Management - Generating Real Value from your Contracts
Contract Management - Generating Real Value from your ContractsTejari
 
Project management procurement
Project management  procurementProject management  procurement
Project management procurementMalcolm Peart
 
CONTRACT ADMINISTRATION- Presentation dated 22.11.16
CONTRACT ADMINISTRATION- Presentation dated 22.11.16CONTRACT ADMINISTRATION- Presentation dated 22.11.16
CONTRACT ADMINISTRATION- Presentation dated 22.11.16Arvind Solanki
 
Importance of Contract Management Training Courses
Importance of Contract Management Training CoursesImportance of Contract Management Training Courses
Importance of Contract Management Training Coursestraningservices
 
Lecture 4 - selection of contract forms
Lecture 4 - selection of contract formsLecture 4 - selection of contract forms
Lecture 4 - selection of contract formskohwenqi
 
Assignment - FIDIC Contract
Assignment - FIDIC ContractAssignment - FIDIC Contract
Assignment - FIDIC ContractKai Yun Pang
 
Project Procurement - Principles and Case Study
Project Procurement - Principles and Case StudyProject Procurement - Principles and Case Study
Project Procurement - Principles and Case StudyKiran Radhakrishnan
 
contract administration PPT
 contract administration PPT contract administration PPT
contract administration PPTKEVINMISTRY8
 
Claims & disputes management
Claims & disputes managementClaims & disputes management
Claims & disputes managementMohammed Tanbouz
 
Contracts risk management notes bagamoyo 2.12.2017 final v1
Contracts risk management  notes bagamoyo 2.12.2017 final v1Contracts risk management  notes bagamoyo 2.12.2017 final v1
Contracts risk management notes bagamoyo 2.12.2017 final v1EMAC Consulting Group
 
Procurement in construction
Procurement in constructionProcurement in construction
Procurement in constructionMahSobeh
 
Project Procurement Management
 Project Procurement Management  Project Procurement Management
Project Procurement Management Serdar Temiz
 

Was ist angesagt? (20)

Project Management-Project procurement Management
Project Management-Project procurement ManagementProject Management-Project procurement Management
Project Management-Project procurement Management
 
Contract management
Contract managementContract management
Contract management
 
Contract Management - Generating Real Value from your Contracts
Contract Management - Generating Real Value from your ContractsContract Management - Generating Real Value from your Contracts
Contract Management - Generating Real Value from your Contracts
 
Project management procurement
Project management  procurementProject management  procurement
Project management procurement
 
CONTRACT ADMINISTRATION- Presentation dated 22.11.16
CONTRACT ADMINISTRATION- Presentation dated 22.11.16CONTRACT ADMINISTRATION- Presentation dated 22.11.16
CONTRACT ADMINISTRATION- Presentation dated 22.11.16
 
Contract Management
Contract ManagementContract Management
Contract Management
 
Importance of Contract Management Training Courses
Importance of Contract Management Training CoursesImportance of Contract Management Training Courses
Importance of Contract Management Training Courses
 
Lecture 4 - selection of contract forms
Lecture 4 - selection of contract formsLecture 4 - selection of contract forms
Lecture 4 - selection of contract forms
 
Assignment - FIDIC Contract
Assignment - FIDIC ContractAssignment - FIDIC Contract
Assignment - FIDIC Contract
 
Procurement- Contract Management
Procurement- Contract ManagementProcurement- Contract Management
Procurement- Contract Management
 
Project Procurement - Principles and Case Study
Project Procurement - Principles and Case StudyProject Procurement - Principles and Case Study
Project Procurement - Principles and Case Study
 
contract administration PPT
 contract administration PPT contract administration PPT
contract administration PPT
 
Claims & disputes management
Claims & disputes managementClaims & disputes management
Claims & disputes management
 
Chap12 project procurement management
Chap12 project procurement managementChap12 project procurement management
Chap12 project procurement management
 
Contract Management
Contract Management Contract Management
Contract Management
 
procurement overview
procurement overviewprocurement overview
procurement overview
 
Contracts risk management notes bagamoyo 2.12.2017 final v1
Contracts risk management  notes bagamoyo 2.12.2017 final v1Contracts risk management  notes bagamoyo 2.12.2017 final v1
Contracts risk management notes bagamoyo 2.12.2017 final v1
 
PMP_Project Procurement Management
PMP_Project Procurement ManagementPMP_Project Procurement Management
PMP_Project Procurement Management
 
Procurement in construction
Procurement in constructionProcurement in construction
Procurement in construction
 
Project Procurement Management
 Project Procurement Management  Project Procurement Management
Project Procurement Management
 

Andere mochten auch

Corwin corporation
Corwin corporationCorwin corporation
Corwin corporationEsha Epsita
 
Project management milestones-webinar
Project management milestones-webinarProject management milestones-webinar
Project management milestones-webinarmodijs
 
Pmbok 4th edition chapter 12 - Project Procurement Management
Pmbok 4th edition   chapter 12 - Project Procurement ManagementPmbok 4th edition   chapter 12 - Project Procurement Management
Pmbok 4th edition chapter 12 - Project Procurement ManagementAhmad Maharma, PMP,RMP
 
Tendering documentation
Tendering documentationTendering documentation
Tendering documentationnipuna_bopage
 
PMP Chap 12 - Project Procurement Management Details - Part 1
PMP   Chap 12 - Project Procurement Management Details - Part 1PMP   Chap 12 - Project Procurement Management Details - Part 1
PMP Chap 12 - Project Procurement Management Details - Part 1Anand Bobade
 
The 12 Milestones of Product Management
The 12 Milestones of Product ManagementThe 12 Milestones of Product Management
The 12 Milestones of Product ManagementJeroen "Jay" van Rijn
 

Andere mochten auch (8)

Corwin corporation
Corwin corporationCorwin corporation
Corwin corporation
 
Project management milestones-webinar
Project management milestones-webinarProject management milestones-webinar
Project management milestones-webinar
 
Pmbok 4th edition chapter 12 - Project Procurement Management
Pmbok 4th edition   chapter 12 - Project Procurement ManagementPmbok 4th edition   chapter 12 - Project Procurement Management
Pmbok 4th edition chapter 12 - Project Procurement Management
 
Tendering documentation
Tendering documentationTendering documentation
Tendering documentation
 
PMP Chap 12 - Project Procurement Management Details - Part 1
PMP   Chap 12 - Project Procurement Management Details - Part 1PMP   Chap 12 - Project Procurement Management Details - Part 1
PMP Chap 12 - Project Procurement Management Details - Part 1
 
The Process of Project Selection
The Process of Project SelectionThe Process of Project Selection
The Process of Project Selection
 
Project management and project life cycle
Project management and project life cycleProject management and project life cycle
Project management and project life cycle
 
The 12 Milestones of Product Management
The 12 Milestones of Product ManagementThe 12 Milestones of Product Management
The 12 Milestones of Product Management
 

Ähnlich wie 12 project procurement management

Project procurement Management - PMP/CAPM
Project procurement  Management - PMP/CAPMProject procurement  Management - PMP/CAPM
Project procurement Management - PMP/CAPMMudassir Iqbal
 
Procurement Masterclass
Procurement MasterclassProcurement Masterclass
Procurement MasterclassJeffrey Cheah
 
Day 3-9 - Final Revision (Procurement)
Day 3-9 - Final Revision (Procurement)Day 3-9 - Final Revision (Procurement)
Day 3-9 - Final Revision (Procurement)Jeffrey Cheah
 
L7_PROJECT PROCUREMENT Management.pdf
L7_PROJECT PROCUREMENT Management.pdfL7_PROJECT PROCUREMENT Management.pdf
L7_PROJECT PROCUREMENT Management.pdfMUST
 
Procurement Management Knowledge Area
Procurement Management Knowledge AreaProcurement Management Knowledge Area
Procurement Management Knowledge AreaJoshua Render
 
Conduct procurements
Conduct procurements Conduct procurements
Conduct procurements Shereef Sabri
 
Procurement management
Procurement managementProcurement management
Procurement managementSuperstarRr
 
2.12 procurement management 1
2.12  procurement management 12.12  procurement management 1
2.12 procurement management 1reddvise
 
Chapter_2-Procurement and Contract management.pptx
Chapter_2-Procurement and Contract management.pptxChapter_2-Procurement and Contract management.pptx
Chapter_2-Procurement and Contract management.pptxssuserc0bf9b
 
Control procurement
Control procurement Control procurement
Control procurement Shereef Sabri
 
ProjectManagementDocs.comProcurement Management Plan Temp.docx
ProjectManagementDocs.comProcurement Management Plan Temp.docxProjectManagementDocs.comProcurement Management Plan Temp.docx
ProjectManagementDocs.comProcurement Management Plan Temp.docxtienmixon
 
ProjectManagementDocs.comProcurement Management Plan Temp.docx
 ProjectManagementDocs.comProcurement Management Plan Temp.docx ProjectManagementDocs.comProcurement Management Plan Temp.docx
ProjectManagementDocs.comProcurement Management Plan Temp.docxgertrudebellgrove
 

Ähnlich wie 12 project procurement management (20)

Project procurement Management - PMP/CAPM
Project procurement  Management - PMP/CAPMProject procurement  Management - PMP/CAPM
Project procurement Management - PMP/CAPM
 
Pmp procurement rev
Pmp procurement revPmp procurement rev
Pmp procurement rev
 
Procurement Masterclass
Procurement MasterclassProcurement Masterclass
Procurement Masterclass
 
Day 3-9 - Final Revision (Procurement)
Day 3-9 - Final Revision (Procurement)Day 3-9 - Final Revision (Procurement)
Day 3-9 - Final Revision (Procurement)
 
L7_PROJECT PROCUREMENT Management.pdf
L7_PROJECT PROCUREMENT Management.pdfL7_PROJECT PROCUREMENT Management.pdf
L7_PROJECT PROCUREMENT Management.pdf
 
Procurement Management Knowledge Area
Procurement Management Knowledge AreaProcurement Management Knowledge Area
Procurement Management Knowledge Area
 
Conduct procurements
Conduct procurements Conduct procurements
Conduct procurements
 
16-20procurement.ppt
16-20procurement.ppt16-20procurement.ppt
16-20procurement.ppt
 
Procurement management
Procurement managementProcurement management
Procurement management
 
2.12 procurement management 1
2.12  procurement management 12.12  procurement management 1
2.12 procurement management 1
 
Chapter_2-Procurement and Contract management.pptx
Chapter_2-Procurement and Contract management.pptxChapter_2-Procurement and Contract management.pptx
Chapter_2-Procurement and Contract management.pptx
 
Session 19 4th edition PMP
Session  19 4th edition PMPSession  19 4th edition PMP
Session 19 4th edition PMP
 
Control procurement
Control procurement Control procurement
Control procurement
 
Procurement management
Procurement managementProcurement management
Procurement management
 
Project procurement management PMBOK Sixth Edition
Project procurement management PMBOK Sixth EditionProject procurement management PMBOK Sixth Edition
Project procurement management PMBOK Sixth Edition
 
ProjectManagementDocs.comProcurement Management Plan Temp.docx
ProjectManagementDocs.comProcurement Management Plan Temp.docxProjectManagementDocs.comProcurement Management Plan Temp.docx
ProjectManagementDocs.comProcurement Management Plan Temp.docx
 
ProjectManagementDocs.comProcurement Management Plan Temp.docx
 ProjectManagementDocs.comProcurement Management Plan Temp.docx ProjectManagementDocs.comProcurement Management Plan Temp.docx
ProjectManagementDocs.comProcurement Management Plan Temp.docx
 
CAPM Week 5 Chapter 12
CAPM Week 5 Chapter 12CAPM Week 5 Chapter 12
CAPM Week 5 Chapter 12
 
11- PMP Training - Procurement Management
11- PMP Training - Procurement Management 11- PMP Training - Procurement Management
11- PMP Training - Procurement Management
 
9. project procurement management
9. project procurement management9. project procurement management
9. project procurement management
 

Mehr von Omer Alsayed PhD,MBA, PMP®

Project stakeholders management arabic ادارة المعنيين في المشروع
Project stakeholders management arabic ادارة المعنيين في المشروعProject stakeholders management arabic ادارة المعنيين في المشروع
Project stakeholders management arabic ادارة المعنيين في المشروعOmer Alsayed PhD,MBA, PMP®
 
برنامج حصاد المياه خطوة نحو تنمية الموارد الطبيعية
برنامج حصاد المياه  خطوة نحو تنمية الموارد الطبيعيةبرنامج حصاد المياه  خطوة نحو تنمية الموارد الطبيعية
برنامج حصاد المياه خطوة نحو تنمية الموارد الطبيعيةOmer Alsayed PhD,MBA, PMP®
 
09 PMP Project Human Resources Management PMBOK 5th edittion
09 PMP Project Human Resources Management PMBOK 5th edittion09 PMP Project Human Resources Management PMBOK 5th edittion
09 PMP Project Human Resources Management PMBOK 5th edittionOmer Alsayed PhD,MBA, PMP®
 
09 Project Human Resources management based on PMBOK5
09 Project Human Resources management based on PMBOK5 09 Project Human Resources management based on PMBOK5
09 Project Human Resources management based on PMBOK5 Omer Alsayed PhD,MBA, PMP®
 
وأحسن الناس من بين الورى رجل
وأحسن الناس من بين الورى رجلوأحسن الناس من بين الورى رجل
وأحسن الناس من بين الورى رجلOmer Alsayed PhD,MBA, PMP®
 

Mehr von Omer Alsayed PhD,MBA, PMP® (20)

Project stakeholders management arabic ادارة المعنيين في المشروع
Project stakeholders management arabic ادارة المعنيين في المشروعProject stakeholders management arabic ادارة المعنيين في المشروع
Project stakeholders management arabic ادارة المعنيين في المشروع
 
04 project integration management
04 project integration management04 project integration management
04 project integration management
 
برنامج حصاد المياه خطوة نحو تنمية الموارد الطبيعية
برنامج حصاد المياه  خطوة نحو تنمية الموارد الطبيعيةبرنامج حصاد المياه  خطوة نحو تنمية الموارد الطبيعية
برنامج حصاد المياه خطوة نحو تنمية الموارد الطبيعية
 
05 project scope management
05 project scope management05 project scope management
05 project scope management
 
04 project integration management
04 project integration management04 project integration management
04 project integration management
 
07 project cost management
07 project cost management07 project cost management
07 project cost management
 
06 project time management m
06 project time management m06 project time management m
06 project time management m
 
08 project quality management
08 project quality management08 project quality management
08 project quality management
 
10 project communications
10 project communications10 project communications
10 project communications
 
09 project human res 2014
09 project human res 201409 project human res 2014
09 project human res 2014
 
13 project stakeholders management
13 project stakeholders management13 project stakeholders management
13 project stakeholders management
 
11 project risk management
11 project risk management11 project risk management
11 project risk management
 
09 project human res 2014
09 project human res 201409 project human res 2014
09 project human res 2014
 
Practical project management 12 feb 2014
Practical project management 12 feb 2014Practical project management 12 feb 2014
Practical project management 12 feb 2014
 
05 project scope management
05 project scope management05 project scope management
05 project scope management
 
Practical project management based on PMBOK5
Practical project management based on PMBOK5Practical project management based on PMBOK5
Practical project management based on PMBOK5
 
09 PMP Project Human Resources Management PMBOK 5th edittion
09 PMP Project Human Resources Management PMBOK 5th edittion09 PMP Project Human Resources Management PMBOK 5th edittion
09 PMP Project Human Resources Management PMBOK 5th edittion
 
09 project human resources management pmbok 5th
09 project human resources management pmbok 5th09 project human resources management pmbok 5th
09 project human resources management pmbok 5th
 
09 Project Human Resources management based on PMBOK5
09 Project Human Resources management based on PMBOK5 09 Project Human Resources management based on PMBOK5
09 Project Human Resources management based on PMBOK5
 
وأحسن الناس من بين الورى رجل
وأحسن الناس من بين الورى رجلوأحسن الناس من بين الورى رجل
وأحسن الناس من بين الورى رجل
 

Kürzlich hochgeladen

WSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfWSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfJamesConcepcion7
 
20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdfChris Skinner
 
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdftrending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdfMintel Group
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
business environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxbusiness environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxShruti Mittal
 
Excvation Safety for safety officers reference
Excvation Safety for safety officers referenceExcvation Safety for safety officers reference
Excvation Safety for safety officers referencessuser2c065e
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfShashank Mehta
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...Operational Excellence Consulting
 
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...ssuserf63bd7
 
Driving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerDriving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerAggregage
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...SOFTTECHHUB
 
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...Hector Del Castillo, CPM, CPMM
 
Pitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckPitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckHajeJanKamps
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFChandresh Chudasama
 
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfGUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfDanny Diep To
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 

Kürzlich hochgeladen (20)

WSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfWSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdf
 
20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf
 
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdftrending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
business environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxbusiness environment micro environment macro environment.pptx
business environment micro environment macro environment.pptx
 
Excvation Safety for safety officers reference
Excvation Safety for safety officers referenceExcvation Safety for safety officers reference
Excvation Safety for safety officers reference
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdf
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
 
WAM Corporate Presentation April 12 2024.pdf
WAM Corporate Presentation April 12 2024.pdfWAM Corporate Presentation April 12 2024.pdf
WAM Corporate Presentation April 12 2024.pdf
 
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
 
Driving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerDriving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon Harmer
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
 
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
 
Pitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckPitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deck
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDF
 
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfGUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 

12 project procurement management