1. ASID Competition Harbor House1 – Design Concept
DESIGN CONCEPT
To be “whole” is to be not broken, damaged or impaired. When speaking of human nature, it
pertains to all aspects, one's physical, intellectual, and spiritual development.
Design of the Harbor House youth shelter is centered on the acronym W.H.O.L.E. Wellness,
being a consideration because above all, the design is to promote the physical and mental well
being of all inhabitants, ensuring that a safe and healthy environment is present at all times.
Residents of the Harbor House facilities are in desperate need of a home. Whatever
circumstances brought residents to the facilities, judgment will not be passed and they will be
given the opportunity to live in a homelike environment until the time they desire to renounce
permanent residence and live on their own.
One main concept of the Harbor House facilities is to provide youth an opportunity to better
their circumstance, living situation, and future lifestyle. For this reason, the facilities include
an in house sub shop that provides residents a place to gain crucial work and social
experience.
The “Whole in the Wall” sub shop is used as a means of allowing residents to touch the
community. While the main entrance to the sub shop is located in the alley around the back of
the building, guests will be able to enter a community of people they see every day in the work
place or on the street. Design accommodates locals and allows for long periods of time spent
studying or hanging out within the shop.
Residents of the Pearl district in Portland tend to prefer organic, and sustainable products.
Many of the buildings in the district are undergoing renovations with an urge toward LEED
certification. Keeping that in mind, mainly eco-friendly and sustainable products were
selected for the design.
3. ASID Competition Harbor House3 – First Floor Plan
Design Concept
1. The homeless want an open and public
space. The reception area is an open
space utilizing half walls and glazing.
2. Homeless want to be able to look
around, to see other people, and to
understand what lies beyond the lobby.
Visual access over half walls is allowed
in order to view people working in
office spaces.
3. A large counter staffed by more than
one person suggests that the facility is
well managed. A large reception desk
is visible and employees at work in
offices are visible over half walls.
4. Some facilities may have a coatroom
much like one present at a museum.
Visitors can check a bag or duffel for
the day avoiding the need to carry
belongings around all day. Storage is
available in mentoring rooms.
Notes:
1. All egress doors open in the
direction of travel
2. .All forms of egress are a
minimum of 25’-0” apart
measured along the interior
path of travel.
3. Paths of travel leading to an
exit do not pass through a
secondary space subject to
closure by doors,
containing storage
materials, or with items that
project into the path of
travel.
4. All paths of travel are
barrier-free and provide a
5’-0” turning circle (shown
as a dotted line) at changes
of travel direction.
5. All interior corridors are a
minimum of 44” wide.
6. All door openings are a
minimum of 3’-0” wide with
a 1’-6” clear space on the
pull side of the door and a
1’-0” clear space on the
push side of the door.
7. All bathrooms are barrier-
free with a 5’-0” turning
circle.
8. Grab bars are indicated
appropriately, with two grab
bars for a toilet and three
grab bars for the barrier
free shower.
9. Sinks in all public
bathrooms have clear-knee
access.
10. Flooring in all public
bathrooms is slip-resistant.
11. Walls in all bathrooms are
impervious to moisture up
to 5’-0” A.F.F.
12. All plumbing fixtures,
including the fittings and
drains of fixtures, are
located within 20’-0” of the
plumbing access line.
13. Wall do not terminate into
glazing.
14. All required FF&E are
present on the floor plan.
15. Floor plan scale is
1/8”=1’-0”
16. All rooms meet minimum
square footage
requirements as listed in
the project requirements
and is calculated o/c to
center of wall.
17. A 50 sq. ft. entry area is
directly adjacent to all
stairwells and elevators.
18. All project code
requirements have been
met.
19. All rooms are labeled with
room names and minimum
area required, actual square
footage is not indicated.
20. All closets have a minimum
interior depth of 2’-0”.
21. Exterior façade was not
changed or altered in any
way.
22. Floor and ceiling planes
were not punctured or
altered.
Non-rated,
finished floor to
finished, ceiling
acoustically
insulated,
½” (13mm) GWB
on both sides,
3-5/8” (92mm)
metal studs
16” (406mm) o.c.
Non-rated, slab to
underside of structure,
acoustically insulated,
½” (13mm) water
resistant GWB one side,
½” (13mm) GWB one
side, 3-5/8” (92mm)
metal studs
16” (406mm) o.c.
Rated 1 hr, slab to
underside of
structure,
acoustically
insulated,
5/8” (16mm) fire-
rated GWB both
sides,
3-5/8” (92mm)
metal studs
16” (406mm) o.c.
4. ASID Competition Harbor House4 – Second Floor Plan
Notes:
1. All egress doors open in the
direction of travel
2. .All forms of egress are a
minimum of 25’-0” apart
measured along the interior
path of travel.
3. Paths of travel leading to an
exit do not pass through a
secondary space subject to
closure by doors,
containing storage
materials, or with items that
project into the path of
travel.
4. All paths of travel are
barrier-free and provide a
5’-0” turning circle (shown
as a dotted line) at changes
of travel direction.
5. All interior corridors are a
minimum of 44” wide.
6. All door openings are a
minimum of 3’-0” wide with
a 1’-6” clear space on the
pull side of the door and a
1’-0” clear space on the
push side of the door.
7. All bathrooms are barrier-
free with a 5’-0” turning
circle.
8. Grab bars are indicated
appropriately, with two grab
bars for a toilet and three
grab bars for the barrier
free shower.
9. Sinks in all public
bathrooms have clear-knee
access.
10. Flooring in all public
bathrooms is slip-resistant.
11. Walls in all bathrooms are
impervious to moisture up
to 5’-0” A.F.F.
12. All plumbing fixtures,
including the fittings and
drains of fixtures, are
located within 20’-0” of the
plumbing access line.
13. Wall do not terminate into
glazing.
14. All required FF&E are
present on the floor plan.
15. Floor plan scale is
1/8”=1’-0”
16. All rooms meet minimum
square footage
requirements as listed in
the project requirements
and is calculated o/c to
center of wall.
17. A 50 sq. ft. entry area is
directly adjacent to all
stairwells and elevators.
18. All project code
requirements have been
met.
19. All rooms are labeled with
room names and minimum
area required, actual square
footage is not indicated.
20. All closets have a minimum
interior depth of 2’-0”.
21. Exterior façade was not
changed or altered in any
way.
22. Shower drains are
horizontal and wall
mounted. Showers are
raised ¼” A.F.F. to allow
slope for drainage to the
wall.
23. Floor and ceiling planes
were not punctured or
altered.
Design Concept
1. As a means of providing privacy to the residents while
ensuring that staff has the ability to supervise the space,
residence room walls are 8 feet high, just short of the
finished ceiling.
2. Doors are omitted from residence rooms, incorporating
hallways as entrances.
3. Drugs must be locked away in a secure separate room to
which residents can only gain access in the presence of
staff. Lockers are available with access only allowed in the
presence of staff.
4. Personal items need to be available at night but stored
away in the daytime. Residence rooms have ample storage
space for personal belongings.
5. Cabinets and closets need to be accessible frequently but
still securable. Cabinets are available to the resident but
lockable.
6. Managing keys is a hassle and residents feel locks can be
picked and that staff may have keys to access personal
belongings. Pad locks are used to lock away all personal
belongings.
5. ASID Competition Harbor House5 – First Floor Lighting & Electrical
Plan
Notes:
1. Ceiling height is 9’ A.F.F.
2. Wall mounted beams and T-bar mounted at 8’ A.F.F.
3. All wall sconces mounted at 60” A.F.F.
4. All outlets mounted at 18” A.F.F. unless otherwise
noted.
5. All wiring to run through conduit attached to T-bar.
6. All ceiling mounted fixtures attached to T-bar at 8’
A.F.F.
Design Concept
In keeping with the urban design of the Whole in the
Wall Sub shop an open grid was selected as the
mounting for all ceiling fixtures. The switching and
electrical wiring runs through conduit attached to
and concealed by the T-bar.
LIGHTING SCHEDULE
DESCRIPTION VOLTAGE LAMPS MOUNTING LENS MANUFACTURER
6" QUARTZ
FRESNAL 120
500W
Q500 T6/
CL/P ANSI
BTM
3200K SURFACE ACRYLIC ALTMAN LIGHTING
ENZIS
RAINBOW
SPOT 120
FROSTED
MR16
TRACK/
SURFACE
FROSTED,
ACRYLIC BRUCK
WINDOWS
WALL
SCONCE 120
(2) 13W
QUAD
TUBE
GX23-2
CFL WALL
WHITE
GLASS WPT DESIGN
FIRE-RATED
GYPSUM
WALLBOARD
FINISHED
CEILING GEORGIA-PACIFIC
6. ASID Competition Harbor House
LIGHTING SCHEDULE
DESCRIPTION VOLTAGE LAMPS MOUNTING LENS MANUFACTURER
6" QUARTZ
FRESNAL 120
500W
Q500
T6/CL/P
ANSI
BTM
3200K SURFACE ACRYLIC
ALTMAN
LIGHTING
ENZIS
RAINBOW
SPOT 120
FROSTE
D MR16
TRACK/
SURFACE
FROSTED,
ACRYLIC BRUCK
WINDOWS
WALL
SCONCE 120
(2) 13W
QUAD
TUBE
GX23-2
CFL WALL
WHITE
GLASS WPT DESIGN
Notes:
1. Ceiling height is 9’ A.F.F.
2. Wall mounted beams and T-bar mounted at 8’ A.F.F.
3. All wall sconces mounted at 60” A.F.F.
4. All outlets mounted at 18” A.F.F. unless otherwise
noted.
5. All wiring to run through conduit attached to T-bar
and reclaimed beams.
6. All ceiling mounted fixtures attached to T-bar and
reclaimed beams at 8’ A.F.F.
Design Concept
1. Spaces require ample ambient lighting, at night they
need to be sufficiently illuminated to enable people
to navigate among them without intruding on other
residents’ ability to get sleep. Emergency lighting is
incorporated into the hallways and the individual
residents control lighting in residence rooms.
2. Ceiling lighting is efficient but likely to seem
institutional, wall lighting is a good alternative. Wall
sconces are present in the design.
6 – Second Floor Lighting &
Electrical Plan
7. ASID Competition Harbor House7 – Lighting Specifications
Specifications:
MANUFACTURER: Compliance Signs
SUBSTRATE: 0.040” (1mm) aluminum, white enamel coated
both sides
PRINTING LAYER: 3.0 mil Vinyl with 1.0 mil permanent
acrylic adhesive UV Stable Eco-solvent ink
LAMINATE: 3.0 mil, PVC Film (Optically Clear) · Scratch
Resistant · Chemical Resistant · UV Resistant
MOUNTING: Double shaped flange for mounting on drop
ceiling OPTIONS: Available for additional charge: ·
Reflective or Glow-in-the-Dark
DESCRIPTION: Aluminum substrate signs printed with UV
resistant eco-solvent ink, reinforced with UV, chemical,
abrasion, and moisture resistant laminate layer. Double
flange is shaped to allow mounting on a drop ceiling by
setting the sign between the ceiling tile and the tile track.
Recommended for indoor and outdoor business and
industrial environments. Service temperature range -40 F
to +18
* Mounting to be altered. Fixture will rest on T-bar.0 F
Specifications:
MANUFACTURER: Altman
PRODUCT: 65Q 6" Fresnel
A lightweight, short throw, all purpose lighting device, the
6" fresnel produces a soft edged beam which varies in
diameter from 4.2 feet to 21 feet at a throw distance of 15
feet.
The 65Q is designed for operation with the long life, high
intensity tungsten halogen lamps. The Luminaire is used in
theatre for acting area lighting where beam shaping is not
required or in television studios for key and backlighting.
Other uses include nightclubs, museums and show
windows where soft edge controlled lighting is required.
INCLUDED:
-Color Frame: 7 1/2" x 7 1/2", black, flat
-Safety Cable: 1/8" diameter x 36" with 1/4" hook.0 F
Specifications:
MANUFACTURER: WPT Design
PRODUCT: Windows wall sconce
DESCRIPTION: Clean and asymmetrical proportions play
with the organic textures of reclaimed sorghum and art
glass. Ideal in any interior, the Windows is illuminated by
Earth-friendly fluorescents. *
CF: Compact Fluorescent Source 2 x 13w (Max) PL GX-23
Base Lamps Included
* Fluorescent lamps not properly disposed of poison our
environ- ment. Properly disposing of your old fluorescent
lamps prevents the release of mercury into our
environment.
Specifications:
MANUFACTURER: Bruck
PRODUCT: Enzis Swing Spot
DESCRIPTION: The Enzis Swing Spot is a fully adjustable
fixture with a wide range of movement; two separate joints
on the Enzis Swing Spot gives it the freedom to provide
light in almost any direction. Integrated adaptor for use
with Enzis track only.The Enzis Swing Spot can not be used
`with accessories
TECHNICAL SPECS: 50W Max. Lamp not included
GU5.3 socket type
PART NUMBERS: 140730bz bronze
140730mc matte chrome
8. ASID Competition Harbor House8 – Material Specifications
FLOOR COVERING SCHEDULE
FLOOR COVERING
FC-1
BAMBOO
MANF: BAMBOO HARDWOODS
STYLE: MOSO PRE-FINISHED
COLOR: ALUM-OXIDE + ACRYLIC URETH.
SIZE: 75.6" x 3.78" x 0.59"
FC-2
STAINED CONCRETE
MANF: ECOPROCOTE
STYLE: SOYCRETE
COLOR: BLACK GRANITE
SIZE: SOLD BY THE GALLON
FC-3
CORK
MANF: GREEN FLOORS
STYLE: CORK PLANK
COLOR: OCTANS 15
SIZE: 35 13/16” x 11 13/16” x 1/2"
CT-1
CERAMIC TILE
MANF: IRIS US
STYLE: URBAN
COLOR: HIGHRISE GREY
SIZE: 18" X 18”
* GROUT: MAPEI/00 WHITE
FLOOR COVERING NOTES
1. GROUT TO BE SUPPLIED AND INSTALLED BY G.C.
2. TILE TO BE INSTALLED WITH CONSISTENT GROUT WIDTH THROUGHOUT
APPROX. 1/16" GROUT JOINT WIDTH.
FC-2FC-1
CT-1
WALL COVERING SCHEDULE
SUPPLIED AND APPLIED BY THE G.C., UNLESS NOTED OTHERWISE.
NOTES:
1. PAINT MANUFACTURER IS SPECIFIED AS BENJAMIN MOORE, ALL PAINTS MUST BE GREEN PROMISE NATURA
PAINTS.
2. PREFERRED METHOD OF PAINT APPLICATION IS BY SPRAY APPLICATION.
WC-1
GLASS TILE
MANF: AMERICAN OLEAN
STYLE: LEGACY GLASS
COLOR: LG48
SIZE: 5/16" WIDE
* GROUT: MAPEI/00 WHITE
PT-1
PAINT
MANF: BENJAMIN MOORE
STYLE: SEMI-GLOSS
COLOR: BRYCE CANYON
SIZE: SOLD BY THE GALLON
* ZERO VOC EVEN AFTER TINTING
WC-2
GRASSCLOTH
MANF: GRASSCLOTHWALLCOVERING.COM
STYLE: GRS-1100
COLOR: SILVER
SIZE: 36" X 8 YARDS/ROLL
* CLASS "A" FIRE RATED
* MADE OF 100% NATURAL YARNS & FIBERS
PT-2
PAINT
MANF: BENJAMIN MOORE
STYLE: SEMI-GLOSS
COLOR: COAT OF ARMS
SIZE: SOLD BY THE GALLON
* ZERO VOC EVEN AFTER TINTING
WC-3
WALLCOVERING
MANF: OMNOVA
STYLE: AVANT POPCIRCLES
COLOR: SAND LINEN
SIZE: 26" X 18" REPEAT
* CLASS "A" FIRE RATED
* GREENGUARD IAQ CERTIFIED FOR LOW VOC
* 100% RECYCLABLE
WT-1
WALL MURAL
MANF: COMMERCIALWALLCOVERING.COM
STYLE: MADE TO ORDER WALLS
COLOR: DIGITAL PHOTO
SIZE: 36" X 8 YARDS/ROLL
* PHOTO PRINTED ON WC-2
WT-2
CRACKLE PAINT
MANF: THE REAL MILK PAINT CO
STYLE: NATURAL CRACKLE
COLOR: THICK CRACKLE
SIZE: SOLD BY THE GALLON
* ENVIRONMENTALLY SAFE
WALL COVERING NOTES
1. CONTRACTOR TO REVIEW DETAIL SHEETS, FINISH PLANS, AND ELEVATION FOR WALL COVERINGS.
2. ALL FACTORY WHITE SPEAKER PLATES TO BE COVERED TO MATCH ADJACENT SURFACES.
3. ALL WOOD SURFACES TO BE PRIMED WITH OIL-BASED PRIMER AND FINISHED W/OIL-BASE SEMI-GLOSS
PAINT.
4. ALL METAL SURFACES TO BE PAINTED SHALL FIRST BE PRIMED WITH METAL PRIMER AND FINISHED WITH
SEMI-GLOSS OIL-BASED PAINT.
5. FINISH COATS MUST NOT SHOW BRUSH MARKS, IF THIS METHOS IS USED VS. SPRAYING OF ANY
MISCELLANEOUS ITEM.
SS-1
WC-2
WT-1
WT-2
WC-1
FC-3
WC-3
9. ASID Competition Harbor House9 – Furniture
T3
C3
C5
C4
S1
C1
T1
T2
C2
C6
T4
T5
Sub Shop
Common Area
10. ASID Competition Harbor House10 – Furniture Schedule
FURNITURE SCHEDULE
KEY QUANTITY ITEM MANUFACTURER CATALOGUE/NO. FABRIC/FINISH REMARKS
C1 4 BARSTOOL CALLIGARIS GN121, CS/1013-P(P77)O778550
FRAME: CHROMED METAL
SEAT: GLOSSY BLACK POLYCARBON ECO-FRIENDLY
C2 16 CHAIR JAIME SALM RBS
FRAME: POWDER-COATED TUBULAR STEEL
MATTE BLACK
SEAT: POST-CONSUMER RECYCLED TIRES
100% RECYCLED TIRE RUBBER,
RECYCLED CONTENT, RECYCLABLE,
ENVIRONMENTA-LLY PREFERABLE
FINISH
C3 1 CHAIR WORKING WONDERS 050-LCMDINT
FRAME: CHROMED STEEL BICYCLE RIMS
SEAT: INNER TUBE UPHOLSTERY
MADE FROM RECYCLED AND REUSED
BICYCLES
C4 1 CHAIR BESPACE PANDA POLYCARBONATE CD'S MADE FROM RECYCLED BLANK CD'S
C5 2 CHAIR SKATE STUDY HOUSE GODFATHER LOUNGE CHAIR
FRAME: METAL AND RECYCLED SKATEBOARD
DECKS
SEAT: BLACK CUSHIONS
MADE FROM RECYCLED
SKATEBOARD DECKS
C6 6 CHAIR SAUDER EDUCATION 702-0650
FRAME: CO-POLYMER POLYPROPYLENE
SEAT: HIGH-DENSITY POLYURTHANE FOAM
UPHOLSTERED IN BLACK PASSES Cal TB 133 SPECIFICATIONS
T1 2 TABLE WELD HOUSE EL CAMINO TABLE RECYCLED STEEL
MADE FROM RECYCLED STEEL FROM
AUTOS
T2 2 TABLE BIKE FURNITURE DESIGN VECTOR TABLE
FRAME: CHROMED STEEL BICYCLE RIMS
TOP: CLEAR GLASS
MADE FROM RECYCLED AND REUSED
BICYCLES
T3 1 SIDE TABLE WORKING WONDERS 050-MODUTBL
FRAME: CHROMED STEEL BICYCLE RIMS
SEAT: 1/4" GLASS
MADE FROM RECYCLED AND REUSED
BICYCLES
T4 1 COFFEE TABLE GREEN WITH ENVY WINGMAN COFFEE TABLE
FRAME: RECYCLED AIRPLANE WING
TOP: 36" BY 24" OVAL GLASS
MADE FROM RECYCLED AIRPLANE
WINGS
T5 1 SIDE TABLE MARK BAKER STUDIOS MODULAR CUBE SYSTEM
FRAME: SALVAGED STRUCTURAL STEEL, BIRCH
PLYWOOD
EMBODIES CORE PRINCIPLES OF
SUSTAINABILITY USING SALVAGED
STRUCTURAL STEEL FOR
CONSTRUCTION
S1 1 SOFA ZUO MODERN CONTEMPORARY 900041
MICROFIBER SEAT, BACK, AND CUSHIONSWITH
ADJUSTABLE ARMS AND HEADRESTS
UPHOLSTERY: SILVER W/FLORAL
MANUFACTURER SPECIFIES
TC1 1 T.V. CABINET KLAUSSNER HOME FURNISHINGS URBAN CRAFTSMAN ARMOIR WOOD/AMBER
11. ASID Competition Harbor House11 – Elevations & Sections
Cabinet Specifications:
MANUFACTURER: Moduline
PRODUCT: ProII Series
DOOR COLOR: Black
F