SlideShare ist ein Scribd-Unternehmen logo
1 von 32
COMMONWEALTH RESOURCES
INVESTMENT FORUM
       Investor Presentation
       David Hatch – Managing Director, Navigator Resources




 IRONMONGERS’ HALL, CITY OF LONDON     TUESDAY,   22 MAY 2012
 www.ObjectiveCapitalConferences.com
NAVIGATOR RESOURCES LIMITED
INVESTOR PRESENTATION
      MAY 2012




                               DAVID HATCH
                            Managing Director




  www.navigatorresources.com.au
Introduction
DISCLAIMER
 The information contained in this presentation is not financial product advice. The presentation is for information purposes and
    is of a general and summary nature only. It does not constitute an offer. Navigator Resources Limited (Navigator) gives no
    warranties in relation to the statements and information in this presentation. Investors should seek appropriate advice on their
    own objectives, financial situation and needs.




                                                                                                                                               Bronzewing
 This presentation contains certain statements which may constitute “forward-looking statements”. Such statements are only
    predictions and are subject to inherent risks and uncertainties which could cause actual values, performance or achievements to
    differ materially from those expressed, implied or projected in any forward looking statements.
 Navigator disclaims any intent or obligation to update publicly any forward-looking statements, whether as a result of new
    information, future events or results or otherwise. Investors are cautioned that forward-looking statements are not guarantees
    of future performance and investors are cautioned not to put undue reliance on forward-looking statements due to the inherent
    uncertainty therein.




                                                                                                                                               Leonora
 This presentation does not constitute or form any part of any offer or invitation to sell or issue, or any solicitation of any offer to
    purchase or subscribe for, any securities in the Company nor shall it or any part of it, or the fact of its distribution, form the basis
    of, or be relied on in connection with, any contract or commitment or investment decision relating to any securities in the
    Company. Any decision regarding any proposed subscription for securities in the Company must be made solely on the basis of
    information on the Company that is publicly available.
 This presentation does not constitute an offer of securities for sale.




                                                                                                                                               Exploration
COMPETENT PERSONS STATEMENT
Sections of information contained within this report that relate to Exploration Results, Mineral Resources or Ore Reserves at the
Bronzewing Gold Project, the Leonora Gold Project and Cummins Range Rare Earth Project are based on information reviewed by
Bernie Kirkpatrick who is a full-time employee of Navigator Resources Limited and a Member of the Australasian Institute of Mining




                                                                                                                                               Conclusion
and Metallurgy. Bernie Kirkpatrick has sufficient experience which is relevant to the style of mineralisation and type of deposit under
consideration and to the activity which he has undertaken to qualify as a Competent Person as defined in the 2004 Edition of the
“Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Bernie Kirkpatrick consents to the
inclusion in this report of the matters based on his information in the form and context in which it appears.
Introduction
CORPORATE OVERVIEW
ASX Code: NAV
Ordinary Shares                  2,222,216,576




                                                  Bronzewing
Market Capitalisation ($0.008)   A$17.8 million
12 month High-Low                A$0.140-0.008
Debt Outstanding                 US$12 million
Hedging                          Nil




                                                  Leonora
Unlisted Options                 62,869,578

ASX Code: NAVOB




                                                  Exploration
Listed Options                   835,096,124
Exercise Price                   A$0.04
Expiry Date                      31 July 2014




                                                  Conclusion
Introduction
BOARD & MANAGEMENT
         Allan Trench
          Non-Executive Chairman (since 2005)
          Over 15 years geology/business




                                                                                            Bronzewing
          management experience in the
          Australian resources industry including
                                                     John Shipp
          with CRU Group, WMC, Barrick,               Non-Executive Director (since 2006)
          Woodside and McKinsey & Company.            Mining engineer with 40 years of
                                                      international experience. Former-
                                                      President Barrick Gold Australia-
         David Hatch                                 Africa operations and GM of KCGM




                                                                                            Leonora
          Managing Director (since 2009)              and Boddington.
          A track record in the management,
          optimisation and development of
          predominantly gold mining assets in
          Australia, Indonesia, PNG and West         Guy Walker
          Africa. Former MD Kingsrose Mining,         Non-Executive Director (since 2012)




                                                                                            Exploration
          Westonia Mines and Abosso Minerals.         Over 20 years experience in
                                                      financial markets and funds
         Ian Macpherson                              management in NZ, North America
          Non-Executive Director (since 2003)         and the UK.      Former COO of
          Chartered accountant with 30 years          Talisman Global Asset Management
          experience, specialising in corporate       and current Company Secretary of
                                                      Au Mining.




                                                                                            Conclusion
          advice, equity and debt raising and
          compliance. Established Ord Partners
          in 1990.
Introduction
BOARD & MANAGEMENT
                         David Hatch – Managing Director




                                                                                         Bronzewing
         Gerry Kaczmarek                         Bernie Kirkpatrick
          CFO/Company Secretary (since 2009)       Exploration Manager (since 2008)
          Accountant and economist with almost     42     years      multi-commodity
          30 years experience in the resources     exploration and mining experience
          and minerals processing industry         with      projects      throughout
          covering projects in Australia and       Australasia including roles of Mine
          overseas. Including 10 years as CFO      Geologist, Consulting Geologist




                                                                                         Leonora
          and Company Secretary of Troy            and     Australian      Exploration
          Resources.                               Manager.



         Craig Bradshaw                          Michelle Simson




                                                                                         Exploration
          Chief Operating Officer (since 2012)     Manager Corporate Affairs (since
          Mining Engineer with nearly 20 years     2007)
          experience, predominantly with WA        9 years administration experience
          gold companies in roles including        in the WA mining industry in the
          Mining Manager, General Manager and      gold and uranium sectors, in both
          COO.                                     site and corporate roles.




                                                                                         Conclusion
             Tim Blyth – General Manager – Bronzewing Operations
Introduction
TWO GOLD PROJECTS IN WA

                          BRONZEWING




                                                                                                Bronzewing
                          1,067,000oz Au resource*
                          +960km2 tenements
                          +3Moz historic production
                          Purchased September 2009; first gold poured
                          April 2010




                                                                                                Leonora
                          Mining operations focussed on Cockburn Open Pit



                          LEONORA




                                                                                                Exploration
                          745,000oz Au resource*
                          320km2 tenements
                          +280,000oz historic production
                          Trial mining program February-August 2010




                                                                                                Conclusion
                          Potential 50,000oz Au/yr production


                                                           * Refer Reserves & Resources table
Introduction
1. Cockburn Pit Cutbacks




                                 Bronzewing
2. Physicals Performance




                                 Leonora
3. Current Mine Plan


4. 2012/13 & 2013/14 Mine Plan




                                 Exploration
   Forecasts




                                 Conclusion
Introduction
COCKBURN PIT CUTBACKS




                                                                                                 Bronzewing
                                                                                                 Leonora
                                                                                                 Exploration
Eastern Cutback                                             Interim Western Cutback
   Cutback commenced February 2011                            Cutback commenced June 2011
   First ore mined June 2011                                  First ore mined September 2011




                                                                                                 Conclusion
                               Majority of waste pre-strip is completed
                               Eastern and interim western cutback now
                                connected around southern end of pit
Introduction
PHYSICALS PERFORMANCE




                                                             Bronzewing
                                                             Leonora
                                                             Exploration
                                                             Conclusion
   Positive gold production trend continuing

                                                * Forecast
Introduction
CURRENT MINE PLAN




                                                                                                    Bronzewing
                                                                                                    Leonora
   2+ years           Mine Plan                 200,000oz   Exploration potential
 Cockburn Pit    4.33Mt @ 1.6g/t Au*            Recovered    (Drill testing a series of
                   (If the current observed                    near mine surface
                    trend of conversion of                  anomalies based on gold




                                                                                                    Exploration
                Inferred material continues,                nuggets and soil sampling
                 there will be additional ore                  scheduled for July)
                     tonnes and mine life)




                                                                                                    Conclusion
                                                              * $1,350 pit design; Indicated only
Introduction
2012/13 MINE PLAN FORECAST

               Q1                                      Q2
   Total movement: 2.40M BCM               Total movement: 1.49M BCM




                                                                           Bronzewing
       Ore mined: 613,000t                     Ore mined: 708,500t
    Plant throughput: 512,500t              Plant throughput: 497,000t
      Average grade: 1.30g/t                  Average grade: 1.55g/t
  Gold recovered: 18,000-22,000oz        Gold recovered: 21,500-25,500oz




                                                                           Leonora
               Q3                                      Q4
   Total movement: 1.49M BCM               Total movement: 1.50M BCM




                                                                           Exploration
       Ore mined: 655,000t                     Ore mined: 727,500t
    Plant throughput: 472,500t              Plant throughput: 478,000t
      Average grade: 1.46g/t                  Average grade: 1.51g/t
  Gold recovered: 19,000-23,000oz        Gold recovered: 20,000-24,000oz




                                                                           Conclusion
           Note: Budget costs and revenue estimates in progress
Introduction
2013/14 MINE PLAN FORECAST

               Q1                                      Q2
   Total movement: 1.50M BCM               Total movement: 1.08M BCM




                                                                           Bronzewing
       Ore mined: 664,000t                     Ore mined: 962,000t
    Plant throughput: 483,500t              Plant throughput: 478,000t
      Average grade: 1.34g/t                  Average grade: 2.18g/t
  Gold recovered: 17,500-21,500oz        Gold recovered: 30,500-34,500oz




                                                                           Leonora
               Q3                                      Q4
    Plant throughput: 472,500t              Plant throughput: 478,000t




                                                                           Exploration
      Average grade: 1.84g/t                  Average grade: 0.83g/t
  Gold recovered: 25,000-29,000oz        Gold recovered: 9,500-13,500oz



           Note: Budget costs and revenue estimates in progress




                                                                           Conclusion
Introduction
1. Project History




                           Bronzewing
2. Project Areas




                           Leonora
3. Trial Mining


4. Development Scenarios




                           Exploration
                           Conclusion
Introduction
   PROJECT HISTORY
                                                                                                       PFS completed:
                                                                                                          12.2Mt @
                                          LGP purchased from Sons                                         1.9g/t Au
    First recorded                        of Gwalia Administrators                                      (742,000oz)+;                                   Development




                                                                                                                                                                              Bronzewing
   mining activity on                                                                                     6 year life                                   options under
      the leases                                                        Resource doubles                                                                consideration
                                                                         to 444,444oz*




                                                                                                                                                                              Leonora
                                        1996-                                     2005               2006               2009                 2010                2011...
                1899
                1978                                        2004
                                        2004




                                                                                                                                                                              Exploration
                     Sons of Gwalia own
                     & operate Leonora
                      Gold Project (LGP)
                                                      Inferred Resource:                                                   Trial mining activity
                                                       3.54Mt @ 1.9g/t                                                    undertaken; 5 months,
                                                          (221,500oz)                                                       114,000t, 7,673oz




                                                                                                                                                                              Conclusion
                                                                                       Resource increases to
                                                                                           700,400oz#

* Indicated : 2.15Mt @ 2.7g/t for 189,000oz ; Inferred: 3.73Mt @ 2.1g/t for 255,000oz; # Measured: 3.65Mt @ 2.1g/t for 241,300oz; Indicated: 3.44Mt @ 2.1g/t for 232,300oz;
Inferred: 3.63Mt @ 1.9g/t for 227,000oz; + Indicated: 8.27Mt @ 2.0g/t for 539,000oz; Inferred: 3.91Mt @ 1.6g/t for 203,000oz
Introduction
THREE MAIN PROJECT AREAS: TOTAL 745,000oz RESOURCE




                                                                                                                                                          Bronzewing
                                                                                                                                                          Leonora
              Cardinia                               Mertondale                                                Raeside




                                                                                                                                                          Exploration
          199,000oz                                395,000oz                                              134,000oz
       4.79Mt @ 1.3g/t                          5.59Mt @ 2.2g/t                                        1.57Mt @ 2.6g/t
 (Indicated: 2.35Mt @ 1.3g/t = 95,000oz   (Indicated: 4.34Mt @ 2.2g/t = 311,000oz              (Indicated: 1.47Mt @ 2.7g/t = 127,000oz
 Inferred: 2.44Mt @ 1.3g/t = 104,000oz)     Inferred: 1.25Mt @ 2.1g/t = 84,000oz)                Inferred: 0.10Mt @ 2.1g/t = 7,000oz)


      Bruno Pit Trial:                          Mert 2 Pit Trial:                                      Resource review:




                                                                                                                                                          Conclusion
   February – June 2010                        March – May 2010                                        September 2009

                                                                     * Additional 17,000oz Resource to total 745,000oz located at Gambier Lass prospect
Introduction
TRIAL MINING: SIGNIFICANT VALUE-ADD ACHIEVED

          Mining                                 Processing             Results




                                                                                            Bronzewing
   February – June 2010                   April – August 2010   40% grade upgrade from
       114,000t ore                         5 parcels (T1-T5)          Bruno Pit
   Predominantly Bruno                   High recovery of 93%   Significant ore body data
      supergene ore                                                     generated
                                         7,673oz gold poured
 Free dig mining confirmed                                      Mining costs and material




                                                                                            Leonora
                                                                  handling confirmed
                                                                A$2.12 million net profit
                                                                      generated




                                                                                            Exploration
                                                                                            Conclusion
                      NAV gold from T1 milling
Introduction
SEVERAL DEVELOPMENT SCENARIOS




                                                                                              Bronzewing
                                                                                              Leonora
     2009 PFS Scenario                  2011 Post-Trial Scenario          Financing Options
  1Mtpa CIL processing facility          Low capital (<$30 million)             Debt
   Central Merton’s Reward               0.5Mtpa processing facility        Hybrid Debt
           location               OR   Cardinia only; shallow low strip          JV




                                                                                              Exploration
        6 year mine life                         ratio mining
                                                                               Equity
                                          Anticipated pit backfill of
      53,000oz pa (1.8g/t)                                                   Asset Sale
                                           tailings and waste rock
      ~$45million capital
                                         4-6 year mine life; 30,000-
                                                 40,000oz pa




                                                                                              Conclusion
                                         Estimated unit cash cost of
                                                $900-$1,000/oz
Introduction
CARDINIA MULTIPLE PIT DEVELOPMENT




                                               Bronzewing
       Trial Mined
       Bruno Pit




                                               Leonora
                                               Exploration
                                               Conclusion
    Cardinia Pit Designs based on A$1,300/oz
Introduction
1. Resources & Reserves




                          Bronzewing
2. Regional Geology




                          Leonora
3. Bronzewing


4. Leonora




                          Exploration
5. East Kimberley




                          Conclusion
Introduction
RESOURCES & RESERVES
Bronzewing Reserves – June 2011
                                                   Mt               g/t Au               oz




                                                                                                     Bronzewing
Probable                                          10.624               1.6            540,000
Total                                             10.624               1.6            540,000

Bronzewing Resources – June 2011 (inclusive of Reserves)
                                                   Mt               g/t Au               oz
Indicated                                         13.72                1.7            738,000




                                                                                                     Leonora
Inferred                                           5.60                1.8            329,000
Total                                             19.32                1.7            1,067,000

Leonora Resources – June 2011




                                                                                                     Exploration
                                                   Mt               g/t Au               oz
Indicated                                          8.16                2.0            533,000
Inferred                                           4.13                1.6            212,000
Total                                             12.29                1.9            745,000




                                                                                                     Conclusion
Cummins Range Inferred Resource – February 2012
COG%              Tonnage Mt        TREO %           P2O5 %    U3O8 ppm      Th ppm       TREO kt
1.0                  4.90             1.74              11.2     145           48             85.0
Introduction        Bronzewing   Leonora   Exploration   Conclusion
 REGIONAL GEOLOGY
Introduction
BRONZEWING
   Total land holding: ~960km2
   Total annual expenditure
    commitment: $2.74 million




                                   Bronzewing
   JV arrangement with Mark
    Creasy (70% NAV; 30%
    Creasy)
   JV arrangement with Audax




                                   Leonora
    Minerals & Hot Holdings (NAV
    farmin to 50% on $1 million
    expenditure over 4 years;
    additional 19% on $1 million




                                   Exploration
    over further 2 years)




                                   Conclusion
Introduction
BRONZEWING – COCKBURN




                                                                        Bronzewing
                                                                        Leonora
                                                                        Exploration
                                                                        Conclusion
   Potential for underground mining following completion of open pit
Introduction
BRONZEWING – DRAGON-VENUS




                                                                                   Bronzewing
                                                                                   Leonora
                                                                                   Exploration
                                                                                   Conclusion
   33km south of Bronzewing plant
   Best intersections include 13m @ 5.2g/t from 126m and 10m @ 4.7g/t from 224m
Introduction
BRONZEWING – BOWER-HARRIER
   Greenfields prospect 3-5km SE of plant; close
    proximity to mill and other infrastructure




                                                     Bronzewing
   NAV has farmed into ground with only sparse
    previous drilling
   BLEG soil anomalies + numerous nuggets over
    a strike length of 6km; maximum soil sample
    value of 225ppb Au




                                                     Leonora
   Favourable geology with main host rock a
    pillowed basalt; magnetic structures evident;
    shearing visible in outcrop
   Heritage survey completed April 2012;




                                                     Exploration
    prospect is ready for drill testing with a
    9,000m aircore program planned for July
    2012
   First pass drill program costing <$0.5 million




                                                     Conclusion
    will determine whether any likelihood of a
    significant new discovery
Introduction
LEONORA
   Total land holding: ~320km2
   Tenement package focussed on well




                                           Bronzewing
    mineralised Mertondale Shear and
    sub-parallel Kurrajong trend
   Highly prospective land holding
    warrants exploration spend to
    increase open pit resource base from




                                           Leonora
    745,000oz to +1Moz
   Total annual expenditure
    commitment: $1.75 million




                                           Exploration
                                           Conclusion
Introduction
LEONORA – MERTON’S REWARD




                                                                                                                                                              Bronzewing
                                                                                                                                                              Leonora
                                                                                                                                                              Exploration
   Original gold discovery on Mertondale Shear
   Current Resource of 1.08Mt @ 2.6g/t for 91,000oz*




                                                                                                                                                              Conclusion
   Potential for northeast plunging, high grade underground lodes
   Historical underground production (1899-1942) of 89,000t @ 21.0g/t = 60,524oz
                          * within a $2,000/oz pit shell, 0.7g/t Au cutoff; Indicated: 1.01Mt @ 2.7g/t for 87,000oz ; Inferred: 0.07Mt @ 1.7g/t for 4,000oz
Introduction
LEONORA – MERTONDALE 5




                                                                                                                                                                Bronzewing
                                                                                                                                                                Leonora
                                                                                                                                                                Exploration
   10km north of Mertondale
   Current Resource of 0.48Mt @ 3.0g/t for 46,000oz*
   Potential for flat, south plunging, higher grade shoot




                                                                                                                                                                Conclusion
   Historical production of 0.39Mt @ 2.6g/t for 32,000oz

                            * within a $2,000/oz pit shell, 0.7g/t Au cutoff; Indicated: 0.32t @ 3.2g/t for 33,000oz ; Inferred: 0.16Mt @ 2.7g/t for 13,000oz
Introduction
LEONORA – HOBBY




                                                                                 Bronzewing
                                                                                 Leonora
                                                                                 Exploration
   Mineralisation from surface, located 6.5km NNE of Cardinia




                                                                                 Conclusion
   Best intersections include 12m @ 10.7g/t from 6m and 9m @ 3.88g/t from 31m
   Mineralisation open down dip and along strike
Introduction
EAST KIMBERLEY
   Cummins Range Rare Earth
    Project: JV with Kimberley Rare




                                       Bronzewing
    Earths (NAV 75%; KRE 25%) (KRE
    to farmin to 55% on $10 million
    expenditure over 4 years;
    additional 25% on BFS delivery)
   Laura River Base Metals Project:




                                       Leonora
    JV with Magma Metals (NAV 30%
    free-carried; Magma have earnt
    in 70%)




                                       Exploration
                                       Conclusion
Introduction
CONCLUSIONS
   As expected, first two years of Bronzewing operation have been
    challenging




                                                                                 Bronzewing
   Supplementary funding has been required
   NAV is positioned to generate significant cashflow in the next 2-3 years
   Seeking to extend Bronzewing mine life with higher quality ounces




                                                                                 Leonora
   NAV is planning to drill test the near mine Bower and Harrier prospects in
    July




                                                                                 Exploration
   NAV is keen to add value to the latent Leonora project by:
        further exploration spend; or
        facilitating development options with third parties




                                                                                 Conclusion

Weitere ähnliche Inhalte

Was ist angesagt?

2013 02-14-alder presentation
2013 02-14-alder presentation2013 02-14-alder presentation
2013 02-14-alder presentation
AlderResources
 
Asx announcement presentation to investors 20.2.12
Asx announcement presentation to investors 20.2.12Asx announcement presentation to investors 20.2.12
Asx announcement presentation to investors 20.2.12
QRL
 
Sandfire- Resources & Energy Symposium 2012
Sandfire- Resources & Energy Symposium 2012Sandfire- Resources & Energy Symposium 2012
Sandfire- Resources & Energy Symposium 2012
Symposium
 

Was ist angesagt? (20)

Alder Presentation November 23 2012
Alder Presentation November 23 2012Alder Presentation November 23 2012
Alder Presentation November 23 2012
 
Alder Presentation November 23 2012
Alder Presentation November 23 2012Alder Presentation November 23 2012
Alder Presentation November 23 2012
 
Alder Presentation December 7 2012
Alder Presentation December 7 2012Alder Presentation December 7 2012
Alder Presentation December 7 2012
 
2013 02-14-alder presentation
2013 02-14-alder presentation2013 02-14-alder presentation
2013 02-14-alder presentation
 
Alder Presentation September 2012
Alder Presentation September 2012Alder Presentation September 2012
Alder Presentation September 2012
 
Asx announcement presentation to investors 20.2.12
Asx announcement presentation to investors 20.2.12Asx announcement presentation to investors 20.2.12
Asx announcement presentation to investors 20.2.12
 
Alder Presentation March 2013
Alder Presentation March 2013Alder Presentation March 2013
Alder Presentation March 2013
 
Amarillo Gold Corporate Presentation-Prefeasibility Updates
Amarillo Gold Corporate Presentation-Prefeasibility UpdatesAmarillo Gold Corporate Presentation-Prefeasibility Updates
Amarillo Gold Corporate Presentation-Prefeasibility Updates
 
Alder Presentation November 2012
Alder Presentation November 2012Alder Presentation November 2012
Alder Presentation November 2012
 
Tvi corporate presentation october 2016
Tvi corporate presentation october 2016Tvi corporate presentation october 2016
Tvi corporate presentation october 2016
 
Tvi corporate presentation august 2016
Tvi corporate presentation august 2016Tvi corporate presentation august 2016
Tvi corporate presentation august 2016
 
Tvi corporate presentation june 8 2016
Tvi corporate presentation june 8 2016Tvi corporate presentation june 8 2016
Tvi corporate presentation june 8 2016
 
Tvi corporate presentation november 2016
Tvi corporate presentation november 2016Tvi corporate presentation november 2016
Tvi corporate presentation november 2016
 
Tvi corporate presentation june 15 2015
Tvi corporate presentation june 15 2015Tvi corporate presentation june 15 2015
Tvi corporate presentation june 15 2015
 
Presentation
PresentationPresentation
Presentation
 
Pacton Gold Corporate Presentation
Pacton Gold Corporate PresentationPacton Gold Corporate Presentation
Pacton Gold Corporate Presentation
 
Tvi corporate presentation august 2015
Tvi corporate presentation august 2015Tvi corporate presentation august 2015
Tvi corporate presentation august 2015
 
TVI investor Presentation May 13 2015
TVI investor Presentation May 13 2015TVI investor Presentation May 13 2015
TVI investor Presentation May 13 2015
 
Corporate Presentation - September 2015
Corporate Presentation - September 2015Corporate Presentation - September 2015
Corporate Presentation - September 2015
 
Sandfire- Resources & Energy Symposium 2012
Sandfire- Resources & Energy Symposium 2012Sandfire- Resources & Energy Symposium 2012
Sandfire- Resources & Energy Symposium 2012
 

Ähnlich wie Investor Presentation

June 2010 HGC Corporate Presentation
June 2010 HGC Corporate PresentationJune 2010 HGC Corporate Presentation
June 2010 HGC Corporate Presentation
Adnet Communications
 
Hawthorne Gold Corporate Presentation May 2010
Hawthorne Gold Corporate Presentation May 2010Hawthorne Gold Corporate Presentation May 2010
Hawthorne Gold Corporate Presentation May 2010
Adnet Communications
 
Hawthorne Gold Corp Corporate Presentation
Hawthorne Gold Corp Corporate PresentationHawthorne Gold Corp Corporate Presentation
Hawthorne Gold Corp Corporate Presentation
Adnet Communications
 
Focus Minerals- Resources & Energy Symposium 2012
Focus Minerals- Resources & Energy Symposium 2012Focus Minerals- Resources & Energy Symposium 2012
Focus Minerals- Resources & Energy Symposium 2012
Symposium
 
Symposium resources roadshow white rock minerals geoff lowe
Symposium resources roadshow white rock minerals geoff loweSymposium resources roadshow white rock minerals geoff lowe
Symposium resources roadshow white rock minerals geoff lowe
Symposium
 
Hawthorne Gold Corporate Presentation May 2010
Hawthorne Gold Corporate Presentation May 2010Hawthorne Gold Corporate Presentation May 2010
Hawthorne Gold Corporate Presentation May 2010
Adnet Communications
 
Hawthorne Gold Corporate Presentation May 2010
Hawthorne Gold Corporate Presentation May 2010Hawthorne Gold Corporate Presentation May 2010
Hawthorne Gold Corporate Presentation May 2010
Adnet Communications
 

Ähnlich wie Investor Presentation (20)

June 2010 HGC Corporate Presentation
June 2010 HGC Corporate PresentationJune 2010 HGC Corporate Presentation
June 2010 HGC Corporate Presentation
 
June 2010 HGC Presentation
June 2010 HGC PresentationJune 2010 HGC Presentation
June 2010 HGC Presentation
 
HGC corporate presentation may 2010
HGC corporate presentation may 2010HGC corporate presentation may 2010
HGC corporate presentation may 2010
 
Hawthorne Gold Corporate Presentation May 2010
Hawthorne Gold Corporate Presentation May 2010Hawthorne Gold Corporate Presentation May 2010
Hawthorne Gold Corporate Presentation May 2010
 
Hawthorne Gold Corp Corporate Presentation
Hawthorne Gold Corp Corporate PresentationHawthorne Gold Corp Corporate Presentation
Hawthorne Gold Corp Corporate Presentation
 
U.S. Silver & Gold Corporate Presentation - February 2013
U.S. Silver & Gold Corporate Presentation - February 2013U.S. Silver & Gold Corporate Presentation - February 2013
U.S. Silver & Gold Corporate Presentation - February 2013
 
Focus Minerals- Resources & Energy Symposium 2012
Focus Minerals- Resources & Energy Symposium 2012Focus Minerals- Resources & Energy Symposium 2012
Focus Minerals- Resources & Energy Symposium 2012
 
REIS 2013 Broken Hill - Convergent Minerals ASX:CVG
REIS 2013 Broken Hill - Convergent Minerals ASX:CVGREIS 2013 Broken Hill - Convergent Minerals ASX:CVG
REIS 2013 Broken Hill - Convergent Minerals ASX:CVG
 
HGC Corporate Presentation 2010
HGC Corporate Presentation 2010HGC Corporate Presentation 2010
HGC Corporate Presentation 2010
 
2015 Broken Hill Resources Investment Symposium - PLD Corporation (ASX:PLD) -...
2015 Broken Hill Resources Investment Symposium - PLD Corporation (ASX:PLD) -...2015 Broken Hill Resources Investment Symposium - PLD Corporation (ASX:PLD) -...
2015 Broken Hill Resources Investment Symposium - PLD Corporation (ASX:PLD) -...
 
Symposium resources roadshow white rock minerals geoff lowe
Symposium resources roadshow white rock minerals geoff loweSymposium resources roadshow white rock minerals geoff lowe
Symposium resources roadshow white rock minerals geoff lowe
 
20120808 Jourdan Presentation
20120808 Jourdan Presentation20120808 Jourdan Presentation
20120808 Jourdan Presentation
 
Hawthorne Gold Corporate Presentation May 2010
Hawthorne Gold Corporate Presentation May 2010Hawthorne Gold Corporate Presentation May 2010
Hawthorne Gold Corporate Presentation May 2010
 
Presentation: Critical Elements (May 2011)
Presentation: Critical Elements (May 2011)Presentation: Critical Elements (May 2011)
Presentation: Critical Elements (May 2011)
 
Hawthorne Corporate Presentation
Hawthorne Corporate PresentationHawthorne Corporate Presentation
Hawthorne Corporate Presentation
 
Gold 2013 Sydney - Convergent Minerals ASX:CVG
Gold 2013 Sydney - Convergent Minerals ASX:CVGGold 2013 Sydney - Convergent Minerals ASX:CVG
Gold 2013 Sydney - Convergent Minerals ASX:CVG
 
Teslin River Resources Presentation September 2012
Teslin River Resources Presentation September 2012Teslin River Resources Presentation September 2012
Teslin River Resources Presentation September 2012
 
Hawthorne Gold Corporate Presentation May 2010
Hawthorne Gold Corporate Presentation May 2010Hawthorne Gold Corporate Presentation May 2010
Hawthorne Gold Corporate Presentation May 2010
 
Mmv pr nov2010
Mmv pr nov2010Mmv pr nov2010
Mmv pr nov2010
 
04.09.2014, Mining exploration project unlocking Mongolia's copper belts, Geo...
04.09.2014, Mining exploration project unlocking Mongolia's copper belts, Geo...04.09.2014, Mining exploration project unlocking Mongolia's copper belts, Geo...
04.09.2014, Mining exploration project unlocking Mongolia's copper belts, Geo...
 

Mehr von Objective Capital Conferences

Mehr von Objective Capital Conferences (20)

Skin Elements Corporate Presentation - London, Dec 2017
Skin Elements Corporate Presentation - London, Dec 2017 Skin Elements Corporate Presentation - London, Dec 2017
Skin Elements Corporate Presentation - London, Dec 2017
 
Organto Presentation - November 2016
Organto Presentation - November 2016Organto Presentation - November 2016
Organto Presentation - November 2016
 
The next generation in proppants
The next generation in proppantsThe next generation in proppants
The next generation in proppants
 
The Global Proppants Industry
The Global Proppants IndustryThe Global Proppants Industry
The Global Proppants Industry
 
Next-Generation Fly-Ash Based Proppants
Next-Generation Fly-Ash Based ProppantsNext-Generation Fly-Ash Based Proppants
Next-Generation Fly-Ash Based Proppants
 
Goviex
GoviexGoviex
Goviex
 
CanAlaska Uranium
CanAlaska UraniumCanAlaska Uranium
CanAlaska Uranium
 
Uranium Equities
Uranium EquitiesUranium Equities
Uranium Equities
 
The World Nuclear Industry Status Report
The World Nuclear Industry Status ReportThe World Nuclear Industry Status Report
The World Nuclear Industry Status Report
 
KBL Mining Corporate Presentation - June 2015
KBL Mining Corporate Presentation - June 2015KBL Mining Corporate Presentation - June 2015
KBL Mining Corporate Presentation - June 2015
 
Century Iron Mines Corporate Presentation - November 2013
Century Iron Mines Corporate Presentation - November 2013Century Iron Mines Corporate Presentation - November 2013
Century Iron Mines Corporate Presentation - November 2013
 
Canoel International Energy - October 2013
Canoel International Energy - October 2013Canoel International Energy - October 2013
Canoel International Energy - October 2013
 
Century Iron Corporate Presentation - May 2013
Century Iron Corporate Presentation - May 2013Century Iron Corporate Presentation - May 2013
Century Iron Corporate Presentation - May 2013
 
Century Iron Mines Corporation
Century Iron Mines CorporationCentury Iron Mines Corporation
Century Iron Mines Corporation
 
Building the next Saskatchewan potash giant
Building the next Saskatchewan potash giantBuilding the next Saskatchewan potash giant
Building the next Saskatchewan potash giant
 
Building the Italian antimony industry
Building the Italian antimony industryBuilding the Italian antimony industry
Building the Italian antimony industry
 
'In the elevator'
'In the elevator''In the elevator'
'In the elevator'
 
Developing Gold Projects in Tanzania and Namibia
Developing Gold Projects in Tanzania and NamibiaDeveloping Gold Projects in Tanzania and Namibia
Developing Gold Projects in Tanzania and Namibia
 
Building the next gold giant
Building the next gold giantBuilding the next gold giant
Building the next gold giant
 
What is the future of the Rare Earths sector?
What is the future of the Rare Earths sector?What is the future of the Rare Earths sector?
What is the future of the Rare Earths sector?
 

Kürzlich hochgeladen

CBD Belapur Expensive Housewife Call Girls Number-📞📞9833754194 No 1 Vipp HIgh...
CBD Belapur Expensive Housewife Call Girls Number-📞📞9833754194 No 1 Vipp HIgh...CBD Belapur Expensive Housewife Call Girls Number-📞📞9833754194 No 1 Vipp HIgh...
CBD Belapur Expensive Housewife Call Girls Number-📞📞9833754194 No 1 Vipp HIgh...
priyasharma62062
 
From Luxury Escort Service Kamathipura : 9352852248 Make on-demand Arrangemen...
From Luxury Escort Service Kamathipura : 9352852248 Make on-demand Arrangemen...From Luxury Escort Service Kamathipura : 9352852248 Make on-demand Arrangemen...
From Luxury Escort Service Kamathipura : 9352852248 Make on-demand Arrangemen...
From Luxury Escort : 9352852248 Make on-demand Arrangements Near yOU
 
call girls in Sant Nagar (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
call girls in Sant Nagar (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️call girls in Sant Nagar (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
call girls in Sant Nagar (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
( Jasmin ) Top VIP Escorts Service Dindigul 💧 7737669865 💧 by Dindigul Call G...
( Jasmin ) Top VIP Escorts Service Dindigul 💧 7737669865 💧 by Dindigul Call G...( Jasmin ) Top VIP Escorts Service Dindigul 💧 7737669865 💧 by Dindigul Call G...
( Jasmin ) Top VIP Escorts Service Dindigul 💧 7737669865 💧 by Dindigul Call G...
dipikadinghjn ( Why You Choose Us? ) Escorts
 
Call Girls in New Ashok Nagar, (delhi) call me [9953056974] escort service 24X7
Call Girls in New Ashok Nagar, (delhi) call me [9953056974] escort service 24X7Call Girls in New Ashok Nagar, (delhi) call me [9953056974] escort service 24X7
Call Girls in New Ashok Nagar, (delhi) call me [9953056974] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
VIP Call Girl Service Andheri West ⚡ 9920725232 What It Takes To Be The Best ...
VIP Call Girl Service Andheri West ⚡ 9920725232 What It Takes To Be The Best ...VIP Call Girl Service Andheri West ⚡ 9920725232 What It Takes To Be The Best ...
VIP Call Girl Service Andheri West ⚡ 9920725232 What It Takes To Be The Best ...
dipikadinghjn ( Why You Choose Us? ) Escorts
 
VIP Kalyan Call Girls 🌐 9920725232 🌐 Make Your Dreams Come True With Mumbai E...
VIP Kalyan Call Girls 🌐 9920725232 🌐 Make Your Dreams Come True With Mumbai E...VIP Kalyan Call Girls 🌐 9920725232 🌐 Make Your Dreams Come True With Mumbai E...
VIP Kalyan Call Girls 🌐 9920725232 🌐 Make Your Dreams Come True With Mumbai E...
roshnidevijkn ( Why You Choose Us? ) Escorts
 

Kürzlich hochgeladen (20)

CBD Belapur Expensive Housewife Call Girls Number-📞📞9833754194 No 1 Vipp HIgh...
CBD Belapur Expensive Housewife Call Girls Number-📞📞9833754194 No 1 Vipp HIgh...CBD Belapur Expensive Housewife Call Girls Number-📞📞9833754194 No 1 Vipp HIgh...
CBD Belapur Expensive Housewife Call Girls Number-📞📞9833754194 No 1 Vipp HIgh...
 
Stock Market Brief Deck (Under Pressure).pdf
Stock Market Brief Deck (Under Pressure).pdfStock Market Brief Deck (Under Pressure).pdf
Stock Market Brief Deck (Under Pressure).pdf
 
Call Girls Rajgurunagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Rajgurunagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Rajgurunagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Rajgurunagar Call Me 7737669865 Budget Friendly No Advance Booking
 
Diva-Thane European Call Girls Number-9833754194-Diva Busty Professional Call...
Diva-Thane European Call Girls Number-9833754194-Diva Busty Professional Call...Diva-Thane European Call Girls Number-9833754194-Diva Busty Professional Call...
Diva-Thane European Call Girls Number-9833754194-Diva Busty Professional Call...
 
Kopar Khairane Russian Call Girls Number-9833754194-Navi Mumbai Fantastic Unl...
Kopar Khairane Russian Call Girls Number-9833754194-Navi Mumbai Fantastic Unl...Kopar Khairane Russian Call Girls Number-9833754194-Navi Mumbai Fantastic Unl...
Kopar Khairane Russian Call Girls Number-9833754194-Navi Mumbai Fantastic Unl...
 
7 tips trading Deriv Accumulator Options
7 tips trading Deriv Accumulator Options7 tips trading Deriv Accumulator Options
7 tips trading Deriv Accumulator Options
 
20240419-SMC-submission-Annual-Superannuation-Performance-Test-–-design-optio...
20240419-SMC-submission-Annual-Superannuation-Performance-Test-–-design-optio...20240419-SMC-submission-Annual-Superannuation-Performance-Test-–-design-optio...
20240419-SMC-submission-Annual-Superannuation-Performance-Test-–-design-optio...
 
From Luxury Escort Service Kamathipura : 9352852248 Make on-demand Arrangemen...
From Luxury Escort Service Kamathipura : 9352852248 Make on-demand Arrangemen...From Luxury Escort Service Kamathipura : 9352852248 Make on-demand Arrangemen...
From Luxury Escort Service Kamathipura : 9352852248 Make on-demand Arrangemen...
 
(INDIRA) Call Girl Mumbai Call Now 8250077686 Mumbai Escorts 24x7
(INDIRA) Call Girl Mumbai Call Now 8250077686 Mumbai Escorts 24x7(INDIRA) Call Girl Mumbai Call Now 8250077686 Mumbai Escorts 24x7
(INDIRA) Call Girl Mumbai Call Now 8250077686 Mumbai Escorts 24x7
 
call girls in Sant Nagar (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
call girls in Sant Nagar (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️call girls in Sant Nagar (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
call girls in Sant Nagar (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
 
Bandra High Profile Sexy Call Girls,9833754194-Khar Road Speciality Call Girl...
Bandra High Profile Sexy Call Girls,9833754194-Khar Road Speciality Call Girl...Bandra High Profile Sexy Call Girls,9833754194-Khar Road Speciality Call Girl...
Bandra High Profile Sexy Call Girls,9833754194-Khar Road Speciality Call Girl...
 
( Jasmin ) Top VIP Escorts Service Dindigul 💧 7737669865 💧 by Dindigul Call G...
( Jasmin ) Top VIP Escorts Service Dindigul 💧 7737669865 💧 by Dindigul Call G...( Jasmin ) Top VIP Escorts Service Dindigul 💧 7737669865 💧 by Dindigul Call G...
( Jasmin ) Top VIP Escorts Service Dindigul 💧 7737669865 💧 by Dindigul Call G...
 
Mira Road Memorable Call Grls Number-9833754194-Bhayandar Speciallty Call Gir...
Mira Road Memorable Call Grls Number-9833754194-Bhayandar Speciallty Call Gir...Mira Road Memorable Call Grls Number-9833754194-Bhayandar Speciallty Call Gir...
Mira Road Memorable Call Grls Number-9833754194-Bhayandar Speciallty Call Gir...
 
Vasai-Virar High Profile Model Call Girls📞9833754194-Nalasopara Satisfy Call ...
Vasai-Virar High Profile Model Call Girls📞9833754194-Nalasopara Satisfy Call ...Vasai-Virar High Profile Model Call Girls📞9833754194-Nalasopara Satisfy Call ...
Vasai-Virar High Profile Model Call Girls📞9833754194-Nalasopara Satisfy Call ...
 
Top Rated Pune Call Girls Shikrapur ⟟ 6297143586 ⟟ Call Me For Genuine Sex S...
Top Rated  Pune Call Girls Shikrapur ⟟ 6297143586 ⟟ Call Me For Genuine Sex S...Top Rated  Pune Call Girls Shikrapur ⟟ 6297143586 ⟟ Call Me For Genuine Sex S...
Top Rated Pune Call Girls Shikrapur ⟟ 6297143586 ⟟ Call Me For Genuine Sex S...
 
W.D. Gann Theory Complete Information.pdf
W.D. Gann Theory Complete Information.pdfW.D. Gann Theory Complete Information.pdf
W.D. Gann Theory Complete Information.pdf
 
Call Girls in New Ashok Nagar, (delhi) call me [9953056974] escort service 24X7
Call Girls in New Ashok Nagar, (delhi) call me [9953056974] escort service 24X7Call Girls in New Ashok Nagar, (delhi) call me [9953056974] escort service 24X7
Call Girls in New Ashok Nagar, (delhi) call me [9953056974] escort service 24X7
 
VIP Call Girl Service Andheri West ⚡ 9920725232 What It Takes To Be The Best ...
VIP Call Girl Service Andheri West ⚡ 9920725232 What It Takes To Be The Best ...VIP Call Girl Service Andheri West ⚡ 9920725232 What It Takes To Be The Best ...
VIP Call Girl Service Andheri West ⚡ 9920725232 What It Takes To Be The Best ...
 
VIP Kalyan Call Girls 🌐 9920725232 🌐 Make Your Dreams Come True With Mumbai E...
VIP Kalyan Call Girls 🌐 9920725232 🌐 Make Your Dreams Come True With Mumbai E...VIP Kalyan Call Girls 🌐 9920725232 🌐 Make Your Dreams Come True With Mumbai E...
VIP Kalyan Call Girls 🌐 9920725232 🌐 Make Your Dreams Come True With Mumbai E...
 
Kharghar Blowjob Housewife Call Girls NUmber-9833754194-CBD Belapur Internati...
Kharghar Blowjob Housewife Call Girls NUmber-9833754194-CBD Belapur Internati...Kharghar Blowjob Housewife Call Girls NUmber-9833754194-CBD Belapur Internati...
Kharghar Blowjob Housewife Call Girls NUmber-9833754194-CBD Belapur Internati...
 

Investor Presentation

  • 1. COMMONWEALTH RESOURCES INVESTMENT FORUM Investor Presentation David Hatch – Managing Director, Navigator Resources IRONMONGERS’ HALL, CITY OF LONDON TUESDAY, 22 MAY 2012 www.ObjectiveCapitalConferences.com
  • 2. NAVIGATOR RESOURCES LIMITED INVESTOR PRESENTATION MAY 2012 DAVID HATCH Managing Director www.navigatorresources.com.au
  • 3. Introduction DISCLAIMER  The information contained in this presentation is not financial product advice. The presentation is for information purposes and is of a general and summary nature only. It does not constitute an offer. Navigator Resources Limited (Navigator) gives no warranties in relation to the statements and information in this presentation. Investors should seek appropriate advice on their own objectives, financial situation and needs. Bronzewing  This presentation contains certain statements which may constitute “forward-looking statements”. Such statements are only predictions and are subject to inherent risks and uncertainties which could cause actual values, performance or achievements to differ materially from those expressed, implied or projected in any forward looking statements.  Navigator disclaims any intent or obligation to update publicly any forward-looking statements, whether as a result of new information, future events or results or otherwise. Investors are cautioned that forward-looking statements are not guarantees of future performance and investors are cautioned not to put undue reliance on forward-looking statements due to the inherent uncertainty therein. Leonora  This presentation does not constitute or form any part of any offer or invitation to sell or issue, or any solicitation of any offer to purchase or subscribe for, any securities in the Company nor shall it or any part of it, or the fact of its distribution, form the basis of, or be relied on in connection with, any contract or commitment or investment decision relating to any securities in the Company. Any decision regarding any proposed subscription for securities in the Company must be made solely on the basis of information on the Company that is publicly available.  This presentation does not constitute an offer of securities for sale. Exploration COMPETENT PERSONS STATEMENT Sections of information contained within this report that relate to Exploration Results, Mineral Resources or Ore Reserves at the Bronzewing Gold Project, the Leonora Gold Project and Cummins Range Rare Earth Project are based on information reviewed by Bernie Kirkpatrick who is a full-time employee of Navigator Resources Limited and a Member of the Australasian Institute of Mining Conclusion and Metallurgy. Bernie Kirkpatrick has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he has undertaken to qualify as a Competent Person as defined in the 2004 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Bernie Kirkpatrick consents to the inclusion in this report of the matters based on his information in the form and context in which it appears.
  • 4. Introduction CORPORATE OVERVIEW ASX Code: NAV Ordinary Shares 2,222,216,576 Bronzewing Market Capitalisation ($0.008) A$17.8 million 12 month High-Low A$0.140-0.008 Debt Outstanding US$12 million Hedging Nil Leonora Unlisted Options 62,869,578 ASX Code: NAVOB Exploration Listed Options 835,096,124 Exercise Price A$0.04 Expiry Date 31 July 2014 Conclusion
  • 5. Introduction BOARD & MANAGEMENT  Allan Trench Non-Executive Chairman (since 2005) Over 15 years geology/business Bronzewing management experience in the Australian resources industry including  John Shipp with CRU Group, WMC, Barrick, Non-Executive Director (since 2006) Woodside and McKinsey & Company. Mining engineer with 40 years of international experience. Former- President Barrick Gold Australia-  David Hatch Africa operations and GM of KCGM Leonora Managing Director (since 2009) and Boddington. A track record in the management, optimisation and development of predominantly gold mining assets in Australia, Indonesia, PNG and West  Guy Walker Africa. Former MD Kingsrose Mining, Non-Executive Director (since 2012) Exploration Westonia Mines and Abosso Minerals. Over 20 years experience in financial markets and funds  Ian Macpherson management in NZ, North America Non-Executive Director (since 2003) and the UK. Former COO of Chartered accountant with 30 years Talisman Global Asset Management experience, specialising in corporate and current Company Secretary of Au Mining. Conclusion advice, equity and debt raising and compliance. Established Ord Partners in 1990.
  • 6. Introduction BOARD & MANAGEMENT David Hatch – Managing Director Bronzewing  Gerry Kaczmarek  Bernie Kirkpatrick CFO/Company Secretary (since 2009) Exploration Manager (since 2008) Accountant and economist with almost 42 years multi-commodity 30 years experience in the resources exploration and mining experience and minerals processing industry with projects throughout covering projects in Australia and Australasia including roles of Mine overseas. Including 10 years as CFO Geologist, Consulting Geologist Leonora and Company Secretary of Troy and Australian Exploration Resources. Manager.  Craig Bradshaw  Michelle Simson Exploration Chief Operating Officer (since 2012) Manager Corporate Affairs (since Mining Engineer with nearly 20 years 2007) experience, predominantly with WA 9 years administration experience gold companies in roles including in the WA mining industry in the Mining Manager, General Manager and gold and uranium sectors, in both COO. site and corporate roles. Conclusion Tim Blyth – General Manager – Bronzewing Operations
  • 7. Introduction TWO GOLD PROJECTS IN WA BRONZEWING Bronzewing 1,067,000oz Au resource* +960km2 tenements +3Moz historic production Purchased September 2009; first gold poured April 2010 Leonora Mining operations focussed on Cockburn Open Pit LEONORA Exploration 745,000oz Au resource* 320km2 tenements +280,000oz historic production Trial mining program February-August 2010 Conclusion Potential 50,000oz Au/yr production * Refer Reserves & Resources table
  • 8. Introduction 1. Cockburn Pit Cutbacks Bronzewing 2. Physicals Performance Leonora 3. Current Mine Plan 4. 2012/13 & 2013/14 Mine Plan Exploration Forecasts Conclusion
  • 9. Introduction COCKBURN PIT CUTBACKS Bronzewing Leonora Exploration Eastern Cutback Interim Western Cutback  Cutback commenced February 2011  Cutback commenced June 2011  First ore mined June 2011  First ore mined September 2011 Conclusion  Majority of waste pre-strip is completed  Eastern and interim western cutback now connected around southern end of pit
  • 10. Introduction PHYSICALS PERFORMANCE Bronzewing Leonora Exploration Conclusion  Positive gold production trend continuing * Forecast
  • 11. Introduction CURRENT MINE PLAN Bronzewing Leonora 2+ years Mine Plan 200,000oz Exploration potential Cockburn Pit 4.33Mt @ 1.6g/t Au* Recovered (Drill testing a series of (If the current observed near mine surface trend of conversion of anomalies based on gold Exploration Inferred material continues, nuggets and soil sampling there will be additional ore scheduled for July) tonnes and mine life) Conclusion * $1,350 pit design; Indicated only
  • 12. Introduction 2012/13 MINE PLAN FORECAST Q1 Q2 Total movement: 2.40M BCM Total movement: 1.49M BCM Bronzewing Ore mined: 613,000t Ore mined: 708,500t Plant throughput: 512,500t Plant throughput: 497,000t Average grade: 1.30g/t Average grade: 1.55g/t Gold recovered: 18,000-22,000oz Gold recovered: 21,500-25,500oz Leonora Q3 Q4 Total movement: 1.49M BCM Total movement: 1.50M BCM Exploration Ore mined: 655,000t Ore mined: 727,500t Plant throughput: 472,500t Plant throughput: 478,000t Average grade: 1.46g/t Average grade: 1.51g/t Gold recovered: 19,000-23,000oz Gold recovered: 20,000-24,000oz Conclusion Note: Budget costs and revenue estimates in progress
  • 13. Introduction 2013/14 MINE PLAN FORECAST Q1 Q2 Total movement: 1.50M BCM Total movement: 1.08M BCM Bronzewing Ore mined: 664,000t Ore mined: 962,000t Plant throughput: 483,500t Plant throughput: 478,000t Average grade: 1.34g/t Average grade: 2.18g/t Gold recovered: 17,500-21,500oz Gold recovered: 30,500-34,500oz Leonora Q3 Q4 Plant throughput: 472,500t Plant throughput: 478,000t Exploration Average grade: 1.84g/t Average grade: 0.83g/t Gold recovered: 25,000-29,000oz Gold recovered: 9,500-13,500oz Note: Budget costs and revenue estimates in progress Conclusion
  • 14. Introduction 1. Project History Bronzewing 2. Project Areas Leonora 3. Trial Mining 4. Development Scenarios Exploration Conclusion
  • 15. Introduction PROJECT HISTORY PFS completed: 12.2Mt @ LGP purchased from Sons 1.9g/t Au First recorded of Gwalia Administrators (742,000oz)+; Development Bronzewing mining activity on 6 year life options under the leases Resource doubles consideration to 444,444oz* Leonora 1996- 2005 2006 2009 2010 2011... 1899 1978 2004 2004 Exploration Sons of Gwalia own & operate Leonora Gold Project (LGP) Inferred Resource: Trial mining activity 3.54Mt @ 1.9g/t undertaken; 5 months, (221,500oz) 114,000t, 7,673oz Conclusion Resource increases to 700,400oz# * Indicated : 2.15Mt @ 2.7g/t for 189,000oz ; Inferred: 3.73Mt @ 2.1g/t for 255,000oz; # Measured: 3.65Mt @ 2.1g/t for 241,300oz; Indicated: 3.44Mt @ 2.1g/t for 232,300oz; Inferred: 3.63Mt @ 1.9g/t for 227,000oz; + Indicated: 8.27Mt @ 2.0g/t for 539,000oz; Inferred: 3.91Mt @ 1.6g/t for 203,000oz
  • 16. Introduction THREE MAIN PROJECT AREAS: TOTAL 745,000oz RESOURCE Bronzewing Leonora Cardinia Mertondale Raeside Exploration 199,000oz 395,000oz 134,000oz 4.79Mt @ 1.3g/t 5.59Mt @ 2.2g/t 1.57Mt @ 2.6g/t (Indicated: 2.35Mt @ 1.3g/t = 95,000oz (Indicated: 4.34Mt @ 2.2g/t = 311,000oz (Indicated: 1.47Mt @ 2.7g/t = 127,000oz Inferred: 2.44Mt @ 1.3g/t = 104,000oz) Inferred: 1.25Mt @ 2.1g/t = 84,000oz) Inferred: 0.10Mt @ 2.1g/t = 7,000oz) Bruno Pit Trial: Mert 2 Pit Trial: Resource review: Conclusion February – June 2010 March – May 2010 September 2009 * Additional 17,000oz Resource to total 745,000oz located at Gambier Lass prospect
  • 17. Introduction TRIAL MINING: SIGNIFICANT VALUE-ADD ACHIEVED Mining Processing Results Bronzewing February – June 2010 April – August 2010 40% grade upgrade from 114,000t ore 5 parcels (T1-T5) Bruno Pit Predominantly Bruno High recovery of 93% Significant ore body data supergene ore generated 7,673oz gold poured Free dig mining confirmed Mining costs and material Leonora handling confirmed A$2.12 million net profit generated Exploration Conclusion NAV gold from T1 milling
  • 18. Introduction SEVERAL DEVELOPMENT SCENARIOS Bronzewing Leonora 2009 PFS Scenario 2011 Post-Trial Scenario Financing Options 1Mtpa CIL processing facility Low capital (<$30 million) Debt Central Merton’s Reward 0.5Mtpa processing facility Hybrid Debt location OR Cardinia only; shallow low strip JV Exploration 6 year mine life ratio mining Equity Anticipated pit backfill of 53,000oz pa (1.8g/t) Asset Sale tailings and waste rock ~$45million capital 4-6 year mine life; 30,000- 40,000oz pa Conclusion Estimated unit cash cost of $900-$1,000/oz
  • 19. Introduction CARDINIA MULTIPLE PIT DEVELOPMENT Bronzewing Trial Mined Bruno Pit Leonora Exploration Conclusion Cardinia Pit Designs based on A$1,300/oz
  • 20. Introduction 1. Resources & Reserves Bronzewing 2. Regional Geology Leonora 3. Bronzewing 4. Leonora Exploration 5. East Kimberley Conclusion
  • 21. Introduction RESOURCES & RESERVES Bronzewing Reserves – June 2011 Mt g/t Au oz Bronzewing Probable 10.624 1.6 540,000 Total 10.624 1.6 540,000 Bronzewing Resources – June 2011 (inclusive of Reserves) Mt g/t Au oz Indicated 13.72 1.7 738,000 Leonora Inferred 5.60 1.8 329,000 Total 19.32 1.7 1,067,000 Leonora Resources – June 2011 Exploration Mt g/t Au oz Indicated 8.16 2.0 533,000 Inferred 4.13 1.6 212,000 Total 12.29 1.9 745,000 Conclusion Cummins Range Inferred Resource – February 2012 COG% Tonnage Mt TREO % P2O5 % U3O8 ppm Th ppm TREO kt 1.0 4.90 1.74 11.2 145 48 85.0
  • 22. Introduction Bronzewing Leonora Exploration Conclusion REGIONAL GEOLOGY
  • 23. Introduction BRONZEWING  Total land holding: ~960km2  Total annual expenditure commitment: $2.74 million Bronzewing  JV arrangement with Mark Creasy (70% NAV; 30% Creasy)  JV arrangement with Audax Leonora Minerals & Hot Holdings (NAV farmin to 50% on $1 million expenditure over 4 years; additional 19% on $1 million Exploration over further 2 years) Conclusion
  • 24. Introduction BRONZEWING – COCKBURN Bronzewing Leonora Exploration Conclusion  Potential for underground mining following completion of open pit
  • 25. Introduction BRONZEWING – DRAGON-VENUS Bronzewing Leonora Exploration Conclusion  33km south of Bronzewing plant  Best intersections include 13m @ 5.2g/t from 126m and 10m @ 4.7g/t from 224m
  • 26. Introduction BRONZEWING – BOWER-HARRIER  Greenfields prospect 3-5km SE of plant; close proximity to mill and other infrastructure Bronzewing  NAV has farmed into ground with only sparse previous drilling  BLEG soil anomalies + numerous nuggets over a strike length of 6km; maximum soil sample value of 225ppb Au Leonora  Favourable geology with main host rock a pillowed basalt; magnetic structures evident; shearing visible in outcrop  Heritage survey completed April 2012; Exploration prospect is ready for drill testing with a 9,000m aircore program planned for July 2012  First pass drill program costing <$0.5 million Conclusion will determine whether any likelihood of a significant new discovery
  • 27. Introduction LEONORA  Total land holding: ~320km2  Tenement package focussed on well Bronzewing mineralised Mertondale Shear and sub-parallel Kurrajong trend  Highly prospective land holding warrants exploration spend to increase open pit resource base from Leonora 745,000oz to +1Moz  Total annual expenditure commitment: $1.75 million Exploration Conclusion
  • 28. Introduction LEONORA – MERTON’S REWARD Bronzewing Leonora Exploration  Original gold discovery on Mertondale Shear  Current Resource of 1.08Mt @ 2.6g/t for 91,000oz* Conclusion  Potential for northeast plunging, high grade underground lodes  Historical underground production (1899-1942) of 89,000t @ 21.0g/t = 60,524oz * within a $2,000/oz pit shell, 0.7g/t Au cutoff; Indicated: 1.01Mt @ 2.7g/t for 87,000oz ; Inferred: 0.07Mt @ 1.7g/t for 4,000oz
  • 29. Introduction LEONORA – MERTONDALE 5 Bronzewing Leonora Exploration  10km north of Mertondale  Current Resource of 0.48Mt @ 3.0g/t for 46,000oz*  Potential for flat, south plunging, higher grade shoot Conclusion  Historical production of 0.39Mt @ 2.6g/t for 32,000oz * within a $2,000/oz pit shell, 0.7g/t Au cutoff; Indicated: 0.32t @ 3.2g/t for 33,000oz ; Inferred: 0.16Mt @ 2.7g/t for 13,000oz
  • 30. Introduction LEONORA – HOBBY Bronzewing Leonora Exploration  Mineralisation from surface, located 6.5km NNE of Cardinia Conclusion  Best intersections include 12m @ 10.7g/t from 6m and 9m @ 3.88g/t from 31m  Mineralisation open down dip and along strike
  • 31. Introduction EAST KIMBERLEY  Cummins Range Rare Earth Project: JV with Kimberley Rare Bronzewing Earths (NAV 75%; KRE 25%) (KRE to farmin to 55% on $10 million expenditure over 4 years; additional 25% on BFS delivery)  Laura River Base Metals Project: Leonora JV with Magma Metals (NAV 30% free-carried; Magma have earnt in 70%) Exploration Conclusion
  • 32. Introduction CONCLUSIONS  As expected, first two years of Bronzewing operation have been challenging Bronzewing  Supplementary funding has been required  NAV is positioned to generate significant cashflow in the next 2-3 years  Seeking to extend Bronzewing mine life with higher quality ounces Leonora  NAV is planning to drill test the near mine Bower and Harrier prospects in July Exploration  NAV is keen to add value to the latent Leonora project by:  further exploration spend; or  facilitating development options with third parties Conclusion