SlideShare ist ein Scribd-Unternehmen logo
1 von 14
Downloaden Sie, um offline zu lesen
Proposition K.I.D.S.S. - April 2, 2013
Keep Improving District Schools and Safety
$2.5 Million Bond Issue
               no tax increase
• Prolongs the current debt from 24/25 to 32/33
• Priorities for funds:
  – Middle School classrooms and security
  – High School new entry, renovations and security
  – 8-lane track
  – Multi-purpose synthetic field
April vs. August
                 Why Now?
•   April 2013 4/7ths = 57% vote
•   August 2013 2/3rds = 67% vote
•   Additional Cost for August election
•   Interest rates at all time low
•   Material cost increase
•   Safety and Security
Additional Classrooms to Middle School




This view shows the existing school facilities and the land owned
by the school district
Proposed Middle School Classroom Addition and Security Upgrades




                                     7th Grade                8th Grade

                                                               Resource &
                                 7                        8      Sp. Ed.
                                                                 Areas      6

                                                      6th Grade



1   2    3              Art
                                     Entry Security
          Expo Wing                  Upgrades


        3-Classroom
        Addition for:
        •Careers
        •Computer Lab
        •Health
Current layout of high school and football field
High school with front door moved to Seymour Street and mock-up Auditorium




   Note the pedestrian walkway leading from the new entry at the high school
   down to the multipurpose complex.
New High School Entry & Administrative Offices




Note – this is not the final mock-up. Moving the entry to Seymour will greatly improve safety for
students before and after school. A single entry will also improve safety and security overall.
One mockup of High School Entry & Offices Addition




                                                                New Main
                                             Lobby
                                                                Entry
                                Connecting       Office
                                  Corridor


                                                          New
                                                          ‘Welcome Center’
                                                          Offices & Secure
                     1    2             Admin.
                                                          Vestibule

                           Convert office areas
                           to Classrooms
A sample 8-lane regulation track with grass field
A synthetic field would allow many organizations to use it
This is a sample synthetic field which is striped black for soccer and
white for football.
PROPOSITION K.I.D.S.S. 2013



Please remember to vote on April 2nd!

Weitere ähnliche Inhalte

Andere mochten auch (8)

“What is Real-Time Bidding? And why is it so important trend in the online a...
 “What is Real-Time Bidding? And why is it so important trend in the online a... “What is Real-Time Bidding? And why is it so important trend in the online a...
“What is Real-Time Bidding? And why is it so important trend in the online a...
 
Taburan Lengkung Normal
Taburan Lengkung NormalTaburan Lengkung Normal
Taburan Lengkung Normal
 
Variability?
Variability?Variability?
Variability?
 
Sukatan Kecenderungan Memusat
Sukatan Kecenderungan MemusatSukatan Kecenderungan Memusat
Sukatan Kecenderungan Memusat
 
Panduan WIM & Penilaian Beterusan
Panduan WIM & Penilaian BeterusanPanduan WIM & Penilaian Beterusan
Panduan WIM & Penilaian Beterusan
 
Avast! antivirus protection
Avast! antivirus protectionAvast! antivirus protection
Avast! antivirus protection
 
Filing System
Filing SystemFiling System
Filing System
 
Panduan soalan 2013
Panduan soalan 2013Panduan soalan 2013
Panduan soalan 2013
 

Ähnlich wie Prop kidss

Vm compiled-edited (print)
Vm compiled-edited (print)Vm compiled-edited (print)
Vm compiled-edited (print)Arthur Wilson
 
Vm compiled-edited (print)
Vm compiled-edited (print)Vm compiled-edited (print)
Vm compiled-edited (print)DarrenTofu
 
Nettleton school district technology updates 2013 - 2014
Nettleton school district technology updates 2013 - 2014Nettleton school district technology updates 2013 - 2014
Nettleton school district technology updates 2013 - 2014aalred
 
Sidhivinayak techncal campus PPT
Sidhivinayak techncal campus PPTSidhivinayak techncal campus PPT
Sidhivinayak techncal campus PPTPrathmesh001
 
About engineering College PPt
About engineering College PPtAbout engineering College PPt
About engineering College PPtPrathmesh001
 
Edu 225 week 2 assignment technology table and review
Edu 225 week 2 assignment technology table and reviewEdu 225 week 2 assignment technology table and review
Edu 225 week 2 assignment technology table and reviewben george
 
Microsoft Office 2007 Excel Advanced - Course Gate
Microsoft Office 2007 Excel Advanced - Course GateMicrosoft Office 2007 Excel Advanced - Course Gate
Microsoft Office 2007 Excel Advanced - Course GateCourse Gate
 
Greg SSAT Achievement Show - June 2016
Greg SSAT Achievement Show - June 2016Greg SSAT Achievement Show - June 2016
Greg SSAT Achievement Show - June 2016Greg Hughes
 
Sidhivinayak techncalcampus
Sidhivinayak techncalcampusSidhivinayak techncalcampus
Sidhivinayak techncalcampusPrathmesh001
 
ACADEMIC STUDY PORTAL PRESENTATION BY I-GLOBE
ACADEMIC STUDY PORTAL PRESENTATION BY I-GLOBEACADEMIC STUDY PORTAL PRESENTATION BY I-GLOBE
ACADEMIC STUDY PORTAL PRESENTATION BY I-GLOBEKindzeka Nestor
 
IGLOBE ACADEMIC PORTALs PRESENTATION AUDIO LOOP
IGLOBE ACADEMIC PORTALs PRESENTATION AUDIO LOOPIGLOBE ACADEMIC PORTALs PRESENTATION AUDIO LOOP
IGLOBE ACADEMIC PORTALs PRESENTATION AUDIO LOOPKindzeka Nestor
 
Internel presentation
Internel presentationInternel presentation
Internel presentationadeel khan
 
Eduaction Managment System Presentation
Eduaction Managment System PresentationEduaction Managment System Presentation
Eduaction Managment System PresentationAlinur Seddik
 

Ähnlich wie Prop kidss (16)

Capital Projects 200809 Revised
Capital Projects 200809 RevisedCapital Projects 200809 Revised
Capital Projects 200809 Revised
 
Vm compiled-edited (print)
Vm compiled-edited (print)Vm compiled-edited (print)
Vm compiled-edited (print)
 
Vm compiled-edited (print)
Vm compiled-edited (print)Vm compiled-edited (print)
Vm compiled-edited (print)
 
Nettleton school district technology updates 2013 - 2014
Nettleton school district technology updates 2013 - 2014Nettleton school district technology updates 2013 - 2014
Nettleton school district technology updates 2013 - 2014
 
Sidhivinayak techncal campus PPT
Sidhivinayak techncal campus PPTSidhivinayak techncal campus PPT
Sidhivinayak techncal campus PPT
 
About engineering College PPt
About engineering College PPtAbout engineering College PPt
About engineering College PPt
 
Edu 225 week 2 assignment technology table and review
Edu 225 week 2 assignment technology table and reviewEdu 225 week 2 assignment technology table and review
Edu 225 week 2 assignment technology table and review
 
Microsoft Office 2007 Excel Advanced - Course Gate
Microsoft Office 2007 Excel Advanced - Course GateMicrosoft Office 2007 Excel Advanced - Course Gate
Microsoft Office 2007 Excel Advanced - Course Gate
 
Greg SSAT Achievement Show - June 2016
Greg SSAT Achievement Show - June 2016Greg SSAT Achievement Show - June 2016
Greg SSAT Achievement Show - June 2016
 
Adaptable School Prototype
Adaptable School PrototypeAdaptable School Prototype
Adaptable School Prototype
 
Raymond Kleinegger resume new
Raymond Kleinegger resume newRaymond Kleinegger resume new
Raymond Kleinegger resume new
 
Sidhivinayak techncalcampus
Sidhivinayak techncalcampusSidhivinayak techncalcampus
Sidhivinayak techncalcampus
 
ACADEMIC STUDY PORTAL PRESENTATION BY I-GLOBE
ACADEMIC STUDY PORTAL PRESENTATION BY I-GLOBEACADEMIC STUDY PORTAL PRESENTATION BY I-GLOBE
ACADEMIC STUDY PORTAL PRESENTATION BY I-GLOBE
 
IGLOBE ACADEMIC PORTALs PRESENTATION AUDIO LOOP
IGLOBE ACADEMIC PORTALs PRESENTATION AUDIO LOOPIGLOBE ACADEMIC PORTALs PRESENTATION AUDIO LOOP
IGLOBE ACADEMIC PORTALs PRESENTATION AUDIO LOOP
 
Internel presentation
Internel presentationInternel presentation
Internel presentation
 
Eduaction Managment System Presentation
Eduaction Managment System PresentationEduaction Managment System Presentation
Eduaction Managment System Presentation
 

Prop kidss

  • 1. Proposition K.I.D.S.S. - April 2, 2013 Keep Improving District Schools and Safety
  • 2. $2.5 Million Bond Issue no tax increase • Prolongs the current debt from 24/25 to 32/33 • Priorities for funds: – Middle School classrooms and security – High School new entry, renovations and security – 8-lane track – Multi-purpose synthetic field
  • 3. April vs. August Why Now? • April 2013 4/7ths = 57% vote • August 2013 2/3rds = 67% vote • Additional Cost for August election • Interest rates at all time low • Material cost increase • Safety and Security
  • 4. Additional Classrooms to Middle School This view shows the existing school facilities and the land owned by the school district
  • 5. Proposed Middle School Classroom Addition and Security Upgrades 7th Grade 8th Grade Resource & 7 8 Sp. Ed. Areas 6 6th Grade 1 2 3 Art Entry Security Expo Wing Upgrades 3-Classroom Addition for: •Careers •Computer Lab •Health
  • 6. Current layout of high school and football field
  • 7. High school with front door moved to Seymour Street and mock-up Auditorium Note the pedestrian walkway leading from the new entry at the high school down to the multipurpose complex.
  • 8. New High School Entry & Administrative Offices Note – this is not the final mock-up. Moving the entry to Seymour will greatly improve safety for students before and after school. A single entry will also improve safety and security overall.
  • 9. One mockup of High School Entry & Offices Addition New Main Lobby Entry Connecting Office Corridor New ‘Welcome Center’ Offices & Secure 1 2 Admin. Vestibule Convert office areas to Classrooms
  • 10. A sample 8-lane regulation track with grass field
  • 11. A synthetic field would allow many organizations to use it
  • 12. This is a sample synthetic field which is striped black for soccer and white for football.
  • 13.
  • 14. PROPOSITION K.I.D.S.S. 2013 Please remember to vote on April 2nd!