2. $2.5 Million Bond Issue
no tax increase
• Prolongs the current debt from 24/25 to 32/33
• Priorities for funds:
– Middle School classrooms and security
– High School new entry, renovations and security
– 8-lane track
– Multi-purpose synthetic field
3. April vs. August
Why Now?
• April 2013 4/7ths = 57% vote
• August 2013 2/3rds = 67% vote
• Additional Cost for August election
• Interest rates at all time low
• Material cost increase
• Safety and Security
4. Additional Classrooms to Middle School
This view shows the existing school facilities and the land owned
by the school district
5. Proposed Middle School Classroom Addition and Security Upgrades
7th Grade 8th Grade
Resource &
7 8 Sp. Ed.
Areas 6
6th Grade
1 2 3 Art
Entry Security
Expo Wing Upgrades
3-Classroom
Addition for:
•Careers
•Computer Lab
•Health
7. High school with front door moved to Seymour Street and mock-up Auditorium
Note the pedestrian walkway leading from the new entry at the high school
down to the multipurpose complex.
8. New High School Entry & Administrative Offices
Note – this is not the final mock-up. Moving the entry to Seymour will greatly improve safety for
students before and after school. A single entry will also improve safety and security overall.
9. One mockup of High School Entry & Offices Addition
New Main
Lobby
Entry
Connecting Office
Corridor
New
‘Welcome Center’
Offices & Secure
1 2 Admin.
Vestibule
Convert office areas
to Classrooms