SlideShare ist ein Scribd-Unternehmen logo
1 von 22
888-320-8050
www.MBSI.com
Key Contact
Patricia Berk - President & Owner of MBSI
• Patricia Berk incorporated MBSI in April of 2000.
• MBSI has become the leading environmentally conscious
modular company in the State of Florida.
• Prior to MBSI, Ms. Berk held positions as Executive Vice
President and was a shareholder of ASAP Office Buildings
in Orlando, Florida, 1996-1999.
• Branch Manager for the Central Florida branch of Space
Master International, 1993-1996.
• Account Executive for Diamond Engineered Space, 1989-
1993.
• Phone 888-320-8050
GUATEMALA HOUSING REVITALIZATION
About MBSI
• MBSI is a solely owned corporation based in the
State of Florida, United States.
• MBSI is a certified general contracting firm,
specializing in modular construction with Turn Key
Services.
• The Company was established April 10, 2000 with
it’s primary business in the South East, USA.
• MBSI has established themselves in the alternative
building marketplace as a leader with energy
efficient and environmentally friendly buildings.
GUATEMALA HOUSING REVITALIZATION
MBSI’s Mission
• To exceed client expectations through
honest communication, quality construction
and sensitivity for the environment, while
fostering a safe, creative and ethical
workplace that provides unlimited
opportunities.
• To be major contributor to the development
and quality of modular construction while
providing impeccable customer service and
communication.
GUATEMALA HOUSING REVITALIZATION
MBSI Business Philosophy
• To attain successful long-term relationships
through truthful and honest business
procedures.
- Utilize proven manufacturers, quality
materials, and provide cost effective
construction.
- Committed to meeting all client
requirements, for total customer satisfaction.
GUATEMALA HOUSING REVITALIZATION
Environmental Focus
• Provider of the first platinum-level
Leadership, Energy and Environmental
Design (LEED) Certified modular school in
the State of Florida
• Introduced green building practices in all
aspects of MBSI as standard practices.
• We use use certified green products in our
modular buildings in order to minimize off
gassing and conserve energy
GUATEMALA HOUSING REVITALIZATION
Market Sectors
• Commercial Housing
- Group treatment homes, Dormitories, Military Housing,
Worker Camps
• Schools
- Charter, Public and Private, Gymnasiums, Classrooms,
Auditoriums
• Medical
- CT/MRI Buildings, X-Ray Storage, Administrative
Buildings, Doctors Offices, Hospitals, Laboratories
• Churches/Places of Worship
- Daycare & Child Care, Offices, Fellowship Halls,
Sanctuary's, Business Offices
• Government
- Administrative Offices, dormitories, field
stations,
Types of Products Provided
• Factory Built Modular Structures
• Pre-engineered Steel Buildings
• Turn Key Site Services
• Building Accessories
GUATEMALA HOUSING REVITALIZATION
Recent Completed Projects
• Shands Hospital MRI/CT Scan Modular
Facility
• Learning Gate Community School, Platinum
Level LEED Certified Hillsboro County
Public Charter School.
www.learninggate.org
• Terrace Community Charter Middle School-
Hillsboro County Public Charter School
• 50,000 sq. ft. classroom space Embry
Riddle Aeronautical University
GUATEMALA HOUSING REVITALIZATION
Jacksonville Medical Center
• MRI/CT can, type II non
combustible modular
medical facility.
• 5000 Square feet.
• Contracted November
2007
• Finished March 2008
To know about MBSI’s other medical buildings and projects,
visit http://mbsi.com/building-types/medical.html
Learning Gate School
• 9 Classrooms, 8000
Sq. Feet
• First Platinum LEED
Certified Modular
School in U.S.
• Receiving National
Attention
• www.learninggate.org
To know about MBSI’s other educational buildings and projects,
visit http://mbsi.com/building-types/education.html
Terrace Community
Charter School
• Built in 2007
• Two Buildings
totaling 36,000 sq.
feet.
• Administrative
Offices
• Gymnasium
• 30 Classrooms
• Cafeteria
An Overview of the
Permanent/Relocatable Modular Construction
Engineering & Submittals
Site Development
Modular Construction
Staging & Installation
Interior & Exterior Finishes
Project Completion
2000 Modular Building Systems Intl.
Design Engineering
• Unlimited Design Assistance
• FL Engineered Blueprints
• PE /Architect Coordination
• Local Permitting Administration
Design Site Development
Modular Construction
Staging and Installation Finishout Completion
2000 Modular Building Systems Intl.
Site Development
• Site preparation
• Foundations
• Logistics and receiving for staging
Design Site Development
Modular Construction
Staging and Installation Finishout Completion
2000 Modular Building Systems Intl.
Modular Construction Process
• Begin Manufacturing Modules
• Quality control/Documentation
• State of FL building approval
• Delivery to Site
Design Site Development
Modular Construction
Staging and Installation
2000 Modular Building Systems Intl.
Finishout Completion
Staging & Installation
• Foundation Development prior to
Delivery
• Staging on or near existing site
• Set-up and installation
• Begin on-site finishes
Design Site Development
Modular Construction
GUATEMALA
Staging and Installation
Begin Finishout
2000 Modular Building Systems Intl.
Finishout Completion
Begin On Site Finishes
• As modular building is installed, on site Interior &
Exterior finishes Begin
• Full Time Construction Management
Design Site Development
Modular Construction
Staging and Installation
Begin Finishout
2000 Modular Building Systems Intl.
On Site Completion
Finishes
Interior Finishes
• Interior finishes are completed
• Full Time Construction Management and Coordination of
Interior Contractors
Design Site Development
Modular Construction
Staging and Installation
Begin Finishout
2000 Modular Building Systems Intl.
Interior Completion
Finishes
Finish Out
•Exterior finishes completed:
•Exterior siding, sidewalks, canopies, etc
Design Site Development
Modular Construction
Staging and Installation
Begin Finishout
2000 Modular Building Systems Intl.
Exterior Completion
Finishes
Completion
• Final walkthrough of building
• Test HVAC, Electrical & Plumbing
• Substantial Completion Signed Off
Design Site Development
Modular Construction
Staging and Installation
Begin Finishout
2000 Modular Building Systems Intl.
Finishout Completion
Project Completed
Design Site Development
Modular Construction
Staging and Installation
Begin Finishout
2000 Modular Building Systems Intl.
Finishout Completion

Weitere ähnliche Inhalte

Was ist angesagt?

Modular Volumetric Construction
Modular Volumetric ConstructionModular Volumetric Construction
Modular Volumetric Constructionphilwdm
 
Advanced Modular Structures
Advanced Modular StructuresAdvanced Modular Structures
Advanced Modular StructuresAdvanced Modular
 
#6a modular construction (1)
#6a    modular construction (1)#6a    modular construction (1)
#6a modular construction (1)Eveana Crystle
 
The National Eco House Oman
The National Eco House OmanThe National Eco House Oman
The National Eco House OmanMECandPMV
 
Building construction
Building constructionBuilding construction
Building constructionLlyod cassidy
 
Building Technology 1 (P1)
Building Technology 1 (P1)Building Technology 1 (P1)
Building Technology 1 (P1)Nicole Foo
 
Building construction ppt
Building construction pptBuilding construction ppt
Building construction pptgyan singh
 
Construction Technology I Presentation Slides
Construction Technology I Presentation SlidesConstruction Technology I Presentation Slides
Construction Technology I Presentation SlidesJiaYu36
 
Innovations in Construction
Innovations in ConstructionInnovations in Construction
Innovations in ConstructionSahil Baviskar
 
Wall Modul General Presentation
Wall Modul General PresentationWall Modul General Presentation
Wall Modul General PresentationWallModul
 
Wall Modul General Presentation
Wall Modul General PresentationWall Modul General Presentation
Wall Modul General PresentationWallModul
 
Off-site and on -site modern method of construction
Off-site and on -site modern method of constructionOff-site and on -site modern method of construction
Off-site and on -site modern method of constructionANNA REBECCA PRASAD
 

Was ist angesagt? (20)

Modular Volumetric Construction
Modular Volumetric ConstructionModular Volumetric Construction
Modular Volumetric Construction
 
About modular home
About modular homeAbout modular home
About modular home
 
Advanced Modular Structures
Advanced Modular StructuresAdvanced Modular Structures
Advanced Modular Structures
 
#6a modular construction (1)
#6a    modular construction (1)#6a    modular construction (1)
#6a modular construction (1)
 
The National Eco House Oman
The National Eco House OmanThe National Eco House Oman
The National Eco House Oman
 
Modern Method
Modern MethodModern Method
Modern Method
 
Modular Construction
Modular ConstructionModular Construction
Modular Construction
 
Building construction
Building constructionBuilding construction
Building construction
 
Building Technology 1 (P1)
Building Technology 1 (P1)Building Technology 1 (P1)
Building Technology 1 (P1)
 
Building construction ppt
Building construction pptBuilding construction ppt
Building construction ppt
 
Proposal for Foldable Mobile House
Proposal for Foldable Mobile HouseProposal for Foldable Mobile House
Proposal for Foldable Mobile House
 
Construction Technology I Presentation Slides
Construction Technology I Presentation SlidesConstruction Technology I Presentation Slides
Construction Technology I Presentation Slides
 
074 Modern Methods of Construction
074 Modern Methods of Construction074 Modern Methods of Construction
074 Modern Methods of Construction
 
Innovations in Construction
Innovations in ConstructionInnovations in Construction
Innovations in Construction
 
6) UBS Product Comp 2015 PDF
6) UBS Product Comp 2015 PDF6) UBS Product Comp 2015 PDF
6) UBS Product Comp 2015 PDF
 
6) UBS AT Home Improvements 2015 PDF
6) UBS  AT Home Improvements 2015 PDF6) UBS  AT Home Improvements 2015 PDF
6) UBS AT Home Improvements 2015 PDF
 
Wall Modul General Presentation
Wall Modul General PresentationWall Modul General Presentation
Wall Modul General Presentation
 
Wall Modul General Presentation
Wall Modul General PresentationWall Modul General Presentation
Wall Modul General Presentation
 
10) UBS Home Imp 2015 PDF
10) UBS  Home Imp  2015 PDF10) UBS  Home Imp  2015 PDF
10) UBS Home Imp 2015 PDF
 
Off-site and on -site modern method of construction
Off-site and on -site modern method of constructionOff-site and on -site modern method of construction
Off-site and on -site modern method of construction
 

Ähnlich wie Modular building systems international (mbsi) modular buildings and construction

D Ford Resume 3 14 10
D Ford Resume 3 14 10D Ford Resume 3 14 10
D Ford Resume 3 14 10gueste65323
 
Power point timg intro - 2013
Power point   timg intro - 2013Power point   timg intro - 2013
Power point timg intro - 2013dthielke
 
Morris Group Resume
Morris Group ResumeMorris Group Resume
Morris Group Resumemorrisgroup
 
Madison Modular Healthcare Solutions
Madison Modular Healthcare SolutionsMadison Modular Healthcare Solutions
Madison Modular Healthcare SolutionsMadison Industries
 
Britco_Changing_The_Way_The_World_Builds_Introduction_August 2014
Britco_Changing_The_Way_The_World_Builds_Introduction_August 2014Britco_Changing_The_Way_The_World_Builds_Introduction_August 2014
Britco_Changing_The_Way_The_World_Builds_Introduction_August 2014Simon Amesbury
 
LP Introduction
LP IntroductionLP Introduction
LP Introductionrennis
 
Lp Presentation
Lp PresentationLp Presentation
Lp Presentationspourvakil
 
Chuck Janczy resume_01202016
Chuck Janczy resume_01202016Chuck Janczy resume_01202016
Chuck Janczy resume_01202016Charles Janczy
 
John McGuigan_Resume 2015
John McGuigan_Resume 2015John McGuigan_Resume 2015
John McGuigan_Resume 2015John McGuigan
 
Did You Know: M SPACE
Did You Know: M SPACEDid You Know: M SPACE
Did You Know: M SPACEM SPACE
 
Professional Experience
Professional ExperienceProfessional Experience
Professional Experiencebdmiller
 
Knowledge Matrix corporate presentation 2014
Knowledge Matrix corporate presentation 2014Knowledge Matrix corporate presentation 2014
Knowledge Matrix corporate presentation 2014Toyaja
 
Cork-Howard General Information
Cork-Howard General InformationCork-Howard General Information
Cork-Howard General Informationlbbryant
 
Assessment Overview.Pdf
Assessment Overview.PdfAssessment Overview.Pdf
Assessment Overview.PdfRhird
 
Assessment Overview.Pdf
Assessment Overview.PdfAssessment Overview.Pdf
Assessment Overview.Pdfbrucedalton
 
Assessment Overview.Pdf
Assessment Overview.PdfAssessment Overview.Pdf
Assessment Overview.PdfFred28
 
Assessment Overview
Assessment OverviewAssessment Overview
Assessment Overviewjerseygeol
 
Assessment Services Overview.Pdf
Assessment Services Overview.PdfAssessment Services Overview.Pdf
Assessment Services Overview.Pdfhdayton1
 

Ähnlich wie Modular building systems international (mbsi) modular buildings and construction (20)

Achieving Modular Multifamily Affordable Housing
Achieving Modular Multifamily Affordable HousingAchieving Modular Multifamily Affordable Housing
Achieving Modular Multifamily Affordable Housing
 
Resume
ResumeResume
Resume
 
D Ford Resume 3 14 10
D Ford Resume 3 14 10D Ford Resume 3 14 10
D Ford Resume 3 14 10
 
Power point timg intro - 2013
Power point   timg intro - 2013Power point   timg intro - 2013
Power point timg intro - 2013
 
Morris Group Resume
Morris Group ResumeMorris Group Resume
Morris Group Resume
 
Madison Modular Healthcare Solutions
Madison Modular Healthcare SolutionsMadison Modular Healthcare Solutions
Madison Modular Healthcare Solutions
 
Britco_Changing_The_Way_The_World_Builds_Introduction_August 2014
Britco_Changing_The_Way_The_World_Builds_Introduction_August 2014Britco_Changing_The_Way_The_World_Builds_Introduction_August 2014
Britco_Changing_The_Way_The_World_Builds_Introduction_August 2014
 
LP Introduction
LP IntroductionLP Introduction
LP Introduction
 
Lp Presentation
Lp PresentationLp Presentation
Lp Presentation
 
Chuck Janczy resume_01202016
Chuck Janczy resume_01202016Chuck Janczy resume_01202016
Chuck Janczy resume_01202016
 
John McGuigan_Resume 2015
John McGuigan_Resume 2015John McGuigan_Resume 2015
John McGuigan_Resume 2015
 
Did You Know: M SPACE
Did You Know: M SPACEDid You Know: M SPACE
Did You Know: M SPACE
 
Professional Experience
Professional ExperienceProfessional Experience
Professional Experience
 
Knowledge Matrix corporate presentation 2014
Knowledge Matrix corporate presentation 2014Knowledge Matrix corporate presentation 2014
Knowledge Matrix corporate presentation 2014
 
Cork-Howard General Information
Cork-Howard General InformationCork-Howard General Information
Cork-Howard General Information
 
Assessment Overview.Pdf
Assessment Overview.PdfAssessment Overview.Pdf
Assessment Overview.Pdf
 
Assessment Overview.Pdf
Assessment Overview.PdfAssessment Overview.Pdf
Assessment Overview.Pdf
 
Assessment Overview.Pdf
Assessment Overview.PdfAssessment Overview.Pdf
Assessment Overview.Pdf
 
Assessment Overview
Assessment OverviewAssessment Overview
Assessment Overview
 
Assessment Services Overview.Pdf
Assessment Services Overview.PdfAssessment Services Overview.Pdf
Assessment Services Overview.Pdf
 

Modular building systems international (mbsi) modular buildings and construction

  • 2. Key Contact Patricia Berk - President & Owner of MBSI • Patricia Berk incorporated MBSI in April of 2000. • MBSI has become the leading environmentally conscious modular company in the State of Florida. • Prior to MBSI, Ms. Berk held positions as Executive Vice President and was a shareholder of ASAP Office Buildings in Orlando, Florida, 1996-1999. • Branch Manager for the Central Florida branch of Space Master International, 1993-1996. • Account Executive for Diamond Engineered Space, 1989- 1993. • Phone 888-320-8050 GUATEMALA HOUSING REVITALIZATION
  • 3. About MBSI • MBSI is a solely owned corporation based in the State of Florida, United States. • MBSI is a certified general contracting firm, specializing in modular construction with Turn Key Services. • The Company was established April 10, 2000 with it’s primary business in the South East, USA. • MBSI has established themselves in the alternative building marketplace as a leader with energy efficient and environmentally friendly buildings. GUATEMALA HOUSING REVITALIZATION
  • 4. MBSI’s Mission • To exceed client expectations through honest communication, quality construction and sensitivity for the environment, while fostering a safe, creative and ethical workplace that provides unlimited opportunities. • To be major contributor to the development and quality of modular construction while providing impeccable customer service and communication. GUATEMALA HOUSING REVITALIZATION
  • 5. MBSI Business Philosophy • To attain successful long-term relationships through truthful and honest business procedures. - Utilize proven manufacturers, quality materials, and provide cost effective construction. - Committed to meeting all client requirements, for total customer satisfaction. GUATEMALA HOUSING REVITALIZATION
  • 6. Environmental Focus • Provider of the first platinum-level Leadership, Energy and Environmental Design (LEED) Certified modular school in the State of Florida • Introduced green building practices in all aspects of MBSI as standard practices. • We use use certified green products in our modular buildings in order to minimize off gassing and conserve energy GUATEMALA HOUSING REVITALIZATION
  • 7. Market Sectors • Commercial Housing - Group treatment homes, Dormitories, Military Housing, Worker Camps • Schools - Charter, Public and Private, Gymnasiums, Classrooms, Auditoriums • Medical - CT/MRI Buildings, X-Ray Storage, Administrative Buildings, Doctors Offices, Hospitals, Laboratories • Churches/Places of Worship - Daycare & Child Care, Offices, Fellowship Halls, Sanctuary's, Business Offices • Government - Administrative Offices, dormitories, field stations,
  • 8. Types of Products Provided • Factory Built Modular Structures • Pre-engineered Steel Buildings • Turn Key Site Services • Building Accessories GUATEMALA HOUSING REVITALIZATION
  • 9. Recent Completed Projects • Shands Hospital MRI/CT Scan Modular Facility • Learning Gate Community School, Platinum Level LEED Certified Hillsboro County Public Charter School. www.learninggate.org • Terrace Community Charter Middle School- Hillsboro County Public Charter School • 50,000 sq. ft. classroom space Embry Riddle Aeronautical University GUATEMALA HOUSING REVITALIZATION
  • 10. Jacksonville Medical Center • MRI/CT can, type II non combustible modular medical facility. • 5000 Square feet. • Contracted November 2007 • Finished March 2008 To know about MBSI’s other medical buildings and projects, visit http://mbsi.com/building-types/medical.html
  • 11. Learning Gate School • 9 Classrooms, 8000 Sq. Feet • First Platinum LEED Certified Modular School in U.S. • Receiving National Attention • www.learninggate.org To know about MBSI’s other educational buildings and projects, visit http://mbsi.com/building-types/education.html
  • 12. Terrace Community Charter School • Built in 2007 • Two Buildings totaling 36,000 sq. feet. • Administrative Offices • Gymnasium • 30 Classrooms • Cafeteria
  • 13. An Overview of the Permanent/Relocatable Modular Construction Engineering & Submittals Site Development Modular Construction Staging & Installation Interior & Exterior Finishes Project Completion 2000 Modular Building Systems Intl.
  • 14. Design Engineering • Unlimited Design Assistance • FL Engineered Blueprints • PE /Architect Coordination • Local Permitting Administration Design Site Development Modular Construction Staging and Installation Finishout Completion 2000 Modular Building Systems Intl.
  • 15. Site Development • Site preparation • Foundations • Logistics and receiving for staging Design Site Development Modular Construction Staging and Installation Finishout Completion 2000 Modular Building Systems Intl.
  • 16. Modular Construction Process • Begin Manufacturing Modules • Quality control/Documentation • State of FL building approval • Delivery to Site Design Site Development Modular Construction Staging and Installation 2000 Modular Building Systems Intl. Finishout Completion
  • 17. Staging & Installation • Foundation Development prior to Delivery • Staging on or near existing site • Set-up and installation • Begin on-site finishes Design Site Development Modular Construction GUATEMALA Staging and Installation Begin Finishout 2000 Modular Building Systems Intl. Finishout Completion
  • 18. Begin On Site Finishes • As modular building is installed, on site Interior & Exterior finishes Begin • Full Time Construction Management Design Site Development Modular Construction Staging and Installation Begin Finishout 2000 Modular Building Systems Intl. On Site Completion Finishes
  • 19. Interior Finishes • Interior finishes are completed • Full Time Construction Management and Coordination of Interior Contractors Design Site Development Modular Construction Staging and Installation Begin Finishout 2000 Modular Building Systems Intl. Interior Completion Finishes
  • 20. Finish Out •Exterior finishes completed: •Exterior siding, sidewalks, canopies, etc Design Site Development Modular Construction Staging and Installation Begin Finishout 2000 Modular Building Systems Intl. Exterior Completion Finishes
  • 21. Completion • Final walkthrough of building • Test HVAC, Electrical & Plumbing • Substantial Completion Signed Off Design Site Development Modular Construction Staging and Installation Begin Finishout 2000 Modular Building Systems Intl. Finishout Completion
  • 22. Project Completed Design Site Development Modular Construction Staging and Installation Begin Finishout 2000 Modular Building Systems Intl. Finishout Completion