TMHG 526
     Project Management

Nawanan Theera‐Ampornpunt, M.D., Ph.D.
Faculty of Medicine Ramathibodi Hospital
            Mahidol University
             April 11, 2013
IT Project Management




Marchewka (2006)   Marchewka (2009)
Introduction
• Information Technology (IT) projects are organizational
  investments that require
   – Time
   – Money
   – Other resources such as people, technology, facilities, etc.
• Organizations expect some type of value in return of this
  investment
• IT Project Management is a relatively new discipline that
  combines traditional Project Management with Software
  Engineering/Management Information Systems to make IT
  projects more successful.
An ITPM Approach
• Organizational resources are limited, so
  organizations must choose among competing
  interests to fund specific projects.
• This decision should be based on the value a
  competing project will provide to an organization.
Which Situation Is Worse?
• Successfully building and implementing a system
  that provides little or no value to the
  organization.
Or…
• Failing to implement an information system that
  could have provided value to the organization,
  but was poorly developed or poorly managed.
The Software Crisis
• The CHAOS study published in 1995 by The Standish
  Group found that although the U.S. spent over $250
  billion on IT projects, approximately…
   –31% were cancelled before completion
   –53% were completed but over budget, over
      schedule, and did not meet original specifications.
       • For mid-size companies, average cost overruns
         were 182%, while average schedule overruns
         were 202%!
Why Do IT Projects Fail?
• Larger projects have the lowest success rate and
  appear to be more risky than medium and smaller
  projects
   –Technology, business models and markets change
     so rapidly that a project that takes more than a
     year can be obsolete before they are completed.
• The Chaos study also provides some insight as to the
  factors that influence project success.
Has the Current State of IT Projects
              Changed Since 1995?
• The Standish Group has continued to study IT
  projects over the years.
• In general, IT Projects are showing higher success
  rates due to
   –Better project management tools & processes
   –Smaller projects
   –Improved communication among stakeholders
   –More skillful IT project managers
• But there is still ample opportunity for improvement!
New Top Ten Factors for IT Project Success
                         Rank                                     Success Factor
                          1          User Involvement
                          2          Executive Support
                          3          Clear Business Objectives
                          4          Emotional Maturity
                          5          Optimizing Scope
                          6          Agile Process
                          7          Project Management Expertise
                          8          Skilled Resources
                          9          Execution
                          10         Tools and Infrastructure
Source: The Standish Group. CHAOS (West Yarmouth, MA: 1995, 2010) and http://www.infoq.com/articles/Interview‐Johnson‐Standish‐CHAOS. 
(cited in Marchewka JT. Information technology project management. 4th ed. Singapore: John Wiley & Sons;2013.
Summary of CHAOS Studies from 1994 to 2008




Figure 1.1 Sources: www.standishgroup.com
Improving the Likelihood of Success
• Socio-technical Approach
• Project Management Approach
   – processes and infrastructure (Methodology)
   – resources
   – expectations
   – competition
   – efficiency and effectiveness
• Knowledge Management Approach
   – lessons learned, best practices and shared knowledge
IT Project Management
      • A project: “a temporary endeavor undertaken to
        accomplish a unique purpose”

      • Project management: “the application of
        knowledge, skills, tools, and techniques to
        project activities in order to meet or exceed
        project requirements”

Marchewka (2006)
The Context of Project Management - Project Attributes

 •   Time Frame
 •   Purpose (to provide value!)
 •   Ownership
 •   Resources (the triple constraint)
 •   Roles
      – Project Manager
      – Project Sponsor
      – Subject Matter Experts
      – Technical Experts
 •   Risk & Assumptions
 •   Interdependent Tasks
 •   Planned Organizational Change
 •   Operate in Environments Larger than the Project Itself
Class Exercise
The Importance of Project Management

 Group discussion: Without proper Project
 Management, what can go wrong with the IT
 projects?
The Project Management Dilemma



     Good                  Fast
              Project
            Deliverables

             Cheap
The Triple Constraint




Marchewka (2006)
The Project Life Cycle & IT Development
• Project Life Cycle (PLC)
   – A collection of logical stages or phases that maps the life
     of a project from its beginning to its end in order to define,
     build and deliver the product of the project – i.e., the
     information system
• Projects are divided into phases to increase
  manageability and reduce risk
   – Phase exits, stage gates, or kill points are decision points
     at the end of each phase to evaluate performance, correct
     problems or cancel the project
   – Fast tracking is the overlapping of phases to reduce the
     project’s schedule
      • Can be risky!
Project Life Cycle




Marchewka JT (2006)
Software Development Life Cycle (SDLC)

• Represents the sequential phases or stages an information
  system follows throughout its useful life
• Useful for understanding the development of the project’s
  largest work product – the application system
• Phases/Stages
   – Planning
   – Analysis
   – Design
   – Implementation
   – Maintenance and Support
Software Development Life Cycle




Marchewka JT (2006)
Relationship Between PLC & SDLC
• The systems development life cycle (SDLC)
  becomes part of the project life cycle (PLC).
   –The PLC focuses on the project management
    phases, processes, tools and techniques for
    effectively managing the project.
   –The SDLC focuses on the software engineering
    phases, processes, tools and techniques for building
    and/or implementing the IT solution.
PLC & SDLC




Marchewka JT (2006)
IT Project Management Methodology




Marchewka JT (2006)
Putting the SDLC into Practice
• Structured Approach to Systems
  Development
  –Waterfall Method
• Rapid Applications Development (RAD)
  –Prototyping
  –Spiral Development
  –Extreme Programming
Structured Approaches:
   Waterfall Method
Extreme Project Management (XPM)
• A new approach and philosophy to project management that
  is becoming increasingly popular.
• Characterizes many of today’s projects that exemplify speed,
  uncertainty, changing requirements and high risks.
• Traditional project management often takes an orderly
  approach while XPM embraces the fact that projects are often
  chaotic and unpredictable.
• XPM focuses on flexibility, adaptability and innovation
• Traditional and new approaches together can provide us with
  a better understanding of how to improve the likelihood of
  project success.
The Project Management
            Body of Knowledge (PMBOK ®)

• The Guide to the Project Management Body of Knowledge (PMBOK®
  Guide) documents 9 project management knowledge areas.
• The PMBOK® Guide is published and maintained by the Project
  Management Institute (PMI).
    – http://www.pmi.org
• PMI provides a certification in project management called the Project
  Management Professional (PMP) that many people today believe will
  be as relevant as a CPA certification.
• PMP certification requires that you pass a PMP certification exam to
  demonstrate a level of understanding about project management, as
  well as satisfy education and experience requirements, and agree to a
  professional code of conduct.
The Project Management
                   Body of Knowledge (PMBOK ®)

      1.      Project Integration Management
      2.      Project Scope Management
      3.      Project Time Management
      4.      Project Cost Management
      5.      Project Quality Management
      6.      Project Human Resources Management
      7.      Project Communications Management
      8.      Project Risk Management
      9.      Project Procurement Management

Marchewka (2006)
Project Management Body of Knowledge Areas




Marchewka (2006)
Developing The Business Case




Marchewka (2006)
Measurable Organizational Value (MOV)
      •    The project’s goal
      •    Measure of success
      •    Must be measurable
      •    Provides value to the organization
      •    Must be agreed upon
      •    Must be verifiable at the end of the project
      •    Guides the project throughout its life cycle
      •    Should align with the organization’s strategy and goals

Marchewka (2006)
The IT Value Chain




Marchewka (2006)
A Good Project Goal

         “Our goal is to land a man on the 
            moon and return him safely 
      to the earth by the end of the decade.”
                                  John F. Kennedy (1961)




Marchewka (2006)
Metrics: Financial
      • Payback Period     =       Initial Investment
                                     Net Cash Flow
      • Breakeven Point =          Initial Investment
                                   Net Profit Margin
      • Project ROI = (Total Expected Benefits - Total Expected Costs)
                                  Total Expected Costs




Marchewka (2006)
Metrics: Scoring Method
            Criterion                                           Weight        Alternative A      Alternative B   Alternative C

                               ROI                               15%                2                  4              10
            Financial          Payback                           10%                3                  5              10
                               Net Present Value (NPV)           15%                2                  4              10
                               Alignment with strategic 
                               objectives                        10%                3                  5              8
            Organizational
                               Likelihood of achieving 
                               project’s MOV                     10%                2                  6              9

                               Availability of skilled 
                               team members                       5%                5                  5              4

                               Maintainability                    5%                4                  6              7
            Project
                               Time to develop                    5%                5                  7              6
                               Risk                               5%                3                  5              5
                               Customer satisfaction             10%                2                  4              9
            External
                               Increased market share            10%                2                  5              8

Marchewka   Total Score                                          100%             2.65               4.85            8.50
(2006)      Notes: Risk scores have a reverse scale – i.e., higher scores for risk imply lower levels of risk
Balanced Scorecard




Marchewka (2006)
MOV & Scorecard




Marchewka (2006)
IT Project Management Methodology




Marchewka (2006)
Project Charter Template




Marchewka (2006)
Formulating Project Plan




Marchewka (2006)
Project Scope




In‐Scope              Out‐of‐Scope
Project Planning Framework




Marchewka (2006)
Gantt Chart




Marchewka (2006)
PERT Chart




http://en.wikipedia.org/wiki/Program_Evaluation_and_Review_Technique
Activity On The Node (AON)
                         Network Diagram




Marchewka (2006)
Project Scheduling
      • Critical Path Method (CPM)
      • Precedence Diagramming Method (PDM)
      • Lead Time & Lag Time




Marchewka (2006)
Work Breakdown Structure




Marchewka (2006)
Project Schedule Estimation Techniques
      •    Guesstimating
      •    Delphi Technique
      •    Time Boxing
      •    Top-Down
      •    Bottom Up
      •    Analogous Estimates (Past experiences)
      •    Parametric Modeling (Statistical)


Marchewka (2006)
Project Budget
• Direct/up-front costs
     – Materials
     – Services
     – Labor
• Ongoing costs
• Indirect costs
     –   Facilities, utilities
     –   Administration
     –   Taxes
     –   Benefits
•   (Opportunity & productivity costs)
•   (Sunk costs)
•   Learning curve
•   Reserves
•   Total Cost of Ownership (TCO)
Project Human Resource Management
      • Project team members, roles & responsibilities
      • Organizational structure
             – Functional
             – Project-based
             – Matrix
      • Stakeholder analysis




Marchewka (2006)
Project Risk Management
                                 Risk = f(likelihood x impact)
                                     Risk Strategies
                                     • Accept/ignore
                                     • Avoid completely
                                     • Reduce risk
                                        likelihood or impact
                                     • Transfer risk to
                                        someone else (e.g.
                                        insurance)

Marchewka (2006)

Weitere ähnliche Inhalte

Was ist angesagt?

ЛЕКЦІЯ - БЕСІДА Академічна доброчесність здобувачів вищої освіти для сайта.ppt
ЛЕКЦІЯ - БЕСІДА Академічна доброчесність здобувачів вищої освіти для сайта.pptЛЕКЦІЯ - БЕСІДА Академічна доброчесність здобувачів вищої освіти для сайта.ppt
ЛЕКЦІЯ - БЕСІДА Академічна доброчесність здобувачів вищої освіти для сайта.pptNataliaMatkovska2
 
أعمال الانشاءات الخرسانية - Concrete Structure Works
أعمال الانشاءات الخرسانية - Concrete Structure Worksأعمال الانشاءات الخرسانية - Concrete Structure Works
أعمال الانشاءات الخرسانية - Concrete Structure WorksHussain Sbetan
 
Construction site supervision aalecture one.
Construction site supervision aalecture one.Construction site supervision aalecture one.
Construction site supervision aalecture one.Gebeyehu Worku
 
Fundamentals of Project Planning, Scheduling, Monitoring & Control
Fundamentals of Project Planning, Scheduling, Monitoring & ControlFundamentals of Project Planning, Scheduling, Monitoring & Control
Fundamentals of Project Planning, Scheduling, Monitoring & ControlAssociation for Project Management
 
Surveying,ADVANCE EQUIPMENT IN SURVEY
Surveying,ADVANCE EQUIPMENT  IN SURVEYSurveying,ADVANCE EQUIPMENT  IN SURVEY
Surveying,ADVANCE EQUIPMENT IN SURVEYPRAJWAL SHRIRAO
 
Doors and windows dr.fatma elnekhaily
Doors and windows dr.fatma elnekhailyDoors and windows dr.fatma elnekhaily
Doors and windows dr.fatma elnekhailyDrFatma3
 

Was ist angesagt? (8)

ЛЕКЦІЯ - БЕСІДА Академічна доброчесність здобувачів вищої освіти для сайта.ppt
ЛЕКЦІЯ - БЕСІДА Академічна доброчесність здобувачів вищої освіти для сайта.pptЛЕКЦІЯ - БЕСІДА Академічна доброчесність здобувачів вищої освіти для сайта.ppt
ЛЕКЦІЯ - БЕСІДА Академічна доброчесність здобувачів вищої освіти для сайта.ppt
 
Gantt and PERT chart
Gantt and PERT chartGantt and PERT chart
Gantt and PERT chart
 
أعمال الانشاءات الخرسانية - Concrete Structure Works
أعمال الانشاءات الخرسانية - Concrete Structure Worksأعمال الانشاءات الخرسانية - Concrete Structure Works
أعمال الانشاءات الخرسانية - Concrete Structure Works
 
autocad presentation.pdf
autocad presentation.pdfautocad presentation.pdf
autocad presentation.pdf
 
Construction site supervision aalecture one.
Construction site supervision aalecture one.Construction site supervision aalecture one.
Construction site supervision aalecture one.
 
Fundamentals of Project Planning, Scheduling, Monitoring & Control
Fundamentals of Project Planning, Scheduling, Monitoring & ControlFundamentals of Project Planning, Scheduling, Monitoring & Control
Fundamentals of Project Planning, Scheduling, Monitoring & Control
 
Surveying,ADVANCE EQUIPMENT IN SURVEY
Surveying,ADVANCE EQUIPMENT  IN SURVEYSurveying,ADVANCE EQUIPMENT  IN SURVEY
Surveying,ADVANCE EQUIPMENT IN SURVEY
 
Doors and windows dr.fatma elnekhaily
Doors and windows dr.fatma elnekhailyDoors and windows dr.fatma elnekhaily
Doors and windows dr.fatma elnekhaily
 

Andere mochten auch

ITEC N466: Project initialization
ITEC N466: Project initializationITEC N466: Project initialization
ITEC N466: Project initializationAhmad Ammari
 
The Human Side of Project Management
The Human Side of Project ManagementThe Human Side of Project Management
The Human Side of Project ManagementAchchuthan Seetharan
 
Project management IT Project Management
Project management IT Project Management Project management IT Project Management
Project management IT Project Management Amanda Haddad
 
Project management and information technology context
Project management and information technology contextProject management and information technology context
Project management and information technology contextDhani Ahmad
 
Business Case Development - How and Why
Business Case Development - How and WhyBusiness Case Development - How and Why
Business Case Development - How and WhyDave Angelow
 

Andere mochten auch (6)

ITEC N466: Project initialization
ITEC N466: Project initializationITEC N466: Project initialization
ITEC N466: Project initialization
 
Business case
Business case  Business case
Business case
 
The Human Side of Project Management
The Human Side of Project ManagementThe Human Side of Project Management
The Human Side of Project Management
 
Project management IT Project Management
Project management IT Project Management Project management IT Project Management
Project management IT Project Management
 
Project management and information technology context
Project management and information technology contextProject management and information technology context
Project management and information technology context
 
Business Case Development - How and Why
Business Case Development - How and WhyBusiness Case Development - How and Why
Business Case Development - How and Why
 

Ähnlich wie Project Management

Project Management (for Data Science for Health Care Graduate Programs) (Octo...
Project Management (for Data Science for Health Care Graduate Programs) (Octo...Project Management (for Data Science for Health Care Graduate Programs) (Octo...
Project Management (for Data Science for Health Care Graduate Programs) (Octo...Nawanan Theera-Ampornpunt
 
Introduction to ict project management
Introduction to ict project managementIntroduction to ict project management
Introduction to ict project managementmanproy
 
PM-1 Overview.ppt
PM-1 Overview.pptPM-1 Overview.ppt
PM-1 Overview.pptnatisil1
 
1. Introduction to Project Management and the Project Management Framework
1. Introduction to Project Management and the Project Management Framework1. Introduction to Project Management and the Project Management Framework
1. Introduction to Project Management and the Project Management FrameworkMeshack Shack
 
Mega project not mega problems session 1
Mega project not mega problems session 1Mega project not mega problems session 1
Mega project not mega problems session 1Aconex
 
Project Management Framework
Project Management FrameworkProject Management Framework
Project Management FrameworkRahul Sudame
 
Session 2-Introduction to PPM -b.pdf
Session 2-Introduction to PPM -b.pdfSession 2-Introduction to PPM -b.pdf
Session 2-Introduction to PPM -b.pdfNyakanaJoseph1
 
Project management by hamidun
Project management by hamidunProject management by hamidun
Project management by hamidunDr Hamidun Jaafar
 
L01 introduction to pm
L01 introduction to pmL01 introduction to pm
L01 introduction to pmAsa Chan
 
WQD2011 - INNOVATION - Afoes Consultants - An Innovative Approach
WQD2011 - INNOVATION - Afoes Consultants - An Innovative ApproachWQD2011 - INNOVATION - Afoes Consultants - An Innovative Approach
WQD2011 - INNOVATION - Afoes Consultants - An Innovative ApproachDubai Quality Group
 

Ähnlich wie Project Management (20)

Project Management
Project ManagementProject Management
Project Management
 
Project Management
Project ManagementProject Management
Project Management
 
Project Management (for Data Science for Health Care Graduate Programs) (Octo...
Project Management (for Data Science for Health Care Graduate Programs) (Octo...Project Management (for Data Science for Health Care Graduate Programs) (Octo...
Project Management (for Data Science for Health Care Graduate Programs) (Octo...
 
Introduction to ict project management
Introduction to ict project managementIntroduction to ict project management
Introduction to ict project management
 
1. introduction
1. introduction1. introduction
1. introduction
 
PM-1 Overview.ppt
PM-1 Overview.pptPM-1 Overview.ppt
PM-1 Overview.ppt
 
1. Introduction to Project Management and the Project Management Framework
1. Introduction to Project Management and the Project Management Framework1. Introduction to Project Management and the Project Management Framework
1. Introduction to Project Management and the Project Management Framework
 
Mega project not mega problems session 1
Mega project not mega problems session 1Mega project not mega problems session 1
Mega project not mega problems session 1
 
Project Management Framework
Project Management FrameworkProject Management Framework
Project Management Framework
 
PMExpo2017slide Eureka Service - Oracle Prime
PMExpo2017slide Eureka Service - Oracle PrimePMExpo2017slide Eureka Service - Oracle Prime
PMExpo2017slide Eureka Service - Oracle Prime
 
13115 intro to project management presentation
13115 intro to project management presentation13115 intro to project management presentation
13115 intro to project management presentation
 
u-1.ppt
u-1.pptu-1.ppt
u-1.ppt
 
Project managemen concept
Project managemen conceptProject managemen concept
Project managemen concept
 
Session 2-Introduction to PPM -b.pdf
Session 2-Introduction to PPM -b.pdfSession 2-Introduction to PPM -b.pdf
Session 2-Introduction to PPM -b.pdf
 
1.introduction pm
1.introduction pm1.introduction pm
1.introduction pm
 
ICT 4109.pdf
ICT 4109.pdfICT 4109.pdf
ICT 4109.pdf
 
Manpro ppt
Manpro pptManpro ppt
Manpro ppt
 
Project management by hamidun
Project management by hamidunProject management by hamidun
Project management by hamidun
 
L01 introduction to pm
L01 introduction to pmL01 introduction to pm
L01 introduction to pm
 
WQD2011 - INNOVATION - Afoes Consultants - An Innovative Approach
WQD2011 - INNOVATION - Afoes Consultants - An Innovative ApproachWQD2011 - INNOVATION - Afoes Consultants - An Innovative Approach
WQD2011 - INNOVATION - Afoes Consultants - An Innovative Approach
 

Mehr von Nawanan Theera-Ampornpunt

Health Informatics for Health Service Systems (March 11, 2024)
Health Informatics for Health Service Systems (March 11, 2024)Health Informatics for Health Service Systems (March 11, 2024)
Health Informatics for Health Service Systems (March 11, 2024)Nawanan Theera-Ampornpunt
 
Personal Data Protection Act and the Four Subordinate Laws (February 29, 2024)
Personal Data Protection Act and the Four Subordinate Laws (February 29, 2024)Personal Data Protection Act and the Four Subordinate Laws (February 29, 2024)
Personal Data Protection Act and the Four Subordinate Laws (February 29, 2024)Nawanan Theera-Ampornpunt
 
Privacy & PDPA Awareness Training for Ramathibodi Residents (October 5, 2023)
Privacy & PDPA Awareness Training for Ramathibodi Residents (October 5, 2023)Privacy & PDPA Awareness Training for Ramathibodi Residents (October 5, 2023)
Privacy & PDPA Awareness Training for Ramathibodi Residents (October 5, 2023)Nawanan Theera-Ampornpunt
 
Case Study PDPA Workshop (September 15, 2023)
Case Study PDPA Workshop (September 15, 2023)Case Study PDPA Workshop (September 15, 2023)
Case Study PDPA Workshop (September 15, 2023)Nawanan Theera-Ampornpunt
 
Case Studies on Overview of PDPA and its Subordinate Laws (September 15, 2023)
Case Studies on Overview of PDPA and its Subordinate Laws (September 15, 2023)Case Studies on Overview of PDPA and its Subordinate Laws (September 15, 2023)
Case Studies on Overview of PDPA and its Subordinate Laws (September 15, 2023)Nawanan Theera-Ampornpunt
 
Ramathibodi Security & Privacy Awareness Training (Fiscal Year 2023)
Ramathibodi Security & Privacy Awareness Training (Fiscal Year 2023)Ramathibodi Security & Privacy Awareness Training (Fiscal Year 2023)
Ramathibodi Security & Privacy Awareness Training (Fiscal Year 2023)Nawanan Theera-Ampornpunt
 
Relationship Between Thailand's Official Information Act and Personal Data Pr...
Relationship Between Thailand's Official Information Act and Personal Data Pr...Relationship Between Thailand's Official Information Act and Personal Data Pr...
Relationship Between Thailand's Official Information Act and Personal Data Pr...Nawanan Theera-Ampornpunt
 
Social Media - PDPA: Is There A Way Out? (October 19, 2022)
Social Media - PDPA: Is There A Way Out? (October 19, 2022)Social Media - PDPA: Is There A Way Out? (October 19, 2022)
Social Media - PDPA: Is There A Way Out? (October 19, 2022)Nawanan Theera-Ampornpunt
 
Do's and Don'ts on PDPA for Doctors (May 31, 2022)
Do's and Don'ts on PDPA for Doctors (May 31, 2022)Do's and Don'ts on PDPA for Doctors (May 31, 2022)
Do's and Don'ts on PDPA for Doctors (May 31, 2022)Nawanan Theera-Ampornpunt
 
Telemedicine: A Health Informatician's Point of View
Telemedicine: A Health Informatician's Point of ViewTelemedicine: A Health Informatician's Point of View
Telemedicine: A Health Informatician's Point of ViewNawanan Theera-Ampornpunt
 
การบริหารความเสี่ยงคณะฯ (February 9, 2022)
การบริหารความเสี่ยงคณะฯ (February 9, 2022)การบริหารความเสี่ยงคณะฯ (February 9, 2022)
การบริหารความเสี่ยงคณะฯ (February 9, 2022)Nawanan Theera-Ampornpunt
 
จริยธรรมและกฎหมายที่เกี่ยวข้องกับเทคโนโลยีสารสนเทศทางสุขภาพ (February 8, 2022)
จริยธรรมและกฎหมายที่เกี่ยวข้องกับเทคโนโลยีสารสนเทศทางสุขภาพ (February 8, 2022)จริยธรรมและกฎหมายที่เกี่ยวข้องกับเทคโนโลยีสารสนเทศทางสุขภาพ (February 8, 2022)
จริยธรรมและกฎหมายที่เกี่ยวข้องกับเทคโนโลยีสารสนเทศทางสุขภาพ (February 8, 2022)Nawanan Theera-Ampornpunt
 
พระราชบัญญัติคุ้มครองข้อมูลส่วนบุคคล พ.ศ. 2562 (PDPA) (January 21, 2022)
พระราชบัญญัติคุ้มครองข้อมูลส่วนบุคคล พ.ศ. 2562 (PDPA) (January 21, 2022)พระราชบัญญัติคุ้มครองข้อมูลส่วนบุคคล พ.ศ. 2562 (PDPA) (January 21, 2022)
พระราชบัญญัติคุ้มครองข้อมูลส่วนบุคคล พ.ศ. 2562 (PDPA) (January 21, 2022)Nawanan Theera-Ampornpunt
 
Digital Health Transformation for Health Executives (January 18, 2022)
Digital Health Transformation for Health Executives (January 18, 2022)Digital Health Transformation for Health Executives (January 18, 2022)
Digital Health Transformation for Health Executives (January 18, 2022)Nawanan Theera-Ampornpunt
 
Updates on Privacy & Security Laws (November 26, 2021)
Updates on Privacy & Security Laws (November 26, 2021)Updates on Privacy & Security Laws (November 26, 2021)
Updates on Privacy & Security Laws (November 26, 2021)Nawanan Theera-Ampornpunt
 
Health Informatics for Clinical Research (November 25, 2021)
Health Informatics for Clinical Research (November 25, 2021)Health Informatics for Clinical Research (November 25, 2021)
Health Informatics for Clinical Research (November 25, 2021)Nawanan Theera-Ampornpunt
 
Research Ethics and Ethics for Health Informaticians (November 15, 2021)
Research Ethics and Ethics for Health Informaticians (November 15, 2021)Research Ethics and Ethics for Health Informaticians (November 15, 2021)
Research Ethics and Ethics for Health Informaticians (November 15, 2021)Nawanan Theera-Ampornpunt
 
Consumer Health Informatics, Mobile Health, and Social Media for Health: Part...
Consumer Health Informatics, Mobile Health, and Social Media for Health: Part...Consumer Health Informatics, Mobile Health, and Social Media for Health: Part...
Consumer Health Informatics, Mobile Health, and Social Media for Health: Part...Nawanan Theera-Ampornpunt
 

Mehr von Nawanan Theera-Ampornpunt (20)

Health Informatics for Health Service Systems (March 11, 2024)
Health Informatics for Health Service Systems (March 11, 2024)Health Informatics for Health Service Systems (March 11, 2024)
Health Informatics for Health Service Systems (March 11, 2024)
 
Personal Data Protection Act and the Four Subordinate Laws (February 29, 2024)
Personal Data Protection Act and the Four Subordinate Laws (February 29, 2024)Personal Data Protection Act and the Four Subordinate Laws (February 29, 2024)
Personal Data Protection Act and the Four Subordinate Laws (February 29, 2024)
 
Privacy & PDPA Awareness Training for Ramathibodi Residents (October 5, 2023)
Privacy & PDPA Awareness Training for Ramathibodi Residents (October 5, 2023)Privacy & PDPA Awareness Training for Ramathibodi Residents (October 5, 2023)
Privacy & PDPA Awareness Training for Ramathibodi Residents (October 5, 2023)
 
Case Study PDPA Workshop (September 15, 2023)
Case Study PDPA Workshop (September 15, 2023)Case Study PDPA Workshop (September 15, 2023)
Case Study PDPA Workshop (September 15, 2023)
 
Case Studies on Overview of PDPA and its Subordinate Laws (September 15, 2023)
Case Studies on Overview of PDPA and its Subordinate Laws (September 15, 2023)Case Studies on Overview of PDPA and its Subordinate Laws (September 15, 2023)
Case Studies on Overview of PDPA and its Subordinate Laws (September 15, 2023)
 
Ramathibodi Security & Privacy Awareness Training (Fiscal Year 2023)
Ramathibodi Security & Privacy Awareness Training (Fiscal Year 2023)Ramathibodi Security & Privacy Awareness Training (Fiscal Year 2023)
Ramathibodi Security & Privacy Awareness Training (Fiscal Year 2023)
 
Relationship Between Thailand's Official Information Act and Personal Data Pr...
Relationship Between Thailand's Official Information Act and Personal Data Pr...Relationship Between Thailand's Official Information Act and Personal Data Pr...
Relationship Between Thailand's Official Information Act and Personal Data Pr...
 
Social Media - PDPA: Is There A Way Out? (October 19, 2022)
Social Media - PDPA: Is There A Way Out? (October 19, 2022)Social Media - PDPA: Is There A Way Out? (October 19, 2022)
Social Media - PDPA: Is There A Way Out? (October 19, 2022)
 
Do's and Don'ts on PDPA for Doctors (May 31, 2022)
Do's and Don'ts on PDPA for Doctors (May 31, 2022)Do's and Don'ts on PDPA for Doctors (May 31, 2022)
Do's and Don'ts on PDPA for Doctors (May 31, 2022)
 
Telemedicine: A Health Informatician's Point of View
Telemedicine: A Health Informatician's Point of ViewTelemedicine: A Health Informatician's Point of View
Telemedicine: A Health Informatician's Point of View
 
Meeting Management (March 2, 2022)
Meeting Management (March 2, 2022)Meeting Management (March 2, 2022)
Meeting Management (March 2, 2022)
 
การบริหารความเสี่ยงคณะฯ (February 9, 2022)
การบริหารความเสี่ยงคณะฯ (February 9, 2022)การบริหารความเสี่ยงคณะฯ (February 9, 2022)
การบริหารความเสี่ยงคณะฯ (February 9, 2022)
 
จริยธรรมและกฎหมายที่เกี่ยวข้องกับเทคโนโลยีสารสนเทศทางสุขภาพ (February 8, 2022)
จริยธรรมและกฎหมายที่เกี่ยวข้องกับเทคโนโลยีสารสนเทศทางสุขภาพ (February 8, 2022)จริยธรรมและกฎหมายที่เกี่ยวข้องกับเทคโนโลยีสารสนเทศทางสุขภาพ (February 8, 2022)
จริยธรรมและกฎหมายที่เกี่ยวข้องกับเทคโนโลยีสารสนเทศทางสุขภาพ (February 8, 2022)
 
พระราชบัญญัติคุ้มครองข้อมูลส่วนบุคคล พ.ศ. 2562 (PDPA) (January 21, 2022)
พระราชบัญญัติคุ้มครองข้อมูลส่วนบุคคล พ.ศ. 2562 (PDPA) (January 21, 2022)พระราชบัญญัติคุ้มครองข้อมูลส่วนบุคคล พ.ศ. 2562 (PDPA) (January 21, 2022)
พระราชบัญญัติคุ้มครองข้อมูลส่วนบุคคล พ.ศ. 2562 (PDPA) (January 21, 2022)
 
Digital Health Transformation for Health Executives (January 18, 2022)
Digital Health Transformation for Health Executives (January 18, 2022)Digital Health Transformation for Health Executives (January 18, 2022)
Digital Health Transformation for Health Executives (January 18, 2022)
 
Updates on Privacy & Security Laws (November 26, 2021)
Updates on Privacy & Security Laws (November 26, 2021)Updates on Privacy & Security Laws (November 26, 2021)
Updates on Privacy & Security Laws (November 26, 2021)
 
Hospital Informatics (November 26, 2021)
Hospital Informatics (November 26, 2021)Hospital Informatics (November 26, 2021)
Hospital Informatics (November 26, 2021)
 
Health Informatics for Clinical Research (November 25, 2021)
Health Informatics for Clinical Research (November 25, 2021)Health Informatics for Clinical Research (November 25, 2021)
Health Informatics for Clinical Research (November 25, 2021)
 
Research Ethics and Ethics for Health Informaticians (November 15, 2021)
Research Ethics and Ethics for Health Informaticians (November 15, 2021)Research Ethics and Ethics for Health Informaticians (November 15, 2021)
Research Ethics and Ethics for Health Informaticians (November 15, 2021)
 
Consumer Health Informatics, Mobile Health, and Social Media for Health: Part...
Consumer Health Informatics, Mobile Health, and Social Media for Health: Part...Consumer Health Informatics, Mobile Health, and Social Media for Health: Part...
Consumer Health Informatics, Mobile Health, and Social Media for Health: Part...
 

Kürzlich hochgeladen

EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEarley Information Science
 
Tech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdfTech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdfhans926745
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024The Digital Insurer
 
Evaluating the top large language models.pdf
Evaluating the top large language models.pdfEvaluating the top large language models.pdf
Evaluating the top large language models.pdfChristopherTHyatt
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoffsammart93
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdflior mazor
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Servicegiselly40
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsJoaquim Jorge
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?Antenna Manufacturer Coco
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProduct Anonymous
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 

Kürzlich hochgeladen (20)

EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
 
Tech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdfTech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdf
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
Evaluating the top large language models.pdf
Evaluating the top large language models.pdfEvaluating the top large language models.pdf
Evaluating the top large language models.pdf
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 

Project Management

  • 1. TMHG 526 Project Management Nawanan Theera‐Ampornpunt, M.D., Ph.D. Faculty of Medicine Ramathibodi Hospital Mahidol University April 11, 2013
  • 2. IT Project Management Marchewka (2006) Marchewka (2009)
  • 3. Introduction • Information Technology (IT) projects are organizational investments that require – Time – Money – Other resources such as people, technology, facilities, etc. • Organizations expect some type of value in return of this investment • IT Project Management is a relatively new discipline that combines traditional Project Management with Software Engineering/Management Information Systems to make IT projects more successful.
  • 4. An ITPM Approach • Organizational resources are limited, so organizations must choose among competing interests to fund specific projects. • This decision should be based on the value a competing project will provide to an organization.
  • 5. Which Situation Is Worse? • Successfully building and implementing a system that provides little or no value to the organization. Or… • Failing to implement an information system that could have provided value to the organization, but was poorly developed or poorly managed.
  • 6. The Software Crisis • The CHAOS study published in 1995 by The Standish Group found that although the U.S. spent over $250 billion on IT projects, approximately… –31% were cancelled before completion –53% were completed but over budget, over schedule, and did not meet original specifications. • For mid-size companies, average cost overruns were 182%, while average schedule overruns were 202%!
  • 7.
  • 8. Why Do IT Projects Fail? • Larger projects have the lowest success rate and appear to be more risky than medium and smaller projects –Technology, business models and markets change so rapidly that a project that takes more than a year can be obsolete before they are completed. • The Chaos study also provides some insight as to the factors that influence project success.
  • 9.
  • 10. Has the Current State of IT Projects Changed Since 1995? • The Standish Group has continued to study IT projects over the years. • In general, IT Projects are showing higher success rates due to –Better project management tools & processes –Smaller projects –Improved communication among stakeholders –More skillful IT project managers • But there is still ample opportunity for improvement!
  • 11. New Top Ten Factors for IT Project Success Rank Success Factor 1 User Involvement 2 Executive Support 3 Clear Business Objectives 4 Emotional Maturity 5 Optimizing Scope 6 Agile Process 7 Project Management Expertise 8 Skilled Resources 9 Execution 10 Tools and Infrastructure Source: The Standish Group. CHAOS (West Yarmouth, MA: 1995, 2010) and http://www.infoq.com/articles/Interview‐Johnson‐Standish‐CHAOS.  (cited in Marchewka JT. Information technology project management. 4th ed. Singapore: John Wiley & Sons;2013.
  • 12. Summary of CHAOS Studies from 1994 to 2008 Figure 1.1 Sources: www.standishgroup.com
  • 13. Improving the Likelihood of Success • Socio-technical Approach • Project Management Approach – processes and infrastructure (Methodology) – resources – expectations – competition – efficiency and effectiveness • Knowledge Management Approach – lessons learned, best practices and shared knowledge
  • 14. IT Project Management • A project: “a temporary endeavor undertaken to accomplish a unique purpose” • Project management: “the application of knowledge, skills, tools, and techniques to project activities in order to meet or exceed project requirements” Marchewka (2006)
  • 15. The Context of Project Management - Project Attributes • Time Frame • Purpose (to provide value!) • Ownership • Resources (the triple constraint) • Roles – Project Manager – Project Sponsor – Subject Matter Experts – Technical Experts • Risk & Assumptions • Interdependent Tasks • Planned Organizational Change • Operate in Environments Larger than the Project Itself
  • 16. Class Exercise The Importance of Project Management Group discussion: Without proper Project Management, what can go wrong with the IT projects?
  • 17. The Project Management Dilemma Good Fast Project Deliverables Cheap
  • 19. The Project Life Cycle & IT Development • Project Life Cycle (PLC) – A collection of logical stages or phases that maps the life of a project from its beginning to its end in order to define, build and deliver the product of the project – i.e., the information system • Projects are divided into phases to increase manageability and reduce risk – Phase exits, stage gates, or kill points are decision points at the end of each phase to evaluate performance, correct problems or cancel the project – Fast tracking is the overlapping of phases to reduce the project’s schedule • Can be risky!
  • 21. Software Development Life Cycle (SDLC) • Represents the sequential phases or stages an information system follows throughout its useful life • Useful for understanding the development of the project’s largest work product – the application system • Phases/Stages – Planning – Analysis – Design – Implementation – Maintenance and Support
  • 22. Software Development Life Cycle Marchewka JT (2006)
  • 23. Relationship Between PLC & SDLC • The systems development life cycle (SDLC) becomes part of the project life cycle (PLC). –The PLC focuses on the project management phases, processes, tools and techniques for effectively managing the project. –The SDLC focuses on the software engineering phases, processes, tools and techniques for building and/or implementing the IT solution.
  • 24. PLC & SDLC Marchewka JT (2006)
  • 25. IT Project Management Methodology Marchewka JT (2006)
  • 26. Putting the SDLC into Practice • Structured Approach to Systems Development –Waterfall Method • Rapid Applications Development (RAD) –Prototyping –Spiral Development –Extreme Programming
  • 27. Structured Approaches: Waterfall Method
  • 28. Extreme Project Management (XPM) • A new approach and philosophy to project management that is becoming increasingly popular. • Characterizes many of today’s projects that exemplify speed, uncertainty, changing requirements and high risks. • Traditional project management often takes an orderly approach while XPM embraces the fact that projects are often chaotic and unpredictable. • XPM focuses on flexibility, adaptability and innovation • Traditional and new approaches together can provide us with a better understanding of how to improve the likelihood of project success.
  • 29. The Project Management Body of Knowledge (PMBOK ®) • The Guide to the Project Management Body of Knowledge (PMBOK® Guide) documents 9 project management knowledge areas. • The PMBOK® Guide is published and maintained by the Project Management Institute (PMI). – http://www.pmi.org • PMI provides a certification in project management called the Project Management Professional (PMP) that many people today believe will be as relevant as a CPA certification. • PMP certification requires that you pass a PMP certification exam to demonstrate a level of understanding about project management, as well as satisfy education and experience requirements, and agree to a professional code of conduct.
  • 30. The Project Management Body of Knowledge (PMBOK ®) 1. Project Integration Management 2. Project Scope Management 3. Project Time Management 4. Project Cost Management 5. Project Quality Management 6. Project Human Resources Management 7. Project Communications Management 8. Project Risk Management 9. Project Procurement Management Marchewka (2006)
  • 32. Developing The Business Case Marchewka (2006)
  • 33. Measurable Organizational Value (MOV) • The project’s goal • Measure of success • Must be measurable • Provides value to the organization • Must be agreed upon • Must be verifiable at the end of the project • Guides the project throughout its life cycle • Should align with the organization’s strategy and goals Marchewka (2006)
  • 34. The IT Value Chain Marchewka (2006)
  • 35. A Good Project Goal “Our goal is to land a man on the  moon and return him safely  to the earth by the end of the decade.” John F. Kennedy (1961) Marchewka (2006)
  • 36. Metrics: Financial • Payback Period = Initial Investment Net Cash Flow • Breakeven Point = Initial Investment Net Profit Margin • Project ROI = (Total Expected Benefits - Total Expected Costs) Total Expected Costs Marchewka (2006)
  • 37. Metrics: Scoring Method Criterion Weight Alternative A Alternative B Alternative C ROI 15% 2 4 10 Financial Payback 10% 3 5 10 Net Present Value (NPV) 15% 2 4 10 Alignment with strategic  objectives 10% 3 5 8 Organizational Likelihood of achieving  project’s MOV 10% 2 6 9 Availability of skilled  team members 5% 5 5 4 Maintainability 5% 4 6 7 Project Time to develop 5% 5 7 6 Risk  5% 3 5 5 Customer satisfaction 10% 2 4 9 External Increased market share 10% 2 5 8 Marchewka Total Score 100% 2.65 4.85 8.50 (2006) Notes: Risk scores have a reverse scale – i.e., higher scores for risk imply lower levels of risk
  • 40. IT Project Management Methodology Marchewka (2006)
  • 43. Project Scope In‐Scope Out‐of‐Scope
  • 47. Activity On The Node (AON) Network Diagram Marchewka (2006)
  • 48. Project Scheduling • Critical Path Method (CPM) • Precedence Diagramming Method (PDM) • Lead Time & Lag Time Marchewka (2006)
  • 50. Project Schedule Estimation Techniques • Guesstimating • Delphi Technique • Time Boxing • Top-Down • Bottom Up • Analogous Estimates (Past experiences) • Parametric Modeling (Statistical) Marchewka (2006)
  • 51. Project Budget • Direct/up-front costs – Materials – Services – Labor • Ongoing costs • Indirect costs – Facilities, utilities – Administration – Taxes – Benefits • (Opportunity & productivity costs) • (Sunk costs) • Learning curve • Reserves • Total Cost of Ownership (TCO)
  • 52. Project Human Resource Management • Project team members, roles & responsibilities • Organizational structure – Functional – Project-based – Matrix • Stakeholder analysis Marchewka (2006)
  • 53. Project Risk Management Risk = f(likelihood x impact) Risk Strategies • Accept/ignore • Avoid completely • Reduce risk likelihood or impact • Transfer risk to someone else (e.g. insurance) Marchewka (2006)