4. The Physical Manufacturing System
Two subsystems directly support the
physical manufacturing system.
CADD (computer-aided design and drafting)
CAM (computer-aided manufacturing)
7. The Manufacturing Resource
Planning (MRP II) System
The MRP II system comprises the
materials requirements planning
(MRP) system and the related systems
for sales, billing, and purchasing.
10. Production Planning
Production planning involves the
determination of which products
to produce and the scheduling
of production to make optimal
use of production resources.
18. Cost Accounting
Production
status file
Production
data file
• Material
requisition
data
• RTG data
Cost accounting program(s)
Summary
report
Updated
production
status file
Completed
production
order file
Resource
usage
file
21. Activity-Based Costing
Traditional cost accounting techniques
may be inadequate in a computer
integrated manufacturing environment.
Because CIM reduces direct
labor and increases overhead.
Variable costs decrease
and fixed costs increase.
23. Activity-Based Costing
What are some examples of activities?
Machine centers
Material handling
Inspection stations
Manual assembly
A single department may contain
several different activities.
24. Major Processing Modules in MRP
II
Bill-of-materials
module
Master production
scheduling
module
Inventory control
module
Routings file
module
MRP II
Production order
module
Production
activity control
module
25. Implementing JIT in a
MRP II/CIM Environment
Less emphasis might be placed
on a complete MRP II system.