10 years of experience with Westinghouse
fuel
at NPP Temelin
Daniel Ernst & Luka Milisdorfer
VVER 2010
Prague, November 1-3, 2010
2VVER 2010
History
Contract with Westinghouse was signed in 1993
First fuel assembly (FA) VVANTAGE-6 - was loaded into the reactor of Unit 1 in July,
2000 .
..and first criticality was achieved 3 months later
8 cycles at Unit 1 (Cycle 5 was divided on Cycle 5 and 5A) and 7 cycles at Unit 2
These 15 cycles represent 960 FAs 490 FAs (U1) + 470 FAs (U2)
Average burnup of unloaded F/As was 37.800 MWd/tU and maximum average burnup of
F/A was app. 44.500 MWd/tU
67 leaking FAs, 27 FAs were repaired and reused
3VVER 2010
Content
History
Core Design, Safety Evaluation and Core Monitoring
Fuel Problems
Post Irradiation Inspection Program
Conclusion
4VVER 2010
Core Design and Safety Evaluation
Transfer of computational software and methodology (NRC
licensed). Computational aids were modified by Westinghouse for
usage with hexagonal core (ANC-H; PHOENIX-H, etc.)
Set of core design trainings for EZ personnel several of them
as on-job-trainings important know-how transfer allows CEZ
to perform its own core design-related calculations
Close WEC- EZ joint cooperation in loading pattern search the
preliminary patterns (with brief safety evaluation) were found by
EZ and then fully evaluated by Westinghouse and delivered as a
final core design.
Over time the participation of the CEZ personnel in core design
process becomes more and more significant
Core Design and Safety Evaluation
Complicated core design:
Real cycle lengths significantly departs from the scheduled ones
Core Design constraints caused by IRI and grid-to-rod fretting
Common core design limitations and efforts: safety aspects,
reactor vessel fluency minimalization; economical aspects.
In despite of the above-mentioned limits the safe, operation-
friendly and reasonable cost-effective loading patterns were found
Low leakage cores reactor vessel fluency minimalization
Cores which helps to mitigate the IRI issue.
Cores with sufficient and comfortable margins to operational
limits (peaking factors)
Cores with minimalized sixth asymmetry forcing function, etc.
5VVER 2010
Core Design and Safety Evaluation
During IRI and grid-to-rod fretting problems detailed core design
guideline was created to mitigate/eliminate the above-mentioned
issues.
Since the irreparable leakage of the fuel, which were several times
determined during outages the Contingency Plans was always
created before each fuel reload helps with quick redesign
The core redesign were often performed in challenging time range
days/few weeks
6VVER 2010
Core Design and Safety Evaluation
The flexible fuel assemblies design was the main presumptions for
successful core design:
Fuel enrichment according to core designer requests
(restricted only by range 0.7 5.0 % w/o)
Axial and primarily radial profiled fuel assemblies
Fine tuning of burnable absorbers using integrated fuel burnable
absorbers (IFBA) rods from 0 to 84 IFBA rods per assembly
The loading pattern proposals safety evaluation:
Using the bounding principle
Performed for reasonable cycle burn-up window
- mostly ± 20 EFPD
Safety margins sufficient for safe and comfortable operation
7VVER 2010
Core Monitoring
The Westinghouse core monitoring system BEACON based on
Rhodium self-powered incore detectors was modified for use for
hexagonal core
BEACON TSM (Technical Specification Monitoring) used at
Temelin
For the first cycles the version BEACON 2.0.1 were used the
core monitoring model development was fully performed by
Westinghouse
The modified De-coupled version BEACON 6 was fully
applied in 2008. The preceding system tuning and test opartion
was performed in close WEC-CEZ cooperation
8VVER 2010
Core Monitoring
The BEACON Model Development Training was performed in
2009
The training was performed as a on-job-training (U2C7)
The BEACON models were than develop by CEZ personnel and
verified by Westinghouse.
In 2010 the training for determining self powered detectors
cross-section constants for using with fuel containing gadolinium
It allows CEZ to develop the core monitoring system model for
the cores with new type of fuel supplied by JSC TVEL
9VVER 2010
10VVER 2010
Fuel Problems
Problems with RCCAs (Rod Control Cluster Assembly) during
operation Incomplete Rod Insertion (IRI)
Fuel Assembly (FA) / Fuel Rod (FR) Bow
Excessive FA Growth
Leaking FRs
11VVER 2010
Fuel Problems - IRI
Description
Some RCCAs (on both Units) do not drop fully to the bottom position (IRI
Incomplete Rod Insertion) - root cause was changes in FA geometry
Worst case - Unit 1, June 2 test showed two RCCAs stopped above the level of the
hydraulic dashpot, in other words they failed to meet the Limit Condition
unscheduled outage for refueling
Since the problem became known, the function of RCCAs dropping has been
repeatedly tested at intervals specified by SUJB
The interval for tests was 30 days (in 2005) and is 150 days (in 2010)
Based on previous tests fuel vendor:
provides prediction of number of IRI for upcoming test we were/are better
prepared for given situation
performs a safety assessment
12VVER 2010
Fuel Problems IRI (cont.)
Corrective actions
BCO (Bases for Continuous Operation)
Non fuel modification was done in 2005 - control rod drive shaft connecting bars were
modified (drilled holes, increased weight the similar way as on the other VVER1000
units)
FA design modifications (2006-2007)
tube-in-tube dashpot design and top nozzle modifications (Phase 0)
fuel rod loading equipment alignments
a new structural materials of FR cladding and other FA components (Phase 1X)
A methodology for core design with bowed and twisted FAs has been developed
13VVER 2010
Fuel Problems IRI (cont.)
Odstran ni IRI na ETE modifikaci paliva Westinghouse
0
5
10
15
20
25
30
35
40
45
50
55
1.8.2004
9.11.2004
17.2.2005
28.5.2005
5.9.2005
14.12.2005
24.3.2006
2.7.2006
10.10.2006
18.1.2007
28.4.2007
6.8.2007
14.11.2007
22.2.2008
1.6.2008
9.9.2008
18.12.2008
28.3.2009
6.7.2009
14.10.2009
22.1.2010
PoetIRI
U2EOC2
U1EOC3
U1EOC4
U1EOC5
U1EOC5AU2EOC3
U2EOC4
U1EOC6 U1EOC7
U2EOC5 U2EOC6
14VVER 2010
Fuel Problems FA/FR Bow
Description
The mechanical deformations of FR and FA, i.e. the deviations from their ideal
geometric shapes and the elongation of fuel assemblies (radiation growth), come as a
natural phenomenon accompanying the production of energy inside the cores of
nuclear reactors
FAs prone to geometry changes due mostly to the radiation growth of FRs and FA
skeleton. The changes translate themselves into FA bow and twist
The first cores in the Temelin NPP have been designed to tolerate the flow area
reductions by as many as 51%. All subsequent core designs were calculated with the
conservative assumption that the FRs could touch each other
FA bow has affected refueling of core, reshuffling sequence of FAs was changed, the
special dummy assemblies have been used to load bowed and twisted FAs
However, FA bow and twist is not a safety problem, it is an usual phenomenon in all
reactors in the world
15VVER 2010
Fuel Problems FA/FR Bow (cont.)
16VVER 2010
Fuel Problems FA/FR Bow (cont.)
17VVER 2010
Fuel Problems Excessive FA Growth
Comparison of three different designs of VVANTAGE-6 fuel
0
2
4
6
8
10
12
14
16
0.0 2.0 4.0 6.0 8.0 10.0
Fast Neutron Fluence, (x 1E21 NVT)
FuelAssemblyGrowth,mm
T1 Growth Updated Best Estimate Curve
Updated Upper Limit Curve T2 Growth
Phase 1X Growth
T1 design:
- original design
- loaded to Unit 1, first core
only
- Zircaloy-4
T2 design
- loaded to Unit 2, first core
and all reloads for both Units
till 2006
- Zircaloy-4
Phase 0
- loaded to both Units in 2006
- Zircaloy-4
Phase 1X design
- all reloads from 2007 till now
- ZIRLO
18VVER 2010
Fuel Problems Excessive FA Growth (cont.)
F/A Growth vs. WEC database
Zr-4 Fuel Assembly Growth Data Base
0.000
0.050
0.100
0.150
0.200
0.250
0.300
0.350
0.400
0.450
0.500
0.00 2.00 4.00 6.00 8.00 10.00 12.00
Fast Fluence (1e21 nvt)
FuelAssemblyGrowth(%)
Zr-4 Fuel Assembly Growth Data Base
Temelin 1 EOC 1 and 2 Data
Temelin 2 EOC 2 Data
Temelin 1 EOC 3 Data
Temelin 1 EOC 4 Data
Temelin 2 EOC 3 Data
Temelin 1 EC 5A Data - ZIRLO
19VVER 2010
Fuel Problems Leaking FRs
Description
The nuclear reactor installed at the Temelin NPP contains 163 fuel assemblies and each
assembly holds 312 fuel rods. All nuclear power plants are designed on assumption that a
certain number of the rods develop leaks
The number of fuel rods supposed to become leaky is determined with reliance on safety
analyses and detailed in Technical Specifications in the form of Safety Limits & Conditions - at
the Temelin NPP the fuel rods are checked for tightness through monitoring the specific
activity in the primary circuit the overall specific activity limit of 3,7x109 Bq/l
Summary of maximum activities found in the primary circuit coolant on both Units (Bq/l):
2003 2004 2005 2006 2007 2008 2009 2010
Unit 1 5,9x10
6
2,4x10
6
3,6x10
6
6,3x10
6
7,9x10
6
7,1x10
6
6,3x10
6
4,3x10
6
Unit 2 2,7x10
6
7,0x10
6
3,3x10
6
6,4x10
6
8,5x10
6
5,8x10
6
6,3x10
6
6,6x10
6
20VVER 2010
Fuel Problems Leaking FRs (cont.)
FRI faktor
FRI ETE 2005 - 2010
0
20
40
60
80
100
120
140
160
leden05
bezen05
kvten05
ervenec05
zai05
listopad05
leden06
bezen06
kvten06
ervenec06
zai06
listopad06
leden07
bezen07
kvten07
ervenec07
zai07
listopad07
leden08
bezen08
kvten08
ervenec08
zai08
listopad08
leden09
bezen09
kvten09
ervenec09
zai09
listopad09
leden10
bezen10
kvten10
as [m s]
FRI
[Bq/g]
HVB 1 HVB 2
21VVER 2010
Fuel Problems Leaking FRs (cont.)
Sipping systems are used to search the leakers:
On-line Sipping - the system applies a gas method of continuous changes in the
Xe 133 concentration
Off-line sipping - the system used to conduct qualitative measurements of a FA
found damaged in an attempt to reveal the scope of damage done
Fuel Inspection & Repair Equipment a system used to identify and repair leakers:
mobile equipment (for both Units) designed and manufactured by Westinghouse
during outage is FRIE assembled on the floor of the Reactor Hall and than is
transported into the fresh fuel cask pit next to spent fuel pool
the refueling machine moves fuel assemblies in and out of the FRIE
the fuel assembly rests on a turntable which allows it to be rotated 360 degrees
during
the inspection process
is designed to provide complete fuel inspection for entire FA
the fuel assembly UT inspection system is used to locate leaking fuel rods
the failed fuel rod storage basket (FFRSB) provides storage for the failed fuel rods
leakers are replaced with dummy rods.
22VVER 2010
Fuel Problems Leaking FRs (cont.)
Unit 1
End of Cycle # of Leakers # of Repaired Leakers # of Leaked F/Rs
2 1 0 0
3 5 1 1
4 6 1 1
5 6 6 8
5A 4 2 3
6 7 7 10
7 3 1 1
8 0 0 0
Unit 2
End of Cycle # of Leakers # of Repaired Leakers # of Leaked F/Rs
2 3 2 5
3 10 2 4
4 5 2 2
5 7 2 3
6 5 0 0
7 5 1 2
An overview of leaks disclosed in fuel at the Temelin NPP
23VVER 2010
Fuel Problems Leaking FRs (cont.)
Root cause of leaking FRs is grid-to-rod fretting that means vibration of FRs in spacer
grids
Fuel Rod Fuel Rod with fretting marks
24VVER 2010
Fuel Problems Leaking FRs (cont.)
25VVER 2010
Fuel Problems Leaking FRs (cont.)
FR separation event at Unit 2
Fuel reconstitution was being performed on assembly BE24
One leaking fuel rod was to be removed and replaced by a stainless steel rod
After withdrawing about 150 cm of the fuel rod, the rod jerked suddenly and fractured
Visual examination of the fracture location indicated the separation was caused by
secondary hydriding (there had been no indications of significant hydriding from the
visuals)
Extensive through-wall grid-to-rod fretting was found
Visual examinations of the fractured ends on both rod segments showed intact fuel
pellets with no empty area, indicating that no fuel pellets were lost during the fracture
event.
26VVER 2010
Fuel Problems Leaking FRs (cont.)
27VVER 2010
Post Irradiation Inspection Program (PIIP)
Post Irradiation Inspection Program (PIIP)
substituted the Lead Test Assembly program for new fuel design
program was structured to meet requirements of the Czech Regulatory Body (SUJB)
additional proof of material compatibility, analytical methods support and verification,
overall thermomechanical performance demonstration
8 selected FAs (these 8 FAs were pre-characterized )
The inspection program included:
FA measurements
Visual Examination
FA Bow, Twist and Overall FA Length Measurement
Peripheral FR Corrosion Measurements
Single FR measurements
Visual Examination
Corrosion Measurements
Profilometry Measurements
RCCA inspections
Measurements of Total Wear of the Tube Cross Section
28VVER 2010
Post Irradiation Inspection Program (PIIP) cont.
PIIP results
Positive:
visual examinations revealed little or no corrosion on the cladding
surfaces confirmation of compatibility of Zircaloy alloy with the VVER
water chemistry
there was no wear of any RCCA rodlet (criterion is wear less than10%)
29VVER 2010
Post Irradiation Inspection Program (PIIP) cont.
PIIP results
Negative:
FA twist, bow and length measurements showed an unexpected
behavior
FR visuals of leaking FRs indicated GRF
30VVER 2010
Conclusion
During first decade of the Temelin NPP operation, formidable
mission of implementing and development program of a new fuel
system has been accomplished. Indeed, it raised more or less
serious problems which all were solved together with the fuel vendor
and we can say they are under the control.
Today, we are standing at the beginning of new era, waiting what
will be brought by the future.

Weitere ähnliche Inhalte

Was ist angesagt?

VVER Nuclear Reactors
VVER Nuclear ReactorsVVER Nuclear Reactors
VVER Nuclear ReactorsSabinoMiani
 
GAV2023 - L’albédo (α) des prairies : un levier d'atténuation du changement c...
GAV2023 - L’albédo (α) des prairies : un levier d'atténuation du changement c...GAV2023 - L’albédo (α) des prairies : un levier d'atténuation du changement c...
GAV2023 - L’albédo (α) des prairies : un levier d'atténuation du changement c...Institut de l'Elevage - Idele
 
Atelier JPO Pradel 2022 - Atelier 1 - Le rendement fromager : un outil de pil...
Atelier JPO Pradel 2022 - Atelier 1 - Le rendement fromager : un outil de pil...Atelier JPO Pradel 2022 - Atelier 1 - Le rendement fromager : un outil de pil...
Atelier JPO Pradel 2022 - Atelier 1 - Le rendement fromager : un outil de pil...Institut de l'Elevage - Idele
 
Biodiésel...
Biodiésel...Biodiésel...
Biodiésel...SanHPupo
 
Electric and hybrid_marine_world_expo_patrick_baan_062014
Electric and hybrid_marine_world_expo_patrick_baan_062014Electric and hybrid_marine_world_expo_patrick_baan_062014
Electric and hybrid_marine_world_expo_patrick_baan_062014Wärtsilä Corporation
 
JPO Pradel 2022 - Atelier 4 - Une litière bien gérée, on ne peut pas s’en pas...
JPO Pradel 2022 - Atelier 4 - Une litière bien gérée, on ne peut pas s’en pas...JPO Pradel 2022 - Atelier 4 - Une litière bien gérée, on ne peut pas s’en pas...
JPO Pradel 2022 - Atelier 4 - Une litière bien gérée, on ne peut pas s’en pas...Institut de l'Elevage - Idele
 
Solar generation for APC
Solar generation for APC Solar generation for APC
Solar generation for APC Molla Morshad
 
VERDIS Presentation - APR 2015 - CUSTOMER
VERDIS Presentation - APR 2015 - CUSTOMERVERDIS Presentation - APR 2015 - CUSTOMER
VERDIS Presentation - APR 2015 - CUSTOMERJorge Gomez
 
Presentation: DOE Stetsoon Hydrogen Storage technologies
Presentation: DOE Stetsoon Hydrogen Storage technologiesPresentation: DOE Stetsoon Hydrogen Storage technologies
Presentation: DOE Stetsoon Hydrogen Storage technologieschrisrobschu
 
9 fiches pour décrire l'alimentation des chèvres laitières françaises
9 fiches pour décrire l'alimentation des chèvres laitières françaises9 fiches pour décrire l'alimentation des chèvres laitières françaises
9 fiches pour décrire l'alimentation des chèvres laitières françaisesInstitut de l'Elevage - Idele
 
MMX2023 Viande - Contexte économique international des marchés des produits d...
MMX2023 Viande - Contexte économique international des marchés des produits d...MMX2023 Viande - Contexte économique international des marchés des produits d...
MMX2023 Viande - Contexte économique international des marchés des produits d...Institut de l'Elevage - Idele
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plantSiraskarCom
 
Introduction to Diesel fuel
Introduction to Diesel fuelIntroduction to Diesel fuel
Introduction to Diesel fuelPratik Patel
 
Opportunities and Challenges of Renewable Energy Integration with Hydrogen Pr...
Opportunities and Challenges of Renewable Energy Integration with Hydrogen Pr...Opportunities and Challenges of Renewable Energy Integration with Hydrogen Pr...
Opportunities and Challenges of Renewable Energy Integration with Hydrogen Pr...OECD Environment
 
Application of first law thermodynamics (yoga n zian)
Application of first law thermodynamics (yoga n zian)Application of first law thermodynamics (yoga n zian)
Application of first law thermodynamics (yoga n zian)qiebti
 
Gas cycles part i (1)
Gas cycles   part i (1)Gas cycles   part i (1)
Gas cycles part i (1)Mehtab Rai
 

Was ist angesagt? (20)

VVER Nuclear Reactors
VVER Nuclear ReactorsVVER Nuclear Reactors
VVER Nuclear Reactors
 
GAV2023 - L’albédo (α) des prairies : un levier d'atténuation du changement c...
GAV2023 - L’albédo (α) des prairies : un levier d'atténuation du changement c...GAV2023 - L’albédo (α) des prairies : un levier d'atténuation du changement c...
GAV2023 - L’albédo (α) des prairies : un levier d'atténuation du changement c...
 
Atelier JPO Pradel 2022 - Atelier 1 - Le rendement fromager : un outil de pil...
Atelier JPO Pradel 2022 - Atelier 1 - Le rendement fromager : un outil de pil...Atelier JPO Pradel 2022 - Atelier 1 - Le rendement fromager : un outil de pil...
Atelier JPO Pradel 2022 - Atelier 1 - Le rendement fromager : un outil de pil...
 
S'installer en élevage ovin (2ème partie)
S'installer en élevage ovin (2ème partie)S'installer en élevage ovin (2ème partie)
S'installer en élevage ovin (2ème partie)
 
Energy Storage
Energy StorageEnergy Storage
Energy Storage
 
Biodiésel...
Biodiésel...Biodiésel...
Biodiésel...
 
Electric and hybrid_marine_world_expo_patrick_baan_062014
Electric and hybrid_marine_world_expo_patrick_baan_062014Electric and hybrid_marine_world_expo_patrick_baan_062014
Electric and hybrid_marine_world_expo_patrick_baan_062014
 
JPO Pradel 2022 - Atelier 4 - Une litière bien gérée, on ne peut pas s’en pas...
JPO Pradel 2022 - Atelier 4 - Une litière bien gérée, on ne peut pas s’en pas...JPO Pradel 2022 - Atelier 4 - Une litière bien gérée, on ne peut pas s’en pas...
JPO Pradel 2022 - Atelier 4 - Une litière bien gérée, on ne peut pas s’en pas...
 
Solar generation for APC
Solar generation for APC Solar generation for APC
Solar generation for APC
 
VERDIS Presentation - APR 2015 - CUSTOMER
VERDIS Presentation - APR 2015 - CUSTOMERVERDIS Presentation - APR 2015 - CUSTOMER
VERDIS Presentation - APR 2015 - CUSTOMER
 
Presentation: DOE Stetsoon Hydrogen Storage technologies
Presentation: DOE Stetsoon Hydrogen Storage technologiesPresentation: DOE Stetsoon Hydrogen Storage technologies
Presentation: DOE Stetsoon Hydrogen Storage technologies
 
9 fiches pour décrire l'alimentation des chèvres laitières françaises
9 fiches pour décrire l'alimentation des chèvres laitières françaises9 fiches pour décrire l'alimentation des chèvres laitières françaises
9 fiches pour décrire l'alimentation des chèvres laitières françaises
 
MMX2023 Viande - Contexte économique international des marchés des produits d...
MMX2023 Viande - Contexte économique international des marchés des produits d...MMX2023 Viande - Contexte économique international des marchés des produits d...
MMX2023 Viande - Contexte économique international des marchés des produits d...
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Focus sur le persillé
Focus sur le persilléFocus sur le persillé
Focus sur le persillé
 
Introduction to Diesel fuel
Introduction to Diesel fuelIntroduction to Diesel fuel
Introduction to Diesel fuel
 
Opportunities and Challenges of Renewable Energy Integration with Hydrogen Pr...
Opportunities and Challenges of Renewable Energy Integration with Hydrogen Pr...Opportunities and Challenges of Renewable Energy Integration with Hydrogen Pr...
Opportunities and Challenges of Renewable Energy Integration with Hydrogen Pr...
 
Application of first law thermodynamics (yoga n zian)
Application of first law thermodynamics (yoga n zian)Application of first law thermodynamics (yoga n zian)
Application of first law thermodynamics (yoga n zian)
 
Gas cycles part i (1)
Gas cycles   part i (1)Gas cycles   part i (1)
Gas cycles part i (1)
 
Du nouveau pour l’alimentation des agneaux !
Du nouveau pour l’alimentation des agneaux !Du nouveau pour l’alimentation des agneaux !
Du nouveau pour l’alimentation des agneaux !
 

Andere mochten auch

TVSA-T fuel assembly for “Temelin” NPP. Main results of design and safety ana...
TVSA-T fuel assembly for “Temelin” NPP. Main results of design and safety ana...TVSA-T fuel assembly for “Temelin” NPP. Main results of design and safety ana...
TVSA-T fuel assembly for “Temelin” NPP. Main results of design and safety ana...myatom
 
Топливо ВВЭР: Совершенствование технологии изготовления и конструкции, опыт и...
Топливо ВВЭР: Совершенствование технологии изготовления и конструкции, опыт и...Топливо ВВЭР: Совершенствование технологии изготовления и конструкции, опыт и...
Топливо ВВЭР: Совершенствование технологии изготовления и конструкции, опыт и...myatom
 
атомный энергетический реактор ввэр 1000 (буклет)
атомный энергетический реактор ввэр 1000 (буклет)атомный энергетический реактор ввэр 1000 (буклет)
атомный энергетический реактор ввэр 1000 (буклет)Ngô Quang
 
Temelin power uprate
Temelin power uprateTemelin power uprate
Temelin power upratemyatom
 
VVER core catcher
VVER core catcherVVER core catcher
VVER core catcherpsa_eps
 

Andere mochten auch (7)

TVSA-T fuel assembly for “Temelin” NPP. Main results of design and safety ana...
TVSA-T fuel assembly for “Temelin” NPP. Main results of design and safety ana...TVSA-T fuel assembly for “Temelin” NPP. Main results of design and safety ana...
TVSA-T fuel assembly for “Temelin” NPP. Main results of design and safety ana...
 
Топливо ВВЭР: Совершенствование технологии изготовления и конструкции, опыт и...
Топливо ВВЭР: Совершенствование технологии изготовления и конструкции, опыт и...Топливо ВВЭР: Совершенствование технологии изготовления и конструкции, опыт и...
Топливо ВВЭР: Совершенствование технологии изготовления и конструкции, опыт и...
 
атомный энергетический реактор ввэр 1000 (буклет)
атомный энергетический реактор ввэр 1000 (буклет)атомный энергетический реактор ввэр 1000 (буклет)
атомный энергетический реактор ввэр 1000 (буклет)
 
Temelin power uprate
Temelin power uprateTemelin power uprate
Temelin power uprate
 
What is Rosatom?
What is Rosatom?What is Rosatom?
What is Rosatom?
 
VVER core catcher
VVER core catcherVVER core catcher
VVER core catcher
 
Х3/X4 - РУ
Х3/X4  - РУХ3/X4  - РУ
Х3/X4 - РУ
 

Ähnlich wie 10 years of experience with Westinghouse fuel at NPP Temelin

ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24Jean-Francois Saint-Marcoux
 
Design and Development of a 10 Million Liters Capacity Petroleum Product Stor...
Design and Development of a 10 Million Liters Capacity Petroleum Product Stor...Design and Development of a 10 Million Liters Capacity Petroleum Product Stor...
Design and Development of a 10 Million Liters Capacity Petroleum Product Stor...theijes
 
Condition monitoring of_steam_turbines_by_performa
Condition monitoring of_steam_turbines_by_performaCondition monitoring of_steam_turbines_by_performa
Condition monitoring of_steam_turbines_by_performaUdhayakumar Venkataraman
 
Development of Process for Replacement of Mill Roller
Development of Process for Replacement of Mill RollerDevelopment of Process for Replacement of Mill Roller
Development of Process for Replacement of Mill RollerIRJET Journal
 
Analysis of Bearing and Shaft Failures in Motors.pdf
Analysis of Bearing and Shaft Failures in Motors.pdfAnalysis of Bearing and Shaft Failures in Motors.pdf
Analysis of Bearing and Shaft Failures in Motors.pdfZiad Salem
 
IRJET- Design and Fabrication of Magnetorheological Brake
IRJET-  	  Design and Fabrication of Magnetorheological BrakeIRJET-  	  Design and Fabrication of Magnetorheological Brake
IRJET- Design and Fabrication of Magnetorheological BrakeIRJET Journal
 
Fabrication of Advanced Hybrid Savonius Wind Turbine
Fabrication of Advanced Hybrid Savonius Wind TurbineFabrication of Advanced Hybrid Savonius Wind Turbine
Fabrication of Advanced Hybrid Savonius Wind TurbineDigvijay Gabhane
 
NAB Lessons Learned Paper Greig 2015
NAB Lessons Learned Paper Greig 2015NAB Lessons Learned Paper Greig 2015
NAB Lessons Learned Paper Greig 2015Andrew Greig
 
Summer traning on Power Transformer Construction
Summer traning on Power Transformer ConstructionSummer traning on Power Transformer Construction
Summer traning on Power Transformer ConstructionStudent
 
IRJET- Preventive Maintenance and Root Cause Analysis of Sealed Quench Furnac...
IRJET- Preventive Maintenance and Root Cause Analysis of Sealed Quench Furnac...IRJET- Preventive Maintenance and Root Cause Analysis of Sealed Quench Furnac...
IRJET- Preventive Maintenance and Root Cause Analysis of Sealed Quench Furnac...IRJET Journal
 
Brochure a4-may12-screen
Brochure a4-may12-screenBrochure a4-may12-screen
Brochure a4-may12-screenPaulHParker
 
Report on International Efficiency Efficiency Classes for Low Voltage AC Moto...
Report on International Efficiency Efficiency Classes for Low Voltage AC Moto...Report on International Efficiency Efficiency Classes for Low Voltage AC Moto...
Report on International Efficiency Efficiency Classes for Low Voltage AC Moto...LeQuangCuong
 

Ähnlich wie 10 years of experience with Westinghouse fuel at NPP Temelin (20)

Svr part 4_e
Svr part 4_eSvr part 4_e
Svr part 4_e
 
APR 1400 Presentation
APR 1400 PresentationAPR 1400 Presentation
APR 1400 Presentation
 
Advanced Power Reactor 1400 MWe
Advanced Power Reactor 1400 MWe  Advanced Power Reactor 1400 MWe
Advanced Power Reactor 1400 MWe
 
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24
 
Engine blade
Engine bladeEngine blade
Engine blade
 
Design and Development of a 10 Million Liters Capacity Petroleum Product Stor...
Design and Development of a 10 Million Liters Capacity Petroleum Product Stor...Design and Development of a 10 Million Liters Capacity Petroleum Product Stor...
Design and Development of a 10 Million Liters Capacity Petroleum Product Stor...
 
Ship's Energy Efficiency Management
Ship's Energy Efficiency ManagementShip's Energy Efficiency Management
Ship's Energy Efficiency Management
 
Condition monitoring of_steam_turbines_by_performa
Condition monitoring of_steam_turbines_by_performaCondition monitoring of_steam_turbines_by_performa
Condition monitoring of_steam_turbines_by_performa
 
Development of Process for Replacement of Mill Roller
Development of Process for Replacement of Mill RollerDevelopment of Process for Replacement of Mill Roller
Development of Process for Replacement of Mill Roller
 
Analysis of Bearing and Shaft Failures in Motors.pdf
Analysis of Bearing and Shaft Failures in Motors.pdfAnalysis of Bearing and Shaft Failures in Motors.pdf
Analysis of Bearing and Shaft Failures in Motors.pdf
 
IRJET- Design and Fabrication of Magnetorheological Brake
IRJET-  	  Design and Fabrication of Magnetorheological BrakeIRJET-  	  Design and Fabrication of Magnetorheological Brake
IRJET- Design and Fabrication of Magnetorheological Brake
 
Fabrication of Advanced Hybrid Savonius Wind Turbine
Fabrication of Advanced Hybrid Savonius Wind TurbineFabrication of Advanced Hybrid Savonius Wind Turbine
Fabrication of Advanced Hybrid Savonius Wind Turbine
 
NAB Lessons Learned Paper Greig 2015
NAB Lessons Learned Paper Greig 2015NAB Lessons Learned Paper Greig 2015
NAB Lessons Learned Paper Greig 2015
 
Turbina vapor
Turbina vaporTurbina vapor
Turbina vapor
 
Wgp4205 turbine
Wgp4205 turbineWgp4205 turbine
Wgp4205 turbine
 
Summer traning on Power Transformer Construction
Summer traning on Power Transformer ConstructionSummer traning on Power Transformer Construction
Summer traning on Power Transformer Construction
 
Bhel report block 4
Bhel report block 4Bhel report block 4
Bhel report block 4
 
IRJET- Preventive Maintenance and Root Cause Analysis of Sealed Quench Furnac...
IRJET- Preventive Maintenance and Root Cause Analysis of Sealed Quench Furnac...IRJET- Preventive Maintenance and Root Cause Analysis of Sealed Quench Furnac...
IRJET- Preventive Maintenance and Root Cause Analysis of Sealed Quench Furnac...
 
Brochure a4-may12-screen
Brochure a4-may12-screenBrochure a4-may12-screen
Brochure a4-may12-screen
 
Report on International Efficiency Efficiency Classes for Low Voltage AC Moto...
Report on International Efficiency Efficiency Classes for Low Voltage AC Moto...Report on International Efficiency Efficiency Classes for Low Voltage AC Moto...
Report on International Efficiency Efficiency Classes for Low Voltage AC Moto...
 

Mehr von myatom

JANTI Fukushima report part 4 5 6
JANTI Fukushima report part 4 5 6JANTI Fukushima report part 4 5 6
JANTI Fukushima report part 4 5 6myatom
 
JANTI Fukushima report part 3
JANTI Fukushima report part 3JANTI Fukushima report part 3
JANTI Fukushima report part 3myatom
 
JANTI Fukushima report part 1 2
JANTI Fukushima report part 1 2JANTI Fukushima report part 1 2
JANTI Fukushima report part 1 2myatom
 
Janti fukushima report_at
Janti fukushima report_atJanti fukushima report_at
Janti fukushima report_atmyatom
 
BWR Fukushima
BWR FukushimaBWR Fukushima
BWR Fukushimamyatom
 
Updated plant costs 2010
Updated plant costs 2010Updated plant costs 2010
Updated plant costs 2010myatom
 
Рачков зятц
Рачков зятцРачков зятц
Рачков зятцmyatom
 
рачков зятц3
рачков зятц3рачков зятц3
рачков зятц3myatom
 
рачков зятц
рачков зятцрачков зятц
рачков зятцmyatom
 
щедровицкий2010 новая платформа
щедровицкий2010 новая платформащедровицкий2010 новая платформа
щедровицкий2010 новая платформаmyatom
 
формирование кадров
формирование кадровформирование кадров
формирование кадровmyatom
 
Vber300 OKBM
Vber300 OKBMVber300 OKBM
Vber300 OKBMmyatom
 
AES-2006, part 1
AES-2006, part 1AES-2006, part 1
AES-2006, part 1myatom
 
Banyuk vver 2010
Banyuk vver 2010Banyuk vver 2010
Banyuk vver 2010myatom
 
Ryzhov VVER prospects atomexpo2010
Ryzhov VVER prospects atomexpo2010Ryzhov VVER prospects atomexpo2010
Ryzhov VVER prospects atomexpo2010myatom
 
Rothwell Braun THE COST STRUCTURE OF INTERNATIONAL URANIUM ENRICHMENT SERVICE...
Rothwell Braun THE COST STRUCTURE OF INTERNATIONAL URANIUM ENRICHMENT SERVICE...Rothwell Braun THE COST STRUCTURE OF INTERNATIONAL URANIUM ENRICHMENT SERVICE...
Rothwell Braun THE COST STRUCTURE OF INTERNATIONAL URANIUM ENRICHMENT SERVICE...myatom
 
MIT Nuclear fuel cycle 2010
MIT Nuclear fuel cycle 2010MIT Nuclear fuel cycle 2010
MIT Nuclear fuel cycle 2010myatom
 
Policy Challenges of Nuclear Reactor Construction: Cost Escalation and Crowd...
 Policy Challenges of Nuclear Reactor Construction: Cost Escalation and Crowd... Policy Challenges of Nuclear Reactor Construction: Cost Escalation and Crowd...
Policy Challenges of Nuclear Reactor Construction: Cost Escalation and Crowd...myatom
 
Nuclear New build Unveiled by ADL
Nuclear New build Unveiled by ADLNuclear New build Unveiled by ADL
Nuclear New build Unveiled by ADLmyatom
 
CANDU in Ukraine 2010
CANDU in Ukraine 2010CANDU in Ukraine 2010
CANDU in Ukraine 2010myatom
 

Mehr von myatom (20)

JANTI Fukushima report part 4 5 6
JANTI Fukushima report part 4 5 6JANTI Fukushima report part 4 5 6
JANTI Fukushima report part 4 5 6
 
JANTI Fukushima report part 3
JANTI Fukushima report part 3JANTI Fukushima report part 3
JANTI Fukushima report part 3
 
JANTI Fukushima report part 1 2
JANTI Fukushima report part 1 2JANTI Fukushima report part 1 2
JANTI Fukushima report part 1 2
 
Janti fukushima report_at
Janti fukushima report_atJanti fukushima report_at
Janti fukushima report_at
 
BWR Fukushima
BWR FukushimaBWR Fukushima
BWR Fukushima
 
Updated plant costs 2010
Updated plant costs 2010Updated plant costs 2010
Updated plant costs 2010
 
Рачков зятц
Рачков зятцРачков зятц
Рачков зятц
 
рачков зятц3
рачков зятц3рачков зятц3
рачков зятц3
 
рачков зятц
рачков зятцрачков зятц
рачков зятц
 
щедровицкий2010 новая платформа
щедровицкий2010 новая платформащедровицкий2010 новая платформа
щедровицкий2010 новая платформа
 
формирование кадров
формирование кадровформирование кадров
формирование кадров
 
Vber300 OKBM
Vber300 OKBMVber300 OKBM
Vber300 OKBM
 
AES-2006, part 1
AES-2006, part 1AES-2006, part 1
AES-2006, part 1
 
Banyuk vver 2010
Banyuk vver 2010Banyuk vver 2010
Banyuk vver 2010
 
Ryzhov VVER prospects atomexpo2010
Ryzhov VVER prospects atomexpo2010Ryzhov VVER prospects atomexpo2010
Ryzhov VVER prospects atomexpo2010
 
Rothwell Braun THE COST STRUCTURE OF INTERNATIONAL URANIUM ENRICHMENT SERVICE...
Rothwell Braun THE COST STRUCTURE OF INTERNATIONAL URANIUM ENRICHMENT SERVICE...Rothwell Braun THE COST STRUCTURE OF INTERNATIONAL URANIUM ENRICHMENT SERVICE...
Rothwell Braun THE COST STRUCTURE OF INTERNATIONAL URANIUM ENRICHMENT SERVICE...
 
MIT Nuclear fuel cycle 2010
MIT Nuclear fuel cycle 2010MIT Nuclear fuel cycle 2010
MIT Nuclear fuel cycle 2010
 
Policy Challenges of Nuclear Reactor Construction: Cost Escalation and Crowd...
 Policy Challenges of Nuclear Reactor Construction: Cost Escalation and Crowd... Policy Challenges of Nuclear Reactor Construction: Cost Escalation and Crowd...
Policy Challenges of Nuclear Reactor Construction: Cost Escalation and Crowd...
 
Nuclear New build Unveiled by ADL
Nuclear New build Unveiled by ADLNuclear New build Unveiled by ADL
Nuclear New build Unveiled by ADL
 
CANDU in Ukraine 2010
CANDU in Ukraine 2010CANDU in Ukraine 2010
CANDU in Ukraine 2010
 

Kürzlich hochgeladen

Basic Building Blocks of Internet of Things.
Basic Building Blocks of Internet of Things.Basic Building Blocks of Internet of Things.
Basic Building Blocks of Internet of Things.YounusS2
 
Igniting Next Level Productivity with AI-Infused Data Integration Workflows
Igniting Next Level Productivity with AI-Infused Data Integration WorkflowsIgniting Next Level Productivity with AI-Infused Data Integration Workflows
Igniting Next Level Productivity with AI-Infused Data Integration WorkflowsSafe Software
 
COMPUTER 10: Lesson 7 - File Storage and Online Collaboration
COMPUTER 10: Lesson 7 - File Storage and Online CollaborationCOMPUTER 10: Lesson 7 - File Storage and Online Collaboration
COMPUTER 10: Lesson 7 - File Storage and Online Collaborationbruanjhuli
 
Comparing Sidecar-less Service Mesh from Cilium and Istio
Comparing Sidecar-less Service Mesh from Cilium and IstioComparing Sidecar-less Service Mesh from Cilium and Istio
Comparing Sidecar-less Service Mesh from Cilium and IstioChristian Posta
 
How Accurate are Carbon Emissions Projections?
How Accurate are Carbon Emissions Projections?How Accurate are Carbon Emissions Projections?
How Accurate are Carbon Emissions Projections?IES VE
 
Linked Data in Production: Moving Beyond Ontologies
Linked Data in Production: Moving Beyond OntologiesLinked Data in Production: Moving Beyond Ontologies
Linked Data in Production: Moving Beyond OntologiesDavid Newbury
 
Videogame localization & technology_ how to enhance the power of translation.pdf
Videogame localization & technology_ how to enhance the power of translation.pdfVideogame localization & technology_ how to enhance the power of translation.pdf
Videogame localization & technology_ how to enhance the power of translation.pdfinfogdgmi
 
Nanopower In Semiconductor Industry.pdf
Nanopower  In Semiconductor Industry.pdfNanopower  In Semiconductor Industry.pdf
Nanopower In Semiconductor Industry.pdfPedro Manuel
 
Computer 10: Lesson 10 - Online Crimes and Hazards
Computer 10: Lesson 10 - Online Crimes and HazardsComputer 10: Lesson 10 - Online Crimes and Hazards
Computer 10: Lesson 10 - Online Crimes and HazardsSeth Reyes
 
Bird eye's view on Camunda open source ecosystem
Bird eye's view on Camunda open source ecosystemBird eye's view on Camunda open source ecosystem
Bird eye's view on Camunda open source ecosystemAsko Soukka
 
activity_diagram_combine_v4_20190827.pdfactivity_diagram_combine_v4_20190827.pdf
activity_diagram_combine_v4_20190827.pdfactivity_diagram_combine_v4_20190827.pdfactivity_diagram_combine_v4_20190827.pdfactivity_diagram_combine_v4_20190827.pdf
activity_diagram_combine_v4_20190827.pdfactivity_diagram_combine_v4_20190827.pdfJamie (Taka) Wang
 
20230202 - Introduction to tis-py
20230202 - Introduction to tis-py20230202 - Introduction to tis-py
20230202 - Introduction to tis-pyJamie (Taka) Wang
 
UiPath Platform: The Backend Engine Powering Your Automation - Session 1
UiPath Platform: The Backend Engine Powering Your Automation - Session 1UiPath Platform: The Backend Engine Powering Your Automation - Session 1
UiPath Platform: The Backend Engine Powering Your Automation - Session 1DianaGray10
 
Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...
Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...
Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...Will Schroeder
 
Cybersecurity Workshop #1.pptx
Cybersecurity Workshop #1.pptxCybersecurity Workshop #1.pptx
Cybersecurity Workshop #1.pptxGDSC PJATK
 
ADOPTING WEB 3 FOR YOUR BUSINESS: A STEP-BY-STEP GUIDE
ADOPTING WEB 3 FOR YOUR BUSINESS: A STEP-BY-STEP GUIDEADOPTING WEB 3 FOR YOUR BUSINESS: A STEP-BY-STEP GUIDE
ADOPTING WEB 3 FOR YOUR BUSINESS: A STEP-BY-STEP GUIDELiveplex
 
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdf
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdfUiPath Solutions Management Preview - Northern CA Chapter - March 22.pdf
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdfDianaGray10
 
Using IESVE for Loads, Sizing and Heat Pump Modeling to Achieve Decarbonization
Using IESVE for Loads, Sizing and Heat Pump Modeling to Achieve DecarbonizationUsing IESVE for Loads, Sizing and Heat Pump Modeling to Achieve Decarbonization
Using IESVE for Loads, Sizing and Heat Pump Modeling to Achieve DecarbonizationIES VE
 
Machine Learning Model Validation (Aijun Zhang 2024).pdf
Machine Learning Model Validation (Aijun Zhang 2024).pdfMachine Learning Model Validation (Aijun Zhang 2024).pdf
Machine Learning Model Validation (Aijun Zhang 2024).pdfAijun Zhang
 

Kürzlich hochgeladen (20)

Basic Building Blocks of Internet of Things.
Basic Building Blocks of Internet of Things.Basic Building Blocks of Internet of Things.
Basic Building Blocks of Internet of Things.
 
Igniting Next Level Productivity with AI-Infused Data Integration Workflows
Igniting Next Level Productivity with AI-Infused Data Integration WorkflowsIgniting Next Level Productivity with AI-Infused Data Integration Workflows
Igniting Next Level Productivity with AI-Infused Data Integration Workflows
 
COMPUTER 10: Lesson 7 - File Storage and Online Collaboration
COMPUTER 10: Lesson 7 - File Storage and Online CollaborationCOMPUTER 10: Lesson 7 - File Storage and Online Collaboration
COMPUTER 10: Lesson 7 - File Storage and Online Collaboration
 
Comparing Sidecar-less Service Mesh from Cilium and Istio
Comparing Sidecar-less Service Mesh from Cilium and IstioComparing Sidecar-less Service Mesh from Cilium and Istio
Comparing Sidecar-less Service Mesh from Cilium and Istio
 
How Accurate are Carbon Emissions Projections?
How Accurate are Carbon Emissions Projections?How Accurate are Carbon Emissions Projections?
How Accurate are Carbon Emissions Projections?
 
Linked Data in Production: Moving Beyond Ontologies
Linked Data in Production: Moving Beyond OntologiesLinked Data in Production: Moving Beyond Ontologies
Linked Data in Production: Moving Beyond Ontologies
 
20150722 - AGV
20150722 - AGV20150722 - AGV
20150722 - AGV
 
Videogame localization & technology_ how to enhance the power of translation.pdf
Videogame localization & technology_ how to enhance the power of translation.pdfVideogame localization & technology_ how to enhance the power of translation.pdf
Videogame localization & technology_ how to enhance the power of translation.pdf
 
Nanopower In Semiconductor Industry.pdf
Nanopower  In Semiconductor Industry.pdfNanopower  In Semiconductor Industry.pdf
Nanopower In Semiconductor Industry.pdf
 
Computer 10: Lesson 10 - Online Crimes and Hazards
Computer 10: Lesson 10 - Online Crimes and HazardsComputer 10: Lesson 10 - Online Crimes and Hazards
Computer 10: Lesson 10 - Online Crimes and Hazards
 
Bird eye's view on Camunda open source ecosystem
Bird eye's view on Camunda open source ecosystemBird eye's view on Camunda open source ecosystem
Bird eye's view on Camunda open source ecosystem
 
activity_diagram_combine_v4_20190827.pdfactivity_diagram_combine_v4_20190827.pdf
activity_diagram_combine_v4_20190827.pdfactivity_diagram_combine_v4_20190827.pdfactivity_diagram_combine_v4_20190827.pdfactivity_diagram_combine_v4_20190827.pdf
activity_diagram_combine_v4_20190827.pdfactivity_diagram_combine_v4_20190827.pdf
 
20230202 - Introduction to tis-py
20230202 - Introduction to tis-py20230202 - Introduction to tis-py
20230202 - Introduction to tis-py
 
UiPath Platform: The Backend Engine Powering Your Automation - Session 1
UiPath Platform: The Backend Engine Powering Your Automation - Session 1UiPath Platform: The Backend Engine Powering Your Automation - Session 1
UiPath Platform: The Backend Engine Powering Your Automation - Session 1
 
Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...
Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...
Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...
 
Cybersecurity Workshop #1.pptx
Cybersecurity Workshop #1.pptxCybersecurity Workshop #1.pptx
Cybersecurity Workshop #1.pptx
 
ADOPTING WEB 3 FOR YOUR BUSINESS: A STEP-BY-STEP GUIDE
ADOPTING WEB 3 FOR YOUR BUSINESS: A STEP-BY-STEP GUIDEADOPTING WEB 3 FOR YOUR BUSINESS: A STEP-BY-STEP GUIDE
ADOPTING WEB 3 FOR YOUR BUSINESS: A STEP-BY-STEP GUIDE
 
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdf
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdfUiPath Solutions Management Preview - Northern CA Chapter - March 22.pdf
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdf
 
Using IESVE for Loads, Sizing and Heat Pump Modeling to Achieve Decarbonization
Using IESVE for Loads, Sizing and Heat Pump Modeling to Achieve DecarbonizationUsing IESVE for Loads, Sizing and Heat Pump Modeling to Achieve Decarbonization
Using IESVE for Loads, Sizing and Heat Pump Modeling to Achieve Decarbonization
 
Machine Learning Model Validation (Aijun Zhang 2024).pdf
Machine Learning Model Validation (Aijun Zhang 2024).pdfMachine Learning Model Validation (Aijun Zhang 2024).pdf
Machine Learning Model Validation (Aijun Zhang 2024).pdf
 

10 years of experience with Westinghouse fuel at NPP Temelin

  • 1. 10 years of experience with Westinghouse fuel at NPP Temelin Daniel Ernst & Luka Milisdorfer VVER 2010 Prague, November 1-3, 2010
  • 2. 2VVER 2010 History Contract with Westinghouse was signed in 1993 First fuel assembly (FA) VVANTAGE-6 - was loaded into the reactor of Unit 1 in July, 2000 . ..and first criticality was achieved 3 months later 8 cycles at Unit 1 (Cycle 5 was divided on Cycle 5 and 5A) and 7 cycles at Unit 2 These 15 cycles represent 960 FAs 490 FAs (U1) + 470 FAs (U2) Average burnup of unloaded F/As was 37.800 MWd/tU and maximum average burnup of F/A was app. 44.500 MWd/tU 67 leaking FAs, 27 FAs were repaired and reused
  • 3. 3VVER 2010 Content History Core Design, Safety Evaluation and Core Monitoring Fuel Problems Post Irradiation Inspection Program Conclusion
  • 4. 4VVER 2010 Core Design and Safety Evaluation Transfer of computational software and methodology (NRC licensed). Computational aids were modified by Westinghouse for usage with hexagonal core (ANC-H; PHOENIX-H, etc.) Set of core design trainings for EZ personnel several of them as on-job-trainings important know-how transfer allows CEZ to perform its own core design-related calculations Close WEC- EZ joint cooperation in loading pattern search the preliminary patterns (with brief safety evaluation) were found by EZ and then fully evaluated by Westinghouse and delivered as a final core design. Over time the participation of the CEZ personnel in core design process becomes more and more significant
  • 5. Core Design and Safety Evaluation Complicated core design: Real cycle lengths significantly departs from the scheduled ones Core Design constraints caused by IRI and grid-to-rod fretting Common core design limitations and efforts: safety aspects, reactor vessel fluency minimalization; economical aspects. In despite of the above-mentioned limits the safe, operation- friendly and reasonable cost-effective loading patterns were found Low leakage cores reactor vessel fluency minimalization Cores which helps to mitigate the IRI issue. Cores with sufficient and comfortable margins to operational limits (peaking factors) Cores with minimalized sixth asymmetry forcing function, etc. 5VVER 2010
  • 6. Core Design and Safety Evaluation During IRI and grid-to-rod fretting problems detailed core design guideline was created to mitigate/eliminate the above-mentioned issues. Since the irreparable leakage of the fuel, which were several times determined during outages the Contingency Plans was always created before each fuel reload helps with quick redesign The core redesign were often performed in challenging time range days/few weeks 6VVER 2010
  • 7. Core Design and Safety Evaluation The flexible fuel assemblies design was the main presumptions for successful core design: Fuel enrichment according to core designer requests (restricted only by range 0.7 5.0 % w/o) Axial and primarily radial profiled fuel assemblies Fine tuning of burnable absorbers using integrated fuel burnable absorbers (IFBA) rods from 0 to 84 IFBA rods per assembly The loading pattern proposals safety evaluation: Using the bounding principle Performed for reasonable cycle burn-up window - mostly ± 20 EFPD Safety margins sufficient for safe and comfortable operation 7VVER 2010
  • 8. Core Monitoring The Westinghouse core monitoring system BEACON based on Rhodium self-powered incore detectors was modified for use for hexagonal core BEACON TSM (Technical Specification Monitoring) used at Temelin For the first cycles the version BEACON 2.0.1 were used the core monitoring model development was fully performed by Westinghouse The modified De-coupled version BEACON 6 was fully applied in 2008. The preceding system tuning and test opartion was performed in close WEC-CEZ cooperation 8VVER 2010
  • 9. Core Monitoring The BEACON Model Development Training was performed in 2009 The training was performed as a on-job-training (U2C7) The BEACON models were than develop by CEZ personnel and verified by Westinghouse. In 2010 the training for determining self powered detectors cross-section constants for using with fuel containing gadolinium It allows CEZ to develop the core monitoring system model for the cores with new type of fuel supplied by JSC TVEL 9VVER 2010
  • 10. 10VVER 2010 Fuel Problems Problems with RCCAs (Rod Control Cluster Assembly) during operation Incomplete Rod Insertion (IRI) Fuel Assembly (FA) / Fuel Rod (FR) Bow Excessive FA Growth Leaking FRs
  • 11. 11VVER 2010 Fuel Problems - IRI Description Some RCCAs (on both Units) do not drop fully to the bottom position (IRI Incomplete Rod Insertion) - root cause was changes in FA geometry Worst case - Unit 1, June 2 test showed two RCCAs stopped above the level of the hydraulic dashpot, in other words they failed to meet the Limit Condition unscheduled outage for refueling Since the problem became known, the function of RCCAs dropping has been repeatedly tested at intervals specified by SUJB The interval for tests was 30 days (in 2005) and is 150 days (in 2010) Based on previous tests fuel vendor: provides prediction of number of IRI for upcoming test we were/are better prepared for given situation performs a safety assessment
  • 12. 12VVER 2010 Fuel Problems IRI (cont.) Corrective actions BCO (Bases for Continuous Operation) Non fuel modification was done in 2005 - control rod drive shaft connecting bars were modified (drilled holes, increased weight the similar way as on the other VVER1000 units) FA design modifications (2006-2007) tube-in-tube dashpot design and top nozzle modifications (Phase 0) fuel rod loading equipment alignments a new structural materials of FR cladding and other FA components (Phase 1X) A methodology for core design with bowed and twisted FAs has been developed
  • 13. 13VVER 2010 Fuel Problems IRI (cont.) Odstran ni IRI na ETE modifikaci paliva Westinghouse 0 5 10 15 20 25 30 35 40 45 50 55 1.8.2004 9.11.2004 17.2.2005 28.5.2005 5.9.2005 14.12.2005 24.3.2006 2.7.2006 10.10.2006 18.1.2007 28.4.2007 6.8.2007 14.11.2007 22.2.2008 1.6.2008 9.9.2008 18.12.2008 28.3.2009 6.7.2009 14.10.2009 22.1.2010 PoetIRI U2EOC2 U1EOC3 U1EOC4 U1EOC5 U1EOC5AU2EOC3 U2EOC4 U1EOC6 U1EOC7 U2EOC5 U2EOC6
  • 14. 14VVER 2010 Fuel Problems FA/FR Bow Description The mechanical deformations of FR and FA, i.e. the deviations from their ideal geometric shapes and the elongation of fuel assemblies (radiation growth), come as a natural phenomenon accompanying the production of energy inside the cores of nuclear reactors FAs prone to geometry changes due mostly to the radiation growth of FRs and FA skeleton. The changes translate themselves into FA bow and twist The first cores in the Temelin NPP have been designed to tolerate the flow area reductions by as many as 51%. All subsequent core designs were calculated with the conservative assumption that the FRs could touch each other FA bow has affected refueling of core, reshuffling sequence of FAs was changed, the special dummy assemblies have been used to load bowed and twisted FAs However, FA bow and twist is not a safety problem, it is an usual phenomenon in all reactors in the world
  • 15. 15VVER 2010 Fuel Problems FA/FR Bow (cont.)
  • 16. 16VVER 2010 Fuel Problems FA/FR Bow (cont.)
  • 17. 17VVER 2010 Fuel Problems Excessive FA Growth Comparison of three different designs of VVANTAGE-6 fuel 0 2 4 6 8 10 12 14 16 0.0 2.0 4.0 6.0 8.0 10.0 Fast Neutron Fluence, (x 1E21 NVT) FuelAssemblyGrowth,mm T1 Growth Updated Best Estimate Curve Updated Upper Limit Curve T2 Growth Phase 1X Growth T1 design: - original design - loaded to Unit 1, first core only - Zircaloy-4 T2 design - loaded to Unit 2, first core and all reloads for both Units till 2006 - Zircaloy-4 Phase 0 - loaded to both Units in 2006 - Zircaloy-4 Phase 1X design - all reloads from 2007 till now - ZIRLO
  • 18. 18VVER 2010 Fuel Problems Excessive FA Growth (cont.) F/A Growth vs. WEC database Zr-4 Fuel Assembly Growth Data Base 0.000 0.050 0.100 0.150 0.200 0.250 0.300 0.350 0.400 0.450 0.500 0.00 2.00 4.00 6.00 8.00 10.00 12.00 Fast Fluence (1e21 nvt) FuelAssemblyGrowth(%) Zr-4 Fuel Assembly Growth Data Base Temelin 1 EOC 1 and 2 Data Temelin 2 EOC 2 Data Temelin 1 EOC 3 Data Temelin 1 EOC 4 Data Temelin 2 EOC 3 Data Temelin 1 EC 5A Data - ZIRLO
  • 19. 19VVER 2010 Fuel Problems Leaking FRs Description The nuclear reactor installed at the Temelin NPP contains 163 fuel assemblies and each assembly holds 312 fuel rods. All nuclear power plants are designed on assumption that a certain number of the rods develop leaks The number of fuel rods supposed to become leaky is determined with reliance on safety analyses and detailed in Technical Specifications in the form of Safety Limits & Conditions - at the Temelin NPP the fuel rods are checked for tightness through monitoring the specific activity in the primary circuit the overall specific activity limit of 3,7x109 Bq/l Summary of maximum activities found in the primary circuit coolant on both Units (Bq/l): 2003 2004 2005 2006 2007 2008 2009 2010 Unit 1 5,9x10 6 2,4x10 6 3,6x10 6 6,3x10 6 7,9x10 6 7,1x10 6 6,3x10 6 4,3x10 6 Unit 2 2,7x10 6 7,0x10 6 3,3x10 6 6,4x10 6 8,5x10 6 5,8x10 6 6,3x10 6 6,6x10 6
  • 20. 20VVER 2010 Fuel Problems Leaking FRs (cont.) FRI faktor FRI ETE 2005 - 2010 0 20 40 60 80 100 120 140 160 leden05 bezen05 kvten05 ervenec05 zai05 listopad05 leden06 bezen06 kvten06 ervenec06 zai06 listopad06 leden07 bezen07 kvten07 ervenec07 zai07 listopad07 leden08 bezen08 kvten08 ervenec08 zai08 listopad08 leden09 bezen09 kvten09 ervenec09 zai09 listopad09 leden10 bezen10 kvten10 as [m s] FRI [Bq/g] HVB 1 HVB 2
  • 21. 21VVER 2010 Fuel Problems Leaking FRs (cont.) Sipping systems are used to search the leakers: On-line Sipping - the system applies a gas method of continuous changes in the Xe 133 concentration Off-line sipping - the system used to conduct qualitative measurements of a FA found damaged in an attempt to reveal the scope of damage done Fuel Inspection & Repair Equipment a system used to identify and repair leakers: mobile equipment (for both Units) designed and manufactured by Westinghouse during outage is FRIE assembled on the floor of the Reactor Hall and than is transported into the fresh fuel cask pit next to spent fuel pool the refueling machine moves fuel assemblies in and out of the FRIE the fuel assembly rests on a turntable which allows it to be rotated 360 degrees during the inspection process is designed to provide complete fuel inspection for entire FA the fuel assembly UT inspection system is used to locate leaking fuel rods the failed fuel rod storage basket (FFRSB) provides storage for the failed fuel rods leakers are replaced with dummy rods.
  • 22. 22VVER 2010 Fuel Problems Leaking FRs (cont.) Unit 1 End of Cycle # of Leakers # of Repaired Leakers # of Leaked F/Rs 2 1 0 0 3 5 1 1 4 6 1 1 5 6 6 8 5A 4 2 3 6 7 7 10 7 3 1 1 8 0 0 0 Unit 2 End of Cycle # of Leakers # of Repaired Leakers # of Leaked F/Rs 2 3 2 5 3 10 2 4 4 5 2 2 5 7 2 3 6 5 0 0 7 5 1 2 An overview of leaks disclosed in fuel at the Temelin NPP
  • 23. 23VVER 2010 Fuel Problems Leaking FRs (cont.) Root cause of leaking FRs is grid-to-rod fretting that means vibration of FRs in spacer grids Fuel Rod Fuel Rod with fretting marks
  • 24. 24VVER 2010 Fuel Problems Leaking FRs (cont.)
  • 25. 25VVER 2010 Fuel Problems Leaking FRs (cont.) FR separation event at Unit 2 Fuel reconstitution was being performed on assembly BE24 One leaking fuel rod was to be removed and replaced by a stainless steel rod After withdrawing about 150 cm of the fuel rod, the rod jerked suddenly and fractured Visual examination of the fracture location indicated the separation was caused by secondary hydriding (there had been no indications of significant hydriding from the visuals) Extensive through-wall grid-to-rod fretting was found Visual examinations of the fractured ends on both rod segments showed intact fuel pellets with no empty area, indicating that no fuel pellets were lost during the fracture event.
  • 26. 26VVER 2010 Fuel Problems Leaking FRs (cont.)
  • 27. 27VVER 2010 Post Irradiation Inspection Program (PIIP) Post Irradiation Inspection Program (PIIP) substituted the Lead Test Assembly program for new fuel design program was structured to meet requirements of the Czech Regulatory Body (SUJB) additional proof of material compatibility, analytical methods support and verification, overall thermomechanical performance demonstration 8 selected FAs (these 8 FAs were pre-characterized ) The inspection program included: FA measurements Visual Examination FA Bow, Twist and Overall FA Length Measurement Peripheral FR Corrosion Measurements Single FR measurements Visual Examination Corrosion Measurements Profilometry Measurements RCCA inspections Measurements of Total Wear of the Tube Cross Section
  • 28. 28VVER 2010 Post Irradiation Inspection Program (PIIP) cont. PIIP results Positive: visual examinations revealed little or no corrosion on the cladding surfaces confirmation of compatibility of Zircaloy alloy with the VVER water chemistry there was no wear of any RCCA rodlet (criterion is wear less than10%)
  • 29. 29VVER 2010 Post Irradiation Inspection Program (PIIP) cont. PIIP results Negative: FA twist, bow and length measurements showed an unexpected behavior FR visuals of leaking FRs indicated GRF
  • 30. 30VVER 2010 Conclusion During first decade of the Temelin NPP operation, formidable mission of implementing and development program of a new fuel system has been accomplished. Indeed, it raised more or less serious problems which all were solved together with the fuel vendor and we can say they are under the control. Today, we are standing at the beginning of new era, waiting what will be brought by the future.