SlideShare ist ein Scribd-Unternehmen logo
1 von 18
Downloaden Sie, um offline zu lesen
Precast Concrete Construction 
By:MADAN MOHAN JANA West bengal survey institute 
2012
What is Precast Concrete ? 
Precast concrete means a concrete member that is cast and cured at a location other than its final designated location. The use of reinforced concrete is a relatively recent invention, usually dated to 1848 when jean- Louis Lambot became the first to use it. Joseph Monier, a French gardener, patented a design for reinforced garden tubs in 1868, and later patented reinforced concrete beams and posts for railway and road guardrails.
Advantages of Precast Concrete Construction 
Very rapid speed of erection 
Good quality control 
Entire building can be precast-walls, floors , beams , etc. 
Rapid construction on site 
High quality because of the controlled conditions in the factory 
Prestressing is easily done which can reduce the size and number of the structural members.
Advantages of Precast Concrete Wall Systems 
Aesthetic versatility 
Durability 
Security 
Low maintenance 
Economy
Disadvantages of Precast Concrete Construction 
Very heavy members 
Camber in beams and slabs 
Very small margin for error 
Connections may be difficult 
Somewhat limited building design flexibility 
Because panel size is limited, precast concrete can not be used for two-way structural systems. 
Economics of scale demand regularly shaped buildings. 
Need for repetition of forms will affect building design. 
Joints between panels are often expensive and complicated. 
Skilled workmanship is required in the application of the panel on site. 
Cranes are required to lift panels.
Popular Uses of Precast Concrete 
Concrete curtain walls 
As an exterior cladding (may include exposed aggregate) 
For structural walls 
Ability to precast in three dimensions allows precast panels to form parts of mechanical systems
Slabs: 
a) Flat slab - 
Thickness of 4", 6" and 8" 
Spans up to 25’-0" 
Standard panel width = 4’-0" 
Typical designations = FS4 (FS = Flat Slab, 4 = thickness of slab in inches) 
precast concrete 
b) Hollow Core slab - 
Thicknesses of 4", 6", 8", 10" and 12" 
Spans up to 40’-0" 
Standard panel width = 4’-0" 
Typical designations = 4HC6 (4 = panel width in feet, HC = Hollow Core, 6 = slab thickness in inches)
Beams: 
a) Rectangular Beam (RB) - 
Typical beam width = 12" or 16" 
Spans up to 50’-0" 
Typical designation = 16RB24 (16 = width in inches, 24 = depth in inches) 
b) "L" and "IT" (inverted "Tee") beams (LB and IT) - 
Typically used to support slabs, walls, masonry, and beams 
Typical beam width = 12" 
Depths of 20", 28", 36", 44", 52" and 60"
c) Double Tee Beam (DT) - 
Combination beam and slab 
Spans up to 100’-0" 
Typical width = 8’-0" 
Depths of 12", 18", 24" and 32" 
Designation = 8DT24+2 (8 = width in feet, 24 = depth, +2 = 2" topping)
d) Single Tee Beam (ST) - 
Combination beam and slab 
Spans up to 120’-0" 
Typical width = 8’-0" 
Typical depths of 36" and 48" 
Designation = 8ST36+2 (8 = width in feet, 24 = depth, +2 = 2" topping)
Walls: 
Wall panels available in standard 8’-0" widths. 
Can be flat, or have architectural features such as window and door openings, ribs, reveals, textures, sandwich (insulation built-in), sculptured, etc.
Methods of Attachment of Precast Concrete Members:
Weld Plates 
The most common method of attachment of precast members is by use of steel weld plates. Typically, the precast members have embedded plates that can be used as welding surfaces for loose connecting plates or angles (see below):
Rebar and Grout 
Used typically with slabs, reinforcing bars are spliced into slabs and grouted in place (see below):
Thank You for Your Attention

Weitere ähnliche Inhalte

Was ist angesagt?

Prefabrication construction
Prefabrication constructionPrefabrication construction
Prefabrication constructionDivya Vishnoi
 
PORTAL FRAME- Structural systems
PORTAL FRAME- Structural systemsPORTAL FRAME- Structural systems
PORTAL FRAME- Structural systemsGrace Henry
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concreteUdisha15
 
PRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEMPRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEMSagar Shah
 
Introduction to prestressed concrete
Introduction to prestressed concreteIntroduction to prestressed concrete
Introduction to prestressed concrete9833356555
 
Pre cast vs cast-in-situ concrete
Pre cast vs cast-in-situ concretePre cast vs cast-in-situ concrete
Pre cast vs cast-in-situ concreteRajat Nainwal
 
Precast construction
Precast constructionPrecast construction
Precast constructionDivya Vishnoi
 
Specifications of buildings
Specifications of buildingsSpecifications of buildings
Specifications of buildingsSimarpreet Singh
 
Pre fabricated structures
Pre fabricated structuresPre fabricated structures
Pre fabricated structuresjamali husain
 
Prefabrication types and Applications explained
Prefabrication types and Applications explainedPrefabrication types and Applications explained
Prefabrication types and Applications explainedEyad Reda
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concreteRajesh Burde
 
Alternate building materials
Alternate building materialsAlternate building materials
Alternate building materialsJaspreet singh
 
Bc open pre fabricated construction system
Bc open pre fabricated construction systemBc open pre fabricated construction system
Bc open pre fabricated construction systemAnuj Singhal
 

Was ist angesagt? (20)

Prefabrication construction
Prefabrication constructionPrefabrication construction
Prefabrication construction
 
specification of Rcc
specification of Rccspecification of Rcc
specification of Rcc
 
PORTAL FRAME- Structural systems
PORTAL FRAME- Structural systemsPORTAL FRAME- Structural systems
PORTAL FRAME- Structural systems
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
 
Prefabrication
PrefabricationPrefabrication
Prefabrication
 
PRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEMPRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEM
 
Introduction to prestressed concrete
Introduction to prestressed concreteIntroduction to prestressed concrete
Introduction to prestressed concrete
 
Pre cast vs cast-in-situ concrete
Pre cast vs cast-in-situ concretePre cast vs cast-in-situ concrete
Pre cast vs cast-in-situ concrete
 
Precast construction
Precast constructionPrecast construction
Precast construction
 
High rise building construction
High rise building constructionHigh rise building construction
High rise building construction
 
Joints in concrete
Joints in concreteJoints in concrete
Joints in concrete
 
Precast-concrete Details
Precast-concrete DetailsPrecast-concrete Details
Precast-concrete Details
 
Specifications of buildings
Specifications of buildingsSpecifications of buildings
Specifications of buildings
 
Pre fabricated structures
Pre fabricated structuresPre fabricated structures
Pre fabricated structures
 
Prefabrication types and Applications explained
Prefabrication types and Applications explainedPrefabrication types and Applications explained
Prefabrication types and Applications explained
 
Prefabrication
PrefabricationPrefabrication
Prefabrication
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
 
Prefabricated structures
Prefabricated structuresPrefabricated structures
Prefabricated structures
 
Alternate building materials
Alternate building materialsAlternate building materials
Alternate building materials
 
Bc open pre fabricated construction system
Bc open pre fabricated construction systemBc open pre fabricated construction system
Bc open pre fabricated construction system
 

Andere mochten auch

Virtual Outriggers in Tall Buildings
Virtual Outriggers in Tall BuildingsVirtual Outriggers in Tall Buildings
Virtual Outriggers in Tall BuildingsAndrew J Horton
 
solid waste management by abrar saleem
solid waste management by abrar saleemsolid waste management by abrar saleem
solid waste management by abrar saleemjunaid bashir
 
Prefabricated structures
Prefabricated structuresPrefabricated structures
Prefabricated structuresFAIZAL MUHAMMED
 
Architectural (construction) systems-section 3
Architectural (construction) systems-section 3Architectural (construction) systems-section 3
Architectural (construction) systems-section 3Saja Hamad
 
segmental construction of bridges
segmental construction of bridgessegmental construction of bridges
segmental construction of bridgesSravan Kumar
 
Tunnelling & underground design (Topic5-hard & weak rock tunnelling)
Tunnelling & underground design (Topic5-hard & weak rock tunnelling)Tunnelling & underground design (Topic5-hard & weak rock tunnelling)
Tunnelling & underground design (Topic5-hard & weak rock tunnelling)Hamed Zarei
 
New Austrian Tunnelling Method (NATM)
New Austrian Tunnelling Method (NATM)New Austrian Tunnelling Method (NATM)
New Austrian Tunnelling Method (NATM)Austrian Standards
 
Shield Tail Deformations - Experiences, Mechanics and Lessons
Shield Tail Deformations - Experiences, Mechanics and LessonsShield Tail Deformations - Experiences, Mechanics and Lessons
Shield Tail Deformations - Experiences, Mechanics and Lessonscoen_van_der_vliet
 
World Tunnel Conference 2014
World Tunnel Conference 2014World Tunnel Conference 2014
World Tunnel Conference 2014richardbieniawski
 
NATM (New Austrian Tunneling Method ) in Tunneling
NATM (New Austrian Tunneling Method ) in TunnelingNATM (New Austrian Tunneling Method ) in Tunneling
NATM (New Austrian Tunneling Method ) in TunnelingHamed Zarei
 
Top down construction
Top down constructionTop down construction
Top down constructionAmulya Kansal
 
Tunneling Construction - NATM
Tunneling Construction - NATMTunneling Construction - NATM
Tunneling Construction - NATMluisaam
 

Andere mochten auch (20)

Virtual Outriggers in Tall Buildings
Virtual Outriggers in Tall BuildingsVirtual Outriggers in Tall Buildings
Virtual Outriggers in Tall Buildings
 
solid waste management by abrar saleem
solid waste management by abrar saleemsolid waste management by abrar saleem
solid waste management by abrar saleem
 
PDCA
PDCAPDCA
PDCA
 
Sandwich panels
Sandwich panelsSandwich panels
Sandwich panels
 
Industrial flooring
Industrial flooringIndustrial flooring
Industrial flooring
 
Prefabricated structures
Prefabricated structuresPrefabricated structures
Prefabricated structures
 
Architectural (construction) systems-section 3
Architectural (construction) systems-section 3Architectural (construction) systems-section 3
Architectural (construction) systems-section 3
 
Tunnelling methods
Tunnelling methodsTunnelling methods
Tunnelling methods
 
segmental construction of bridges
segmental construction of bridgessegmental construction of bridges
segmental construction of bridges
 
Tunnelling & underground design (Topic5-hard & weak rock tunnelling)
Tunnelling & underground design (Topic5-hard & weak rock tunnelling)Tunnelling & underground design (Topic5-hard & weak rock tunnelling)
Tunnelling & underground design (Topic5-hard & weak rock tunnelling)
 
New Austrian Tunnelling Method (NATM)
New Austrian Tunnelling Method (NATM)New Austrian Tunnelling Method (NATM)
New Austrian Tunnelling Method (NATM)
 
Tunnels concepts
Tunnels conceptsTunnels concepts
Tunnels concepts
 
Bridge 91 Design
Bridge 91 DesignBridge 91 Design
Bridge 91 Design
 
Shield Tail Deformations - Experiences, Mechanics and Lessons
Shield Tail Deformations - Experiences, Mechanics and LessonsShield Tail Deformations - Experiences, Mechanics and Lessons
Shield Tail Deformations - Experiences, Mechanics and Lessons
 
World Tunnel Conference 2014
World Tunnel Conference 2014World Tunnel Conference 2014
World Tunnel Conference 2014
 
Tunneling
Tunneling Tunneling
Tunneling
 
NATM (New Austrian Tunneling Method ) in Tunneling
NATM (New Austrian Tunneling Method ) in TunnelingNATM (New Austrian Tunneling Method ) in Tunneling
NATM (New Austrian Tunneling Method ) in Tunneling
 
Top down construction
Top down constructionTop down construction
Top down construction
 
Directional Drilling
Directional DrillingDirectional Drilling
Directional Drilling
 
Tunneling Construction - NATM
Tunneling Construction - NATMTunneling Construction - NATM
Tunneling Construction - NATM
 

Ähnlich wie Precast Concrete Construction Guide

Prefabrication & Pre-CASTING, Advanced Structural Concretes Materials for Pre...
Prefabrication & Pre-CASTING, Advanced Structural Concretes Materials for Pre...Prefabrication & Pre-CASTING, Advanced Structural Concretes Materials for Pre...
Prefabrication & Pre-CASTING, Advanced Structural Concretes Materials for Pre...Deepak Verma
 
Technology of precast concrete structures- م.11 - مبادرة #تواصل_تطوير- أ.د. إ...
Technology of precast concrete structures- م.11 - مبادرة #تواصل_تطوير- أ.د. إ...Technology of precast concrete structures- م.11 - مبادرة #تواصل_تطوير- أ.د. إ...
Technology of precast concrete structures- م.11 - مبادرة #تواصل_تطوير- أ.د. إ...Egyptian Engineers Association
 
Technology of precast concrete structures 12-5-2020-rev.5
Technology of precast concrete structures 12-5-2020-rev.5Technology of precast concrete structures 12-5-2020-rev.5
Technology of precast concrete structures 12-5-2020-rev.5Islam Ezz El-Arab
 
Concrete cast in_place_and_pre_cast_slab
Concrete cast in_place_and_pre_cast_slabConcrete cast in_place_and_pre_cast_slab
Concrete cast in_place_and_pre_cast_slabDivineGraceFernando
 
Grid waffle slab
Grid waffle slabGrid waffle slab
Grid waffle slabVikas Mehta
 
PLANNING AND DESIGNING OF PRECAST STRUCTURES
PLANNING AND DESIGNING OF PRECAST STRUCTURESPLANNING AND DESIGNING OF PRECAST STRUCTURES
PLANNING AND DESIGNING OF PRECAST STRUCTURESAjit Sabnis
 
Atecon product catalogue 2017
Atecon product catalogue 2017Atecon product catalogue 2017
Atecon product catalogue 2017Atecon
 
TEC Products: Setting Material Technology Solutions for Wood Substrates
TEC Products: Setting Material Technology Solutions for Wood SubstratesTEC Products: Setting Material Technology Solutions for Wood Substrates
TEC Products: Setting Material Technology Solutions for Wood SubstratesTEC Installation Systems
 
Precast compound wall
Precast compound wallPrecast compound wall
Precast compound wallHarsh Bothra
 
WAFFLE SLAB.pptx
WAFFLE SLAB.pptxWAFFLE SLAB.pptx
WAFFLE SLAB.pptxAmol Pawar
 
Chapters-3,4,5.pptx
Chapters-3,4,5.pptxChapters-3,4,5.pptx
Chapters-3,4,5.pptxssuserc0bf9b
 
Aerated autoclaved concrete
Aerated autoclaved concreteAerated autoclaved concrete
Aerated autoclaved concreteFrahim Akhtar
 
Optimum Value Engineering & Integrated Design
Optimum Value Engineering & Integrated DesignOptimum Value Engineering & Integrated Design
Optimum Value Engineering & Integrated DesignBrea Perrelli
 
Advance Formwork System (PERI FORMWORK SYSTEM)
Advance Formwork System (PERI FORMWORK SYSTEM)Advance Formwork System (PERI FORMWORK SYSTEM)
Advance Formwork System (PERI FORMWORK SYSTEM)Bhishma Bhatti
 

Ähnlich wie Precast Concrete Construction Guide (20)

Prefabrication & Pre-CASTING, Advanced Structural Concretes Materials for Pre...
Prefabrication & Pre-CASTING, Advanced Structural Concretes Materials for Pre...Prefabrication & Pre-CASTING, Advanced Structural Concretes Materials for Pre...
Prefabrication & Pre-CASTING, Advanced Structural Concretes Materials for Pre...
 
Aac
AacAac
Aac
 
Formwork
FormworkFormwork
Formwork
 
Floor and slabs
Floor and slabsFloor and slabs
Floor and slabs
 
Technology of precast concrete structures- م.11 - مبادرة #تواصل_تطوير- أ.د. إ...
Technology of precast concrete structures- م.11 - مبادرة #تواصل_تطوير- أ.د. إ...Technology of precast concrete structures- م.11 - مبادرة #تواصل_تطوير- أ.د. إ...
Technology of precast concrete structures- م.11 - مبادرة #تواصل_تطوير- أ.د. إ...
 
Technology of precast concrete structures 12-5-2020-rev.5
Technology of precast concrete structures 12-5-2020-rev.5Technology of precast concrete structures 12-5-2020-rev.5
Technology of precast concrete structures 12-5-2020-rev.5
 
Concrete cast in_place_and_pre_cast_slab
Concrete cast in_place_and_pre_cast_slabConcrete cast in_place_and_pre_cast_slab
Concrete cast in_place_and_pre_cast_slab
 
Grid waffle slab
Grid waffle slabGrid waffle slab
Grid waffle slab
 
PLANNING AND DESIGNING OF PRECAST STRUCTURES
PLANNING AND DESIGNING OF PRECAST STRUCTURESPLANNING AND DESIGNING OF PRECAST STRUCTURES
PLANNING AND DESIGNING OF PRECAST STRUCTURES
 
Atecon product catalogue 2017
Atecon product catalogue 2017Atecon product catalogue 2017
Atecon product catalogue 2017
 
Grid/ Waffle Slabs
Grid/ Waffle SlabsGrid/ Waffle Slabs
Grid/ Waffle Slabs
 
TEC Products: Setting Material Technology Solutions for Wood Substrates
TEC Products: Setting Material Technology Solutions for Wood SubstratesTEC Products: Setting Material Technology Solutions for Wood Substrates
TEC Products: Setting Material Technology Solutions for Wood Substrates
 
Precast compound wall
Precast compound wallPrecast compound wall
Precast compound wall
 
WAFFLE SLAB.pptx
WAFFLE SLAB.pptxWAFFLE SLAB.pptx
WAFFLE SLAB.pptx
 
Chapters-3,4,5.pptx
Chapters-3,4,5.pptxChapters-3,4,5.pptx
Chapters-3,4,5.pptx
 
Aerated autoclaved concrete
Aerated autoclaved concreteAerated autoclaved concrete
Aerated autoclaved concrete
 
Optimum Value Engineering & Integrated Design
Optimum Value Engineering & Integrated DesignOptimum Value Engineering & Integrated Design
Optimum Value Engineering & Integrated Design
 
Chapter 4
Chapter 4Chapter 4
Chapter 4
 
Advance Formwork System (PERI FORMWORK SYSTEM)
Advance Formwork System (PERI FORMWORK SYSTEM)Advance Formwork System (PERI FORMWORK SYSTEM)
Advance Formwork System (PERI FORMWORK SYSTEM)
 
The Stone Strong System
The Stone Strong SystemThe Stone Strong System
The Stone Strong System
 

Kürzlich hochgeladen

Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdfsahilsajad201
 
CS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfCS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfBalamuruganV28
 
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书rnrncn29
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdfHafizMudaserAhmad
 
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdfDEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdfAkritiPradhan2
 
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.elesangwon
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingBootNeck1
 
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHTEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHSneha Padhiar
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdfCaalaaAbdulkerim
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communicationpanditadesh123
 
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork
 
Prach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism CommunityPrach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism Communityprachaibot
 
Artificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewArtificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewsandhya757531
 
List of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfList of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfisabel213075
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxsiddharthjain2303
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxRomil Mishra
 
Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionSneha Padhiar
 
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdfPaper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdfNainaShrivastava14
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosVictor Morales
 

Kürzlich hochgeladen (20)

Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdf
 
CS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfCS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdf
 
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf
 
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdfDEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdf
 
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event Scheduling
 
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHTEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdf
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communication
 
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
 
Prach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism CommunityPrach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism Community
 
Artificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewArtificial Intelligence in Power System overview
Artificial Intelligence in Power System overview
 
List of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfList of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdf
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptx
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptx
 
Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based question
 
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdfPaper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitos
 

Precast Concrete Construction Guide

  • 1. Precast Concrete Construction By:MADAN MOHAN JANA West bengal survey institute 2012
  • 2. What is Precast Concrete ? Precast concrete means a concrete member that is cast and cured at a location other than its final designated location. The use of reinforced concrete is a relatively recent invention, usually dated to 1848 when jean- Louis Lambot became the first to use it. Joseph Monier, a French gardener, patented a design for reinforced garden tubs in 1868, and later patented reinforced concrete beams and posts for railway and road guardrails.
  • 3. Advantages of Precast Concrete Construction Very rapid speed of erection Good quality control Entire building can be precast-walls, floors , beams , etc. Rapid construction on site High quality because of the controlled conditions in the factory Prestressing is easily done which can reduce the size and number of the structural members.
  • 4. Advantages of Precast Concrete Wall Systems Aesthetic versatility Durability Security Low maintenance Economy
  • 5. Disadvantages of Precast Concrete Construction Very heavy members Camber in beams and slabs Very small margin for error Connections may be difficult Somewhat limited building design flexibility Because panel size is limited, precast concrete can not be used for two-way structural systems. Economics of scale demand regularly shaped buildings. Need for repetition of forms will affect building design. Joints between panels are often expensive and complicated. Skilled workmanship is required in the application of the panel on site. Cranes are required to lift panels.
  • 6. Popular Uses of Precast Concrete Concrete curtain walls As an exterior cladding (may include exposed aggregate) For structural walls Ability to precast in three dimensions allows precast panels to form parts of mechanical systems
  • 7. Slabs: a) Flat slab - Thickness of 4", 6" and 8" Spans up to 25’-0" Standard panel width = 4’-0" Typical designations = FS4 (FS = Flat Slab, 4 = thickness of slab in inches) precast concrete b) Hollow Core slab - Thicknesses of 4", 6", 8", 10" and 12" Spans up to 40’-0" Standard panel width = 4’-0" Typical designations = 4HC6 (4 = panel width in feet, HC = Hollow Core, 6 = slab thickness in inches)
  • 8. Beams: a) Rectangular Beam (RB) - Typical beam width = 12" or 16" Spans up to 50’-0" Typical designation = 16RB24 (16 = width in inches, 24 = depth in inches) b) "L" and "IT" (inverted "Tee") beams (LB and IT) - Typically used to support slabs, walls, masonry, and beams Typical beam width = 12" Depths of 20", 28", 36", 44", 52" and 60"
  • 9.
  • 10.
  • 11. c) Double Tee Beam (DT) - Combination beam and slab Spans up to 100’-0" Typical width = 8’-0" Depths of 12", 18", 24" and 32" Designation = 8DT24+2 (8 = width in feet, 24 = depth, +2 = 2" topping)
  • 12. d) Single Tee Beam (ST) - Combination beam and slab Spans up to 120’-0" Typical width = 8’-0" Typical depths of 36" and 48" Designation = 8ST36+2 (8 = width in feet, 24 = depth, +2 = 2" topping)
  • 13. Walls: Wall panels available in standard 8’-0" widths. Can be flat, or have architectural features such as window and door openings, ribs, reveals, textures, sandwich (insulation built-in), sculptured, etc.
  • 14.
  • 15. Methods of Attachment of Precast Concrete Members:
  • 16. Weld Plates The most common method of attachment of precast members is by use of steel weld plates. Typically, the precast members have embedded plates that can be used as welding surfaces for loose connecting plates or angles (see below):
  • 17. Rebar and Grout Used typically with slabs, reinforcing bars are spliced into slabs and grouted in place (see below):
  • 18. Thank You for Your Attention