SlideShare ist ein Scribd-Unternehmen logo
1 von 6
Page 1 of 6
Mohammed Hegazy Mousa
Technical Project Manager
002 010 222 36273
Mdhegazy@hotmail.com
Personal data
Name Mohamed Hegazy Mousa
Date & place of birth November 24,1985 Elharam - Giza
Home address 9 Nasr Elsawra , El Haram , Giza
Sex Male
Phone 002- 01022236273
E-mail address Mdhegazy@hotmail.com
Nationality Egyptian
Military state Exempted
Car & driving license Have
Marital status Married
Education
2002 – 2008: Faculty of Engineering, Cairo University, Egypt
Bachelor of Chemical Engineering
Graduation score: 64%
1999 - 2002: Orman Language School, Dokki, Giza, Egypt
Thanaweya Amma
Graduation score: 97%
Languages
Good speaking, reading and writing knowledge of Arabic and English.
Computer Skills
 Professional experience in MS-Office, and Microsoft Project.
 Very good experience in Photoshop and AutoCAD
 Professional experience in Simulation air dispersion modules using Breeze Aermod.
 Professional experience in Simulation Software like Pro II, Hysys and VMGSim.
 Very professional in Dynamic Simulation using Dynsim
Page 2 of 6
Objective
To secure a challenging and rewarding position with a solid, progressive company
that offers Opportunity for performance based career advancement in a setting that
utilizes my experience and educational background in Engineer.
Profile Description
 TechnicalProjectManager having total work experience of 7 years
 Currently working in Contact Group, Egypt
 Previous Worked as Technical Engineer in Egyptian International Co.
2E.M for Petroleum Services Technology and Engineering Research
and Consulting Company
Professional Experience
1. Company Contact Group (Block Industries Foam Factory)
Duration November 2012 to till Now
Designation Technical Project Manager
Industry Manufacturing EPS and XPS Insulation Products
Job responsibilities:
 Implementation New EPS , EPE and XPS Factories in 10th Of Ramadan and 6th
October at Egypt
 Prepare shop drawings, detailed drawings using AutoCAD for new EPS,EPE and
XPS Factory
 Design calculations using software’s and excel sheets with reference to
international standards
 Design and Sizing Process Pipelines, HVAC, Plumbing, Firefighting and utility
piping system like steam, air , water and drain Piping
 Selection Equipment specifications , size ,working system and features with
suppliers for new factory
 Contact with suppliers for all technical aspects
 Prepare technical submittals, hydraulic calculations, operations and maintenance
manuals and compliance Statements, drawing reviews.
 Evaluate new design, construction and installation methods for best practices
 Arrange meetings with supplier to review relevant certifications problems
 Co-ordinate with architectural and electrical design for better project co-ordination
design and installation process
 Carrying out site surveys, feasibility reports, design calculations and simulations
Page 3 of 6
 Assessment and recommendation of new suppliers, evaluating vendor’s proposals
 Recommend and select both vendors and consulting personnel for the project
 Participate in meetings, technical aspects and problem solving techniques
 Prepare and study the requisition requirements, equipment/material specifications,
and verification and inspection release process, ensure all certification
requirements are clearly identified
 Estimate the cost of projects on the basis of labor charges, time, used material,
tools and other technical challenges
 Estimating the actual time of the project
 Coordinating and assembling the project staff during the entire project session
 Recruitment all project team (engineering, supervisors , Welding, assembly
technician and labors)
 Supervision and manage all installation work
 Supervise installation work on site (piping, steel structure, Equipment) and
ensure it is executed in accordance with the specifications and drawings
provided.
 Use Lean Technology Application in old and new factory
 Connect ,follow, supervise and manage manufacturing Suppliers
 Follow up new Equipment manufacturing , shipping and arrival date
 Scheduling and planning project timelines
 Reviewing project contract draft and make remarks.
 Prepare bill of quantities and request for pricing/quotation from the sub-
contractors.
 Prepare and co-ordinate all mechanical project material list and costing.
 Empowered to enter into contracts and purchase necessary equipment and
supplies.
 Supervised onsite work crews and contractors to execute recovery plans on a daily
basis.
 Overall supervision of Civil/Structural engineers/designers including Lead
Discipline Engineers.
 Responsible for technical selections, technical evaluations for project
specifications
 Responsible for all assembly work and Plant Start up
 Preparation of different detailed projects visibility studies like ( EPS Foam
Factory , XPS Foam Factory , EPE Foam Factory, Bitumen Insulation Factory ,
Cement Bags Factory , Rubber Factory , and Interlock Factory)
 Prepare cost model for all Factory products
 Create solutions for old technologies
 Contact with mould manufacturing suppliers and follow them in manufacturing
process and time plane
Page 4 of 6
 Developing full-scale plans for various projects
 Plan, manage and coordinate the day to day production activities to ensure a
continuous flow of input from one machine to another for optimum production and
efficiently utilization of the machines.
 Ensure that proper plans and resources (people, facilities, supplies etc.) are in
place and efficiently utilized to ensure the uninterrupted supply of material and
service
 Check all department report and time span
 Connect with all group factories to solving all technical problems and handle all
paper and documentation
 Supervision and manage assembly and disassembly equipment in all group
factories
 Prepare monthly report that they; sales report, production capacity report, active
equipment report, Spare parts consumption report, Raw material consumption
report and Energy consumption report
 Follow up daily problems received from all departments and try solving it
 Troubleshooting planning, production ,manufacturing ,sales ,purchases and
Quality Departments
 Communicates effectively with clients to identify problems and try solving it
 Preparation of monthly evaluation plant performances in statistical and graphical
form.
 Analyze / audit the use of energy in the plant
 Recommend strategies for reducing energy costs
 Innovation , plan and Execution Energy saving system (Natural Gas, Electricity
and Water)
 Organize and plan for preventive maintenance in such a way that production
activity will not be paralyzed.
 Preparing the budgets and CAPEX for different projects
 Preparing technical reports for project tenders.
 Ensure all Safety and Environmental procedures are respected (5 S)
 Defined project plans and schedules, monitored progress and made adjustments to
accommodate changes in requirements, scope, and available resources.
Coordinated engineers in developing and integrating software.
 Sustains and improves reliability, plant operation, maintenance, and systems
documentation for a leading EPS and XPS Foam Factory.
 Directs a 115-member staff responsible for the largest EPS, EPE and XPS
facilities, with processing output of 35 tons per day.
 Implements a wide variety of engineering solutions to increase equipment
availability, increase net operating rate, reduce operation losses, and achieve
standard and acceptable production rates.
Page 5 of 6
 Provide technical support and guidance to junior engineers and quantity surveying
department.
 Preparation of Production and sales manuals and presentations for Chairman
2. Company Egyptian International Co. 2E.M for Petroleum Services
Technology, Egypt.
Duration October 2010 to October 2012
Designation Technical Project Engineer
Industry Petroleum and Chemical Raw Material Products
Job responsibilities:
 Preparation of manuals and presentations for sales team
 Preparation of different projects visibility studies
 Continually seeks opportunities to increase internal client satisfaction and deepen
clients relationships
 Market company products through deals with different companies in different
fields to supply them with our products
 Follow-up tenders for different companies in all field
 Connect with Suppliers in all different countries
 Come up with the new and advanced ways for the construction of a particular
project, regarding its completion and success.
 Estimate the cost of projects on the basis of labor charges, time, used material,
tools and other technical challenges
 Estimating the actual time of the project
 Check the report and time span
 Lead the implementation and planning of the project
 Define the project tasks as well as the requirement of resources.
 Coordinating and assembling the project staff during the entire project session.
 Follow-up daily raw materials specifications supplied to cement and steel
companies
 Implementation of used oil recycling Plant In Alexandria
3. Company Engineering Research& Consulting Company, Egypt
Duration June 2008 to September 2010
Designation Project Engineer
Industry Research & Consulting
Page 6 of 6
Job responsibilities:
 Developing full-scale plans for various projects.
 Scheduling and planning project timelines.
 Modeling and simulation different dynamic simulation units and Plants
 Assist in participating in evaluating Energy Audit for more than ten factories
 Find Solution for Energy Saving for different factories
 Propose alternative energy sources for certain plant equipment such as bio-waste
to energy, solar hot water pre-heaters, and solar chillers
 Preparation of manuals and presentations for training, simulation for different
chemical processes and training in different simulation programs
 Instructor of VMGSim course (Simulation Software)
 Preparation of different projects visibility studies
 Preparation of different OTS projects using Dynism software
 Modeling and simulation different air dispersion models for many plants
 Trainer coordinator
 Communicates effectively with internal clients to identify needs and evaluate
alternative business solutions with company project management.
 Continually seeks opportunities to increase internal client satisfaction and deepen
client relationships.
Training
South Valley cement Company
Arabian Cement Company
SIDPEC
ECHEM
EPC
ENPPI
EGPC
Bahgat Group
Declaration
I, hereby declare that all the above details are true and genuine to the best of my knowledge.
Mohammed Hegazy Mousa

Weitere ähnliche Inhalte

Was ist angesagt?

Five ways to improve productivity at the construction site
Five ways to improve productivity at the construction siteFive ways to improve productivity at the construction site
Five ways to improve productivity at the construction siteVikaslal2006
 
021 Construction Productivity (PART 1)
021 Construction Productivity (PART 1)021 Construction Productivity (PART 1)
021 Construction Productivity (PART 1)Dr Fereidoun Dejahang
 
Labor productivity improvement in construction projects using wbs obs integra...
Labor productivity improvement in construction projects using wbs obs integra...Labor productivity improvement in construction projects using wbs obs integra...
Labor productivity improvement in construction projects using wbs obs integra...Essam Lotffy, PMP®, CCP®
 
Antonio J Mendes MASc_Resume
Antonio J Mendes MASc_ResumeAntonio J Mendes MASc_Resume
Antonio J Mendes MASc_ResumeTony Mendes
 
Gary Armstrong Resume-2
Gary Armstrong Resume-2Gary Armstrong Resume-2
Gary Armstrong Resume-2Gary Armstrong
 
Eric_Stemen_Resume_07MAY16
Eric_Stemen_Resume_07MAY16Eric_Stemen_Resume_07MAY16
Eric_Stemen_Resume_07MAY16Eric Stemen
 
resume- Jase Parr
resume- Jase Parrresume- Jase Parr
resume- Jase ParrJase Parr
 
Jessica_Cabral_Resume1i
Jessica_Cabral_Resume1iJessica_Cabral_Resume1i
Jessica_Cabral_Resume1iJessica Cabral
 
Resume112414
Resume112414Resume112414
Resume112414Jim Cuatt
 
Resume_for_Mike_Baker_05-31-15
Resume_for_Mike_Baker_05-31-15Resume_for_Mike_Baker_05-31-15
Resume_for_Mike_Baker_05-31-15Michael Baker
 

Was ist angesagt? (20)

Technical analysis
Technical analysisTechnical analysis
Technical analysis
 
Five ways to improve productivity at the construction site
Five ways to improve productivity at the construction siteFive ways to improve productivity at the construction site
Five ways to improve productivity at the construction site
 
021 Construction Productivity (PART 1)
021 Construction Productivity (PART 1)021 Construction Productivity (PART 1)
021 Construction Productivity (PART 1)
 
BF CV - 18th Nov16
BF CV - 18th Nov16BF CV - 18th Nov16
BF CV - 18th Nov16
 
Labor productivity improvement in construction projects using wbs obs integra...
Labor productivity improvement in construction projects using wbs obs integra...Labor productivity improvement in construction projects using wbs obs integra...
Labor productivity improvement in construction projects using wbs obs integra...
 
Charly CV - 2015
Charly CV - 2015Charly CV - 2015
Charly CV - 2015
 
STEPHEN HESKETH
STEPHEN HESKETHSTEPHEN HESKETH
STEPHEN HESKETH
 
Medaht Cv
Medaht CvMedaht Cv
Medaht Cv
 
Antonio J Mendes MASc_Resume
Antonio J Mendes MASc_ResumeAntonio J Mendes MASc_Resume
Antonio J Mendes MASc_Resume
 
Gary Armstrong Resume-2
Gary Armstrong Resume-2Gary Armstrong Resume-2
Gary Armstrong Resume-2
 
Eric_Stemen_Resume_07MAY16
Eric_Stemen_Resume_07MAY16Eric_Stemen_Resume_07MAY16
Eric_Stemen_Resume_07MAY16
 
resume- Jase Parr
resume- Jase Parrresume- Jase Parr
resume- Jase Parr
 
056 Labour Productivity
056 Labour Productivity056 Labour Productivity
056 Labour Productivity
 
Danny De Russe-Resume
Danny De Russe-ResumeDanny De Russe-Resume
Danny De Russe-Resume
 
DB resume
DB resumeDB resume
DB resume
 
Jessica_Cabral_Resume1i
Jessica_Cabral_Resume1iJessica_Cabral_Resume1i
Jessica_Cabral_Resume1i
 
Resume
ResumeResume
Resume
 
Resume112414
Resume112414Resume112414
Resume112414
 
Resume_for_Mike_Baker_05-31-15
Resume_for_Mike_Baker_05-31-15Resume_for_Mike_Baker_05-31-15
Resume_for_Mike_Baker_05-31-15
 
Mohamed hamdy .C.V
Mohamed hamdy .C.VMohamed hamdy .C.V
Mohamed hamdy .C.V
 

Andere mochten auch (15)

Summarizing
SummarizingSummarizing
Summarizing
 
Ensayo Alicia Ortiz
Ensayo Alicia OrtizEnsayo Alicia Ortiz
Ensayo Alicia Ortiz
 
AG's_DLR2
AG's_DLR2AG's_DLR2
AG's_DLR2
 
Փետրվար 2014
Փետրվար 2014Փետրվար 2014
Փետրվար 2014
 
մի սովորական կյանք
մի սովորական կյանքմի սովորական կյանք
մի սովորական կյանք
 
Ziya eren tanitim
Ziya eren tanitimZiya eren tanitim
Ziya eren tanitim
 
William blake poetry
William blake poetryWilliam blake poetry
William blake poetry
 
Contradictory decisions on cost sharing agreements
Contradictory decisions on cost sharing agreementsContradictory decisions on cost sharing agreements
Contradictory decisions on cost sharing agreements
 
Green Cities Sustainable Transport
Green Cities Sustainable TransportGreen Cities Sustainable Transport
Green Cities Sustainable Transport
 
Uso efectivo de los oa en el ambiente escolar
Uso efectivo de los oa en el ambiente escolar Uso efectivo de los oa en el ambiente escolar
Uso efectivo de los oa en el ambiente escolar
 
Hirarchial notes1 (2)
Hirarchial notes1 (2)Hirarchial notes1 (2)
Hirarchial notes1 (2)
 
A restrição ao aproveitamento do ágio de rentabilidade futura nas operações e...
A restrição ao aproveitamento do ágio de rentabilidade futura nas operações e...A restrição ao aproveitamento do ágio de rentabilidade futura nas operações e...
A restrição ao aproveitamento do ágio de rentabilidade futura nas operações e...
 
Keats as-a-romantic-poet
Keats as-a-romantic-poetKeats as-a-romantic-poet
Keats as-a-romantic-poet
 
English 8 - Types of Reading (Intensive vs. Extensive)
English 8 - Types of Reading (Intensive vs. Extensive)English 8 - Types of Reading (Intensive vs. Extensive)
English 8 - Types of Reading (Intensive vs. Extensive)
 
Paradigmas clases
Paradigmas clasesParadigmas clases
Paradigmas clases
 

Ähnlich wie Mohamed Hegazy CV -

Ähnlich wie Mohamed Hegazy CV - (20)

PROJECT ENGINEER
PROJECT ENGINEERPROJECT ENGINEER
PROJECT ENGINEER
 
Project - Logistics & Operation
Project - Logistics & OperationProject - Logistics & Operation
Project - Logistics & Operation
 
Senior Mechanical Engineer CV
Senior Mechanical Engineer CVSenior Mechanical Engineer CV
Senior Mechanical Engineer CV
 
SRCV
SRCVSRCV
SRCV
 
Henry CV
Henry CVHenry CV
Henry CV
 
Shailesh Pawar Profile
Shailesh Pawar ProfileShailesh Pawar Profile
Shailesh Pawar Profile
 
cv Tajuddin 15 August 2015
cv Tajuddin 15 August 2015cv Tajuddin 15 August 2015
cv Tajuddin 15 August 2015
 
Mari cv - office
Mari cv - officeMari cv - office
Mari cv - office
 
Mec.Engineer
Mec.EngineerMec.Engineer
Mec.Engineer
 
Eugene Eybers - CURRICULUM VITAE Rev 4 oman
Eugene Eybers - CURRICULUM VITAE Rev 4 oman Eugene Eybers - CURRICULUM VITAE Rev 4 oman
Eugene Eybers - CURRICULUM VITAE Rev 4 oman
 
Allen Schmitgen Resume' #12
Allen Schmitgen Resume' #12Allen Schmitgen Resume' #12
Allen Schmitgen Resume' #12
 
RANGANATHAN NEW RESUME
RANGANATHAN NEW RESUMERANGANATHAN NEW RESUME
RANGANATHAN NEW RESUME
 
CV_Amit Ghule
CV_Amit GhuleCV_Amit Ghule
CV_Amit Ghule
 
CV_RBMerida
CV_RBMeridaCV_RBMerida
CV_RBMerida
 
Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)
 
Mac Buzanowski Resume
Mac Buzanowski ResumeMac Buzanowski Resume
Mac Buzanowski Resume
 
Episode 26 : Project Management
Episode 26 : Project Management Episode 26 : Project Management
Episode 26 : Project Management
 
Tamer Akl C.V
Tamer Akl C.VTamer Akl C.V
Tamer Akl C.V
 
cv Sept 2015
cv Sept 2015cv Sept 2015
cv Sept 2015
 
my cv.doc
my cv.docmy cv.doc
my cv.doc
 

Mohamed Hegazy CV -

  • 1. Page 1 of 6 Mohammed Hegazy Mousa Technical Project Manager 002 010 222 36273 Mdhegazy@hotmail.com Personal data Name Mohamed Hegazy Mousa Date & place of birth November 24,1985 Elharam - Giza Home address 9 Nasr Elsawra , El Haram , Giza Sex Male Phone 002- 01022236273 E-mail address Mdhegazy@hotmail.com Nationality Egyptian Military state Exempted Car & driving license Have Marital status Married Education 2002 – 2008: Faculty of Engineering, Cairo University, Egypt Bachelor of Chemical Engineering Graduation score: 64% 1999 - 2002: Orman Language School, Dokki, Giza, Egypt Thanaweya Amma Graduation score: 97% Languages Good speaking, reading and writing knowledge of Arabic and English. Computer Skills  Professional experience in MS-Office, and Microsoft Project.  Very good experience in Photoshop and AutoCAD  Professional experience in Simulation air dispersion modules using Breeze Aermod.  Professional experience in Simulation Software like Pro II, Hysys and VMGSim.  Very professional in Dynamic Simulation using Dynsim
  • 2. Page 2 of 6 Objective To secure a challenging and rewarding position with a solid, progressive company that offers Opportunity for performance based career advancement in a setting that utilizes my experience and educational background in Engineer. Profile Description  TechnicalProjectManager having total work experience of 7 years  Currently working in Contact Group, Egypt  Previous Worked as Technical Engineer in Egyptian International Co. 2E.M for Petroleum Services Technology and Engineering Research and Consulting Company Professional Experience 1. Company Contact Group (Block Industries Foam Factory) Duration November 2012 to till Now Designation Technical Project Manager Industry Manufacturing EPS and XPS Insulation Products Job responsibilities:  Implementation New EPS , EPE and XPS Factories in 10th Of Ramadan and 6th October at Egypt  Prepare shop drawings, detailed drawings using AutoCAD for new EPS,EPE and XPS Factory  Design calculations using software’s and excel sheets with reference to international standards  Design and Sizing Process Pipelines, HVAC, Plumbing, Firefighting and utility piping system like steam, air , water and drain Piping  Selection Equipment specifications , size ,working system and features with suppliers for new factory  Contact with suppliers for all technical aspects  Prepare technical submittals, hydraulic calculations, operations and maintenance manuals and compliance Statements, drawing reviews.  Evaluate new design, construction and installation methods for best practices  Arrange meetings with supplier to review relevant certifications problems  Co-ordinate with architectural and electrical design for better project co-ordination design and installation process  Carrying out site surveys, feasibility reports, design calculations and simulations
  • 3. Page 3 of 6  Assessment and recommendation of new suppliers, evaluating vendor’s proposals  Recommend and select both vendors and consulting personnel for the project  Participate in meetings, technical aspects and problem solving techniques  Prepare and study the requisition requirements, equipment/material specifications, and verification and inspection release process, ensure all certification requirements are clearly identified  Estimate the cost of projects on the basis of labor charges, time, used material, tools and other technical challenges  Estimating the actual time of the project  Coordinating and assembling the project staff during the entire project session  Recruitment all project team (engineering, supervisors , Welding, assembly technician and labors)  Supervision and manage all installation work  Supervise installation work on site (piping, steel structure, Equipment) and ensure it is executed in accordance with the specifications and drawings provided.  Use Lean Technology Application in old and new factory  Connect ,follow, supervise and manage manufacturing Suppliers  Follow up new Equipment manufacturing , shipping and arrival date  Scheduling and planning project timelines  Reviewing project contract draft and make remarks.  Prepare bill of quantities and request for pricing/quotation from the sub- contractors.  Prepare and co-ordinate all mechanical project material list and costing.  Empowered to enter into contracts and purchase necessary equipment and supplies.  Supervised onsite work crews and contractors to execute recovery plans on a daily basis.  Overall supervision of Civil/Structural engineers/designers including Lead Discipline Engineers.  Responsible for technical selections, technical evaluations for project specifications  Responsible for all assembly work and Plant Start up  Preparation of different detailed projects visibility studies like ( EPS Foam Factory , XPS Foam Factory , EPE Foam Factory, Bitumen Insulation Factory , Cement Bags Factory , Rubber Factory , and Interlock Factory)  Prepare cost model for all Factory products  Create solutions for old technologies  Contact with mould manufacturing suppliers and follow them in manufacturing process and time plane
  • 4. Page 4 of 6  Developing full-scale plans for various projects  Plan, manage and coordinate the day to day production activities to ensure a continuous flow of input from one machine to another for optimum production and efficiently utilization of the machines.  Ensure that proper plans and resources (people, facilities, supplies etc.) are in place and efficiently utilized to ensure the uninterrupted supply of material and service  Check all department report and time span  Connect with all group factories to solving all technical problems and handle all paper and documentation  Supervision and manage assembly and disassembly equipment in all group factories  Prepare monthly report that they; sales report, production capacity report, active equipment report, Spare parts consumption report, Raw material consumption report and Energy consumption report  Follow up daily problems received from all departments and try solving it  Troubleshooting planning, production ,manufacturing ,sales ,purchases and Quality Departments  Communicates effectively with clients to identify problems and try solving it  Preparation of monthly evaluation plant performances in statistical and graphical form.  Analyze / audit the use of energy in the plant  Recommend strategies for reducing energy costs  Innovation , plan and Execution Energy saving system (Natural Gas, Electricity and Water)  Organize and plan for preventive maintenance in such a way that production activity will not be paralyzed.  Preparing the budgets and CAPEX for different projects  Preparing technical reports for project tenders.  Ensure all Safety and Environmental procedures are respected (5 S)  Defined project plans and schedules, monitored progress and made adjustments to accommodate changes in requirements, scope, and available resources. Coordinated engineers in developing and integrating software.  Sustains and improves reliability, plant operation, maintenance, and systems documentation for a leading EPS and XPS Foam Factory.  Directs a 115-member staff responsible for the largest EPS, EPE and XPS facilities, with processing output of 35 tons per day.  Implements a wide variety of engineering solutions to increase equipment availability, increase net operating rate, reduce operation losses, and achieve standard and acceptable production rates.
  • 5. Page 5 of 6  Provide technical support and guidance to junior engineers and quantity surveying department.  Preparation of Production and sales manuals and presentations for Chairman 2. Company Egyptian International Co. 2E.M for Petroleum Services Technology, Egypt. Duration October 2010 to October 2012 Designation Technical Project Engineer Industry Petroleum and Chemical Raw Material Products Job responsibilities:  Preparation of manuals and presentations for sales team  Preparation of different projects visibility studies  Continually seeks opportunities to increase internal client satisfaction and deepen clients relationships  Market company products through deals with different companies in different fields to supply them with our products  Follow-up tenders for different companies in all field  Connect with Suppliers in all different countries  Come up with the new and advanced ways for the construction of a particular project, regarding its completion and success.  Estimate the cost of projects on the basis of labor charges, time, used material, tools and other technical challenges  Estimating the actual time of the project  Check the report and time span  Lead the implementation and planning of the project  Define the project tasks as well as the requirement of resources.  Coordinating and assembling the project staff during the entire project session.  Follow-up daily raw materials specifications supplied to cement and steel companies  Implementation of used oil recycling Plant In Alexandria 3. Company Engineering Research& Consulting Company, Egypt Duration June 2008 to September 2010 Designation Project Engineer Industry Research & Consulting
  • 6. Page 6 of 6 Job responsibilities:  Developing full-scale plans for various projects.  Scheduling and planning project timelines.  Modeling and simulation different dynamic simulation units and Plants  Assist in participating in evaluating Energy Audit for more than ten factories  Find Solution for Energy Saving for different factories  Propose alternative energy sources for certain plant equipment such as bio-waste to energy, solar hot water pre-heaters, and solar chillers  Preparation of manuals and presentations for training, simulation for different chemical processes and training in different simulation programs  Instructor of VMGSim course (Simulation Software)  Preparation of different projects visibility studies  Preparation of different OTS projects using Dynism software  Modeling and simulation different air dispersion models for many plants  Trainer coordinator  Communicates effectively with internal clients to identify needs and evaluate alternative business solutions with company project management.  Continually seeks opportunities to increase internal client satisfaction and deepen client relationships. Training South Valley cement Company Arabian Cement Company SIDPEC ECHEM EPC ENPPI EGPC Bahgat Group Declaration I, hereby declare that all the above details are true and genuine to the best of my knowledge. Mohammed Hegazy Mousa