1. Page 1 of 6
Mohammed Hegazy Mousa
Technical Project Manager
002 010 222 36273
Mdhegazy@hotmail.com
Personal data
Name Mohamed Hegazy Mousa
Date & place of birth November 24,1985 Elharam - Giza
Home address 9 Nasr Elsawra , El Haram , Giza
Sex Male
Phone 002- 01022236273
E-mail address Mdhegazy@hotmail.com
Nationality Egyptian
Military state Exempted
Car & driving license Have
Marital status Married
Education
2002 – 2008: Faculty of Engineering, Cairo University, Egypt
Bachelor of Chemical Engineering
Graduation score: 64%
1999 - 2002: Orman Language School, Dokki, Giza, Egypt
Thanaweya Amma
Graduation score: 97%
Languages
Good speaking, reading and writing knowledge of Arabic and English.
Computer Skills
Professional experience in MS-Office, and Microsoft Project.
Very good experience in Photoshop and AutoCAD
Professional experience in Simulation air dispersion modules using Breeze Aermod.
Professional experience in Simulation Software like Pro II, Hysys and VMGSim.
Very professional in Dynamic Simulation using Dynsim
2. Page 2 of 6
Objective
To secure a challenging and rewarding position with a solid, progressive company
that offers Opportunity for performance based career advancement in a setting that
utilizes my experience and educational background in Engineer.
Profile Description
TechnicalProjectManager having total work experience of 7 years
Currently working in Contact Group, Egypt
Previous Worked as Technical Engineer in Egyptian International Co.
2E.M for Petroleum Services Technology and Engineering Research
and Consulting Company
Professional Experience
1. Company Contact Group (Block Industries Foam Factory)
Duration November 2012 to till Now
Designation Technical Project Manager
Industry Manufacturing EPS and XPS Insulation Products
Job responsibilities:
Implementation New EPS , EPE and XPS Factories in 10th Of Ramadan and 6th
October at Egypt
Prepare shop drawings, detailed drawings using AutoCAD for new EPS,EPE and
XPS Factory
Design calculations using software’s and excel sheets with reference to
international standards
Design and Sizing Process Pipelines, HVAC, Plumbing, Firefighting and utility
piping system like steam, air , water and drain Piping
Selection Equipment specifications , size ,working system and features with
suppliers for new factory
Contact with suppliers for all technical aspects
Prepare technical submittals, hydraulic calculations, operations and maintenance
manuals and compliance Statements, drawing reviews.
Evaluate new design, construction and installation methods for best practices
Arrange meetings with supplier to review relevant certifications problems
Co-ordinate with architectural and electrical design for better project co-ordination
design and installation process
Carrying out site surveys, feasibility reports, design calculations and simulations
3. Page 3 of 6
Assessment and recommendation of new suppliers, evaluating vendor’s proposals
Recommend and select both vendors and consulting personnel for the project
Participate in meetings, technical aspects and problem solving techniques
Prepare and study the requisition requirements, equipment/material specifications,
and verification and inspection release process, ensure all certification
requirements are clearly identified
Estimate the cost of projects on the basis of labor charges, time, used material,
tools and other technical challenges
Estimating the actual time of the project
Coordinating and assembling the project staff during the entire project session
Recruitment all project team (engineering, supervisors , Welding, assembly
technician and labors)
Supervision and manage all installation work
Supervise installation work on site (piping, steel structure, Equipment) and
ensure it is executed in accordance with the specifications and drawings
provided.
Use Lean Technology Application in old and new factory
Connect ,follow, supervise and manage manufacturing Suppliers
Follow up new Equipment manufacturing , shipping and arrival date
Scheduling and planning project timelines
Reviewing project contract draft and make remarks.
Prepare bill of quantities and request for pricing/quotation from the sub-
contractors.
Prepare and co-ordinate all mechanical project material list and costing.
Empowered to enter into contracts and purchase necessary equipment and
supplies.
Supervised onsite work crews and contractors to execute recovery plans on a daily
basis.
Overall supervision of Civil/Structural engineers/designers including Lead
Discipline Engineers.
Responsible for technical selections, technical evaluations for project
specifications
Responsible for all assembly work and Plant Start up
Preparation of different detailed projects visibility studies like ( EPS Foam
Factory , XPS Foam Factory , EPE Foam Factory, Bitumen Insulation Factory ,
Cement Bags Factory , Rubber Factory , and Interlock Factory)
Prepare cost model for all Factory products
Create solutions for old technologies
Contact with mould manufacturing suppliers and follow them in manufacturing
process and time plane
4. Page 4 of 6
Developing full-scale plans for various projects
Plan, manage and coordinate the day to day production activities to ensure a
continuous flow of input from one machine to another for optimum production and
efficiently utilization of the machines.
Ensure that proper plans and resources (people, facilities, supplies etc.) are in
place and efficiently utilized to ensure the uninterrupted supply of material and
service
Check all department report and time span
Connect with all group factories to solving all technical problems and handle all
paper and documentation
Supervision and manage assembly and disassembly equipment in all group
factories
Prepare monthly report that they; sales report, production capacity report, active
equipment report, Spare parts consumption report, Raw material consumption
report and Energy consumption report
Follow up daily problems received from all departments and try solving it
Troubleshooting planning, production ,manufacturing ,sales ,purchases and
Quality Departments
Communicates effectively with clients to identify problems and try solving it
Preparation of monthly evaluation plant performances in statistical and graphical
form.
Analyze / audit the use of energy in the plant
Recommend strategies for reducing energy costs
Innovation , plan and Execution Energy saving system (Natural Gas, Electricity
and Water)
Organize and plan for preventive maintenance in such a way that production
activity will not be paralyzed.
Preparing the budgets and CAPEX for different projects
Preparing technical reports for project tenders.
Ensure all Safety and Environmental procedures are respected (5 S)
Defined project plans and schedules, monitored progress and made adjustments to
accommodate changes in requirements, scope, and available resources.
Coordinated engineers in developing and integrating software.
Sustains and improves reliability, plant operation, maintenance, and systems
documentation for a leading EPS and XPS Foam Factory.
Directs a 115-member staff responsible for the largest EPS, EPE and XPS
facilities, with processing output of 35 tons per day.
Implements a wide variety of engineering solutions to increase equipment
availability, increase net operating rate, reduce operation losses, and achieve
standard and acceptable production rates.
5. Page 5 of 6
Provide technical support and guidance to junior engineers and quantity surveying
department.
Preparation of Production and sales manuals and presentations for Chairman
2. Company Egyptian International Co. 2E.M for Petroleum Services
Technology, Egypt.
Duration October 2010 to October 2012
Designation Technical Project Engineer
Industry Petroleum and Chemical Raw Material Products
Job responsibilities:
Preparation of manuals and presentations for sales team
Preparation of different projects visibility studies
Continually seeks opportunities to increase internal client satisfaction and deepen
clients relationships
Market company products through deals with different companies in different
fields to supply them with our products
Follow-up tenders for different companies in all field
Connect with Suppliers in all different countries
Come up with the new and advanced ways for the construction of a particular
project, regarding its completion and success.
Estimate the cost of projects on the basis of labor charges, time, used material,
tools and other technical challenges
Estimating the actual time of the project
Check the report and time span
Lead the implementation and planning of the project
Define the project tasks as well as the requirement of resources.
Coordinating and assembling the project staff during the entire project session.
Follow-up daily raw materials specifications supplied to cement and steel
companies
Implementation of used oil recycling Plant In Alexandria
3. Company Engineering Research& Consulting Company, Egypt
Duration June 2008 to September 2010
Designation Project Engineer
Industry Research & Consulting
6. Page 6 of 6
Job responsibilities:
Developing full-scale plans for various projects.
Scheduling and planning project timelines.
Modeling and simulation different dynamic simulation units and Plants
Assist in participating in evaluating Energy Audit for more than ten factories
Find Solution for Energy Saving for different factories
Propose alternative energy sources for certain plant equipment such as bio-waste
to energy, solar hot water pre-heaters, and solar chillers
Preparation of manuals and presentations for training, simulation for different
chemical processes and training in different simulation programs
Instructor of VMGSim course (Simulation Software)
Preparation of different projects visibility studies
Preparation of different OTS projects using Dynism software
Modeling and simulation different air dispersion models for many plants
Trainer coordinator
Communicates effectively with internal clients to identify needs and evaluate
alternative business solutions with company project management.
Continually seeks opportunities to increase internal client satisfaction and deepen
client relationships.
Training
South Valley cement Company
Arabian Cement Company
SIDPEC
ECHEM
EPC
ENPPI
EGPC
Bahgat Group
Declaration
I, hereby declare that all the above details are true and genuine to the best of my knowledge.
Mohammed Hegazy Mousa