Donald Waters                                                    Operations Strategy



CHAPTER 12 – CAPACITY MANAGEMENT




AIMS OF THE CHAPTER

The capacity of a process is the maximum amount that it can produce in a

given time. Capacity management is responsible for planning the capacity of

a process. This is largely a strategic role of matching the long-term capacity

and demand – but there are also tactical and operations aspects to consider.

A particular problem is that both the capacity and demand vary over time.

Sometimes the variations follow predictable patterns, but usually there is

uncertainty with no apparent pattern.



The aim of the chapter is to discuss the broad issue of capacity management.

More specific aims are to:



   ‱   define the capacity of a process and discuss its measurement

   The capacity of a process is the maximum amount of a product that it

   can make in a given time. This gives the overall view, but we can

   interpret this statement in different ways. In particular, the designed

   capacity is the maximum possible output in ideal conditions, and the

   effective capacity is the maximum realistic output in normal conditions.

   People also refer to the productive capacity (used for making

   products), non-productive capacity (used for other purposes), and idle

   capacity (not used at all). Related measures look at the output (the


                                      -1-
Donald Waters                                                      Operations Strategy


   amount of product actually made), productivity (the amount produced

   for each unit of resource), utilisation (proportion of designed capacity

   that is actually used), efficiency (proportion of the effective capacity

   actually used) and effectiveness.



   ‱   understand the aims of capacity management

   Capacity management is responsible for all aspects of operations’

   capacity. It is generally responsible for matching the long-term

   capacity of a process to the demand for its products. It does this

   through capacity planning, which describes more specific methods for

   achieving this match. An important point is that every process has a

   bottleneck where resources or facilities limit the overall output.



   ‱   describe a general approach to capacity planning

   The chapter develops a general approach to capacity requirements

   planning based on six steps:

       1. consider demand and translate this into a required capacity for the

          process

       2. find the capacity already available in the process

       3. identify mismatches between capacity needed and that available

       4. suggest alternative plans for overcoming any mismatch

       5. compare these plans and find the best

       6. implement the best.

Each of these steps has its own problems.




                                       -2-
Donald Waters                                                   Operations Strategy


   ‱   consider the timing and size of capacity changes

There are continuous changes to operations – brought about by changes in the

environment and internal adjustments – and these often need adjustments to

process capacity. The first question here concerns the timing of changes, and

whether it is generally best to work with spare capacity or some shortage. This

balance depends on the relative costs of unused capacity and shortages, with

factors that encourage early expansion including variable and uncertain

demand, high profits margins, high cost of unmet demand, low costs of spare

capacity, continuously changing product mix, variable efficiency, and capacity

increases that are relatively small. The second question concerns the size of

change, and whether it is better to have a few large changes or more small

adjustments. Factors that encourage a few large expansions include the

benefits of capacity staying ahead of demand for a longer time, a cushion

against unexpected conditions, fewer disruptions, lower costs per unit of

expansion, earlier economies of scale, potential to encourage more demand,

and giving some advantages over competitors.



   ‱   discuss reasons why capacity changes over time

There are many reasons for this. The chapter illustrated systematic changes

due to learning effects, maintenance, replacement policies and the business

cycle. Superimposed on these patterns are short term variations due to staff

illness, interruptions, break-downs, weather, holidays, enthusiasm of

employees, fatigue, and so on.



   ‱   appreciate the need for shorter term adjustments to capacity



                                     -3-
Donald Waters                                                      Operations Strategy


Capacity planning is largely a strategic function, setting available capacity over

the long term. But demand can change very quickly, by the day or even the

hour, so managers need the flexibility to make short-term adjustments to their

effective capacity. There are two ways of doing this based on supply

management or demand management. Each of these is appropriate

circumstances, and the choice depends on the balance of costs and benefits.




DISCUSSION QUESTIONS

1. Why is capacity management a strategic issue? To what extent do tactical

   and operational factors influence the capacity?

Capacity management is a strategic issue, because capacity is an important

issue, with effects over the long term, involving high cost, made by senior

managers – and all the other features of strategic decisions. At the same time,

in common with most other types of decision, there are tactical and operational

factors to consider. For example, a company might decide to open a call centre

in a particular location. Its capacity is a strategic decision, as this cannot be

changed in the short term, and any expansion would need another building and

extra facilities. But staffing patterns might be tactical decisions set for a few

months. Then on a particular day, operational decisions decide exactly who is

working. So the context is set by the strategic capacity decision, and this is

adjusted in the light of requirements with tactical and operations decisions.



2. Capacity is not really an absolute limit on the output from a process, but it is

   a measure of management performance. Do you agree with this?



                                       -4-
Donald Waters                                                      Operations Strategy


Yes – to a large extent. The evidence to support this comes from different

organisations – and even different managers – can use exactly the same

facilities and get different levels of output. The implication is that some

managers can use facilities more efficiently, increasing production – and

effective capacity. Further evidence comes from the observation that capacity

changes over time. If managers can control these changes more efficiently,

then they can increase effective capacity.



Of course, there are limits to the extent that capacity is a measure of

management rather than some fixed limit, and it would be difficult to consistently

get higher output than the designed capacity.



3. You often see notices at the entrance to pubs, clubs, halls and other

    buildings saying that, ‘The capacity of this facility is 200 people’. What does

    this really mean?

Sometimes there might be physical limits on capacity, such as the number of

seats in the facility. Often, though, there is no physical limit and the capacity is

an arbitrary number that is set to reflect some other concern. For example, fire

regulations might set a maximum acceptable time for everyone to leave a club

through the emergency exits – and then capacity of the club is set by its

evacuation procedures. But again, this is based on an arbitrary decision about

evacuation times. Generally, such notices mean that someone has taken a

decision – based on some criteria – that this should be the capacity of the

facility.




                                       -5-
Donald Waters                                                      Operations Strategy


4. Is it always possible to find the capacity of a process? How can you find the

   capacity of a shopping mall, national park or a shipping lane? Can you give

   examples where it is difficult to find a capacity, and say how these difficulties

   are overcome?

Not really. The examples given are only a few of the many possible ones where

it is difficult to set a real – or even convincing – capacity. The way of

overcoming them is to use agreed – but generally arbitrary – measures.



5. Is it better to have frequent small changes in capacity, or fewer large ones?

This depends entirely on circumstances, and the relative costs of making the

expansion and having spare capacity. Factors that encourage a few large

expansions include the benefits of capacity staying ahead of demand for a

longer time, a cushion against unexpected conditions, fewer disruptions, lower

costs per unit of expansion, earlier economies of scale, potential to encourage

more demand, and giving some advantages over competitors.



6. Why does capacity change over time?

There are many reasons for this. The chapter illustrated systematic changes

due to learning effects, maintenance, replacement policies and the business

cycle. Superimposed on these patterns are short term variations due to staff

illness, interruptions, break-downs, weather, holidays, enthusiasm of

employees, fatigue, and so on. And then there are apparently random

variations that cannot be explained.



7. Capacity planning is a waste of time. Long-term forecasts of demand are



                                       -6-
Donald Waters                                                       Operations Strategy


   unreliable, and both capacity and demand vary in unknown ways. So

   organisations should simply get enough capacity to cover likely demand for

   the future. What do you think of this view?

In some conditions this is a reasonable view. When extra capacity is cheap and

lost custom is expensive, it makes sense to have as much capacity as

necessary to meet all potential demand. But usually managers have to find a

compromise that balances the cost of capacity and lost sales. If, for example,

capacity is expensive and lost custom is cheap, then it would make sense to

limit capacity to the level that gives the best operations. The usual solution

comes between these two, and managers have to consider all factors and

choose the amount of capacity that best meets their aims. Included in their

decisions is an assessment of the risks and uncertainties in their forecasts for

demand and factors affecting capacity.



8. Nobody would seriously consider limiting demand for a product, but would

   always look for ways of increasing process capacity. Is this true?

No. Many organisations limit demand for a product – or the amount they

actually supply. For example, luxury goods, portrait painters, football stadiums,

university courses, professional institutions, limited edition prints, medical

practices, bespoke tailors, etc all put artificial limits on their sales. The reason is

simply a balance of the benefits of meeting demand with the costs involved.

When the costs of expanding are higher than the benefits, it makes sense to

limit capacity.




                                        -7-
Donald Waters                                                    Operations Strategy



IDEAS IN PRACTICE

Forthright Communications Inc.

Aim: to illustrate some calculations of capacity and related performance



This case shows some calculations associated with the capacity of a central

process in a communications company. These figures are not an end in

themselves, but they highlight areas where improvements might be made.

For example the utilisation was 74 percent, and this might seem rather low –

effectively resources are standing idle for more than a quarter of the time.

The analyses of non-productive use and wasted capacity show why this

occurred. Then managers can consider these areas and start looking at ways

of reducing the waste.



SunAlto Orange

Aim: to illustrate the calculation of process capacity.



The capacity of an overall process is set by the capacity of its limiting

bottleneck. This case describes a fairly short process, each part of which has

a known capacity. The packing equipment forms the limiting bottleneck, and

the overall capacity can only be increased by increasing the capacity here.

The process is not balanced, so each part has a different utilisation. Usually

managers want a balanced process where all operations have virtually the

same capacity.



Global Car sales

                                      -8-
Donald Waters                                                    Operations Strategy


Aim: to illustrate some problems in defining capacity



The car industry is characterised by high capital investment in automated

production. This is only profitable when capacity is carefully matched to

demand, and plants get high figures for utilisation and productivity. In recent

years, it is widely felt that there is considerable excess capacity, and this has

lead to a series of mergers and take-overs. However, a closer look begins to

question this picture. It takes several years to increase capacity in a car plant,

so there must be some cushion to allow for variations and sudden growth in

demand. At the same time, the capacity comes in different forms, with some

being more apparent than real. If we take these into account we can argue

that there is not really any over-capacity in the industry, but capacity is quite

closely aligned to demand.



KDF Resources GmbH

Aim: to introduce the type of calculations involved with capacity planning



This case illustrates some of the initial considerations when a company starts

to look at plans for expanding capacity. Here the company has increasing

demand that can only be met by increasing capacity. So it looks at the

alternatives available – expansion on the existing site, or one, two or three

new centres – and starts to compare these. The costs suggest a single large

centre, but managers then have to consider a range of other factors, including

the risks associated with mismatches between supply and demand. The book




                                      -9-
Donald Waters                                                  Operations Strategy


develops this type of approach into a formal procedure for capacity

requirements planning.



GlaxoSmithKline

Aim: to illustrate the effects of economies of scale on growth in one industry



This case outlines the steps that one company has taken on its move from a

small single company to become one of the world’s largest pharmaceutical

company. The thinking behind this growth is that it is very expensive to

develop new drugs, and research companies can get considerable economies

of scale. A company can have organic growth, but this often gives an industry

excess capacity. In this case it was felt better to grow by a series of mergers

with similar companies. There are other examples of this, including retailers,

banks, television companies, telephone operators, and car manufacturers.



Wholefood Preparation Ltd

Aim: to outline some cost calculations for equipment replacement



The age and condition of equipment has a direct effect on capacity, with older

equipment usually reducing capacity (due to increase breakdowns and

generally deteriorating performance). Managers have to make decisions

about the best time to replace equipment, generally balancing the costs of

buying new equipment and continuing to operate older equipment. This case

illustrates the way that an operations manager approached this decision for




                                     - 10 -
Donald Waters                                                     Operations Strategy


production machines in one food preparation company. These costs give a

starting point for further analysis.



European Car Manufacturers

Aim: to show the effects of perceived over-capacity in one industry



An earlier case considered the effects of over-capacity in global car

manufacturing. This case shows the effect in Europe, where over-capacity is

seen to be a significant problem. Companies want to increase the utilisation

of their own facilities, but this is difficult in a competitive market. The path

taken by the industry is to reduce the number of companies working, so that

production is concentrated into fewer more efficient operations. The direct

result is a series of mergers, takeovers and closures.




CASE STUDY – HEATHROW AIRPORT

Decisions about capacity often have expensive consequences. This is

particularly noticeable with airports, where any expansion is expensive in its

direct costs, environmental impact, effect on local communities, and so on.

Heathrow is London’s main airport and is one of the busiest in the world.

Demand for air travel around London continues to grow, but Heathrow’s

limited capacity means that much of this has been transferred to other

airports. Gatwick, Stansted and Luton have all had major expansions, and all

have plans for yet more capacity in the future.




                                       - 11 -
Donald Waters                                                   Operations Strategy


For a long time Heathrow’s capacity has been limited by the bottleneck at its

passenger terminals. The fifth terminal will remove (at least for some time)

this limit and increase overall capacity.



‱   How can BAA measure the capacity of Heathrow? What factors affect this

    capacity?

The capacity of an airport is usually stated in terms of the number of

passengers that can use it in a year. This, in turn, depends on the number of

other measures, particularly:

       o Air-side operations – largely the number of passengers that planes

          can deliver and take away, determined by the number of runways,

          time slots available for planes to land and take-off, size of planes,

          occupancy, etc

       o Land-side operations – largely the number of passengers that the

          terminal buildings can handle, dealing with all aspects of arrivals,

          departures and associated services.

For each of these, BAA can use many related measures for specific aspects

of capacity. As usual with capacity, the actual limits are largely a matter of

agreement than physical limits. For example, the separation of planes is an

agreed distance that is considered safe, and the number of check-in desks is

set by agreed levels of customer service.



Larger planes, greater occupancy, more time slots for take-off and landing,

and new systems have already increased capacity of the Heathrow. For a

long time the bottleneck has been identified as terminal capacity. The fifth



                                      - 12 -
Donald Waters                                                     Operations Strategy


terminal will remove this (or more accurately move it to another part of

operations). The new terminal improves both air-side and land-side

operations, removing current bottlenecks and significantly increasing overall

capacity.



‱   For years, Heathrow has been operating beyond its designed capacity.

    What effects does this have?

The planned capacity is a theoretical limit, so when this is exceeded it means

that the limit has somehow been raised. Saying that the airport is working

beyond its designed capacity really means that it is working more efficiently

than expected and is finding ways of dealing with more passengers than

expected. But the capacity is largely an agreed measure, and obviously does

not reflect the maximum number of people that could fit into the space. It

would really be fairer to say that the airport is working beyond its agreed

effective capacity. This presumably means that some facilities – those at the

bottlenecks – are stretched beyond their limits. This can raise many related

problems and inevitably means that customer service declines.



‱   Airports like Heathrow continue to expand. What will eventually limit their

    capacity?

This is difficult to answer. It seems that the current growth in demand for air

travel is likely to continue for the foreseeable future, in the way that road travel

has been expanding for well over a century. But there must ultimately be

some limits, and these might come from several sources. Air travel might

become less popular, perhaps because of changing social habits, costs,



                                      - 13 -
Donald Waters                                                     Operations Strategy


population levels, attitudes towards the environment, options for alternative

types of transport, etc. In the shorter term, airports might increase the

capacity of current facilities by using them more efficiently, installing better

systems, and generally improving operations. For example, introducing

automation (as described in the case for IATA) can dramatically increase the

number of passengers who can check-in through current facilities; improving

control systems can increase the number of plane movements; new planes

can increase passenger density.




                                       - 14 -

Weitere Àhnliche Inhalte

Was ist angesagt?

High impact facilities organizations for submission
High impact facilities organizations for submissionHigh impact facilities organizations for submission
High impact facilities organizations for submissionRobin Camarote, LLC
 
Strategic, Tactical and Operational Decision Making
Strategic, Tactical and Operational Decision Making Strategic, Tactical and Operational Decision Making
Strategic, Tactical and Operational Decision Making Lakshman Basnet
 
Strategic management
Strategic managementStrategic management
Strategic managementHari Narayan H
 
Managing A Successful Team Offline Version
Managing A Successful Team Offline VersionManaging A Successful Team Offline Version
Managing A Successful Team Offline VersionDrPaulHancock
 
tqm-col-mba-5575
tqm-col-mba-5575tqm-col-mba-5575
tqm-col-mba-5575Farrukh javed
 
Mak effective cost controls in challenging economic conditions ace final
Mak effective cost controls in challenging economic conditions ace finalMak effective cost controls in challenging economic conditions ace final
Mak effective cost controls in challenging economic conditions ace finalMasoud Khan
 
Chapter 11 : Managing Change
Chapter 11 : Managing ChangeChapter 11 : Managing Change
Chapter 11 : Managing ChangePeleZain
 
Lecture 5 Quality Performance Tools & Techniques
Lecture 5  Quality Performance Tools & TechniquesLecture 5  Quality Performance Tools & Techniques
Lecture 5 Quality Performance Tools & TechniquesTantish QS, UTM
 
Lecture 4 quality performance measurement tools and techniques
Lecture 4 quality performance measurement tools and techniquesLecture 4 quality performance measurement tools and techniques
Lecture 4 quality performance measurement tools and techniquesTantish QS, UTM
 
Lecture 3 benchmarking in quality system
Lecture 3  benchmarking in quality systemLecture 3  benchmarking in quality system
Lecture 3 benchmarking in quality systemTantish QS, UTM
 
MES from the Ground Up
MES from the Ground UpMES from the Ground Up
MES from the Ground UpEdward Brown
 
Implementating just in-time production and procurement strategies
Implementating just in-time production and procurement  strategiesImplementating just in-time production and procurement  strategies
Implementating just in-time production and procurement strategiesAjay Yadav
 
Strategic Management 1
Strategic Management 1Strategic Management 1
Strategic Management 1yaman90
 
Power point set 001 definitions of strategy spring 2009
Power point set 001  definitions of strategy spring 2009Power point set 001  definitions of strategy spring 2009
Power point set 001 definitions of strategy spring 2009Ankush Sharma
 
chapter 12
chapter 12chapter 12
chapter 12RAJINDAR
 

Was ist angesagt? (20)

Managing change
Managing changeManaging change
Managing change
 
High impact facilities organizations for submission
High impact facilities organizations for submissionHigh impact facilities organizations for submission
High impact facilities organizations for submission
 
Strategic, Tactical and Operational Decision Making
Strategic, Tactical and Operational Decision Making Strategic, Tactical and Operational Decision Making
Strategic, Tactical and Operational Decision Making
 
Strategic management
Strategic managementStrategic management
Strategic management
 
Managing A Successful Team Offline Version
Managing A Successful Team Offline VersionManaging A Successful Team Offline Version
Managing A Successful Team Offline Version
 
8 2
8 28 2
8 2
 
tqm-col-mba-5575
tqm-col-mba-5575tqm-col-mba-5575
tqm-col-mba-5575
 
Mak effective cost controls in challenging economic conditions ace final
Mak effective cost controls in challenging economic conditions ace finalMak effective cost controls in challenging economic conditions ace final
Mak effective cost controls in challenging economic conditions ace final
 
Chapter 11 : Managing Change
Chapter 11 : Managing ChangeChapter 11 : Managing Change
Chapter 11 : Managing Change
 
Lecture 5 Quality Performance Tools & Techniques
Lecture 5  Quality Performance Tools & TechniquesLecture 5  Quality Performance Tools & Techniques
Lecture 5 Quality Performance Tools & Techniques
 
Lecture 4 quality performance measurement tools and techniques
Lecture 4 quality performance measurement tools and techniquesLecture 4 quality performance measurement tools and techniques
Lecture 4 quality performance measurement tools and techniques
 
Lecture 3 benchmarking in quality system
Lecture 3  benchmarking in quality systemLecture 3  benchmarking in quality system
Lecture 3 benchmarking in quality system
 
10a_req
10a_req10a_req
10a_req
 
MES from the Ground Up
MES from the Ground UpMES from the Ground Up
MES from the Ground Up
 
Implementating just in-time production and procurement strategies
Implementating just in-time production and procurement  strategiesImplementating just in-time production and procurement  strategies
Implementating just in-time production and procurement strategies
 
BUSINESS CONTINUITY PLANNING
BUSINESS CONTINUITY PLANNINGBUSINESS CONTINUITY PLANNING
BUSINESS CONTINUITY PLANNING
 
Strategic Management 1
Strategic Management 1Strategic Management 1
Strategic Management 1
 
Power point set 001 definitions of strategy spring 2009
Power point set 001  definitions of strategy spring 2009Power point set 001  definitions of strategy spring 2009
Power point set 001 definitions of strategy spring 2009
 
chapter 12
chapter 12chapter 12
chapter 12
 
Unit iii
Unit iiiUnit iii
Unit iii
 

Andere mochten auch

IS740 Chapter 11
IS740 Chapter 11IS740 Chapter 11
IS740 Chapter 11iDocs
 
IS740 Chapter 09
IS740 Chapter 09IS740 Chapter 09
IS740 Chapter 09iDocs
 
IS740 Chapter 08
IS740 Chapter 08IS740 Chapter 08
IS740 Chapter 08iDocs
 
Net+, 6th Ed. CH. 1
Net+, 6th Ed. CH. 1Net+, 6th Ed. CH. 1
Net+, 6th Ed. CH. 1WedgeB
 
Information system presentation assignment 1 (management information system) ...
Information system presentation assignment 1 (management information system) ...Information system presentation assignment 1 (management information system) ...
Information system presentation assignment 1 (management information system) ...vibrant6000
 
Dynamics 6th ed meriam solution
Dynamics 6th ed meriam solutionDynamics 6th ed meriam solution
Dynamics 6th ed meriam solutionfitsum2020
 
Information System Concepts & Types of Information Systems
Information System Concepts & Types of Information SystemsInformation System Concepts & Types of Information Systems
Information System Concepts & Types of Information SystemsVR Talsaniya
 

Andere mochten auch (7)

IS740 Chapter 11
IS740 Chapter 11IS740 Chapter 11
IS740 Chapter 11
 
IS740 Chapter 09
IS740 Chapter 09IS740 Chapter 09
IS740 Chapter 09
 
IS740 Chapter 08
IS740 Chapter 08IS740 Chapter 08
IS740 Chapter 08
 
Net+, 6th Ed. CH. 1
Net+, 6th Ed. CH. 1Net+, 6th Ed. CH. 1
Net+, 6th Ed. CH. 1
 
Information system presentation assignment 1 (management information system) ...
Information system presentation assignment 1 (management information system) ...Information system presentation assignment 1 (management information system) ...
Information system presentation assignment 1 (management information system) ...
 
Dynamics 6th ed meriam solution
Dynamics 6th ed meriam solutionDynamics 6th ed meriam solution
Dynamics 6th ed meriam solution
 
Information System Concepts & Types of Information Systems
Information System Concepts & Types of Information SystemsInformation System Concepts & Types of Information Systems
Information System Concepts & Types of Information Systems
 

Ähnlich wie Chapter 12a

4. Capacity Planning.docx
4. Capacity Planning.docx4. Capacity Planning.docx
4. Capacity Planning.docxMahnoorHayat7
 
Capacity planning
Capacity planningCapacity planning
Capacity planningAtul Saralach
 
Capacity planning chapter 8
Capacity planning chapter 8Capacity planning chapter 8
Capacity planning chapter 8Yonela Gaba
 
CAPACITY PLANNING AND ‎FACILITIES PLANNING
CAPACITY PLANNING AND ‎FACILITIES PLANNINGCAPACITY PLANNING AND ‎FACILITIES PLANNING
CAPACITY PLANNING AND ‎FACILITIES PLANNINGLibcorpio
 
Capacity Managment
Capacity ManagmentCapacity Managment
Capacity ManagmentNadia Sahar
 
Capacity Planning
Capacity PlanningCapacity Planning
Capacity PlanningIndira Gapuzan
 
Capacity Planning for Products and Services
Capacity Planning for Products and ServicesCapacity Planning for Products and Services
Capacity Planning for Products and ServicesKarenWagan
 
Capacity management
Capacity managementCapacity management
Capacity managementyashodeep more
 
CAPACITY & AGGREGATE PLANNING
CAPACITY & AGGREGATE PLANNINGCAPACITY & AGGREGATE PLANNING
CAPACITY & AGGREGATE PLANNINGVijit Gajbhiye
 
Module 3 Session 4 Capacity management
Module 3 Session 4    Capacity managementModule 3 Session 4    Capacity management
Module 3 Session 4 Capacity managementAnushreeSingh49
 
Prod planch
Prod planchProd planch
Prod planchgomezjj
 
Maximizing Profits
Maximizing ProfitsMaximizing Profits
Maximizing Profitsbrunsgregory
 
Om presentation group 10 sec a
Om presentation group 10 sec aOm presentation group 10 sec a
Om presentation group 10 sec aAbhijeet Dash
 
Production and Operation Management (Capacity Planning )
Production and Operation Management (Capacity Planning )Production and Operation Management (Capacity Planning )
Production and Operation Management (Capacity Planning )Dr. Mohit Sahu
 
Capacity Planning
Capacity PlanningCapacity Planning
Capacity PlanningMOHD ARISH
 
Reading 3 Strategic Capacity Management.pdf
Reading 3 Strategic Capacity Management.pdfReading 3 Strategic Capacity Management.pdf
Reading 3 Strategic Capacity Management.pdfMuhammadMoazzam38
 
(CAPACITY PLANNIG)
(CAPACITY PLANNIG)(CAPACITY PLANNIG)
(CAPACITY PLANNIG)Laureen Awuor
 
Capacity Planning Chapter outline 12.1 Facilities deci.docx
Capacity Planning Chapter outline 12.1 Facilities deci.docxCapacity Planning Chapter outline 12.1 Facilities deci.docx
Capacity Planning Chapter outline 12.1 Facilities deci.docxhumphrieskalyn
 
Operations ppt
Operations pptOperations ppt
Operations pptPritam RW
 

Ähnlich wie Chapter 12a (20)

4. Capacity Planning.docx
4. Capacity Planning.docx4. Capacity Planning.docx
4. Capacity Planning.docx
 
Capacity planning
Capacity planningCapacity planning
Capacity planning
 
Capacity planning chapter 8
Capacity planning chapter 8Capacity planning chapter 8
Capacity planning chapter 8
 
CAPACITY PLANNING AND ‎FACILITIES PLANNING
CAPACITY PLANNING AND ‎FACILITIES PLANNINGCAPACITY PLANNING AND ‎FACILITIES PLANNING
CAPACITY PLANNING AND ‎FACILITIES PLANNING
 
Capacity Managment
Capacity ManagmentCapacity Managment
Capacity Managment
 
Capacity Planning
Capacity PlanningCapacity Planning
Capacity Planning
 
Capacity Planning for Products and Services
Capacity Planning for Products and ServicesCapacity Planning for Products and Services
Capacity Planning for Products and Services
 
Capacity management
Capacity managementCapacity management
Capacity management
 
CAPACITY & AGGREGATE PLANNING
CAPACITY & AGGREGATE PLANNINGCAPACITY & AGGREGATE PLANNING
CAPACITY & AGGREGATE PLANNING
 
Module 3 Session 4 Capacity management
Module 3 Session 4    Capacity managementModule 3 Session 4    Capacity management
Module 3 Session 4 Capacity management
 
Prod planch
Prod planchProd planch
Prod planch
 
Maximizing Profits
Maximizing ProfitsMaximizing Profits
Maximizing Profits
 
Om presentation group 10 sec a
Om presentation group 10 sec aOm presentation group 10 sec a
Om presentation group 10 sec a
 
Production and Operation Management (Capacity Planning )
Production and Operation Management (Capacity Planning )Production and Operation Management (Capacity Planning )
Production and Operation Management (Capacity Planning )
 
Capacity Planning
Capacity PlanningCapacity Planning
Capacity Planning
 
Reading 3 Strategic Capacity Management.pdf
Reading 3 Strategic Capacity Management.pdfReading 3 Strategic Capacity Management.pdf
Reading 3 Strategic Capacity Management.pdf
 
(CAPACITY PLANNIG)
(CAPACITY PLANNIG)(CAPACITY PLANNIG)
(CAPACITY PLANNIG)
 
Matching Supply and Demand
Matching Supply and DemandMatching Supply and Demand
Matching Supply and Demand
 
Capacity Planning Chapter outline 12.1 Facilities deci.docx
Capacity Planning Chapter outline 12.1 Facilities deci.docxCapacity Planning Chapter outline 12.1 Facilities deci.docx
Capacity Planning Chapter outline 12.1 Facilities deci.docx
 
Operations ppt
Operations pptOperations ppt
Operations ppt
 

KĂŒrzlich hochgeladen

How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17Celine George
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management SystemChristalin Nelson
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfMr Bounab Samir
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfJemuel Francisco
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management systemChristalin Nelson
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 
Science 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptxScience 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptxMaryGraceBautista27
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfphamnguyenenglishnb
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parentsnavabharathschool99
 
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptxiammrhaywood
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptxSherlyMaeNeri
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfTechSoup
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Jisc
 
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxBarangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxCarlos105
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfErwinPantujan2
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptxmary850239
 

KĂŒrzlich hochgeladen (20)

How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management System
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management system
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 
Science 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptxScience 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptx
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parents
 
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptx
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
 
Raw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptxRaw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptx
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...
 
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxBarangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx
 

Chapter 12a

  • 1. Donald Waters Operations Strategy CHAPTER 12 – CAPACITY MANAGEMENT AIMS OF THE CHAPTER The capacity of a process is the maximum amount that it can produce in a given time. Capacity management is responsible for planning the capacity of a process. This is largely a strategic role of matching the long-term capacity and demand – but there are also tactical and operations aspects to consider. A particular problem is that both the capacity and demand vary over time. Sometimes the variations follow predictable patterns, but usually there is uncertainty with no apparent pattern. The aim of the chapter is to discuss the broad issue of capacity management. More specific aims are to: ‱ define the capacity of a process and discuss its measurement The capacity of a process is the maximum amount of a product that it can make in a given time. This gives the overall view, but we can interpret this statement in different ways. In particular, the designed capacity is the maximum possible output in ideal conditions, and the effective capacity is the maximum realistic output in normal conditions. People also refer to the productive capacity (used for making products), non-productive capacity (used for other purposes), and idle capacity (not used at all). Related measures look at the output (the -1-
  • 2. Donald Waters Operations Strategy amount of product actually made), productivity (the amount produced for each unit of resource), utilisation (proportion of designed capacity that is actually used), efficiency (proportion of the effective capacity actually used) and effectiveness. ‱ understand the aims of capacity management Capacity management is responsible for all aspects of operations’ capacity. It is generally responsible for matching the long-term capacity of a process to the demand for its products. It does this through capacity planning, which describes more specific methods for achieving this match. An important point is that every process has a bottleneck where resources or facilities limit the overall output. ‱ describe a general approach to capacity planning The chapter develops a general approach to capacity requirements planning based on six steps: 1. consider demand and translate this into a required capacity for the process 2. find the capacity already available in the process 3. identify mismatches between capacity needed and that available 4. suggest alternative plans for overcoming any mismatch 5. compare these plans and find the best 6. implement the best. Each of these steps has its own problems. -2-
  • 3. Donald Waters Operations Strategy ‱ consider the timing and size of capacity changes There are continuous changes to operations – brought about by changes in the environment and internal adjustments – and these often need adjustments to process capacity. The first question here concerns the timing of changes, and whether it is generally best to work with spare capacity or some shortage. This balance depends on the relative costs of unused capacity and shortages, with factors that encourage early expansion including variable and uncertain demand, high profits margins, high cost of unmet demand, low costs of spare capacity, continuously changing product mix, variable efficiency, and capacity increases that are relatively small. The second question concerns the size of change, and whether it is better to have a few large changes or more small adjustments. Factors that encourage a few large expansions include the benefits of capacity staying ahead of demand for a longer time, a cushion against unexpected conditions, fewer disruptions, lower costs per unit of expansion, earlier economies of scale, potential to encourage more demand, and giving some advantages over competitors. ‱ discuss reasons why capacity changes over time There are many reasons for this. The chapter illustrated systematic changes due to learning effects, maintenance, replacement policies and the business cycle. Superimposed on these patterns are short term variations due to staff illness, interruptions, break-downs, weather, holidays, enthusiasm of employees, fatigue, and so on. ‱ appreciate the need for shorter term adjustments to capacity -3-
  • 4. Donald Waters Operations Strategy Capacity planning is largely a strategic function, setting available capacity over the long term. But demand can change very quickly, by the day or even the hour, so managers need the flexibility to make short-term adjustments to their effective capacity. There are two ways of doing this based on supply management or demand management. Each of these is appropriate circumstances, and the choice depends on the balance of costs and benefits. DISCUSSION QUESTIONS 1. Why is capacity management a strategic issue? To what extent do tactical and operational factors influence the capacity? Capacity management is a strategic issue, because capacity is an important issue, with effects over the long term, involving high cost, made by senior managers – and all the other features of strategic decisions. At the same time, in common with most other types of decision, there are tactical and operational factors to consider. For example, a company might decide to open a call centre in a particular location. Its capacity is a strategic decision, as this cannot be changed in the short term, and any expansion would need another building and extra facilities. But staffing patterns might be tactical decisions set for a few months. Then on a particular day, operational decisions decide exactly who is working. So the context is set by the strategic capacity decision, and this is adjusted in the light of requirements with tactical and operations decisions. 2. Capacity is not really an absolute limit on the output from a process, but it is a measure of management performance. Do you agree with this? -4-
  • 5. Donald Waters Operations Strategy Yes – to a large extent. The evidence to support this comes from different organisations – and even different managers – can use exactly the same facilities and get different levels of output. The implication is that some managers can use facilities more efficiently, increasing production – and effective capacity. Further evidence comes from the observation that capacity changes over time. If managers can control these changes more efficiently, then they can increase effective capacity. Of course, there are limits to the extent that capacity is a measure of management rather than some fixed limit, and it would be difficult to consistently get higher output than the designed capacity. 3. You often see notices at the entrance to pubs, clubs, halls and other buildings saying that, ‘The capacity of this facility is 200 people’. What does this really mean? Sometimes there might be physical limits on capacity, such as the number of seats in the facility. Often, though, there is no physical limit and the capacity is an arbitrary number that is set to reflect some other concern. For example, fire regulations might set a maximum acceptable time for everyone to leave a club through the emergency exits – and then capacity of the club is set by its evacuation procedures. But again, this is based on an arbitrary decision about evacuation times. Generally, such notices mean that someone has taken a decision – based on some criteria – that this should be the capacity of the facility. -5-
  • 6. Donald Waters Operations Strategy 4. Is it always possible to find the capacity of a process? How can you find the capacity of a shopping mall, national park or a shipping lane? Can you give examples where it is difficult to find a capacity, and say how these difficulties are overcome? Not really. The examples given are only a few of the many possible ones where it is difficult to set a real – or even convincing – capacity. The way of overcoming them is to use agreed – but generally arbitrary – measures. 5. Is it better to have frequent small changes in capacity, or fewer large ones? This depends entirely on circumstances, and the relative costs of making the expansion and having spare capacity. Factors that encourage a few large expansions include the benefits of capacity staying ahead of demand for a longer time, a cushion against unexpected conditions, fewer disruptions, lower costs per unit of expansion, earlier economies of scale, potential to encourage more demand, and giving some advantages over competitors. 6. Why does capacity change over time? There are many reasons for this. The chapter illustrated systematic changes due to learning effects, maintenance, replacement policies and the business cycle. Superimposed on these patterns are short term variations due to staff illness, interruptions, break-downs, weather, holidays, enthusiasm of employees, fatigue, and so on. And then there are apparently random variations that cannot be explained. 7. Capacity planning is a waste of time. Long-term forecasts of demand are -6-
  • 7. Donald Waters Operations Strategy unreliable, and both capacity and demand vary in unknown ways. So organisations should simply get enough capacity to cover likely demand for the future. What do you think of this view? In some conditions this is a reasonable view. When extra capacity is cheap and lost custom is expensive, it makes sense to have as much capacity as necessary to meet all potential demand. But usually managers have to find a compromise that balances the cost of capacity and lost sales. If, for example, capacity is expensive and lost custom is cheap, then it would make sense to limit capacity to the level that gives the best operations. The usual solution comes between these two, and managers have to consider all factors and choose the amount of capacity that best meets their aims. Included in their decisions is an assessment of the risks and uncertainties in their forecasts for demand and factors affecting capacity. 8. Nobody would seriously consider limiting demand for a product, but would always look for ways of increasing process capacity. Is this true? No. Many organisations limit demand for a product – or the amount they actually supply. For example, luxury goods, portrait painters, football stadiums, university courses, professional institutions, limited edition prints, medical practices, bespoke tailors, etc all put artificial limits on their sales. The reason is simply a balance of the benefits of meeting demand with the costs involved. When the costs of expanding are higher than the benefits, it makes sense to limit capacity. -7-
  • 8. Donald Waters Operations Strategy IDEAS IN PRACTICE Forthright Communications Inc. Aim: to illustrate some calculations of capacity and related performance This case shows some calculations associated with the capacity of a central process in a communications company. These figures are not an end in themselves, but they highlight areas where improvements might be made. For example the utilisation was 74 percent, and this might seem rather low – effectively resources are standing idle for more than a quarter of the time. The analyses of non-productive use and wasted capacity show why this occurred. Then managers can consider these areas and start looking at ways of reducing the waste. SunAlto Orange Aim: to illustrate the calculation of process capacity. The capacity of an overall process is set by the capacity of its limiting bottleneck. This case describes a fairly short process, each part of which has a known capacity. The packing equipment forms the limiting bottleneck, and the overall capacity can only be increased by increasing the capacity here. The process is not balanced, so each part has a different utilisation. Usually managers want a balanced process where all operations have virtually the same capacity. Global Car sales -8-
  • 9. Donald Waters Operations Strategy Aim: to illustrate some problems in defining capacity The car industry is characterised by high capital investment in automated production. This is only profitable when capacity is carefully matched to demand, and plants get high figures for utilisation and productivity. In recent years, it is widely felt that there is considerable excess capacity, and this has lead to a series of mergers and take-overs. However, a closer look begins to question this picture. It takes several years to increase capacity in a car plant, so there must be some cushion to allow for variations and sudden growth in demand. At the same time, the capacity comes in different forms, with some being more apparent than real. If we take these into account we can argue that there is not really any over-capacity in the industry, but capacity is quite closely aligned to demand. KDF Resources GmbH Aim: to introduce the type of calculations involved with capacity planning This case illustrates some of the initial considerations when a company starts to look at plans for expanding capacity. Here the company has increasing demand that can only be met by increasing capacity. So it looks at the alternatives available – expansion on the existing site, or one, two or three new centres – and starts to compare these. The costs suggest a single large centre, but managers then have to consider a range of other factors, including the risks associated with mismatches between supply and demand. The book -9-
  • 10. Donald Waters Operations Strategy develops this type of approach into a formal procedure for capacity requirements planning. GlaxoSmithKline Aim: to illustrate the effects of economies of scale on growth in one industry This case outlines the steps that one company has taken on its move from a small single company to become one of the world’s largest pharmaceutical company. The thinking behind this growth is that it is very expensive to develop new drugs, and research companies can get considerable economies of scale. A company can have organic growth, but this often gives an industry excess capacity. In this case it was felt better to grow by a series of mergers with similar companies. There are other examples of this, including retailers, banks, television companies, telephone operators, and car manufacturers. Wholefood Preparation Ltd Aim: to outline some cost calculations for equipment replacement The age and condition of equipment has a direct effect on capacity, with older equipment usually reducing capacity (due to increase breakdowns and generally deteriorating performance). Managers have to make decisions about the best time to replace equipment, generally balancing the costs of buying new equipment and continuing to operate older equipment. This case illustrates the way that an operations manager approached this decision for - 10 -
  • 11. Donald Waters Operations Strategy production machines in one food preparation company. These costs give a starting point for further analysis. European Car Manufacturers Aim: to show the effects of perceived over-capacity in one industry An earlier case considered the effects of over-capacity in global car manufacturing. This case shows the effect in Europe, where over-capacity is seen to be a significant problem. Companies want to increase the utilisation of their own facilities, but this is difficult in a competitive market. The path taken by the industry is to reduce the number of companies working, so that production is concentrated into fewer more efficient operations. The direct result is a series of mergers, takeovers and closures. CASE STUDY – HEATHROW AIRPORT Decisions about capacity often have expensive consequences. This is particularly noticeable with airports, where any expansion is expensive in its direct costs, environmental impact, effect on local communities, and so on. Heathrow is London’s main airport and is one of the busiest in the world. Demand for air travel around London continues to grow, but Heathrow’s limited capacity means that much of this has been transferred to other airports. Gatwick, Stansted and Luton have all had major expansions, and all have plans for yet more capacity in the future. - 11 -
  • 12. Donald Waters Operations Strategy For a long time Heathrow’s capacity has been limited by the bottleneck at its passenger terminals. The fifth terminal will remove (at least for some time) this limit and increase overall capacity. ‱ How can BAA measure the capacity of Heathrow? What factors affect this capacity? The capacity of an airport is usually stated in terms of the number of passengers that can use it in a year. This, in turn, depends on the number of other measures, particularly: o Air-side operations – largely the number of passengers that planes can deliver and take away, determined by the number of runways, time slots available for planes to land and take-off, size of planes, occupancy, etc o Land-side operations – largely the number of passengers that the terminal buildings can handle, dealing with all aspects of arrivals, departures and associated services. For each of these, BAA can use many related measures for specific aspects of capacity. As usual with capacity, the actual limits are largely a matter of agreement than physical limits. For example, the separation of planes is an agreed distance that is considered safe, and the number of check-in desks is set by agreed levels of customer service. Larger planes, greater occupancy, more time slots for take-off and landing, and new systems have already increased capacity of the Heathrow. For a long time the bottleneck has been identified as terminal capacity. The fifth - 12 -
  • 13. Donald Waters Operations Strategy terminal will remove this (or more accurately move it to another part of operations). The new terminal improves both air-side and land-side operations, removing current bottlenecks and significantly increasing overall capacity. ‱ For years, Heathrow has been operating beyond its designed capacity. What effects does this have? The planned capacity is a theoretical limit, so when this is exceeded it means that the limit has somehow been raised. Saying that the airport is working beyond its designed capacity really means that it is working more efficiently than expected and is finding ways of dealing with more passengers than expected. But the capacity is largely an agreed measure, and obviously does not reflect the maximum number of people that could fit into the space. It would really be fairer to say that the airport is working beyond its agreed effective capacity. This presumably means that some facilities – those at the bottlenecks – are stretched beyond their limits. This can raise many related problems and inevitably means that customer service declines. ‱ Airports like Heathrow continue to expand. What will eventually limit their capacity? This is difficult to answer. It seems that the current growth in demand for air travel is likely to continue for the foreseeable future, in the way that road travel has been expanding for well over a century. But there must ultimately be some limits, and these might come from several sources. Air travel might become less popular, perhaps because of changing social habits, costs, - 13 -
  • 14. Donald Waters Operations Strategy population levels, attitudes towards the environment, options for alternative types of transport, etc. In the shorter term, airports might increase the capacity of current facilities by using them more efficiently, installing better systems, and generally improving operations. For example, introducing automation (as described in the case for IATA) can dramatically increase the number of passengers who can check-in through current facilities; improving control systems can increase the number of plane movements; new planes can increase passenger density. - 14 -