SlideShare a Scribd company logo
1 of 22
Download to read offline
MMX MINERAÇÃO
August | 2014
DISCLAIMER
2
This presentation relating to MMX Mineração e Metálicos S.A. (“MMX”) includes “forward-looking statements”, as that term is defined in the Private Securities
Litigation Reform Act of 1995, in Section 27A of the Securities Act of 1933 and Section 21E of the U.S. Securities Exchange Act of 1934. All statements
other than statements of historical facts are statements that could be deemed forward-looking statements and are often characterized by the use of words
such as “projects”, “expects”, “anticipates”, “intends”, “plans”, “believes”, “estimates”, “may”, “will”, or “intends”, or by discussions or comments about our
objectives, strategy, plans or intentions and results of operations. Forward-looking statements include projections regarding our operating capacity, operating
expenditures, capital expenditures and start-up dates.
By their nature, these forward-looking statements involve numerous assumptions, uncertainties and opportunities, both general and specific. The risk exists
that these statements may not be fulfilled or, even if they are fulfilled, the results or developments described in such statements may not be indicative of
results or developments in future periods. We caution participants of this presentation not to place undue reliance on these forward-looking statements as a
number of factors could cause future results to differ materially from these statements.
Forward-looking statements may be influenced in particular by factors such as the ability to obtain all required regulatory approvals on a timely basis or at
all, exploration for mineral resources and reserves, difficulty in converting geological resources into mineral reserves, and changes in economic, political and
regulatory conditions. We caution that the foregoing list is not exhaustive. When relying on forward-looking statements to make decisions, investors should
carefully consider these factors as well as other uncertainties and events.
MMX does not undertake to update our forward-looking statements unless required by law. This presentation is neither an offer to sell (which can only be
made pursuant to definitive offering documents) nor a solicitation of an offer to buy any securities in the United States, or any other jurisdiction. The
securities referred to herein have not been registered in any jurisdiction, and in particular, will not be registered under the U.S. Securities Act of 1933, as
amended, or any applicable state securities laws and may not be offered or sold in the United States absent registration or an applicable exemption from
such registration requirements.
This presentation and its contents are proprietary information and may not be reproduced or otherwise disseminated in whole or in part without MMX’s prior
written consent.
MMX INTRODUCTION1.
4
MMX Corumbá
Mineração
MMX Sudeste
100%94,52%
5,48% EBX
CONTROLLING
SHAREHOLDERS
57,42%
WISCO
10,5%
SK
NETWORKS
8,8%
OTHERS
23,28%
Serra
Azul
Bom
Sucesso
SHAREHOLDING STRUCTURE
35%
Porto Sudeste
do Brasil
65%
5
Operating system: Serra Azul;
Current Capacity: approximately 7 Mtpy;
Mining rights in traditional iron ore districts:
Brazil (Minas Gerais and Mato Grosso do Sul);
Production committed with strategic
consumers – China and South Korea –
through long-term contracts;
Brownfield start up in Brazil;
Strategic port location.
Sudeste System | MG
Serra Azul Unit
Corumbá System | MS*
Porto Sudeste | RJ
Sistema Sudeste
MMX INTRODUCTION
*MMX entered into agreements with Vetria Mineração for the lease of mining rights in Corumbá.
6
RESOURCE BASE
SRK and Coffey Mining certifications (Serra Azul, Pau de Vinho e Bom Sucesso): 3,6
billion tons of mineral resources. Reserves of 1 billion tons in Serra Azul.
COMPETITIVE
PRODUCTION
COST
STRUCTURE
Low stripping ratio;
Competitive scale;
Energy supply contract with MPX;
Infrastructure with integrated logistics.
GUARANTEED
LOGISTICS
Porto Sudeste at 50 Mtpy, expandable to 100 Mtpy, provides gateway to seaborne
markets;
Long Term Railway Contract with MRS.
SECURED OFF-
TAKE
64% of future production already committed through long-term contracts.
OPERATIONAL
TRACK RECORD
Main operations located in the traditional Serra Azul mining region, in Minas Gerais
Iron Ore Quadrangle.
HIGHLIGHTS
7
HIGHLIGHTS
2012 AUGUST
2014
Conclusion of
the capital
increase in the
amount of R$
1.4 billion;
Renewal of the
lease contracts
for mineral
rights with the
CEFAR,
extending the
terms of validity
from 2021 to
2034;
Conclusion of the
contracting of
supplementary long term
funding for the Sudeste
Superport with BNDES, in
the sum of R$ 935 million;
New
certification of
mineral
resources (SRK
and Coffey
Mining) totaling
3.6 billion tons
considering
Serra Azul Unit,
Mina Pau de
Vinho and Bom
Sucesso;
Sale of all shares
in Minera MMX de
Chile S.A. to
Inversiones Cooper
Mining S.A.
Definitive
agreements
executed by the
Company with
Trafigura and
Mubadala;
The merger of
MMX Porto
Sudeste S.A.
by MMX
Approval of
the business
plan’s revision
of the
Company;
Conclusion of the
investment
operations of
Trafigura and
Mubadala in
Porto Sudeste do
Brasil SA.;
MMX entered
into
agreements
with Vetria
Mineração for
the lease of
mining rights in
Corumbá, which
envisage the
assumption of
certain
contracts
8
FINANCIAL HIGHLIGHTS
237
181
110
0
100
200
300
1Q13 4Q13 1Q14
Net Revenue (R$ million)
140
96
31
0
50
100
150
1Q13 4Q13 1Q14
Gross Profit (R$ million)
-131 -501
-600
-500
-400
-300
-200
-100
0
1Q13 4Q13 1Q14
Adjusted EBITDA (R$ million)
Adjusted EBITDA
SUDESTE SYSTEM2.
SERRA AZUL UNIT2.1
11
Mine Porto SudesteRailway
Serra Azul unit is near to the MRS
railway - 7 km from the mine, a
distance currently traversed by
trucks.
MMX has a long term contract with
MRS railway, which connects the mine
with the CSN’s port and the Porto
Sudeste, both located in Itaguaí.
Porto Sudeste will have 50Mtpy iron
ore shipping capacity. The Superport
will have a depth of 20 meters,
enough to handle Capesize vessels.
Integrated logistic:
Mine > Railway > Port as a
factor of Value Creation
WISCO
Long-Term contract (20 years) to
trade iron ore. SK will take-off part of
the Sudeste System yearly production
equivalent to its participation in MMX
Capital (14%).
Long-Term contract (20 years).
Wisco will off-take at least 50% of
MMX Sudeste production.
OFFTAKERS (SHAREHOLDERS)
SK NETWORKS
UNIQUE INTEGRATED LOGISTICS
SK and Wisco will together
offtake 64% of total production
QUADRILÁTERO FERRÍFERO
Iron ore Quadrangle
Minas Gerais
RAILWAY
Railway access connecting MRS
to the Porto Sudeste
Expansion project with integrated
logistic and pellet feed iron ore
14
SERRA AZUL
Highlights
Production target: 15 Mtpy waiting of new partner;
64% of production already committed through long-term contracts;
997.4 million tons of reserves already secured by SRK.
Project Status
Installation License issued in April, 2012;
Beginning of construction of Serra Azul Unit expansion (earth work completed in the beneficiation plant area);
Expected Quality – Ouro Preto pilot plant test work
Fe: 66,65% P: 0,025% AL2O3: 0,54%
SiO2: 3,23% Mn: 0,018% LOI: 0,75%
BR
38
1
Itatiaiuçu
Igarapé
São Joaquim
de Bicas
Brumadinho
Sarzedo
Mario Campos
N
Growth through consolidation while
leveraging existing infrastructure
SERRA AZUL
1 2
3 4
5
6
7
8
9
10
11
12
13
14
14
15
15
1 USIMINAS Western
2
3
4
5
6
7
8
9
MRI
USIMINAS Central
Arcelor Mittal
Minerita
Ferrous-Santanense
USIMINAS Eastern
Comisa
Emicon
10
11
12
MMX
USIMINAS Pau de Vinho
Ferrous – Esperança
13 Minera do Brasil
14 Vale
Itaminas15 15
Serra azul unit expansion project
UNIDADE SERRA AZUL
16
1 Beneficiation Plant
2
Tailings dam, about 40km away
from the mine, associated with
a tailings pipeline
3
Pipeline with approximately 7km
extension
4
Rail terminal connected to the
MRS rail network
5 Arch extensions
6 Waste deposit
7 Water supply
8 High voltage power station
9 Access
2
6
9
1
5
7
9 9
8
3 4
Itatiaiuçu
Igarapé
São Joaquim de Bicas
Mario Campos
Serra Azul Expansion
Beneficiation Plant
Earthwork
SERRA AZUL
1
Pump House, Sump and
Thickeners
2 Construction Site
1
1
3 Beneficiation
2
3
4 Grinding
4
5 Substation
6 Grinding
7 Piles
8 Primary Crusher
5
6
7
8
9 Primary Crusher
10
Water Storage
Tank
11
Construction Site
and Warehouse
12
Water Storage
Tank Inc.
9
10
11
12
13 Main Access
14 Administrative Buildings
15 Maintenance Workshop
13 14
15
PORTO SUDESTE DO BRASIL2.2
Overview
20
35% partnership with Trafigura and Mubadala, with
significant operational track record and extensive
financial capacity.
Long term contract with MMX Sudeste for port handling
services of 7 Mtpy with an expandable option to increase
to 13 Mtpy until 2015.
In case of Port expansion to up to 100 Mtpy, MMX’s
shipping right can also be increased by 13% of extended
Port capacity.
The whole internal trading of iron ore will be made
through the Porto Sudeste.
MMX shall have an option to acquire an additional stake
of up to 7.5% in PortCo, for a final stake of up to 42.5%.
PORTO SUDESTE
Porto Sudeste | Itaguaí (RJ)
21
Carlos Gonzalez CEO and IRO
Adriana Marques Manager
Phone + 55 21 2163-6197
+ 55 21 2163-6338
E-mail ri@mmx.com.br
MMX
INVESTOR RELATIONS
www.mmx.com.br

More Related Content

What's hot

Mmx agosto 2013 - ingles - vfinal
Mmx   agosto 2013 - ingles - vfinalMmx   agosto 2013 - ingles - vfinal
Mmx agosto 2013 - ingles - vfinalmmxriweb
 
Mmx janeiro - en - vfinal
Mmx   janeiro - en - vfinalMmx   janeiro - en - vfinal
Mmx janeiro - en - vfinalmmxriweb
 
Mmx dezembro 13 - en - vfinal
Mmx   dezembro 13 - en - vfinalMmx   dezembro 13 - en - vfinal
Mmx dezembro 13 - en - vfinalmmxriweb
 
Mmx julho 2013 - ingles - vfinal
Mmx   julho 2013 - ingles - vfinalMmx   julho 2013 - ingles - vfinal
Mmx julho 2013 - ingles - vfinalmmxriweb
 
Mmx agosto 2013 - ingles - vfinal
Mmx   agosto 2013 - ingles - vfinalMmx   agosto 2013 - ingles - vfinal
Mmx agosto 2013 - ingles - vfinalmmxriweb
 
Mmx agosto 2013 - ingles - vfinal
Mmx   agosto 2013 - ingles - vfinalMmx   agosto 2013 - ingles - vfinal
Mmx agosto 2013 - ingles - vfinalmmxriweb
 
Mmx setembro 2013 - ingles - vfinal
Mmx   setembro 2013 - ingles - vfinalMmx   setembro 2013 - ingles - vfinal
Mmx setembro 2013 - ingles - vfinalmmxriweb
 
Mmx outubro 2013 - ingles - vfinal
Mmx   outubro 2013 - ingles - vfinalMmx   outubro 2013 - ingles - vfinal
Mmx outubro 2013 - ingles - vfinalmmxriweb
 
Mmx abril 2013 - ingles - v2
Mmx   abril 2013 - ingles - v2Mmx   abril 2013 - ingles - v2
Mmx abril 2013 - ingles - v2mmxriweb
 
Mmx maio 2013 - ingles - v2
Mmx   maio 2013 - ingles - v2Mmx   maio 2013 - ingles - v2
Mmx maio 2013 - ingles - v2mmxriweb
 
Mmx maio 2013 - ingles - v2
Mmx   maio 2013 - ingles - v2Mmx   maio 2013 - ingles - v2
Mmx maio 2013 - ingles - v2mmxriweb
 
Mmx maio 2013 - ingles - vfinal
Mmx   maio 2013 - ingles - vfinalMmx   maio 2013 - ingles - vfinal
Mmx maio 2013 - ingles - vfinalmmxriweb
 
Mmx junho 2013 - ingles - vfinal
Mmx   junho 2013 - ingles - vfinalMmx   junho 2013 - ingles - vfinal
Mmx junho 2013 - ingles - vfinalmmxriweb
 
Mmx junho 2013 - ingles - vfinal
Mmx   junho 2013 - ingles - vfinalMmx   junho 2013 - ingles - vfinal
Mmx junho 2013 - ingles - vfinalmmxriweb
 
Mmx maio 2013 - ingles - vfinal
Mmx   maio 2013 - ingles - vfinalMmx   maio 2013 - ingles - vfinal
Mmx maio 2013 - ingles - vfinalmmxriweb
 
Mmx maio 2013 - ingles - vfinal
Mmx   maio 2013 - ingles - vfinalMmx   maio 2013 - ingles - vfinal
Mmx maio 2013 - ingles - vfinalmmxriweb
 
Mmx abril 2013 - ingles - v3
Mmx   abril 2013 - ingles - v3Mmx   abril 2013 - ingles - v3
Mmx abril 2013 - ingles - v3mmxriweb
 

What's hot (17)

Mmx agosto 2013 - ingles - vfinal
Mmx   agosto 2013 - ingles - vfinalMmx   agosto 2013 - ingles - vfinal
Mmx agosto 2013 - ingles - vfinal
 
Mmx janeiro - en - vfinal
Mmx   janeiro - en - vfinalMmx   janeiro - en - vfinal
Mmx janeiro - en - vfinal
 
Mmx dezembro 13 - en - vfinal
Mmx   dezembro 13 - en - vfinalMmx   dezembro 13 - en - vfinal
Mmx dezembro 13 - en - vfinal
 
Mmx julho 2013 - ingles - vfinal
Mmx   julho 2013 - ingles - vfinalMmx   julho 2013 - ingles - vfinal
Mmx julho 2013 - ingles - vfinal
 
Mmx agosto 2013 - ingles - vfinal
Mmx   agosto 2013 - ingles - vfinalMmx   agosto 2013 - ingles - vfinal
Mmx agosto 2013 - ingles - vfinal
 
Mmx agosto 2013 - ingles - vfinal
Mmx   agosto 2013 - ingles - vfinalMmx   agosto 2013 - ingles - vfinal
Mmx agosto 2013 - ingles - vfinal
 
Mmx setembro 2013 - ingles - vfinal
Mmx   setembro 2013 - ingles - vfinalMmx   setembro 2013 - ingles - vfinal
Mmx setembro 2013 - ingles - vfinal
 
Mmx outubro 2013 - ingles - vfinal
Mmx   outubro 2013 - ingles - vfinalMmx   outubro 2013 - ingles - vfinal
Mmx outubro 2013 - ingles - vfinal
 
Mmx abril 2013 - ingles - v2
Mmx   abril 2013 - ingles - v2Mmx   abril 2013 - ingles - v2
Mmx abril 2013 - ingles - v2
 
Mmx maio 2013 - ingles - v2
Mmx   maio 2013 - ingles - v2Mmx   maio 2013 - ingles - v2
Mmx maio 2013 - ingles - v2
 
Mmx maio 2013 - ingles - v2
Mmx   maio 2013 - ingles - v2Mmx   maio 2013 - ingles - v2
Mmx maio 2013 - ingles - v2
 
Mmx maio 2013 - ingles - vfinal
Mmx   maio 2013 - ingles - vfinalMmx   maio 2013 - ingles - vfinal
Mmx maio 2013 - ingles - vfinal
 
Mmx junho 2013 - ingles - vfinal
Mmx   junho 2013 - ingles - vfinalMmx   junho 2013 - ingles - vfinal
Mmx junho 2013 - ingles - vfinal
 
Mmx junho 2013 - ingles - vfinal
Mmx   junho 2013 - ingles - vfinalMmx   junho 2013 - ingles - vfinal
Mmx junho 2013 - ingles - vfinal
 
Mmx maio 2013 - ingles - vfinal
Mmx   maio 2013 - ingles - vfinalMmx   maio 2013 - ingles - vfinal
Mmx maio 2013 - ingles - vfinal
 
Mmx maio 2013 - ingles - vfinal
Mmx   maio 2013 - ingles - vfinalMmx   maio 2013 - ingles - vfinal
Mmx maio 2013 - ingles - vfinal
 
Mmx abril 2013 - ingles - v3
Mmx   abril 2013 - ingles - v3Mmx   abril 2013 - ingles - v3
Mmx abril 2013 - ingles - v3
 

Similar to MMX MINERAÇÃO August 2014 Presentation

Mmx janeiro - en - vfinal
Mmx   janeiro - en - vfinalMmx   janeiro - en - vfinal
Mmx janeiro - en - vfinalmmxriweb
 
Mmx junho 2013 - ingles - vfinal
Mmx   junho 2013 - ingles - vfinalMmx   junho 2013 - ingles - vfinal
Mmx junho 2013 - ingles - vfinalmmxriweb
 
Mmx junho 2013 - ingles - vfinal
Mmx   junho 2013 - ingles - vfinalMmx   junho 2013 - ingles - vfinal
Mmx junho 2013 - ingles - vfinalmmxriweb
 
Mmx junho 2013 - ingles - vfinal
Mmx   junho 2013 - ingles - vfinalMmx   junho 2013 - ingles - vfinal
Mmx junho 2013 - ingles - vfinalmmxriweb
 
Mmx abril 2013 - ingles - vfinal
Mmx   abril 2013 - ingles - vfinalMmx   abril 2013 - ingles - vfinal
Mmx abril 2013 - ingles - vfinalmmxriweb
 
Mmx maio 2013 - ingles
Mmx   maio 2013 - inglesMmx   maio 2013 - ingles
Mmx maio 2013 - inglesmmxriweb
 
Corporate Presentation - February 2012
Corporate Presentation - February 2012Corporate Presentation - February 2012
Corporate Presentation - February 2012mmxriweb
 
Mmx novembro 2013 - ingles - vfinal
Mmx   novembro 2013 - ingles - vfinalMmx   novembro 2013 - ingles - vfinal
Mmx novembro 2013 - ingles - vfinalmmxriweb
 
Presentation mmx, llx, port x and usiminas...
Presentation mmx, llx, port x and usiminas...Presentation mmx, llx, port x and usiminas...
Presentation mmx, llx, port x and usiminas...mmxriweb
 
Presentation mmx, llx, port x and usiminas...
Presentation mmx, llx, port x and usiminas...Presentation mmx, llx, port x and usiminas...
Presentation mmx, llx, port x and usiminas...mmxriweb
 
Mmx webcast ingles 1 t13 v2
Mmx webcast ingles 1 t13   v2Mmx webcast ingles 1 t13   v2
Mmx webcast ingles 1 t13 v2mmxriweb
 
Mmx announcement v-final_17out
Mmx   announcement v-final_17outMmx   announcement v-final_17out
Mmx announcement v-final_17outmmxriweb
 
Mmx anuncio resultados-20_a_eng_vfinal
Mmx   anuncio resultados-20_a_eng_vfinalMmx   anuncio resultados-20_a_eng_vfinal
Mmx anuncio resultados-20_a_eng_vfinalmmxriweb
 
Mmx anuncio resultados-20_a_eng
Mmx   anuncio resultados-20_a_engMmx   anuncio resultados-20_a_eng
Mmx anuncio resultados-20_a_engmmxriweb
 

Similar to MMX MINERAÇÃO August 2014 Presentation (14)

Mmx janeiro - en - vfinal
Mmx   janeiro - en - vfinalMmx   janeiro - en - vfinal
Mmx janeiro - en - vfinal
 
Mmx junho 2013 - ingles - vfinal
Mmx   junho 2013 - ingles - vfinalMmx   junho 2013 - ingles - vfinal
Mmx junho 2013 - ingles - vfinal
 
Mmx junho 2013 - ingles - vfinal
Mmx   junho 2013 - ingles - vfinalMmx   junho 2013 - ingles - vfinal
Mmx junho 2013 - ingles - vfinal
 
Mmx junho 2013 - ingles - vfinal
Mmx   junho 2013 - ingles - vfinalMmx   junho 2013 - ingles - vfinal
Mmx junho 2013 - ingles - vfinal
 
Mmx abril 2013 - ingles - vfinal
Mmx   abril 2013 - ingles - vfinalMmx   abril 2013 - ingles - vfinal
Mmx abril 2013 - ingles - vfinal
 
Mmx maio 2013 - ingles
Mmx   maio 2013 - inglesMmx   maio 2013 - ingles
Mmx maio 2013 - ingles
 
Corporate Presentation - February 2012
Corporate Presentation - February 2012Corporate Presentation - February 2012
Corporate Presentation - February 2012
 
Mmx novembro 2013 - ingles - vfinal
Mmx   novembro 2013 - ingles - vfinalMmx   novembro 2013 - ingles - vfinal
Mmx novembro 2013 - ingles - vfinal
 
Presentation mmx, llx, port x and usiminas...
Presentation mmx, llx, port x and usiminas...Presentation mmx, llx, port x and usiminas...
Presentation mmx, llx, port x and usiminas...
 
Presentation mmx, llx, port x and usiminas...
Presentation mmx, llx, port x and usiminas...Presentation mmx, llx, port x and usiminas...
Presentation mmx, llx, port x and usiminas...
 
Mmx webcast ingles 1 t13 v2
Mmx webcast ingles 1 t13   v2Mmx webcast ingles 1 t13   v2
Mmx webcast ingles 1 t13 v2
 
Mmx announcement v-final_17out
Mmx   announcement v-final_17outMmx   announcement v-final_17out
Mmx announcement v-final_17out
 
Mmx anuncio resultados-20_a_eng_vfinal
Mmx   anuncio resultados-20_a_eng_vfinalMmx   anuncio resultados-20_a_eng_vfinal
Mmx anuncio resultados-20_a_eng_vfinal
 
Mmx anuncio resultados-20_a_eng
Mmx   anuncio resultados-20_a_engMmx   anuncio resultados-20_a_eng
Mmx anuncio resultados-20_a_eng
 

More from mmxriweb

Apresentação Corporativa - Agosto 2014
Apresentação Corporativa - Agosto 2014Apresentação Corporativa - Agosto 2014
Apresentação Corporativa - Agosto 2014mmxriweb
 
Mmx julho - pt - vfinal nova
Mmx   julho - pt - vfinal novaMmx   julho - pt - vfinal nova
Mmx julho - pt - vfinal novammxriweb
 
Mmx webcast ingles 1 t14 v1
Mmx webcast ingles 1 t14   v1Mmx webcast ingles 1 t14   v1
Mmx webcast ingles 1 t14 v1mmxriweb
 
Mmx webcast portugues 1 t14 vf
Mmx webcast portugues 1 t14   vfMmx webcast portugues 1 t14   vf
Mmx webcast portugues 1 t14 vfmmxriweb
 
Mmx junho - pt - vfinal nova
Mmx   junho - pt - vfinal novaMmx   junho - pt - vfinal nova
Mmx junho - pt - vfinal novammxriweb
 
Mmx junho - pt - vfinal nova
Mmx   junho - pt - vfinal novaMmx   junho - pt - vfinal nova
Mmx junho - pt - vfinal novammxriweb
 
Mmx maio - pt - vfinal nova
Mmx   maio - pt - vfinal novaMmx   maio - pt - vfinal nova
Mmx maio - pt - vfinal novammxriweb
 
Mmx maio - pt - vfinal nova
Mmx   maio - pt - vfinal novaMmx   maio - pt - vfinal nova
Mmx maio - pt - vfinal novammxriweb
 
Mmx maio - pt - vfinal nova
Mmx   maio - pt - vfinal novaMmx   maio - pt - vfinal nova
Mmx maio - pt - vfinal novammxriweb
 
Mmx abril - pt - vfinal nova
Mmx   abril - pt - vfinal novaMmx   abril - pt - vfinal nova
Mmx abril - pt - vfinal novammxriweb
 
Mmx março - pt - vfinal nova
Mmx   março - pt - vfinal novaMmx   março - pt - vfinal nova
Mmx março - pt - vfinal novammxriweb
 
Mmx webcast ingles 2013 vfinal
Mmx webcast ingles 2013 vfinalMmx webcast ingles 2013 vfinal
Mmx webcast ingles 2013 vfinalmmxriweb
 
Mmx webcast portugues 2013 vfinal
Mmx webcast portugues 2013 vfinalMmx webcast portugues 2013 vfinal
Mmx webcast portugues 2013 vfinalmmxriweb
 
Mmx março - pt - vfinal nova
Mmx   março - pt - vfinal novaMmx   março - pt - vfinal nova
Mmx março - pt - vfinal novammxriweb
 
Mmx fevereiro - pt - vfinal nova
Mmx   fevereiro - pt - vfinal novaMmx   fevereiro - pt - vfinal nova
Mmx fevereiro - pt - vfinal novammxriweb
 
Mmx fevereiro - pt - vfinal
Mmx   fevereiro - pt - vfinalMmx   fevereiro - pt - vfinal
Mmx fevereiro - pt - vfinalmmxriweb
 
Mmx fevereiro - pt - vfinal2
Mmx   fevereiro - pt - vfinal2Mmx   fevereiro - pt - vfinal2
Mmx fevereiro - pt - vfinal2mmxriweb
 
Mmx janeiro - pt - vfinal
Mmx   janeiro - pt - vfinalMmx   janeiro - pt - vfinal
Mmx janeiro - pt - vfinalmmxriweb
 
Mmx janeiro - pt - vfinal
Mmx   janeiro - pt - vfinalMmx   janeiro - pt - vfinal
Mmx janeiro - pt - vfinalmmxriweb
 
Mmx dezembro 2013 - português - apimec vfinal
Mmx   dezembro 2013 - português - apimec vfinalMmx   dezembro 2013 - português - apimec vfinal
Mmx dezembro 2013 - português - apimec vfinalmmxriweb
 

More from mmxriweb (20)

Apresentação Corporativa - Agosto 2014
Apresentação Corporativa - Agosto 2014Apresentação Corporativa - Agosto 2014
Apresentação Corporativa - Agosto 2014
 
Mmx julho - pt - vfinal nova
Mmx   julho - pt - vfinal novaMmx   julho - pt - vfinal nova
Mmx julho - pt - vfinal nova
 
Mmx webcast ingles 1 t14 v1
Mmx webcast ingles 1 t14   v1Mmx webcast ingles 1 t14   v1
Mmx webcast ingles 1 t14 v1
 
Mmx webcast portugues 1 t14 vf
Mmx webcast portugues 1 t14   vfMmx webcast portugues 1 t14   vf
Mmx webcast portugues 1 t14 vf
 
Mmx junho - pt - vfinal nova
Mmx   junho - pt - vfinal novaMmx   junho - pt - vfinal nova
Mmx junho - pt - vfinal nova
 
Mmx junho - pt - vfinal nova
Mmx   junho - pt - vfinal novaMmx   junho - pt - vfinal nova
Mmx junho - pt - vfinal nova
 
Mmx maio - pt - vfinal nova
Mmx   maio - pt - vfinal novaMmx   maio - pt - vfinal nova
Mmx maio - pt - vfinal nova
 
Mmx maio - pt - vfinal nova
Mmx   maio - pt - vfinal novaMmx   maio - pt - vfinal nova
Mmx maio - pt - vfinal nova
 
Mmx maio - pt - vfinal nova
Mmx   maio - pt - vfinal novaMmx   maio - pt - vfinal nova
Mmx maio - pt - vfinal nova
 
Mmx abril - pt - vfinal nova
Mmx   abril - pt - vfinal novaMmx   abril - pt - vfinal nova
Mmx abril - pt - vfinal nova
 
Mmx março - pt - vfinal nova
Mmx   março - pt - vfinal novaMmx   março - pt - vfinal nova
Mmx março - pt - vfinal nova
 
Mmx webcast ingles 2013 vfinal
Mmx webcast ingles 2013 vfinalMmx webcast ingles 2013 vfinal
Mmx webcast ingles 2013 vfinal
 
Mmx webcast portugues 2013 vfinal
Mmx webcast portugues 2013 vfinalMmx webcast portugues 2013 vfinal
Mmx webcast portugues 2013 vfinal
 
Mmx março - pt - vfinal nova
Mmx   março - pt - vfinal novaMmx   março - pt - vfinal nova
Mmx março - pt - vfinal nova
 
Mmx fevereiro - pt - vfinal nova
Mmx   fevereiro - pt - vfinal novaMmx   fevereiro - pt - vfinal nova
Mmx fevereiro - pt - vfinal nova
 
Mmx fevereiro - pt - vfinal
Mmx   fevereiro - pt - vfinalMmx   fevereiro - pt - vfinal
Mmx fevereiro - pt - vfinal
 
Mmx fevereiro - pt - vfinal2
Mmx   fevereiro - pt - vfinal2Mmx   fevereiro - pt - vfinal2
Mmx fevereiro - pt - vfinal2
 
Mmx janeiro - pt - vfinal
Mmx   janeiro - pt - vfinalMmx   janeiro - pt - vfinal
Mmx janeiro - pt - vfinal
 
Mmx janeiro - pt - vfinal
Mmx   janeiro - pt - vfinalMmx   janeiro - pt - vfinal
Mmx janeiro - pt - vfinal
 
Mmx dezembro 2013 - português - apimec vfinal
Mmx   dezembro 2013 - português - apimec vfinalMmx   dezembro 2013 - português - apimec vfinal
Mmx dezembro 2013 - português - apimec vfinal
 

MMX MINERAÇÃO August 2014 Presentation

  • 2. DISCLAIMER 2 This presentation relating to MMX Mineração e Metálicos S.A. (“MMX”) includes “forward-looking statements”, as that term is defined in the Private Securities Litigation Reform Act of 1995, in Section 27A of the Securities Act of 1933 and Section 21E of the U.S. Securities Exchange Act of 1934. All statements other than statements of historical facts are statements that could be deemed forward-looking statements and are often characterized by the use of words such as “projects”, “expects”, “anticipates”, “intends”, “plans”, “believes”, “estimates”, “may”, “will”, or “intends”, or by discussions or comments about our objectives, strategy, plans or intentions and results of operations. Forward-looking statements include projections regarding our operating capacity, operating expenditures, capital expenditures and start-up dates. By their nature, these forward-looking statements involve numerous assumptions, uncertainties and opportunities, both general and specific. The risk exists that these statements may not be fulfilled or, even if they are fulfilled, the results or developments described in such statements may not be indicative of results or developments in future periods. We caution participants of this presentation not to place undue reliance on these forward-looking statements as a number of factors could cause future results to differ materially from these statements. Forward-looking statements may be influenced in particular by factors such as the ability to obtain all required regulatory approvals on a timely basis or at all, exploration for mineral resources and reserves, difficulty in converting geological resources into mineral reserves, and changes in economic, political and regulatory conditions. We caution that the foregoing list is not exhaustive. When relying on forward-looking statements to make decisions, investors should carefully consider these factors as well as other uncertainties and events. MMX does not undertake to update our forward-looking statements unless required by law. This presentation is neither an offer to sell (which can only be made pursuant to definitive offering documents) nor a solicitation of an offer to buy any securities in the United States, or any other jurisdiction. The securities referred to herein have not been registered in any jurisdiction, and in particular, will not be registered under the U.S. Securities Act of 1933, as amended, or any applicable state securities laws and may not be offered or sold in the United States absent registration or an applicable exemption from such registration requirements. This presentation and its contents are proprietary information and may not be reproduced or otherwise disseminated in whole or in part without MMX’s prior written consent.
  • 4. 4 MMX Corumbá Mineração MMX Sudeste 100%94,52% 5,48% EBX CONTROLLING SHAREHOLDERS 57,42% WISCO 10,5% SK NETWORKS 8,8% OTHERS 23,28% Serra Azul Bom Sucesso SHAREHOLDING STRUCTURE 35% Porto Sudeste do Brasil 65%
  • 5. 5 Operating system: Serra Azul; Current Capacity: approximately 7 Mtpy; Mining rights in traditional iron ore districts: Brazil (Minas Gerais and Mato Grosso do Sul); Production committed with strategic consumers – China and South Korea – through long-term contracts; Brownfield start up in Brazil; Strategic port location. Sudeste System | MG Serra Azul Unit Corumbá System | MS* Porto Sudeste | RJ Sistema Sudeste MMX INTRODUCTION *MMX entered into agreements with Vetria Mineração for the lease of mining rights in Corumbá.
  • 6. 6 RESOURCE BASE SRK and Coffey Mining certifications (Serra Azul, Pau de Vinho e Bom Sucesso): 3,6 billion tons of mineral resources. Reserves of 1 billion tons in Serra Azul. COMPETITIVE PRODUCTION COST STRUCTURE Low stripping ratio; Competitive scale; Energy supply contract with MPX; Infrastructure with integrated logistics. GUARANTEED LOGISTICS Porto Sudeste at 50 Mtpy, expandable to 100 Mtpy, provides gateway to seaborne markets; Long Term Railway Contract with MRS. SECURED OFF- TAKE 64% of future production already committed through long-term contracts. OPERATIONAL TRACK RECORD Main operations located in the traditional Serra Azul mining region, in Minas Gerais Iron Ore Quadrangle. HIGHLIGHTS
  • 7. 7 HIGHLIGHTS 2012 AUGUST 2014 Conclusion of the capital increase in the amount of R$ 1.4 billion; Renewal of the lease contracts for mineral rights with the CEFAR, extending the terms of validity from 2021 to 2034; Conclusion of the contracting of supplementary long term funding for the Sudeste Superport with BNDES, in the sum of R$ 935 million; New certification of mineral resources (SRK and Coffey Mining) totaling 3.6 billion tons considering Serra Azul Unit, Mina Pau de Vinho and Bom Sucesso; Sale of all shares in Minera MMX de Chile S.A. to Inversiones Cooper Mining S.A. Definitive agreements executed by the Company with Trafigura and Mubadala; The merger of MMX Porto Sudeste S.A. by MMX Approval of the business plan’s revision of the Company; Conclusion of the investment operations of Trafigura and Mubadala in Porto Sudeste do Brasil SA.; MMX entered into agreements with Vetria Mineração for the lease of mining rights in Corumbá, which envisage the assumption of certain contracts
  • 8. 8 FINANCIAL HIGHLIGHTS 237 181 110 0 100 200 300 1Q13 4Q13 1Q14 Net Revenue (R$ million) 140 96 31 0 50 100 150 1Q13 4Q13 1Q14 Gross Profit (R$ million) -131 -501 -600 -500 -400 -300 -200 -100 0 1Q13 4Q13 1Q14 Adjusted EBITDA (R$ million) Adjusted EBITDA
  • 11. 11 Mine Porto SudesteRailway Serra Azul unit is near to the MRS railway - 7 km from the mine, a distance currently traversed by trucks. MMX has a long term contract with MRS railway, which connects the mine with the CSN’s port and the Porto Sudeste, both located in Itaguaí. Porto Sudeste will have 50Mtpy iron ore shipping capacity. The Superport will have a depth of 20 meters, enough to handle Capesize vessels. Integrated logistic: Mine > Railway > Port as a factor of Value Creation WISCO Long-Term contract (20 years) to trade iron ore. SK will take-off part of the Sudeste System yearly production equivalent to its participation in MMX Capital (14%). Long-Term contract (20 years). Wisco will off-take at least 50% of MMX Sudeste production. OFFTAKERS (SHAREHOLDERS) SK NETWORKS UNIQUE INTEGRATED LOGISTICS SK and Wisco will together offtake 64% of total production
  • 12. QUADRILÁTERO FERRÍFERO Iron ore Quadrangle Minas Gerais
  • 13. RAILWAY Railway access connecting MRS to the Porto Sudeste
  • 14. Expansion project with integrated logistic and pellet feed iron ore 14 SERRA AZUL Highlights Production target: 15 Mtpy waiting of new partner; 64% of production already committed through long-term contracts; 997.4 million tons of reserves already secured by SRK. Project Status Installation License issued in April, 2012; Beginning of construction of Serra Azul Unit expansion (earth work completed in the beneficiation plant area); Expected Quality – Ouro Preto pilot plant test work Fe: 66,65% P: 0,025% AL2O3: 0,54% SiO2: 3,23% Mn: 0,018% LOI: 0,75%
  • 15. BR 38 1 Itatiaiuçu Igarapé São Joaquim de Bicas Brumadinho Sarzedo Mario Campos N Growth through consolidation while leveraging existing infrastructure SERRA AZUL 1 2 3 4 5 6 7 8 9 10 11 12 13 14 14 15 15 1 USIMINAS Western 2 3 4 5 6 7 8 9 MRI USIMINAS Central Arcelor Mittal Minerita Ferrous-Santanense USIMINAS Eastern Comisa Emicon 10 11 12 MMX USIMINAS Pau de Vinho Ferrous – Esperança 13 Minera do Brasil 14 Vale Itaminas15 15
  • 16. Serra azul unit expansion project UNIDADE SERRA AZUL 16 1 Beneficiation Plant 2 Tailings dam, about 40km away from the mine, associated with a tailings pipeline 3 Pipeline with approximately 7km extension 4 Rail terminal connected to the MRS rail network 5 Arch extensions 6 Waste deposit 7 Water supply 8 High voltage power station 9 Access 2 6 9 1 5 7 9 9 8 3 4 Itatiaiuçu Igarapé São Joaquim de Bicas Mario Campos
  • 18. Earthwork SERRA AZUL 1 Pump House, Sump and Thickeners 2 Construction Site 1 1 3 Beneficiation 2 3 4 Grinding 4 5 Substation 6 Grinding 7 Piles 8 Primary Crusher 5 6 7 8 9 Primary Crusher 10 Water Storage Tank 11 Construction Site and Warehouse 12 Water Storage Tank Inc. 9 10 11 12 13 Main Access 14 Administrative Buildings 15 Maintenance Workshop 13 14 15
  • 19. PORTO SUDESTE DO BRASIL2.2
  • 20. Overview 20 35% partnership with Trafigura and Mubadala, with significant operational track record and extensive financial capacity. Long term contract with MMX Sudeste for port handling services of 7 Mtpy with an expandable option to increase to 13 Mtpy until 2015. In case of Port expansion to up to 100 Mtpy, MMX’s shipping right can also be increased by 13% of extended Port capacity. The whole internal trading of iron ore will be made through the Porto Sudeste. MMX shall have an option to acquire an additional stake of up to 7.5% in PortCo, for a final stake of up to 42.5%. PORTO SUDESTE Porto Sudeste | Itaguaí (RJ)
  • 21. 21 Carlos Gonzalez CEO and IRO Adriana Marques Manager Phone + 55 21 2163-6197 + 55 21 2163-6338 E-mail ri@mmx.com.br MMX INVESTOR RELATIONS