Russell Street School Repair  Project Town of Littleton Special Town Meeting May 4, 2009
Overview russell street school project Presentation Sequence ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Russell Street School repairs project Repair Project Objectives SYSTEMS CODE COMPLIANCE Mechanical Electrical Plumbing Windows Accessibility (ADA) Fire Protection Asbestos Abatement
Project Team School Building Committee NAME REPRESENTING russell street school project ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Notes:  1.  PMBC:  Permanent Municipal Building Committee 2.  SBC organized and populated in accordance with applicable MGL and MSBA policy
Safety/Security Education Repair Project Priorities russell street school project
Timeline ACTION russell street school project DATE Current 5 th  graders entered RSS Sep 2006 Initial Statement of Interest (SOI) Nov 2006 Follow-up SOI Nov 2007 MSBA on-site survey Nov 2007 EQA Jan 2008 Feasibility Study approval May 2008 OPM (Dadaelus) hired Nov 2008 Architect (DRA) hired Jan 2009 Feasibility Study Jan – May 2009 Presentation to MSBA March 2009 MSBA approval March 25, 2009 Town Meeting decision May 4, 2009 Ballot Question at Town Elections May 9, 2009 Tonight Three Academic Years
russell street school project Mr. Carl Franceschi President, DRA Abatement/Repair Phasing
GO! FEB JAN MAR APR MAY feasibility study Workshop Town Meeting 1 2 Workshop Strategic Planning Document Concept design documents Strategic Planning Document Document feasibility study Collecting existing conditions Options ideas, goals  &  desires Options ideas, goals  &  desires Listening collecting information Listening collecting information Strategic Planning Document Concept design documents Strategic Planning Document Document feasibility study
Program
Existing Conditions feasibility study First Floor entry view gymnasium
Families of Options feasibility study
feasibility study Decision Progression Families of Options
feasibility study Option Family B - renovations B1.  MULTI-PHASE - INTERNAL SWING SCEHEME TEMPORARILY ELIMINATES :  FACILITY DIRECTOR +  MAINTENANCE ROOMS  MUSIC ROOM  /  BAND STAGE AREA  ART ROOM 5 B Project Cost MSBA Reimb. NET COST to  LITTLETON 13.4M 6.2M 7.2M ,[object Object],[object Object],[object Object],[object Object],[object Object]
feasibility study 5 B PHASE 1
feasibility study 5 B PHASE 1A
PHASE 2 RENOVATION SCOPE OF WORK:  - HVAC UPGRADE - ELECTRICAL UPGRADE - FIRE PROTECTION UPGRADE - TECHNOLOGY UPGRADE - NEW LIGHTING - NEW CEILINGS + FLOORS - PAINTING - HANDICAPPED ACCESS UPGRADES feasibility study 5 B
feasibility study 5 B PHASE 3 RENOVATION SCOPE OF WORK:  - HVAC UPGRADE - ELECTRICAL UPGRADE - FIRE PROTECTION UPGRADE - TECHNOLOGY UPGRADE - NEW LIGHTING - NEW CEILINGS + FLOORS - PAINTING - HANDICAPPED ACCESS UPGRADES
PHASE 4 RENOVATION SCOPE OF WORK:  - HVAC UPGRADE - ELECTRICAL UPGRADE - FIRE PROTECTION UPGRADE - TECHNOLOGY UPGRADE - NEW LIGHTING - NEW CEILINGS + FLOORS - PAINTING - HANDICAPPED ACCESS UPGRADES feasibility study 5 B PHASE  - 4
PHASE 2 RENOVATION SCOPE OF WORK:  - HVAC UPGRADE - ELECTRICAL UPGRADE - FIRE PROTECTION UPGRADE - TECHNOLOGY UPGRADE - NEW LIGHTING - NEW CEILINGS + FLOORS - PAINTING - HANDICAPPED ACCESS  UPGRADES feasibility study 5 B 5
Schedule / Work Plan
feasibility study Project Cost Estimate Ineligible Costs Asbestos Abatement ($301,509) Other (incl legal)   ($60,000) Eligible District Budget   $13,038,491 Reimbursement Rate  47.84% Approximate Total Grant Amount  $6,237,614 Total District Project Share  $7,162,386 Total District Project Budget $13,400,000
Project Cost Estimate Cost History
Project Cost Revisions Adjustment to Construction Cost Estimate   ($742,761) Adjustment for Actual vs. assumed OPM Fees  (370,000) Adjustment to Project Contingency  (59,000) Adjustment to Construction Testing Budget  (75,000) Other Adjustments  +24,079.00 Total of Adjustment  -  $1,222,682 Adjust for market conditions – recent bids Norwood, Malden Daedalus fee actual less than DRA projection for that line item Based on 8% of other adjustments Further delineation of scope suggests less Constion Testing required Original Project Budget  $15,131,820 submitted to MSBA 3/09 Revised Project Budget  $13,909,138 delta  (savings)  $  1,222,682 Reconciled with Daedalus/ prepared for TM
Key Community Questions what if? We choose to do nothing . . . 1 We choose to build new . . . 2
Key Community Questions what if? We choose to do nothing . . . 1 Littleton will expend  $21 M vs $7.2 M in maintaining the Russell Street School over the next 20-year timeframe
“ Do Nothing” Scheme Costs Construction Costs   $11,094,110 Projects Costs $  2,315,157 Premium costs for smaller bid packages  estimated at 10% $  1,340,913 INFLATION @ 3% per year $  6,574,559 $21,324,739 due to system failure / maintenance over the next 20 years including soft costs, engineering, bidding, testings, etc. NOTE:   There will be no state reimbursement share as part of this approach
“ Do Nothing/ B5 Scheme Comparison “ DO NOTHING” State Reimbursement  0 Littleton Share – “DO NOTHING” Scheme $21,324,739 Littleton Share –  Scheme B5 as proposed $7,162,386 B5 SCHEME $21,324,739 vs
Key Community Questions what if? We choose to build new . . . 2 ,[object Object],[object Object],[object Object],[object Object]
New Construction Cost Analysis $315/sf avg. $249.66 $243.04 $341.06 $451.64 $294.01 $290.00 $- $50.00 $100.00 $150.00 $200.00 $250.00 $300.00 $350.00 $400.00 $450.00 $500.00 $$ / Sq. Ft 2009 Cost Per Square Foot Construction Cost, Sq. Ft Paul Revere School Revere, MA Norwood High School Norwood, MA Wellington School Belmont, MA Burlington Burlington, MA Middleton Elementary School Middletown, MA DRA Estimated Cost for  New Construction per study
“ New / B5 Scheme Comparison NEW CONSTRUCTION State Reimbursement  0 Littleton Share – New Construction $26,000,000 Littleton Share –  Scheme B5 as proposed $7,162,386 B5 SCHEME $26,000,000 vs
Dr. Diane Bemis LPS Superintendent Key Project Issues russell street school project Educational and Safety Concerns
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Key Project Issues russell street school project Educational and Safety Concerns
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Key Project Issues russell street school project Educational and Safety Concerns  ( cont .)
Mr. Steve Venuti Treasurer, Town of Littleton Key Project Issues russell street school project Financial Recap
Financial Recap russell street school project ,[object Object],[object Object],[object Object],[object Object],[object Object],MSBA Reimbursements
Financial Recap russell street school project ,[object Object],[object Object],[object Object],[object Object],Bonding Timeline
Financial Recap russell street school project ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Tax Rate Impacts
Demonstrated need Infrastructure modernized Code/legal compliance Repair option most cost effective  Detailed plan ready to execute Safety/Security not compromised Education continuity ensured Reimbursable The RSS Repair Project is a win-win for Littleton Summary russell street school project Summary russell street school project
RSS Repair Project Is Supported by: Massachusetts School Building Authority Board of Selectmen FINCOM School Committee Permanent Municipal Building Committee School Building Committee Support russell street school project
Questions russell street school project Questions
Russell Street School Repair  Project Town of Littleton Special Town Meeting May 4, 2009

Weitere ähnliche Inhalte

Ähnlich wie RSS Renovation Town Meeting Slideshow

Gcps long range capital plan fy2019 2023
Gcps long range capital plan fy2019 2023Gcps long range capital plan fy2019 2023
Gcps long range capital plan fy2019 2023Kenneth Hogge Sr
 
Guilford High School Proposed Improvement
Guilford High School Proposed ImprovementGuilford High School Proposed Improvement
Guilford High School Proposed ImprovementTai Soo Kim Partners
 
Sustainable places, Rosemary Coyne
Sustainable places, Rosemary CoyneSustainable places, Rosemary Coyne
Sustainable places, Rosemary CoyneDesign South East
 
Steering Committee 12-4
Steering Committee 12-4Steering Committee 12-4
Steering Committee 12-4Todd Neibauer
 
An Overview of Issues in Designing and Building Green
An Overview of Issues in Designing and Building GreenAn Overview of Issues in Designing and Building Green
An Overview of Issues in Designing and Building Greenftaraps
 
Sustainable Infrastructure
Sustainable InfrastructureSustainable Infrastructure
Sustainable InfrastructurePhil Clark
 
New strategies for attacking deferred maintenance december 2012
New strategies for attacking deferred maintenance december 2012New strategies for attacking deferred maintenance december 2012
New strategies for attacking deferred maintenance december 2012Sightlines
 
Policy innovation in British Columbia
Policy innovation in British ColumbiaPolicy innovation in British Columbia
Policy innovation in British ColumbiaPembina Institute
 
How Municipalities Can Enable Net-Zero Construction
How Municipalities Can Enable Net-Zero ConstructionHow Municipalities Can Enable Net-Zero Construction
How Municipalities Can Enable Net-Zero ConstructionDerek Satnik
 
HHH_Prelim_09-10_Budget_Preso_30909
HHH_Prelim_09-10_Budget_Preso_30909HHH_Prelim_09-10_Budget_Preso_30909
HHH_Prelim_09-10_Budget_Preso_30909Corinne Carriero
 
REFBC Submission to Climate Leadership Plan Oct 9 2015
REFBC Submission to Climate Leadership Plan Oct 9 2015REFBC Submission to Climate Leadership Plan Oct 9 2015
REFBC Submission to Climate Leadership Plan Oct 9 2015Megan Simm
 
NRSSBC Town Meeting October 3, 2011
NRSSBC Town Meeting October 3, 2011NRSSBC Town Meeting October 3, 2011
NRSSBC Town Meeting October 3, 2011helenmaynard
 
Net-Zero Municipal Policy Workshop - Energy Conscious Community Planning
Net-Zero Municipal Policy Workshop - Energy Conscious Community PlanningNet-Zero Municipal Policy Workshop - Energy Conscious Community Planning
Net-Zero Municipal Policy Workshop - Energy Conscious Community PlanningDerek Satnik
 
A Coming Revolution in CEQA and Sustainable Communities Planning
A Coming Revolution in CEQA and Sustainable Communities PlanningA Coming Revolution in CEQA and Sustainable Communities Planning
A Coming Revolution in CEQA and Sustainable Communities Planningdwayne2m
 

Ähnlich wie RSS Renovation Town Meeting Slideshow (20)

May 5, 2011 society of marketing professionals services forum
May 5, 2011 society of marketing professionals services forumMay 5, 2011 society of marketing professionals services forum
May 5, 2011 society of marketing professionals services forum
 
Gcps long range capital plan fy2019 2023
Gcps long range capital plan fy2019 2023Gcps long range capital plan fy2019 2023
Gcps long range capital plan fy2019 2023
 
Guilford High School Proposed Improvement
Guilford High School Proposed ImprovementGuilford High School Proposed Improvement
Guilford High School Proposed Improvement
 
Mass Energy Summit 2010
Mass Energy Summit 2010Mass Energy Summit 2010
Mass Energy Summit 2010
 
Sustainable places, Rosemary Coyne
Sustainable places, Rosemary CoyneSustainable places, Rosemary Coyne
Sustainable places, Rosemary Coyne
 
Steering Committee 12-4
Steering Committee 12-4Steering Committee 12-4
Steering Committee 12-4
 
An Overview of Issues in Designing and Building Green
An Overview of Issues in Designing and Building GreenAn Overview of Issues in Designing and Building Green
An Overview of Issues in Designing and Building Green
 
Sustainable Infrastructure
Sustainable InfrastructureSustainable Infrastructure
Sustainable Infrastructure
 
New strategies for attacking deferred maintenance december 2012
New strategies for attacking deferred maintenance december 2012New strategies for attacking deferred maintenance december 2012
New strategies for attacking deferred maintenance december 2012
 
Policy innovation in British Columbia
Policy innovation in British ColumbiaPolicy innovation in British Columbia
Policy innovation in British Columbia
 
How Municipalities Can Enable Net-Zero Construction
How Municipalities Can Enable Net-Zero ConstructionHow Municipalities Can Enable Net-Zero Construction
How Municipalities Can Enable Net-Zero Construction
 
HHH_Prelim_09-10_Budget_Preso_30909
HHH_Prelim_09-10_Budget_Preso_30909HHH_Prelim_09-10_Budget_Preso_30909
HHH_Prelim_09-10_Budget_Preso_30909
 
REFBC Submission to Climate Leadership Plan Oct 9 2015
REFBC Submission to Climate Leadership Plan Oct 9 2015REFBC Submission to Climate Leadership Plan Oct 9 2015
REFBC Submission to Climate Leadership Plan Oct 9 2015
 
January 2010 Presentation to MMA Conference
January 2010 Presentation to MMA ConferenceJanuary 2010 Presentation to MMA Conference
January 2010 Presentation to MMA Conference
 
January 2010 MA Municipal Association Presentation
January 2010 MA Municipal Association PresentationJanuary 2010 MA Municipal Association Presentation
January 2010 MA Municipal Association Presentation
 
esos presentation 12th november 2014
esos presentation 12th november 2014esos presentation 12th november 2014
esos presentation 12th november 2014
 
Monterey Park Economic Strategic Planning Workshop 9 May 2009
Monterey Park Economic Strategic Planning Workshop 9 May 2009Monterey Park Economic Strategic Planning Workshop 9 May 2009
Monterey Park Economic Strategic Planning Workshop 9 May 2009
 
NRSSBC Town Meeting October 3, 2011
NRSSBC Town Meeting October 3, 2011NRSSBC Town Meeting October 3, 2011
NRSSBC Town Meeting October 3, 2011
 
Net-Zero Municipal Policy Workshop - Energy Conscious Community Planning
Net-Zero Municipal Policy Workshop - Energy Conscious Community PlanningNet-Zero Municipal Policy Workshop - Energy Conscious Community Planning
Net-Zero Municipal Policy Workshop - Energy Conscious Community Planning
 
A Coming Revolution in CEQA and Sustainable Communities Planning
A Coming Revolution in CEQA and Sustainable Communities PlanningA Coming Revolution in CEQA and Sustainable Communities Planning
A Coming Revolution in CEQA and Sustainable Communities Planning
 

Kürzlich hochgeladen

UiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to HeroUiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to HeroUiPathCommunity
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteDianaGray10
 
Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Hiroshi SHIBATA
 
Generative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfGenerative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfIngrid Airi González
 
A Framework for Development in the AI Age
A Framework for Development in the AI AgeA Framework for Development in the AI Age
A Framework for Development in the AI AgeCprime
 
Sample pptx for embedding into website for demo
Sample pptx for embedding into website for demoSample pptx for embedding into website for demo
Sample pptx for embedding into website for demoHarshalMandlekar2
 
What is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfWhat is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfMounikaPolabathina
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxLoriGlavin3
 
[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality AssuranceInflectra
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxLoriGlavin3
 
Emixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native developmentEmixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native developmentPim van der Noll
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxLoriGlavin3
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxLoriGlavin3
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxLoriGlavin3
 
(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...
(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...
(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...AliaaTarek5
 
Rise of the Machines: Known As Drones...
Rise of the Machines: Known As Drones...Rise of the Machines: Known As Drones...
Rise of the Machines: Known As Drones...Rick Flair
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .Alan Dix
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.Curtis Poe
 
2024 April Patch Tuesday
2024 April Patch Tuesday2024 April Patch Tuesday
2024 April Patch TuesdayIvanti
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024Lonnie McRorey
 

Kürzlich hochgeladen (20)

UiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to HeroUiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to Hero
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test Suite
 
Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024
 
Generative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfGenerative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdf
 
A Framework for Development in the AI Age
A Framework for Development in the AI AgeA Framework for Development in the AI Age
A Framework for Development in the AI Age
 
Sample pptx for embedding into website for demo
Sample pptx for embedding into website for demoSample pptx for embedding into website for demo
Sample pptx for embedding into website for demo
 
What is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfWhat is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdf
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
 
[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
 
Emixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native developmentEmixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native development
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptx
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
 
(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...
(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...
(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...
 
Rise of the Machines: Known As Drones...
Rise of the Machines: Known As Drones...Rise of the Machines: Known As Drones...
Rise of the Machines: Known As Drones...
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.
 
2024 April Patch Tuesday
2024 April Patch Tuesday2024 April Patch Tuesday
2024 April Patch Tuesday
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024
 

RSS Renovation Town Meeting Slideshow

  • 1. Russell Street School Repair Project Town of Littleton Special Town Meeting May 4, 2009
  • 2.
  • 3. Russell Street School repairs project Repair Project Objectives SYSTEMS CODE COMPLIANCE Mechanical Electrical Plumbing Windows Accessibility (ADA) Fire Protection Asbestos Abatement
  • 4.
  • 5. Safety/Security Education Repair Project Priorities russell street school project
  • 6. Timeline ACTION russell street school project DATE Current 5 th graders entered RSS Sep 2006 Initial Statement of Interest (SOI) Nov 2006 Follow-up SOI Nov 2007 MSBA on-site survey Nov 2007 EQA Jan 2008 Feasibility Study approval May 2008 OPM (Dadaelus) hired Nov 2008 Architect (DRA) hired Jan 2009 Feasibility Study Jan – May 2009 Presentation to MSBA March 2009 MSBA approval March 25, 2009 Town Meeting decision May 4, 2009 Ballot Question at Town Elections May 9, 2009 Tonight Three Academic Years
  • 7. russell street school project Mr. Carl Franceschi President, DRA Abatement/Repair Phasing
  • 8. GO! FEB JAN MAR APR MAY feasibility study Workshop Town Meeting 1 2 Workshop Strategic Planning Document Concept design documents Strategic Planning Document Document feasibility study Collecting existing conditions Options ideas, goals & desires Options ideas, goals & desires Listening collecting information Listening collecting information Strategic Planning Document Concept design documents Strategic Planning Document Document feasibility study
  • 10. Existing Conditions feasibility study First Floor entry view gymnasium
  • 11. Families of Options feasibility study
  • 12. feasibility study Decision Progression Families of Options
  • 13.
  • 14. feasibility study 5 B PHASE 1
  • 15. feasibility study 5 B PHASE 1A
  • 16. PHASE 2 RENOVATION SCOPE OF WORK: - HVAC UPGRADE - ELECTRICAL UPGRADE - FIRE PROTECTION UPGRADE - TECHNOLOGY UPGRADE - NEW LIGHTING - NEW CEILINGS + FLOORS - PAINTING - HANDICAPPED ACCESS UPGRADES feasibility study 5 B
  • 17. feasibility study 5 B PHASE 3 RENOVATION SCOPE OF WORK: - HVAC UPGRADE - ELECTRICAL UPGRADE - FIRE PROTECTION UPGRADE - TECHNOLOGY UPGRADE - NEW LIGHTING - NEW CEILINGS + FLOORS - PAINTING - HANDICAPPED ACCESS UPGRADES
  • 18. PHASE 4 RENOVATION SCOPE OF WORK: - HVAC UPGRADE - ELECTRICAL UPGRADE - FIRE PROTECTION UPGRADE - TECHNOLOGY UPGRADE - NEW LIGHTING - NEW CEILINGS + FLOORS - PAINTING - HANDICAPPED ACCESS UPGRADES feasibility study 5 B PHASE - 4
  • 19. PHASE 2 RENOVATION SCOPE OF WORK: - HVAC UPGRADE - ELECTRICAL UPGRADE - FIRE PROTECTION UPGRADE - TECHNOLOGY UPGRADE - NEW LIGHTING - NEW CEILINGS + FLOORS - PAINTING - HANDICAPPED ACCESS UPGRADES feasibility study 5 B 5
  • 21. feasibility study Project Cost Estimate Ineligible Costs Asbestos Abatement ($301,509) Other (incl legal) ($60,000) Eligible District Budget $13,038,491 Reimbursement Rate 47.84% Approximate Total Grant Amount $6,237,614 Total District Project Share $7,162,386 Total District Project Budget $13,400,000
  • 22. Project Cost Estimate Cost History
  • 23. Project Cost Revisions Adjustment to Construction Cost Estimate ($742,761) Adjustment for Actual vs. assumed OPM Fees (370,000) Adjustment to Project Contingency (59,000) Adjustment to Construction Testing Budget (75,000) Other Adjustments +24,079.00 Total of Adjustment - $1,222,682 Adjust for market conditions – recent bids Norwood, Malden Daedalus fee actual less than DRA projection for that line item Based on 8% of other adjustments Further delineation of scope suggests less Constion Testing required Original Project Budget $15,131,820 submitted to MSBA 3/09 Revised Project Budget $13,909,138 delta (savings) $ 1,222,682 Reconciled with Daedalus/ prepared for TM
  • 24. Key Community Questions what if? We choose to do nothing . . . 1 We choose to build new . . . 2
  • 25. Key Community Questions what if? We choose to do nothing . . . 1 Littleton will expend $21 M vs $7.2 M in maintaining the Russell Street School over the next 20-year timeframe
  • 26. “ Do Nothing” Scheme Costs Construction Costs $11,094,110 Projects Costs $ 2,315,157 Premium costs for smaller bid packages estimated at 10% $ 1,340,913 INFLATION @ 3% per year $ 6,574,559 $21,324,739 due to system failure / maintenance over the next 20 years including soft costs, engineering, bidding, testings, etc. NOTE: There will be no state reimbursement share as part of this approach
  • 27. “ Do Nothing/ B5 Scheme Comparison “ DO NOTHING” State Reimbursement 0 Littleton Share – “DO NOTHING” Scheme $21,324,739 Littleton Share – Scheme B5 as proposed $7,162,386 B5 SCHEME $21,324,739 vs
  • 28.
  • 29. New Construction Cost Analysis $315/sf avg. $249.66 $243.04 $341.06 $451.64 $294.01 $290.00 $- $50.00 $100.00 $150.00 $200.00 $250.00 $300.00 $350.00 $400.00 $450.00 $500.00 $$ / Sq. Ft 2009 Cost Per Square Foot Construction Cost, Sq. Ft Paul Revere School Revere, MA Norwood High School Norwood, MA Wellington School Belmont, MA Burlington Burlington, MA Middleton Elementary School Middletown, MA DRA Estimated Cost for New Construction per study
  • 30. “ New / B5 Scheme Comparison NEW CONSTRUCTION State Reimbursement 0 Littleton Share – New Construction $26,000,000 Littleton Share – Scheme B5 as proposed $7,162,386 B5 SCHEME $26,000,000 vs
  • 31. Dr. Diane Bemis LPS Superintendent Key Project Issues russell street school project Educational and Safety Concerns
  • 32.
  • 33.
  • 34. Mr. Steve Venuti Treasurer, Town of Littleton Key Project Issues russell street school project Financial Recap
  • 35.
  • 36.
  • 37.
  • 38. Demonstrated need Infrastructure modernized Code/legal compliance Repair option most cost effective Detailed plan ready to execute Safety/Security not compromised Education continuity ensured Reimbursable The RSS Repair Project is a win-win for Littleton Summary russell street school project Summary russell street school project
  • 39. RSS Repair Project Is Supported by: Massachusetts School Building Authority Board of Selectmen FINCOM School Committee Permanent Municipal Building Committee School Building Committee Support russell street school project
  • 40. Questions russell street school project Questions
  • 41. Russell Street School Repair Project Town of Littleton Special Town Meeting May 4, 2009

Hinweis der Redaktion

  1. <number><number>
  2. <number>
  3. <number>
  4. 5
  5. 6
  6. 78
  7. 8
  8. 8
  9. 8
  10. 8
  11. 8
  12. 8
  13. 8
  14. 8
  15. 8
  16. 18
  17. 18
  18. 18181818182525
  19. 25
  20. 2829
  21. 29
  22. 3132
  23. 33
  24. 3434
  25. 34
  26. 34
  27. 38
  28. 39
  29. <number><number>