1. Deltares & Van Oord
offer to assist
US dredgers
protecting their delta
Mark van Koningsveld (mrv@vanoord.com)
Mindert de Vries (mindert.devries@deltares.nl)
2. Outline
• Briefly about Van Oord
• The Deltares-Van Oord plan
• Basics of dredge production levels
• Van Oord’s relevant experience in large projects
• What do Deltares and Van Oord have to offer?
3. Van Oord Dredging and Marine Contractors bv
• Van Oord DMC is an independent, privately owned (family)
business with a committed shareholder base
• Company history dates back to 1868
• Owns and operates one of the world largest dredging fleets of
more than 400 units
• Active all over the world (on average 200 projects in 50 countries
each year, 26 regional offices around the world, approximately
4000 employees)
• Average turnover in the last four years over 1.6 billion Euro
• Strong focus on innovation, engineering and D&C projects
• One of the initiators of the Building with Nature research project
5. The Deltares-Van Oord plan (2)
• This plan does not
– help within a matter of days
– presume to prevent all damage from oil pollution
• This plan does
– help when the oil spill has to be combatted for
months
– lower clean-up cost (beaches vs marshes)
– provide longer term benefits
Modify the battlefield to make it easier to defend
6. Basics of dredge production levels (1)
Sailing
Borrow area
Coast
Excavation Disposal
Sailing
Larger vessels reduce number of cycles needed!
More and larger vessels reduce construction time and cost!
7. Basics of dredge production levels (2)
Dredging with suction pipe Disposal option 1: Pump ashore
Disposal option 2: Dumping Disposal option 3: Rainbowing
8. Basics of dredge production levels (3)
• Tailor made execution strategy needs to be developed
in close collaboration with US Government and US
dredgers
• We expect in the order of 50 million m3 is needed
• Jumbo (17,000 - 30,000 m3) and Mega (> 30,000 m3)
hoppers needed to get acceptable construction times
and cost!
• NB: World wide large reclamation made feasible only
because of large size hoppers
12. Van Oord experience in large projects
Rotterdam harbour: Maasvlakte 2 (joint venture)
• Record: 3.7 million m3/week – 11 vessels
13. Dubai - over 1 billion m3 of sand moved
The World Palm Deira
Palm Jebel Ali
Waterfront
Palm Jumeirah
Maritime City
Logo Islands
Corniche
Port Mina Seyahi
Arabian Canal
14. Van Oord experience in large projects
Dubai: The World
• Record: 4.5 million m3/week – 17 vessels
15. Sand carrier concept developed by Van Oord!
• 6 x 10.000 m3 sand carriers - continuous process
17. Deltares – Van Oord proposal
• Van Oord offers its unique capabilities to help US
Dredgers make the US Delta plan a success
– Van Oord part of alliance with US dredgers to bring Delta plan
construction time within relevant limits
– Van Oord engineering department and Deltares to collaborate with
USACE and others to draw up a feasible and optimized execution plan
• Deltares offers its state of the art knowledge on the
Mississippi delta
– Real-time modelling capability to optimize the design and focus the
dredging efforts according to ongoing developments
– Eco-engineering knowledge to optimize the overall plan given the
characteristics of the natural system
• We are ready to cooperate with you to take the next
steps