SlideShare ist ein Scribd-Unternehmen logo
1 von 44
“How Lean Thinking Helps Hospitals”
Mark Graban
Senior Fellow, Lean Enterprise Institute
Author, “Lean Hospitals: Improving Quality, Patient Safety, and Employee Satisfaction”
?
?
St. Elisabeth Hospital: The Netherlands
Dr. Jacob Caron, Orthopedic Surgeon
Chairman of the medical staff
Henry Ford - 1922
“In the ordinary hospital the nurses must make useless
steps. More of their time is spent in walking than in
caring for the patient.”
4
Fast Forward to 2005-2008
What % of time do “med/surg” unit RNs spend
directly with patients?
A: 21%
B: 33%
C: 50%
D: 65%
New Zealand: 33%
VMMC: 32%
UK: 34%
Illinois: 31%
Cinci Children’s 29%
It is possible to double this time with patients
More time to do the “right things”
5
6
• Deliveries of supplies delayed because of improper ordering
• Articles returned by other departmentsbecause they were not
made correctly
• Employees have difficultyin handlingnew-type equipment
• Limitedstorage space (linen and supplies) not properly used
• Safety equipmentnot being used
• Correct procedures not followed
• Employees leave to go to other hospitals
77
*Warning: requires
effort and leadership
(not a silver bullet)
The Iceberg of Lean
8
Culture
Management System
Philosophy
5S
Kaizen
StdWork Heijunka
VSMs A3
8
Pitfall – Focus on Implementing
Tools
"We were offering suggestions and getting pushback on safe staffing,
yet being told to reduce the number of pens and pencils.”
– RN (Minnesota)
Continuous
Improvement
Respect For
People
“Equally Important Pillars”
Eliminate
Waste
10
Identify Causes of Walking
(Primary Care)
• MDs, PA, RNS:
– Poor organization
– Supplies in inconvenient
locations
– Missing information
• The system causes this
670 ft for single procedure prep
(pre-Lean walking pattern)
Exam
Procedure
Lab
Reducing Podiatrist Walking
• Created standardized cart
• Along with standardized rooms,
eliminated the need to leave the room
during patient encounters
Restocking Checklist
Quality and Cost
• “Lean is a quality initiative, it isn’t a cost-cutting
initiative. But the end result is, if you improve your
quality, costs will go down.”
– Bill Douglas, CFO of Riverside Medical Center (IL)
• Allegheny Medical Center:
– Reduced central line infections by 95%
– Hospital lost $26,839 per case (~16 cases/yr) = ~$500k/year
• Beth Israel Deaconess Medical Center:
– Avoided 300 V.A.P. cases in one year
– $12M cost savings
• 90% reduction in CR-BSI in MICU and Oncology
• Saved $1.7M
• Saved 17 days L.O.S. per case 14
Source: Dr. Richard Shannon
ThedaCare Coronary Bypass
Improvement
12
1
Case Example: MRI Suite
Reducing MRI Waiting Time
0
2
4
6
8
10
12
14
Weekswaitingforappt
Outpatient Radiology Backlog
Source: Children’s Medical Center, Dallas TX
Typical Department Silos
Oncology Clinic A
Oncology Clinic B
Oncology Clinic C
Chemotherapy
Treatment
Radiation
Treatment
Patients Scheduled 5/2/06
0
2
4
6
8
10
12
14
16
18
7:00
8:00
9:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
Start running
out of chairs
Idle Time
Oncologist Schedule
Look Across the Value Stream -
Oncology
ThedaCare Code STEMI
• Starting Point 2002
– “Did not have a clear,
standardized response to
heart attacks.”
• Studied each process step
in detail
• Posted standardized work
in each room
ThedaCare “Door to Balloon” Time
91
65
52
37
0
10
20
30
40
50
60
70
80
90
100
2005 2006 2007 2008
Minutes
21
Need to Stop Blaming People
"[The CEO] said the
technician responsible for
the mix up also no longer
works there."
A Different Hospital Lab…
“It’s OK,
my people
are very
careful!”
3 Different Patients - Batched
Toyota’s Chairman
Mr. Cho
• Go See
– “Senior Management must
spend time on the front lines.”
• Ask Why
– “Use the “Why?” technique daily.”
• Show Respect
– “Respect your people.”
24
Three Keys to Lean Leadership
“Gemba”
“Toyota managers
should be sufficiently
engaged on the
factory floor that they
have to wash their
hands at least
three times a day.”
Taiichi Ohno
25
“…Kaplan tours the
hospital daily looking
for problems and
solutions. Everyone is
encouraged to look for
changes to make work
more efficient.”
- Virginia Mason CEO Gary Kaplan
26
“Gemba is for Everyone”
Patients
(Gemba)
Walkway over
tracks
Executive
Offices
Parking
Garage
27
“Convis became the first
North American to head a
Toyota manufacturing plant
when he was put in charge
of the Georgetown facility.
He responded to the
promotion by moving his
office from the admin
building adjacent to the
Georgetown plant to the
center of the factory floor.”
28
Six
Sigma
Adapted from: “The Toyota” Way Fieldbook, Liker and Meier
Very few
Large problems
Few
Medium problems
Many
Small problems
Mgmt
Kaizen
Kaizen
Event
Daily Kaizen
Different Types of Kaizen
Chemistry: Before
Chemistry: After
CA
Core Manual
Lab Layout: Before & After
Metric Before After
Potassium IP TAT 74 min (June ’06 avg)
43 min (May 07 avg)
42% reduction
Labor Productivity 0.14 WHPUOS
0.12 WHPUOS
14% reduction
% of Results on
Chart < 7 AM
62% 92%
Square Footage
228 sq ft freed up
(behind manual area, to side of
special chemistry)
Initial Improvement
Lab Improvement (3 years)
32
30
35
40
45
50
55
60
Oct-06
Nov-06
Dec-06
Jan-07
Feb-07
Mar-07
Apr-07
May-07
Jun-07
Jul-07
Aug-07
Sep-07
Oct-07
Nov-07
Dec-07
Jan-08
Feb-08
Mar-08
Apr-08
May-08
Jun-08
Jul-08
Aug-08
Sep-08
Oct-08
Nov-08
Dec-08
Jan-09
Feb-09
Mar-09
Apr-09
May-09
Jun-09
Jul-09
Aug-09
Sep-09
Oct-09
Nov-09
Dec-09
Jan-10
Feb-10
Mar-10
Apr-10
May-10
Jun-10
Troponin TAT (in minutes)
Lab Improvement (3 years)
33
75%
80%
85%
90%
95%
100%
Oct-06
Nov-06
Dec-06
Jan-07
Feb-07
Mar-07
Apr-07
May-07
Jun-07
Jul-07
Aug-07
Sep-07
Oct-07
Nov-07
Dec-07
Jan-08
Feb-08
Mar-08
Apr-08
May-08
Jun-08
Jul-08
Aug-08
Sep-08
Oct-08
Nov-08
Dec-08
Jan-09
Feb-09
Mar-09
Apr-09
May-09
Jun-09
Jul-09
Aug-09
Sep-09
Oct-09
Nov-09
Dec-09
Jan-10
Feb-10
Mar-10
Apr-10
May-10
Jun-10
% tests by 7 AM
Lab Improvement (3 years)
34
0.100
0.110
0.120
0.130
0.140
Oct-06
Nov-06
Dec-06
Jan-07
Feb-07
Mar-07
Apr-07
May-07
Jun-07
Jul-07
Aug-07
Sep-07
Oct-07
Nov-07
Dec-07
Jan-08
Feb-08
Mar-08
Apr-08
May-08
Jun-08
Jul-08
Aug-08
Sep-08
Oct-08
Nov-08
Dec-08
Jan-09
Feb-09
Mar-09
Apr-09
May-09
Jun-09
Jul-09
Aug-09
Sep-09
Oct-09
Nov-09
Dec-09
Jan-10
Feb-10
Mar-10
Apr-10
May-10
Jun-10
Labor Productivity
(Worked Hours per Unit of Service)
The Problem with Ignoring
“Respect for Humanity”
Found posted in a hospital lab
(during Lean assessment)
Engaging Employees
From Locked Box To Visual Idea System
One Idea Card Format
FRONT BACK
Documenting & Celebrating
Improvements
• What was the problem?
• What was changed,
improved, or
implemented?
• What were the benefits?
• Who was involved?
Kaizen Wall
of Fame
What was the Problem?
For disposal of pipette tips, the only containers we had were “sharps” containers. This
Adds extra disposal cost, as the tips are not sharp. The container hole was also
Hard to get tips into.
What was changed, improved, implemented?
Create biohazard bag holders out of urine jugs, cut the tops off.
Photo/Diagram:
What were the benefits? Safety? Quality? Time? Waste? Cost?
Reduces cost since we aren’t doing unneeded sharps disposal and we aren’t throwing
the containers away each time. No safety risk.
Easier to get tips into container (less motion and less arm strain, since the
Container is lower and easier to get into). Tips can be dumped into a larger
Biohazard bin or we can replace the bag.
Who was Involved?
Gretchen, Beth, Janie, Franke
Date:
5/31/07
Area:
STL
Old Style
Container
New
Container
Kaizen Wall of Fame – Core Lab
Value of Kaizen in a Hospital?
• $4,000 per employee (Toyota)
– Just the quantifiable benefit
• What about benefits from:
– Better Quality
– Morale
– Patient Satisfaction
– Less Waiting Time
= $$ ?
Employee Quote
“This is the best thing
we’ve done in my 20
years. We’re finally
fixing things.”
Data From Children’s Medical
Center Dallas
Before Lean 12 Months
After Starting
3. I have the opportunity to do what I do
best every day.
3.11 3.92
8. I feel free to make suggestions for
improvement.
2.84 3.48
10. I feel secure in my job. 2.32 3.42
13. Stress at work is manageable. 2.43 3.23
17. I am satisfied with the lab as a place to
work.
2.51 3.43
18. I would recommend my work area as a
good place to work to others.
2.38 3.46
Grand Average 2.96 3.69
Lean Benefits All Stakeholders
Patients
Caregivers
• Employees
• Medical Staff
• Administrators
Hospital
• Safety & Quality
• Caring Encounters
• Less Waiting and Delay
• Mission
• Stewardship
• Stability / Growth
• Pride in work
• Less frustration
• Job security
• Career growth Philosophy
People
43
Q&A
• Email: mgraban@lean.org
• Lean Enterprise Institute: www.lean.org
• Healthcare Value Leaders: www.hcvln.org
• Blog:
– www.leanblog.org
• Twitter:
– www.twitter.com/LeanBlog
– www.twitter.com/HCVLN
44

Weitere ähnliche Inhalte

Was ist angesagt?

tpm information board.pptx
tpm information board.pptxtpm information board.pptx
tpm information board.pptxVinhCao22
 
Kaizen -CONTINUOUS IMPROVEMENT CYCLE
Kaizen -CONTINUOUS IMPROVEMENT CYCLEKaizen -CONTINUOUS IMPROVEMENT CYCLE
Kaizen -CONTINUOUS IMPROVEMENT CYCLEPalash Halder
 
Autonomous maintenance Jishu Hozen
Autonomous maintenance Jishu HozenAutonomous maintenance Jishu Hozen
Autonomous maintenance Jishu HozenChetanMehta39
 
Jidoka - An Improvement Tool of Lean
Jidoka - An Improvement Tool of LeanJidoka - An Improvement Tool of Lean
Jidoka - An Improvement Tool of Lean5S BALAMURUGAN
 
Total productive maintenance(TPM)
Total productive maintenance(TPM)Total productive maintenance(TPM)
Total productive maintenance(TPM)Md.Muzahid Khan
 
QRQC - Quick Response Quality Control
QRQC - Quick Response Quality ControlQRQC - Quick Response Quality Control
QRQC - Quick Response Quality ControlAyda Riyani
 
Planned Maintenance.
Planned Maintenance.Planned Maintenance.
Planned Maintenance.Hal Frohreich
 
How to implement lean - Executive overview
How to implement lean - Executive overviewHow to implement lean - Executive overview
How to implement lean - Executive overviewW3 Group Canada Inc.
 
Overall Equipment Effectiveness
Overall Equipment EffectivenessOverall Equipment Effectiveness
Overall Equipment EffectivenessAnand Subramaniam
 
Lead time takt time cycle time and throughput
Lead time takt time cycle time and throughputLead time takt time cycle time and throughput
Lead time takt time cycle time and throughputHpm India
 

Was ist angesagt? (20)

tpm information board.pptx
tpm information board.pptxtpm information board.pptx
tpm information board.pptx
 
Kaizen -CONTINUOUS IMPROVEMENT CYCLE
Kaizen -CONTINUOUS IMPROVEMENT CYCLEKaizen -CONTINUOUS IMPROVEMENT CYCLE
Kaizen -CONTINUOUS IMPROVEMENT CYCLE
 
Autonomous maintenance Jishu Hozen
Autonomous maintenance Jishu HozenAutonomous maintenance Jishu Hozen
Autonomous maintenance Jishu Hozen
 
TPM: Quality Maintenance (Hinshitsu Hozen) Poster
TPM: Quality Maintenance (Hinshitsu Hozen) PosterTPM: Quality Maintenance (Hinshitsu Hozen) Poster
TPM: Quality Maintenance (Hinshitsu Hozen) Poster
 
Jidoka - An Improvement Tool of Lean
Jidoka - An Improvement Tool of LeanJidoka - An Improvement Tool of Lean
Jidoka - An Improvement Tool of Lean
 
Total productive maintenance(TPM)
Total productive maintenance(TPM)Total productive maintenance(TPM)
Total productive maintenance(TPM)
 
PDCA: Plan-Do-Check-Act
PDCA: Plan-Do-Check-ActPDCA: Plan-Do-Check-Act
PDCA: Plan-Do-Check-Act
 
TPM: Focused Improvement (Kobetsu Kaizen) Poster
TPM: Focused Improvement (Kobetsu Kaizen) PosterTPM: Focused Improvement (Kobetsu Kaizen) Poster
TPM: Focused Improvement (Kobetsu Kaizen) Poster
 
Overall Equipment Effectiveness
Overall Equipment EffectivenessOverall Equipment Effectiveness
Overall Equipment Effectiveness
 
The 12 Steps of TPM Implementation Poster
The 12 Steps of TPM Implementation PosterThe 12 Steps of TPM Implementation Poster
The 12 Steps of TPM Implementation Poster
 
Standard Work
Standard WorkStandard Work
Standard Work
 
QRQC - Quick Response Quality Control
QRQC - Quick Response Quality ControlQRQC - Quick Response Quality Control
QRQC - Quick Response Quality Control
 
[Partial Preview:] Overall Equipment Effectiveness (OEE)
[Partial Preview:] Overall Equipment Effectiveness (OEE)[Partial Preview:] Overall Equipment Effectiveness (OEE)
[Partial Preview:] Overall Equipment Effectiveness (OEE)
 
SMED Kaizen Event
SMED Kaizen EventSMED Kaizen Event
SMED Kaizen Event
 
Training Within Industry Program: TWI Frameworks
Training Within Industry Program: TWI FrameworksTraining Within Industry Program: TWI Frameworks
Training Within Industry Program: TWI Frameworks
 
Planned Maintenance.
Planned Maintenance.Planned Maintenance.
Planned Maintenance.
 
Twelve steps of qc
Twelve steps of qcTwelve steps of qc
Twelve steps of qc
 
How to implement lean - Executive overview
How to implement lean - Executive overviewHow to implement lean - Executive overview
How to implement lean - Executive overview
 
Overall Equipment Effectiveness
Overall Equipment EffectivenessOverall Equipment Effectiveness
Overall Equipment Effectiveness
 
Lead time takt time cycle time and throughput
Lead time takt time cycle time and throughputLead time takt time cycle time and throughput
Lead time takt time cycle time and throughput
 

Andere mochten auch

Mark Graban Webinar - ASQ LED, Suggestion Boxes & Kaizen
Mark Graban Webinar - ASQ LED, Suggestion Boxes & KaizenMark Graban Webinar - ASQ LED, Suggestion Boxes & Kaizen
Mark Graban Webinar - ASQ LED, Suggestion Boxes & KaizenMark Graban
 
Lean Learning: Iowa Lean Consortium Presentation
Lean Learning: Iowa Lean Consortium PresentationLean Learning: Iowa Lean Consortium Presentation
Lean Learning: Iowa Lean Consortium PresentationChet Marchwinski
 
Go and See: why go to the gemba and what to do when you are there
Go and See: why go to the gemba and what to do when you are thereGo and See: why go to the gemba and what to do when you are there
Go and See: why go to the gemba and what to do when you are thereChet Marchwinski
 
Introduction to Lean leadership Masterclass by David Brunt
Introduction to Lean leadership Masterclass by David BruntIntroduction to Lean leadership Masterclass by David Brunt
Introduction to Lean leadership Masterclass by David BruntLean Enterprise Academy
 
8D Problem Solving - Automotive Industry
8D Problem Solving - Automotive Industry8D Problem Solving - Automotive Industry
8D Problem Solving - Automotive IndustryGestion Projet Auto
 
Power transmission(ppt)
Power transmission(ppt)Power transmission(ppt)
Power transmission(ppt)zeeshan715
 
Concept of energy transmission & distribution
Concept of energy transmission & distribution Concept of energy transmission & distribution
Concept of energy transmission & distribution ZunAib Ali
 

Andere mochten auch (11)

LEI_Overview
LEI_OverviewLEI_Overview
LEI_Overview
 
Lean Thinking Past and Future
Lean Thinking Past and FutureLean Thinking Past and Future
Lean Thinking Past and Future
 
Mark Graban Webinar - ASQ LED, Suggestion Boxes & Kaizen
Mark Graban Webinar - ASQ LED, Suggestion Boxes & KaizenMark Graban Webinar - ASQ LED, Suggestion Boxes & Kaizen
Mark Graban Webinar - ASQ LED, Suggestion Boxes & Kaizen
 
Lean Learning: Iowa Lean Consortium Presentation
Lean Learning: Iowa Lean Consortium PresentationLean Learning: Iowa Lean Consortium Presentation
Lean Learning: Iowa Lean Consortium Presentation
 
Go and See: why go to the gemba and what to do when you are there
Go and See: why go to the gemba and what to do when you are thereGo and See: why go to the gemba and what to do when you are there
Go and See: why go to the gemba and what to do when you are there
 
Lean Transformation Model
Lean Transformation ModelLean Transformation Model
Lean Transformation Model
 
Introduction to Lean leadership Masterclass by David Brunt
Introduction to Lean leadership Masterclass by David BruntIntroduction to Lean leadership Masterclass by David Brunt
Introduction to Lean leadership Masterclass by David Brunt
 
8D Problem Solving - Automotive Industry
8D Problem Solving - Automotive Industry8D Problem Solving - Automotive Industry
8D Problem Solving - Automotive Industry
 
Power transmission(ppt)
Power transmission(ppt)Power transmission(ppt)
Power transmission(ppt)
 
Concept of energy transmission & distribution
Concept of energy transmission & distribution Concept of energy transmission & distribution
Concept of energy transmission & distribution
 
Mineral & energy resources
Mineral & energy resourcesMineral & energy resources
Mineral & energy resources
 

Ähnlich wie Erie st. clair graban sept 27 2010

Mark Graban "How Lean Thinking Helps Hospitals"
Mark Graban "How Lean Thinking Helps Hospitals"Mark Graban "How Lean Thinking Helps Hospitals"
Mark Graban "How Lean Thinking Helps Hospitals"Mark Graban
 
Mark Graban Mass. Lean Healthcare Group
Mark Graban Mass. Lean Healthcare GroupMark Graban Mass. Lean Healthcare Group
Mark Graban Mass. Lean Healthcare GroupMark Graban
 
Lean Healthcare & Lean Design
Lean Healthcare & Lean DesignLean Healthcare & Lean Design
Lean Healthcare & Lean DesignMark Graban
 
Introduction to Lean Management Dr Richard Guerrero_Wessex AHSN
Introduction to Lean Management Dr Richard Guerrero_Wessex AHSNIntroduction to Lean Management Dr Richard Guerrero_Wessex AHSN
Introduction to Lean Management Dr Richard Guerrero_Wessex AHSNHealth Innovation Wessex
 
Lean thinking in EMERGENCY Department
Lean thinking in EMERGENCY DepartmentLean thinking in EMERGENCY Department
Lean thinking in EMERGENCY DepartmentTARAKNATH TARAPHDAR
 
How To Drive Clinical Improvement Programs That Get Results - HAS Session 20
How To Drive Clinical Improvement Programs That Get Results - HAS  Session 20How To Drive Clinical Improvement Programs That Get Results - HAS  Session 20
How To Drive Clinical Improvement Programs That Get Results - HAS Session 20Health Catalyst
 
Hardwiring Hospital-Wide Flow To Drive Competitive Performance
Hardwiring Hospital-Wide Flow To Drive Competitive PerformanceHardwiring Hospital-Wide Flow To Drive Competitive Performance
Hardwiring Hospital-Wide Flow To Drive Competitive PerformanceEmCare
 
A Vision for Lean Healthcare
A Vision forLean HealthcareA Vision forLean Healthcare
A Vision for Lean HealthcareMark Graban
 
Your aging patient bed tower top ten considerations when renovating
Your aging patient bed tower   top ten considerations when renovatingYour aging patient bed tower   top ten considerations when renovating
Your aging patient bed tower top ten considerations when renovatingArray Architects
 
Healthcare Kaizen Webinar Mark Graban Gemba Academy Dec 2011
Healthcare Kaizen Webinar Mark Graban Gemba Academy Dec 2011Healthcare Kaizen Webinar Mark Graban Gemba Academy Dec 2011
Healthcare Kaizen Webinar Mark Graban Gemba Academy Dec 2011Mark Graban
 
Cs Emergency Dept Prescribes Lean
Cs Emergency Dept Prescribes LeanCs Emergency Dept Prescribes Lean
Cs Emergency Dept Prescribes Leanciaranmay
 
Delivering Results in Healthcare by Marc Baker, Ian Taylor and Dr Paul Jarvis
Delivering Results in Healthcare by Marc Baker, Ian Taylor and Dr Paul JarvisDelivering Results in Healthcare by Marc Baker, Ian Taylor and Dr Paul Jarvis
Delivering Results in Healthcare by Marc Baker, Ian Taylor and Dr Paul JarvisLean Enterprise Academy
 
How to improve patient flow in emergency and ambulatory care, pop up uni, 10a...
How to improve patient flow in emergency and ambulatory care, pop up uni, 10a...How to improve patient flow in emergency and ambulatory care, pop up uni, 10a...
How to improve patient flow in emergency and ambulatory care, pop up uni, 10a...NHS England
 
Implementing oesphageal Doppler in Enhanced Recovery
Implementing oesphageal Doppler in Enhanced RecoveryImplementing oesphageal Doppler in Enhanced Recovery
Implementing oesphageal Doppler in Enhanced RecoveryUniversity of Manchester
 
Lean, Six Sigma and Emotional Intelligence
Lean, Six Sigma and Emotional IntelligenceLean, Six Sigma and Emotional Intelligence
Lean, Six Sigma and Emotional IntelligenceIan R. Lazarus
 
Ideation in Medical Device Development: Finding Clinical Needs
Ideation in Medical Device Development: Finding Clinical NeedsIdeation in Medical Device Development: Finding Clinical Needs
Ideation in Medical Device Development: Finding Clinical NeedsCIMIT
 

Ähnlich wie Erie st. clair graban sept 27 2010 (20)

Mark Graban "How Lean Thinking Helps Hospitals"
Mark Graban "How Lean Thinking Helps Hospitals"Mark Graban "How Lean Thinking Helps Hospitals"
Mark Graban "How Lean Thinking Helps Hospitals"
 
Mark Graban Mass. Lean Healthcare Group
Mark Graban Mass. Lean Healthcare GroupMark Graban Mass. Lean Healthcare Group
Mark Graban Mass. Lean Healthcare Group
 
Lean Healthcare & Lean Design
Lean Healthcare & Lean DesignLean Healthcare & Lean Design
Lean Healthcare & Lean Design
 
Introduction to Lean Management Dr Richard Guerrero_Wessex AHSN
Introduction to Lean Management Dr Richard Guerrero_Wessex AHSNIntroduction to Lean Management Dr Richard Guerrero_Wessex AHSN
Introduction to Lean Management Dr Richard Guerrero_Wessex AHSN
 
Lean Thinking for the NHS
Lean Thinking for the NHSLean Thinking for the NHS
Lean Thinking for the NHS
 
Lean Veterinary Practice
Lean Veterinary PracticeLean Veterinary Practice
Lean Veterinary Practice
 
Lean thinking in EMERGENCY Department
Lean thinking in EMERGENCY DepartmentLean thinking in EMERGENCY Department
Lean thinking in EMERGENCY Department
 
How To Drive Clinical Improvement Programs That Get Results - HAS Session 20
How To Drive Clinical Improvement Programs That Get Results - HAS  Session 20How To Drive Clinical Improvement Programs That Get Results - HAS  Session 20
How To Drive Clinical Improvement Programs That Get Results - HAS Session 20
 
Hardwiring Hospital-Wide Flow To Drive Competitive Performance
Hardwiring Hospital-Wide Flow To Drive Competitive PerformanceHardwiring Hospital-Wide Flow To Drive Competitive Performance
Hardwiring Hospital-Wide Flow To Drive Competitive Performance
 
Eliminating Harm
Eliminating Harm Eliminating Harm
Eliminating Harm
 
A Vision for Lean Healthcare
A Vision forLean HealthcareA Vision forLean Healthcare
A Vision for Lean Healthcare
 
Medicines Breakthrough Collaborative 1
Medicines Breakthrough Collaborative 1Medicines Breakthrough Collaborative 1
Medicines Breakthrough Collaborative 1
 
Your aging patient bed tower top ten considerations when renovating
Your aging patient bed tower   top ten considerations when renovatingYour aging patient bed tower   top ten considerations when renovating
Your aging patient bed tower top ten considerations when renovating
 
Healthcare Kaizen Webinar Mark Graban Gemba Academy Dec 2011
Healthcare Kaizen Webinar Mark Graban Gemba Academy Dec 2011Healthcare Kaizen Webinar Mark Graban Gemba Academy Dec 2011
Healthcare Kaizen Webinar Mark Graban Gemba Academy Dec 2011
 
Cs Emergency Dept Prescribes Lean
Cs Emergency Dept Prescribes LeanCs Emergency Dept Prescribes Lean
Cs Emergency Dept Prescribes Lean
 
Delivering Results in Healthcare by Marc Baker, Ian Taylor and Dr Paul Jarvis
Delivering Results in Healthcare by Marc Baker, Ian Taylor and Dr Paul JarvisDelivering Results in Healthcare by Marc Baker, Ian Taylor and Dr Paul Jarvis
Delivering Results in Healthcare by Marc Baker, Ian Taylor and Dr Paul Jarvis
 
How to improve patient flow in emergency and ambulatory care, pop up uni, 10a...
How to improve patient flow in emergency and ambulatory care, pop up uni, 10a...How to improve patient flow in emergency and ambulatory care, pop up uni, 10a...
How to improve patient flow in emergency and ambulatory care, pop up uni, 10a...
 
Implementing oesphageal Doppler in Enhanced Recovery
Implementing oesphageal Doppler in Enhanced RecoveryImplementing oesphageal Doppler in Enhanced Recovery
Implementing oesphageal Doppler in Enhanced Recovery
 
Lean, Six Sigma and Emotional Intelligence
Lean, Six Sigma and Emotional IntelligenceLean, Six Sigma and Emotional Intelligence
Lean, Six Sigma and Emotional Intelligence
 
Ideation in Medical Device Development: Finding Clinical Needs
Ideation in Medical Device Development: Finding Clinical NeedsIdeation in Medical Device Development: Finding Clinical Needs
Ideation in Medical Device Development: Finding Clinical Needs
 

Mehr von Mark Graban

Our Favorite Mistakes: Creating a Culture of Learning from Mistakes
  Our Favorite Mistakes: Creating a Culture of Learning from Mistakes  Our Favorite Mistakes: Creating a Culture of Learning from Mistakes
Our Favorite Mistakes: Creating a Culture of Learning from MistakesMark Graban
 
From Cop to Counselor 2020
From Cop to Counselor 2020From Cop to Counselor 2020
From Cop to Counselor 2020Mark Graban
 
Improve Your Lean Management System With a Simple Chart
Improve Your Lean Management System With a Simple ChartImprove Your Lean Management System With a Simple Chart
Improve Your Lean Management System With a Simple ChartMark Graban
 
Today’s Effective Leader: Shifting From Cop to Coach and Counselor
Today’s Effective Leader: Shifting From Cop to Coach and CounselorToday’s Effective Leader: Shifting From Cop to Coach and Counselor
Today’s Effective Leader: Shifting From Cop to Coach and CounselorMark Graban
 
The Steps You Need to Take to Get Your Business Ready to Reopen (Proactive Ma...
The Steps You Need to Take to Get Your Business Ready to Reopen (Proactive Ma...The Steps You Need to Take to Get Your Business Ready to Reopen (Proactive Ma...
The Steps You Need to Take to Get Your Business Ready to Reopen (Proactive Ma...Mark Graban
 
Getting from Data to Analysis and Insight in the Covid-19 Pandemic (Final)
Getting from Data to Analysis and Insight in the Covid-19 Pandemic (Final)Getting from Data to Analysis and Insight in the Covid-19 Pandemic (Final)
Getting from Data to Analysis and Insight in the Covid-19 Pandemic (Final)Mark Graban
 
Busting Myths About Just in Time: The Implications for Healthcare Supply Chains
Busting Myths About Just in Time: The Implications for Healthcare Supply ChainsBusting Myths About Just in Time: The Implications for Healthcare Supply Chains
Busting Myths About Just in Time: The Implications for Healthcare Supply ChainsMark Graban
 
Mark Graban Garden Center Conference Talk
Mark Graban Garden Center Conference TalkMark Graban Garden Center Conference Talk
Mark Graban Garden Center Conference TalkMark Graban
 
How Authors Can Stress Less Over Their Metrics
How Authors Can Stress Less Over Their MetricsHow Authors Can Stress Less Over Their Metrics
How Authors Can Stress Less Over Their MetricsMark Graban
 
Improve Your Lean Management System With a Simple Chart
Improve Your Lean Management System With a Simple ChartImprove Your Lean Management System With a Simple Chart
Improve Your Lean Management System With a Simple ChartMark Graban
 
Measures of Success: React Less, Lead Better, Improve More
Measures of Success: React Less, Lead Better, Improve MoreMeasures of Success: React Less, Lead Better, Improve More
Measures of Success: React Less, Lead Better, Improve MoreMark Graban
 
Measures of Success - Webinar
Measures of Success - WebinarMeasures of Success - Webinar
Measures of Success - WebinarMark Graban
 
Respect for People and Continuous Improvement for Healthcare
Respect for People and Continuous Improvement for HealthcareRespect for People and Continuous Improvement for Healthcare
Respect for People and Continuous Improvement for HealthcareMark Graban
 
Mark Graban ILC / MGMC Event 2016
Mark Graban ILC / MGMC Event 2016Mark Graban ILC / MGMC Event 2016
Mark Graban ILC / MGMC Event 2016Mark Graban
 
Mark Graban ASHHRA Talk
Mark Graban ASHHRA TalkMark Graban ASHHRA Talk
Mark Graban ASHHRA TalkMark Graban
 
Practicing Lean 2016 Mark Graban Lean Frontiers
Practicing Lean 2016 Mark Graban Lean FrontiersPracticing Lean 2016 Mark Graban Lean Frontiers
Practicing Lean 2016 Mark Graban Lean FrontiersMark Graban
 
The Real Lessons of Dr. Deming’s Red Bead Factory
The Real Lessons of Dr. Deming’s Red Bead FactoryThe Real Lessons of Dr. Deming’s Red Bead Factory
The Real Lessons of Dr. Deming’s Red Bead FactoryMark Graban
 
Mark Graban Intro to Lean - Frisco
Mark Graban Intro to Lean - FriscoMark Graban Intro to Lean - Frisco
Mark Graban Intro to Lean - FriscoMark Graban
 
Mark Graban Practicing Lean - Lean Frontiers TWI & HR Summit May 2016
Mark Graban Practicing Lean - Lean Frontiers TWI & HR Summit May 2016Mark Graban Practicing Lean - Lean Frontiers TWI & HR Summit May 2016
Mark Graban Practicing Lean - Lean Frontiers TWI & HR Summit May 2016Mark Graban
 
Mark Graban Deming Red Bead 2016 SHS
Mark Graban Deming Red Bead 2016 SHSMark Graban Deming Red Bead 2016 SHS
Mark Graban Deming Red Bead 2016 SHSMark Graban
 

Mehr von Mark Graban (20)

Our Favorite Mistakes: Creating a Culture of Learning from Mistakes
  Our Favorite Mistakes: Creating a Culture of Learning from Mistakes  Our Favorite Mistakes: Creating a Culture of Learning from Mistakes
Our Favorite Mistakes: Creating a Culture of Learning from Mistakes
 
From Cop to Counselor 2020
From Cop to Counselor 2020From Cop to Counselor 2020
From Cop to Counselor 2020
 
Improve Your Lean Management System With a Simple Chart
Improve Your Lean Management System With a Simple ChartImprove Your Lean Management System With a Simple Chart
Improve Your Lean Management System With a Simple Chart
 
Today’s Effective Leader: Shifting From Cop to Coach and Counselor
Today’s Effective Leader: Shifting From Cop to Coach and CounselorToday’s Effective Leader: Shifting From Cop to Coach and Counselor
Today’s Effective Leader: Shifting From Cop to Coach and Counselor
 
The Steps You Need to Take to Get Your Business Ready to Reopen (Proactive Ma...
The Steps You Need to Take to Get Your Business Ready to Reopen (Proactive Ma...The Steps You Need to Take to Get Your Business Ready to Reopen (Proactive Ma...
The Steps You Need to Take to Get Your Business Ready to Reopen (Proactive Ma...
 
Getting from Data to Analysis and Insight in the Covid-19 Pandemic (Final)
Getting from Data to Analysis and Insight in the Covid-19 Pandemic (Final)Getting from Data to Analysis and Insight in the Covid-19 Pandemic (Final)
Getting from Data to Analysis and Insight in the Covid-19 Pandemic (Final)
 
Busting Myths About Just in Time: The Implications for Healthcare Supply Chains
Busting Myths About Just in Time: The Implications for Healthcare Supply ChainsBusting Myths About Just in Time: The Implications for Healthcare Supply Chains
Busting Myths About Just in Time: The Implications for Healthcare Supply Chains
 
Mark Graban Garden Center Conference Talk
Mark Graban Garden Center Conference TalkMark Graban Garden Center Conference Talk
Mark Graban Garden Center Conference Talk
 
How Authors Can Stress Less Over Their Metrics
How Authors Can Stress Less Over Their MetricsHow Authors Can Stress Less Over Their Metrics
How Authors Can Stress Less Over Their Metrics
 
Improve Your Lean Management System With a Simple Chart
Improve Your Lean Management System With a Simple ChartImprove Your Lean Management System With a Simple Chart
Improve Your Lean Management System With a Simple Chart
 
Measures of Success: React Less, Lead Better, Improve More
Measures of Success: React Less, Lead Better, Improve MoreMeasures of Success: React Less, Lead Better, Improve More
Measures of Success: React Less, Lead Better, Improve More
 
Measures of Success - Webinar
Measures of Success - WebinarMeasures of Success - Webinar
Measures of Success - Webinar
 
Respect for People and Continuous Improvement for Healthcare
Respect for People and Continuous Improvement for HealthcareRespect for People and Continuous Improvement for Healthcare
Respect for People and Continuous Improvement for Healthcare
 
Mark Graban ILC / MGMC Event 2016
Mark Graban ILC / MGMC Event 2016Mark Graban ILC / MGMC Event 2016
Mark Graban ILC / MGMC Event 2016
 
Mark Graban ASHHRA Talk
Mark Graban ASHHRA TalkMark Graban ASHHRA Talk
Mark Graban ASHHRA Talk
 
Practicing Lean 2016 Mark Graban Lean Frontiers
Practicing Lean 2016 Mark Graban Lean FrontiersPracticing Lean 2016 Mark Graban Lean Frontiers
Practicing Lean 2016 Mark Graban Lean Frontiers
 
The Real Lessons of Dr. Deming’s Red Bead Factory
The Real Lessons of Dr. Deming’s Red Bead FactoryThe Real Lessons of Dr. Deming’s Red Bead Factory
The Real Lessons of Dr. Deming’s Red Bead Factory
 
Mark Graban Intro to Lean - Frisco
Mark Graban Intro to Lean - FriscoMark Graban Intro to Lean - Frisco
Mark Graban Intro to Lean - Frisco
 
Mark Graban Practicing Lean - Lean Frontiers TWI & HR Summit May 2016
Mark Graban Practicing Lean - Lean Frontiers TWI & HR Summit May 2016Mark Graban Practicing Lean - Lean Frontiers TWI & HR Summit May 2016
Mark Graban Practicing Lean - Lean Frontiers TWI & HR Summit May 2016
 
Mark Graban Deming Red Bead 2016 SHS
Mark Graban Deming Red Bead 2016 SHSMark Graban Deming Red Bead 2016 SHS
Mark Graban Deming Red Bead 2016 SHS
 

Erie st. clair graban sept 27 2010

  • 1. “How Lean Thinking Helps Hospitals” Mark Graban Senior Fellow, Lean Enterprise Institute Author, “Lean Hospitals: Improving Quality, Patient Safety, and Employee Satisfaction”
  • 2. ? ?
  • 3. St. Elisabeth Hospital: The Netherlands Dr. Jacob Caron, Orthopedic Surgeon Chairman of the medical staff
  • 4. Henry Ford - 1922 “In the ordinary hospital the nurses must make useless steps. More of their time is spent in walking than in caring for the patient.” 4
  • 5. Fast Forward to 2005-2008 What % of time do “med/surg” unit RNs spend directly with patients? A: 21% B: 33% C: 50% D: 65% New Zealand: 33% VMMC: 32% UK: 34% Illinois: 31% Cinci Children’s 29% It is possible to double this time with patients More time to do the “right things” 5
  • 6. 6 • Deliveries of supplies delayed because of improper ordering • Articles returned by other departmentsbecause they were not made correctly • Employees have difficultyin handlingnew-type equipment • Limitedstorage space (linen and supplies) not properly used • Safety equipmentnot being used • Correct procedures not followed • Employees leave to go to other hospitals
  • 7. 77 *Warning: requires effort and leadership (not a silver bullet)
  • 8. The Iceberg of Lean 8 Culture Management System Philosophy 5S Kaizen StdWork Heijunka VSMs A3 8
  • 9. Pitfall – Focus on Implementing Tools "We were offering suggestions and getting pushback on safe staffing, yet being told to reduce the number of pens and pencils.” – RN (Minnesota)
  • 11. Identify Causes of Walking (Primary Care) • MDs, PA, RNS: – Poor organization – Supplies in inconvenient locations – Missing information • The system causes this 670 ft for single procedure prep (pre-Lean walking pattern) Exam Procedure Lab
  • 12. Reducing Podiatrist Walking • Created standardized cart • Along with standardized rooms, eliminated the need to leave the room during patient encounters Restocking Checklist
  • 13. Quality and Cost • “Lean is a quality initiative, it isn’t a cost-cutting initiative. But the end result is, if you improve your quality, costs will go down.” – Bill Douglas, CFO of Riverside Medical Center (IL) • Allegheny Medical Center: – Reduced central line infections by 95% – Hospital lost $26,839 per case (~16 cases/yr) = ~$500k/year • Beth Israel Deaconess Medical Center: – Avoided 300 V.A.P. cases in one year – $12M cost savings
  • 14. • 90% reduction in CR-BSI in MICU and Oncology • Saved $1.7M • Saved 17 days L.O.S. per case 14 Source: Dr. Richard Shannon
  • 17. Reducing MRI Waiting Time 0 2 4 6 8 10 12 14 Weekswaitingforappt Outpatient Radiology Backlog Source: Children’s Medical Center, Dallas TX
  • 18. Typical Department Silos Oncology Clinic A Oncology Clinic B Oncology Clinic C Chemotherapy Treatment Radiation Treatment
  • 19. Patients Scheduled 5/2/06 0 2 4 6 8 10 12 14 16 18 7:00 8:00 9:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 Start running out of chairs Idle Time Oncologist Schedule Look Across the Value Stream - Oncology
  • 20. ThedaCare Code STEMI • Starting Point 2002 – “Did not have a clear, standardized response to heart attacks.” • Studied each process step in detail • Posted standardized work in each room
  • 21. ThedaCare “Door to Balloon” Time 91 65 52 37 0 10 20 30 40 50 60 70 80 90 100 2005 2006 2007 2008 Minutes 21
  • 22. Need to Stop Blaming People "[The CEO] said the technician responsible for the mix up also no longer works there."
  • 23. A Different Hospital Lab… “It’s OK, my people are very careful!” 3 Different Patients - Batched
  • 24. Toyota’s Chairman Mr. Cho • Go See – “Senior Management must spend time on the front lines.” • Ask Why – “Use the “Why?” technique daily.” • Show Respect – “Respect your people.” 24 Three Keys to Lean Leadership
  • 25. “Gemba” “Toyota managers should be sufficiently engaged on the factory floor that they have to wash their hands at least three times a day.” Taiichi Ohno 25
  • 26. “…Kaplan tours the hospital daily looking for problems and solutions. Everyone is encouraged to look for changes to make work more efficient.” - Virginia Mason CEO Gary Kaplan 26 “Gemba is for Everyone”
  • 28. “Convis became the first North American to head a Toyota manufacturing plant when he was put in charge of the Georgetown facility. He responded to the promotion by moving his office from the admin building adjacent to the Georgetown plant to the center of the factory floor.” 28
  • 29. Six Sigma Adapted from: “The Toyota” Way Fieldbook, Liker and Meier Very few Large problems Few Medium problems Many Small problems Mgmt Kaizen Kaizen Event Daily Kaizen Different Types of Kaizen
  • 30. Chemistry: Before Chemistry: After CA Core Manual Lab Layout: Before & After
  • 31. Metric Before After Potassium IP TAT 74 min (June ’06 avg) 43 min (May 07 avg) 42% reduction Labor Productivity 0.14 WHPUOS 0.12 WHPUOS 14% reduction % of Results on Chart < 7 AM 62% 92% Square Footage 228 sq ft freed up (behind manual area, to side of special chemistry) Initial Improvement
  • 32. Lab Improvement (3 years) 32 30 35 40 45 50 55 60 Oct-06 Nov-06 Dec-06 Jan-07 Feb-07 Mar-07 Apr-07 May-07 Jun-07 Jul-07 Aug-07 Sep-07 Oct-07 Nov-07 Dec-07 Jan-08 Feb-08 Mar-08 Apr-08 May-08 Jun-08 Jul-08 Aug-08 Sep-08 Oct-08 Nov-08 Dec-08 Jan-09 Feb-09 Mar-09 Apr-09 May-09 Jun-09 Jul-09 Aug-09 Sep-09 Oct-09 Nov-09 Dec-09 Jan-10 Feb-10 Mar-10 Apr-10 May-10 Jun-10 Troponin TAT (in minutes)
  • 33. Lab Improvement (3 years) 33 75% 80% 85% 90% 95% 100% Oct-06 Nov-06 Dec-06 Jan-07 Feb-07 Mar-07 Apr-07 May-07 Jun-07 Jul-07 Aug-07 Sep-07 Oct-07 Nov-07 Dec-07 Jan-08 Feb-08 Mar-08 Apr-08 May-08 Jun-08 Jul-08 Aug-08 Sep-08 Oct-08 Nov-08 Dec-08 Jan-09 Feb-09 Mar-09 Apr-09 May-09 Jun-09 Jul-09 Aug-09 Sep-09 Oct-09 Nov-09 Dec-09 Jan-10 Feb-10 Mar-10 Apr-10 May-10 Jun-10 % tests by 7 AM
  • 34. Lab Improvement (3 years) 34 0.100 0.110 0.120 0.130 0.140 Oct-06 Nov-06 Dec-06 Jan-07 Feb-07 Mar-07 Apr-07 May-07 Jun-07 Jul-07 Aug-07 Sep-07 Oct-07 Nov-07 Dec-07 Jan-08 Feb-08 Mar-08 Apr-08 May-08 Jun-08 Jul-08 Aug-08 Sep-08 Oct-08 Nov-08 Dec-08 Jan-09 Feb-09 Mar-09 Apr-09 May-09 Jun-09 Jul-09 Aug-09 Sep-09 Oct-09 Nov-09 Dec-09 Jan-10 Feb-10 Mar-10 Apr-10 May-10 Jun-10 Labor Productivity (Worked Hours per Unit of Service)
  • 35. The Problem with Ignoring “Respect for Humanity” Found posted in a hospital lab (during Lean assessment)
  • 36. Engaging Employees From Locked Box To Visual Idea System
  • 37. One Idea Card Format FRONT BACK
  • 38. Documenting & Celebrating Improvements • What was the problem? • What was changed, improved, or implemented? • What were the benefits? • Who was involved? Kaizen Wall of Fame What was the Problem? For disposal of pipette tips, the only containers we had were “sharps” containers. This Adds extra disposal cost, as the tips are not sharp. The container hole was also Hard to get tips into. What was changed, improved, implemented? Create biohazard bag holders out of urine jugs, cut the tops off. Photo/Diagram: What were the benefits? Safety? Quality? Time? Waste? Cost? Reduces cost since we aren’t doing unneeded sharps disposal and we aren’t throwing the containers away each time. No safety risk. Easier to get tips into container (less motion and less arm strain, since the Container is lower and easier to get into). Tips can be dumped into a larger Biohazard bin or we can replace the bag. Who was Involved? Gretchen, Beth, Janie, Franke Date: 5/31/07 Area: STL Old Style Container New Container
  • 39. Kaizen Wall of Fame – Core Lab
  • 40. Value of Kaizen in a Hospital? • $4,000 per employee (Toyota) – Just the quantifiable benefit • What about benefits from: – Better Quality – Morale – Patient Satisfaction – Less Waiting Time = $$ ?
  • 41. Employee Quote “This is the best thing we’ve done in my 20 years. We’re finally fixing things.”
  • 42. Data From Children’s Medical Center Dallas Before Lean 12 Months After Starting 3. I have the opportunity to do what I do best every day. 3.11 3.92 8. I feel free to make suggestions for improvement. 2.84 3.48 10. I feel secure in my job. 2.32 3.42 13. Stress at work is manageable. 2.43 3.23 17. I am satisfied with the lab as a place to work. 2.51 3.43 18. I would recommend my work area as a good place to work to others. 2.38 3.46 Grand Average 2.96 3.69
  • 43. Lean Benefits All Stakeholders Patients Caregivers • Employees • Medical Staff • Administrators Hospital • Safety & Quality • Caring Encounters • Less Waiting and Delay • Mission • Stewardship • Stability / Growth • Pride in work • Less frustration • Job security • Career growth Philosophy People 43
  • 44. Q&A • Email: mgraban@lean.org • Lean Enterprise Institute: www.lean.org • Healthcare Value Leaders: www.hcvln.org • Blog: – www.leanblog.org • Twitter: – www.twitter.com/LeanBlog – www.twitter.com/HCVLN 44

Hinweis der Redaktion

  1. So why are we talking about this today? Leadership presence at the front line – a very underappreciated topic and practice. When people become a manager often they think that they&apos;ve graduated away from having to be at the front line… and their executive position means that they have people to do that for them that they are world now it&apos;s all about meetings and conference rooms that become disconnected from the work that&apos;s done if they were ever connected to it in the first place. The biggest complaint is – “we don’t have time” or that the executives have staff and other managers to do that for them!
  2. Lean principles don’t change anything about our values or goals
  3. This isn’t about tools – it’s about defining an ideal condition and working tirelessly to close the gap between current state (ACCURATE version) and the ideal state. Can we challenge assumptions? Test – first day on your job--- ask why something is done or why can’t we do it a better way? How does the organization respond? Start from need…
  4. These problems are from 1944. Hospitals have tried virtually everything from other industries in their efforts to improve: Scientific ManagementTraining Within IndustryBenchmarkingCost CuttingTotal Quality ManagementDr. Deming / PDCA / PDSARe-EngineeringSix SigmaBest PracticesFunctional Expert ConsultantsJoint Commission &amp; AccreditationsTargets and Goals
  5. Waste reduction is not traditional cost cutting
  6. 1 in 350 cases in 2009 (full year)
  7. We didn’t even do a formal VSM here, made a change almost immediately (Within a week) as opposed to doing nothing but mapping over 5 days… Laboratory – need to take an end-to-end view. Same is true at Radiology
  8. Guideline = 120 min “door- to-balloon” – 70% success“Did not have a clear, standardized response to heart attacks.”Now 100% success against 90 minute targetFocus on the patient as customerRespect the patient’s timeIdentify systemic causes of patient waitingStandardized workVisual managementStaffing levelsScheduling practicesLook across the entire “value stream”Minimize delays from handoffs