Comparing the application of Closed and Open Systems approaches
                                               in innovation project management
                                                                                                                   Maria Kapsali Ph.D.

Introduction
                                                    Materials and methods                                                                                                                                                       Conclusions
Open Systems thinking is underutilized in
                                                    The method is two embedded multiple cases based on semi-structured interviews and qualitative content analysis. Each case
    project management.                             consists of several subcases: the first one (EARSS) consists of 3 subcases and the second (eTEN) consists of 9 subcases, making a
                                                    total of 12 cases. This unit of analysis is chosen because multiple cases are suitable for explanatory studies, when investigating                                          There are no specific metrics to measure
This study compares the application of              causal connections and because multiple cases can be regarded as generalizable as multiple experiments. The study investigated                                              causal connectedness between minimum
                                                    the causal connectedness between policy implementation instruments and project management practices..
     Closed and Open Systems thinking                                                                                                                                                                                               critical specifications/boundary
     in innovation projects to discover:                                                                                                                                                                                       management and managerial/project tasks.
                                                                                                                                                                                   EU eHealth Policy           AIDMAN
                                                                                                                      Figure 1: Pictorial                                                                      EURODONOR
a)   If Open Systems thinking is useful to                                                EU AR Policy
                                                                                                                      representation of the concept
                                                                                                                                                                                                               EVITAL
                                                                                                                                                                                                               IREMMA
                                                                                                                                                                                                                                     More specific metrics are needed.
                                                                                                                                                             National eHealth         eTEN projects
                                                             National AR Policies                                                                                                                              MEDASHIP
     the management of innovation                             National Project 1
                                                                                            EARSS Project             of embedded multiple case
                                                                                                                                                                 Policies
                                                                                                                                                                                                               MEDICATE
                                                                                                                                                                                                               MED-CONTINENT

     projects and                                             National Project 2                                      studies. The EARSS case on                                                               NIVEMES
                                                              National Project 3
                                                                                        Project Management            the left and the eTEN case                                                               TELE-REMEDY
                                                                                                                                                                                                                                Propositions to proceed:
b)   if it is useful, then how it is practiced                                                                        on the right with all their
                                                                                                                                                                                    Project Management


     and what the outcomes are.                                                     Public Health Infrastructure
                                                                                                                      subcases.
                                                                                                                                                                                Public Health Infrastructure

                                                                                                                                                                                                                                1. In order to develop an Open Systems generic
                                                                                                                                                                                                                                      model we need to create a management
                                                                                                                                                                                                                                      focused model. The input –transformation-
                                                                                                                                                                                                                                      output model can only help us to manage
                                                                                                                                                                                                                                      efficiency through operational metrics.
Literature says                                  Results                                                                                                                                                                              Therefore, managerial agency should be
The application of Open Systems thinking         The first case (EARSS) shows that by using                                                                                                                                           included in a generic Open Systems model.
  in empirical studies is inhibited by the            an Open Systems approach a project
  lack of constructs that are easily                  achieves most of its goals, attributed to:                                                                                                                                2.. The way to develop more specific metrics is
  operationalizable and measurable.              1. The flexibility in decision making to                                                                                                                                             to explore causal connectedness between
                                                      adjust plans and activities                                                                                                                                                     environment and managerial agency (e.g.
Solution: create generic measurable Open         2. Managing the internal and external                                                                                                                                                using constructs like Relationality and
  Systems constructs through studying                                                                                                                                                                                                 metrics such as openness and coupling).
                                                      boundaries.
  systemic properties like causal                3. The alignment of strategic goals with
                                                                                                                                                                                                                                3. Causal maps and logic models can be used as
  connectedness.                                      project activities.                                                                                                                                                            tools to explore connectedness. Then
                                                                                                                                                                                                                                     metrics can be crafted.
                                                 The second case (eTEN) shows that under a
                                                      Closed System approach a project:                                                                                                                                         4. Further research into different types of
Literature says                                                                                                                              .        ,
                                                 1. Does not have the flexibility to manage                                                                                                                                          projects in order to see different variations
The current application of Systems                    change due to the focus on controlling                                                                                                                                         of this generic approach.
                                                                                                                                                 Open Systems thinking was practiced in project
  thinking is performance, goal and                   the production process.
                                                                                                                                                 management through minimum critical                                            5. Further research to understand which success
  problem-solving oriented in production         2. This leads to weak leadership and in-
                                                                                                                                                 specifications and boundary management.                                             factors can complement the Open Systems
  processes and interrelationships.                   group problems.
                                                                                                                                                                                                                                     approach.
                                                 3. Because of buffering the system and
CLOSED systems        control                         standardizing boundary management, the
  complexity in and out of the system                 project managers could not deal with                                                 Causal
                                                                                                                                           connectedness
                                                      complexity at the user level.                                                        between policy
OPEN systems        adjust to complexity                                                                                                   implementation                                                                       For further information
  with internal mechanisms and boundary          The results in Table 1 show that an Open                                                  instruments and                                                                      For information on this subject, to share ideas for related
                                                                                                                                           project
  management                                          Systems approach is more useful for                                                                                                                                       projects and papers, or to request an electronic version
                                                                                                                                           management                                                                           please contact maria.kapsali@mbs.ac.uk or
                                                      projects of high complexity and                                                      practices..                                                                          kapsalis.maria@gmail.com. The full article can be
Project management practice mostly                    uncertainty like innovation projects.                                                                                                                                     obtained in the 25th anniversary issue of the Systemist.
  follows a Closed Systems approach                                                                                                                                                                                                                                     Original Thinking Applied
                                                                                                                                                 Basic construct to measure causal connectedness was
                                                                                                                                                                     Relationality

Weitere ähnliche Inhalte

Andere mochten auch

Andere mochten auch (9)

Prezi amplificador
Prezi amplificadorPrezi amplificador
Prezi amplificador
 
HUMAN SIDE OF LEAN & KANBAN by Alok
HUMAN SIDE OF LEAN & KANBAN by AlokHUMAN SIDE OF LEAN & KANBAN by Alok
HUMAN SIDE OF LEAN & KANBAN by Alok
 
National Park Service Centennial Communications Plan 2014
National Park Service Centennial Communications Plan 2014National Park Service Centennial Communications Plan 2014
National Park Service Centennial Communications Plan 2014
 
T.E.C.
T.E.C.T.E.C.
T.E.C.
 
American Express Serve® - Content Strategy
American Express Serve® - Content StrategyAmerican Express Serve® - Content Strategy
American Express Serve® - Content Strategy
 
Contro lsystem
Contro lsystemContro lsystem
Contro lsystem
 
Closed systems, open systems
Closed systems, open systemsClosed systems, open systems
Closed systems, open systems
 
Violating The Rights of The Child; When "Faith" Violates the Faith in Human R...
Violating The Rights of The Child; When "Faith" Violates the Faith in Human R...Violating The Rights of The Child; When "Faith" Violates the Faith in Human R...
Violating The Rights of The Child; When "Faith" Violates the Faith in Human R...
 
Open vs Closed Systems
Open vs Closed SystemsOpen vs Closed Systems
Open vs Closed Systems
 

Ähnlich wie Open- Closed Systems in innovation projects@ UK Systems Society Conference 2009

Policy Design @ HSREPP 2010 Conference the Hague
Policy Design @ HSREPP 2010 Conference the HaguePolicy Design @ HSREPP 2010 Conference the Hague
Policy Design @ HSREPP 2010 Conference the Hague
Maria Kapsali
 
DETERMINING THE RISKY SOFTWARE PROJECTS USING ARTIFICIAL NEURAL NETWORKS
DETERMINING THE RISKY SOFTWARE PROJECTS USING ARTIFICIAL NEURAL NETWORKSDETERMINING THE RISKY SOFTWARE PROJECTS USING ARTIFICIAL NEURAL NETWORKS
DETERMINING THE RISKY SOFTWARE PROJECTS USING ARTIFICIAL NEURAL NETWORKS
ijseajournal
 
Ieee projects-2012-title-list
Ieee projects-2012-title-listIeee projects-2012-title-list
Ieee projects-2012-title-list
Sandeep Kumar
 

Ähnlich wie Open- Closed Systems in innovation projects@ UK Systems Society Conference 2009 (20)

Poster systems
Poster systemsPoster systems
Poster systems
 
Policy Design @ HSREPP 2010 Conference the Hague
Policy Design @ HSREPP 2010 Conference the HaguePolicy Design @ HSREPP 2010 Conference the Hague
Policy Design @ HSREPP 2010 Conference the Hague
 
Apollon Overview - current status
Apollon Overview - current statusApollon Overview - current status
Apollon Overview - current status
 
Risk Return Analysis - IT infrastructure - Risk Management
Risk Return Analysis - IT infrastructure - Risk ManagementRisk Return Analysis - IT infrastructure - Risk Management
Risk Return Analysis - IT infrastructure - Risk Management
 
Roberto Santoro Apollon
Roberto Santoro ApollonRoberto Santoro Apollon
Roberto Santoro Apollon
 
Pert19
Pert19Pert19
Pert19
 
DETERMINING THE RISKY SOFTWARE PROJECTS USING ARTIFICIAL NEURAL NETWORKS
DETERMINING THE RISKY SOFTWARE PROJECTS USING ARTIFICIAL NEURAL NETWORKSDETERMINING THE RISKY SOFTWARE PROJECTS USING ARTIFICIAL NEURAL NETWORKS
DETERMINING THE RISKY SOFTWARE PROJECTS USING ARTIFICIAL NEURAL NETWORKS
 
Future Internet Strategy in Taiwan
Future Internet Strategy in TaiwanFuture Internet Strategy in Taiwan
Future Internet Strategy in Taiwan
 
The Africa RISING project in Ethiopia
The Africa RISING project in EthiopiaThe Africa RISING project in Ethiopia
The Africa RISING project in Ethiopia
 
Emerging Challenges for Artificial Intelligence in Medicinal Chemistry
Emerging Challenges for Artificial Intelligence in Medicinal ChemistryEmerging Challenges for Artificial Intelligence in Medicinal Chemistry
Emerging Challenges for Artificial Intelligence in Medicinal Chemistry
 
IEEE Projects 2012 - 2013
IEEE Projects 2012 - 2013IEEE Projects 2012 - 2013
IEEE Projects 2012 - 2013
 
Bulk IEEE Java Projects 2012 @ Seabirds ( Chennai, Trichy, Hyderabad, Mumbai,...
Bulk IEEE Java Projects 2012 @ Seabirds ( Chennai, Trichy, Hyderabad, Mumbai,...Bulk IEEE Java Projects 2012 @ Seabirds ( Chennai, Trichy, Hyderabad, Mumbai,...
Bulk IEEE Java Projects 2012 @ Seabirds ( Chennai, Trichy, Hyderabad, Mumbai,...
 
IEEE Projects 2012 For Me Cse @ Seabirds ( Trichy, Chennai, Thanjavur, Pudukk...
IEEE Projects 2012 For Me Cse @ Seabirds ( Trichy, Chennai, Thanjavur, Pudukk...IEEE Projects 2012 For Me Cse @ Seabirds ( Trichy, Chennai, Thanjavur, Pudukk...
IEEE Projects 2012 For Me Cse @ Seabirds ( Trichy, Chennai, Thanjavur, Pudukk...
 
Ieee projects-2012-title-list
Ieee projects-2012-title-listIeee projects-2012-title-list
Ieee projects-2012-title-list
 
IEEE Projects 2012 Titles For Cse @ Seabirds ( Chennai, Pondicherry, Vellore,...
IEEE Projects 2012 Titles For Cse @ Seabirds ( Chennai, Pondicherry, Vellore,...IEEE Projects 2012 Titles For Cse @ Seabirds ( Chennai, Pondicherry, Vellore,...
IEEE Projects 2012 Titles For Cse @ Seabirds ( Chennai, Pondicherry, Vellore,...
 
Bulk IEEE Projects 2012 @ SBGC ( Chennai, Trichy, Karur, Pudukkottai, Nellore...
Bulk IEEE Projects 2012 @ SBGC ( Chennai, Trichy, Karur, Pudukkottai, Nellore...Bulk IEEE Projects 2012 @ SBGC ( Chennai, Trichy, Karur, Pudukkottai, Nellore...
Bulk IEEE Projects 2012 @ SBGC ( Chennai, Trichy, Karur, Pudukkottai, Nellore...
 
Latest IEEE Projects 2012 For IT@ Seabirds ( Trichy, Perambalur, Namakkal, Sa...
Latest IEEE Projects 2012 For IT@ Seabirds ( Trichy, Perambalur, Namakkal, Sa...Latest IEEE Projects 2012 For IT@ Seabirds ( Trichy, Perambalur, Namakkal, Sa...
Latest IEEE Projects 2012 For IT@ Seabirds ( Trichy, Perambalur, Namakkal, Sa...
 
Latest IEEE Projects 2012 for Cse Seabirds ( Trichy, Chennai, Perambalur, Pon...
Latest IEEE Projects 2012 for Cse Seabirds ( Trichy, Chennai, Perambalur, Pon...Latest IEEE Projects 2012 for Cse Seabirds ( Trichy, Chennai, Perambalur, Pon...
Latest IEEE Projects 2012 for Cse Seabirds ( Trichy, Chennai, Perambalur, Pon...
 
Ieee project-for-cse -2012
Ieee project-for-cse -2012Ieee project-for-cse -2012
Ieee project-for-cse -2012
 
IEA DSM Pecha Kucha Brussels workshop
IEA DSM Pecha Kucha Brussels workshopIEA DSM Pecha Kucha Brussels workshop
IEA DSM Pecha Kucha Brussels workshop
 

Mehr von Maria Kapsali

Mixing Methods Tutorial
Mixing Methods Tutorial Mixing Methods Tutorial
Mixing Methods Tutorial
Maria Kapsali
 
Network organisations and cross organisational learning
Network organisations and cross organisational learningNetwork organisations and cross organisational learning
Network organisations and cross organisational learning
Maria Kapsali
 
Systems thinking in innovation project management
Systems thinking in innovation project managementSystems thinking in innovation project management
Systems thinking in innovation project management
Maria Kapsali
 
Systemic relations as dynamic capabilities
Systemic relations as dynamic capabilitiesSystemic relations as dynamic capabilities
Systemic relations as dynamic capabilities
Maria Kapsali
 
Policy- Project Relationality @ HaCIRIC 2009 Brighton
Policy- Project Relationality @ HaCIRIC 2009 Brighton Policy- Project Relationality @ HaCIRIC 2009 Brighton
Policy- Project Relationality @ HaCIRIC 2009 Brighton
Maria Kapsali
 
Poster druid maria kapsali 3
Poster druid maria kapsali 3Poster druid maria kapsali 3
Poster druid maria kapsali 3
Maria Kapsali
 
Systems thinking in innovation project management
Systems thinking in innovation project managementSystems thinking in innovation project management
Systems thinking in innovation project management
Maria Kapsali
 
Policy Design @ HSREPP 2010 Hague conference
Policy Design @ HSREPP 2010 Hague conference  Policy Design @ HSREPP 2010 Hague conference
Policy Design @ HSREPP 2010 Hague conference
Maria Kapsali
 
Systems Dynamics in boundaries @ HaCIRIC 2010 conference Edinburgh
Systems Dynamics in boundaries @ HaCIRIC 2010 conference EdinburghSystems Dynamics in boundaries @ HaCIRIC 2010 conference Edinburgh
Systems Dynamics in boundaries @ HaCIRIC 2010 conference Edinburgh
Maria Kapsali
 
Policy Design@IRC 2010
Policy Design@IRC 2010Policy Design@IRC 2010
Policy Design@IRC 2010
Maria Kapsali
 
Systems Thinking in Innovation Project Management @ EURAM 2010: Systems Think...
Systems Thinking in Innovation Project Management @ EURAM 2010: Systems Think...Systems Thinking in Innovation Project Management @ EURAM 2010: Systems Think...
Systems Thinking in Innovation Project Management @ EURAM 2010: Systems Think...
Maria Kapsali
 
Relationality presentation @ HaCIRIC 2009 presentation
Relationality presentation @ HaCIRIC 2009  presentation Relationality presentation @ HaCIRIC 2009  presentation
Relationality presentation @ HaCIRIC 2009 presentation
Maria Kapsali
 
Project relations as a Dynamic Capability @ EURAM 2010: Systemic Relations As...
Project relations as a Dynamic Capability @ EURAM 2010: Systemic Relations As...Project relations as a Dynamic Capability @ EURAM 2010: Systemic Relations As...
Project relations as a Dynamic Capability @ EURAM 2010: Systemic Relations As...
Maria Kapsali
 

Mehr von Maria Kapsali (19)

Prouska and kapsali_book_presentation
Prouska and kapsali_book_presentationProuska and kapsali_book_presentation
Prouska and kapsali_book_presentation
 
Mixing Methods Tutorial
Mixing Methods Tutorial Mixing Methods Tutorial
Mixing Methods Tutorial
 
Design London DOME poster
Design London DOME posterDesign London DOME poster
Design London DOME poster
 
POMS improving patient care through modularity
POMS  improving patient care through modularity POMS  improving patient care through modularity
POMS improving patient care through modularity
 
Network organisations and cross organisational learning
Network organisations and cross organisational learningNetwork organisations and cross organisational learning
Network organisations and cross organisational learning
 
Simulation design london
Simulation design londonSimulation design london
Simulation design london
 
Systems thinking in innovation project management
Systems thinking in innovation project managementSystems thinking in innovation project management
Systems thinking in innovation project management
 
Systemic relations as dynamic capabilities
Systemic relations as dynamic capabilitiesSystemic relations as dynamic capabilities
Systemic relations as dynamic capabilities
 
Policy- Project Relationality @ HaCIRIC 2009 Brighton
Policy- Project Relationality @ HaCIRIC 2009 Brighton Policy- Project Relationality @ HaCIRIC 2009 Brighton
Policy- Project Relationality @ HaCIRIC 2009 Brighton
 
Poster druid maria kapsali 3
Poster druid maria kapsali 3Poster druid maria kapsali 3
Poster druid maria kapsali 3
 
Systems thinking in innovation project management
Systems thinking in innovation project managementSystems thinking in innovation project management
Systems thinking in innovation project management
 
Dc
DcDc
Dc
 
Ha ciric 2010
Ha ciric 2010Ha ciric 2010
Ha ciric 2010
 
Policy Design @ HSREPP 2010 Hague conference
Policy Design @ HSREPP 2010 Hague conference  Policy Design @ HSREPP 2010 Hague conference
Policy Design @ HSREPP 2010 Hague conference
 
Systems Dynamics in boundaries @ HaCIRIC 2010 conference Edinburgh
Systems Dynamics in boundaries @ HaCIRIC 2010 conference EdinburghSystems Dynamics in boundaries @ HaCIRIC 2010 conference Edinburgh
Systems Dynamics in boundaries @ HaCIRIC 2010 conference Edinburgh
 
Policy Design@IRC 2010
Policy Design@IRC 2010Policy Design@IRC 2010
Policy Design@IRC 2010
 
Systems Thinking in Innovation Project Management @ EURAM 2010: Systems Think...
Systems Thinking in Innovation Project Management @ EURAM 2010: Systems Think...Systems Thinking in Innovation Project Management @ EURAM 2010: Systems Think...
Systems Thinking in Innovation Project Management @ EURAM 2010: Systems Think...
 
Relationality presentation @ HaCIRIC 2009 presentation
Relationality presentation @ HaCIRIC 2009  presentation Relationality presentation @ HaCIRIC 2009  presentation
Relationality presentation @ HaCIRIC 2009 presentation
 
Project relations as a Dynamic Capability @ EURAM 2010: Systemic Relations As...
Project relations as a Dynamic Capability @ EURAM 2010: Systemic Relations As...Project relations as a Dynamic Capability @ EURAM 2010: Systemic Relations As...
Project relations as a Dynamic Capability @ EURAM 2010: Systemic Relations As...
 

Kürzlich hochgeladen

Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
amitlee9823
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
dollysharma2066
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
lizamodels9
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Dipal Arora
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Abortion pills in Kuwait Cytotec pills in Kuwait
 

Kürzlich hochgeladen (20)

Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 

Open- Closed Systems in innovation projects@ UK Systems Society Conference 2009

  • 1. Comparing the application of Closed and Open Systems approaches in innovation project management Maria Kapsali Ph.D. Introduction Materials and methods Conclusions Open Systems thinking is underutilized in The method is two embedded multiple cases based on semi-structured interviews and qualitative content analysis. Each case project management. consists of several subcases: the first one (EARSS) consists of 3 subcases and the second (eTEN) consists of 9 subcases, making a total of 12 cases. This unit of analysis is chosen because multiple cases are suitable for explanatory studies, when investigating There are no specific metrics to measure This study compares the application of causal connections and because multiple cases can be regarded as generalizable as multiple experiments. The study investigated causal connectedness between minimum the causal connectedness between policy implementation instruments and project management practices.. Closed and Open Systems thinking critical specifications/boundary in innovation projects to discover: management and managerial/project tasks. EU eHealth Policy AIDMAN Figure 1: Pictorial EURODONOR a) If Open Systems thinking is useful to EU AR Policy representation of the concept EVITAL IREMMA More specific metrics are needed. National eHealth eTEN projects National AR Policies MEDASHIP the management of innovation National Project 1 EARSS Project of embedded multiple case Policies MEDICATE MED-CONTINENT projects and National Project 2 studies. The EARSS case on NIVEMES National Project 3 Project Management the left and the eTEN case TELE-REMEDY Propositions to proceed: b) if it is useful, then how it is practiced on the right with all their Project Management and what the outcomes are. Public Health Infrastructure subcases. Public Health Infrastructure 1. In order to develop an Open Systems generic model we need to create a management focused model. The input –transformation- output model can only help us to manage efficiency through operational metrics. Literature says Results Therefore, managerial agency should be The application of Open Systems thinking The first case (EARSS) shows that by using included in a generic Open Systems model. in empirical studies is inhibited by the an Open Systems approach a project lack of constructs that are easily achieves most of its goals, attributed to: 2.. The way to develop more specific metrics is operationalizable and measurable. 1. The flexibility in decision making to to explore causal connectedness between adjust plans and activities environment and managerial agency (e.g. Solution: create generic measurable Open 2. Managing the internal and external using constructs like Relationality and Systems constructs through studying metrics such as openness and coupling). boundaries. systemic properties like causal 3. The alignment of strategic goals with 3. Causal maps and logic models can be used as connectedness. project activities. tools to explore connectedness. Then metrics can be crafted. The second case (eTEN) shows that under a Closed System approach a project: 4. Further research into different types of Literature says . , 1. Does not have the flexibility to manage projects in order to see different variations The current application of Systems change due to the focus on controlling of this generic approach. Open Systems thinking was practiced in project thinking is performance, goal and the production process. management through minimum critical 5. Further research to understand which success problem-solving oriented in production 2. This leads to weak leadership and in- specifications and boundary management. factors can complement the Open Systems processes and interrelationships. group problems. approach. 3. Because of buffering the system and CLOSED systems control standardizing boundary management, the complexity in and out of the system project managers could not deal with Causal connectedness complexity at the user level. between policy OPEN systems adjust to complexity implementation For further information with internal mechanisms and boundary The results in Table 1 show that an Open instruments and For information on this subject, to share ideas for related project management Systems approach is more useful for projects and papers, or to request an electronic version management please contact maria.kapsali@mbs.ac.uk or projects of high complexity and practices.. kapsalis.maria@gmail.com. The full article can be Project management practice mostly uncertainty like innovation projects. obtained in the 25th anniversary issue of the Systemist. follows a Closed Systems approach Original Thinking Applied Basic construct to measure causal connectedness was Relationality