MS Project Training
By Muhammad Aamer Shahzad.

                                 1
www.mashahzad.com
2
Trainer’s Bio data
• Muhammad Aamer Shahzad
     • MS Project Management
     • M. Sc Economicss
• EXPERIENCE: 6 YEARS
     • Allmed Solution, Islamabad, Pakistan




                                                                     www.mashahzad.com
        • Position: Territory Manager (Islamabad)
        • Position: Marketing Coordinator
     • Universal Research Group, Islamabad, Pakistan
        • Position: Clinical Research Associates
     • National Institute of Management Science (NIMS), Islamabad,
        • Position: Lecturer
     • Research Consultancy
• Areas of interests:
     • Project Management, Management & Research                         3
       (Projects/Social), Proposal & Report Writing.
Contents
   Brief Introduction to the MS Project 2007 Basics

      Work Breakdown structure

        Define and use of Critical Path Analysis




                                                      www.mashahzad.com
        Macros of MS Project

        How to Setting up the Base line

      Updating the project progress data
                                                          4
   Preparations of different reports
Contents

    Exporting of project data to other software applications


       Define and use of Network diagram




                                                               www.mashahzad.com
       Printing options of MS Project


    Brief Introduction to the MS Project 2010 with enhancing
    capabilities from 2007
                                                                   5
What is Project ?
• A project is an endeavor that helps to accomplish
  some specific objective by utilizing definite
  interconnected tasks and the effective utilization of
  resources. (Agarwal, 2011).




                                                          www.mashahzad.com
• A temporary endeavor undertaken to create a
  unique product, service, or result”. (Project
  management Institute, 2008).

• In terms of scope, schedule and cost, a project has a
  well-defined stated objective (James P. & Gido,             6
  2009).
www.mashahzad.com
7
www.mashahzad.com
Project Planning       8
www.mashahzad.com
10 steps of project planning       9
Project management soft wares
• Project management software has a capacity to help plan,
  organize, and manage resource pools and develop resource
  estimate
• Number of Project management software available.
• All good project software packages contain the facility to create




                                                                          www.mashahzad.com
  Gantt Charts and PERT networks.
  • The Gantt chart provides a quick overview of your plan and a way of
    monitoring progress.
  • A PERT chart is a project management tool used to schedule,
    organize, and coordinate tasks within a project.
• The right type of tool should be selected only after your needs
  are clearly identified.                                                 10
• MS Project is one of them – 200 project management software
Brief Introduction to the MS
Project 2007 Basics
• Microsoft Project – developed and sold by Microsoft,
• Founded by Alan M. Boyd in 1984-5
• Designed to assist a project manager in developing a
  plan, assigning resources to tasks, tracking progress,




                                                            www.mashahzad.com
  managing the budget, and analyzing workloads.
• Available on many corporate computing networks and is
  also available for individual PCs
• creates critical path schedules, and critical chain and
  event chain methodology
• Schedules can be resource leveled, and chains are
  visualized in a Gantt chart.                              11
Introduction
• Enables you to stay informed and control:
  • Project work
  • Schedules
  • Finances




                                                       www.mashahzad.com
• Keep project teams aligned
• File format is .mpp.

•  Select the Start | Programs | MS Office |  MS
  Project
                                                       12
www.mashahzad.com
First start Window   13
     MS Project
Starting Microsoft Project
• Go to file, select new. This will open a screen for blank project click
  ok.
• You can now enter your project information viz. start date, finish
  date and also how would you like to schedule the project from
  either start or finish date.
• Select Gantt Chart view from the view menu.




                                                                            www.mashahzad.com
• You’ll have a spreadsheet where you can now enter information of
  all the activities i.e. task name, duration, start date, end date,
  predecessors and various other fields.
• You can enter required information in two ways, in spreadsheet or
  when you double click on cell you get pop up window in which you
  can enter all the information of that particular activity.
• For predecessor activity you need to write activity number.
• The Soft Ware itself will calculate start and end date.
                                                                            14
• Now the Gantt Chart is complete.
www.mashahzad.com
15
Gantt Chart




              www.mashahzad.com
  16
Work Breakdown structure
• A work breakdown structure (WBS), is a division of deliverable
  of a project into smaller components.
• Helps organize and define the total work scope of the project.
• Provides the necessary framework for detailed cost estimating




                                                                   www.mashahzad.com
  and controlling
• Providing guidance for schedule development and control.




                                                                   17
WBS
• Select the “Information” column, right click and choose “Hide
  Column”.

• Next select the “Task Name” column and from the “Insert”




                                                                  www.mashahzad.com
  menu select “Column”. The following pop-up will appear.

• Choose “WBS” as the “Field name”




                                                                  18
Critical Path Analysis
• Critical Path Analysis (CPA) or the Critical Path Method (CPM)
  helps you to plan all tasks that must be completed as part of a
  project.

• Basis both for preparation of a schedule, and of resource




                                                                     www.mashahzad.com
  planning.

• Allow you to monitor achievement of project goals.

• Help you develop and test your plan to ensure that it is robust.

• CPA helps you to identify the minimum length of time needed
  to complete a project                                              19
CPM…
• For finding CP list all the activities and enter early start, late
  start, early finish and late finish info of all the activities.

• You can do this under insert/columns and selecting each




                                                                       www.mashahzad.com
  terms.

• Following screen shot demonstrates how to insert.

• MS Project automatically calculates Early Start, Early Finish,
  Least Start and Least Finish based on the starting/ending dates
  you have provided.
                                                                       20
CPM




      www.mashahzad.com
21
Macros of MS Project
• A recorded or programmed set of instructions that carry out a
  specific action when initiated.
• Macros in Microsoft Project use Microsoft Visual Basic for
  Applications (VBA).
• Macros are great tools that can be used to automate




                                                                        www.mashahzad.com
  repetitive tasks.
• Create a Macro
  • complex calculations which need to be repeated for varied sets of
    inputs,
  • a particular action being performed over and over again on
    different input, files, etc.
• Start Macro Recording                                                 22
  • Navigate to Tools --> Macro --> Record New Macro --> ok
Macros of MS Project
• Stopping Macro Recording
  • Click on Tools --> Macro --> Stop Recorder.


• Running the Macro




                                                                www.mashahzad.com
  • Navigate to Tools --> Macro --> Macros (or press Alt+F8).
  • Select the macro which you created, and click on Run.




                                                                23
www.mashahzad.com
Macro in MS Project   24
Setting up the Base line
• Baseline is a benchmark of your project's status before work on the
  project begins.

• When you save a baseline, Project copies the information from the
  Start and Finish fields into the Baseline Start and Baseline Finish
  fields.




                                                                            www.mashahzad.com
• The baseline is used evaluate your project progress.

• Baselines measure five parameters—start dates, finish dates,
  durations, costs, and work or labor estimates

• Select Tools |Tracking  | Save Baseline from the menu bar.              25
  Ensure Entire Project option is selected—this is the default. Click OK.
Updating the project progress
data
• Update the baseline for the entire project.
  • This simply replaces baseline values with the currently scheduled
    values.
• Update the baseline for selected tasks.
  • This does not affect the for other tasks or resource baseline




                                                                         www.mashahzad.com
    values in the project plan.
• Save a second or subsequent baseline.
  • You can save up to 11 baselines in a single plan. The first one is
    called Baseline, and the rest are Baseline 1 through Baseline 10.


• If you enter an actual finish date for a task, Project calculates
  its percent complete to be 100%.                                       26
Updating the project progress
data
• To quickly update actual start and finish dates for multiple
  tasks that have the same date, select each task that you want
  to update, and then, on the Project tab, in the Status group,
  click Update Project.




                                                                   www.mashahzad.com
• The Update Project dialog appears. Click Update work as
  complete through, type or select a date, and then next to For,
  click Selected tasks. Click OK



                                                                   27
Preparations of different
reports
• The Report Menu gives you access to preconceived reports,
  which you can also Edit as per your convenience.




                                                              www.mashahzad.com
                                                              28
Exporting of project data to
other software applications
• You can export information from Microsoft Project to another
  format using a wizard.
• Following is a list of formats you export to or import from.
  •   Microsoft Excel (as a workbook or PivotTable report)




                                                                 www.mashahzad.com
  •   text-only (tab delimited)
  •   comma-separated values (CSV)
  •   Extensible Markup Language (XML)


• What do you want to do?
  • Export project information
  • Import project information
                                                                 29
Export project information
On the File tab, click Save As. The Save As dialog box appears.
1. In the File name box, type Sharing, and then click Save.
2. To begin, you’ll copy some task names, durations, and start
     and finish dates from Project to Word.
3. In the Entry table on the left side of the Gantt Chart view,




                                                                    www.mashahzad.com
     select from the name of task 5, Editorial, through task 13’s
     finish date, Wed 9/19/12.
4. On the Task tab, in the Clipboard group, click Copy. Project
     copies the selected range to the Clipboard.
5. Start Word (or a comparable word processor application),
     create a new document, and then paste the Clipboard
     contents into the new document.
• If you have Word 2010, your screen should look similar to the     30
  following illustration.
MS Word 2010




               www.mashahzad.com
  31
For Excel
• Start Excel (or a comparable spreadsheet application) and
  create a new document.
• Now you will copy resource cost details from Project to Excel.
• Switch back to Project.




                                                                    www.mashahzad.com
• On the View tab, in the Resource Views group, click Resource
  Sheet.
• The Resource Sheet view replaces the Gantt Chart view.
• On the View tab, in the Data group, click Tables and then click
  Cost.
• This is the resource cost information you’d like to paste into
  Excel.
                                                                    32
www.mashahzad.com
                                                                                            33
         Click the Select All button in the upper-left corner of the Cost table.
Project selects the entire table, although only cells that contain values will be copied.
www.mashahzad.com
34
For Excel…
• On the Task tab, in the Clipboard group, click Copy.

• Project copies the selected range to the Clipboard.




                                                                     www.mashahzad.com
• Switch back to Excel and then paste the Clipboard contents
  into the new document.

• In Excel, if necessary, widen any columns that don’t display the
  data values and instead

• Display pound signs (##). If you have Excel 2010, your screen      35
  should look similar to the following illustration.
www.mashahzad.com
36
For Excel…
• As with pasting into Word, note that pasting into Excel
  generated the correct column headings, and the cell values
  are the expected data types.

• Close Word and Excel, and then switch back to Project.




                                                                  www.mashahzad.com
• The pasting of rich tabular data into Word or Excel does not
  work the same way in all applications.
• If you were to paste the same data into Notepad, for example,
  the result would be tab-delimited data and no column
  headings. Feel free to experiment with this.
                                                                  37
Import project information
•   In Project, on the  File tab, click Options.
•   The Project Options dialog box appears.
•    Click the Trust Center tab.
•    Click Trust Center Settings.




                                                                   www.mashahzad.com
•   The Trust Center dialog box appears.
•    Click the Legacy Formats tab.
•   Under Legacy Formats,  click Prompt when loading files with
    legacy or non-default file format.



                                                                   38
www.mashahzad.com
39
…Import project information
• Click OK to close the Trust Center dialog box, and then click
  OK again to close the Project Options dialog box.

• With this change to Project’s settings completed, you’re ready




                                                                      www.mashahzad.com
  to import an Excel workbook.

• Click the File tab, and then click Open.

• Navigate to the Chapter17 practice file folder.

• In the file type box (initially labeled Microsoft Project Files),   40
  select Excel 97-2003 Workbook.
…Import project information
• Select the Sample Task List file, and then click Open.

• The Import Wizard appears. This wizard helps you import
  structured data from a different format to Project.




                                                            www.mashahzad.com
• Click Next.

• The second page of the Import Wizard appears.



                                                            41
www.mashahzad.com
42
…Import project information
• The Import Wizard uses maps to organize the way that
  structured data from another file format is imported into
  Project. For this exercise, you will create a new map.
• Make sure that New map is selected, and then click Next.
• The Import Mode page of the Import Wizard appears.




                                                                www.mashahzad.com
• Make sure that As a new project is selected, and then click
  Next.
• The Map Options page of the Import Wizard appears.
• Select the Tasks check box, and make sure that Import
  includes headers is selected as well.
• Headers here refer to column headings.
                                                                43
www.mashahzad.com
44
…Import project information
• Click Next.
• The Task Mapping page of the Import Wizard appears. Here,
  you identify the source worksheet within the Excel workbook
  and specify how you want to map the data from the source
  worksheet to Project fields.




                                                                www.mashahzad.com
• On the Source worksheet name list, select Tasks.
• “Tasks” is the name of the sheet in the Excel workbook.
  Project analyzes the header row names from the worksheet
  and suggests the Project field names that are probable
  matches.
                                                                45
www.mashahzad.com
46
…Import project information
• Click Next.
• The final page of the Import Wizard appears. Here, you have
  the option of saving the settings for the new import map,
  which is useful when you anticipate importing similar data into
  Project in the future. This time, you’ll skip this step.




                                                                    www.mashahzad.com
• Click Finish.
• A confirmation dialog box appears because Project is now
  attempting to open a non-default file format.
• Click Yes.
• Project imports the Excel data into a new Project plan. (The
  dates you see on the timescale will differ from those shown
  because Project uses the current date as the project start date   47
  in the new file.)
…Import project information




                                                                   www.mashahzad.com
• Unless you’ve changed the default scheduling setting for new
  tasks, the task list is manually scheduled.
• This is a simple task list with just task names and durations.
  The process for importing
• More complex structured data is similar, however.
• Close the new file without saving the changes.                   48
• The Sharing project plan remains open in Project.
Define and use of Network
diagram
• Network Diagram is a standard way of representing project
  activities and their relationships.
• A project network is a graph (flow chart) depicting the
  sequence in which a project's terminal elements are to be
  completed by showing terminal elements and their




                                                                    www.mashahzad.com
  dependencies.
• A network diagram is essentially a flow chart that includes all
  of the project elements and how they relate to one another.
• It is easy to read and
• Not only depicts the sequence of activities in the project, but
  also shows parallel activities and the links between each
  activity.                                                         49
Network diagram…
• Certain tasks are
  dependent on one
  another to complete
  the project.




                        www.mashahzad.com
• Click on  View and
  then  on Network
  Diagram


                        50
www.mashahzad.com
51
Printing options of MS Project
• Printing a view or report in MS Project is very similar to
  printing in other Office programs:
• Click File >  Print >  Print.
• Click  Page Setup; this link appears at the bottom of the




                                                                     www.mashahzad.com
  controls, to the left of the print preview.
• Make sure the Page tab is visible, and then under Scaling, click
  Fit to and type or select 1 page wide by 2 tall.
• In the Page Setup dialog box, click the Legend tab.
• On the Legend tab are three alignment tabs. Click the Left tab.
• Here, you can see the text and field codes that appear in the
  legend.
                                                                     52
www.mashahzad.com
53
www.mashahzad.com
54
Printing…
• Project will print the project title and current date on the left
  side of the legend. You also want to print the project plan’s
  estimated cost value in the legend.
• Click at the end of the second line of text, and then press the
  Enter key.




                                                                      www.mashahzad.com
• Type Total Cost: followed by a space.
• In the Project fields box, click Cost from the drop-down list,
  and then click Add.
• Project adds the cost code to the Left legend text.
• To conclude the page setup customization, you’ll specify what
  columns from the table in the Gantt Chart view get printed.
                                                                      55
www.mashahzad.com
56
Printing…
• To conclude the page setup customization, you’ll specify what
  columns from the table in the Gantt Chart view get printed.
• Click the View tab.
• Click Print all sheet columns, and then click OK to close the




                                                                    www.mashahzad.com
  Page Setup dialog box.
• Project applies the changes you specified to the legend. To get
  a closer look, zoom in on the legend.
• In the Print Preview screen, click the lower-left corner of the
  page with the magnifying- glass pointer.
• Project zooms in to show the page at a legible resolution.

                                                                    57
www.mashahzad.com
58
Printing…
• On the View tab, in the Split View group, click the Timeline check
  box.

• Project displays the Timeline view.




                                                                         www.mashahzad.com
• Click anywhere in the Timeline view.

• On the File tab, click Save & Send.

• This pane of the Backstage view includes options for several ways of
  sharing or collaborating online.

• Under the File Types heading on the left side of the Save & Send
  tab, click Create PDF/XPS Document.                                    59
www.mashahzad.com
60
www.mashahzad.com
61
Printing…
• Click Create PDF/XPS.

• The Browse dialog box appears. Use the file name and
  location given in the dialog box.




                                                                  www.mashahzad.com
• In the Save as type box, select either PDF Files or XPS Files
  (depending on what format you want to see), and then click
  OK.

• The Document Export Options dialog box appears. Use the
  default settings.

•  Click OK.                                                     62
MS Project 2007 --- 2010
• Word is now moving from Project 2007 to Project 2010.
• Microsoft Project 2010 is a powerful application that allows
  you to plan, resource, manage and report on a project no
  matter how large.
• In project 2010 you can create projects which can be managed




                                                                  www.mashahzad.com
  across continents via the Internet or intranet.
• User Friendly Applications.
• Major new features introduced in the 2010 edition.
• Different View
• Project 2010 offers a manual scheduling mode.
• Project Professional 2010 contains the Team Planner, a
  resource scheduling view that lets users see at a glance what
  their team members are working on and move tasks from one       63
  person to another.
MS Project 2007 --- 2010…
• Synchronization with SharePoint lists
• Placeholder tasks let users create a plan by using task names
  only. Users can enter any combination of start date, finish
  date, and duration and fill in the rest later.
• Project 2010 now includes a timeline view.




                                                                   www.mashahzad.com
• Enhanced copy and paste
• The compare projects feature in Project 2010 now includes
  Gantt bars to help users see more clearly how one version of a
  project differs from another version.
• Features similar to those in Microsoft Excel are available in
  Project 2010.
• Creating subtasks and then rolling them up into summary
  tasks is no longer restricted.                                   64
www.mashahzad.com
65

Weitere ähnliche Inhalte

Ähnlich wie Ms projects training

MIS485 Capstone Project in MIS 2MGT 400 - Project M
MIS485 Capstone Project in MIS 2MGT 400 - Project MMIS485 Capstone Project in MIS 2MGT 400 - Project M
MIS485 Capstone Project in MIS 2MGT 400 - Project MIlonaThornburg83
 
Primavera vs Microsoft Project Professional
Primavera vs Microsoft Project ProfessionalPrimavera vs Microsoft Project Professional
Primavera vs Microsoft Project ProfessionalAdvaiya Solutions, Inc.
 
MPUG Webinar: Setting up a project schedule without a PPM solution
MPUG Webinar: Setting up a project schedule without a PPM solutionMPUG Webinar: Setting up a project schedule without a PPM solution
MPUG Webinar: Setting up a project schedule without a PPM solutionRaphael Santos
 
Initialization microsoft project 2010
Initialization microsoft project  2010Initialization microsoft project  2010
Initialization microsoft project 2010Wipro
 
Wbs, estimation and scheduling
Wbs, estimation and schedulingWbs, estimation and scheduling
Wbs, estimation and schedulingSulman Ahmed
 
Cognos Online Training with placement Assistance - QuontraSolutions
Cognos Online Training with placement Assistance - QuontraSolutionsCognos Online Training with placement Assistance - QuontraSolutions
Cognos Online Training with placement Assistance - QuontraSolutionsQUONTRASOLUTIONS
 
Kendo Manager On-premise Project Management Software
Kendo Manager On-premise Project Management SoftwareKendo Manager On-premise Project Management Software
Kendo Manager On-premise Project Management SoftwareMSc. Ljubisa Vukovic
 
The secret to delivering a great website project on time and on budget every ...
The secret to delivering a great website project on time and on budget every ...The secret to delivering a great website project on time and on budget every ...
The secret to delivering a great website project on time and on budget every ...Marketecture
 
Where is Scheduling Headed?
Where is Scheduling Headed?Where is Scheduling Headed?
Where is Scheduling Headed?Basis
 
Use of computer in project management
Use of computer in project managementUse of computer in project management
Use of computer in project managementImran Nawaz
 
Primavera P6 Training.pdf
Primavera P6 Training.pdfPrimavera P6 Training.pdf
Primavera P6 Training.pdfirfanakram32
 
Primavara
PrimavaraPrimavara
Primavaradanabl
 
Comparison and Analysis of Project Management software
Comparison and Analysis of Project Management softwareComparison and Analysis of Project Management software
Comparison and Analysis of Project Management softwareKonstantin Prokhorov, MBA, MSc
 
MS Project Management (Overviews) | Software Mange Tool | Software Project Ma...
MS Project Management (Overviews) | Software Mange Tool | Software Project Ma...MS Project Management (Overviews) | Software Mange Tool | Software Project Ma...
MS Project Management (Overviews) | Software Mange Tool | Software Project Ma...Kuldeep Kumar
 
Softwares used in project management
Softwares used in project managementSoftwares used in project management
Softwares used in project managementAmmar abbas
 
Recruiting for Drupal #Hiring
Recruiting for Drupal #HiringRecruiting for Drupal #Hiring
Recruiting for Drupal #HiringGaurav Gaur
 
Fast track RTC Innovate India 2013
Fast track  RTC Innovate India 2013Fast track  RTC Innovate India 2013
Fast track RTC Innovate India 2013Daniel Leroux
 

Ähnlich wie Ms projects training (20)

MIS485 Capstone Project in MIS 2MGT 400 - Project M
MIS485 Capstone Project in MIS 2MGT 400 - Project MMIS485 Capstone Project in MIS 2MGT 400 - Project M
MIS485 Capstone Project in MIS 2MGT 400 - Project M
 
Primavera vs Microsoft Project Professional
Primavera vs Microsoft Project ProfessionalPrimavera vs Microsoft Project Professional
Primavera vs Microsoft Project Professional
 
MPUG Webinar: Setting up a project schedule without a PPM solution
MPUG Webinar: Setting up a project schedule without a PPM solutionMPUG Webinar: Setting up a project schedule without a PPM solution
MPUG Webinar: Setting up a project schedule without a PPM solution
 
Initialization microsoft project 2010
Initialization microsoft project  2010Initialization microsoft project  2010
Initialization microsoft project 2010
 
Wbs
WbsWbs
Wbs
 
Wbs, estimation and scheduling
Wbs, estimation and schedulingWbs, estimation and scheduling
Wbs, estimation and scheduling
 
Cognos Online Training with placement Assistance - QuontraSolutions
Cognos Online Training with placement Assistance - QuontraSolutionsCognos Online Training with placement Assistance - QuontraSolutions
Cognos Online Training with placement Assistance - QuontraSolutions
 
Kendo Manager On-premise Project Management Software
Kendo Manager On-premise Project Management SoftwareKendo Manager On-premise Project Management Software
Kendo Manager On-premise Project Management Software
 
The secret to delivering a great website project on time and on budget every ...
The secret to delivering a great website project on time and on budget every ...The secret to delivering a great website project on time and on budget every ...
The secret to delivering a great website project on time and on budget every ...
 
Where is Scheduling Headed?
Where is Scheduling Headed?Where is Scheduling Headed?
Where is Scheduling Headed?
 
Use of computer in project management
Use of computer in project managementUse of computer in project management
Use of computer in project management
 
tcc primavera
tcc primaveratcc primavera
tcc primavera
 
Primavera P6 Training.pdf
Primavera P6 Training.pdfPrimavera P6 Training.pdf
Primavera P6 Training.pdf
 
Primavara
PrimavaraPrimavara
Primavara
 
Comparison and Analysis of Project Management software
Comparison and Analysis of Project Management softwareComparison and Analysis of Project Management software
Comparison and Analysis of Project Management software
 
SPM_UNIT-2.pptx
SPM_UNIT-2.pptxSPM_UNIT-2.pptx
SPM_UNIT-2.pptx
 
MS Project Management (Overviews) | Software Mange Tool | Software Project Ma...
MS Project Management (Overviews) | Software Mange Tool | Software Project Ma...MS Project Management (Overviews) | Software Mange Tool | Software Project Ma...
MS Project Management (Overviews) | Software Mange Tool | Software Project Ma...
 
Softwares used in project management
Softwares used in project managementSoftwares used in project management
Softwares used in project management
 
Recruiting for Drupal #Hiring
Recruiting for Drupal #HiringRecruiting for Drupal #Hiring
Recruiting for Drupal #Hiring
 
Fast track RTC Innovate India 2013
Fast track  RTC Innovate India 2013Fast track  RTC Innovate India 2013
Fast track RTC Innovate India 2013
 

Kürzlich hochgeladen

4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptxmary850239
 
Integumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptIntegumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptshraddhaparab530
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxHumphrey A Beña
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management SystemChristalin Nelson
 
EmpTech Lesson 18 - ICT Project for Website Traffic Statistics and Performanc...
EmpTech Lesson 18 - ICT Project for Website Traffic Statistics and Performanc...EmpTech Lesson 18 - ICT Project for Website Traffic Statistics and Performanc...
EmpTech Lesson 18 - ICT Project for Website Traffic Statistics and Performanc...liera silvan
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfErwinPantujan2
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17Celine George
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Seán Kennedy
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...Postal Advocate Inc.
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONHumphrey A Beña
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 
Oppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmOppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmStan Meyer
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Celine George
 
Congestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationCongestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationdeepaannamalai16
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4JOYLYNSAMANIEGO
 

Kürzlich hochgeladen (20)

4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx
 
Integumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptIntegumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.ppt
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
 
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptxYOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management System
 
EmpTech Lesson 18 - ICT Project for Website Traffic Statistics and Performanc...
EmpTech Lesson 18 - ICT Project for Website Traffic Statistics and Performanc...EmpTech Lesson 18 - ICT Project for Website Traffic Statistics and Performanc...
EmpTech Lesson 18 - ICT Project for Website Traffic Statistics and Performanc...
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
 
Paradigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTAParadigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTA
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptxYOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
 
Oppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmOppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and Film
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17
 
Congestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationCongestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentation
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4
 

Ms projects training

  • 1. www.mashahzad.com MS Project Training By Muhammad Aamer Shahzad. 1
  • 3. Trainer’s Bio data • Muhammad Aamer Shahzad • MS Project Management • M. Sc Economicss • EXPERIENCE: 6 YEARS • Allmed Solution, Islamabad, Pakistan www.mashahzad.com • Position: Territory Manager (Islamabad) • Position: Marketing Coordinator • Universal Research Group, Islamabad, Pakistan • Position: Clinical Research Associates • National Institute of Management Science (NIMS), Islamabad, • Position: Lecturer • Research Consultancy • Areas of interests: • Project Management, Management & Research 3 (Projects/Social), Proposal & Report Writing.
  • 4. Contents Brief Introduction to the MS Project 2007 Basics Work Breakdown structure Define and use of Critical Path Analysis www.mashahzad.com Macros of MS Project How to Setting up the Base line Updating the project progress data 4 Preparations of different reports
  • 5. Contents Exporting of project data to other software applications Define and use of Network diagram www.mashahzad.com Printing options of MS Project Brief Introduction to the MS Project 2010 with enhancing capabilities from 2007 5
  • 6. What is Project ? • A project is an endeavor that helps to accomplish some specific objective by utilizing definite interconnected tasks and the effective utilization of resources. (Agarwal, 2011). www.mashahzad.com • A temporary endeavor undertaken to create a unique product, service, or result”. (Project management Institute, 2008). • In terms of scope, schedule and cost, a project has a well-defined stated objective (James P. & Gido, 6 2009).
  • 9. www.mashahzad.com 10 steps of project planning 9
  • 10. Project management soft wares • Project management software has a capacity to help plan, organize, and manage resource pools and develop resource estimate • Number of Project management software available. • All good project software packages contain the facility to create www.mashahzad.com Gantt Charts and PERT networks. • The Gantt chart provides a quick overview of your plan and a way of monitoring progress. • A PERT chart is a project management tool used to schedule, organize, and coordinate tasks within a project. • The right type of tool should be selected only after your needs are clearly identified. 10 • MS Project is one of them – 200 project management software
  • 11. Brief Introduction to the MS Project 2007 Basics • Microsoft Project – developed and sold by Microsoft, • Founded by Alan M. Boyd in 1984-5 • Designed to assist a project manager in developing a plan, assigning resources to tasks, tracking progress, www.mashahzad.com managing the budget, and analyzing workloads. • Available on many corporate computing networks and is also available for individual PCs • creates critical path schedules, and critical chain and event chain methodology • Schedules can be resource leveled, and chains are visualized in a Gantt chart. 11
  • 12. Introduction • Enables you to stay informed and control: • Project work • Schedules • Finances www.mashahzad.com • Keep project teams aligned • File format is .mpp. •  Select the Start | Programs | MS Office |  MS Project 12
  • 14. Starting Microsoft Project • Go to file, select new. This will open a screen for blank project click ok. • You can now enter your project information viz. start date, finish date and also how would you like to schedule the project from either start or finish date. • Select Gantt Chart view from the view menu. www.mashahzad.com • You’ll have a spreadsheet where you can now enter information of all the activities i.e. task name, duration, start date, end date, predecessors and various other fields. • You can enter required information in two ways, in spreadsheet or when you double click on cell you get pop up window in which you can enter all the information of that particular activity. • For predecessor activity you need to write activity number. • The Soft Ware itself will calculate start and end date. 14 • Now the Gantt Chart is complete.
  • 16. Gantt Chart www.mashahzad.com 16
  • 17. Work Breakdown structure • A work breakdown structure (WBS), is a division of deliverable of a project into smaller components. • Helps organize and define the total work scope of the project. • Provides the necessary framework for detailed cost estimating www.mashahzad.com and controlling • Providing guidance for schedule development and control. 17
  • 18. WBS • Select the “Information” column, right click and choose “Hide Column”. • Next select the “Task Name” column and from the “Insert” www.mashahzad.com menu select “Column”. The following pop-up will appear. • Choose “WBS” as the “Field name” 18
  • 19. Critical Path Analysis • Critical Path Analysis (CPA) or the Critical Path Method (CPM) helps you to plan all tasks that must be completed as part of a project. • Basis both for preparation of a schedule, and of resource www.mashahzad.com planning. • Allow you to monitor achievement of project goals. • Help you develop and test your plan to ensure that it is robust. • CPA helps you to identify the minimum length of time needed to complete a project 19
  • 20. CPM… • For finding CP list all the activities and enter early start, late start, early finish and late finish info of all the activities. • You can do this under insert/columns and selecting each www.mashahzad.com terms. • Following screen shot demonstrates how to insert. • MS Project automatically calculates Early Start, Early Finish, Least Start and Least Finish based on the starting/ending dates you have provided. 20
  • 21. CPM www.mashahzad.com 21
  • 22. Macros of MS Project • A recorded or programmed set of instructions that carry out a specific action when initiated. • Macros in Microsoft Project use Microsoft Visual Basic for Applications (VBA). • Macros are great tools that can be used to automate www.mashahzad.com repetitive tasks. • Create a Macro • complex calculations which need to be repeated for varied sets of inputs, • a particular action being performed over and over again on different input, files, etc. • Start Macro Recording 22 • Navigate to Tools --> Macro --> Record New Macro --> ok
  • 23. Macros of MS Project • Stopping Macro Recording • Click on Tools --> Macro --> Stop Recorder. • Running the Macro www.mashahzad.com • Navigate to Tools --> Macro --> Macros (or press Alt+F8). • Select the macro which you created, and click on Run. 23
  • 25. Setting up the Base line • Baseline is a benchmark of your project's status before work on the project begins. • When you save a baseline, Project copies the information from the Start and Finish fields into the Baseline Start and Baseline Finish fields. www.mashahzad.com • The baseline is used evaluate your project progress. • Baselines measure five parameters—start dates, finish dates, durations, costs, and work or labor estimates • Select Tools |Tracking  | Save Baseline from the menu bar. 25 Ensure Entire Project option is selected—this is the default. Click OK.
  • 26. Updating the project progress data • Update the baseline for the entire project. • This simply replaces baseline values with the currently scheduled values. • Update the baseline for selected tasks. • This does not affect the for other tasks or resource baseline www.mashahzad.com values in the project plan. • Save a second or subsequent baseline. • You can save up to 11 baselines in a single plan. The first one is called Baseline, and the rest are Baseline 1 through Baseline 10. • If you enter an actual finish date for a task, Project calculates its percent complete to be 100%. 26
  • 27. Updating the project progress data • To quickly update actual start and finish dates for multiple tasks that have the same date, select each task that you want to update, and then, on the Project tab, in the Status group, click Update Project. www.mashahzad.com • The Update Project dialog appears. Click Update work as complete through, type or select a date, and then next to For, click Selected tasks. Click OK 27
  • 28. Preparations of different reports • The Report Menu gives you access to preconceived reports, which you can also Edit as per your convenience. www.mashahzad.com 28
  • 29. Exporting of project data to other software applications • You can export information from Microsoft Project to another format using a wizard. • Following is a list of formats you export to or import from. • Microsoft Excel (as a workbook or PivotTable report) www.mashahzad.com • text-only (tab delimited) • comma-separated values (CSV) • Extensible Markup Language (XML) • What do you want to do? • Export project information • Import project information 29
  • 30. Export project information On the File tab, click Save As. The Save As dialog box appears. 1. In the File name box, type Sharing, and then click Save. 2. To begin, you’ll copy some task names, durations, and start and finish dates from Project to Word. 3. In the Entry table on the left side of the Gantt Chart view, www.mashahzad.com select from the name of task 5, Editorial, through task 13’s finish date, Wed 9/19/12. 4. On the Task tab, in the Clipboard group, click Copy. Project copies the selected range to the Clipboard. 5. Start Word (or a comparable word processor application), create a new document, and then paste the Clipboard contents into the new document. • If you have Word 2010, your screen should look similar to the 30 following illustration.
  • 31. MS Word 2010 www.mashahzad.com 31
  • 32. For Excel • Start Excel (or a comparable spreadsheet application) and create a new document. • Now you will copy resource cost details from Project to Excel. • Switch back to Project. www.mashahzad.com • On the View tab, in the Resource Views group, click Resource Sheet. • The Resource Sheet view replaces the Gantt Chart view. • On the View tab, in the Data group, click Tables and then click Cost. • This is the resource cost information you’d like to paste into Excel. 32
  • 33. www.mashahzad.com 33 Click the Select All button in the upper-left corner of the Cost table. Project selects the entire table, although only cells that contain values will be copied.
  • 35. For Excel… • On the Task tab, in the Clipboard group, click Copy. • Project copies the selected range to the Clipboard. www.mashahzad.com • Switch back to Excel and then paste the Clipboard contents into the new document. • In Excel, if necessary, widen any columns that don’t display the data values and instead • Display pound signs (##). If you have Excel 2010, your screen 35 should look similar to the following illustration.
  • 37. For Excel… • As with pasting into Word, note that pasting into Excel generated the correct column headings, and the cell values are the expected data types. • Close Word and Excel, and then switch back to Project. www.mashahzad.com • The pasting of rich tabular data into Word or Excel does not work the same way in all applications. • If you were to paste the same data into Notepad, for example, the result would be tab-delimited data and no column headings. Feel free to experiment with this. 37
  • 38. Import project information • In Project, on the  File tab, click Options. • The Project Options dialog box appears. •  Click the Trust Center tab. •  Click Trust Center Settings. www.mashahzad.com • The Trust Center dialog box appears. •  Click the Legacy Formats tab. • Under Legacy Formats,  click Prompt when loading files with legacy or non-default file format. 38
  • 40. …Import project information • Click OK to close the Trust Center dialog box, and then click OK again to close the Project Options dialog box. • With this change to Project’s settings completed, you’re ready www.mashahzad.com to import an Excel workbook. • Click the File tab, and then click Open. • Navigate to the Chapter17 practice file folder. • In the file type box (initially labeled Microsoft Project Files), 40 select Excel 97-2003 Workbook.
  • 41. …Import project information • Select the Sample Task List file, and then click Open. • The Import Wizard appears. This wizard helps you import structured data from a different format to Project. www.mashahzad.com • Click Next. • The second page of the Import Wizard appears. 41
  • 43. …Import project information • The Import Wizard uses maps to organize the way that structured data from another file format is imported into Project. For this exercise, you will create a new map. • Make sure that New map is selected, and then click Next. • The Import Mode page of the Import Wizard appears. www.mashahzad.com • Make sure that As a new project is selected, and then click Next. • The Map Options page of the Import Wizard appears. • Select the Tasks check box, and make sure that Import includes headers is selected as well. • Headers here refer to column headings. 43
  • 45. …Import project information • Click Next. • The Task Mapping page of the Import Wizard appears. Here, you identify the source worksheet within the Excel workbook and specify how you want to map the data from the source worksheet to Project fields. www.mashahzad.com • On the Source worksheet name list, select Tasks. • “Tasks” is the name of the sheet in the Excel workbook. Project analyzes the header row names from the worksheet and suggests the Project field names that are probable matches. 45
  • 47. …Import project information • Click Next. • The final page of the Import Wizard appears. Here, you have the option of saving the settings for the new import map, which is useful when you anticipate importing similar data into Project in the future. This time, you’ll skip this step. www.mashahzad.com • Click Finish. • A confirmation dialog box appears because Project is now attempting to open a non-default file format. • Click Yes. • Project imports the Excel data into a new Project plan. (The dates you see on the timescale will differ from those shown because Project uses the current date as the project start date 47 in the new file.)
  • 48. …Import project information www.mashahzad.com • Unless you’ve changed the default scheduling setting for new tasks, the task list is manually scheduled. • This is a simple task list with just task names and durations. The process for importing • More complex structured data is similar, however. • Close the new file without saving the changes. 48 • The Sharing project plan remains open in Project.
  • 49. Define and use of Network diagram • Network Diagram is a standard way of representing project activities and their relationships. • A project network is a graph (flow chart) depicting the sequence in which a project's terminal elements are to be completed by showing terminal elements and their www.mashahzad.com dependencies. • A network diagram is essentially a flow chart that includes all of the project elements and how they relate to one another. • It is easy to read and • Not only depicts the sequence of activities in the project, but also shows parallel activities and the links between each activity. 49
  • 50. Network diagram… • Certain tasks are dependent on one another to complete the project. www.mashahzad.com • Click on  View and then  on Network Diagram 50
  • 52. Printing options of MS Project • Printing a view or report in MS Project is very similar to printing in other Office programs: • Click File >  Print >  Print. • Click  Page Setup; this link appears at the bottom of the www.mashahzad.com controls, to the left of the print preview. • Make sure the Page tab is visible, and then under Scaling, click Fit to and type or select 1 page wide by 2 tall. • In the Page Setup dialog box, click the Legend tab. • On the Legend tab are three alignment tabs. Click the Left tab. • Here, you can see the text and field codes that appear in the legend. 52
  • 55. Printing… • Project will print the project title and current date on the left side of the legend. You also want to print the project plan’s estimated cost value in the legend. • Click at the end of the second line of text, and then press the Enter key. www.mashahzad.com • Type Total Cost: followed by a space. • In the Project fields box, click Cost from the drop-down list, and then click Add. • Project adds the cost code to the Left legend text. • To conclude the page setup customization, you’ll specify what columns from the table in the Gantt Chart view get printed. 55
  • 57. Printing… • To conclude the page setup customization, you’ll specify what columns from the table in the Gantt Chart view get printed. • Click the View tab. • Click Print all sheet columns, and then click OK to close the www.mashahzad.com Page Setup dialog box. • Project applies the changes you specified to the legend. To get a closer look, zoom in on the legend. • In the Print Preview screen, click the lower-left corner of the page with the magnifying- glass pointer. • Project zooms in to show the page at a legible resolution. 57
  • 59. Printing… • On the View tab, in the Split View group, click the Timeline check box. • Project displays the Timeline view. www.mashahzad.com • Click anywhere in the Timeline view. • On the File tab, click Save & Send. • This pane of the Backstage view includes options for several ways of sharing or collaborating online. • Under the File Types heading on the left side of the Save & Send tab, click Create PDF/XPS Document. 59
  • 62. Printing… • Click Create PDF/XPS. • The Browse dialog box appears. Use the file name and location given in the dialog box. www.mashahzad.com • In the Save as type box, select either PDF Files or XPS Files (depending on what format you want to see), and then click OK. • The Document Export Options dialog box appears. Use the default settings. •  Click OK. 62
  • 63. MS Project 2007 --- 2010 • Word is now moving from Project 2007 to Project 2010. • Microsoft Project 2010 is a powerful application that allows you to plan, resource, manage and report on a project no matter how large. • In project 2010 you can create projects which can be managed www.mashahzad.com across continents via the Internet or intranet. • User Friendly Applications. • Major new features introduced in the 2010 edition. • Different View • Project 2010 offers a manual scheduling mode. • Project Professional 2010 contains the Team Planner, a resource scheduling view that lets users see at a glance what their team members are working on and move tasks from one 63 person to another.
  • 64. MS Project 2007 --- 2010… • Synchronization with SharePoint lists • Placeholder tasks let users create a plan by using task names only. Users can enter any combination of start date, finish date, and duration and fill in the rest later. • Project 2010 now includes a timeline view. www.mashahzad.com • Enhanced copy and paste • The compare projects feature in Project 2010 now includes Gantt bars to help users see more clearly how one version of a project differs from another version. • Features similar to those in Microsoft Excel are available in Project 2010. • Creating subtasks and then rolling them up into summary tasks is no longer restricted. 64