SlideShare ist ein Scribd-Unternehmen logo
1 von 9
AO6 – Collaboratively Review
  Results and Produce Final Product

 Unit 2: Collaborative Working
Group Task

• You will be working in your groups to
  complete the work for this Assessment
  Objective.




                        Unit 2: Collaborative Working
Reviewing Group Member’s Work

• To ensure the final product is accurate
  you will each review each others work.




                         Unit 2: Collaborative Working
Comments & Tracking Changes

• Use the Review toolbar to add
  comments to the work you are
  reviewing and track changes in order
  to give feedback later.




                       Unit 2: Collaborative Working
Version Numbers
• Each time you make changes to work you
  have received save it with a different version
  number.

• This stops the original being lost.

• Example:



                              Unit 2: Collaborative Working
Acting on Feedback
• Once your page has been reviewed by
  another group member you will need to
  amend your document in light of feedback
  received.

• You may not choose to act on all
  feedback, but will need to justify why not.




                             Unit 2: Collaborative Working
Final Product
• Once all individual changes have been made
  each page will need to be put together to
  produce a final document to go into the
  next edition of Innov8 Magazine.




                           Unit 2: Collaborative Working
AO6 Portfolio Evidence (Part 1)
 Hold a group meeting (and provide minutes) to
  decide who will be reviewing which pages and who
  will be putting all the pages together into a
  finished product.

 Email your completed document to your reviewer
  (provide annotated screenshots of sending and
  receiving the emails).

 Ensure you save the original and new documents
  with different version numbers (provide
  annotated screenshots of these explaining
  purpose)

                              Unit 2: Collaborative Working
AO6 Portfolio Evidence (Part 2)
 Review your allocated piece of work by adding
  thorough and helpful comments and
  tracking the changes you make.

 When complete email this back to the author.

 Act on feedback received or explain why
  suggestions were not followed. (Don’t forget to
  save the new one as a different version)

 Produce the final magazine insert with all
  pages complete.
                              Unit 2: Collaborative Working

Weitere ähnliche Inhalte

Andere mochten auch

Effizientes lesen - Lesegeschwindigkeit steigern
Effizientes lesen -  Lesegeschwindigkeit steigernEffizientes lesen -  Lesegeschwindigkeit steigern
Effizientes lesen - Lesegeschwindigkeit steigernStefan Martens
 
GRATISKULTUR IM WEB - FLUCH ODER SEGEN ?
GRATISKULTUR IM WEB  - FLUCH ODER SEGEN ? GRATISKULTUR IM WEB  - FLUCH ODER SEGEN ?
GRATISKULTUR IM WEB - FLUCH ODER SEGEN ? Stefan Martens
 
eCollaboration: Evaluation of a File Sharing Platform for SME
eCollaboration: Evaluation of a File Sharing Platform for SMEeCollaboration: Evaluation of a File Sharing Platform for SME
eCollaboration: Evaluation of a File Sharing Platform for SMEStefan Martens
 
Consumer Behaviour
Consumer BehaviourConsumer Behaviour
Consumer BehaviourArjun Ramesh
 

Andere mochten auch (6)

Effizientes lesen - Lesegeschwindigkeit steigern
Effizientes lesen -  Lesegeschwindigkeit steigernEffizientes lesen -  Lesegeschwindigkeit steigern
Effizientes lesen - Lesegeschwindigkeit steigern
 
Apple Update 2013
Apple Update 2013Apple Update 2013
Apple Update 2013
 
GRATISKULTUR IM WEB - FLUCH ODER SEGEN ?
GRATISKULTUR IM WEB  - FLUCH ODER SEGEN ? GRATISKULTUR IM WEB  - FLUCH ODER SEGEN ?
GRATISKULTUR IM WEB - FLUCH ODER SEGEN ?
 
eCollaboration: Evaluation of a File Sharing Platform for SME
eCollaboration: Evaluation of a File Sharing Platform for SMEeCollaboration: Evaluation of a File Sharing Platform for SME
eCollaboration: Evaluation of a File Sharing Platform for SME
 
Chapter 2 MIS
Chapter 2 MISChapter 2 MIS
Chapter 2 MIS
 
Consumer Behaviour
Consumer BehaviourConsumer Behaviour
Consumer Behaviour
 

Ähnlich wie Ao6 collaboratively review

Ao7 review and evaluate
Ao7   review and evaluateAo7   review and evaluate
Ao7 review and evaluateMartin Booth
 
Ao5 carry out allocated part
Ao5   carry out allocated partAo5   carry out allocated part
Ao5 carry out allocated partMartin Booth
 
Cmp induction project 2021 pro forma
Cmp induction project 2021 pro formaCmp induction project 2021 pro forma
Cmp induction project 2021 pro formaDavid Bakes
 
Project4 Schedule Steps Engl317 Summer2021
Project4 Schedule Steps Engl317 Summer2021Project4 Schedule Steps Engl317 Summer2021
Project4 Schedule Steps Engl317 Summer2021Victoria Arthur
 
Agile development
Agile developmentAgile development
Agile developmentcatchkinnu
 
Assignment Instructions  The case study is a project manag.docx
Assignment Instructions  The case study is a project manag.docxAssignment Instructions  The case study is a project manag.docx
Assignment Instructions  The case study is a project manag.docxssuser562afc1
 
Year 13 Multimedia Project Management
Year 13 Multimedia Project ManagementYear 13 Multimedia Project Management
Year 13 Multimedia Project Managementc.west
 
Cornel Fatulescu - Envisaged Collaboration Framework - CodeCamp 25 oct 2014
Cornel Fatulescu  - Envisaged Collaboration Framework - CodeCamp 25 oct 2014Cornel Fatulescu  - Envisaged Collaboration Framework - CodeCamp 25 oct 2014
Cornel Fatulescu - Envisaged Collaboration Framework - CodeCamp 25 oct 2014Codecamp Romania
 
EEECSE 120 Answer SheetCapstone Design Project .docx
EEECSE 120 Answer SheetCapstone Design Project             .docxEEECSE 120 Answer SheetCapstone Design Project             .docx
EEECSE 120 Answer SheetCapstone Design Project .docxtoltonkendal
 
Unit4 reverse engineering
Unit4 reverse engineeringUnit4 reverse engineering
Unit4 reverse engineeringAtul Joshi
 
Daily Scrum, Sprint Review & Retrospective.pptx
Daily Scrum, Sprint Review & Retrospective.pptxDaily Scrum, Sprint Review & Retrospective.pptx
Daily Scrum, Sprint Review & Retrospective.pptxMd. Rakib Trofder
 
The benefits of using Git
The benefits of using GitThe benefits of using Git
The benefits of using GitYannick Warnier
 

Ähnlich wie Ao6 collaboratively review (20)

Ao7 review and evaluate
Ao7   review and evaluateAo7   review and evaluate
Ao7 review and evaluate
 
Ao1 plan project
Ao1   plan projectAo1   plan project
Ao1 plan project
 
LO4 - Lesson 2 - Feedback
LO4 - Lesson 2 - FeedbackLO4 - Lesson 2 - Feedback
LO4 - Lesson 2 - Feedback
 
Prg 211 prg211
Prg 211 prg211Prg 211 prg211
Prg 211 prg211
 
Lab 1: Conducting a review
Lab 1: Conducting a reviewLab 1: Conducting a review
Lab 1: Conducting a review
 
Ao5 carry out allocated part
Ao5   carry out allocated partAo5   carry out allocated part
Ao5 carry out allocated part
 
Cmp induction project 2021 pro forma
Cmp induction project 2021 pro formaCmp induction project 2021 pro forma
Cmp induction project 2021 pro forma
 
Project4 Schedule Steps Engl317 Summer2021
Project4 Schedule Steps Engl317 Summer2021Project4 Schedule Steps Engl317 Summer2021
Project4 Schedule Steps Engl317 Summer2021
 
觀察者模式
觀察者模式 觀察者模式
觀察者模式
 
Agile development
Agile developmentAgile development
Agile development
 
Assignment Instructions  The case study is a project manag.docx
Assignment Instructions  The case study is a project manag.docxAssignment Instructions  The case study is a project manag.docx
Assignment Instructions  The case study is a project manag.docx
 
Year 13 Multimedia Project Management
Year 13 Multimedia Project ManagementYear 13 Multimedia Project Management
Year 13 Multimedia Project Management
 
Cornel Fatulescu - Envisaged Collaboration Framework - CodeCamp 25 oct 2014
Cornel Fatulescu  - Envisaged Collaboration Framework - CodeCamp 25 oct 2014Cornel Fatulescu  - Envisaged Collaboration Framework - CodeCamp 25 oct 2014
Cornel Fatulescu - Envisaged Collaboration Framework - CodeCamp 25 oct 2014
 
EEECSE 120 Answer SheetCapstone Design Project .docx
EEECSE 120 Answer SheetCapstone Design Project             .docxEEECSE 120 Answer SheetCapstone Design Project             .docx
EEECSE 120 Answer SheetCapstone Design Project .docx
 
Unit4 reverse engineering
Unit4 reverse engineeringUnit4 reverse engineering
Unit4 reverse engineering
 
Sip311 w5-indie study
Sip311 w5-indie studySip311 w5-indie study
Sip311 w5-indie study
 
3-SE Agility and Process-2.pptx
3-SE Agility and Process-2.pptx3-SE Agility and Process-2.pptx
3-SE Agility and Process-2.pptx
 
Daily Scrum, Sprint Review & Retrospective.pptx
Daily Scrum, Sprint Review & Retrospective.pptxDaily Scrum, Sprint Review & Retrospective.pptx
Daily Scrum, Sprint Review & Retrospective.pptx
 
The Scrum Framework
The Scrum FrameworkThe Scrum Framework
The Scrum Framework
 
The benefits of using Git
The benefits of using GitThe benefits of using Git
The benefits of using Git
 

Ao6 collaboratively review

  • 1. AO6 – Collaboratively Review Results and Produce Final Product  Unit 2: Collaborative Working
  • 2. Group Task • You will be working in your groups to complete the work for this Assessment Objective. Unit 2: Collaborative Working
  • 3. Reviewing Group Member’s Work • To ensure the final product is accurate you will each review each others work. Unit 2: Collaborative Working
  • 4. Comments & Tracking Changes • Use the Review toolbar to add comments to the work you are reviewing and track changes in order to give feedback later. Unit 2: Collaborative Working
  • 5. Version Numbers • Each time you make changes to work you have received save it with a different version number. • This stops the original being lost. • Example: Unit 2: Collaborative Working
  • 6. Acting on Feedback • Once your page has been reviewed by another group member you will need to amend your document in light of feedback received. • You may not choose to act on all feedback, but will need to justify why not. Unit 2: Collaborative Working
  • 7. Final Product • Once all individual changes have been made each page will need to be put together to produce a final document to go into the next edition of Innov8 Magazine. Unit 2: Collaborative Working
  • 8. AO6 Portfolio Evidence (Part 1)  Hold a group meeting (and provide minutes) to decide who will be reviewing which pages and who will be putting all the pages together into a finished product.  Email your completed document to your reviewer (provide annotated screenshots of sending and receiving the emails).  Ensure you save the original and new documents with different version numbers (provide annotated screenshots of these explaining purpose) Unit 2: Collaborative Working
  • 9. AO6 Portfolio Evidence (Part 2)  Review your allocated piece of work by adding thorough and helpful comments and tracking the changes you make.  When complete email this back to the author.  Act on feedback received or explain why suggestions were not followed. (Don’t forget to save the new one as a different version)  Produce the final magazine insert with all pages complete. Unit 2: Collaborative Working