1.
Scope of work to be done
Was the equipment supply and product training of
Modicon Quantum PLC's and FactoryLink SCADA.
However, the whole project was to be executed
during a planned shutdown period and required
careful planning in order to minimise disruption at
the changeover.
Products used
The PLC was programmed in hot stand‐by
configuration and it was decided to make use of
standard terminal cabling in order to facilitate a
smoother transition.
www.age.co.za
AGE Technologies JHB (Pty) Ltd. secured the contract
to assist Arcelor Mittal’s planning department with
the design, project management and commissioning
of the automation system required at the
Vanderbijlpark works Continuous Casting plant.
Duration of the project
The project was five months in preparation and
comprised 3 man‐months effort in execution.