SlideShare ist ein Scribd-Unternehmen logo
1 von 18
Downloaden Sie, um offline zu lesen
Training Center
for Automation and Drives
SIMATIC PCS 7 System Training
MultiprojectPage 1
Date: 20.12.2006
File:ST-PCS7SYS_V70_mp.1
SIMATIC PCS 7
Siemens AG 2003. All rights reserved.
SITRAIN Training for
Automation and Drives
M35_C9_Multiproject
Content Page
PCS 7 Multiproject ............................................................................................................................ 2
Creating Multiprojects ....................................................................................................................... 3
Multiproject (Moving and Editing the Project) .................................................................................... 4
Multiproject (Save/Archive MP - 1) ................................................................................................... 5
Multiproject (Save/Archive MP - 2) ................................................................................................... 6
Multiproject (Restoring an Individual Project) .................................................................................... 7
Multiproject (Update Projects) .......................................................................................................... 8
Description of Task ......................................................................................................................... 9
Multiproject: Preparation .................................................................................................................. 10
Multiproject: Prepare Distributed Working ......................................................................................... 11
Multiproject: Distributed Working ...................................................................................................... 12
Multiproject: Restoring the Distributed Project .................................................................................. 13
Multiproject: Test AS Program with PLCSIM ..................................................................................... 14
Multiproject: Prepare OS Test with PLCSIM (1) ................................................................................ 15
Multiproject: Updating the Networks ................................................................................................. 16
Multiproject: Insert Picture into PH and Compile OS ......................................................................... 17
Multiproject: OS Test with PLCSIM ................................................................................................... 18
Training Center
for Automation and Drives
SIMATIC PCS 7 System Training
MultiprojectPage 2
Date: 20.12.2006
File:ST-PCS7SYS_V70_mp.2
SIMATIC PCS 7
Siemens AG 2003. All rights reserved.
SITRAIN Training for
Automation and Drives
PCS 7 Multiproject
PC
Server ES
Terminal bus
Plant bus
PC
ES1
AS
01
C
P
U
C
P
P
S
AS
02
C
P
U
C
P
P
S
PC
ES2
PC
OS
Multiproject
Project1 Project2 Project3
Master data
library
Multiproject The folder where all the projects and libraries are stored for an automation
solution is called a multiproject; it contains one or more STEP 7 projects and
optionally also libraries. The projects within the multiproject can contain objects
with cross-project relationships (e.g. cross-project S7 connections).
Benefits of Multiproject
If projects are part of a multiproject, they can be created with a smaller size and
clearer structure. Using multiprojects, you can e.g. create one project for each
operator and divide the stations among the operators for distributed execution.
Cross-project functions allow you to handle a multiproject almost like one single
project.
Examples of Cross-Project Functions
Cross-project functions in STEP 7 (basic package):
- Save as (store multiproject with all projects at another location)
- Archive (multiproject with all projects)
- Match cross-project networking (e.g. merge subnets)
- Update view (all projects of a multiproject)
Other cross-project functions (with PCS 7, SIMATIC BATCH)
- Compile OS (transfer AS-OS connection data)
- Export SIMATIC BATCH plant data
Training Center
for Automation and Drives
SIMATIC PCS 7 System Training
MultiprojectPage 3
Date: 20.12.2006
File:ST-PCS7SYS_V70_mp.3
SIMATIC PCS 7
Siemens AG 2003. All rights reserved.
SITRAIN Training for
Automation and Drives
Creating Multiprojects
ES server
or +
MP P1
P2
LIB
ES server
MP P1
LIB
ES-x
P2
MP = Multiproject, stored on the hard disk of the server ES
P1 = Project within the MP, stored on the server ES
P2 = Project within the MP, stored (alternatively) on the server ES or on the distributed ES
LIB = Master data library, within the MP
Creating Multiprojects There are two ways to create a multiproject:
1. On the ES that is used as the server ES, you can create the multiproject with
the individual projects and the master data library. All folders are saved on the
hard disk of the server ES (MP, P1, P2 and LIB)
2. The multiproject and part of the projects are created on the server ES. The
folders MP, P1 and LIB are saved here. Another project (P2) is created on
another ES (ES-x) and later included in the multiproject.
Notice Before creating the multiproject and associated projects, create a directory
on each local hard disk of the participating ESs and enable it for sharing
with all the participating configuring engineers. All other access paths are
handled via the Windows network environment, the computer name and
share name for the directories.
Each project can contain an AS, OS or a combination of several ASs and OSs.
The combination is created in such a way that the individual projects can later be
distributed among the individual ESs (configuring engineers). The library remains
on the server ES so it can be accessed by all.
The server ES should be entered in one project of the multiproject; this allows you
to perform compiling and downloading centrally.
As long as the PC interface of the respective ES is set in PG operation in the
distributed, individual projects (via "Set PC Station" and "Set PG/PC Interface"),
there is no need for the explicit presence of an ES in these projects. The final
network configuration is performed later in the multiproject after the projects have
been synchronized.
Remark Immediately after creating the projects in the multiproject, set the display
language for each project/library via
Options -> Language for Display Devices
Training Center
for Automation and Drives
SIMATIC PCS 7 System Training
MultiprojectPage 4
Date: 20.12.2006
File:ST-PCS7SYS_V70_mp.4
SIMATIC PCS 7
Siemens AG 2003. All rights reserved.
SITRAIN Training for
Automation and Drives
Multiproject (Moving and Editing the Project)
ES server
MP P1
P2
LIB
ES-x
P2
ES server
MP P1
Link
LIB
ES-x
P2
P2-
old
Save as:
•Without reorganization
•Insert in MP
•Select current MP
•Replace current project
•UNC path
1. Move
2. Edit
Move On the server ES, go to the multiproject and select the project (P2), then select
File -> Save as...
to copy it to the distributed ES x. In doing so, please apply the settings shown on
the slide.
The purpose of the procedure is to store a copy of the project on the hard disk of
the distributed ES x (P2). The selected options set up a link in the multiproject to
the project on the distributed ES x. The multiproject version is updated via this
link. The old version of the project remains on the hard disk of the server ES
under its original name (P2 old version).
In the event of an error occurring on the ES x, this older version can be used as
the backup for project P2.
Edit Project P2 which is saved on the distributed ES x can be locally processed. Here,
you can also access the master data library and the charts of the other projects
from SIMATIC Manager across MPs.
Remark If a project that was started on another ES is to be included in a multiproject, this
is possible from the multiproject itself as described below.
Select the MP, then
right-click and select Multiproject -> Insert in multiproject (Browse if
necessary)
The selected project is now included in the multiproject.
Training Center
for Automation and Drives
SIMATIC PCS 7 System Training
MultiprojectPage 5
Date: 20.12.2006
File:ST-PCS7SYS_V70_mp.5
SIMATIC PCS 7
Siemens AG 2003. All rights reserved.
SITRAIN Training for
Automation and Drives
Multiproject (Save/Archive MP - 1)
ES server
MP P1
P2 link
LIB
ES server
Save as:
•Without / with
reorganization
Save
Archive
MP1 P1
P2
LIB
ES server
MP P1
P2 link
LIB
P2 link
ES server
MP.ZIP
P1
P2
LIB
Save MP as For backup purposes, you can also save a multiproject explicitly. In the SIMATIC
Manager, open the multiproject and select its icon.
Select
File -> Save as... Option with (without) reorganization
to copy the multiproject to another directory of your choice and open it there.
Note 1 If you use this procedure, the projects are also saved in the same directory
and the links to the distributed ESs are removed!
This means that you then need to use "Save as..." again to distribute the
individual ESs (see previous slide).
Archiving MPs After closing the multiproject, select
File -> Archive
to initiate archiving. First, you must select the multiproject you want to archive.
Next, select the directory you want so save the archive to and enter a name for
the archive.
The result is a "zip" file containing the entire MP contents.
Retrieving MPs You first need to prepare (share) the directory or, alternatively, empty the old
directory (delete MP).
Select
File -> Retrieve
First, you select the multiproject to be retrieved, then the target directory where
you want to save the retrieved file.
Note 1 applies here too, i.e. links are removed.
Training Center
for Automation and Drives
SIMATIC PCS 7 System Training
MultiprojectPage 6
Date: 20.12.2006
File:ST-PCS7SYS_V70_mp.6
SIMATIC PCS 7
Siemens AG 2003. All rights reserved.
SITRAIN Training for
Automation and Drives
Multiproject (Save/Archive MP - 2)
Note 2 If when trying to save, reorganize or archive the multiproject, a message is
displayed "...being processed by another application. Close and restart...", one of
the following tips may help:
- For archiving, you must first close the multiproject and each project. Then exit
the SIMATIC Manager and launch it again. Now start archiving again.
- If the information about existing access operations indicate an OS (WinCC), the
"emergency brake" can be pulled using the "Reset_WinCC.vbs" script. In a typical
installation, you can find this script under
C:Program FilesSIEMENSWINCCbinReset_WinCC.vbs
The script stops all WinCC processes and services that work with WinCC. Access
to the project database is enabled.
You must subsequently restart the SIMATIC Manager.
Training Center
for Automation and Drives
SIMATIC PCS 7 System Training
MultiprojectPage 7
Date: 20.12.2006
File:ST-PCS7SYS_V70_mp.7
SIMATIC PCS 7
Siemens AG 2003. All rights reserved.
SITRAIN Training for
Automation and Drives
Multiproject (Restoring an Individual Project)
ES server
MP P1
P2
LIB
ES-x
P2
ES server
MP P1
P2 link
LIB
ES-x
P2
P2-
old
3. Save as:
•Without reorganization
•Insert in MP
•Select current MP
•Replace current project
•UNC path
4. Result
1. Close P22. Delete P2-old (not the link in the MP!)
Restoring an Individual Project
To restore a project that was decentrally edited to the server ES (e.g. to distribute
it to another ES), proceed as follows:
First, delete the old project (P2-old) - either using the SIMATIC Manager, as a
single project or via the Windows Explorer)
Select the current project (P2) in the MP and select
File -> Save as... (see options in the slide)
to copy it to the location where the deleted project stood in the multiproject
directory. The previous project version (P2) remains on the distributed ES-x and
can either be deleted or used as an additional backup copy until the process is
completed.
Now the Server ES can redistribute the projects among the decentralized ESs.
.
Training Center
for Automation and Drives
SIMATIC PCS 7 System Training
MultiprojectPage 8
Date: 20.12.2006
File:ST-PCS7SYS_V70_mp.8
SIMATIC PCS 7
Siemens AG 2003. All rights reserved.
SITRAIN Training for
Automation and Drives
Multiproject (Update Projects)
PC1
ES1
AS
01
C
P
U
C
P
P
S
AS
02
C
P
U
C
P
P
S
PC2
ES2
Multiproject
Project 1 Project 2
Network 1 Network 2
System bus (universal subnet due to update)
Connection 1
Refer.: XYZ
Connection 1
Refer.: XYZ
Project 1 If project 1 on ES1 is not yet included in the multiproject, you can use NetPro e.g.
to configure "Subnet 1" as system bus. Connections originating from AS01's CPU
to a station that is not in the same project are set up as connections to a station in
an "unknown project". For this type of connection, you need to enter a
"Connection name (reference)" in the Properties dialog box (e.g. "XYZ"). It is
called an "open connection".
Project 2 If project 2 on ES2 is not yet included in the multiproject, you can use NetPro e.g.
to configure "Subnet 2" as system bus. Connections originating from AS02's CPU
to a station that is not in the same project 2 are set up as connections to a station
in an "unknown project". For this type of connection, you need to enter a
"Connection name (reference)" in the Properties dialog box (e.g. "XYZ").
Remark Connections in different projects that are later merged in the multiproject, must
have the same connection names (references="XZY"). The above described
procedure is not necessary if the projects were already inserted in the multiproject
when the connection was created. If this is the case, when you set up a
connection in NetPro, the other station is selected via the multiproject (it is offered
for selection in the screen).
Update Projects Select
File -> Multiproject -> Update projects
to merge subnets and connections that were originally created in separate
projects - as part of the "project update". The subnets that originally had their own
names (e.g. "Subnet 1" and "Subnet 2") are merged under a new name (e.g.
"system bus").
"Open connections" from the two projects having the same reference are also
made.
Training Center
for Automation and Drives
SIMATIC PCS 7 System Training
MultiprojectPage 9
Date: 20.12.2006
File:ST-PCS7SYS_V70_mp.9
SIMATIC PCS 7
Siemens AG 2003. All rights reserved.
SITRAIN Training for
Automation and Drives
Description of Task
Terminal bus
AS
01
C
P
U
C
P
P
S
PLC
SIM
C
P
U
C
P
P
S
PC
ES/OS
Multiproject
PRO_ASi PRO_OSi PRO_SIMMaster data
library
Plant bus
MPI bus
COURSE_V7 COURSE_V7 ES_Distributed
Share
Starting point Your multiproject with the projects PRO_ASi, PRO_OSi and master data library
are present in the "Course_V7" folder.
The "ES_Distributed" folder is created for external storage of a project (created
for the exercise on your ES, but could also be present on the hard disk of a
different PCS 7 ES).
Both folders are shared and accessible under Windows. (If they are present on
different ESs, the login name and password of the configuration engineer must be
known on both computers.)
A ready-made PRO_SIM project exists for importing into your multiproject (ask
your trainer for the storage location).
Remark The objective of the exercise is the handling of projects and networks within a
multiproject (external storage, editing and restoring).
If the external storage of the project is to the neighboring ES, the configuration
engineers there may only observe your operations. They can only process the
externally stored project after you have finished swapping it out!
However, with respect to handling, there is no difference whether this project is
saved in a directory on your own ES hard disk or moved to a network drive (of
another PC).
In order to avoid these delays, a separate directory is shared for the project to be
stored externally. PLC_SIM is used to test the additional program (in order to also
become acquainted with this test option). Since the PLC_SIM option is installed
on every PC, an MPI connection to it can be set up for test purposes. Online tests
can then also be carried out.
Training Center
for Automation and Drives
SIMATIC PCS 7 System Training
MultiprojectPage 10
Date: 20.12.2006
File:ST-PCS7SYS_V70_mp.10
SIMATIC PCS 7
Siemens AG 2003. All rights reserved.
SITRAIN Training for
Automation and Drives
Multiproject: Preparation
E:
ES_Distributed
Share
Course_V7
2
1
Preparations Prepare your ES for the following exercises. On the local hard disk "E", create a
directory called "ES_Distributed" and share it using the same share name. It is to
be subsequently used for "external storage" of a distributed project, and read and
write operations should be possible on it. Also share the folder containing the
multiproject (Course_V7 in this case).
---------------------------------------------------------------------------------------------------------
Steps 1. Use the Windows Explorer to create the "ES_Distributed" directory on the "E"
drive.
2. Share this with full access.
---------------------------------------------------------------------------------------------------------
Create Folder 1. Open the Windows Explorer (right-click the START button in the Windows
taskbar and select "Explorer").
Select the E drive, click in the right pane,
right-click and select New Folder
Call the new folder "ES_Distributed".
Share Folder 2. Point to the new folder,
right-click and select Share... Share this folder
then click the
Permissions button
to ensure the other configuring engineers can access the directory (and
subdirectories) from other ESs.
Repeat the procedure for the "Course_V7" directory containing the multiproject.
Remark You only set sharing for the main directory. Do not change the permissions for
any subdirectories that may be present!
Training Center
for Automation and Drives
SIMATIC PCS 7 System Training
MultiprojectPage 11
Date: 20.12.2006
File:ST-PCS7SYS_V70_mp.11
SIMATIC PCS 7
Siemens AG 2003. All rights reserved.
SITRAIN Training for
Automation and Drives
Multiproject: Prepare Distributed Working
ES
MP
PRO_ASi
LIB
ESE:
Course_V7
D:
Course_V7
ES
MP
LIB
E:
Course_V7
Retrieve projects Insert project in multiproject
PRO_OSi
MP
PRO_ASi
LIB
PRO_OSi
PRO_ASi
PRO_OSi
PRO_SIM
PRO_SIM
PRO_SIM
PH Update
PH Update
ES_Distributed
E:
Course_V7
ES
MP
LIB
PRO_ASi
PRO_OSi
PRO_SIM
Shift project
3 4
5 6
Retrieve project 3. Open the SIMATIC Manager, and select
File Retrieve
to retrieve the PRO_SIM (ProSim.ZIP) project to the "Course_V7" directory.
Insert in MP 4. Open your multiproject. Select the MP. Select
File Multiproject Insert in multiproject
to search for the previously retrieved PRO_SIM project, and insert it.
PH Update 5. Update the plant hierarchy:
The source is PRO_SIM
The target is PRO_OSi.
In a later step, you are to monitor both ASs (ASi and PLC_SIM) from your OS.
Shifting the project (normally to a drive of the distributed ES)
6. Move the PRO_SIM project to the "ES_Distributed" directory (target). First,
select the PRO_SIM project to be moved and select
File Save as… and select the options
"Insert in multiproject", "Current multiproject", "Replace current project"
Training Center
for Automation and Drives
SIMATIC PCS 7 System Training
MultiprojectPage 12
Date: 20.12.2006
File:ST-PCS7SYS_V70_mp.12
SIMATIC PCS 7
Siemens AG 2003. All rights reserved.
SITRAIN Training for
Automation and Drives
Multiproject: Distributed Working
E:
Course_V7
ES_Distributed
ES
MP
LIB
PRO_ASi
PRO_OSi
PRO_SIM
8
7
9
Processing First close the multiproject in the SIMATIC Manager (it need not be open on the
distributed ES).
At this point, normal processing on the distributed ES would be continued. In our
exercise, carry out all procedures on your ES.
7. Open just the PRO_SIM project from the "ES_Distributed" directory by
selecting
File Open User projects
Do not proceed via the multiproject.
8. Open your master data library from the "Course_V7" directory using
File Open Libraries
Do not proceed via the multiproject.
9. Insert the VAL_MOT and V_SIM_FB blocks from the master data library into
the CFC, and interconnect them.
Finally, close both windows (project and library).
Remark You can open every project or every library of the multiproject from the distributed
ES without these having to be open on the central ES itself.
The central ES server or the directory enabled there need only be accessible over
the LAN if something has to be copied from or inserted there.
If all required data/blocks are already on the distributed ES, it is possible to work
there without the LAN.
Training Center
for Automation and Drives
SIMATIC PCS 7 System Training
MultiprojectPage 13
Date: 20.12.2006
File:ST-PCS7SYS_V70_mp.13
SIMATIC PCS 7
Siemens AG 2003. All rights reserved.
SITRAIN Training for
Automation and Drives
Multiproject: Restoring the Distributed Project
E:
Course_V7
ES_Distributed
ES
MP
LIB
PRO_ASi
PRO_OSi
PRO_SIM
10
11
Deleting the old version (of the moved project)
10. According to the multiproject, the "PRO_SIM" component is located on the
distributed ES. Delete the PRO_SIM project, which still remains in the
"Course_V7"directory (after you have moved it to the ES_Distributed directory
using Save as... (only in the editing sense, but actually only copied)).
Restoring to the MP
11. Move the current PRO_SIM project back to the "Course_V7" directory. This
updates the status for the MP. Use the same procedure as with
"Decentralization".
The "old" state now present in the "ES_Distributed" directory can subsequently be
saved or deleted there.
Training Center
for Automation and Drives
SIMATIC PCS 7 System Training
MultiprojectPage 14
Date: 20.12.2006
File:ST-PCS7SYS_V70_mp.14
SIMATIC PCS 7
Siemens AG 2003. All rights reserved.
SITRAIN Training for
Automation and Drives
Multiproject: Test AS Program with PLCSIM
1213
14
Start PLC_SIM 12. Click the icon labeled with 12 (see slide). The PLCSIM desktop is opened.
PLCSIM internally converts the programming interface of the SIMATIC Manager
to MPI. It represents an S7-300 or S7-400 CPU which is still empty.
Load HW Config 13. Load the HW Config of the AS from the PRO_SIM project. The screen forms
are called as if the AS were connected via MPI. From the PLCSIM window, you
can select
Simulation Save target system as
to save the downloaded station (using HW Config and the program that is still
empty)
Note An S7-CPU has the default MPI address "2". This should be used when
downloading the PLCSIM for the first time. It subsequently has the address
defined in the project.
Download charts 14. Select the chart folder of the AS and download it using
right-click and select Download PLC
Use the download option
"Download to test CPU (complete program)"
Test Carry out the test in the CFC as usual.
Training Center
for Automation and Drives
SIMATIC PCS 7 System Training
MultiprojectPage 15
Date: 20.12.2006
File:ST-PCS7SYS_V70_mp.15
SIMATIC PCS 7
Siemens AG 2003. All rights reserved.
SITRAIN Training for
Automation and Drives
Multiproject: Prepare OS Test with PLCSIM (1)
15
Supplement PC HW Config
Note! Before you supplement the HW Config, you should guarantee that your OS can
communicate in runtime with your AS (download the S7 connection if necessary),
and then deactivate.
15. Because PLCSIM can only be addressed over MPI, revise the HW Config of
your ES/OS to include a PROFIBUS/MPI CP (e.g. 5611 or compatible), even if
one is not physically present.
The slot is irrelevant.
In the properties of the CP 5611, convert the interface to MPI and set the MPI
address = 0 (PLCSIM has the MPI address = 2 as default).
Network the CP with the MPI network existing in the project.
Do not download to the PC if a CP is not present. Following successful
tests, the CP can be removed again.
This addition enables you to select the MPI route when compiling the OS.
Training Center
for Automation and Drives
SIMATIC PCS 7 System Training
MultiprojectPage 16
Date: 20.12.2006
File:ST-PCS7SYS_V70_mp.16
SIMATIC PCS 7
Siemens AG 2003. All rights reserved.
SITRAIN Training for
Automation and Drives
Multiproject: Updating the Networks
Updating MPI networks in the multiproject
PLC
SIM
C
P
U
C
P
P
S
PC
ES/OS
PRO_OSi PRO_SIM
MPI_OS MPI_SIM
16
Updating networks 16. Select the multiproject icon in the SIMATIC Manager and
right-click and select Multiproject Adjust projects
to start combination of the networks.
Combine the MPI networks of the PRO_OSi and PRO_SIM projects.
A route is then present for NetPro between the OS and the PLCSIM.
When compiling the OS later, this path is selected as the connection between OS
and PLCSIM.
Training Center
for Automation and Drives
SIMATIC PCS 7 System Training
MultiprojectPage 17
Date: 20.12.2006
File:ST-PCS7SYS_V70_mp.17
SIMATIC PCS 7
Siemens AG 2003. All rights reserved.
SITRAIN Training for
Automation and Drives
Multiproject: Insert Picture into PH and Compile OS
17
18
Add to PH 17. The "Tank farm" folder in the PH is assigned to your OS in the PRO_OSi,
whereas the AS assignment in the PRO_SIM indicates PLCSIM. Through
insertion of a picture (e.g. "BildSim" in the "Pumps" folder in the PH), the
VAL_MOT block from the CFC in the PH folder of the same name is recorded
when compiling the OS, and an associated block icon is positioned in the picture.
Compile 18. When compiling the OS, assign the MPI connection to the "Tank farm" area in
the "Compile dialog".
Training Center
for Automation and Drives
SIMATIC PCS 7 System Training
MultiprojectPage 18
Date: 20.12.2006
File:ST-PCS7SYS_V70_mp.18
SIMATIC PCS 7
Siemens AG 2003. All rights reserved.
SITRAIN Training for
Automation and Drives
Multiproject: OS Test with PLCSIM
Requirements: The OS Runtime has previously communicated
with your AS.
Close PLCSIM (if still open)
Activate OS.
If a communication fault is displayed, do not acknowledge, but move the
message window away from center
Start PLCSIM.
Acknowledge previous error message
Download saved project from PLCSIM, possibly download PLCSIM from CFC
Set PLCSIM to RUN.
Now log on to OS Runtime, and test. The two connections should
function (named connection to your AS and MPI to the PLCSIM)
Online test 19. For the runtime test of the expansion using PRO_SIM in addition to the
existing system, please observe the following sequence of steps (see slide).
If you start with the PLCSIM switched on, you can only test the expansion from
PRO_SIM, the link to the real AS is not established. If you subsequently switch
PLCSIM off, only communication with the real AS functions.

Weitere ähnliche Inhalte

Was ist angesagt?

Ch3 v70 project_structure_en
Ch3 v70 project_structure_enCh3 v70 project_structure_en
Ch3 v70 project_structure_enconfidencial
 
05 project setup v1.00_en
05 project setup v1.00_en05 project setup v1.00_en
05 project setup v1.00_enconfidencial
 
09 basics operating and monitoring v1.00_en
09 basics operating and monitoring v1.00_en09 basics operating and monitoring v1.00_en
09 basics operating and monitoring v1.00_enconfidencial
 
17 demonstration server client system-v1.00_en
17 demonstration server client system-v1.00_en17 demonstration server client system-v1.00_en
17 demonstration server client system-v1.00_enconfidencial
 
15 final steps of configuration v1.00_en
15 final steps of configuration v1.00_en15 final steps of configuration v1.00_en
15 final steps of configuration v1.00_enconfidencial
 
Ch4 v70 system_configuration_en
Ch4 v70 system_configuration_enCh4 v70 system_configuration_en
Ch4 v70 system_configuration_enconfidencial
 
19 exercises v1.00_en
19 exercises v1.00_en19 exercises v1.00_en
19 exercises v1.00_enconfidencial
 
06 station and network configuration v1.00_en
06 station and network configuration v1.00_en06 station and network configuration v1.00_en
06 station and network configuration v1.00_enconfidencial
 
12 archiving system v1.00_en
12 archiving system v1.00_en12 archiving system v1.00_en
12 archiving system v1.00_enconfidencial
 
00 st pcs7-sys_v8.0_register 20 en
00 st pcs7-sys_v8.0_register 20 en00 st pcs7-sys_v8.0_register 20 en
00 st pcs7-sys_v8.0_register 20 enconfidencial
 
Ch1 2 kb_pcs7_v70_en
Ch1 2 kb_pcs7_v70_enCh1 2 kb_pcs7_v70_en
Ch1 2 kb_pcs7_v70_enconfidencial
 
02 pcs 7 documentation and support v1.00 en
02 pcs 7 documentation and support v1.00 en02 pcs 7 documentation and support v1.00 en
02 pcs 7 documentation and support v1.00 enconfidencial
 
08 basics control functions v1.00_en
08 basics control functions v1.00_en08 basics control functions v1.00_en
08 basics control functions v1.00_enconfidencial
 
18 syntax rules v1.0
18 syntax rules v1.018 syntax rules v1.0
18 syntax rules v1.0confidencial
 
13 locking functions and operating modes v1.00_en
13 locking functions and operating modes v1.00_en13 locking functions and operating modes v1.00_en
13 locking functions and operating modes v1.00_enconfidencial
 
5000466 v10x a manual conversor usb-i485 - english
5000466 v10x a   manual conversor usb-i485 - english5000466 v10x a   manual conversor usb-i485 - english
5000466 v10x a manual conversor usb-i485 - englishRafaelGago1
 
CLP S7 300 E S7 400
CLP S7 300 E S7 400 CLP S7 300 E S7 400
CLP S7 300 E S7 400 confidencial
 
03 requirements and functional process description v1.00_en
03 requirements and functional process description v1.00_en03 requirements and functional process description v1.00_en
03 requirements and functional process description v1.00_enconfidencial
 
CLP S7 300 E S7 400
CLP S7 300 E S7 400 CLP S7 300 E S7 400
CLP S7 300 E S7 400 confidencial
 

Was ist angesagt? (20)

Ch3 v70 project_structure_en
Ch3 v70 project_structure_enCh3 v70 project_structure_en
Ch3 v70 project_structure_en
 
05 project setup v1.00_en
05 project setup v1.00_en05 project setup v1.00_en
05 project setup v1.00_en
 
09 basics operating and monitoring v1.00_en
09 basics operating and monitoring v1.00_en09 basics operating and monitoring v1.00_en
09 basics operating and monitoring v1.00_en
 
17 demonstration server client system-v1.00_en
17 demonstration server client system-v1.00_en17 demonstration server client system-v1.00_en
17 demonstration server client system-v1.00_en
 
15 final steps of configuration v1.00_en
15 final steps of configuration v1.00_en15 final steps of configuration v1.00_en
15 final steps of configuration v1.00_en
 
Ch4 v70 system_configuration_en
Ch4 v70 system_configuration_enCh4 v70 system_configuration_en
Ch4 v70 system_configuration_en
 
19 exercises v1.00_en
19 exercises v1.00_en19 exercises v1.00_en
19 exercises v1.00_en
 
06 station and network configuration v1.00_en
06 station and network configuration v1.00_en06 station and network configuration v1.00_en
06 station and network configuration v1.00_en
 
12 archiving system v1.00_en
12 archiving system v1.00_en12 archiving system v1.00_en
12 archiving system v1.00_en
 
Ch8 v70 os_en
Ch8 v70 os_enCh8 v70 os_en
Ch8 v70 os_en
 
00 st pcs7-sys_v8.0_register 20 en
00 st pcs7-sys_v8.0_register 20 en00 st pcs7-sys_v8.0_register 20 en
00 st pcs7-sys_v8.0_register 20 en
 
Ch1 2 kb_pcs7_v70_en
Ch1 2 kb_pcs7_v70_enCh1 2 kb_pcs7_v70_en
Ch1 2 kb_pcs7_v70_en
 
02 pcs 7 documentation and support v1.00 en
02 pcs 7 documentation and support v1.00 en02 pcs 7 documentation and support v1.00 en
02 pcs 7 documentation and support v1.00 en
 
08 basics control functions v1.00_en
08 basics control functions v1.00_en08 basics control functions v1.00_en
08 basics control functions v1.00_en
 
18 syntax rules v1.0
18 syntax rules v1.018 syntax rules v1.0
18 syntax rules v1.0
 
13 locking functions and operating modes v1.00_en
13 locking functions and operating modes v1.00_en13 locking functions and operating modes v1.00_en
13 locking functions and operating modes v1.00_en
 
5000466 v10x a manual conversor usb-i485 - english
5000466 v10x a   manual conversor usb-i485 - english5000466 v10x a   manual conversor usb-i485 - english
5000466 v10x a manual conversor usb-i485 - english
 
CLP S7 300 E S7 400
CLP S7 300 E S7 400 CLP S7 300 E S7 400
CLP S7 300 E S7 400
 
03 requirements and functional process description v1.00_en
03 requirements and functional process description v1.00_en03 requirements and functional process description v1.00_en
03 requirements and functional process description v1.00_en
 
CLP S7 300 E S7 400
CLP S7 300 E S7 400 CLP S7 300 E S7 400
CLP S7 300 E S7 400
 

Andere mochten auch

Informativo tecnico comunicacao t140 s com 2 ois55
Informativo tecnico   comunicacao t140 s com 2 ois55Informativo tecnico   comunicacao t140 s com 2 ois55
Informativo tecnico comunicacao t140 s com 2 ois55confidencial
 
Ch1 2 kb_pcs7_v70_en
Ch1 2 kb_pcs7_v70_enCh1 2 kb_pcs7_v70_en
Ch1 2 kb_pcs7_v70_enconfidencial
 
Apostila do treinamento profibus 2 configuração
Apostila do treinamento profibus 2  configuraçãoApostila do treinamento profibus 2  configuração
Apostila do treinamento profibus 2 configuraçãoconfidencial
 
09 tia portal hands on - pcba-v1
09 tia portal   hands on - pcba-v109 tia portal   hands on - pcba-v1
09 tia portal hands on - pcba-v1confidencial
 
00 etiqueta dorso_pasta_st-micro1
00 etiqueta dorso_pasta_st-micro100 etiqueta dorso_pasta_st-micro1
00 etiqueta dorso_pasta_st-micro1confidencial
 
Ecopy duplizieren ab_v5
Ecopy duplizieren ab_v5Ecopy duplizieren ab_v5
Ecopy duplizieren ab_v5confidencial
 
Wincc procedimento para configuracao de comunicacao com s7
Wincc procedimento para configuracao de comunicacao com s7Wincc procedimento para configuracao de comunicacao com s7
Wincc procedimento para configuracao de comunicacao com s7confidencial
 
W240 pf700 vc sugar centrifuge lab1
W240   pf700 vc sugar centrifuge lab1W240   pf700 vc sugar centrifuge lab1
W240 pf700 vc sugar centrifuge lab1confidencial
 
E dde zellenverknuepfung
E dde zellenverknuepfungE dde zellenverknuepfung
E dde zellenverknuepfungconfidencial
 
Pf400 process pid_for_fans_lab
Pf400 process pid_for_fans_labPf400 process pid_for_fans_lab
Pf400 process pid_for_fans_labconfidencial
 
Ae08 system vb_script
Ae08 system vb_scriptAe08 system vb_script
Ae08 system vb_scriptconfidencial
 
CLP S7 300 E S7 400
CLP S7 300 E S7 400 CLP S7 300 E S7 400
CLP S7 300 E S7 400 confidencial
 
Apostila informativos técnicos s15
Apostila informativos técnicos   s15Apostila informativos técnicos   s15
Apostila informativos técnicos s15confidencial
 

Andere mochten auch (20)

S7 bas-04
S7 bas-04S7 bas-04
S7 bas-04
 
Informativo tecnico comunicacao t140 s com 2 ois55
Informativo tecnico   comunicacao t140 s com 2 ois55Informativo tecnico   comunicacao t140 s com 2 ois55
Informativo tecnico comunicacao t140 s com 2 ois55
 
Back win ccv6e
Back win ccv6eBack win ccv6e
Back win ccv6e
 
Ch1 2 kb_pcs7_v70_en
Ch1 2 kb_pcs7_v70_enCh1 2 kb_pcs7_v70_en
Ch1 2 kb_pcs7_v70_en
 
Apostila do treinamento profibus 2 configuração
Apostila do treinamento profibus 2  configuraçãoApostila do treinamento profibus 2  configuração
Apostila do treinamento profibus 2 configuração
 
09 tia portal hands on - pcba-v1
09 tia portal   hands on - pcba-v109 tia portal   hands on - pcba-v1
09 tia portal hands on - pcba-v1
 
00 etiqueta dorso_pasta_st-micro1
00 etiqueta dorso_pasta_st-micro100 etiqueta dorso_pasta_st-micro1
00 etiqueta dorso_pasta_st-micro1
 
Ecopy duplizieren ab_v5
Ecopy duplizieren ab_v5Ecopy duplizieren ab_v5
Ecopy duplizieren ab_v5
 
Wincc procedimento para configuracao de comunicacao com s7
Wincc procedimento para configuracao de comunicacao com s7Wincc procedimento para configuracao de comunicacao com s7
Wincc procedimento para configuracao de comunicacao com s7
 
W240 pf700 vc sugar centrifuge lab1
W240   pf700 vc sugar centrifuge lab1W240   pf700 vc sugar centrifuge lab1
W240 pf700 vc sugar centrifuge lab1
 
E dde zellenverknuepfung
E dde zellenverknuepfungE dde zellenverknuepfung
E dde zellenverknuepfung
 
Capa s7-bas
Capa s7-basCapa s7-bas
Capa s7-bas
 
Pf400 process pid_for_fans_lab
Pf400 process pid_for_fans_labPf400 process pid_for_fans_lab
Pf400 process pid_for_fans_lab
 
Ae08 system vb_script
Ae08 system vb_scriptAe08 system vb_script
Ae08 system vb_script
 
Back v7
Back v7Back v7
Back v7
 
Capa s7-bas
Capa s7-basCapa s7-bas
Capa s7-bas
 
CLP S7 300 E S7 400
CLP S7 300 E S7 400 CLP S7 300 E S7 400
CLP S7 300 E S7 400
 
CLP S7 300 E S7 400
CLP S7 300 E S7 400CLP S7 300 E S7 400
CLP S7 300 E S7 400
 
Apostila informativos técnicos s15
Apostila informativos técnicos   s15Apostila informativos técnicos   s15
Apostila informativos técnicos s15
 
E dozentenhilf
E dozentenhilfE dozentenhilf
E dozentenhilf
 

Ähnlich wie Ch9 v70 multiproject_en

Advantages Of SAMBA
Advantages Of SAMBAAdvantages Of SAMBA
Advantages Of SAMBAAngela Hays
 
TECHNICAL WHITE PAPER▶Symantec Backup Exec 2014 Blueprints - OST Powered Appl...
TECHNICAL WHITE PAPER▶Symantec Backup Exec 2014 Blueprints - OST Powered Appl...TECHNICAL WHITE PAPER▶Symantec Backup Exec 2014 Blueprints - OST Powered Appl...
TECHNICAL WHITE PAPER▶Symantec Backup Exec 2014 Blueprints - OST Powered Appl...Symantec
 
Lukas Macura - Employing Zabbix to monitor OpenWrt (Beesip) devices with Uciprov
Lukas Macura - Employing Zabbix to monitor OpenWrt (Beesip) devices with UciprovLukas Macura - Employing Zabbix to monitor OpenWrt (Beesip) devices with Uciprov
Lukas Macura - Employing Zabbix to monitor OpenWrt (Beesip) devices with UciprovZabbix
 
OpenCmsDays 2013 - Using OpenCms 9 folders as a network drive
OpenCmsDays 2013 - Using OpenCms 9 folders as a network driveOpenCmsDays 2013 - Using OpenCms 9 folders as a network drive
OpenCmsDays 2013 - Using OpenCms 9 folders as a network driveAlkacon Software GmbH & Co. KG
 
Dealing with kubesprawl tetris style !
Dealing with kubesprawl   tetris style !Dealing with kubesprawl   tetris style !
Dealing with kubesprawl tetris style !Taco Scargo
 
[Patel] SPFx: An ISV Insight into latest Microsoft's customization model
[Patel] SPFx: An ISV Insight into latest Microsoft's customization model[Patel] SPFx: An ISV Insight into latest Microsoft's customization model
[Patel] SPFx: An ISV Insight into latest Microsoft's customization modelEuropean Collaboration Summit
 
Address Binding Scheme
Address Binding SchemeAddress Binding Scheme
Address Binding SchemeRajesh Piryani
 
Prizm Installation Guide
Prizm Installation GuidePrizm Installation Guide
Prizm Installation Guidevjvarenya
 
Ch9 v70 multiproject_en
Ch9 v70 multiproject_enCh9 v70 multiproject_en
Ch9 v70 multiproject_enconfidencial
 
First Steps Developing Embedded Applications using Heterogeneous Multi-core P...
First Steps Developing Embedded Applications using Heterogeneous Multi-core P...First Steps Developing Embedded Applications using Heterogeneous Multi-core P...
First Steps Developing Embedded Applications using Heterogeneous Multi-core P...Toradex
 
Asp net mvc
Asp net mvcAsp net mvc
Asp net mvcbgrynko
 
Using DC/OS for Continuous Delivery - DevPulseCon 2017
Using DC/OS for Continuous Delivery - DevPulseCon 2017Using DC/OS for Continuous Delivery - DevPulseCon 2017
Using DC/OS for Continuous Delivery - DevPulseCon 2017pleia2
 

Ähnlich wie Ch9 v70 multiproject_en (20)

Advantages Of SAMBA
Advantages Of SAMBAAdvantages Of SAMBA
Advantages Of SAMBA
 
TECHNICAL WHITE PAPER▶Symantec Backup Exec 2014 Blueprints - OST Powered Appl...
TECHNICAL WHITE PAPER▶Symantec Backup Exec 2014 Blueprints - OST Powered Appl...TECHNICAL WHITE PAPER▶Symantec Backup Exec 2014 Blueprints - OST Powered Appl...
TECHNICAL WHITE PAPER▶Symantec Backup Exec 2014 Blueprints - OST Powered Appl...
 
Lukas Macura - Employing Zabbix to monitor OpenWrt (Beesip) devices with Uciprov
Lukas Macura - Employing Zabbix to monitor OpenWrt (Beesip) devices with UciprovLukas Macura - Employing Zabbix to monitor OpenWrt (Beesip) devices with Uciprov
Lukas Macura - Employing Zabbix to monitor OpenWrt (Beesip) devices with Uciprov
 
Ae backup
Ae backupAe backup
Ae backup
 
UDP Report
UDP ReportUDP Report
UDP Report
 
OpenCmsDays 2013 - Using OpenCms 9 folders as a network drive
OpenCmsDays 2013 - Using OpenCms 9 folders as a network driveOpenCmsDays 2013 - Using OpenCms 9 folders as a network drive
OpenCmsDays 2013 - Using OpenCms 9 folders as a network drive
 
Dealing with kubesprawl tetris style !
Dealing with kubesprawl   tetris style !Dealing with kubesprawl   tetris style !
Dealing with kubesprawl tetris style !
 
[Patel] SPFx: An ISV Insight into latest Microsoft's customization model
[Patel] SPFx: An ISV Insight into latest Microsoft's customization model[Patel] SPFx: An ISV Insight into latest Microsoft's customization model
[Patel] SPFx: An ISV Insight into latest Microsoft's customization model
 
Rapidly deploying software
Rapidly deploying softwareRapidly deploying software
Rapidly deploying software
 
Address Binding Scheme
Address Binding SchemeAddress Binding Scheme
Address Binding Scheme
 
Embedded Linux
Embedded LinuxEmbedded Linux
Embedded Linux
 
Prizm Installation Guide
Prizm Installation GuidePrizm Installation Guide
Prizm Installation Guide
 
Ch9 v70 multiproject_en
Ch9 v70 multiproject_enCh9 v70 multiproject_en
Ch9 v70 multiproject_en
 
First Steps Developing Embedded Applications using Heterogeneous Multi-core P...
First Steps Developing Embedded Applications using Heterogeneous Multi-core P...First Steps Developing Embedded Applications using Heterogeneous Multi-core P...
First Steps Developing Embedded Applications using Heterogeneous Multi-core P...
 
Asp net mvc
Asp net mvcAsp net mvc
Asp net mvc
 
Using DC/OS for Continuous Delivery - DevPulseCon 2017
Using DC/OS for Continuous Delivery - DevPulseCon 2017Using DC/OS for Continuous Delivery - DevPulseCon 2017
Using DC/OS for Continuous Delivery - DevPulseCon 2017
 
What's new in p2 (2009)?
What's new in p2 (2009)?What's new in p2 (2009)?
What's new in p2 (2009)?
 
Simple build tool
Simple build toolSimple build tool
Simple build tool
 
All in one
All in oneAll in one
All in one
 
Code One 2018 maven
Code One 2018   mavenCode One 2018   maven
Code One 2018 maven
 

Mehr von confidencial

14 mass data engineering v1.00_en
14 mass data engineering v1.00_en14 mass data engineering v1.00_en
14 mass data engineering v1.00_enconfidencial
 
11 customizing the os v1.00_en
11 customizing the os v1.00_en11 customizing the os v1.00_en
11 customizing the os v1.00_enconfidencial
 
10 basics automatic mode control v1.00_en
10 basics automatic mode control v1.00_en10 basics automatic mode control v1.00_en
10 basics automatic mode control v1.00_enconfidencial
 
07 connection to the process v1.00_en
07 connection to the process v1.00_en07 connection to the process v1.00_en
07 connection to the process v1.00_enconfidencial
 
01 introduction v1.00_en
01 introduction v1.00_en01 introduction v1.00_en
01 introduction v1.00_enconfidencial
 
Fluxograma processo acucar_alcool_etanol_verde
Fluxograma processo acucar_alcool_etanol_verdeFluxograma processo acucar_alcool_etanol_verde
Fluxograma processo acucar_alcool_etanol_verdeconfidencial
 
01tiaportal handson-basicov11v2-140421084257-phpapp01
01tiaportal handson-basicov11v2-140421084257-phpapp0101tiaportal handson-basicov11v2-140421084257-phpapp01
01tiaportal handson-basicov11v2-140421084257-phpapp01confidencial
 
Sitrains7 1200pwmpid-150301123045-conversion-gate01
Sitrains7 1200pwmpid-150301123045-conversion-gate01Sitrains7 1200pwmpid-150301123045-conversion-gate01
Sitrains7 1200pwmpid-150301123045-conversion-gate01confidencial
 
Sitrain introdução a ihm
Sitrain introdução a ihmSitrain introdução a ihm
Sitrain introdução a ihmconfidencial
 
Sitrain visão geral do sistema tia portal
Sitrain visão geral do sistema tia portalSitrain visão geral do sistema tia portal
Sitrain visão geral do sistema tia portalconfidencial
 
Sitrain step7basic 150301103500-conversion-
Sitrain step7basic 150301103500-conversion-Sitrain step7basic 150301103500-conversion-
Sitrain step7basic 150301103500-conversion-confidencial
 
Sitrain operações binárias e digitais
Sitrain operações binárias e digitaisSitrain operações binárias e digitais
Sitrain operações binárias e digitaisconfidencial
 
Sitrain blocos de orgazação
Sitrain blocos de orgazaçãoSitrain blocos de orgazação
Sitrain blocos de orgazaçãoconfidencial
 
Sitrain soluções sugeridasconversion s7 1200
Sitrain  soluções sugeridasconversion s7 1200 Sitrain  soluções sugeridasconversion s7 1200
Sitrain soluções sugeridasconversion s7 1200 confidencial
 
Dispositivos e redes de comunicaçãos
Dispositivos e redes de comunicaçãosDispositivos e redes de comunicaçãos
Dispositivos e redes de comunicaçãosconfidencial
 
treinamentos em automacao e solucoes industriais s7 tia 2 simatic s7 porgama...
 treinamentos em automacao e solucoes industriais s7 tia 2 simatic s7 porgama... treinamentos em automacao e solucoes industriais s7 tia 2 simatic s7 porgama...
treinamentos em automacao e solucoes industriais s7 tia 2 simatic s7 porgama...confidencial
 

Mehr von confidencial (17)

14 mass data engineering v1.00_en
14 mass data engineering v1.00_en14 mass data engineering v1.00_en
14 mass data engineering v1.00_en
 
11 customizing the os v1.00_en
11 customizing the os v1.00_en11 customizing the os v1.00_en
11 customizing the os v1.00_en
 
10 basics automatic mode control v1.00_en
10 basics automatic mode control v1.00_en10 basics automatic mode control v1.00_en
10 basics automatic mode control v1.00_en
 
07 connection to the process v1.00_en
07 connection to the process v1.00_en07 connection to the process v1.00_en
07 connection to the process v1.00_en
 
01 introduction v1.00_en
01 introduction v1.00_en01 introduction v1.00_en
01 introduction v1.00_en
 
Fluxograma processo acucar_alcool_etanol_verde
Fluxograma processo acucar_alcool_etanol_verdeFluxograma processo acucar_alcool_etanol_verde
Fluxograma processo acucar_alcool_etanol_verde
 
01tiaportal handson-basicov11v2-140421084257-phpapp01
01tiaportal handson-basicov11v2-140421084257-phpapp0101tiaportal handson-basicov11v2-140421084257-phpapp01
01tiaportal handson-basicov11v2-140421084257-phpapp01
 
Sitrains7 1200pwmpid-150301123045-conversion-gate01
Sitrains7 1200pwmpid-150301123045-conversion-gate01Sitrains7 1200pwmpid-150301123045-conversion-gate01
Sitrains7 1200pwmpid-150301123045-conversion-gate01
 
Sitrain introdução a ihm
Sitrain introdução a ihmSitrain introdução a ihm
Sitrain introdução a ihm
 
Sitrain visão geral do sistema tia portal
Sitrain visão geral do sistema tia portalSitrain visão geral do sistema tia portal
Sitrain visão geral do sistema tia portal
 
Sitrain tags do plc
Sitrain tags do plcSitrain tags do plc
Sitrain tags do plc
 
Sitrain step7basic 150301103500-conversion-
Sitrain step7basic 150301103500-conversion-Sitrain step7basic 150301103500-conversion-
Sitrain step7basic 150301103500-conversion-
 
Sitrain operações binárias e digitais
Sitrain operações binárias e digitaisSitrain operações binárias e digitais
Sitrain operações binárias e digitais
 
Sitrain blocos de orgazação
Sitrain blocos de orgazaçãoSitrain blocos de orgazação
Sitrain blocos de orgazação
 
Sitrain soluções sugeridasconversion s7 1200
Sitrain  soluções sugeridasconversion s7 1200 Sitrain  soluções sugeridasconversion s7 1200
Sitrain soluções sugeridasconversion s7 1200
 
Dispositivos e redes de comunicaçãos
Dispositivos e redes de comunicaçãosDispositivos e redes de comunicaçãos
Dispositivos e redes de comunicaçãos
 
treinamentos em automacao e solucoes industriais s7 tia 2 simatic s7 porgama...
 treinamentos em automacao e solucoes industriais s7 tia 2 simatic s7 porgama... treinamentos em automacao e solucoes industriais s7 tia 2 simatic s7 porgama...
treinamentos em automacao e solucoes industriais s7 tia 2 simatic s7 porgama...
 

Kürzlich hochgeladen

How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Enterprise Knowledge
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfEnterprise Knowledge
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilV3cube
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Paola De la Torre
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 

Kürzlich hochgeladen (20)

How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of Brazil
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 

Ch9 v70 multiproject_en

  • 1. Training Center for Automation and Drives SIMATIC PCS 7 System Training MultiprojectPage 1 Date: 20.12.2006 File:ST-PCS7SYS_V70_mp.1 SIMATIC PCS 7 Siemens AG 2003. All rights reserved. SITRAIN Training for Automation and Drives M35_C9_Multiproject Content Page PCS 7 Multiproject ............................................................................................................................ 2 Creating Multiprojects ....................................................................................................................... 3 Multiproject (Moving and Editing the Project) .................................................................................... 4 Multiproject (Save/Archive MP - 1) ................................................................................................... 5 Multiproject (Save/Archive MP - 2) ................................................................................................... 6 Multiproject (Restoring an Individual Project) .................................................................................... 7 Multiproject (Update Projects) .......................................................................................................... 8 Description of Task ......................................................................................................................... 9 Multiproject: Preparation .................................................................................................................. 10 Multiproject: Prepare Distributed Working ......................................................................................... 11 Multiproject: Distributed Working ...................................................................................................... 12 Multiproject: Restoring the Distributed Project .................................................................................. 13 Multiproject: Test AS Program with PLCSIM ..................................................................................... 14 Multiproject: Prepare OS Test with PLCSIM (1) ................................................................................ 15 Multiproject: Updating the Networks ................................................................................................. 16 Multiproject: Insert Picture into PH and Compile OS ......................................................................... 17 Multiproject: OS Test with PLCSIM ................................................................................................... 18
  • 2. Training Center for Automation and Drives SIMATIC PCS 7 System Training MultiprojectPage 2 Date: 20.12.2006 File:ST-PCS7SYS_V70_mp.2 SIMATIC PCS 7 Siemens AG 2003. All rights reserved. SITRAIN Training for Automation and Drives PCS 7 Multiproject PC Server ES Terminal bus Plant bus PC ES1 AS 01 C P U C P P S AS 02 C P U C P P S PC ES2 PC OS Multiproject Project1 Project2 Project3 Master data library Multiproject The folder where all the projects and libraries are stored for an automation solution is called a multiproject; it contains one or more STEP 7 projects and optionally also libraries. The projects within the multiproject can contain objects with cross-project relationships (e.g. cross-project S7 connections). Benefits of Multiproject If projects are part of a multiproject, they can be created with a smaller size and clearer structure. Using multiprojects, you can e.g. create one project for each operator and divide the stations among the operators for distributed execution. Cross-project functions allow you to handle a multiproject almost like one single project. Examples of Cross-Project Functions Cross-project functions in STEP 7 (basic package): - Save as (store multiproject with all projects at another location) - Archive (multiproject with all projects) - Match cross-project networking (e.g. merge subnets) - Update view (all projects of a multiproject) Other cross-project functions (with PCS 7, SIMATIC BATCH) - Compile OS (transfer AS-OS connection data) - Export SIMATIC BATCH plant data
  • 3. Training Center for Automation and Drives SIMATIC PCS 7 System Training MultiprojectPage 3 Date: 20.12.2006 File:ST-PCS7SYS_V70_mp.3 SIMATIC PCS 7 Siemens AG 2003. All rights reserved. SITRAIN Training for Automation and Drives Creating Multiprojects ES server or + MP P1 P2 LIB ES server MP P1 LIB ES-x P2 MP = Multiproject, stored on the hard disk of the server ES P1 = Project within the MP, stored on the server ES P2 = Project within the MP, stored (alternatively) on the server ES or on the distributed ES LIB = Master data library, within the MP Creating Multiprojects There are two ways to create a multiproject: 1. On the ES that is used as the server ES, you can create the multiproject with the individual projects and the master data library. All folders are saved on the hard disk of the server ES (MP, P1, P2 and LIB) 2. The multiproject and part of the projects are created on the server ES. The folders MP, P1 and LIB are saved here. Another project (P2) is created on another ES (ES-x) and later included in the multiproject. Notice Before creating the multiproject and associated projects, create a directory on each local hard disk of the participating ESs and enable it for sharing with all the participating configuring engineers. All other access paths are handled via the Windows network environment, the computer name and share name for the directories. Each project can contain an AS, OS or a combination of several ASs and OSs. The combination is created in such a way that the individual projects can later be distributed among the individual ESs (configuring engineers). The library remains on the server ES so it can be accessed by all. The server ES should be entered in one project of the multiproject; this allows you to perform compiling and downloading centrally. As long as the PC interface of the respective ES is set in PG operation in the distributed, individual projects (via "Set PC Station" and "Set PG/PC Interface"), there is no need for the explicit presence of an ES in these projects. The final network configuration is performed later in the multiproject after the projects have been synchronized. Remark Immediately after creating the projects in the multiproject, set the display language for each project/library via Options -> Language for Display Devices
  • 4. Training Center for Automation and Drives SIMATIC PCS 7 System Training MultiprojectPage 4 Date: 20.12.2006 File:ST-PCS7SYS_V70_mp.4 SIMATIC PCS 7 Siemens AG 2003. All rights reserved. SITRAIN Training for Automation and Drives Multiproject (Moving and Editing the Project) ES server MP P1 P2 LIB ES-x P2 ES server MP P1 Link LIB ES-x P2 P2- old Save as: •Without reorganization •Insert in MP •Select current MP •Replace current project •UNC path 1. Move 2. Edit Move On the server ES, go to the multiproject and select the project (P2), then select File -> Save as... to copy it to the distributed ES x. In doing so, please apply the settings shown on the slide. The purpose of the procedure is to store a copy of the project on the hard disk of the distributed ES x (P2). The selected options set up a link in the multiproject to the project on the distributed ES x. The multiproject version is updated via this link. The old version of the project remains on the hard disk of the server ES under its original name (P2 old version). In the event of an error occurring on the ES x, this older version can be used as the backup for project P2. Edit Project P2 which is saved on the distributed ES x can be locally processed. Here, you can also access the master data library and the charts of the other projects from SIMATIC Manager across MPs. Remark If a project that was started on another ES is to be included in a multiproject, this is possible from the multiproject itself as described below. Select the MP, then right-click and select Multiproject -> Insert in multiproject (Browse if necessary) The selected project is now included in the multiproject.
  • 5. Training Center for Automation and Drives SIMATIC PCS 7 System Training MultiprojectPage 5 Date: 20.12.2006 File:ST-PCS7SYS_V70_mp.5 SIMATIC PCS 7 Siemens AG 2003. All rights reserved. SITRAIN Training for Automation and Drives Multiproject (Save/Archive MP - 1) ES server MP P1 P2 link LIB ES server Save as: •Without / with reorganization Save Archive MP1 P1 P2 LIB ES server MP P1 P2 link LIB P2 link ES server MP.ZIP P1 P2 LIB Save MP as For backup purposes, you can also save a multiproject explicitly. In the SIMATIC Manager, open the multiproject and select its icon. Select File -> Save as... Option with (without) reorganization to copy the multiproject to another directory of your choice and open it there. Note 1 If you use this procedure, the projects are also saved in the same directory and the links to the distributed ESs are removed! This means that you then need to use "Save as..." again to distribute the individual ESs (see previous slide). Archiving MPs After closing the multiproject, select File -> Archive to initiate archiving. First, you must select the multiproject you want to archive. Next, select the directory you want so save the archive to and enter a name for the archive. The result is a "zip" file containing the entire MP contents. Retrieving MPs You first need to prepare (share) the directory or, alternatively, empty the old directory (delete MP). Select File -> Retrieve First, you select the multiproject to be retrieved, then the target directory where you want to save the retrieved file. Note 1 applies here too, i.e. links are removed.
  • 6. Training Center for Automation and Drives SIMATIC PCS 7 System Training MultiprojectPage 6 Date: 20.12.2006 File:ST-PCS7SYS_V70_mp.6 SIMATIC PCS 7 Siemens AG 2003. All rights reserved. SITRAIN Training for Automation and Drives Multiproject (Save/Archive MP - 2) Note 2 If when trying to save, reorganize or archive the multiproject, a message is displayed "...being processed by another application. Close and restart...", one of the following tips may help: - For archiving, you must first close the multiproject and each project. Then exit the SIMATIC Manager and launch it again. Now start archiving again. - If the information about existing access operations indicate an OS (WinCC), the "emergency brake" can be pulled using the "Reset_WinCC.vbs" script. In a typical installation, you can find this script under C:Program FilesSIEMENSWINCCbinReset_WinCC.vbs The script stops all WinCC processes and services that work with WinCC. Access to the project database is enabled. You must subsequently restart the SIMATIC Manager.
  • 7. Training Center for Automation and Drives SIMATIC PCS 7 System Training MultiprojectPage 7 Date: 20.12.2006 File:ST-PCS7SYS_V70_mp.7 SIMATIC PCS 7 Siemens AG 2003. All rights reserved. SITRAIN Training for Automation and Drives Multiproject (Restoring an Individual Project) ES server MP P1 P2 LIB ES-x P2 ES server MP P1 P2 link LIB ES-x P2 P2- old 3. Save as: •Without reorganization •Insert in MP •Select current MP •Replace current project •UNC path 4. Result 1. Close P22. Delete P2-old (not the link in the MP!) Restoring an Individual Project To restore a project that was decentrally edited to the server ES (e.g. to distribute it to another ES), proceed as follows: First, delete the old project (P2-old) - either using the SIMATIC Manager, as a single project or via the Windows Explorer) Select the current project (P2) in the MP and select File -> Save as... (see options in the slide) to copy it to the location where the deleted project stood in the multiproject directory. The previous project version (P2) remains on the distributed ES-x and can either be deleted or used as an additional backup copy until the process is completed. Now the Server ES can redistribute the projects among the decentralized ESs. .
  • 8. Training Center for Automation and Drives SIMATIC PCS 7 System Training MultiprojectPage 8 Date: 20.12.2006 File:ST-PCS7SYS_V70_mp.8 SIMATIC PCS 7 Siemens AG 2003. All rights reserved. SITRAIN Training for Automation and Drives Multiproject (Update Projects) PC1 ES1 AS 01 C P U C P P S AS 02 C P U C P P S PC2 ES2 Multiproject Project 1 Project 2 Network 1 Network 2 System bus (universal subnet due to update) Connection 1 Refer.: XYZ Connection 1 Refer.: XYZ Project 1 If project 1 on ES1 is not yet included in the multiproject, you can use NetPro e.g. to configure "Subnet 1" as system bus. Connections originating from AS01's CPU to a station that is not in the same project are set up as connections to a station in an "unknown project". For this type of connection, you need to enter a "Connection name (reference)" in the Properties dialog box (e.g. "XYZ"). It is called an "open connection". Project 2 If project 2 on ES2 is not yet included in the multiproject, you can use NetPro e.g. to configure "Subnet 2" as system bus. Connections originating from AS02's CPU to a station that is not in the same project 2 are set up as connections to a station in an "unknown project". For this type of connection, you need to enter a "Connection name (reference)" in the Properties dialog box (e.g. "XYZ"). Remark Connections in different projects that are later merged in the multiproject, must have the same connection names (references="XZY"). The above described procedure is not necessary if the projects were already inserted in the multiproject when the connection was created. If this is the case, when you set up a connection in NetPro, the other station is selected via the multiproject (it is offered for selection in the screen). Update Projects Select File -> Multiproject -> Update projects to merge subnets and connections that were originally created in separate projects - as part of the "project update". The subnets that originally had their own names (e.g. "Subnet 1" and "Subnet 2") are merged under a new name (e.g. "system bus"). "Open connections" from the two projects having the same reference are also made.
  • 9. Training Center for Automation and Drives SIMATIC PCS 7 System Training MultiprojectPage 9 Date: 20.12.2006 File:ST-PCS7SYS_V70_mp.9 SIMATIC PCS 7 Siemens AG 2003. All rights reserved. SITRAIN Training for Automation and Drives Description of Task Terminal bus AS 01 C P U C P P S PLC SIM C P U C P P S PC ES/OS Multiproject PRO_ASi PRO_OSi PRO_SIMMaster data library Plant bus MPI bus COURSE_V7 COURSE_V7 ES_Distributed Share Starting point Your multiproject with the projects PRO_ASi, PRO_OSi and master data library are present in the "Course_V7" folder. The "ES_Distributed" folder is created for external storage of a project (created for the exercise on your ES, but could also be present on the hard disk of a different PCS 7 ES). Both folders are shared and accessible under Windows. (If they are present on different ESs, the login name and password of the configuration engineer must be known on both computers.) A ready-made PRO_SIM project exists for importing into your multiproject (ask your trainer for the storage location). Remark The objective of the exercise is the handling of projects and networks within a multiproject (external storage, editing and restoring). If the external storage of the project is to the neighboring ES, the configuration engineers there may only observe your operations. They can only process the externally stored project after you have finished swapping it out! However, with respect to handling, there is no difference whether this project is saved in a directory on your own ES hard disk or moved to a network drive (of another PC). In order to avoid these delays, a separate directory is shared for the project to be stored externally. PLC_SIM is used to test the additional program (in order to also become acquainted with this test option). Since the PLC_SIM option is installed on every PC, an MPI connection to it can be set up for test purposes. Online tests can then also be carried out.
  • 10. Training Center for Automation and Drives SIMATIC PCS 7 System Training MultiprojectPage 10 Date: 20.12.2006 File:ST-PCS7SYS_V70_mp.10 SIMATIC PCS 7 Siemens AG 2003. All rights reserved. SITRAIN Training for Automation and Drives Multiproject: Preparation E: ES_Distributed Share Course_V7 2 1 Preparations Prepare your ES for the following exercises. On the local hard disk "E", create a directory called "ES_Distributed" and share it using the same share name. It is to be subsequently used for "external storage" of a distributed project, and read and write operations should be possible on it. Also share the folder containing the multiproject (Course_V7 in this case). --------------------------------------------------------------------------------------------------------- Steps 1. Use the Windows Explorer to create the "ES_Distributed" directory on the "E" drive. 2. Share this with full access. --------------------------------------------------------------------------------------------------------- Create Folder 1. Open the Windows Explorer (right-click the START button in the Windows taskbar and select "Explorer"). Select the E drive, click in the right pane, right-click and select New Folder Call the new folder "ES_Distributed". Share Folder 2. Point to the new folder, right-click and select Share... Share this folder then click the Permissions button to ensure the other configuring engineers can access the directory (and subdirectories) from other ESs. Repeat the procedure for the "Course_V7" directory containing the multiproject. Remark You only set sharing for the main directory. Do not change the permissions for any subdirectories that may be present!
  • 11. Training Center for Automation and Drives SIMATIC PCS 7 System Training MultiprojectPage 11 Date: 20.12.2006 File:ST-PCS7SYS_V70_mp.11 SIMATIC PCS 7 Siemens AG 2003. All rights reserved. SITRAIN Training for Automation and Drives Multiproject: Prepare Distributed Working ES MP PRO_ASi LIB ESE: Course_V7 D: Course_V7 ES MP LIB E: Course_V7 Retrieve projects Insert project in multiproject PRO_OSi MP PRO_ASi LIB PRO_OSi PRO_ASi PRO_OSi PRO_SIM PRO_SIM PRO_SIM PH Update PH Update ES_Distributed E: Course_V7 ES MP LIB PRO_ASi PRO_OSi PRO_SIM Shift project 3 4 5 6 Retrieve project 3. Open the SIMATIC Manager, and select File Retrieve to retrieve the PRO_SIM (ProSim.ZIP) project to the "Course_V7" directory. Insert in MP 4. Open your multiproject. Select the MP. Select File Multiproject Insert in multiproject to search for the previously retrieved PRO_SIM project, and insert it. PH Update 5. Update the plant hierarchy: The source is PRO_SIM The target is PRO_OSi. In a later step, you are to monitor both ASs (ASi and PLC_SIM) from your OS. Shifting the project (normally to a drive of the distributed ES) 6. Move the PRO_SIM project to the "ES_Distributed" directory (target). First, select the PRO_SIM project to be moved and select File Save as… and select the options "Insert in multiproject", "Current multiproject", "Replace current project"
  • 12. Training Center for Automation and Drives SIMATIC PCS 7 System Training MultiprojectPage 12 Date: 20.12.2006 File:ST-PCS7SYS_V70_mp.12 SIMATIC PCS 7 Siemens AG 2003. All rights reserved. SITRAIN Training for Automation and Drives Multiproject: Distributed Working E: Course_V7 ES_Distributed ES MP LIB PRO_ASi PRO_OSi PRO_SIM 8 7 9 Processing First close the multiproject in the SIMATIC Manager (it need not be open on the distributed ES). At this point, normal processing on the distributed ES would be continued. In our exercise, carry out all procedures on your ES. 7. Open just the PRO_SIM project from the "ES_Distributed" directory by selecting File Open User projects Do not proceed via the multiproject. 8. Open your master data library from the "Course_V7" directory using File Open Libraries Do not proceed via the multiproject. 9. Insert the VAL_MOT and V_SIM_FB blocks from the master data library into the CFC, and interconnect them. Finally, close both windows (project and library). Remark You can open every project or every library of the multiproject from the distributed ES without these having to be open on the central ES itself. The central ES server or the directory enabled there need only be accessible over the LAN if something has to be copied from or inserted there. If all required data/blocks are already on the distributed ES, it is possible to work there without the LAN.
  • 13. Training Center for Automation and Drives SIMATIC PCS 7 System Training MultiprojectPage 13 Date: 20.12.2006 File:ST-PCS7SYS_V70_mp.13 SIMATIC PCS 7 Siemens AG 2003. All rights reserved. SITRAIN Training for Automation and Drives Multiproject: Restoring the Distributed Project E: Course_V7 ES_Distributed ES MP LIB PRO_ASi PRO_OSi PRO_SIM 10 11 Deleting the old version (of the moved project) 10. According to the multiproject, the "PRO_SIM" component is located on the distributed ES. Delete the PRO_SIM project, which still remains in the "Course_V7"directory (after you have moved it to the ES_Distributed directory using Save as... (only in the editing sense, but actually only copied)). Restoring to the MP 11. Move the current PRO_SIM project back to the "Course_V7" directory. This updates the status for the MP. Use the same procedure as with "Decentralization". The "old" state now present in the "ES_Distributed" directory can subsequently be saved or deleted there.
  • 14. Training Center for Automation and Drives SIMATIC PCS 7 System Training MultiprojectPage 14 Date: 20.12.2006 File:ST-PCS7SYS_V70_mp.14 SIMATIC PCS 7 Siemens AG 2003. All rights reserved. SITRAIN Training for Automation and Drives Multiproject: Test AS Program with PLCSIM 1213 14 Start PLC_SIM 12. Click the icon labeled with 12 (see slide). The PLCSIM desktop is opened. PLCSIM internally converts the programming interface of the SIMATIC Manager to MPI. It represents an S7-300 or S7-400 CPU which is still empty. Load HW Config 13. Load the HW Config of the AS from the PRO_SIM project. The screen forms are called as if the AS were connected via MPI. From the PLCSIM window, you can select Simulation Save target system as to save the downloaded station (using HW Config and the program that is still empty) Note An S7-CPU has the default MPI address "2". This should be used when downloading the PLCSIM for the first time. It subsequently has the address defined in the project. Download charts 14. Select the chart folder of the AS and download it using right-click and select Download PLC Use the download option "Download to test CPU (complete program)" Test Carry out the test in the CFC as usual.
  • 15. Training Center for Automation and Drives SIMATIC PCS 7 System Training MultiprojectPage 15 Date: 20.12.2006 File:ST-PCS7SYS_V70_mp.15 SIMATIC PCS 7 Siemens AG 2003. All rights reserved. SITRAIN Training for Automation and Drives Multiproject: Prepare OS Test with PLCSIM (1) 15 Supplement PC HW Config Note! Before you supplement the HW Config, you should guarantee that your OS can communicate in runtime with your AS (download the S7 connection if necessary), and then deactivate. 15. Because PLCSIM can only be addressed over MPI, revise the HW Config of your ES/OS to include a PROFIBUS/MPI CP (e.g. 5611 or compatible), even if one is not physically present. The slot is irrelevant. In the properties of the CP 5611, convert the interface to MPI and set the MPI address = 0 (PLCSIM has the MPI address = 2 as default). Network the CP with the MPI network existing in the project. Do not download to the PC if a CP is not present. Following successful tests, the CP can be removed again. This addition enables you to select the MPI route when compiling the OS.
  • 16. Training Center for Automation and Drives SIMATIC PCS 7 System Training MultiprojectPage 16 Date: 20.12.2006 File:ST-PCS7SYS_V70_mp.16 SIMATIC PCS 7 Siemens AG 2003. All rights reserved. SITRAIN Training for Automation and Drives Multiproject: Updating the Networks Updating MPI networks in the multiproject PLC SIM C P U C P P S PC ES/OS PRO_OSi PRO_SIM MPI_OS MPI_SIM 16 Updating networks 16. Select the multiproject icon in the SIMATIC Manager and right-click and select Multiproject Adjust projects to start combination of the networks. Combine the MPI networks of the PRO_OSi and PRO_SIM projects. A route is then present for NetPro between the OS and the PLCSIM. When compiling the OS later, this path is selected as the connection between OS and PLCSIM.
  • 17. Training Center for Automation and Drives SIMATIC PCS 7 System Training MultiprojectPage 17 Date: 20.12.2006 File:ST-PCS7SYS_V70_mp.17 SIMATIC PCS 7 Siemens AG 2003. All rights reserved. SITRAIN Training for Automation and Drives Multiproject: Insert Picture into PH and Compile OS 17 18 Add to PH 17. The "Tank farm" folder in the PH is assigned to your OS in the PRO_OSi, whereas the AS assignment in the PRO_SIM indicates PLCSIM. Through insertion of a picture (e.g. "BildSim" in the "Pumps" folder in the PH), the VAL_MOT block from the CFC in the PH folder of the same name is recorded when compiling the OS, and an associated block icon is positioned in the picture. Compile 18. When compiling the OS, assign the MPI connection to the "Tank farm" area in the "Compile dialog".
  • 18. Training Center for Automation and Drives SIMATIC PCS 7 System Training MultiprojectPage 18 Date: 20.12.2006 File:ST-PCS7SYS_V70_mp.18 SIMATIC PCS 7 Siemens AG 2003. All rights reserved. SITRAIN Training for Automation and Drives Multiproject: OS Test with PLCSIM Requirements: The OS Runtime has previously communicated with your AS. Close PLCSIM (if still open) Activate OS. If a communication fault is displayed, do not acknowledge, but move the message window away from center Start PLCSIM. Acknowledge previous error message Download saved project from PLCSIM, possibly download PLCSIM from CFC Set PLCSIM to RUN. Now log on to OS Runtime, and test. The two connections should function (named connection to your AS and MPI to the PLCSIM) Online test 19. For the runtime test of the expansion using PRO_SIM in addition to the existing system, please observe the following sequence of steps (see slide). If you start with the PLCSIM switched on, you can only test the expansion from PRO_SIM, the link to the real AS is not established. If you subsequently switch PLCSIM off, only communication with the real AS functions.