1. NATIONAL SERVICE OF LEARNING
FORM FORMATION`S PROJECT
Name: Bryan Tovar. Hernan Jimenez. Sara Marin. Manuel Castaño. Kelin Marin Grade: 9-B
Direction Web:Tecnoinventores9-b.blogspot.com Tel: 6100896
Dirección General
Dirección de Formación Profesional
1.1 Educational Institution:
I.E.T.I. SIMONA DUQUE
1.2 MUNICIPALITY:
Antioquia
Marinilla
1.2 Name of the project:
Solar Ecological panel Based on Gelatine
1.3 Training Program that responds to
I strengthen my profile for the world of the work. (Integration of the degrees 9 º of the IETISD with the
Technical Average)
1.4 Estimated time of execution of the
project (months):
9 Months
1.5 Companies or institutions that take part
in his formulation or financing : (if exist)
No Company
1.7 Key words of search
Panel, Solar, Ecological, Cell, Photocell, Gelatine, Copper, Zinc.
2. 2. Structure of the Project
2.1 Approaching the Problem
What we want is to create a solar cell with different materials to make it cheap and accessible for that this helps our Planet
2.2 Justification of the Project
One Gave East I project Thinking About The Need Of The Persons Since The Solar Panel Is Based on Gelatine, It is Economic and Helps to the Improvement
Of The Environment
2.3 General objetive
To transform The Solar Radiation Into Electric power By means of A Solar Ecological Panel Based on Gelatine
2.4 Specific objetive:
· To design Our Project This way To take Her To A Model (Prototype)
· To construct The Solar Panel Using Recyclable Materials
· To be employed At Equipment And At Class
· To expose Our Project In order that The People Find out
3. 2.5 scope: It can Be To Municipal Level
2.5.1
All The Persons That Use
Beneficiaries of
the project
Social
His Benefit Is That The Population Is going To have Less Electrical
Consumption
Economic
Fewer Costs In Energy And Fewer Expenses
Environmental
The Panel Not to be going To contaminate And It was Taking care Of
The Environment
Technological
She is Alternative A New Energy
2.5.2 Impact
2.5.3 Restrictions or associated risks:
That The Gelatine Might Deteriorate Easily Without A System Of Refrigeration
2.5.4. Products or results of the project
That The Gelatine Without Flavor Gave To Us A Major Increase Of Solar power Together with A foil Of Zinc and One Of Copper
4. 2.6:Innovation/ Technological management
Yes: If it solves it because we will be able to generate energy from our own homes.
The project addresses a need of the productive sector
yes/no
The project improves the process / product / service exists?.
yes/no
Yes: If it improves it because the productive sector of nowadays is commonly a villain because it
does not produce the energy from his homes.
The project involves the use of new techniques and process
technologies
yes/no
No: Not it does not involve them because it is possible to realize with the technology that we
have nowadays
The end products are susceptible to industrial protection and / or
copyright
yes/no
The products obtained in the project can be positioned in the
market?.
yes/no
No: They are not rights of the author because this project not surgio of the thought of us rather
only wanted to get improved
Yes: If they can be positioned on the market since they can sell in order that the persons
generate alternative energy
2.7 Productive assessment
With the development of the project can meet the need for a
potential customer.
yes/no
Feasibility of project business plan
yes/no
Yes: If it is possible to satisfy the need of a person because it him is going to generate fewer
expenses economically and they go to abide alternative energies in his ' own home
The Panel Can Easily sold By His Low Cost
5. 3. Planning
3.1 PROCESS STAGES
Fase 1:
Fundamentación
PHASE 2: formulación
PHASE 3:DIAGNOSTIC
4 PHASE: ANALYSIS
AND CONSTRUCTION
OF THE PROPOSAL
5 PHASE:
3.2
ACTIVITIES
OF THE
PROJECT
We started
with an Idea
Asking
Questions
3.3. RESULTS
OF
LEARNING(a
partirof the
program of
formation)
We continue
to make the
project by
asking
questions and
a Valuation
Table
Learn more
about the
solar panels
and Electrical
Energy
Completion of Basic rules of
the Project
the Draft
3.4
ASSOCIATE
COMPETITIO
N
science
DESCRIPTION OF THE ACTIVITY
We Met for equipments and
began to work from the idea.
TEACHERSTHA
HOURS
T TAKE PART
Jairo Miranda.
Alba Giraldo.
EVIDENCES
four
A range of alternative
energy
The textual Project
finished
science
I initiate the textual Project By
means of different routes of
investigation.
Jairo Miranda.
Alba Giraldo.
Six
There was no
competition
associated
We finish the Project and we all
work well.
Jairo Miranda.
Alba Giraldo.
Four
We construct the solar panel
helping ourselves with Gelatine, it
laminates one of copper and one of
Zinc
Jairo Miranda.
Alba Giraldo.
Seventy
two
Completion of the
project (Model)
Jairo Miranda.
Alba Giraldo
Five
Exposing the different
people including the
Jury
Build the
project
Work and
There was no
equipment in
competition
order to build
associated
the project
Exposure of
the Project
Have the
project
completed
There was no
We exposed the already finished
AND have a
competition
work and it us was OK
good
associated
management
on the Project
Termination of Data