SlideShare ist ein Scribd-Unternehmen logo
1 von 14
Downloaden Sie, um offline zu lesen
ALSOL – HYBRID SOLAR THERMAL
                 TOWER POWER PLANT IN ALGERIA
3.05




       2nd German-Arabic Energy2011 Dipl. Ing. MBA Gerrit Koll 21 October 2011
              German-Arabic Energy Forum Forum         20 – 20.10.2011           1
Solar Tower Jülich
3.05




           German-Arabic Energy Forum 2011   Dipl. Ing. MBA Gerrit Koll   20.10.2011   2
Solar Tower Jülich
3.05




           German-Arabic Energy Forum 2011   Dipl. Ing. MBA Gerrit Koll   20.10.2011   3
Kraftanlagen München GmbH

       KAM is a leading EPC and
       piping construction company in
       Germany & Europe

                                                   Power plant technology              Energy technology
       Almost 6 decades of
       experience with a capacity of
       2.400 persons and 360 Mio. €
       turnover

                                                                                       Underground piping
                                                     Renewable energies
       Over 10 years of experience in                                                     construction
       R&D and construction of CSP
       technology and an
       implemented reference facility

                                                                                          Chemical &
       Local presence in the region                     Utility service
                                                                                    petrochemical industries
3.05




                German-Arabic Energy Forum 2011   Dipl. Ing. MBA Gerrit Koll   20.10.2011                      4
ALSOL – Phase I - Feasibility

       Technology Transfer from Jülich Germany – to Tipaza Algeria:




        Work is based on a Bilateral Agreement between Germany & Algeria
        Adaption of the technology for algerian condition (e.g. hybrid)
        Selection of the suitable plant designs
        Basic engineering for the selected plant designs
        Establishment of a sientific collaboration ( Training of Sientists in Jülich)
        Elaboration of a founding and finance Scheme
3.05




                 German-Arabic Energy Forum 2011   Dipl. Ing. MBA Gerrit Koll   20.10.2011   5
ALSOL – Partners
Project partners & funders

         Public Funding

                  Dirección generale de la
                  Recherche sientifique y du
                  Developpment technologique




        Donee                                    Project Partners
         Centre de recherche
         Energetique
         renouvables




          Project
                                        Construction                Research                 Operation
                                       •Planning                •Tools & Methods             •Trial Operation
                                       •Engineering             •Monitoring                  •Normal Operation
                                       •Installation            •Optimization                •Investigational Operation
         Solar Tower Tipasa            •Comminssioning          •Developement

       Owner & Operator: CDER                  KAM                    DLR, SIJ, KAM          CDER, SWJ, KAM, DLR, SIJ
3.05




                        German-Arabic Energy Forum 2011         Dipl. Ing. MBA Gerrit Koll    20.10.2011                  6
ALSOL Technical Concept
Solar only plant concept


                                                                          Natural gas
                                                                                            5

                                                                                        ∼
                     Open Volumetric             Hot Air 680 °C               Gas Turbine
                                         2
                        Receiver
                                                                      6
                                                                                    Steam
                                                                  3
                                                                                                    7

                                                    Thermal
                                                    Storage                             Turbine   ~
       1                                     4                                 HRSG                     8
                                                              4
                             Air
           Heliostat Field   Recirculation       Cold Air 120 °C                                  Cooling
                                                                                                  cycle
3.05




                     German-Arabic Energy Forum 2011   Dipl. Ing. MBA Gerrit Koll    20.10.2011             7
ALSOL Technical Concept
Solar only plant concept -> Hybrid plant concept


                                                                          Natural gas
                                                                                            5

                                                                                        ∼
                     Open Volumetric             Hot Air 680 °C               Gas Turbine
                                         2
                        Receiver
                                                                      6
                                                                                    Steam
                                                                  3
                                                                                                    7

                                                    Thermal
                                                    Storage                             Turbine   ~
       1                                     4                                 HRSG                     8
                                                              4
                             Air
           Heliostat Field   Recirculation       Cold Air 120 °C                                  Cooling
                                                                                                  cycle
3.05




                     German-Arabic Energy Forum 2011   Dipl. Ing. MBA Gerrit Koll    20.10.2011             8
ALSOL Technical Concept


       Operational concept:       GT-hybrid parallel
       Heliostat field:           North field, 25000 m²
       Tower height:              60 m
       Receiver design power      13,7 MW
       Heat storage capacity      20 MWh                                                     2


       GT / ST design power       4,6 MW / 2,5 MW                   1



       Cooling concept            dry air cooling


                                                  8

                                                                        7




                                                                            6




                                                                                                 5
                                                      4


                                                                        3

                                                                                             4
3.05




                German-Arabic Energy Forum 2011   Dipl. Ing. MBA Gerrit Koll    20.10.2011           9
ALSOL Technical Concept
Technology Advantages


☼      Bridge technology through hybridisation


       simple combination with conventional (gas or biogas) firing or turbine – technology bridge


☼      Energy on demand


       adaptation to the consumption profile through simple storage


☼      High system efficiency


       steam cycle operates on parameters as usual for conventional power plants


☼      Environmental friendly – low water consumption


       low water consumption due to dry cooling system no hazardous media used such thermal oil
3.05




                     German-Arabic Energy Forum 2011   Dipl. Ing. MBA Gerrit Koll   20.10.2011      10
ALSOL Objectives

Close German – Algerian Cooperation in the
field of latest renewable technology
development                                               International
                                                          cooperation                               CDER
                                                                                                    USTHB
Proximity to research institutes, universities                                  UDES
                                                                                                    National
and airports in the north of Algeria                                                                universities


Investigation facility providing a broad spectrum
for future R&D-studies such as Hybrid with GT,           TIPAZA /                      National
                                                                                       university
                                                         Bourkika
heat storage, heat extraction for desalination,
research platform, modular extendable scale

Innovative plant concept with gas turbine                           TIPAZA, Bourkika
hybridization and heat storage for operation on
                                                               36°29'39.70"N, 2°28'38.01"E
demand and high plant availability

Light tower to promote the technology in the                   The expected annual DNI:
north African region where the future
application will take place                                               1900 kWh/(m² a)
3.05




                 German-Arabic Energy Forum 2011   Dipl. Ing. MBA Gerrit Koll    20.10.2011                        11
ALSOL II - Implementation
       Current activities
                          preparation ALSOL phase II
                         government-founded research cooperation:
                         - Project organization
                         - Definition of WPs

                         Budget acquisition and financial
                         structure for plant construction



       Time Schedule for next steps
                                                                     2012          2013           2014         2015   2016
                          Permit Process
        ALSOL phase II




                          Detail engineering
                          Component ordering
                          Delivery and works
                          Commissioning and test operation
                          Plant handover


                                                                                                    Start of CSP R&D Work
3.05




                                   German-Arabic Energy Forum 2011   Dipl. Ing. MBA Gerrit Koll   20.10.2011            12
Outlook – the bigger picture

         Technology                                                     Energy
         Europe to North Africa                                         North Africa to Europe
         ☼ creation of local value                                      ☼ clean & ambient friendly
         ☼ development                                                  ☼ reliable & on demand



           International
           cooperation                            CDER
                                                  UST HB
                             UDES
                                                  National
                                                  universities




          TIPAZA /                   National
          Bourkika                   university
3.05




                     German-Arabic Energy Forum 2011        Dipl. Ing. MBA Gerrit Koll   20.10.2011   13
Contact:         Dipl. Ing. MBA Gerrit Koll
       E-Mail:          KollG@ka-muenchen.de




Thank you for your attention




                                                                                     Kraftanlagen München GmbH
3.01
3.05




                  German-Arabic Energy Forum 2011   Dipl. Ing. MBA Gerrit Koll   20.10.2011                          14
                                                                                        Ridlerstraße 31c - 80339 München
                                                                                                  www.ka-muenchen.de

Weitere ähnliche Inhalte

Ähnlich wie ALSOL HYBRID SOLAR THERMAL TOWER POWER PROJECT

Practical Implementation Of Renewable Hydrogen & Fuel Cell Installations in t...
Practical Implementation Of Renewable Hydrogen & Fuel Cell Installations in t...Practical Implementation Of Renewable Hydrogen & Fuel Cell Installations in t...
Practical Implementation Of Renewable Hydrogen & Fuel Cell Installations in t...guest083950
 
Innovative projects in the refrigeration and Air Conditioning sector
Innovative projects in the refrigeration and Air Conditioning sector Innovative projects in the refrigeration and Air Conditioning sector
Innovative projects in the refrigeration and Air Conditioning sector UNEP OzonAction
 
High-Efficiency Heating Rooftop Units (RTUs): The Final Frontier for Condensi...
High-Efficiency Heating Rooftop Units (RTUs): The Final Frontier for Condensi...High-Efficiency Heating Rooftop Units (RTUs): The Final Frontier for Condensi...
High-Efficiency Heating Rooftop Units (RTUs): The Final Frontier for Condensi...E Source Companies, LLC
 
Cu stp 08_tes+hybrid
Cu stp 08_tes+hybridCu stp 08_tes+hybrid
Cu stp 08_tes+hybridManuel Silva
 
Km88 solar powered hho brown gas fuel cell (wecompress)
Km88 solar powered hho brown gas fuel cell (wecompress)Km88 solar powered hho brown gas fuel cell (wecompress)
Km88 solar powered hho brown gas fuel cell (wecompress)1000kv technologies
 
IRJET- Water Cooling With LPG as Refrigerant for Restaurants
IRJET- Water Cooling With LPG as Refrigerant for RestaurantsIRJET- Water Cooling With LPG as Refrigerant for Restaurants
IRJET- Water Cooling With LPG as Refrigerant for RestaurantsIRJET Journal
 
IRJET- Water Cooling With LPG as Refrigerant for Restaurants
IRJET- Water Cooling With LPG as Refrigerant for RestaurantsIRJET- Water Cooling With LPG as Refrigerant for Restaurants
IRJET- Water Cooling With LPG as Refrigerant for RestaurantsIRJET Journal
 
C2 - ENGINEERING THE ENERGY TRANSITION
C2 - ENGINEERING THE  ENERGY TRANSITIONC2 - ENGINEERING THE  ENERGY TRANSITION
C2 - ENGINEERING THE ENERGY TRANSITIONIceland Geothermal
 
Vogtle 3&4 - Cleaner Energy Means Clean Air
Vogtle 3&4 - Cleaner Energy Means Clean AirVogtle 3&4 - Cleaner Energy Means Clean Air
Vogtle 3&4 - Cleaner Energy Means Clean Airandrewbouldin
 
11 eurammon symposium_2017-huber_r290_f3
11 eurammon symposium_2017-huber_r290_f311 eurammon symposium_2017-huber_r290_f3
11 eurammon symposium_2017-huber_r290_f3Katarina Lisci
 
Adoption of supercritical technology (1)
Adoption of supercritical technology (1)Adoption of supercritical technology (1)
Adoption of supercritical technology (1)HARSHIT GUPTA
 
Applied Hydrogen Slide Presentation 3.12.08
Applied Hydrogen Slide Presentation  3.12.08Applied Hydrogen Slide Presentation  3.12.08
Applied Hydrogen Slide Presentation 3.12.08fredyornath
 
43-slides-0-2_Turbodenl.pdf
43-slides-0-2_Turbodenl.pdf43-slides-0-2_Turbodenl.pdf
43-slides-0-2_Turbodenl.pdfBryanlillibridge
 
Operational analysis of biogas based cold storage
Operational analysis of biogas based cold storageOperational analysis of biogas based cold storage
Operational analysis of biogas based cold storagePrem Kumar
 
3.8 reheating furnace
3.8 reheating furnace3.8 reheating furnace
3.8 reheating furnacemvjykmr
 
Gas reinjection and flaring reduction Norway's experience - Steinar Nja (Norw...
Gas reinjection and flaring reduction Norway's experience - Steinar Nja (Norw...Gas reinjection and flaring reduction Norway's experience - Steinar Nja (Norw...
Gas reinjection and flaring reduction Norway's experience - Steinar Nja (Norw...Esther Petrilli-Massey
 
Parabolic trough collectors comparison
Parabolic trough collectors comparisonParabolic trough collectors comparison
Parabolic trough collectors comparisonSolar Reference
 

Ähnlich wie ALSOL HYBRID SOLAR THERMAL TOWER POWER PROJECT (20)

Practical Implementation Of Renewable Hydrogen & Fuel Cell Installations in t...
Practical Implementation Of Renewable Hydrogen & Fuel Cell Installations in t...Practical Implementation Of Renewable Hydrogen & Fuel Cell Installations in t...
Practical Implementation Of Renewable Hydrogen & Fuel Cell Installations in t...
 
Innovative projects in the refrigeration and Air Conditioning sector
Innovative projects in the refrigeration and Air Conditioning sector Innovative projects in the refrigeration and Air Conditioning sector
Innovative projects in the refrigeration and Air Conditioning sector
 
Geothermal Power Plants
Geothermal Power PlantsGeothermal Power Plants
Geothermal Power Plants
 
High-Efficiency Heating Rooftop Units (RTUs): The Final Frontier for Condensi...
High-Efficiency Heating Rooftop Units (RTUs): The Final Frontier for Condensi...High-Efficiency Heating Rooftop Units (RTUs): The Final Frontier for Condensi...
High-Efficiency Heating Rooftop Units (RTUs): The Final Frontier for Condensi...
 
Cu stp 08_tes+hybrid
Cu stp 08_tes+hybridCu stp 08_tes+hybrid
Cu stp 08_tes+hybrid
 
ID-109.pdf
ID-109.pdfID-109.pdf
ID-109.pdf
 
GE Hitachi. Nuclear Innovation
GE Hitachi. Nuclear InnovationGE Hitachi. Nuclear Innovation
GE Hitachi. Nuclear Innovation
 
Km88 solar powered hho brown gas fuel cell (wecompress)
Km88 solar powered hho brown gas fuel cell (wecompress)Km88 solar powered hho brown gas fuel cell (wecompress)
Km88 solar powered hho brown gas fuel cell (wecompress)
 
IRJET- Water Cooling With LPG as Refrigerant for Restaurants
IRJET- Water Cooling With LPG as Refrigerant for RestaurantsIRJET- Water Cooling With LPG as Refrigerant for Restaurants
IRJET- Water Cooling With LPG as Refrigerant for Restaurants
 
IRJET- Water Cooling With LPG as Refrigerant for Restaurants
IRJET- Water Cooling With LPG as Refrigerant for RestaurantsIRJET- Water Cooling With LPG as Refrigerant for Restaurants
IRJET- Water Cooling With LPG as Refrigerant for Restaurants
 
C2 - ENGINEERING THE ENERGY TRANSITION
C2 - ENGINEERING THE  ENERGY TRANSITIONC2 - ENGINEERING THE  ENERGY TRANSITION
C2 - ENGINEERING THE ENERGY TRANSITION
 
Vogtle 3&4 - Cleaner Energy Means Clean Air
Vogtle 3&4 - Cleaner Energy Means Clean AirVogtle 3&4 - Cleaner Energy Means Clean Air
Vogtle 3&4 - Cleaner Energy Means Clean Air
 
11 eurammon symposium_2017-huber_r290_f3
11 eurammon symposium_2017-huber_r290_f311 eurammon symposium_2017-huber_r290_f3
11 eurammon symposium_2017-huber_r290_f3
 
Adoption of supercritical technology (1)
Adoption of supercritical technology (1)Adoption of supercritical technology (1)
Adoption of supercritical technology (1)
 
Applied Hydrogen Slide Presentation 3.12.08
Applied Hydrogen Slide Presentation  3.12.08Applied Hydrogen Slide Presentation  3.12.08
Applied Hydrogen Slide Presentation 3.12.08
 
43-slides-0-2_Turbodenl.pdf
43-slides-0-2_Turbodenl.pdf43-slides-0-2_Turbodenl.pdf
43-slides-0-2_Turbodenl.pdf
 
Operational analysis of biogas based cold storage
Operational analysis of biogas based cold storageOperational analysis of biogas based cold storage
Operational analysis of biogas based cold storage
 
3.8 reheating furnace
3.8 reheating furnace3.8 reheating furnace
3.8 reheating furnace
 
Gas reinjection and flaring reduction Norway's experience - Steinar Nja (Norw...
Gas reinjection and flaring reduction Norway's experience - Steinar Nja (Norw...Gas reinjection and flaring reduction Norway's experience - Steinar Nja (Norw...
Gas reinjection and flaring reduction Norway's experience - Steinar Nja (Norw...
 
Parabolic trough collectors comparison
Parabolic trough collectors comparisonParabolic trough collectors comparison
Parabolic trough collectors comparison
 

Mehr von lyesdz

GE innovation barometer for MENAT
GE innovation barometer for MENATGE innovation barometer for MENAT
GE innovation barometer for MENATlyesdz
 
Industry guide Algeria
Industry guide AlgeriaIndustry guide Algeria
Industry guide Algerialyesdz
 
Algeria PR4 2012
Algeria PR4 2012Algeria PR4 2012
Algeria PR4 2012lyesdz
 
Algeria PR3 2012
Algeria PR3 2012Algeria PR3 2012
Algeria PR3 2012lyesdz
 
Algeria PR2 2012
Algeria PR2 2012Algeria PR2 2012
Algeria PR2 2012lyesdz
 
Algeria PR1 2012
Algeria PR1 2012Algeria PR1 2012
Algeria PR1 2012lyesdz
 
Extension Works for Djen Djen Port Protection
Extension Works for Djen Djen Port ProtectionExtension Works for Djen Djen Port Protection
Extension Works for Djen Djen Port Protectionlyesdz
 
GE innovation barometer- Algeria 2012
GE innovation barometer- Algeria 2012GE innovation barometer- Algeria 2012
GE innovation barometer- Algeria 2012lyesdz
 
Algerian Railway 2010 2014
Algerian Railway 2010 2014Algerian Railway 2010 2014
Algerian Railway 2010 2014lyesdz
 
Activités en algérie 2010
Activités en algérie 2010Activités en algérie 2010
Activités en algérie 2010lyesdz
 
Environnement_mediteranee
Environnement_mediteraneeEnvironnement_mediteranee
Environnement_mediteraneelyesdz
 
MoBiLiTy
MoBiLiTyMoBiLiTy
MoBiLiTylyesdz
 
Programme enr et_efficacite_energetique_fr
Programme enr et_efficacite_energetique_frProgramme enr et_efficacite_energetique_fr
Programme enr et_efficacite_energetique_frlyesdz
 

Mehr von lyesdz (14)

GE innovation barometer for MENAT
GE innovation barometer for MENATGE innovation barometer for MENAT
GE innovation barometer for MENAT
 
Industry guide Algeria
Industry guide AlgeriaIndustry guide Algeria
Industry guide Algeria
 
Algeria PR4 2012
Algeria PR4 2012Algeria PR4 2012
Algeria PR4 2012
 
Algeria PR3 2012
Algeria PR3 2012Algeria PR3 2012
Algeria PR3 2012
 
Algeria PR2 2012
Algeria PR2 2012Algeria PR2 2012
Algeria PR2 2012
 
Algeria PR1 2012
Algeria PR1 2012Algeria PR1 2012
Algeria PR1 2012
 
Extension Works for Djen Djen Port Protection
Extension Works for Djen Djen Port ProtectionExtension Works for Djen Djen Port Protection
Extension Works for Djen Djen Port Protection
 
GE innovation barometer- Algeria 2012
GE innovation barometer- Algeria 2012GE innovation barometer- Algeria 2012
GE innovation barometer- Algeria 2012
 
Algerian Railway 2010 2014
Algerian Railway 2010 2014Algerian Railway 2010 2014
Algerian Railway 2010 2014
 
Activités en algérie 2010
Activités en algérie 2010Activités en algérie 2010
Activités en algérie 2010
 
Environnement_mediteranee
Environnement_mediteraneeEnvironnement_mediteranee
Environnement_mediteranee
 
MoBiLiTy
MoBiLiTyMoBiLiTy
MoBiLiTy
 
Plan
PlanPlan
Plan
 
Programme enr et_efficacite_energetique_fr
Programme enr et_efficacite_energetique_frProgramme enr et_efficacite_energetique_fr
Programme enr et_efficacite_energetique_fr
 

Kürzlich hochgeladen

A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?Igalia
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUK Journal
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxKatpro Technologies
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Servicegiselly40
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsJoaquim Jorge
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CVKhem
 

Kürzlich hochgeladen (20)

A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 

ALSOL HYBRID SOLAR THERMAL TOWER POWER PROJECT

  • 1. ALSOL – HYBRID SOLAR THERMAL TOWER POWER PLANT IN ALGERIA 3.05 2nd German-Arabic Energy2011 Dipl. Ing. MBA Gerrit Koll 21 October 2011 German-Arabic Energy Forum Forum 20 – 20.10.2011 1
  • 2. Solar Tower Jülich 3.05 German-Arabic Energy Forum 2011 Dipl. Ing. MBA Gerrit Koll 20.10.2011 2
  • 3. Solar Tower Jülich 3.05 German-Arabic Energy Forum 2011 Dipl. Ing. MBA Gerrit Koll 20.10.2011 3
  • 4. Kraftanlagen München GmbH KAM is a leading EPC and piping construction company in Germany & Europe Power plant technology Energy technology Almost 6 decades of experience with a capacity of 2.400 persons and 360 Mio. € turnover Underground piping Renewable energies Over 10 years of experience in construction R&D and construction of CSP technology and an implemented reference facility Chemical & Local presence in the region Utility service petrochemical industries 3.05 German-Arabic Energy Forum 2011 Dipl. Ing. MBA Gerrit Koll 20.10.2011 4
  • 5. ALSOL – Phase I - Feasibility Technology Transfer from Jülich Germany – to Tipaza Algeria: Work is based on a Bilateral Agreement between Germany & Algeria Adaption of the technology for algerian condition (e.g. hybrid) Selection of the suitable plant designs Basic engineering for the selected plant designs Establishment of a sientific collaboration ( Training of Sientists in Jülich) Elaboration of a founding and finance Scheme 3.05 German-Arabic Energy Forum 2011 Dipl. Ing. MBA Gerrit Koll 20.10.2011 5
  • 6. ALSOL – Partners Project partners & funders Public Funding Dirección generale de la Recherche sientifique y du Developpment technologique Donee Project Partners Centre de recherche Energetique renouvables Project Construction Research Operation •Planning •Tools & Methods •Trial Operation •Engineering •Monitoring •Normal Operation •Installation •Optimization •Investigational Operation Solar Tower Tipasa •Comminssioning •Developement Owner & Operator: CDER KAM DLR, SIJ, KAM CDER, SWJ, KAM, DLR, SIJ 3.05 German-Arabic Energy Forum 2011 Dipl. Ing. MBA Gerrit Koll 20.10.2011 6
  • 7. ALSOL Technical Concept Solar only plant concept Natural gas 5 ∼ Open Volumetric Hot Air 680 °C Gas Turbine 2 Receiver 6 Steam 3 7 Thermal Storage Turbine ~ 1 4 HRSG 8 4 Air Heliostat Field Recirculation Cold Air 120 °C Cooling cycle 3.05 German-Arabic Energy Forum 2011 Dipl. Ing. MBA Gerrit Koll 20.10.2011 7
  • 8. ALSOL Technical Concept Solar only plant concept -> Hybrid plant concept Natural gas 5 ∼ Open Volumetric Hot Air 680 °C Gas Turbine 2 Receiver 6 Steam 3 7 Thermal Storage Turbine ~ 1 4 HRSG 8 4 Air Heliostat Field Recirculation Cold Air 120 °C Cooling cycle 3.05 German-Arabic Energy Forum 2011 Dipl. Ing. MBA Gerrit Koll 20.10.2011 8
  • 9. ALSOL Technical Concept Operational concept: GT-hybrid parallel Heliostat field: North field, 25000 m² Tower height: 60 m Receiver design power 13,7 MW Heat storage capacity 20 MWh 2 GT / ST design power 4,6 MW / 2,5 MW 1 Cooling concept dry air cooling 8 7 6 5 4 3 4 3.05 German-Arabic Energy Forum 2011 Dipl. Ing. MBA Gerrit Koll 20.10.2011 9
  • 10. ALSOL Technical Concept Technology Advantages ☼ Bridge technology through hybridisation simple combination with conventional (gas or biogas) firing or turbine – technology bridge ☼ Energy on demand adaptation to the consumption profile through simple storage ☼ High system efficiency steam cycle operates on parameters as usual for conventional power plants ☼ Environmental friendly – low water consumption low water consumption due to dry cooling system no hazardous media used such thermal oil 3.05 German-Arabic Energy Forum 2011 Dipl. Ing. MBA Gerrit Koll 20.10.2011 10
  • 11. ALSOL Objectives Close German – Algerian Cooperation in the field of latest renewable technology development International cooperation CDER USTHB Proximity to research institutes, universities UDES National and airports in the north of Algeria universities Investigation facility providing a broad spectrum for future R&D-studies such as Hybrid with GT, TIPAZA / National university Bourkika heat storage, heat extraction for desalination, research platform, modular extendable scale Innovative plant concept with gas turbine TIPAZA, Bourkika hybridization and heat storage for operation on 36°29'39.70"N, 2°28'38.01"E demand and high plant availability Light tower to promote the technology in the The expected annual DNI: north African region where the future application will take place 1900 kWh/(m² a) 3.05 German-Arabic Energy Forum 2011 Dipl. Ing. MBA Gerrit Koll 20.10.2011 11
  • 12. ALSOL II - Implementation Current activities preparation ALSOL phase II government-founded research cooperation: - Project organization - Definition of WPs Budget acquisition and financial structure for plant construction Time Schedule for next steps 2012 2013 2014 2015 2016 Permit Process ALSOL phase II Detail engineering Component ordering Delivery and works Commissioning and test operation Plant handover Start of CSP R&D Work 3.05 German-Arabic Energy Forum 2011 Dipl. Ing. MBA Gerrit Koll 20.10.2011 12
  • 13. Outlook – the bigger picture Technology Energy Europe to North Africa North Africa to Europe ☼ creation of local value ☼ clean & ambient friendly ☼ development ☼ reliable & on demand International cooperation CDER UST HB UDES National universities TIPAZA / National Bourkika university 3.05 German-Arabic Energy Forum 2011 Dipl. Ing. MBA Gerrit Koll 20.10.2011 13
  • 14. Contact: Dipl. Ing. MBA Gerrit Koll E-Mail: KollG@ka-muenchen.de Thank you for your attention Kraftanlagen München GmbH 3.01 3.05 German-Arabic Energy Forum 2011 Dipl. Ing. MBA Gerrit Koll 20.10.2011 14 Ridlerstraße 31c - 80339 München www.ka-muenchen.de