Civil Engineering Department
                 Prof. Majed Abu-Zreig
            Hydraulics and Hydrology – CE 352

                     Chapter 4

            Water Distribution Systems

6/29/2012                                       1
Node, Loop, and Pipes   Pipe
                                   Node




                                          Loop




6/29/2012                                        2
Pipe Networks

• The equations to solve Pipe network must
  satisfy the following condition:
• The net flow into any junction must be zero
     ∑Q = 0
• The net head loss a round any closed loop must
  be zero. The HGL at each junction must have one
  and only one elevation
• All head losses must satisfy the Moody and
  minor-loss friction correlation
  6/29/2012                                     3
Hydraulic Analysis
   After completing all preliminary studies and
   layout drawing of the network, one of the
   methods of hydraulic analysis is used to
      • Size the pipes and
      • Assign the pressures and velocities
        required.



6/29/2012                                         4
Hydraulic Analysis of Water Networks

•     The solution to the problem is based on the same
      basic hydraulic principles that govern simple and
      compound pipes that were discussed previously.
•     The following are the most common methods used
      to analyze the Grid-system networks:
            1.   Hardy Cross method.
            2.   Sections method.
            3.   Circle method.
            4.   Computer programs (Epanet,Loop, Alied...)

6/29/2012                                                    5
Hardy Cross Method
 • This method is applicable to closed-loop pipe
   networks (a complex set of pipes in parallel).




 • It depends on the idea of head balance method
 • Was originally devised by professor Hardy Cross.
6/29/2012                                             6
Assumptions / Steps of this method:

1.    Assume that the water is withdrawn from nodes only; not
      directly from pipes.
2.    The discharge, Q , entering the system will have (+) value,
      and the discharge, Q , leaving the system will have (-) value.
3.    Usually neglect minor losses since these will be small with
      respect to those in long pipes, i.e.; Or could be included as
      equivalent lengths in each pipe.
4.    Assume flows for each individual pipe in the network.
5.    At any junction (node), as done for pipes in parallel,


        ∑ Qin =∑ Qout          or     ∑Q = 0

6/29/2012                                                              7
6.       Around any loop in the grid, the sum of head losses must
          equal to zero:       ∑ hf = 0
                                   loop

      –      Conventionally, clockwise flows in a loop are considered (+) and
             produce positive head losses; counterclockwise flows are then (-) and
             produce negative head losses.
      –      This fact is called the head balance of each loop, and this can be valid
             only if the assumed Q for each pipe, within the loop, is correct.
 •        The probability of initially guessing all flow rates correctly is
          virtually null.
 •        Therefore, to balance the head around each loop, a flow rate
          correction (∆) for each loop in the network should be
          computed, and hence some iteration scheme is needed.


6/29/2012                                                                         8
7.     After finding the discharge correction, ∆ (one for each
       loop) , the assumed discharges Q0 are adjusted and another
       iteration is carried out until all corrections (values of ∆ )
       become zero or negligible. At this point the condition of :

                        ∑ h f ≅ 0.0             is satisfied.
                        loop

Notes:
•   The flows in pipes common to two loops are positive in one
    loop and negative in the other.
•   When calculated corrections are applied, with careful
    attention to sign, pipes common to two loops receive both
    corrections.


6/29/2012                                                              9
How to find the correction value ( ∆)
       hF = kQ n ⎯ (1)
                 ⎯→
      n = 2 ⇒ Darcy, Manning              Q = Q o + ∆ ⎯ ( 2)
                                                      ⎯→
      n = 1.85 ⇒ Hazen William

      from 1 & 2
                                  ⎡ n           n(n − 1) n − 2 2   ⎤
     hf = kQ = k (Qo + ∆ )                n −1
                              = k ⎢Qo + nQo ∆ +         Qo ∆ + ....⎥
              n           n

                                  ⎣                2               ⎦

      Neglect terms contains ∆2                   (
                                     hf = kQ n = k Qon + nQon −1∆   )
      For each loop

    ∑ hF = ∑ kQ n = 0
    loop      loop

   ∴ ∑ kQ n = ∑ kQon + ∑ nkQ (n −1) ∆ = 0
6/29/2012                                                               10
∆=
                            −   ∑   kQ on
                                                 =
                                                      −∑h    F

                            ∑   nkQ o(n −1 )
                                                      n∑
                                                         hF

                                                         Q   o

•   Note that if Hazen Williams (which is generally used in this method) is
    used to find the head losses, then
            h f = k Q1.85        (n = 1.85) , then

                                        − ∑ hf
                                 ∆=
                                                 hf
                                      185 ∑
                                       .
                                                 Q
• If Darcy-Wiesbach is used to find the head losses, then
            h f = k Q2          (n = 2) , then

                                         −∑ h f
                                  ∆=
                                                 hf
6/29/2012                               2∑                                    11
                                                 Q
Example
Solve the following pipe network using Hazen William Method CHW =100

                   63 L/s        1

                                24




                                                12
                                     11.4



                                                 .6
                                39
                                                             4
                            3               2

                                                                 37.8 L/s
 pipe     L        D
 1        305m 150mm                                  25.2

 2        305m 150mm                                    5
 3        610m 200mm
 4        457m 150mm                  25.2 L/s

 5   6/29/2012
            153m   200mm                                                    12
10.7 L
          hf =        1.852
                                   Q1.852 ⇒ C HW = 100, Q = in L/s
                 C HW       D 4.87                                       1

                                        1.852
                  10.7 L         ⎛ Q ⎞
          hf =      1.852   4.87
                                 ⎜      ⎟                            3                     4
               C HW       D      ⎝ 1000 ⎠                                        2

                ⎧            L ⎫
          h f = ⎨6.02 ×10 −9 4.87 ⎬ Q1.852                                             5
                ⎊           D     ⎭
          h f = {K }Q1.852




     − ∑ hF   − 0.28                      − ∑ hF   − 0.45
                                                                             for pipe 2 in loop 1
∆1 =        =         = −0.24        ∆2 =        =         = −0.57
        hF 1.85(0.64)                        hF 1.85(0.43)                   ∆ = ∆1 − ∆ 2
     n∑                                   n∑
        Qo                                   Qo
                                                                             for pipe 2 in loop 2
   6/29/2012                                                                                 13
                                                                             ∆ = ∆ 2 − ∆1
1



                                                                      3                  4
                                                                               2


                                                                                     5




       − ∑ hF   − 0.18                   − ∑ hF   − (0.07 )               for pipe 2 in loop 1
∆1 =          =         = −0.15   ∆1 =          =           = −0.09
          hF 1.85(0.64)                     hF 1.85(0.42)
       n∑                                n∑                               ∆ = ∆1 − ∆ 2
          Qo                                Qo
                                                                          for pipe 2 in loop 2
       6/29/2012                                                          ∆ = ∆ 2 − ∆1 14
General Notes
• Occasionally the assumed direction of flow will be incorrect. In such
  cases the method will produce corrections larger than the original
  flow and in subsequent calculations the direction will be reversed.
• Even when the initial flow assumptions are poor, the convergence
  will usually be rapid. Only in unusual cases will more than three
  iterations be necessary.
• The method is applicable to the design of new system or to
  evaluation of proposed changes in an existing system.
• The pressure calculation in the above example assumes points are at
  equal elevations. If they are not, the elevation difference must be
  includes in the calculation.
• The balanced network must then be reviewed to assure that the
  velocity and pressure criteria are satisfied. If some lines do not meet
  the suggested criteria, it would be necessary to increase the
  6/29/2012                                                           15
  diameters of these pipes and repeat the calculations.
Summary
• Assigning clockwise flows and their associated head
  losses are positive, the procedure is as follows:
      Assume values of Q to satisfy ∑Q = 0.
      Calculate HL from Q using hf = K1Q2 .
      If ∑hf = 0, then the solution is correct.
      If ∑hf ≠ 0, then apply a correction factor, ∆Q, to all
      Q and repeat from step (2).
      For practical purposes, the calculation is usually
      terminated when ∑hf < 0.01 m or ∆Q < 1 L/s.
      A reasonably efficient value of ∆Q for rapid
      convergence is given by;

                            ∆Q = −
                                      ∑H    L
                                            L

                                        H
                                     2∑ L
                                        L
                                                Q
   6/29/2012                                                   16
Example
• The following example contains nodes with different
  elevations and pressure heads.
• Neglecting minor loses in the pipes, determine:
            • The flows in the pipes.
            • The pressure heads at the nodes.




6/29/2012                                           17
Assume T= 150C




6/29/2012                    18
Assume flows magnitude and direction




6/29/2012                          19
First Iteration
• Loop (1)

             L        D         Q                   hf       hf/Q
  Pipe                                     f
            (m)      (m)      (m3/s)               (m)     (m/m3/s)
   AB       600      0.25      0.12     0.0157     11.48    95.64
   BE       200      0.10      0.01     0.0205     3.38    338.06
   EF       600      0.15     -0.06     0.0171    -40.25   670.77
   FA       200      0.20     -0.10     0.0162     -8.34    83.42
                                          ÎŁ       -33.73   1187.89

                  − 33.73
            ∆=−            = 0.01419 m 3 /s = 14.20 L/s
6/29/2012       2(1187.89)                                           20
First Iteration
• Loop (2)

             L         D         Q                     hf      hf/Q
  Pipe                                      f
            (m)       (m)      (m3/s)                 (m)    (m/m3/s)
   BC       600      0.15       0.05      0.0173     28.29   565.81
   CD       200      0.10       0.01      0.0205     3.38    338.05
   DE       600      0.15       -0.02     0.0189     -4.94   246.78
   EB       200      0.10       -0.01     0.0205     -3.38   338.05
                                            ÎŁ        23.35   1488.7

                    23.35
            ∆=−             = −0.00784 m 3 /s = −7.842 L/s
6/29/2012         2(1488.7)                                           21
14.20


 Second Iteration
                                        14.20              14.20      7.84

• Loop (1)
                                                     14.20

             L        D         Q                    hf          hf/Q
  Pipe                                      f
            (m)      (m)      (m3/s)                (m)        (m/m3/s)
   AB       600      0.25     0.1342     0.0156    14.27           106.08
   BE       200      0.10     0.03204    0.0186    31.48           982.60
   EF       600      0.15     -0.0458    0.0174    -23.89          521.61
   FA       200      0.20     -0.0858    0.0163    -6.21           72.33
                                            ÎŁ      15.65       1682.62
                   15.65
            ∆=−            = −0.00465 m 3 /s = −4.65 L/s
6/29/2012       2(1682.62)                                                  22
7.84

 Second Iteration
                                              14.20    7.84                   7.84

• Loop (2)
                                                              7.84

             L         D          Q                     hf             hf/Q
  Pipe                                       f
            (m)       (m)       (m3/s)                 (m)           (m/m3/s)
   BC       600      0.15      0.04216    0.0176      20.37          483.24
   CD       200      0.10      0.00216    0.0261       0.20           93.23
   DE       600      0.15     -0.02784    0.0182      -9.22          331.23
   EB       200      0.10     -0.03204    0.0186      -31.48         982.60
                                             ÎŁ        -20.13         1890.60

                     − 20.13
              ∆=−             = 0.00532 m 3 /s = 5.32 L/s
6/29/2012           2(1890.3)                                                  23
Third Iteration
• Loop (1)

             L        D         Q                    hf       hf/Q
  Pipe                                     f
            (m)      (m)      (m3/s)                (m)     (m/m3/s)
   AB       600      0.25     0.1296    0.0156     13.30    102.67
   BE       200      0.10    0.02207    0.0190     15.30    693.08
   EF       600      0.15    -0.05045   0.0173     -28.78   570.54
   FA       200      0.20    -0.09045   0.0163      -6.87    75.97
                                           ÎŁ        -7.05   1442.26

                   − 7.05
             ∆=−            = 0.00244 m 3 /s = 2.44 L/s
6/29/2012        2(1442.26)                                           24
Third Iteration
• Loop (2)

             L         D         Q                     hf       hf/Q
  Pipe                                       f
            (m)       (m)      (m3/s)                 (m)     (m/m3/s)
   BC       600      0.15     0.04748     0.0174     25.61    539.30
   CD       200      0.10     0.00748     0.0212      1.96    262.11
   DE       600      0.15     -0.02252    0.0186     -6.17    274.07
   EB       200      0.10     -0.02207    0.0190     -15.30   693.08
                                            ÎŁ         6.1     1768.56

                      6 .1
            ∆=−              = −0.00172 m 3 /s = −1.72 L/s
6/29/2012         2(1768.56)                                            25
After applying Third correction




6/29/2012                         26
Velocity and Pressure Heads:
             Q         V      hf
 pipe
            (l/s)    (m/s)   (m)
                                            13.79           23.85
  AB        131.99   2.689   13.79

  BE        26.23    3.340   21.35

  FE        48.01    2.717   26.16
                                     6.52           21.35           1.21

  AF        88.01    2.801   6.52

  BC        45.76    2.589   23.85          26.16           7.09

  CD         5.76    0.733   1.21

  ED        24.24    1.372   7.09
6/29/2012                                                                  27
Velocity and Pressure Heads:
            p/Îł+Z    Z    P/Îł
Node
             (m)    (m)   (m)
                                          13.79           23.85
   A         70     30     40

   B        56.21   25    31.21

   C        32.36   20    12.36                   21.35           1.21
                                  6.52

   D        31.15   20    11.15

   E        37.32   22    15.32          26.16            7.09


   F        63.48   25    38.48

6/29/2012                                                            28
Example
For the square loop shown, find the discharge in all the pipes.
All pipes are 1 km long and 300 mm in diameter, with a friction
factor of 0.0163. Assume that minor losses can be neglected.




   6/29/2012                                                29
•Solution:
 Assume values of Q to satisfy continuity equations all
 at nodes.
 The head loss is calculated using; HL = K1Q2
 HL = hf + hLm
 But minor losses can be neglected: ⇒ hLm = 0
 Thus         HL = hf
 Head loss can be calculated using the Darcy-Weisbach
 equation
                               L V2
                        hf = Îť
                               D 2g
  6/29/2012                                         30
L V2
                   HL = hf = Îť
                               D 2g
                                  1000   V2
                   H L = 0.0163 x      x
                                   0.3 2 x 9.81
                                Q2                       Q2
                   H L = 2.77           = 2.77 x
                                    2                          2
                                A                  ⎛π     2⎞
                                                   ⎜ x 0.3 ⎟
                                                   ⎝4      ⎠
                   H L = 554Q 2
                   H L = K' Q 2
               ∴ K ' = 554
First trial

              Pipe         Q (L/s)             HL (m)              HL/Q
              AB                60                  2.0            0.033
              BC                40                 0.886           0.0222
              CD                0                    0               0
              AD                -40                -0.886          0.0222
               ÎŁ                                   2.00            0.0774
      Since ∑HL > 0.01 m, then correction has to be applied.
6/29/2012                                                                   31
∑ HL           2
                 ∆Q = −           =−            = −12.92 L / s
                             HL      2 x 0.0774
                          2∑
                                Q
 Second trial

            Pipe            Q (L/s)        HL (m)          HL/Q
                AB           47.08          1.23          0.0261
                BC           27.08          0.407          0.015
                CD           -12.92        -0.092          0.007
                AD           -52.92        -1.555         0.0294
                ÎŁ                          -0.0107       0.07775

 Since ∑HL ≈ 0.01 m, then it is OK.
 Thus, the discharge in each pipe is as follows (to the nearest integer).
                              Pipe         Discharge
                                              (L/s)
                               AB               47
                               BC               27
                               CD               -13

6/29/2012
                               AD               -53                         32

Weitere ähnliche Inhalte

Was ist angesagt?

Hardy cross method of pipe network analysis
Hardy cross method of pipe network analysisHardy cross method of pipe network analysis
Hardy cross method of pipe network analysissidrarashiddar
 
Water treatment
Water treatmentWater treatment
Water treatmentYasir Hashmi
 
Rack & Screen
Rack & ScreenRack & Screen
Rack & ScreenNiaz Memon
 
Environmental Engineering -II Unit I
Environmental Engineering -II Unit IEnvironmental Engineering -II Unit I
Environmental Engineering -II Unit IGAURAV. H .TANDON
 
Effluent Treatment Plant Design, Operation And Analysis Of Waste Water
Effluent Treatment Plant Design, Operation And Analysis Of Waste Water Effluent Treatment Plant Design, Operation And Analysis Of Waste Water
Effluent Treatment Plant Design, Operation And Analysis Of Waste Water Jaidev Singh
 
Treatment of water
Treatment of waterTreatment of water
Treatment of waterdhavalsshah
 
Open channel flow
Open channel flowOpen channel flow
Open channel flowAdnan Aslam
 
economic channel section
economic channel sectioneconomic channel section
economic channel sectionVaibhav Pathak
 
Sedimentation Tanks: Design and Working
Sedimentation Tanks: Design and WorkingSedimentation Tanks: Design and Working
Sedimentation Tanks: Design and WorkingRohit Kumar Tiwari
 
Open channel design
Open channel designOpen channel design
Open channel designMohsin Siddique
 
Hydraulic Jump
Hydraulic JumpHydraulic Jump
Hydraulic JumpKaran Patel
 
(Part iii)- open channels
(Part iii)- open channels(Part iii)- open channels
(Part iii)- open channelsMohsin Siddique
 
Drainage Engineering (cross drainage structures)
Drainage Engineering (cross drainage structures)Drainage Engineering (cross drainage structures)
Drainage Engineering (cross drainage structures)Latif Hyder Wadho
 
Flow In Pipes
Flow In PipesFlow In Pipes
Flow In PipesIla Lee
 
Sewage treatment
Sewage treatmentSewage treatment
Sewage treatmentelizashufina99
 
Examples solutions in open channel flow
Examples solutions in open channel flowExamples solutions in open channel flow
Examples solutions in open channel flowDr. Ezzat Elsayed Gomaa
 
Dymanics of open channel flow
Dymanics of open channel flowDymanics of open channel flow
Dymanics of open channel flowMohsin Siddique
 
. Direct step method
. Direct step method. Direct step method
. Direct step methodMood Naik
 

Was ist angesagt? (20)

Hardy cross method of pipe network analysis
Hardy cross method of pipe network analysisHardy cross method of pipe network analysis
Hardy cross method of pipe network analysis
 
Water treatment
Water treatmentWater treatment
Water treatment
 
Rack & Screen
Rack & ScreenRack & Screen
Rack & Screen
 
Environmental Engineering -II Unit I
Environmental Engineering -II Unit IEnvironmental Engineering -II Unit I
Environmental Engineering -II Unit I
 
Effluent Treatment Plant Design, Operation And Analysis Of Waste Water
Effluent Treatment Plant Design, Operation And Analysis Of Waste Water Effluent Treatment Plant Design, Operation And Analysis Of Waste Water
Effluent Treatment Plant Design, Operation And Analysis Of Waste Water
 
Treatment of water
Treatment of waterTreatment of water
Treatment of water
 
Open channel flow
Open channel flowOpen channel flow
Open channel flow
 
economic channel section
economic channel sectioneconomic channel section
economic channel section
 
Open Channel Flow
Open Channel FlowOpen Channel Flow
Open Channel Flow
 
Sedimentation Tanks: Design and Working
Sedimentation Tanks: Design and WorkingSedimentation Tanks: Design and Working
Sedimentation Tanks: Design and Working
 
Open channel design
Open channel designOpen channel design
Open channel design
 
Hydraulic Jump
Hydraulic JumpHydraulic Jump
Hydraulic Jump
 
(Part iii)- open channels
(Part iii)- open channels(Part iii)- open channels
(Part iii)- open channels
 
Drainage Engineering (cross drainage structures)
Drainage Engineering (cross drainage structures)Drainage Engineering (cross drainage structures)
Drainage Engineering (cross drainage structures)
 
Flow In Pipes
Flow In PipesFlow In Pipes
Flow In Pipes
 
Sewage treatment
Sewage treatmentSewage treatment
Sewage treatment
 
Examples solutions in open channel flow
Examples solutions in open channel flowExamples solutions in open channel flow
Examples solutions in open channel flow
 
Dymanics of open channel flow
Dymanics of open channel flowDymanics of open channel flow
Dymanics of open channel flow
 
Sludge digestion process
Sludge digestion processSludge digestion process
Sludge digestion process
 
. Direct step method
. Direct step method. Direct step method
. Direct step method
 

Andere mochten auch

Flood routing
Flood routingFlood routing
Flood routingvivek gami
 
economy Chapter7_by louy Al hami
economy Chapter7_by louy Al hamieconomy Chapter7_by louy Al hami
economy Chapter7_by louy Al hamiLouy Alhamy
 
economy Chapter6 2011_by louy Al hami
economy Chapter6 2011_by louy Al hami economy Chapter6 2011_by louy Al hami
economy Chapter6 2011_by louy Al hami Louy Alhamy
 
hydro chapter_7_groundwater_by louy Al hami
hydro chapter_7_groundwater_by louy Al hami hydro chapter_7_groundwater_by louy Al hami
hydro chapter_7_groundwater_by louy Al hami Louy Alhamy
 
hydro chapter_11_hydrology_by louy al hami
hydro  chapter_11_hydrology_by louy al hami hydro  chapter_11_hydrology_by louy al hami
hydro chapter_11_hydrology_by louy al hami Louy Alhamy
 
economy Chapter2_by louy Al hami
economy Chapter2_by louy Al hami economy Chapter2_by louy Al hami
economy Chapter2_by louy Al hami Louy Alhamy
 
hydro chapter_4_a_by louy al hami
hydro chapter_4_a_by louy al hami hydro chapter_4_a_by louy al hami
hydro chapter_4_a_by louy al hami Louy Alhamy
 
hydro chapter_5_a_by louy Al hami
hydro chapter_5_a_by louy Al hami hydro chapter_5_a_by louy Al hami
hydro chapter_5_a_by louy Al hami Louy Alhamy
 
hydro chapter_3 by louy Al hami
hydro chapter_3 by louy Al hami hydro chapter_3 by louy Al hami
hydro chapter_3 by louy Al hami Louy Alhamy
 

Andere mochten auch (12)

Flood routing
Flood routingFlood routing
Flood routing
 
Flood Routing using Muskingum Method
Flood Routing using Muskingum MethodFlood Routing using Muskingum Method
Flood Routing using Muskingum Method
 
economy Chapter7_by louy Al hami
economy Chapter7_by louy Al hamieconomy Chapter7_by louy Al hami
economy Chapter7_by louy Al hami
 
7 routing
7 routing7 routing
7 routing
 
economy Chapter6 2011_by louy Al hami
economy Chapter6 2011_by louy Al hami economy Chapter6 2011_by louy Al hami
economy Chapter6 2011_by louy Al hami
 
hydro chapter_7_groundwater_by louy Al hami
hydro chapter_7_groundwater_by louy Al hami hydro chapter_7_groundwater_by louy Al hami
hydro chapter_7_groundwater_by louy Al hami
 
hydro chapter_11_hydrology_by louy al hami
hydro  chapter_11_hydrology_by louy al hami hydro  chapter_11_hydrology_by louy al hami
hydro chapter_11_hydrology_by louy al hami
 
economy Chapter2_by louy Al hami
economy Chapter2_by louy Al hami economy Chapter2_by louy Al hami
economy Chapter2_by louy Al hami
 
Surface runoff
Surface runoffSurface runoff
Surface runoff
 
hydro chapter_4_a_by louy al hami
hydro chapter_4_a_by louy al hami hydro chapter_4_a_by louy al hami
hydro chapter_4_a_by louy al hami
 
hydro chapter_5_a_by louy Al hami
hydro chapter_5_a_by louy Al hami hydro chapter_5_a_by louy Al hami
hydro chapter_5_a_by louy Al hami
 
hydro chapter_3 by louy Al hami
hydro chapter_3 by louy Al hami hydro chapter_3 by louy Al hami
hydro chapter_3 by louy Al hami
 

Ähnlich wie hydro chapter_4_b_pipe_network_by louy Al hami

Unit.ppt
Unit.pptUnit.ppt
Unit.pptBradAv1
 
Calculating Non-adiabatic Pressure Perturbations during Multi-field Inflation
Calculating Non-adiabatic Pressure Perturbations during Multi-field InflationCalculating Non-adiabatic Pressure Perturbations during Multi-field Inflation
Calculating Non-adiabatic Pressure Perturbations during Multi-field InflationIan Huston
 
Holweck pump
Holweck pumpHolweck pump
Holweck pumpirinikou
 
Switched capacitor
Switched capacitorSwitched capacitor
Switched capacitorGur Kan
 
Ejercicio Redes Malladas
Ejercicio Redes MalladasEjercicio Redes Malladas
Ejercicio Redes MalladasUbaldoJGarca
 
Hidden gates in universe: Wormholes UCEN 2017 by Dr. Ali Övgün
Hidden gates in universe: Wormholes UCEN 2017 by Dr. Ali ÖvgünHidden gates in universe: Wormholes UCEN 2017 by Dr. Ali Övgün
Hidden gates in universe: Wormholes UCEN 2017 by Dr. Ali ÖvgünEastern Mediterranean University
 
Fundamentals of Transport Phenomena ChE 715
Fundamentals of Transport Phenomena ChE 715Fundamentals of Transport Phenomena ChE 715
Fundamentals of Transport Phenomena ChE 715HelpWithAssignment.com
 
about power system operation and control13197214.ppt
about power system operation and control13197214.pptabout power system operation and control13197214.ppt
about power system operation and control13197214.pptMohammedAhmed66819
 
The lattice Boltzmann equation: background, boundary conditions, and Burnett-...
The lattice Boltzmann equation: background, boundary conditions, and Burnett-...The lattice Boltzmann equation: background, boundary conditions, and Burnett-...
The lattice Boltzmann equation: background, boundary conditions, and Burnett-...Tim Reis
 
Laminar turbulent
Laminar turbulentLaminar turbulent
Laminar turbulentkrajesh11111
 
Drift flux
Drift fluxDrift flux
Drift fluxfiyghar.com
 
A two equation VLES turbulence model with near-wall delayed behaviour
A two equation VLES turbulence model with near-wall delayed behaviourA two equation VLES turbulence model with near-wall delayed behaviour
A two equation VLES turbulence model with near-wall delayed behaviourApplied CCM Pty Ltd
 
Cold gas thruster to de orbit nano satellite
Cold gas thruster to de orbit nano satelliteCold gas thruster to de orbit nano satellite
Cold gas thruster to de orbit nano satelliteApurva Anand
 
Aquifer Parameter Estimation
Aquifer Parameter EstimationAquifer Parameter Estimation
Aquifer Parameter EstimationC. P. Kumar
 
Two dimensional Pool Boiling
Two dimensional Pool BoilingTwo dimensional Pool Boiling
Two dimensional Pool BoilingRobvanGils
 

Ähnlich wie hydro chapter_4_b_pipe_network_by louy Al hami (20)

Unit.ppt
Unit.pptUnit.ppt
Unit.ppt
 
Calculating Non-adiabatic Pressure Perturbations during Multi-field Inflation
Calculating Non-adiabatic Pressure Perturbations during Multi-field InflationCalculating Non-adiabatic Pressure Perturbations during Multi-field Inflation
Calculating Non-adiabatic Pressure Perturbations during Multi-field Inflation
 
Holweck pump
Holweck pumpHolweck pump
Holweck pump
 
NANO266 - Lecture 2 - The Hartree-Fock Approach
NANO266 - Lecture 2 - The Hartree-Fock ApproachNANO266 - Lecture 2 - The Hartree-Fock Approach
NANO266 - Lecture 2 - The Hartree-Fock Approach
 
Switched capacitor
Switched capacitorSwitched capacitor
Switched capacitor
 
Ejercicio Redes Malladas
Ejercicio Redes MalladasEjercicio Redes Malladas
Ejercicio Redes Malladas
 
Hidden gates in universe: Wormholes UCEN 2017 by Dr. Ali Övgün
Hidden gates in universe: Wormholes UCEN 2017 by Dr. Ali ÖvgünHidden gates in universe: Wormholes UCEN 2017 by Dr. Ali Övgün
Hidden gates in universe: Wormholes UCEN 2017 by Dr. Ali Övgün
 
Cytochrome c Oxidase Jan06
Cytochrome c Oxidase Jan06Cytochrome c Oxidase Jan06
Cytochrome c Oxidase Jan06
 
Fundamentals of Transport Phenomena ChE 715
Fundamentals of Transport Phenomena ChE 715Fundamentals of Transport Phenomena ChE 715
Fundamentals of Transport Phenomena ChE 715
 
about power system operation and control13197214.ppt
about power system operation and control13197214.pptabout power system operation and control13197214.ppt
about power system operation and control13197214.ppt
 
The lattice Boltzmann equation: background, boundary conditions, and Burnett-...
The lattice Boltzmann equation: background, boundary conditions, and Burnett-...The lattice Boltzmann equation: background, boundary conditions, and Burnett-...
The lattice Boltzmann equation: background, boundary conditions, and Burnett-...
 
1stSymposiumTALK_Closed_Conduit-Paul_Ghamry
1stSymposiumTALK_Closed_Conduit-Paul_Ghamry1stSymposiumTALK_Closed_Conduit-Paul_Ghamry
1stSymposiumTALK_Closed_Conduit-Paul_Ghamry
 
Laminar turbulent
Laminar turbulentLaminar turbulent
Laminar turbulent
 
Drift flux
Drift fluxDrift flux
Drift flux
 
A two equation VLES turbulence model with near-wall delayed behaviour
A two equation VLES turbulence model with near-wall delayed behaviourA two equation VLES turbulence model with near-wall delayed behaviour
A two equation VLES turbulence model with near-wall delayed behaviour
 
Kaplan turbines
Kaplan turbinesKaplan turbines
Kaplan turbines
 
Cold gas thruster to de orbit nano satellite
Cold gas thruster to de orbit nano satelliteCold gas thruster to de orbit nano satellite
Cold gas thruster to de orbit nano satellite
 
Aquifer Parameter Estimation
Aquifer Parameter EstimationAquifer Parameter Estimation
Aquifer Parameter Estimation
 
Two dimensional Pool Boiling
Two dimensional Pool BoilingTwo dimensional Pool Boiling
Two dimensional Pool Boiling
 
CFD
CFDCFD
CFD
 

KĂźrzlich hochgeladen

How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
Food processing presentation for bsc agriculture hons
Food processing presentation for bsc agriculture honsFood processing presentation for bsc agriculture hons
Food processing presentation for bsc agriculture honsManeerUddin
 
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYKayeClaireEstoconing
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptxmary850239
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxAshokKarra1
 
Integumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptIntegumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptshraddhaparab530
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17Celine George
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Mark Reed
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)lakshayb543
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4MiaBumagat1
 
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptxiammrhaywood
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management systemChristalin Nelson
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfPatidar M
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptxmary850239
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Celine George
 
Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)cama23
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxVanesaIglesias10
 

KĂźrzlich hochgeladen (20)

How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
Food processing presentation for bsc agriculture hons
Food processing presentation for bsc agriculture honsFood processing presentation for bsc agriculture hons
Food processing presentation for bsc agriculture hons
 
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptx
 
Integumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptIntegumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.ppt
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4
 
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management system
 
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptxLEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdf
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17
 
Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptx
 

hydro chapter_4_b_pipe_network_by louy Al hami

  • 1. Civil Engineering Department Prof. Majed Abu-Zreig Hydraulics and Hydrology – CE 352 Chapter 4 Water Distribution Systems 6/29/2012 1
  • 2. Node, Loop, and Pipes Pipe Node Loop 6/29/2012 2
  • 3. Pipe Networks • The equations to solve Pipe network must satisfy the following condition: • The net flow into any junction must be zero ∑Q = 0 • The net head loss a round any closed loop must be zero. The HGL at each junction must have one and only one elevation • All head losses must satisfy the Moody and minor-loss friction correlation 6/29/2012 3
  • 4. Hydraulic Analysis After completing all preliminary studies and layout drawing of the network, one of the methods of hydraulic analysis is used to • Size the pipes and • Assign the pressures and velocities required. 6/29/2012 4
  • 5. Hydraulic Analysis of Water Networks • The solution to the problem is based on the same basic hydraulic principles that govern simple and compound pipes that were discussed previously. • The following are the most common methods used to analyze the Grid-system networks: 1. Hardy Cross method. 2. Sections method. 3. Circle method. 4. Computer programs (Epanet,Loop, Alied...) 6/29/2012 5
  • 6. Hardy Cross Method • This method is applicable to closed-loop pipe networks (a complex set of pipes in parallel). • It depends on the idea of head balance method • Was originally devised by professor Hardy Cross. 6/29/2012 6
  • 7. Assumptions / Steps of this method: 1. Assume that the water is withdrawn from nodes only; not directly from pipes. 2. The discharge, Q , entering the system will have (+) value, and the discharge, Q , leaving the system will have (-) value. 3. Usually neglect minor losses since these will be small with respect to those in long pipes, i.e.; Or could be included as equivalent lengths in each pipe. 4. Assume flows for each individual pipe in the network. 5. At any junction (node), as done for pipes in parallel, ∑ Qin =∑ Qout or ∑Q = 0 6/29/2012 7
  • 8. 6. Around any loop in the grid, the sum of head losses must equal to zero: ∑ hf = 0 loop – Conventionally, clockwise flows in a loop are considered (+) and produce positive head losses; counterclockwise flows are then (-) and produce negative head losses. – This fact is called the head balance of each loop, and this can be valid only if the assumed Q for each pipe, within the loop, is correct. • The probability of initially guessing all flow rates correctly is virtually null. • Therefore, to balance the head around each loop, a flow rate correction (∆) for each loop in the network should be computed, and hence some iteration scheme is needed. 6/29/2012 8
  • 9. 7. After finding the discharge correction, ∆ (one for each loop) , the assumed discharges Q0 are adjusted and another iteration is carried out until all corrections (values of ∆ ) become zero or negligible. At this point the condition of : ∑ h f ≅ 0.0 is satisfied. loop Notes: • The flows in pipes common to two loops are positive in one loop and negative in the other. • When calculated corrections are applied, with careful attention to sign, pipes common to two loops receive both corrections. 6/29/2012 9
  • 10. How to find the correction value ( ∆) hF = kQ n ⎯ (1) ⎯→ n = 2 ⇒ Darcy, Manning Q = Q o + ∆ ⎯ ( 2) ⎯→ n = 1.85 ⇒ Hazen William from 1 & 2 ⎡ n n(n − 1) n − 2 2 ⎤ hf = kQ = k (Qo + ∆ ) n −1 = k ⎢Qo + nQo ∆ + Qo ∆ + ....⎥ n n ⎣ 2 ⎦ Neglect terms contains ∆2 ( hf = kQ n = k Qon + nQon −1∆ ) For each loop ∑ hF = ∑ kQ n = 0 loop loop ∴ ∑ kQ n = ∑ kQon + ∑ nkQ (n −1) ∆ = 0 6/29/2012 10
  • 11. ∆= − ∑ kQ on = −∑h F ∑ nkQ o(n −1 ) n∑ hF Q o • Note that if Hazen Williams (which is generally used in this method) is used to find the head losses, then h f = k Q1.85 (n = 1.85) , then − ∑ hf ∆= hf 185 ∑ . Q • If Darcy-Wiesbach is used to find the head losses, then h f = k Q2 (n = 2) , then −∑ h f ∆= hf 6/29/2012 2∑ 11 Q
  • 12. Example Solve the following pipe network using Hazen William Method CHW =100 63 L/s 1 24 12 11.4 .6 39 4 3 2 37.8 L/s pipe L D 1 305m 150mm 25.2 2 305m 150mm 5 3 610m 200mm 4 457m 150mm 25.2 L/s 5 6/29/2012 153m 200mm 12
  • 13. 10.7 L hf = 1.852 Q1.852 ⇒ C HW = 100, Q = in L/s C HW D 4.87 1 1.852 10.7 L ⎛ Q ⎞ hf = 1.852 4.87 ⎜ ⎟ 3 4 C HW D ⎝ 1000 ⎠ 2 ⎧ L ⎫ h f = ⎨6.02 ×10 −9 4.87 ⎬ Q1.852 5 ⎊ D ⎭ h f = {K }Q1.852 − ∑ hF − 0.28 − ∑ hF − 0.45 for pipe 2 in loop 1 ∆1 = = = −0.24 ∆2 = = = −0.57 hF 1.85(0.64) hF 1.85(0.43) ∆ = ∆1 − ∆ 2 n∑ n∑ Qo Qo for pipe 2 in loop 2 6/29/2012 13 ∆ = ∆ 2 − ∆1
  • 14. 1 3 4 2 5 − ∑ hF − 0.18 − ∑ hF − (0.07 ) for pipe 2 in loop 1 ∆1 = = = −0.15 ∆1 = = = −0.09 hF 1.85(0.64) hF 1.85(0.42) n∑ n∑ ∆ = ∆1 − ∆ 2 Qo Qo for pipe 2 in loop 2 6/29/2012 ∆ = ∆ 2 − ∆1 14
  • 15. General Notes • Occasionally the assumed direction of flow will be incorrect. In such cases the method will produce corrections larger than the original flow and in subsequent calculations the direction will be reversed. • Even when the initial flow assumptions are poor, the convergence will usually be rapid. Only in unusual cases will more than three iterations be necessary. • The method is applicable to the design of new system or to evaluation of proposed changes in an existing system. • The pressure calculation in the above example assumes points are at equal elevations. If they are not, the elevation difference must be includes in the calculation. • The balanced network must then be reviewed to assure that the velocity and pressure criteria are satisfied. If some lines do not meet the suggested criteria, it would be necessary to increase the 6/29/2012 15 diameters of these pipes and repeat the calculations.
  • 16. Summary • Assigning clockwise flows and their associated head losses are positive, the procedure is as follows: Assume values of Q to satisfy ∑Q = 0. Calculate HL from Q using hf = K1Q2 . If ∑hf = 0, then the solution is correct. If ∑hf ≠ 0, then apply a correction factor, ∆Q, to all Q and repeat from step (2). For practical purposes, the calculation is usually terminated when ∑hf < 0.01 m or ∆Q < 1 L/s. A reasonably efficient value of ∆Q for rapid convergence is given by; ∆Q = − ∑H L L H 2∑ L L Q 6/29/2012 16
  • 17. Example • The following example contains nodes with different elevations and pressure heads. • Neglecting minor loses in the pipes, determine: • The flows in the pipes. • The pressure heads at the nodes. 6/29/2012 17
  • 19. Assume flows magnitude and direction 6/29/2012 19
  • 20. First Iteration • Loop (1) L D Q hf hf/Q Pipe f (m) (m) (m3/s) (m) (m/m3/s) AB 600 0.25 0.12 0.0157 11.48 95.64 BE 200 0.10 0.01 0.0205 3.38 338.06 EF 600 0.15 -0.06 0.0171 -40.25 670.77 FA 200 0.20 -0.10 0.0162 -8.34 83.42 ÎŁ -33.73 1187.89 − 33.73 ∆=− = 0.01419 m 3 /s = 14.20 L/s 6/29/2012 2(1187.89) 20
  • 21. First Iteration • Loop (2) L D Q hf hf/Q Pipe f (m) (m) (m3/s) (m) (m/m3/s) BC 600 0.15 0.05 0.0173 28.29 565.81 CD 200 0.10 0.01 0.0205 3.38 338.05 DE 600 0.15 -0.02 0.0189 -4.94 246.78 EB 200 0.10 -0.01 0.0205 -3.38 338.05 ÎŁ 23.35 1488.7 23.35 ∆=− = −0.00784 m 3 /s = −7.842 L/s 6/29/2012 2(1488.7) 21
  • 22. 14.20 Second Iteration 14.20 14.20 7.84 • Loop (1) 14.20 L D Q hf hf/Q Pipe f (m) (m) (m3/s) (m) (m/m3/s) AB 600 0.25 0.1342 0.0156 14.27 106.08 BE 200 0.10 0.03204 0.0186 31.48 982.60 EF 600 0.15 -0.0458 0.0174 -23.89 521.61 FA 200 0.20 -0.0858 0.0163 -6.21 72.33 ÎŁ 15.65 1682.62 15.65 ∆=− = −0.00465 m 3 /s = −4.65 L/s 6/29/2012 2(1682.62) 22
  • 23. 7.84 Second Iteration 14.20 7.84 7.84 • Loop (2) 7.84 L D Q hf hf/Q Pipe f (m) (m) (m3/s) (m) (m/m3/s) BC 600 0.15 0.04216 0.0176 20.37 483.24 CD 200 0.10 0.00216 0.0261 0.20 93.23 DE 600 0.15 -0.02784 0.0182 -9.22 331.23 EB 200 0.10 -0.03204 0.0186 -31.48 982.60 ÎŁ -20.13 1890.60 − 20.13 ∆=− = 0.00532 m 3 /s = 5.32 L/s 6/29/2012 2(1890.3) 23
  • 24. Third Iteration • Loop (1) L D Q hf hf/Q Pipe f (m) (m) (m3/s) (m) (m/m3/s) AB 600 0.25 0.1296 0.0156 13.30 102.67 BE 200 0.10 0.02207 0.0190 15.30 693.08 EF 600 0.15 -0.05045 0.0173 -28.78 570.54 FA 200 0.20 -0.09045 0.0163 -6.87 75.97 ÎŁ -7.05 1442.26 − 7.05 ∆=− = 0.00244 m 3 /s = 2.44 L/s 6/29/2012 2(1442.26) 24
  • 25. Third Iteration • Loop (2) L D Q hf hf/Q Pipe f (m) (m) (m3/s) (m) (m/m3/s) BC 600 0.15 0.04748 0.0174 25.61 539.30 CD 200 0.10 0.00748 0.0212 1.96 262.11 DE 600 0.15 -0.02252 0.0186 -6.17 274.07 EB 200 0.10 -0.02207 0.0190 -15.30 693.08 ÎŁ 6.1 1768.56 6 .1 ∆=− = −0.00172 m 3 /s = −1.72 L/s 6/29/2012 2(1768.56) 25
  • 26. After applying Third correction 6/29/2012 26
  • 27. Velocity and Pressure Heads: Q V hf pipe (l/s) (m/s) (m) 13.79 23.85 AB 131.99 2.689 13.79 BE 26.23 3.340 21.35 FE 48.01 2.717 26.16 6.52 21.35 1.21 AF 88.01 2.801 6.52 BC 45.76 2.589 23.85 26.16 7.09 CD 5.76 0.733 1.21 ED 24.24 1.372 7.09 6/29/2012 27
  • 28. Velocity and Pressure Heads: p/Îł+Z Z P/Îł Node (m) (m) (m) 13.79 23.85 A 70 30 40 B 56.21 25 31.21 C 32.36 20 12.36 21.35 1.21 6.52 D 31.15 20 11.15 E 37.32 22 15.32 26.16 7.09 F 63.48 25 38.48 6/29/2012 28
  • 29. Example For the square loop shown, find the discharge in all the pipes. All pipes are 1 km long and 300 mm in diameter, with a friction factor of 0.0163. Assume that minor losses can be neglected. 6/29/2012 29
  • 30. •Solution: Assume values of Q to satisfy continuity equations all at nodes. The head loss is calculated using; HL = K1Q2 HL = hf + hLm But minor losses can be neglected: ⇒ hLm = 0 Thus HL = hf Head loss can be calculated using the Darcy-Weisbach equation L V2 hf = Îť D 2g 6/29/2012 30
  • 31. L V2 HL = hf = Îť D 2g 1000 V2 H L = 0.0163 x x 0.3 2 x 9.81 Q2 Q2 H L = 2.77 = 2.77 x 2 2 A ⎛π 2⎞ ⎜ x 0.3 ⎟ ⎝4 ⎠ H L = 554Q 2 H L = K' Q 2 ∴ K ' = 554 First trial Pipe Q (L/s) HL (m) HL/Q AB 60 2.0 0.033 BC 40 0.886 0.0222 CD 0 0 0 AD -40 -0.886 0.0222 ÎŁ 2.00 0.0774 Since ∑HL > 0.01 m, then correction has to be applied. 6/29/2012 31
  • 32. ∑ HL 2 ∆Q = − =− = −12.92 L / s HL 2 x 0.0774 2∑ Q Second trial Pipe Q (L/s) HL (m) HL/Q AB 47.08 1.23 0.0261 BC 27.08 0.407 0.015 CD -12.92 -0.092 0.007 AD -52.92 -1.555 0.0294 ÎŁ -0.0107 0.07775 Since ∑HL ≈ 0.01 m, then it is OK. Thus, the discharge in each pipe is as follows (to the nearest integer). Pipe Discharge (L/s) AB 47 BC 27 CD -13 6/29/2012 AD -53 32