SlideShare ist ein Scribd-Unternehmen logo
1 von 1
Solar radiation forecasting with non-lineal statistical techniques and                                                                              20 08
                                                                                                                                                                           UN 008
                            qualitative predictions from Spanish National Weather Service                                                                               OS r 2
                                                                                                                                                                    EUR be
                                                                                                                                                                        to BON
                                                                                                                                                                      Oc IS
                                    Martín L., Zarzalejo L.F., Polo J., Navarro A., Marchante R.                                                                         L

1. INTRODUCTION                                                3. RESULTS
 Solar energy feed-in tariff is regulated by (RD 436/2004, Errors of the models essayed are measured in terms of
 661/2007) in Spain. Predictions must be given for next 72 mean root mean squared deviation (RMSD). The best
 hours and deviations are strongly penalized. A new method NN(z) model is compared to persistence model (PER) in
 to predict half daily values of solar radiation is presented.  terms of improvement of RMDS.
2. METHODOLOGY                                                                                                        1       N                    45.0 ° N




                                                                                                                        ∑ ( xi − xi )
                                                                                                                                      2
                                                                                                               RMSD =            ˆ               42.5 ° N

Solar radiation is transformed to a new gaussian and                                                                  N i=1                     40.0 ° N
                                                                                                                                                                                         • Madrid RRN AEMet

stationary variable. “Lost component” (LC) is the difference
                                                                                                                     i − ierrorm             37.5 ° N


betwen extratrrestrial and ground measured solar radiation.                                           improvement =  1 −         ÷
                                                                                                                     i − ierror ÷
                                                                                                                                              35.0 ° N
                                                                                                                                                                                                                                       °
                                                                                                                                                  15.0 ° W12 °                                                                  °   0.0 E
                                                                                                                                                            .5 W10.0 ° W                                         ° E 5.0 ° E 7.5 E 1

                                                                                                                               p 
                                                                                                                                                                         7.5 ° W 5.0 ° W 2.5 ° W 0.0 °       2.5


6000
                                                                                                               38

5000
                                  Lost Component                    L
                                                                                                               36
                                                                                                                                                                                                                      NN(1)
4000                                                                C                                                                                                                                                 NN(2)
                                                                                                               34




                                                                        Halfday)
                                                                                                                                                                                                                      NN(3)
                                                                    P                                                                                                                                                 NN(4)
3000                                                                R                                                                                                                                                 NN(5)
                                                                                                               32



                                                                     2
                                                                    E                                                                                                                                                 NN(6)
2000                                                                D                                                                                                                                                 NN(7)

                                                                        % RM SE Prediction G (W /m
                                                                    I                                          30                                                                                                     NN(8)
                                                                    C                                                                                                                                                 NN(9)
                                                                    T                                                                                                                                                 NN(10)
1000                                                                                                           28                                                                                                     P ersistence
                                                                    I
                                                                    O
       0
       0
                                                                    N                                          26
           100    200    300      400     500      600     700      S
                           Half Day
                                                                                                               24



Synoptic predictions of sky conditions (SYN) are used as                                                       22
                                                                                                                    1     2          3                              4                                    5                                  6
input to the neual network to test the improvement of the                                                      40
                                                                                                                                   Pre diction horizon (Halfdaily )


predictions. AEMET offers this predicitons in its web page          W
                                                                    I
for each location of Spain and 7 days in adavance.                  T
                                                                                                               35

                                                                    H                                                                                                                                                  NN(1)
                                                                                     Halfday)




                                                                                                                                                                                                                       NN(2)
                                                                                                               30
                                                                                                                                                                                                                       NN(3)
                                                                    S                                                                                                                                                  NN(4)
                                                                    Y
                                                                             2




                                                                                                                                                                                                                       NN(5)
                                                                                     %RMSE Prediction G (W/m




                                                                    N                                          25
                                                                                                                                                                                                                       NN(6)
                                                                                                                                                                                                                       NN(7)
                                                                    C                                          20
                                                                                                                                                                                                                       NN(8)
                                                                                                                                                                                                                       NN(9)
                                                                    O
                                                                                                                                                                                                                       NN(10)
                                                                    N                                                                                                                                                  Persistence
                                                                    D                                          15
                                                                    I
                                                                    T
                                                                                                               10
                                                                    I
                                                                    O
                                                                    N                                           5
                                                                    S                                            1        2          3                              4                                    5                                  6
                                                                                                                                   Prediction horizon (Halfdaily)



                                                          4. CONCLUSIONS
                                                          The error of the first model is limited by an upper level
                                                          which is due to deterministic nonlinear behaviour of the
                                                          signal which can’t be followed correctly by neural
                                                          network models. The second model improves
Neural Network (NN) is used to predict future values from considerably the prediction. The error has a lower level
observations. NN(z) índica el tamaño del vector patrón de of nine percent which is the best prediction error that can
entrada empleado z=1…10.                                  be achieved with the methology presented.

                                                División de Energías Renovables (Departamento de Energía), CIEMAT, Av. Complutense
                                                           nº22, Madrid, 28040, (Madrid) España, +34 913466048, luis.martin@ciemat.es

Weitere ähnliche Inhalte

Mehr von IrSOLaV Pomares

CSP, CPV or PV solar plant simulation report
CSP, CPV or PV solar plant simulation reportCSP, CPV or PV solar plant simulation report
CSP, CPV or PV solar plant simulation reportIrSOLaV Pomares
 
Solar radiation ground measured data quality assessment report
 Solar radiation ground measured data quality assessment report Solar radiation ground measured data quality assessment report
Solar radiation ground measured data quality assessment reportIrSOLaV Pomares
 
Typical Meteorological Year Report for CSP, CPV and PV solar plants
Typical Meteorological Year Report for CSP, CPV and PV solar plantsTypical Meteorological Year Report for CSP, CPV and PV solar plants
Typical Meteorological Year Report for CSP, CPV and PV solar plantsIrSOLaV Pomares
 
Technical report site assessment of solar resource for a csp plant. correctio...
Technical report site assessment of solar resource for a csp plant. correctio...Technical report site assessment of solar resource for a csp plant. correctio...
Technical report site assessment of solar resource for a csp plant. correctio...IrSOLaV Pomares
 
Forecasting commercial services from S2M - Juan Liria (Sun2Market)
Forecasting commercial services from S2M - Juan Liria (Sun2Market)Forecasting commercial services from S2M - Juan Liria (Sun2Market)
Forecasting commercial services from S2M - Juan Liria (Sun2Market)IrSOLaV Pomares
 
Future guidelines the meteorological view - Isabel Martínez (AEMet)
Future guidelines the meteorological view - Isabel Martínez (AEMet)Future guidelines the meteorological view - Isabel Martínez (AEMet)
Future guidelines the meteorological view - Isabel Martínez (AEMet)IrSOLaV Pomares
 
Future guidelines on solar forecasting the research view - David Pozo (Univer...
Future guidelines on solar forecasting the research view - David Pozo (Univer...Future guidelines on solar forecasting the research view - David Pozo (Univer...
Future guidelines on solar forecasting the research view - David Pozo (Univer...IrSOLaV Pomares
 
Forecasting commercial services from IrSOLaV - Luis Martin (IRSOLAV)
Forecasting commercial services from IrSOLaV - Luis Martin (IRSOLAV)Forecasting commercial services from IrSOLaV - Luis Martin (IRSOLAV)
Forecasting commercial services from IrSOLaV - Luis Martin (IRSOLAV)IrSOLaV Pomares
 
Managing the energy purchasing - Jorge gonzalez (Gesternova)
Managing the energy purchasing - Jorge gonzalez (Gesternova)Managing the energy purchasing - Jorge gonzalez (Gesternova)
Managing the energy purchasing - Jorge gonzalez (Gesternova)IrSOLaV Pomares
 
Forecasting energy fo pv system - Miguel Martínez (Wenner Solar)
Forecasting energy fo pv system - Miguel Martínez (Wenner Solar)Forecasting energy fo pv system - Miguel Martínez (Wenner Solar)
Forecasting energy fo pv system - Miguel Martínez (Wenner Solar)IrSOLaV Pomares
 
Gemasolar a thermal solar power plant with 15 hours, Ignacio Burgaleta (Torre...
Gemasolar a thermal solar power plant with 15 hours, Ignacio Burgaleta (Torre...Gemasolar a thermal solar power plant with 15 hours, Ignacio Burgaleta (Torre...
Gemasolar a thermal solar power plant with 15 hours, Ignacio Burgaleta (Torre...IrSOLaV Pomares
 
Solar Thermal Power Plant with Thermal Storage - Ignacio Burgaleta (Torresol ...
Solar Thermal Power Plant with Thermal Storage - Ignacio Burgaleta (Torresol ...Solar Thermal Power Plant with Thermal Storage - Ignacio Burgaleta (Torresol ...
Solar Thermal Power Plant with Thermal Storage - Ignacio Burgaleta (Torresol ...IrSOLaV Pomares
 
General situation of solar thermal energy - Eduardo Iglesias (Protermosolar)
General situation of solar thermal energy - Eduardo Iglesias (Protermosolar)General situation of solar thermal energy - Eduardo Iglesias (Protermosolar)
General situation of solar thermal energy - Eduardo Iglesias (Protermosolar)IrSOLaV Pomares
 
The CECRE: Making renewable energy technologies compatible with the security ...
The CECRE: Making renewable energy technologies compatible with the security ...The CECRE: Making renewable energy technologies compatible with the security ...
The CECRE: Making renewable energy technologies compatible with the security ...IrSOLaV Pomares
 
Workshop on Applications of Solar Radiation Forecasting - Introduction - Jesú...
Workshop on Applications of Solar Radiation Forecasting - Introduction - Jesú...Workshop on Applications of Solar Radiation Forecasting - Introduction - Jesú...
Workshop on Applications of Solar Radiation Forecasting - Introduction - Jesú...IrSOLaV Pomares
 
Assessment and evaluation of solar resources adb course
Assessment and evaluation of solar resources adb courseAssessment and evaluation of solar resources adb course
Assessment and evaluation of solar resources adb courseIrSOLaV Pomares
 
Solar resource assessment luis martin
Solar resource assessment luis martinSolar resource assessment luis martin
Solar resource assessment luis martinIrSOLaV Pomares
 
Review solar prediction iea 07-06
Review solar prediction iea 07-06Review solar prediction iea 07-06
Review solar prediction iea 07-06IrSOLaV Pomares
 
Quality of ground data for assessment and benchmarking
Quality of ground data for assessment and benchmarkingQuality of ground data for assessment and benchmarking
Quality of ground data for assessment and benchmarkingIrSOLaV Pomares
 
Luis martin jornada becarios 2006
Luis martin jornada becarios 2006Luis martin jornada becarios 2006
Luis martin jornada becarios 2006IrSOLaV Pomares
 

Mehr von IrSOLaV Pomares (20)

CSP, CPV or PV solar plant simulation report
CSP, CPV or PV solar plant simulation reportCSP, CPV or PV solar plant simulation report
CSP, CPV or PV solar plant simulation report
 
Solar radiation ground measured data quality assessment report
 Solar radiation ground measured data quality assessment report Solar radiation ground measured data quality assessment report
Solar radiation ground measured data quality assessment report
 
Typical Meteorological Year Report for CSP, CPV and PV solar plants
Typical Meteorological Year Report for CSP, CPV and PV solar plantsTypical Meteorological Year Report for CSP, CPV and PV solar plants
Typical Meteorological Year Report for CSP, CPV and PV solar plants
 
Technical report site assessment of solar resource for a csp plant. correctio...
Technical report site assessment of solar resource for a csp plant. correctio...Technical report site assessment of solar resource for a csp plant. correctio...
Technical report site assessment of solar resource for a csp plant. correctio...
 
Forecasting commercial services from S2M - Juan Liria (Sun2Market)
Forecasting commercial services from S2M - Juan Liria (Sun2Market)Forecasting commercial services from S2M - Juan Liria (Sun2Market)
Forecasting commercial services from S2M - Juan Liria (Sun2Market)
 
Future guidelines the meteorological view - Isabel Martínez (AEMet)
Future guidelines the meteorological view - Isabel Martínez (AEMet)Future guidelines the meteorological view - Isabel Martínez (AEMet)
Future guidelines the meteorological view - Isabel Martínez (AEMet)
 
Future guidelines on solar forecasting the research view - David Pozo (Univer...
Future guidelines on solar forecasting the research view - David Pozo (Univer...Future guidelines on solar forecasting the research view - David Pozo (Univer...
Future guidelines on solar forecasting the research view - David Pozo (Univer...
 
Forecasting commercial services from IrSOLaV - Luis Martin (IRSOLAV)
Forecasting commercial services from IrSOLaV - Luis Martin (IRSOLAV)Forecasting commercial services from IrSOLaV - Luis Martin (IRSOLAV)
Forecasting commercial services from IrSOLaV - Luis Martin (IRSOLAV)
 
Managing the energy purchasing - Jorge gonzalez (Gesternova)
Managing the energy purchasing - Jorge gonzalez (Gesternova)Managing the energy purchasing - Jorge gonzalez (Gesternova)
Managing the energy purchasing - Jorge gonzalez (Gesternova)
 
Forecasting energy fo pv system - Miguel Martínez (Wenner Solar)
Forecasting energy fo pv system - Miguel Martínez (Wenner Solar)Forecasting energy fo pv system - Miguel Martínez (Wenner Solar)
Forecasting energy fo pv system - Miguel Martínez (Wenner Solar)
 
Gemasolar a thermal solar power plant with 15 hours, Ignacio Burgaleta (Torre...
Gemasolar a thermal solar power plant with 15 hours, Ignacio Burgaleta (Torre...Gemasolar a thermal solar power plant with 15 hours, Ignacio Burgaleta (Torre...
Gemasolar a thermal solar power plant with 15 hours, Ignacio Burgaleta (Torre...
 
Solar Thermal Power Plant with Thermal Storage - Ignacio Burgaleta (Torresol ...
Solar Thermal Power Plant with Thermal Storage - Ignacio Burgaleta (Torresol ...Solar Thermal Power Plant with Thermal Storage - Ignacio Burgaleta (Torresol ...
Solar Thermal Power Plant with Thermal Storage - Ignacio Burgaleta (Torresol ...
 
General situation of solar thermal energy - Eduardo Iglesias (Protermosolar)
General situation of solar thermal energy - Eduardo Iglesias (Protermosolar)General situation of solar thermal energy - Eduardo Iglesias (Protermosolar)
General situation of solar thermal energy - Eduardo Iglesias (Protermosolar)
 
The CECRE: Making renewable energy technologies compatible with the security ...
The CECRE: Making renewable energy technologies compatible with the security ...The CECRE: Making renewable energy technologies compatible with the security ...
The CECRE: Making renewable energy technologies compatible with the security ...
 
Workshop on Applications of Solar Radiation Forecasting - Introduction - Jesú...
Workshop on Applications of Solar Radiation Forecasting - Introduction - Jesú...Workshop on Applications of Solar Radiation Forecasting - Introduction - Jesú...
Workshop on Applications of Solar Radiation Forecasting - Introduction - Jesú...
 
Assessment and evaluation of solar resources adb course
Assessment and evaluation of solar resources adb courseAssessment and evaluation of solar resources adb course
Assessment and evaluation of solar resources adb course
 
Solar resource assessment luis martin
Solar resource assessment luis martinSolar resource assessment luis martin
Solar resource assessment luis martin
 
Review solar prediction iea 07-06
Review solar prediction iea 07-06Review solar prediction iea 07-06
Review solar prediction iea 07-06
 
Quality of ground data for assessment and benchmarking
Quality of ground data for assessment and benchmarkingQuality of ground data for assessment and benchmarking
Quality of ground data for assessment and benchmarking
 
Luis martin jornada becarios 2006
Luis martin jornada becarios 2006Luis martin jornada becarios 2006
Luis martin jornada becarios 2006
 

Solar radiation forecasting with non-linear techniques

  • 1. Solar radiation forecasting with non-lineal statistical techniques and 20 08 UN 008 qualitative predictions from Spanish National Weather Service OS r 2 EUR be to BON Oc IS Martín L., Zarzalejo L.F., Polo J., Navarro A., Marchante R. L 1. INTRODUCTION 3. RESULTS Solar energy feed-in tariff is regulated by (RD 436/2004, Errors of the models essayed are measured in terms of 661/2007) in Spain. Predictions must be given for next 72 mean root mean squared deviation (RMSD). The best hours and deviations are strongly penalized. A new method NN(z) model is compared to persistence model (PER) in to predict half daily values of solar radiation is presented. terms of improvement of RMDS. 2. METHODOLOGY 1 N 45.0 ° N ∑ ( xi − xi ) 2 RMSD = ˆ 42.5 ° N Solar radiation is transformed to a new gaussian and N i=1 40.0 ° N • Madrid RRN AEMet stationary variable. “Lost component” (LC) is the difference  i − ierrorm  37.5 ° N betwen extratrrestrial and ground measured solar radiation. improvement =  1 − ÷  i − ierror ÷ 35.0 ° N ° 15.0 ° W12 ° ° 0.0 E .5 W10.0 ° W ° E 5.0 ° E 7.5 E 1  p  7.5 ° W 5.0 ° W 2.5 ° W 0.0 ° 2.5 6000 38 5000 Lost Component L 36 NN(1) 4000 C NN(2) 34 Halfday) NN(3) P NN(4) 3000 R NN(5) 32 2 E NN(6) 2000 D NN(7) % RM SE Prediction G (W /m I 30 NN(8) C NN(9) T NN(10) 1000 28 P ersistence I O 0 0 N 26 100 200 300 400 500 600 700 S Half Day 24 Synoptic predictions of sky conditions (SYN) are used as 22 1 2 3 4 5 6 input to the neual network to test the improvement of the 40 Pre diction horizon (Halfdaily ) predictions. AEMET offers this predicitons in its web page W I for each location of Spain and 7 days in adavance. T 35 H NN(1) Halfday) NN(2) 30 NN(3) S NN(4) Y 2 NN(5) %RMSE Prediction G (W/m N 25 NN(6) NN(7) C 20 NN(8) NN(9) O NN(10) N Persistence D 15 I T 10 I O N 5 S 1 2 3 4 5 6 Prediction horizon (Halfdaily) 4. CONCLUSIONS The error of the first model is limited by an upper level which is due to deterministic nonlinear behaviour of the signal which can’t be followed correctly by neural network models. The second model improves Neural Network (NN) is used to predict future values from considerably the prediction. The error has a lower level observations. NN(z) índica el tamaño del vector patrón de of nine percent which is the best prediction error that can entrada empleado z=1…10. be achieved with the methology presented. División de Energías Renovables (Departamento de Energía), CIEMAT, Av. Complutense nº22, Madrid, 28040, (Madrid) España, +34 913466048, luis.martin@ciemat.es