21 Apr 2014 2 Re-Issued for Review & Approval WB WB DK
20 Mar 2014 1 Issued for Review & Approval WB WB DK
Document No. CTC-546-EBAS-0043 SHT: 01 OF: 82
PHASE 4- CONCEPT DESIGN OF ROADS & INFRASTRUCTURE – PACKAGES 26 & 27
EXISTING BUILDING CONDITIONS SURVEY
PHASE 4 CONCEPT DESIGN OF ROADS &
INFRASTRUCTURE – PACKAGES 26 & 27
EXISTING BUILDING CONDITIONS SURVEY
REVISION 1
APRIL, 2014
TABLE OF CONTENTS
INTRODUCTION
PART 1
EXISTING BUILDING CONDITIONS SURVEY-PACKAGE 27
(HIGH LEVEL DESIGN AREAS)
PART 2
ANALYSIS OF SURVEY
OVERALL BUILDING CONDITIONS PLAN
PART 3
FINDINGS AND RECOMMENDATIONS
BUILDING CONSTRAINTS PLANS
STRATEGIC LAND ACQUISITION APPROACH
APPENDIX A: ROADWAY CONSTRAINTS PLANS (TRAFFIC DRIVEN)
APPENDIX B: EXISTING LAND USES (BROADER VIEW)
APPENDIX C: EXISTING BUILDING HEIGHTS
The contents of this document do not necessarily
reflect views or policies of the Ministry of Municipality
& Urban Planning (MMUP)
Existing Building Conditions Survey
Planning Area
The High Design Level planning area lies within Package 27 are located in the urban area
in Doha South, west of Doha International Airport. The High Level Design areas, indicated
in red below, indicate the limit of work for the Existing Building Conditions Survey, while the
remaining areas have been photographically recorded and documented.
Doha
International
Airport
Existing Building Conditions Survey
Part 1 – Building Conditions Survey – Package 27 (High Level Design Areas)
Introduction
The purpose of this Existing Building Assessment Survey is to
evaluate the state of buildings and architectural features within the
High Level Design areas of Package 27. This report will be used to
gauge land acquisition needs for roadway improvements and will
also be used as a tool to augment the roadway design constraints
plans.
The process in which this survey was prepared consisted of a visual
field survey identifying buildings, building condition and occupation.
The findings were then translated in to a graphic format where a
building assessment color coding system was used to graphically
depict actual building conditions. During the months of investigation
and survey, numerous buildings had undergone remodeling,
demolition with new construction taking place. The survey team,
then went back out to update the findings and modified the building
assessment graphics.
The graphic survey within this report illustrates current land uses
and zoning, building conditions and a photographic inventory of the
conditions. The building rating methodology is a generalized
approach taking in to account several factors including curb appeal,
occupancy, land use and future potential. This survey was
conducted based on exterior visual assessments and does not
include the assessments of:
Roofing HVAC Systems Structural Conditions
Electrical Fire Protection Accessibility.
Figure: Design Intensity Level Classifications
Overall Project Process
The Urban Design/Landscape tasks for the project consist of three (3) major
milestones and deliverables stages (see Figure below). Following Project
Commencement, a Study Area Audit was performed with a detailed study
and analysis of the immediate project area including an expanded area. The
expanded area study consisted of studying how the adjacent areas could
possibly impact the project study area and how interlinking land uses,
vehicular and pedestrian circulation systems and greenspace improvements.
Various tasks were performed in the Study Area Audit where a photographic
inventory consisting of photos and videos of all roadway corridors were
performed. The inventory also captured neighboring areas and how the
relationships of land uses impact the project study area. For example, some
conflicts in land use were found where contractors, light industrial or heavy
commercial uses where located adjacent to multi-family housing in the more
heavily urbanized areas, primarily along Mansoura and Najma Roads. See
maps for identified areas affected.
Project
Commencement
Kick-Off
Meetings
Study Area Audit
Building Assessment
Photo Inventory
Adjacent Neighborhoods
SWOT Analysis
Land Use Survey
Concept Design
Concept Options
Workshops
Bi-weekly Meetings
Coordination with
Municipality
Preliminary Cost Estimates
Design Development
High Design Level Areas
Design Guidelines
Qualities of Excellence
Technical Brief
Implementation Plan
Cost Estimates
Figure: Project Process Diagram
Photo: Contractors mixed with neighborhood
retailers/services and residential units
Existing Building Conditions Survey
CURRENT STAGE
MANSOURA ROAD
EXISTING LAND USE PLAN
EXISTING BUILDING CONDITIONS PLAN
Mosque
Existing Building Conditions Survey
Very poor condition buildings. Candidates
for complete removal
Vacant Parcel,
candidate for Anchor
Retail Development
adjacent to Hyper
Market
Poor Condition
buildings, demolishing
recommended
Poor ConditionAcceptable Condition
Poor ConditionAcceptable ConditionPoor Condition
Poor ConditionVacant Parcel Poor Condition
Acceptable Condition
Good Condition - Mosque
General Notes:
1. East Mansoura Road consists of older commercial uses and
buildings. Buildings have not been maintained very well and lacks a
gateway treatment entering this mixed-use area off Al Matar Road.
2. Lack of parking along Mansoura affords an opportunity to demolish
buildings along Mansoura and 1 street behind to provide off-street
parking opportunities for local residents and commercial tenants.
3. Image 1 shows a vacant parcel which is proposed to be included in a
District Center which will serve as a destination place and sits
adjacent to an existing hypermarket.
4. Lack of visual character and appeal.
Poor Condition
Acceptable Condition
Poor Condition
Existing Building Conditions Survey
EXISTING LAND USE PLAN
EXISTING BUILDING CONDITIONS PLAN
MANSOURA
Souq Hajjaj
(Under Redevelopment)
Existing Building Conditions Survey
Poor Condition structures throughout,
opportunities to provide off-street
parking and grand entry statement for
proposed development.
Pedestrian connectivity vital in the re-
development of the Souq property.
Poor Condition
buildings, demolishing
recommended
Poor Condition
buildings, demolishing
recommended Poor Condition
buildings, demolishing
recommended
Land use conflicts between
commercial and multi-family
residential-Contractors.
Transport trucks, materials
storage and vehicle fleets
interact with residential
component
Acceptable ConditionPoor Condition
Poor ConditionPoor ConditionNew Construction
Poor ConditionAcceptable Condition Acceptable Condition
Poor Condition
Acceptable Condition
General Notes:
1. Numerous poor condition buildings and lack of organized on-street
parking;
2. Residential above commercial units;
3. Most parcels along this stretch are in Poor condition and are ideal to
be demolished providing the necessary room for roadway widening
and pedestrian scale improvements;
4. Mid-block crossings should be taken in to consideration to minimize
traffic disturbances and safety incidents.
Poor Condition Poor Condition
Acceptable Condition Poor Condition
Existing Building Conditions Survey
EXISTING LAND USE PLAN
EXISTING BUILDING CONDITIONS PLAN
MANSOURA
Mosque
Existing Building Conditions Survey
28, 29, 30-Poor
Condition buildings,
acquiring and
demolishing
recommended
Poor Condition
buildings, demolishing
recommended
Poor Condition
buildings, demolishing
recommended
32-New Construction,
acquire property now to
avoid escalated costs
prior to completion
Mosque in good condition,
candidate for removal due
to proximity to road
Land use conflicts between
commercial and multi-family
residential-Contractors from the Souq
Souq Hajjaj
(Under
Redevelopment)
Multi-Family
Residential,
acceptable condition,
avoid if possible
Poor Condition
buildings, demolishing
recommended
Acceptable ConditionAcceptable ConditionNew Construction
Good Condition - MosquePoor Condition Poor Condition
Acceptable Condition
Poor Condition
Acceptable Condition
Existing Building Conditions Survey
General Notes:
1. Central Mansoura Road consists of older commercial uses and
buildings. Buildings have not been maintained very well and lacks
adequate and quality public space at the intersection of Mansoura
and Najma;
2. This area is a pinching point with some buildings built on top of the
right-of-way;
3. Recommended to acquire and demolish retail strip center across
from the Mosque to provide road widening so to avoid the Mosque
(images 28-30);
4. Image 32 New Construction (early photo 2012), acquire property
now to avoid escalated costs prior to completion;
5. Poor condition buildings adjacent to Mosque to the west. Demolish
and provide adequate room for road widening;
6. Multi-family adjacent to Souq Hajjaj in acceptable condition, avoid if
possible to maintain residential character, Image 36;
7. Re-align Najma, demolish commercial and multi-family poor
condition structures. Visual blight and traffic movements greatly
increase visual character.
EXISTING LAND USE PLAN
EXISTING BUILDING CONDITIONS PLAN
Girls School, poor condition
(Future Rail Station)
NAJMA
Mosque
Existing Building Conditions Survey
Poor Condition
buildings, demolishing
recommended
Mosque in good condition,
candidate for removal due
to proximity to road
Multi-family buildings, mid-rise, good
condition and provide newer
residential component to a blight
stricken area
Poor Condition
buildings, demolishing
recommended
Poor Condition
buildings, demolishing
recommended
Poor Condition
buildings, demolishing
recommended
Poor Condition
buildings,
demolishing
recommended
NAJMA
Acceptable ConditionPoor Condition
Poor ConditionPoor ConditionPoor Condition
Poor ConditionPoor Condition Poor Condition
Poor Condition
Poor Condition
New Construction
Existing Building Conditions Survey
General Notes:
1. Numerous poor condition buildings and lack of organized on-street
parking, Images 37-40;
2. Residential above commercial units, Images 38, 40 and 45;
3. Image 47 shows new construction which started in the summer of
2013 and is in alignment with a preferred option of the Najma Road re-
alignment. Acquisition of this parcel is recommended.
4. Poor condition buildings adjacent to Mosque to the west. Demolish
and provide adequate room for road widening;
5. Image 47 New Construction, acquire property now to avoid escalated
costs prior to completion;
EXISTING LAND USE PLAN
EXISTING BUILDING CONDITIONS PLAN
Existing Building Conditions Survey
Poor Condition
buildings, demolishing
recommended
Poor Condition
buildings, demolishing
recommended. Rail
Station improvements
necessary to enhance
urban character
Poor Condition
buildings, demolishing
recommended
Poor Condition
buildings, demolishing
recommended
Acceptable condition-
Candidates for removal
for road widening
Acceptable
condition-
Candidates for
removal for road
widening
Acceptable
condition-
Candidates for
removal for road
widening
Acceptable
condition-
Candidates for
removal for road
widening
Acceptable
condition-
Candidates for
removal for road
widening
Poor Condition
buildings, demolishing
recommended
New ConstructionPoor Condition
Acceptable ConditionNew ConstructionPoor Condition
Poor ConditionPoor Condition Acceptable Condition
Poor Condition
Acceptable Condition
General Notes:
1. Numerous poor condition buildings and lack of organized on-street
parking;
2. Residential above commercial units;
3. Two (2) new buildings under construction, Images 54 and 57;
4. Opportunities to demolish buildings and integrate off-street parking,
Image 51.
5. Several properties have been upgraded with new construction
improving the visual aesthetics.
Poor Condition Poor Condition
Existing Building Conditions Survey
EXISTING LAND USE PLAN
EXISTING BUILDING CONDITIONS PLAN
Existing Building Conditions Survey
Poor Condition
buildings,
demolishing
recommended
Poor Condition
buildings, demolishing
recommended
70-Poor Condition
buildings, demolishing
recommended
Poor ConditionPoor Condition
New ConstructionPoor ConditionAcceptable Condition
Poor ConditionAcceptable Condition Acceptable Condition
Acceptable Condition
Good Condition
General Notes:
1. Numerous poor condition buildings and lack of organized on-street
parking;
2. Two properties have been upgraded to Good Condition and New
Construction improving the visual aesthetics, Images 62, 65, 68
and 72.
Poor Condition Good Condition
Existing Building Conditions Survey
EXISTING LAND USE PLAN
EXISTING BUILDING CONDITIONS PLAN
Existing Building Conditions Survey
Poor Condition
buildings, demolishing
recommended
Poor Condition building,
demolishing
recommended
Good condition-good
basis for urban family
revitalization
Poor Condition
buildings, demolishing
recommended
Under Redevelopment
(Shopping Mall)
Vacant
Parcel
Good ConditionGood ConditionGood ConditionAcceptable Condition
Good ConditionPoor Condition
Poor Condition
Acceptable Condition Good Condition
General Notes:
1. Lack of on-street parking;
2. Numerous newer multi-
family buildings at west end
near Munthaza;
3. Several properties have
been upgraded to Good
Condition and new
construction improving the
visual aesthetics. Images
75, 76, 78-82.
Good Condition New Construction – Al Hassan
Apartments
Poor Condition Poor Condition
Acceptable Condition
Existing Building Conditions Survey
Existing Building Conditions Survey
NAJMA ROAD
EXISTING LAND USE PLAN
EXISTING BUILDING CONDITIONS PLAN
MANSOURA
Mosque
Existing Building Conditions Survey
Poor Condition
buildings, demolishing
recommended
Poor Condition
buildings, demolishing
recommended
Good
condition
multi-family
residential,
Avoid if
possible.
Vacant
Parcel
Poor Condition
buildings, demolishing
recommended
Mosque in good
condition,
candidate for
removal due to
proximity to road
Poor Condition
buildings, demolishing
recommended
Land use conflicts between
commercial and multi-family
residential-Contractors
Poor Condition
buildings, demolishing
recommended
Good Condition (new)Good Condition
Poor ConditionPoor ConditionPoor Condition
Poor ConditionPoor Condition Good Condition
Poor Condition
Vacant Parcel
Acceptable Condition
Poor ConditionPoor Condition
Poor Condition
Poor Condition
Existing Building Conditions Survey
General Notes:
1. Najma Road north of Mansoura
is a tightly restricted road with an
abundance of on-street parking.
Consideration should be given to
new construction requirements
for off-street parking when
owners obtain building permits;
2. Numerous Poor condition
buildings exist where acquisition
should occur providing the
necessary re-alignment of Najma
Road at Mansoura, Images 5-8.
EXISTING LAND USE PLAN
EXISTING BUILDING CONDITIONS PLAN
MANSOURA
Mosque
Existing Building Conditions Survey
Poor Condition
buildings, demolishing
recommended
Poor Condition
buildings, demolishing
recommended
Poor Condition
buildings, demolishing
recommended
Good condition and
New Construction-
Avoid if possible
Mosque in good
condition,
candidate for
removal due to
proximity to road
Poor Condition
buildings, demolishing
recommended
New ConstructionGood Condition
Good ConditionGood ConditionPoor Condition
Poor ConditionPoor Condition Poor Condition
Poor Condition
Poor Condition
Poor ConditionGood Condition
Acceptable ConditionAcceptable Condition Acceptable Condition
Existing Building Conditions Survey
General Notes:
1. A Mosque exists at the southwest
corner of Mansoura and Najma. It
is preferred not to disturb the
Mosque with opportunities to
demolish the east side due to Poor
condition structures., Images 16-
21;
2. Demolishing of the east side will
provide adequate room for road
widening.
Existing Building Conditions Survey
MUNTHAZA ROAD
EXISTING LAND USE PLAN
EXISTING BUILDING CONDITIONS PLAN
MANSOURA
School
under re-
development as
Special Use
District
Existing Building Conditions Survey
Poor Condition
buildings, demolishing
recommended
Acquired
Acquired
AcquiredAcquired
AcquiredVacant ParcelGood Condition
Good ConditionPoor Condition Good Condition
Good Condition
Acceptable Condition
Acquired
AcquiredAcquired
Acquired
Existing Building Conditions Survey
General Notes:
1. North Munthaza commencing at B-Ring Road is designated to be a
Gateway to north Doha. Munthaza currently has and is projected to
have high traffic counts and the acquisition of buildings on the west side
of Munthaza has already taken place, Images 8-14.
EXISTING LAND USE PLAN
EXISTING BUILDING CONDITIONS PLAN
Existing Building Conditions Survey
Acquired
Acquired
Vacant Parcel
Acquired
Under
Redevelopment
Future Shopping
Mall
Poor Condition
Acceptable ConditionVacant Parcel Acceptable Condition
Acquired
Acceptable Condition
AcquiredAcquired Acquired
Acquired Acquired
Poor Condition
Existing Building Conditions Survey
General Notes:
1. This stretch of Munthaza Road consists of older commercial uses and
buildings. Buildings have not been maintained very well and lacks
cohesion in architectural types and styles;
2. The west side of Munthaza has been acquired, Images 19-25.
EXISTING LAND USE PLAN
EXISTING BUILDING CONDITIONS PLAN
Munthaza Park
Holiday Villa
Resort
Existing Building Conditions Survey
Acquired
Acquired
Acquired
Strip center
demolished, under
re-development
No interior
access to parcel.
Condition
assumed
Acceptable
Vacant Parcel
AcquiredNew Construction and removal
of strip center
Acceptable Condition
Good Condition
Acceptable Condition
Existing Building Conditions Survey
Acquired
Acquired Acquired
General Notes:
1. The approach to Munthaza Park on the southwest corner of Munthaza
and C-Ring Road. Several government offices are located along
Munthaza Road which serve the local residents;
2. Land acquisition of portions of the park have occurred to
accommodate road widening improvements.
Poor Condition Acceptable Condition
Part 2 – Analysis of Survey
The principles of the survey conducted is subjective in nature and
relative to surrounding land uses, building heights in comparison to
adjacent properties, incompatibility, heritage or cultural landmarks,
materials and scale, future rights-of-way and encroachments, curbing
and pedestrian sidewalk access to each property.
The largest category of properties falls within the Acceptable building
condition. These properties contain acceptable structural conditions of
buildings and land use compatibility, but are available for land acquisition
during the roadway improvement design stage. The acquisition of these
parcels may assist in relevant geometric improvement solutions for
surrounding links, interchanges and intersections and provide a
continuance of proposed urban design solutions.
Overall Summary:
1. Identified buildings that cannot be acquired due to cultural or
economic restrictions;
2. Identified buildings where their conditions are substandard and
acquisition is most likely;
3. Identified buildings where land use/occupation compatibilities conflict
with surrounding uses, not applicable to the Land Use Plan, land use
compatibilities refers to occupied uses and not current zoning.
4. Identified buildings and/or parcels where acquisition assists in
reaching project goals of an improved vehicular and pedestrian
circulation network to meet future demands where Poor and
Acceptable Conditions are identified.
5. The conclusion is graphically shown on the following page, figure
Overall Building Conditions Analysis – Package 27.
The field investigations yielded specific recommendations for building
protection and are categorized as constraints. Further analysis included a
value engineering approach where strategic planning included the land
acquisition and removal of various stretches roads confined to one side were
considered. Acquisition of both road sides is not feasible where time and cost
of design and implementation would exceed the current planning and build out
schedules.
Land Acquisition and Roadway Improvement Strategic Approach was
developed indicating sides of roads where land acquisition should be
concentrated. Specific recommendations and strategic approach to land
acquisition and roadway improvements based on the site survey are followed
in Part 3 Findings and Recommendations of this report.
Existing Building Conditions Survey
Overall Building Conditions Analysis – Package 27
Existing Building Conditions Survey
Part 3 – Findings and Recommendations
The findings encountered during this survey concluded that there are
numerous opportunities for parcel acquisition and the demolishing of
older, poor condition buildings. Considerable Roadway and
Streetscape improvements are needed to not only enhance these
vehicular and pedestrian corridors, but also provide the minimum
required space needed to make the much needed roadway
improvements.
The comprehensive result, based on the field survey and subsequent
findings and recommendations, specific recommendations are listed.
The specific recommendations reference individual buildings by site
photo reference number and street name.
Building Constraints plans were developed and included that identify
buildings that are Restricted and cannot be acquired or encroached
upon and other buildings that may be identified as Good or Acceptable
Condition buildings, are candidates for acquisition and removal. These
buildings should be avoided if possible in determining final roadway
alignment options.
A Strategic Approach for Land Acquisition was established to minimize
the impact of road corridors to one side versus both sides. This
approach will efficiently lead the design process in road improvements
and urban design solutions.
Appendix A: Roadway Constraints Plans (Traffic driven) show specific
conditions where various constraints may limit land acquisition and
structures that should be avoided due to building
significance/importance, utility restrictions and/or fixed rail station
locations. Specific notes and photos are included identifying the key
restraints in developing the roadway and urban design options and
should be used as an analysis tool for option development.
Study Area Audit & Analysis:
Building Conditions and
Roadway Constraints
Findings and
Recommendations Options Development
Existing Building Conditions Survey
Existing Building Conditions Survey
Specific Recommendations
The Analysis resulted in specific identification of buildings of varying conditions.
Specifically, buildings that may cause a constraint, were buildings of a Good
Condition assessment and certain Acceptable Condition assessments that the
project may want to avoid due to land use, architectural character and/or that
potential roadway design would not impact directly.
The primary recommendations for buildings to Avoid are listed below by Street
Name and Photo reference number. These buildings include:
Mansoura
18 – Under construction and existing room available for roadway widening, should
not be affected;
31 – Existing Mosque in Good Condition. The demolishing of adjacent properties
should provide ample room for road widening and the re-alignment of Najma;
32 – Under construction, commercial building that may be acquired. The re-
alignment of Najma outweighs avoiding this property. The property should be
acquired now, prior to construction completion, to avoid escalated acquisition costs;
35-36 – Multi-family residential building that preserves the character of the
residential area. Road widening should not affect this side of Mansoura;
54 & 57 – Under construction. Image 57 should be avoided due to adjacent/nearby
buildings being in Acceptable Condition. Image 54 can be acquired with adjacent
Poor condition buildings;
68 – Under Construction and sits on a prime corner. Acquisition costs would
be high;
72 – Good Condition building, recently built. Sits on corner and architectural
character suitable for area;
75-76 – Good condition buildings that support the revitalization of the north side of
Mansoura on the west end;
78-82 – Row of buildings in Good condition and New Construction occurring and
should be avoided due to condition and precedent set for revitalization near Munthaza
Road.
Najma
3 & 9 – The only two (2) Good Condition buildings on the north side of Mansoura that
should be avoided due to condition and multi-story status. Image 3 is a candidate for
acquisition due to all adjacent buildings being in Poor condition. Most buildings along
this stretch are in Poor Condition;
23-25 – The buildings consist of the Mosque, an New Construction and Good
Condition. These buildings set the parameters of the roadway design where they
should be avoided. Demolishing the buildings across Najma are acceptable due to the
Poor Condition as shown in Images 16-21.
Munthaza
The entire west side of Munthaza between B-Ring and C-Ring Roads has been
acquired. All Vacant Parcels and structures are to be removed for road improvements;
1 – School in Poor Condition and should be demolished. A Special Use District is
planned for this Parcel to include Rail Station elements. Improvements should
transition in to any proposed plans for the new District;
3-6 – Buildings are in Good Condition south of the school. Avoid if possible due to the
road widening occurring on the west side;
17 – Acceptable buildings should be avoided. Road widening to occur on west side;
25 – Large parcel of s-f residential is being acquired for future retail mall development;
30-31 – Existing Holiday Villa resort. Avoid this property which is currently a good
anchor at Munthaza and C-Ring Roads. High acquisition and demolishing costs make it
prohibitive.
Existing Building Conditions Survey
Land Acquisition and Roadway Improvements Strategic Approach
Following the site survey and analysis of the existing building conditions, a strategic
approach was formulated to best identify the methods of land acquisition and
demolition of structures within the corridors. Varying factors played roles in the
determination of which buildings would be acquired.
Where multiple buildings were grouped together creating longer stretches or blocks
that could be acquired, these were ideal candidates for acquisition on one side of
the road and minimizing impacts to the opposite side. The results clearly were
identified where roadway and utility improvements should occur and assisted in the
focus of design options that should be generated.
Specific recommendation for road side impacts include:
Mansoura – The entire south side can be impacted due to aged and poor condition
buildings. The north side of Mansoura has newer buildings and future plans for
residential and retail development. A rail station is planned for the old girls adjacent
to Najma Road.
Najma - Starting at B-Ring Road, Najma has newer mid-rise multi-family buildings
on the east side going southward. The east side should remain unimpacted. The
west side consisting of a large ASHGAL facility is a prime candidate for acquisition
and removal to accommodate road improvements. Continuing driving southward.
The side of the road to be impacted switches sides. This is ideal in a larger context
where Najma needs to be re-aligned at Mansoura to greatly improve traffic flow.
Continuing southward on Najma through the Mansoura intersection, the east side of
Najma from Mansoura to the first round-a-bout consists of poor condition buildings
is the choice for the side to impact. The west side of Najma consist of a newer
Mosque at the corner of Mansoura and good condition buildings with one new
building under construction.
Mansoura Road – South (right) side buildings
in poor condition, candidate for acquisition and
removal.
Mansoura Road – South (right) side buildings
in poor condition, candidate for acquisition and
removal.
Najma Road – East (right) side buildings in poor
condition, candidate for acquisition and removal.
Najma Road – East (right) side buildings in
poor condition, candidate for acquisition and
removal. Newer good conditions buildings to
the west (left).
Najma Road – East (right) side buildings in poor
condition, candidate for acquisition and removal.
Newer good condition buildings to the right in
distance.
Najma Road – West (left) side ASHGAL
buildings in poor condition, candidate for
acquisition and removal. Newer good
conditions buildings to the east (right).
Existing Building Conditions Survey
Munthaza (B-Ring south to C-Ring) – The entire west side can be impacted due to
properties having already been acquired. Minimal impacts to the east side are
anticipated.
Munthaza Park is currently under going re-master planning efforts and park
improvements will be taken in to consideration during road design options.
A planned shopping mall on the east side, south of Mansoura is planned and careful
consideration of road improvements will need to take in to account planned ingress
and egress points, pedestrian circulation and signalization with staggered side street
junctions.
Munthaza Road – West (right) side buildings in
poor condition and vacant parcels, candidates
for acquisition and removal.
Munthaza Road – West (right) side buildings in
poor condition and vacant parcels, candidates
for acquisition and removal.
Munthaza Road – West (side buildings in poor
condition and vacant parcels, candidates for
acquisition and removal.
Munthaza Road – West (side buildings in poor
condition and vacant parcels, candidates for
acquisition and removal.
Munthaza Road – West consists of Munthaza
Park which is under re-master planning by the
Parks Department.
Munthaza Road – East side buildings consist
of newer higher end buildings. Shown is the
Holiday Villa Resort at the corner of Munthaza
and C-Ring Roads.
Existing Building Conditions Survey
Mosque
Existing Building Conditions Survey
Existing Building Conditions Survey
Souq Haraj
Existing Building Conditions Survey
Mosque
Girls School
Existing Building Conditions Survey
Existing Building Conditions Survey
Mosque
Existing Building Conditions Survey
Future Shopping Mall
Munthaza
Park
Existing Building Conditions Survey
ASHGAL Facility
Existing Building Conditions Survey
ASHGAL Facility
Existing Building Conditions Survey
Mosque
Girls School
Existing Building Conditions Survey
Existing Building Conditions Survey
School
Existing Building Conditions Survey
School
Existing Building Conditions Survey
Mosque
Existing Building Conditions Survey
Future Shopping Mall
Munthaza
Park
Existing Building Conditions Survey
Munthaza
Park
Existing Building Conditions Survey
Munthaza
Park
Holiday
Villa
Resort
APPENDIX A: ROADWAY CONSTRAINTS PLANS (TRAFFIC DRIVEN)
Existing Building Conditions Survey
Avoid – Mosque in Good
condition and due to acquisition
and removal costs.
Avoid – Building in Acceptable
condition and due to acquisition
and removal costs.
Avoid – Mosque property.
Road design should take in to
account and avoid.
Avoid – New construction, cost
of acquisition is lower now prior
to completion. Candidate for
acquisition and removal.
Mansoura Road – Al Matar to Najma
2a1 2 3
2a
2
3
Constraints Plan
Avoid – New construction, cost
of acquisition is lower now prior
to completion. Candidate for
acquisition and removal.
3a
3a
Reference Photos
Najma
Souq Haraj
No serious constraints throughout
this zone. Both sides of road not
constrained by any one building.
1
Roadway Constraints Plan
* All remaining buildings are candidates for acquisition and removal
Existing Building Conditions Survey
Avoid – Building in Acceptable
condition and due to acquisition
and removal costs.
Avoid – Building in Acceptable
condition and due to acquisition
and removal costs.
Avoid – New construction, cost
of acquisition is lower now prior
to completion.
Mansoura Road – Najma to Munthaza
Avoid – Building in Acceptable
condition and due to acquisition
and removal costs.
Avoid – New construction, near
completion.
Avoid – Building in Acceptable
condition and due to acquisition
and removal costs.
Avoid – Building in Good
condition and due to acquisition
and removal costs.
Avoid – Building in Good
Condition and due to acquisition
and removal costs.
6a4 5 6
7 8 109
5
4
66a
7
8
9
10
Constraints Plan
Reference Photos
North side of Mansoura contains Good
Condition and New Construction
parcels. .Avoid if possible.
Roadway Constraints Plan
* All remaining buildings are candidates for acquisition and removal
Existing Building Conditions Survey
Avoid – Building in Acceptable
condition and due to acquisition
and removal costs.
Avoid – Mosque, it is a
candidate for removal due to
Poor and Acceptable condition
adjacent buildings.
Avoid – New construction, cost
of acquisition is lower now prior
to completion. Candidate for
acquisition and removal.
Avoid – Building in Good
condition and due to acquisition
and removal costs.
Avoid – New construction, near
completion. Acquisition and
removal costs exceed limits.
Avoid – New Construction and
due to acquisition and removal
costs.
1211 13
14 15
Mansoura Road – Najma to Munthaza
13
11a
11
14
15
11a
Constraints Plan
Reference Photos
12
Roadway Constraints Plan
General Notes:
1. The north side of Mansoura should be avoided to the number of
New Construction and Good Condition buildings through this
stretch;
2. Shopping Mall proposed on the south side of Mansoura at
Munthaza Road;
* All remaining buildings are candidates for acquisition and removal
Existing Building Conditions Survey
Avoid – Building in Acceptable
condition and due to acquisition
and removal costs.
Avoid – Building in Acceptable
condition and due to acquisition
and removal costs.
Avoid– Mosque property. Road
design should take in to
account.
New construction, cost of
acquisition is lower now prior to
construction completion. Candidate
for acquisition and removal.
Najma Road – North of Mansoura
4
18
19
20
18
19
20
Avoid – Building in Acceptable
condition and due to acquisition
and removal costs.
19a
19a
Constraints Plan Reference Photos
Mansoura
4
Roadway Constraints Plan
* All remaining buildings are candidates for acquisition and removal
General Notes:
1. The east side of Najma contains Poor Condition buildings and a
vacant parcel. Image 19a is the only building in Good Condition. Re-
alignment of Najma can bypass this building to gain the needed room
for improvements. Opportunities for greenspace will be available .
Existing Building Conditions Survey
Avoid – Building in Good
condition and due to acquisition
and removal costs.
Avoid – New Construction and
due to acquisition and removal
costs.
Avoid – Building in Acceptable
condition and due to acquisition
and removal costs.
Avoid– Good Condition,
Acquisition and removal costs.
21
22
24
Najma Road – South of Mansoura
21
22
24
Constraints PlanReference Photos Reference Photos
25
Avoid – Building in Acceptable
condition and due to acquisition
and removal costs.
25
5
5
Roadway Constraints Plan
* All remaining buildings are candidates for
acquisition and removal
General Notes:
1. The west side of Najma should
be avoided. The east side is a
prime candidate for acquisition
and removal. All buildings on the
east side are in Poor Condition.
Existing Building Conditions Survey
Avoid – Hotel in Acceptable
condition and due to acquisition
and removal costs.
Avoid – Building in Acceptable
condition and due to acquisition
and removal costs.
Avoid – Good condition,
acquisition and removal costs
Avoid– Building in Good
Condition and road improvements
will be constructed on the west
side of Munthaza
Munthaza Road – B-Ring to C-Ring Road
6a
27
27
6a
26
26
Constraints Plan
Reference Photos Reference Photos
Roadway Constraints Plan
* All remaining buildings are candidates for acquisition
and removal
General Notes:
1. The west side of Munthaza has been
acquired for necessary road
improvements. The east side of
Munthaza should not be affected.
28
28
Existing Building Conditions Survey
Avoid– Hotel in Acceptable
condition and due to acquisition
and removal costs.
Avoid – Building in Acceptable
condition and due to acquisition
and removal costs.
Avoid– Holiday Villa resort
complex with existing strip center
demolished along C-Ring Road.
Munthaza Road – B-Ring to C-Ring Road
31
30
29
30
31
29
Constraints Plan
Reference Photos Reference Photos
Roadway Constraints Plan
* All remaining buildings are candidates for acquisition
and removal
General Notes:
1. The west side of Munthaza has been
acquired for necessary road
improvements. The east side of
Munthaza should not be affected.
Munthaza Park
Future
Shopping
Mall
APPENDIX B: EXISTING LAND USE PLANS (BROADER VIEW)
APPENDIX C: EXISTING BUILDING HEIGHTS
Existing Building Survey Reveals Demolition and Redevelopment Opportunities
Existing Building Survey Reveals Demolition and Redevelopment Opportunities
Existing Building Survey Reveals Demolition and Redevelopment Opportunities
Existing Building Survey Reveals Demolition and Redevelopment Opportunities
Existing Building Survey Reveals Demolition and Redevelopment Opportunities
Existing Building Survey Reveals Demolition and Redevelopment Opportunities
Existing Building Survey Reveals Demolition and Redevelopment Opportunities

Weitere ähnliche Inhalte

Was ist angesagt?

Tall buildings case studies
Tall buildings   case studiesTall buildings   case studies
Tall buildings case studiesSoumitra Smart
 
Shopping mall case study
Shopping mall case studyShopping mall case study
Shopping mall case studyankita20111994
 
building services -Lift's and escalators
building services -Lift's and escalatorsbuilding services -Lift's and escalators
building services -Lift's and escalatorsKethees Waran
 
High-rise Presentation
High-rise PresentationHigh-rise Presentation
High-rise PresentationKaiserin Tania
 
architectural design
architectural design architectural design
architectural design ganesh keskar
 
Long span structures in Concrete and Steel
Long span structures in Concrete and SteelLong span structures in Concrete and Steel
Long span structures in Concrete and SteelRithika Ravishankar
 
Masters Thesis Report _ Skyscraper _ High rise Mixed use Development
Masters Thesis Report _ Skyscraper _ High rise Mixed use DevelopmentMasters Thesis Report _ Skyscraper _ High rise Mixed use Development
Masters Thesis Report _ Skyscraper _ High rise Mixed use DevelopmentAr. M. Senthil [ senthilmani ]
 
Provision for fire protection in high rise buildings
Provision for fire protection in high rise buildingsProvision for fire protection in high rise buildings
Provision for fire protection in high rise buildingsAarti Rani
 
What is the eden project
What is the eden project What is the eden project
What is the eden project Youngman Kim
 
Greg lynn contemporary process -II M.Arch
Greg lynn contemporary process -II  M.Arch Greg lynn contemporary process -II  M.Arch
Greg lynn contemporary process -II M.Arch Kethees Waran
 
Services in high rise
Services in high riseServices in high rise
Services in high riseAstha Agarwal
 
150316 case studies
150316 case studies150316 case studies
150316 case studiesTieng Wei
 
Presentation about commercial building
Presentation about commercial buildingPresentation about commercial building
Presentation about commercial buildingYuwita Killua
 
IIT Kanpur case study
IIT Kanpur case studyIIT Kanpur case study
IIT Kanpur case studyHimaniMishra7
 

Was ist angesagt? (20)

Tall buildings case studies
Tall buildings   case studiesTall buildings   case studies
Tall buildings case studies
 
Shopping mall case study
Shopping mall case studyShopping mall case study
Shopping mall case study
 
Udcpr Maharashtra
Udcpr  MaharashtraUdcpr  Maharashtra
Udcpr Maharashtra
 
building services -Lift's and escalators
building services -Lift's and escalatorsbuilding services -Lift's and escalators
building services -Lift's and escalators
 
High-rise Presentation
High-rise PresentationHigh-rise Presentation
High-rise Presentation
 
architectural design
architectural design architectural design
architectural design
 
Long span structures in Concrete and Steel
Long span structures in Concrete and SteelLong span structures in Concrete and Steel
Long span structures in Concrete and Steel
 
Shanghai tower
Shanghai towerShanghai tower
Shanghai tower
 
Masters Thesis Report _ Skyscraper _ High rise Mixed use Development
Masters Thesis Report _ Skyscraper _ High rise Mixed use DevelopmentMasters Thesis Report _ Skyscraper _ High rise Mixed use Development
Masters Thesis Report _ Skyscraper _ High rise Mixed use Development
 
Vernacular architecture
Vernacular architectureVernacular architecture
Vernacular architecture
 
Provision for fire protection in high rise buildings
Provision for fire protection in high rise buildingsProvision for fire protection in high rise buildings
Provision for fire protection in high rise buildings
 
Sears tower
Sears towerSears tower
Sears tower
 
What is the eden project
What is the eden project What is the eden project
What is the eden project
 
Greg lynn contemporary process -II M.Arch
Greg lynn contemporary process -II  M.Arch Greg lynn contemporary process -II  M.Arch
Greg lynn contemporary process -II M.Arch
 
Commerzbank headquarters
Commerzbank headquartersCommerzbank headquarters
Commerzbank headquarters
 
Services in high rise
Services in high riseServices in high rise
Services in high rise
 
Building bye laws
Building bye lawsBuilding bye laws
Building bye laws
 
150316 case studies
150316 case studies150316 case studies
150316 case studies
 
Presentation about commercial building
Presentation about commercial buildingPresentation about commercial building
Presentation about commercial building
 
IIT Kanpur case study
IIT Kanpur case studyIIT Kanpur case study
IIT Kanpur case study
 

Andere mochten auch

urbanland use and land values by manikanta swamy v s
urbanland use and land values by manikanta swamy v surbanland use and land values by manikanta swamy v s
urbanland use and land values by manikanta swamy v smeetmksvs
 
Geography M3 Relief and Land use
Geography M3 Relief and Land useGeography M3 Relief and Land use
Geography M3 Relief and Land useeLearningJa
 
Neighbourhood Design Report
Neighbourhood Design ReportNeighbourhood Design Report
Neighbourhood Design ReportAsadullah Malik
 
Classification of buildings
Classification of buildingsClassification of buildings
Classification of buildingsMounika swathi
 
Jaipur building bye laws
Jaipur building bye lawsJaipur building bye laws
Jaipur building bye lawsvikashsaini78
 
Land use planning
Land use planningLand use planning
Land use planningTin Lagman
 

Andere mochten auch (8)

Land Use
Land UseLand Use
Land Use
 
urbanland use and land values by manikanta swamy v s
urbanland use and land values by manikanta swamy v surbanland use and land values by manikanta swamy v s
urbanland use and land values by manikanta swamy v s
 
Geography M3 Relief and Land use
Geography M3 Relief and Land useGeography M3 Relief and Land use
Geography M3 Relief and Land use
 
Significance of Soil Survey and Land Use Planning for Sustainable Agriculture...
Significance of Soil Survey and Land Use Planning for Sustainable Agriculture...Significance of Soil Survey and Land Use Planning for Sustainable Agriculture...
Significance of Soil Survey and Land Use Planning for Sustainable Agriculture...
 
Neighbourhood Design Report
Neighbourhood Design ReportNeighbourhood Design Report
Neighbourhood Design Report
 
Classification of buildings
Classification of buildingsClassification of buildings
Classification of buildings
 
Jaipur building bye laws
Jaipur building bye lawsJaipur building bye laws
Jaipur building bye laws
 
Land use planning
Land use planningLand use planning
Land use planning
 

Ähnlich wie Existing Building Survey Reveals Demolition and Redevelopment Opportunities

Designing of an airport
Designing of an airportDesigning of an airport
Designing of an airportNilanjana Pal
 
Urban Design Guidelines for High-rise Buildings
Urban Design Guidelines  for High-rise BuildingsUrban Design Guidelines  for High-rise Buildings
Urban Design Guidelines for High-rise BuildingsBemnetLeykun
 
The Significance of a Site Survey in The Construction Industry
The Significance of a Site Survey in The Construction IndustryThe Significance of a Site Survey in The Construction Industry
The Significance of a Site Survey in The Construction IndustryAussie Hydro-Vac Services
 
Azem Al-Kurdi CV - 4.9.2016
Azem Al-Kurdi CV - 4.9.2016Azem Al-Kurdi CV - 4.9.2016
Azem Al-Kurdi CV - 4.9.2016Azem Al Kurdi
 
17 mse003 pv plant devlopement
17 mse003 pv plant devlopement17 mse003 pv plant devlopement
17 mse003 pv plant devlopementpaneliya sagar
 
CV-06-20-16 Maher Abu Mallouh
CV-06-20-16 Maher Abu MallouhCV-06-20-16 Maher Abu Mallouh
CV-06-20-16 Maher Abu MallouhMaher Abu-Mallouh
 
PLANNING AND COST ANALYSIS FOR SETTING UP OF A NEW RMCPLANT NEAR BELAGAVI
PLANNING AND COST ANALYSIS FOR SETTING UP OF A NEW RMCPLANT NEAR BELAGAVIPLANNING AND COST ANALYSIS FOR SETTING UP OF A NEW RMCPLANT NEAR BELAGAVI
PLANNING AND COST ANALYSIS FOR SETTING UP OF A NEW RMCPLANT NEAR BELAGAVIIRJET Journal
 
Planning and cost analysis of the commercial building
Planning and cost analysis of the commercial buildingPlanning and cost analysis of the commercial building
Planning and cost analysis of the commercial buildingila vamsi krishna
 
Site layout cpm module4
Site layout cpm module4Site layout cpm module4
Site layout cpm module4ahsanrabbani
 
9. introduction to site preparation
9. introduction to site preparation9. introduction to site preparation
9. introduction to site preparationNoshad Ahmed Wahocho
 
Lorain Road Business District Revitalization Plan Public Open House #2
Lorain Road Business District Revitalization Plan Public Open House #2Lorain Road Business District Revitalization Plan Public Open House #2
Lorain Road Business District Revitalization Plan Public Open House #2Cuyahoga County Planning Commission
 
MSG Resume_Kalabat, Iden_2015
MSG Resume_Kalabat, Iden_2015MSG Resume_Kalabat, Iden_2015
MSG Resume_Kalabat, Iden_2015Iden Kalabat
 
Urban Design SWOT Analysis, Doha, Qatar
Urban Design SWOT Analysis, Doha, QatarUrban Design SWOT Analysis, Doha, Qatar
Urban Design SWOT Analysis, Doha, QatarWalter Bone, RLA ASLA
 
Lead Process Engineer
Lead Process EngineerLead Process Engineer
Lead Process EngineerJuber Loharia
 

Ähnlich wie Existing Building Survey Reveals Demolition and Redevelopment Opportunities (20)

Section 2 Inventory and Assessment
Section 2  Inventory and AssessmentSection 2  Inventory and Assessment
Section 2 Inventory and Assessment
 
Designing of an airport
Designing of an airportDesigning of an airport
Designing of an airport
 
Urban Design Guidelines for High-rise Buildings
Urban Design Guidelines  for High-rise BuildingsUrban Design Guidelines  for High-rise Buildings
Urban Design Guidelines for High-rise Buildings
 
The Significance of a Site Survey in The Construction Industry
The Significance of a Site Survey in The Construction IndustryThe Significance of a Site Survey in The Construction Industry
The Significance of a Site Survey in The Construction Industry
 
Azem Al-Kurdi CV - 4.9.2016
Azem Al-Kurdi CV - 4.9.2016Azem Al-Kurdi CV - 4.9.2016
Azem Al-Kurdi CV - 4.9.2016
 
17 mse003 pv plant devlopement
17 mse003 pv plant devlopement17 mse003 pv plant devlopement
17 mse003 pv plant devlopement
 
CV-06-20-16 Maher Abu Mallouh
CV-06-20-16 Maher Abu MallouhCV-06-20-16 Maher Abu Mallouh
CV-06-20-16 Maher Abu Mallouh
 
MARTIN Daniel CV
MARTIN Daniel CVMARTIN Daniel CV
MARTIN Daniel CV
 
PLANNING AND COST ANALYSIS FOR SETTING UP OF A NEW RMCPLANT NEAR BELAGAVI
PLANNING AND COST ANALYSIS FOR SETTING UP OF A NEW RMCPLANT NEAR BELAGAVIPLANNING AND COST ANALYSIS FOR SETTING UP OF A NEW RMCPLANT NEAR BELAGAVI
PLANNING AND COST ANALYSIS FOR SETTING UP OF A NEW RMCPLANT NEAR BELAGAVI
 
Planning and cost analysis of the commercial building
Planning and cost analysis of the commercial buildingPlanning and cost analysis of the commercial building
Planning and cost analysis of the commercial building
 
Site layout cpm module4
Site layout cpm module4Site layout cpm module4
Site layout cpm module4
 
9. introduction to site preparation
9. introduction to site preparation9. introduction to site preparation
9. introduction to site preparation
 
Lorain Road Business District Revitalization Plan Public Open House #2
Lorain Road Business District Revitalization Plan Public Open House #2Lorain Road Business District Revitalization Plan Public Open House #2
Lorain Road Business District Revitalization Plan Public Open House #2
 
MSG Resume_Kalabat, Iden_2015
MSG Resume_Kalabat, Iden_2015MSG Resume_Kalabat, Iden_2015
MSG Resume_Kalabat, Iden_2015
 
Product-oriented construction management
Product-oriented construction managementProduct-oriented construction management
Product-oriented construction management
 
Urban Design SWOT Analysis, Doha, Qatar
Urban Design SWOT Analysis, Doha, QatarUrban Design SWOT Analysis, Doha, Qatar
Urban Design SWOT Analysis, Doha, Qatar
 
CV Template mohamed1
CV Template mohamed1CV Template mohamed1
CV Template mohamed1
 
Lead Process Engineer
Lead Process EngineerLead Process Engineer
Lead Process Engineer
 
Staff Report on Modifications to Planned Development Ordinance.
Staff Report on Modifications to Planned Development Ordinance. Staff Report on Modifications to Planned Development Ordinance.
Staff Report on Modifications to Planned Development Ordinance.
 
Naveed Asif C.V Updated
Naveed Asif C.V UpdatedNaveed Asif C.V Updated
Naveed Asif C.V Updated
 

Mehr von Walter Bone, RLA ASLA

Landscape Middle East Magazine - February 2018
Landscape Middle East Magazine - February 2018Landscape Middle East Magazine - February 2018
Landscape Middle East Magazine - February 2018Walter Bone, RLA ASLA
 
Sands Cotai Central NW Corner Wow Feature
Sands Cotai Central NW Corner Wow FeatureSands Cotai Central NW Corner Wow Feature
Sands Cotai Central NW Corner Wow FeatureWalter Bone, RLA ASLA
 
Al Habtoor City Hotels Complex, Business Bay, Dubai
Al Habtoor City Hotels Complex, Business Bay, DubaiAl Habtoor City Hotels Complex, Business Bay, Dubai
Al Habtoor City Hotels Complex, Business Bay, DubaiWalter Bone, RLA ASLA
 
DPR Landscape Maintenance Guidelines
DPR Landscape Maintenance GuidelinesDPR Landscape Maintenance Guidelines
DPR Landscape Maintenance GuidelinesWalter Bone, RLA ASLA
 
Global 100 Theme Park Schematic for Holland
Global 100 Theme Park Schematic for HollandGlobal 100 Theme Park Schematic for Holland
Global 100 Theme Park Schematic for HollandWalter Bone, RLA ASLA
 
2017 Future Landscape & Public Realm Presentation - Abu Dhabi
2017 Future Landscape & Public Realm Presentation - Abu Dhabi2017 Future Landscape & Public Realm Presentation - Abu Dhabi
2017 Future Landscape & Public Realm Presentation - Abu DhabiWalter Bone, RLA ASLA
 
Trump International Golf Clubhouse @Akoya Oxygen in Dubai
Trump International Golf Clubhouse @Akoya Oxygen in DubaiTrump International Golf Clubhouse @Akoya Oxygen in Dubai
Trump International Golf Clubhouse @Akoya Oxygen in DubaiWalter Bone, RLA ASLA
 
Najmat Development - Reem Island, Abu Dhabi
Najmat Development - Reem Island, Abu DhabiNajmat Development - Reem Island, Abu Dhabi
Najmat Development - Reem Island, Abu DhabiWalter Bone, RLA ASLA
 
Landscape Middle East Magazine Nov 2016
Landscape Middle East Magazine Nov 2016Landscape Middle East Magazine Nov 2016
Landscape Middle East Magazine Nov 2016Walter Bone, RLA ASLA
 
2016 Future Landscape & Public Realm Presentation, Doha, Qatar
2016 Future Landscape & Public Realm Presentation, Doha, Qatar2016 Future Landscape & Public Realm Presentation, Doha, Qatar
2016 Future Landscape & Public Realm Presentation, Doha, QatarWalter Bone, RLA ASLA
 

Mehr von Walter Bone, RLA ASLA (20)

Walter bone 2021-jan
Walter bone 2021-janWalter bone 2021-jan
Walter bone 2021-jan
 
Doha, Qatar Pre-Concept Streetscape
Doha, Qatar Pre-Concept StreetscapeDoha, Qatar Pre-Concept Streetscape
Doha, Qatar Pre-Concept Streetscape
 
Laguna Water Park @ La Mer, Dubai
Laguna Water Park @ La Mer, DubaiLaguna Water Park @ La Mer, Dubai
Laguna Water Park @ La Mer, Dubai
 
Portfolio 2018
Portfolio 2018Portfolio 2018
Portfolio 2018
 
Landscape Middle East Magazine - February 2018
Landscape Middle East Magazine - February 2018Landscape Middle East Magazine - February 2018
Landscape Middle East Magazine - February 2018
 
Hand Sketches
Hand SketchesHand Sketches
Hand Sketches
 
Spring Valley Community Park
Spring Valley Community ParkSpring Valley Community Park
Spring Valley Community Park
 
Sands Cotai Central NW Corner Wow Feature
Sands Cotai Central NW Corner Wow FeatureSands Cotai Central NW Corner Wow Feature
Sands Cotai Central NW Corner Wow Feature
 
Al Habtoor City Hotels Complex, Business Bay, Dubai
Al Habtoor City Hotels Complex, Business Bay, DubaiAl Habtoor City Hotels Complex, Business Bay, Dubai
Al Habtoor City Hotels Complex, Business Bay, Dubai
 
Theme Park & Attraction Experience
Theme Park & Attraction ExperienceTheme Park & Attraction Experience
Theme Park & Attraction Experience
 
DPR Landscape Maintenance Guidelines
DPR Landscape Maintenance GuidelinesDPR Landscape Maintenance Guidelines
DPR Landscape Maintenance Guidelines
 
The World of Hunger Games - Dubai
The World of Hunger Games - DubaiThe World of Hunger Games - Dubai
The World of Hunger Games - Dubai
 
Global 100 Theme Park Schematic for Holland
Global 100 Theme Park Schematic for HollandGlobal 100 Theme Park Schematic for Holland
Global 100 Theme Park Schematic for Holland
 
2017 Future Landscape & Public Realm Presentation - Abu Dhabi
2017 Future Landscape & Public Realm Presentation - Abu Dhabi2017 Future Landscape & Public Realm Presentation - Abu Dhabi
2017 Future Landscape & Public Realm Presentation - Abu Dhabi
 
Trump International Golf Clubhouse @Akoya Oxygen in Dubai
Trump International Golf Clubhouse @Akoya Oxygen in DubaiTrump International Golf Clubhouse @Akoya Oxygen in Dubai
Trump International Golf Clubhouse @Akoya Oxygen in Dubai
 
Najmat Development - Reem Island, Abu Dhabi
Najmat Development - Reem Island, Abu DhabiNajmat Development - Reem Island, Abu Dhabi
Najmat Development - Reem Island, Abu Dhabi
 
Legoland Water Park - Dubai
Legoland Water Park - DubaiLegoland Water Park - Dubai
Legoland Water Park - Dubai
 
Landscape Middle East Magazine Nov 2016
Landscape Middle East Magazine Nov 2016Landscape Middle East Magazine Nov 2016
Landscape Middle East Magazine Nov 2016
 
2016 Future Landscape & Public Realm Presentation, Doha, Qatar
2016 Future Landscape & Public Realm Presentation, Doha, Qatar2016 Future Landscape & Public Realm Presentation, Doha, Qatar
2016 Future Landscape & Public Realm Presentation, Doha, Qatar
 
Dong Hai Gardens Construction
Dong Hai Gardens ConstructionDong Hai Gardens Construction
Dong Hai Gardens Construction
 

Kürzlich hochgeladen

Design principles on typography in design
Design principles on typography in designDesign principles on typography in design
Design principles on typography in designnooreen17
 
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`dajasot375
 
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10uasjlagroup
 
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Service
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts ServiceCall Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Service
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Servicejennyeacort
 
ARt app | UX Case Study
ARt app | UX Case StudyARt app | UX Case Study
ARt app | UX Case StudySophia Viganò
 
Call Girls Meghani Nagar 7397865700 Independent Call Girls
Call Girls Meghani Nagar 7397865700  Independent Call GirlsCall Girls Meghani Nagar 7397865700  Independent Call Girls
Call Girls Meghani Nagar 7397865700 Independent Call Girlsssuser7cb4ff
 
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degreeyuu sss
 
Mookuthi is an artisanal nose ornament brand based in Madras.
Mookuthi is an artisanal nose ornament brand based in Madras.Mookuthi is an artisanal nose ornament brand based in Madras.
Mookuthi is an artisanal nose ornament brand based in Madras.Mookuthi
 
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一F dds
 
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证nhjeo1gg
 
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档208367051
 
How to Empower the future of UX Design with Gen AI
How to Empower the future of UX Design with Gen AIHow to Empower the future of UX Design with Gen AI
How to Empower the future of UX Design with Gen AIyuj
 
Pharmaceutical Packaging for the elderly.pdf
Pharmaceutical Packaging for the elderly.pdfPharmaceutical Packaging for the elderly.pdf
Pharmaceutical Packaging for the elderly.pdfAayushChavan5
 
Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Rndexperts
 
Call Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full NightCall Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full Nightssuser7cb4ff
 
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝soniya singh
 
Cosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable BricksCosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable Bricksabhishekparmar618
 
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services DubaiDubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubaikojalkojal131
 
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degreeyuu sss
 
Architecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdfArchitecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdfSumit Lathwal
 

Kürzlich hochgeladen (20)

Design principles on typography in design
Design principles on typography in designDesign principles on typography in design
Design principles on typography in design
 
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
 
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
 
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Service
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts ServiceCall Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Service
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Service
 
ARt app | UX Case Study
ARt app | UX Case StudyARt app | UX Case Study
ARt app | UX Case Study
 
Call Girls Meghani Nagar 7397865700 Independent Call Girls
Call Girls Meghani Nagar 7397865700  Independent Call GirlsCall Girls Meghani Nagar 7397865700  Independent Call Girls
Call Girls Meghani Nagar 7397865700 Independent Call Girls
 
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
 
Mookuthi is an artisanal nose ornament brand based in Madras.
Mookuthi is an artisanal nose ornament brand based in Madras.Mookuthi is an artisanal nose ornament brand based in Madras.
Mookuthi is an artisanal nose ornament brand based in Madras.
 
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
 
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
 
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
 
How to Empower the future of UX Design with Gen AI
How to Empower the future of UX Design with Gen AIHow to Empower the future of UX Design with Gen AI
How to Empower the future of UX Design with Gen AI
 
Pharmaceutical Packaging for the elderly.pdf
Pharmaceutical Packaging for the elderly.pdfPharmaceutical Packaging for the elderly.pdf
Pharmaceutical Packaging for the elderly.pdf
 
Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025
 
Call Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full NightCall Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full Night
 
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
 
Cosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable BricksCosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable Bricks
 
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services DubaiDubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
 
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
 
Architecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdfArchitecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdf
 

Existing Building Survey Reveals Demolition and Redevelopment Opportunities

  • 1.
  • 2. 21 Apr 2014 2 Re-Issued for Review & Approval WB WB DK 20 Mar 2014 1 Issued for Review & Approval WB WB DK Document No. CTC-546-EBAS-0043 SHT: 01 OF: 82 PHASE 4- CONCEPT DESIGN OF ROADS & INFRASTRUCTURE – PACKAGES 26 & 27 EXISTING BUILDING CONDITIONS SURVEY PHASE 4 CONCEPT DESIGN OF ROADS & INFRASTRUCTURE – PACKAGES 26 & 27 EXISTING BUILDING CONDITIONS SURVEY REVISION 1 APRIL, 2014
  • 3. TABLE OF CONTENTS INTRODUCTION PART 1 EXISTING BUILDING CONDITIONS SURVEY-PACKAGE 27 (HIGH LEVEL DESIGN AREAS) PART 2 ANALYSIS OF SURVEY OVERALL BUILDING CONDITIONS PLAN PART 3 FINDINGS AND RECOMMENDATIONS BUILDING CONSTRAINTS PLANS STRATEGIC LAND ACQUISITION APPROACH APPENDIX A: ROADWAY CONSTRAINTS PLANS (TRAFFIC DRIVEN) APPENDIX B: EXISTING LAND USES (BROADER VIEW) APPENDIX C: EXISTING BUILDING HEIGHTS The contents of this document do not necessarily reflect views or policies of the Ministry of Municipality & Urban Planning (MMUP)
  • 5. Planning Area The High Design Level planning area lies within Package 27 are located in the urban area in Doha South, west of Doha International Airport. The High Level Design areas, indicated in red below, indicate the limit of work for the Existing Building Conditions Survey, while the remaining areas have been photographically recorded and documented. Doha International Airport Existing Building Conditions Survey Part 1 – Building Conditions Survey – Package 27 (High Level Design Areas) Introduction The purpose of this Existing Building Assessment Survey is to evaluate the state of buildings and architectural features within the High Level Design areas of Package 27. This report will be used to gauge land acquisition needs for roadway improvements and will also be used as a tool to augment the roadway design constraints plans. The process in which this survey was prepared consisted of a visual field survey identifying buildings, building condition and occupation. The findings were then translated in to a graphic format where a building assessment color coding system was used to graphically depict actual building conditions. During the months of investigation and survey, numerous buildings had undergone remodeling, demolition with new construction taking place. The survey team, then went back out to update the findings and modified the building assessment graphics. The graphic survey within this report illustrates current land uses and zoning, building conditions and a photographic inventory of the conditions. The building rating methodology is a generalized approach taking in to account several factors including curb appeal, occupancy, land use and future potential. This survey was conducted based on exterior visual assessments and does not include the assessments of: Roofing HVAC Systems Structural Conditions Electrical Fire Protection Accessibility. Figure: Design Intensity Level Classifications
  • 6. Overall Project Process The Urban Design/Landscape tasks for the project consist of three (3) major milestones and deliverables stages (see Figure below). Following Project Commencement, a Study Area Audit was performed with a detailed study and analysis of the immediate project area including an expanded area. The expanded area study consisted of studying how the adjacent areas could possibly impact the project study area and how interlinking land uses, vehicular and pedestrian circulation systems and greenspace improvements. Various tasks were performed in the Study Area Audit where a photographic inventory consisting of photos and videos of all roadway corridors were performed. The inventory also captured neighboring areas and how the relationships of land uses impact the project study area. For example, some conflicts in land use were found where contractors, light industrial or heavy commercial uses where located adjacent to multi-family housing in the more heavily urbanized areas, primarily along Mansoura and Najma Roads. See maps for identified areas affected. Project Commencement Kick-Off Meetings Study Area Audit Building Assessment Photo Inventory Adjacent Neighborhoods SWOT Analysis Land Use Survey Concept Design Concept Options Workshops Bi-weekly Meetings Coordination with Municipality Preliminary Cost Estimates Design Development High Design Level Areas Design Guidelines Qualities of Excellence Technical Brief Implementation Plan Cost Estimates Figure: Project Process Diagram Photo: Contractors mixed with neighborhood retailers/services and residential units Existing Building Conditions Survey CURRENT STAGE
  • 8. EXISTING LAND USE PLAN EXISTING BUILDING CONDITIONS PLAN Mosque Existing Building Conditions Survey Very poor condition buildings. Candidates for complete removal Vacant Parcel, candidate for Anchor Retail Development adjacent to Hyper Market Poor Condition buildings, demolishing recommended
  • 9. Poor ConditionAcceptable Condition Poor ConditionAcceptable ConditionPoor Condition Poor ConditionVacant Parcel Poor Condition Acceptable Condition Good Condition - Mosque General Notes: 1. East Mansoura Road consists of older commercial uses and buildings. Buildings have not been maintained very well and lacks a gateway treatment entering this mixed-use area off Al Matar Road. 2. Lack of parking along Mansoura affords an opportunity to demolish buildings along Mansoura and 1 street behind to provide off-street parking opportunities for local residents and commercial tenants. 3. Image 1 shows a vacant parcel which is proposed to be included in a District Center which will serve as a destination place and sits adjacent to an existing hypermarket. 4. Lack of visual character and appeal. Poor Condition Acceptable Condition Poor Condition Existing Building Conditions Survey
  • 10. EXISTING LAND USE PLAN EXISTING BUILDING CONDITIONS PLAN MANSOURA Souq Hajjaj (Under Redevelopment) Existing Building Conditions Survey Poor Condition structures throughout, opportunities to provide off-street parking and grand entry statement for proposed development. Pedestrian connectivity vital in the re- development of the Souq property. Poor Condition buildings, demolishing recommended Poor Condition buildings, demolishing recommended Poor Condition buildings, demolishing recommended Land use conflicts between commercial and multi-family residential-Contractors. Transport trucks, materials storage and vehicle fleets interact with residential component
  • 11. Acceptable ConditionPoor Condition Poor ConditionPoor ConditionNew Construction Poor ConditionAcceptable Condition Acceptable Condition Poor Condition Acceptable Condition General Notes: 1. Numerous poor condition buildings and lack of organized on-street parking; 2. Residential above commercial units; 3. Most parcels along this stretch are in Poor condition and are ideal to be demolished providing the necessary room for roadway widening and pedestrian scale improvements; 4. Mid-block crossings should be taken in to consideration to minimize traffic disturbances and safety incidents. Poor Condition Poor Condition Acceptable Condition Poor Condition Existing Building Conditions Survey
  • 12. EXISTING LAND USE PLAN EXISTING BUILDING CONDITIONS PLAN MANSOURA Mosque Existing Building Conditions Survey 28, 29, 30-Poor Condition buildings, acquiring and demolishing recommended Poor Condition buildings, demolishing recommended Poor Condition buildings, demolishing recommended 32-New Construction, acquire property now to avoid escalated costs prior to completion Mosque in good condition, candidate for removal due to proximity to road Land use conflicts between commercial and multi-family residential-Contractors from the Souq Souq Hajjaj (Under Redevelopment) Multi-Family Residential, acceptable condition, avoid if possible Poor Condition buildings, demolishing recommended
  • 13. Acceptable ConditionAcceptable ConditionNew Construction Good Condition - MosquePoor Condition Poor Condition Acceptable Condition Poor Condition Acceptable Condition Existing Building Conditions Survey General Notes: 1. Central Mansoura Road consists of older commercial uses and buildings. Buildings have not been maintained very well and lacks adequate and quality public space at the intersection of Mansoura and Najma; 2. This area is a pinching point with some buildings built on top of the right-of-way; 3. Recommended to acquire and demolish retail strip center across from the Mosque to provide road widening so to avoid the Mosque (images 28-30); 4. Image 32 New Construction (early photo 2012), acquire property now to avoid escalated costs prior to completion; 5. Poor condition buildings adjacent to Mosque to the west. Demolish and provide adequate room for road widening; 6. Multi-family adjacent to Souq Hajjaj in acceptable condition, avoid if possible to maintain residential character, Image 36; 7. Re-align Najma, demolish commercial and multi-family poor condition structures. Visual blight and traffic movements greatly increase visual character.
  • 14. EXISTING LAND USE PLAN EXISTING BUILDING CONDITIONS PLAN Girls School, poor condition (Future Rail Station) NAJMA Mosque Existing Building Conditions Survey Poor Condition buildings, demolishing recommended Mosque in good condition, candidate for removal due to proximity to road Multi-family buildings, mid-rise, good condition and provide newer residential component to a blight stricken area Poor Condition buildings, demolishing recommended Poor Condition buildings, demolishing recommended Poor Condition buildings, demolishing recommended Poor Condition buildings, demolishing recommended NAJMA
  • 15. Acceptable ConditionPoor Condition Poor ConditionPoor ConditionPoor Condition Poor ConditionPoor Condition Poor Condition Poor Condition Poor Condition New Construction Existing Building Conditions Survey General Notes: 1. Numerous poor condition buildings and lack of organized on-street parking, Images 37-40; 2. Residential above commercial units, Images 38, 40 and 45; 3. Image 47 shows new construction which started in the summer of 2013 and is in alignment with a preferred option of the Najma Road re- alignment. Acquisition of this parcel is recommended. 4. Poor condition buildings adjacent to Mosque to the west. Demolish and provide adequate room for road widening; 5. Image 47 New Construction, acquire property now to avoid escalated costs prior to completion;
  • 16. EXISTING LAND USE PLAN EXISTING BUILDING CONDITIONS PLAN Existing Building Conditions Survey Poor Condition buildings, demolishing recommended Poor Condition buildings, demolishing recommended. Rail Station improvements necessary to enhance urban character Poor Condition buildings, demolishing recommended Poor Condition buildings, demolishing recommended Acceptable condition- Candidates for removal for road widening Acceptable condition- Candidates for removal for road widening Acceptable condition- Candidates for removal for road widening Acceptable condition- Candidates for removal for road widening Acceptable condition- Candidates for removal for road widening Poor Condition buildings, demolishing recommended
  • 17. New ConstructionPoor Condition Acceptable ConditionNew ConstructionPoor Condition Poor ConditionPoor Condition Acceptable Condition Poor Condition Acceptable Condition General Notes: 1. Numerous poor condition buildings and lack of organized on-street parking; 2. Residential above commercial units; 3. Two (2) new buildings under construction, Images 54 and 57; 4. Opportunities to demolish buildings and integrate off-street parking, Image 51. 5. Several properties have been upgraded with new construction improving the visual aesthetics. Poor Condition Poor Condition Existing Building Conditions Survey
  • 18. EXISTING LAND USE PLAN EXISTING BUILDING CONDITIONS PLAN Existing Building Conditions Survey Poor Condition buildings, demolishing recommended Poor Condition buildings, demolishing recommended 70-Poor Condition buildings, demolishing recommended
  • 19. Poor ConditionPoor Condition New ConstructionPoor ConditionAcceptable Condition Poor ConditionAcceptable Condition Acceptable Condition Acceptable Condition Good Condition General Notes: 1. Numerous poor condition buildings and lack of organized on-street parking; 2. Two properties have been upgraded to Good Condition and New Construction improving the visual aesthetics, Images 62, 65, 68 and 72. Poor Condition Good Condition Existing Building Conditions Survey
  • 20. EXISTING LAND USE PLAN EXISTING BUILDING CONDITIONS PLAN Existing Building Conditions Survey Poor Condition buildings, demolishing recommended Poor Condition building, demolishing recommended Good condition-good basis for urban family revitalization Poor Condition buildings, demolishing recommended Under Redevelopment (Shopping Mall) Vacant Parcel
  • 21. Good ConditionGood ConditionGood ConditionAcceptable Condition Good ConditionPoor Condition Poor Condition Acceptable Condition Good Condition General Notes: 1. Lack of on-street parking; 2. Numerous newer multi- family buildings at west end near Munthaza; 3. Several properties have been upgraded to Good Condition and new construction improving the visual aesthetics. Images 75, 76, 78-82. Good Condition New Construction – Al Hassan Apartments Poor Condition Poor Condition Acceptable Condition Existing Building Conditions Survey
  • 24. EXISTING LAND USE PLAN EXISTING BUILDING CONDITIONS PLAN MANSOURA Mosque Existing Building Conditions Survey Poor Condition buildings, demolishing recommended Poor Condition buildings, demolishing recommended Good condition multi-family residential, Avoid if possible. Vacant Parcel Poor Condition buildings, demolishing recommended Mosque in good condition, candidate for removal due to proximity to road Poor Condition buildings, demolishing recommended Land use conflicts between commercial and multi-family residential-Contractors Poor Condition buildings, demolishing recommended
  • 25. Good Condition (new)Good Condition Poor ConditionPoor ConditionPoor Condition Poor ConditionPoor Condition Good Condition Poor Condition Vacant Parcel Acceptable Condition Poor ConditionPoor Condition Poor Condition Poor Condition Existing Building Conditions Survey General Notes: 1. Najma Road north of Mansoura is a tightly restricted road with an abundance of on-street parking. Consideration should be given to new construction requirements for off-street parking when owners obtain building permits; 2. Numerous Poor condition buildings exist where acquisition should occur providing the necessary re-alignment of Najma Road at Mansoura, Images 5-8.
  • 26. EXISTING LAND USE PLAN EXISTING BUILDING CONDITIONS PLAN MANSOURA Mosque Existing Building Conditions Survey Poor Condition buildings, demolishing recommended Poor Condition buildings, demolishing recommended Poor Condition buildings, demolishing recommended Good condition and New Construction- Avoid if possible Mosque in good condition, candidate for removal due to proximity to road Poor Condition buildings, demolishing recommended
  • 27. New ConstructionGood Condition Good ConditionGood ConditionPoor Condition Poor ConditionPoor Condition Poor Condition Poor Condition Poor Condition Poor ConditionGood Condition Acceptable ConditionAcceptable Condition Acceptable Condition Existing Building Conditions Survey General Notes: 1. A Mosque exists at the southwest corner of Mansoura and Najma. It is preferred not to disturb the Mosque with opportunities to demolish the east side due to Poor condition structures., Images 16- 21; 2. Demolishing of the east side will provide adequate room for road widening.
  • 30. EXISTING LAND USE PLAN EXISTING BUILDING CONDITIONS PLAN MANSOURA School under re- development as Special Use District Existing Building Conditions Survey Poor Condition buildings, demolishing recommended Acquired Acquired
  • 31. AcquiredAcquired AcquiredVacant ParcelGood Condition Good ConditionPoor Condition Good Condition Good Condition Acceptable Condition Acquired AcquiredAcquired Acquired Existing Building Conditions Survey General Notes: 1. North Munthaza commencing at B-Ring Road is designated to be a Gateway to north Doha. Munthaza currently has and is projected to have high traffic counts and the acquisition of buildings on the west side of Munthaza has already taken place, Images 8-14.
  • 32. EXISTING LAND USE PLAN EXISTING BUILDING CONDITIONS PLAN Existing Building Conditions Survey Acquired Acquired Vacant Parcel Acquired Under Redevelopment Future Shopping Mall
  • 33. Poor Condition Acceptable ConditionVacant Parcel Acceptable Condition Acquired Acceptable Condition AcquiredAcquired Acquired Acquired Acquired Poor Condition Existing Building Conditions Survey General Notes: 1. This stretch of Munthaza Road consists of older commercial uses and buildings. Buildings have not been maintained very well and lacks cohesion in architectural types and styles; 2. The west side of Munthaza has been acquired, Images 19-25.
  • 34. EXISTING LAND USE PLAN EXISTING BUILDING CONDITIONS PLAN Munthaza Park Holiday Villa Resort Existing Building Conditions Survey Acquired Acquired Acquired Strip center demolished, under re-development No interior access to parcel. Condition assumed Acceptable Vacant Parcel
  • 35. AcquiredNew Construction and removal of strip center Acceptable Condition Good Condition Acceptable Condition Existing Building Conditions Survey Acquired Acquired Acquired General Notes: 1. The approach to Munthaza Park on the southwest corner of Munthaza and C-Ring Road. Several government offices are located along Munthaza Road which serve the local residents; 2. Land acquisition of portions of the park have occurred to accommodate road widening improvements. Poor Condition Acceptable Condition
  • 36. Part 2 – Analysis of Survey The principles of the survey conducted is subjective in nature and relative to surrounding land uses, building heights in comparison to adjacent properties, incompatibility, heritage or cultural landmarks, materials and scale, future rights-of-way and encroachments, curbing and pedestrian sidewalk access to each property. The largest category of properties falls within the Acceptable building condition. These properties contain acceptable structural conditions of buildings and land use compatibility, but are available for land acquisition during the roadway improvement design stage. The acquisition of these parcels may assist in relevant geometric improvement solutions for surrounding links, interchanges and intersections and provide a continuance of proposed urban design solutions. Overall Summary: 1. Identified buildings that cannot be acquired due to cultural or economic restrictions; 2. Identified buildings where their conditions are substandard and acquisition is most likely; 3. Identified buildings where land use/occupation compatibilities conflict with surrounding uses, not applicable to the Land Use Plan, land use compatibilities refers to occupied uses and not current zoning. 4. Identified buildings and/or parcels where acquisition assists in reaching project goals of an improved vehicular and pedestrian circulation network to meet future demands where Poor and Acceptable Conditions are identified. 5. The conclusion is graphically shown on the following page, figure Overall Building Conditions Analysis – Package 27. The field investigations yielded specific recommendations for building protection and are categorized as constraints. Further analysis included a value engineering approach where strategic planning included the land acquisition and removal of various stretches roads confined to one side were considered. Acquisition of both road sides is not feasible where time and cost of design and implementation would exceed the current planning and build out schedules. Land Acquisition and Roadway Improvement Strategic Approach was developed indicating sides of roads where land acquisition should be concentrated. Specific recommendations and strategic approach to land acquisition and roadway improvements based on the site survey are followed in Part 3 Findings and Recommendations of this report. Existing Building Conditions Survey
  • 37. Overall Building Conditions Analysis – Package 27 Existing Building Conditions Survey
  • 38. Part 3 – Findings and Recommendations The findings encountered during this survey concluded that there are numerous opportunities for parcel acquisition and the demolishing of older, poor condition buildings. Considerable Roadway and Streetscape improvements are needed to not only enhance these vehicular and pedestrian corridors, but also provide the minimum required space needed to make the much needed roadway improvements. The comprehensive result, based on the field survey and subsequent findings and recommendations, specific recommendations are listed. The specific recommendations reference individual buildings by site photo reference number and street name. Building Constraints plans were developed and included that identify buildings that are Restricted and cannot be acquired or encroached upon and other buildings that may be identified as Good or Acceptable Condition buildings, are candidates for acquisition and removal. These buildings should be avoided if possible in determining final roadway alignment options. A Strategic Approach for Land Acquisition was established to minimize the impact of road corridors to one side versus both sides. This approach will efficiently lead the design process in road improvements and urban design solutions. Appendix A: Roadway Constraints Plans (Traffic driven) show specific conditions where various constraints may limit land acquisition and structures that should be avoided due to building significance/importance, utility restrictions and/or fixed rail station locations. Specific notes and photos are included identifying the key restraints in developing the roadway and urban design options and should be used as an analysis tool for option development. Study Area Audit & Analysis: Building Conditions and Roadway Constraints Findings and Recommendations Options Development Existing Building Conditions Survey
  • 39. Existing Building Conditions Survey Specific Recommendations The Analysis resulted in specific identification of buildings of varying conditions. Specifically, buildings that may cause a constraint, were buildings of a Good Condition assessment and certain Acceptable Condition assessments that the project may want to avoid due to land use, architectural character and/or that potential roadway design would not impact directly. The primary recommendations for buildings to Avoid are listed below by Street Name and Photo reference number. These buildings include: Mansoura 18 – Under construction and existing room available for roadway widening, should not be affected; 31 – Existing Mosque in Good Condition. The demolishing of adjacent properties should provide ample room for road widening and the re-alignment of Najma; 32 – Under construction, commercial building that may be acquired. The re- alignment of Najma outweighs avoiding this property. The property should be acquired now, prior to construction completion, to avoid escalated acquisition costs; 35-36 – Multi-family residential building that preserves the character of the residential area. Road widening should not affect this side of Mansoura; 54 & 57 – Under construction. Image 57 should be avoided due to adjacent/nearby buildings being in Acceptable Condition. Image 54 can be acquired with adjacent Poor condition buildings; 68 – Under Construction and sits on a prime corner. Acquisition costs would be high; 72 – Good Condition building, recently built. Sits on corner and architectural character suitable for area; 75-76 – Good condition buildings that support the revitalization of the north side of Mansoura on the west end; 78-82 – Row of buildings in Good condition and New Construction occurring and should be avoided due to condition and precedent set for revitalization near Munthaza Road. Najma 3 & 9 – The only two (2) Good Condition buildings on the north side of Mansoura that should be avoided due to condition and multi-story status. Image 3 is a candidate for acquisition due to all adjacent buildings being in Poor condition. Most buildings along this stretch are in Poor Condition; 23-25 – The buildings consist of the Mosque, an New Construction and Good Condition. These buildings set the parameters of the roadway design where they should be avoided. Demolishing the buildings across Najma are acceptable due to the Poor Condition as shown in Images 16-21. Munthaza The entire west side of Munthaza between B-Ring and C-Ring Roads has been acquired. All Vacant Parcels and structures are to be removed for road improvements; 1 – School in Poor Condition and should be demolished. A Special Use District is planned for this Parcel to include Rail Station elements. Improvements should transition in to any proposed plans for the new District; 3-6 – Buildings are in Good Condition south of the school. Avoid if possible due to the road widening occurring on the west side; 17 – Acceptable buildings should be avoided. Road widening to occur on west side; 25 – Large parcel of s-f residential is being acquired for future retail mall development; 30-31 – Existing Holiday Villa resort. Avoid this property which is currently a good anchor at Munthaza and C-Ring Roads. High acquisition and demolishing costs make it prohibitive.
  • 40. Existing Building Conditions Survey Land Acquisition and Roadway Improvements Strategic Approach Following the site survey and analysis of the existing building conditions, a strategic approach was formulated to best identify the methods of land acquisition and demolition of structures within the corridors. Varying factors played roles in the determination of which buildings would be acquired. Where multiple buildings were grouped together creating longer stretches or blocks that could be acquired, these were ideal candidates for acquisition on one side of the road and minimizing impacts to the opposite side. The results clearly were identified where roadway and utility improvements should occur and assisted in the focus of design options that should be generated. Specific recommendation for road side impacts include: Mansoura – The entire south side can be impacted due to aged and poor condition buildings. The north side of Mansoura has newer buildings and future plans for residential and retail development. A rail station is planned for the old girls adjacent to Najma Road. Najma - Starting at B-Ring Road, Najma has newer mid-rise multi-family buildings on the east side going southward. The east side should remain unimpacted. The west side consisting of a large ASHGAL facility is a prime candidate for acquisition and removal to accommodate road improvements. Continuing driving southward. The side of the road to be impacted switches sides. This is ideal in a larger context where Najma needs to be re-aligned at Mansoura to greatly improve traffic flow. Continuing southward on Najma through the Mansoura intersection, the east side of Najma from Mansoura to the first round-a-bout consists of poor condition buildings is the choice for the side to impact. The west side of Najma consist of a newer Mosque at the corner of Mansoura and good condition buildings with one new building under construction. Mansoura Road – South (right) side buildings in poor condition, candidate for acquisition and removal. Mansoura Road – South (right) side buildings in poor condition, candidate for acquisition and removal. Najma Road – East (right) side buildings in poor condition, candidate for acquisition and removal. Najma Road – East (right) side buildings in poor condition, candidate for acquisition and removal. Newer good conditions buildings to the west (left). Najma Road – East (right) side buildings in poor condition, candidate for acquisition and removal. Newer good condition buildings to the right in distance. Najma Road – West (left) side ASHGAL buildings in poor condition, candidate for acquisition and removal. Newer good conditions buildings to the east (right).
  • 41. Existing Building Conditions Survey Munthaza (B-Ring south to C-Ring) – The entire west side can be impacted due to properties having already been acquired. Minimal impacts to the east side are anticipated. Munthaza Park is currently under going re-master planning efforts and park improvements will be taken in to consideration during road design options. A planned shopping mall on the east side, south of Mansoura is planned and careful consideration of road improvements will need to take in to account planned ingress and egress points, pedestrian circulation and signalization with staggered side street junctions. Munthaza Road – West (right) side buildings in poor condition and vacant parcels, candidates for acquisition and removal. Munthaza Road – West (right) side buildings in poor condition and vacant parcels, candidates for acquisition and removal. Munthaza Road – West (side buildings in poor condition and vacant parcels, candidates for acquisition and removal. Munthaza Road – West (side buildings in poor condition and vacant parcels, candidates for acquisition and removal. Munthaza Road – West consists of Munthaza Park which is under re-master planning by the Parks Department. Munthaza Road – East side buildings consist of newer higher end buildings. Shown is the Holiday Villa Resort at the corner of Munthaza and C-Ring Roads.
  • 44. Existing Building Conditions Survey Souq Haraj
  • 45. Existing Building Conditions Survey Mosque Girls School
  • 48. Existing Building Conditions Survey Future Shopping Mall Munthaza Park
  • 49. Existing Building Conditions Survey ASHGAL Facility
  • 50. Existing Building Conditions Survey ASHGAL Facility
  • 51. Existing Building Conditions Survey Mosque Girls School
  • 56. Existing Building Conditions Survey Future Shopping Mall Munthaza Park
  • 57. Existing Building Conditions Survey Munthaza Park
  • 58. Existing Building Conditions Survey Munthaza Park Holiday Villa Resort
  • 59. APPENDIX A: ROADWAY CONSTRAINTS PLANS (TRAFFIC DRIVEN)
  • 60. Existing Building Conditions Survey Avoid – Mosque in Good condition and due to acquisition and removal costs. Avoid – Building in Acceptable condition and due to acquisition and removal costs. Avoid – Mosque property. Road design should take in to account and avoid. Avoid – New construction, cost of acquisition is lower now prior to completion. Candidate for acquisition and removal. Mansoura Road – Al Matar to Najma 2a1 2 3 2a 2 3 Constraints Plan Avoid – New construction, cost of acquisition is lower now prior to completion. Candidate for acquisition and removal. 3a 3a Reference Photos Najma Souq Haraj No serious constraints throughout this zone. Both sides of road not constrained by any one building. 1 Roadway Constraints Plan * All remaining buildings are candidates for acquisition and removal
  • 61. Existing Building Conditions Survey Avoid – Building in Acceptable condition and due to acquisition and removal costs. Avoid – Building in Acceptable condition and due to acquisition and removal costs. Avoid – New construction, cost of acquisition is lower now prior to completion. Mansoura Road – Najma to Munthaza Avoid – Building in Acceptable condition and due to acquisition and removal costs. Avoid – New construction, near completion. Avoid – Building in Acceptable condition and due to acquisition and removal costs. Avoid – Building in Good condition and due to acquisition and removal costs. Avoid – Building in Good Condition and due to acquisition and removal costs. 6a4 5 6 7 8 109 5 4 66a 7 8 9 10 Constraints Plan Reference Photos North side of Mansoura contains Good Condition and New Construction parcels. .Avoid if possible. Roadway Constraints Plan * All remaining buildings are candidates for acquisition and removal
  • 62. Existing Building Conditions Survey Avoid – Building in Acceptable condition and due to acquisition and removal costs. Avoid – Mosque, it is a candidate for removal due to Poor and Acceptable condition adjacent buildings. Avoid – New construction, cost of acquisition is lower now prior to completion. Candidate for acquisition and removal. Avoid – Building in Good condition and due to acquisition and removal costs. Avoid – New construction, near completion. Acquisition and removal costs exceed limits. Avoid – New Construction and due to acquisition and removal costs. 1211 13 14 15 Mansoura Road – Najma to Munthaza 13 11a 11 14 15 11a Constraints Plan Reference Photos 12 Roadway Constraints Plan General Notes: 1. The north side of Mansoura should be avoided to the number of New Construction and Good Condition buildings through this stretch; 2. Shopping Mall proposed on the south side of Mansoura at Munthaza Road; * All remaining buildings are candidates for acquisition and removal
  • 63. Existing Building Conditions Survey Avoid – Building in Acceptable condition and due to acquisition and removal costs. Avoid – Building in Acceptable condition and due to acquisition and removal costs. Avoid– Mosque property. Road design should take in to account. New construction, cost of acquisition is lower now prior to construction completion. Candidate for acquisition and removal. Najma Road – North of Mansoura 4 18 19 20 18 19 20 Avoid – Building in Acceptable condition and due to acquisition and removal costs. 19a 19a Constraints Plan Reference Photos Mansoura 4 Roadway Constraints Plan * All remaining buildings are candidates for acquisition and removal General Notes: 1. The east side of Najma contains Poor Condition buildings and a vacant parcel. Image 19a is the only building in Good Condition. Re- alignment of Najma can bypass this building to gain the needed room for improvements. Opportunities for greenspace will be available .
  • 64. Existing Building Conditions Survey Avoid – Building in Good condition and due to acquisition and removal costs. Avoid – New Construction and due to acquisition and removal costs. Avoid – Building in Acceptable condition and due to acquisition and removal costs. Avoid– Good Condition, Acquisition and removal costs. 21 22 24 Najma Road – South of Mansoura 21 22 24 Constraints PlanReference Photos Reference Photos 25 Avoid – Building in Acceptable condition and due to acquisition and removal costs. 25 5 5 Roadway Constraints Plan * All remaining buildings are candidates for acquisition and removal General Notes: 1. The west side of Najma should be avoided. The east side is a prime candidate for acquisition and removal. All buildings on the east side are in Poor Condition.
  • 65. Existing Building Conditions Survey Avoid – Hotel in Acceptable condition and due to acquisition and removal costs. Avoid – Building in Acceptable condition and due to acquisition and removal costs. Avoid – Good condition, acquisition and removal costs Avoid– Building in Good Condition and road improvements will be constructed on the west side of Munthaza Munthaza Road – B-Ring to C-Ring Road 6a 27 27 6a 26 26 Constraints Plan Reference Photos Reference Photos Roadway Constraints Plan * All remaining buildings are candidates for acquisition and removal General Notes: 1. The west side of Munthaza has been acquired for necessary road improvements. The east side of Munthaza should not be affected. 28 28
  • 66. Existing Building Conditions Survey Avoid– Hotel in Acceptable condition and due to acquisition and removal costs. Avoid – Building in Acceptable condition and due to acquisition and removal costs. Avoid– Holiday Villa resort complex with existing strip center demolished along C-Ring Road. Munthaza Road – B-Ring to C-Ring Road 31 30 29 30 31 29 Constraints Plan Reference Photos Reference Photos Roadway Constraints Plan * All remaining buildings are candidates for acquisition and removal General Notes: 1. The west side of Munthaza has been acquired for necessary road improvements. The east side of Munthaza should not be affected. Munthaza Park Future Shopping Mall
  • 67. APPENDIX B: EXISTING LAND USE PLANS (BROADER VIEW)
  • 68.
  • 69.
  • 70.
  • 71.
  • 72.
  • 73.
  • 74.
  • 75. APPENDIX C: EXISTING BUILDING HEIGHTS