MUNICIPAL WASTEWATER PUMP STATION
DESIGN PROBLEMS AND SOLUTIONS
Presented at:
WEFTEC 2006
Dallas, TX
October 24, 2006
New England Water Environment Association Meeting
Westford, MA
September 12, 2006
Virginia Water Environment Association Annual Meeting
Roanoke, VA
May 2, 2006
MUNICIPAL WASTEWATER PUMP STATION
DESIGN PROBLEMS AND SOLUTIONS
INTRODUCTION
In the Northern Virginia suburbs of Washington DC rapid residential growth has
resulted in the need for construction of numerous municipal wastewater pumping
stations. Municipal pump stations in Northern Virginia typically are submersible
type pump stations with a design capacity between from 100 gpm to 1 MGD. The
design requirements for submersible type pump stations continue to evolve to
address construction and operation problems. This paper identifies several of
these problems and the solutions that have been implemented in the design of
several recently constructed wastewater pump stations in Northern Virginia. The
author has prepared this paper based on his 32 years of experience in wastewater
pump station design in the Northern Virginia Area.
METHODOLOGY
Each of the identified pump station design problems is listed below by number
with the corresponding design solution indicated under the problem.
PROBLEMS AND SOLUTIONS
1. Concrete Corrosion Protection
Problem: Until recently, most pump stations in Northern Virginia were
constructed of concrete. Typically the wet well interior and exterior concrete
surfaces received two coats of a coal tar epoxy coating to protect the concrete
from the corrosion due to hydrogen sulfide in the influent sewage. Experience
has indicated that concrete corrosion will result if either the coal tar epoxy is not
properly applied, or is not reapplied when it deteriorates over time. It is very
difficult to reapply coal tar epoxy, because usually the pump station wet well can
not be taken out of service.
Solution: New pump stations include a high density polyethylene (HDPE) liner on
the interior of the concrete surfaces exposed to wastewater for corrosion protection.
This liner is provided as an option by the precast concrete suppliers and the
concrete is formed around the outside of the liner. Following installation of the
lined precast concrete structure a certified welder field welds the seams and welds
around pipe penetrations to assure that the HDPE liner prevents sewer gas from
attacking the concrete. Another alternative is to utilize precast polymer concrete
structures. Polymer concrete utilizes epoxy to bind the aggregate instead of cement.
Thus the polymer concrete is not susceptible to corrosion due to sewer gas.

Contact:
Jeff Chapin, P.E.
8401 Arlington Boulevard
Fairfax, VA 22031
Phone: (703) 849-0555
Fax: (703) 849-0623
2. Corrosion Resistant Materials:
Problem: Previous pump station designs included the use of galvanized steel and
coated metal components in areas susceptible to hydrogen sulfide in influent
sewage. After several years the metal components corroded and had to be
replaced. These items included piping, pump guide rails, supports, grating, hand
rails, stairs, bar screens, bolts, weirs, ladders, slide gates and other items.
Solution: Type 316 stainless steel is specified for guide rails, brackets, bolts,
nuts, structural steel, supports, and stairs. Fiberglass grating and ladders are
specified. Aluminum hatch covers and slide gates are still specified because they
are light way and durable, but they are susceptible to corrosion over time. The
exterior of ductile iron piping is epoxy coated. Corrosion resistant materials
should also be specified for electrical components.
3. Pump Protection from Influent Sewage Debris
Problem: Most of the older pump stations had the influent sewer entering
directly into the wet well and relied on the ability of the submersible pumps to
pump a 3 inch diameter solid. Some pump stations had a basket screen attached
to the influent sewer inside the wet well to try to protect the pumps from damage.
However, the screens have to be manually lifted out of the wet well and cleaned
by hand often to be effective.
Solution: In order to assure that the pumps are adequately protected, new
submersible pump stations in Northern Virginia often include a comminutor vault
preceding the wet well. Raw wastewater entering the pump station flows through
the comminutor vault influent channel which is equipped with a grinder. The
grinder is a hydraulically driven horizontal screen and cutter assembly. The
rotating screen directs solids toward and into the cutters where the influent solids
are ground into fine particles to protect the downstream pumps. The grinder 5hp
hydraulic power pack is located in a fiberglass enclosure mounted on top of the
comminutor vault. In the event the grinder must be taken out of service, slide
gates are provided to direct comminutor vault influent flow to a bypass bar
screen. Also, in the event flow backs up upstream of the grinder the influent
channel wall has an overflow notch just upstream of the bar screen. The bar
screen is constructed of stainless steel bars and must be manually cleaned with a
rake. The comminutor vault is a 12 ft. diameter precast concrete manhole with
an HDPE liner. Stainless steel alternating tread stairs are used for access to the
bottom of the vault. All lighting and electrical equipment is explosion proof
inside the vault. A ventilation fan is provided on top of the comminutor vault.
4. Pump Selection Based on Total Dynamic Head Calculations
Pumps are selected based on total dynamic head (TDH) calculations which can
lead to improper sizing unless the Engineer carefully considers the exact pipe
inside diameter, the Williams Hazen flow coefficient (C), and the location of
high points in the force main. Each of these factors is discussed as follows:
Inside Pipe Diameter: Typically in Northern Virginia force main piping is either
double cement lined ductile iron pipe or PWC pipe per AWWA C-900. The
inside pipe diameter may vary considerably depending on the type of pipe
selected. For long force mains extending two or more miles in length this can
result in a significant difference in friction head component of the TDH.
Solution: Determine the type of force main to be constructed and the exact inside
pipe diameter in preparing TDH calculations. If the force main could be either
ductile iron pipe, PVC or some other material, the TDH calculations should be
prepared for each possible pipe material to make sure that the selected pump is
adequate for all pipe materials.
Williams Hazen flow coefficient (C): For new ductile iron pipe a C factor of 140
is often used in TDH calculations to estimate friction head in the force main
when it is first placed in service. A C factor of 120 is often used to estimate the
friction head in the force main after several years of operation. Pump selection
based on a C factor of 140 alone will result in a pump that may be undersized
when the force main pipe C factor decreases due to increased roughness of pipe
internal surfaces over time. If the pump selection is based on a C factor of 120,
the pump may pump too high a flow rate at startup because the new smooth pipe
C factor is actually 140. This can result in overloading the pump motor. Also, it
is important to note that field measurements of the actual C factors for old force
mains which have been in continuous service for over 25 years has indicated that
the C factor has decreased to approximately 100.
Solution: For new pump stations, prepare TDH calculations based on the initial
new pipe C factor and the anticipated C factor after the force main has been in
service for several years. When expanding the capacity of existing pump stations
which have been in service for many years, the actual C factor of the force main
should be determined by field measurements.
Problem involves a Force Main High Point near the pump station: Typically the
TDH calculations are based on the entire length of force main pipe from the
pump station to the discharge point. However, when pumping from one valley
over a hill to a gravity sewer on the other side of the hill it is important to
consider whether or not there is free fall in the down hill segment of the force
main such that the downhill length of pipe does not need to be considered in the
TDH calculations. If the static head from the high point to the discharge point
exceeds the full flow headloss in the downhill segment of force main, sewage
should flow by gravity through the force main similar to a gravity sewer instead
of as a full pipe under pressure. Failure to recognize this condition in long force
mains with a high point near the pump station can result in the selection of much
higher capacity pumping equipment than actually required, and in significantly
higher pumping rates than anticipated.
5. Energy Efficient Operation
Problem: Common pump station design practice over the past 50 years has been
to provide two pumps sized for the peak design flow rate, one of which is a
standby pump. For pump stations with long force mains, the friction loss when
operating at the design peak flow rate is excessive, resulting in high energy costs.
Energy efficiency is becoming a very important consideration in pump station
design. The Town of Purcellville East End Pump Station in Loudoun County, VA
was equipped with two 75 hp submersible pumps which cycled on and off at the
peak design flow rate of 600 gpm at 127 feet TDH. Sewage is pumped through
an 8-inch force main, 4,572 feet long with friction headloss of 39 feet and
excessive energy costs from frequent pump cycling on and off due to sewer
infiltration/inflow.
Solution: A small 10 hp submersible jockey pump was installed in the wet well
to operate almost continuously through the day at a flow rate of approximately
100 gpm. This lower flow rate significantly reduced the friction loss and energy
requirements while providing reliable service. The friction headloss was reduced
from 39 feet to 2 feet. The larger pumps only operate a few times a day during
peak flow periods in the morning and evening which is sufficient to flush out
solids in the force main. Power costs were significantly reduced based on three
years of operation.
6. Pump Station Appearance
Problem: For many years pump stations were designed to be functional with
little attention given to the exterior appearance and the impact on the surrounding
community. Many of the new pump stations in Northern Virginia are located
next to new homes costing over $700,000 or next to attractive commercial
development. Standard utility buildings with barbed wire exterior fencing are
often unacceptable to the developers in Northern Virginia.
Solution: The pump station control building exteriors include stone faced block
walls or other features to match the surrounding development architecture. Ten
foot high black galvanized steel picket fence is used with an extended top slanted
for security.
7. Surge Protection
Problem: When the pumps cycle off or there is a power failure, high surge
pressures can damage piping.
Solution: Soft start/stop electrical control equipment significantly reduces surge
pressures. As backup protection a surge relief valve is often installed at each
pump station in the event of a power failure or a failure of the soft start/stop
equipment.
8. Rehabilitation of Existing Pump Stations
Problem: Fairfax County has a program to rehabilitate four to eight pump
stations every few years under one construction contract as necessary. After
approximately 20 years of service they have found that parts are no longer
available for electrical controls, and pumps and valves need to be replaced. Also,
the building structures, roads and electrical service are often in need of
replacement. The pump station must be maintained in continuous service through
construction and thus constructability issues must be identified in the design
process.
Solution: Based on over 15 recent pump station rehabilitation projects, a typical
scope of work can be identified for construction rehabilitation. Each pump station
needs to be examined separately to determine what rehabilitation measures are
needed. Pumps and valves and other mechanical equipment items are replaced.
Typically, dry pit submersible pumps are used to replaced shaft pumps. New
electrical controls are installed. Corrosion resistant materials are installed to
replace corroded materials or epoxy coatings are applied to existing surfaces.
Structural and architectural improvements are identified. The construction
phasing and temporary pumping requirements are identified in the contract
documents for construction. An existing 20 MGD wet well/dry well pump station
with vertical shaft pumps was expanded to 40 MGD capacity with dry pit
submersible pumps while maintaining continuous operation. This was achieved
by first installing two of the submersible pumps in the wet well and providing a
temporary force main. Once this temporary pumping system was operations, all
of the equipment in the dry well was replaced with new equipment. Once two of
the four dry pit submersibles were installed in the dry well, the two pumps in the
wet well were removed and also installed in the dry well to complete the project.
9. Prevention of Leakage into the Pump Station Structures
Problem: Cracks or joints in precast concrete manhole structures used to
construct new pump stations can result in groundwater leakage into the pump
station which must be pumped to the treatment facility resulting in unnecessary
costs and reduced capacity. It is often difficult to permanently seal such cracks or
joints after construction is completed and the pump station is in service creating a
confined space. This is especially true for deep pump stations.
Solution: All weather butyl joint sealant materials are available for effective
sealing precast concrete joints exposed to high groundwater pressures. Butyl
sealants are rubber based and exhibit physical properties such as rebound,
compression, low temperature and high temperature flows that are all required
for long term sealing performance. This joint material was effectively used at the
50 foot deep Morris Farm Pump Station in Prince William County to prevent
leakage. Other methods of sealing the joints and concrete surfaces are also
available including bentonite.
10. Odor Control
Problem: Sewage piping designed for future ultimate design flows is often way
oversized for initial flows resulting in long pipe retention times and septic odors.
Solution: Chemical feed addition at pump stations can help minimize odor
problems throughout the downstream sewer system. BioxideÂź chemical solution
has been utilized at several new pump stations to minimize odors. The BioxideÂź
material utilizes the inherent ability of the facultative bacteria normally present in
wastewater to metabolize hydrogen sulfide and other odor-causing, reduced sulfur
containing compounds. The material provides nitrate-oxygen to the wastewater to
support this biochemical mechanism. This nitrate-oxygen is applied via nitrate
salts. The material shall be chemically stable, allowing continuous removal of
sulfide contributed by side streams downstream of the application point. The pump
station design includes a pad mounted Bioxide chemical storage tank and
automatic chemical feed equipment.
11. Provisions for Future Expansion
Problem: The rapid growth experienced in Northern Virginia over the past few
years can result in pump stations being undersized to convey projected flow
rates. If provisions for future expansion are not included in the design, the entire
pump station or major components of the pump station may have to be replaced.
Solution: Provisions for future expansion include the selection of pumps with
higher than required motor horsepower to allow the future installation of larger
diameter impellers capable of pumping increased flows. The Morris Farm Pump
Station in Prince William County was almost over capacity at start up because of
the addition of unanticipated sewage flows from a new elementary school which
was supposed to be served by an adjacent gravity sewer system. Fortunately, by
adding a larger impeller the additional flow could be accommodated without any
other changes. Other considerations include sizing the force main, generator set,
wet well, electrical service and other components to allow some increase in
capacity without causing problems during initial operation.
12. Grit Deposition in Wet Wells Sized for Future Flow Rates
Problem: The design criteria for submersible pump wet well sizing can lead to
excessive grit deposition in the wet well due to initial low flow conditions. The
grit can result in serious odor problems and is difficult to remove.
Solution: Provide temporary solid concrete block filler in the wet well areas
subject to grit deposition or provide baffle walls to reduce the wet well area
during initial low flow conditions. In the future when the flows approach the
design flow rate, the blocks or baffle walls can be removed.
CONCLUSION
The planning and design of new municipal wastewater pump stations or
rehabilitation/expansion of existing pump stations requires careful consideration
of potential problems and possible solutions presented above.
Municipal Sewage Pump Station
Design Problems and Solutions
presented by:

Jeff Chapin, PE
October 24, 2006
Session 28
Morris Farm
Western Prince William County, Virginia
Prince William County Service Authority
Morris Farm Pump Station

928 GPM Capacity
Prince William County Service Authority
Morris Farm Pump Station
Corrosion

Sewer Gas Corrodes Concrete and Metal Components
Prince William County Service Authority
Morris Farm Pump Station

Grinder Vault with HPDE Liner & Stainless Steel Stairs
Prince William County Service Authority
Morris Farm Pump Station

Grinder
Prince William County Service Authority
Morris Farm Pump Station

Grinder Hydraulic Power Drive
Prince William County Service Authority
Morris Farm Pump Station

Bypass Bar Screen
Prince William County Service Authority
Morris Farm Pump Station

Wet Well
Prince William County Service Authority
Morris Farm Pump Station

Valve Vault
Prince William County Service Authority
Morris Farm Pump Station

Control Building & Standby Generator
Prince William County Service Authority
Morris Farm Pump Station

Control Building Panels
Odor Control

Prince William County Service Authority
Morris Farm Pump Station

Bioxide Tank
Construction Problems
Commuter
Vault

Wet
Well

Valve
Vault

Meter
Vault

Potential for
Differential
Settlement
Potential for
Water Leakage

Typical Submersible Pump Station
Section View
Prince William County, Virginia
Watertight Structures

250 gpm Camp Glenkirk Pump Station
Rock Excavation

Prince William County Service Authority
Broad Run Pump Station

Rock Saw
Potential Problems & Solutions

Lift Chain Enters Volute

Short Chain Length

Power Cable Excessive Flexing

Short Cable Length

Cavitation With 2 Pumps Running

Check 2 Pump Curve

At Low Speed Pump Head Does
Not Overcome System Head

Check Pump Curve At Low Speed

Air Entrainment From Concentric
Reducer On Pump Suction Piping

Use Eccentric Reducer
Energy Efficiency Improvement at
Purcellville East End Pump Station
‱ Original Pump System
‱
‱
‱
‱
‱
‱

Two 75 hp Submersible Pumps
600 GPM Pumping Rate
Significant Infiltration & Inflow
4,572 Feet of 8-inch Force Main
Friction Headloss = 39 feet
Excessive Surge With Frequent Pump Starts
Installation of Small Pump
Energy Efficiency Improvement at
Purcellville East End Pump Station
‱ Improvements:
‱
‱
‱
‱

Added a new 10 hp submersible pump
Rated 120 gpm at 90 feet TDH
Friction Headloss = 2 feet
Cost of Pump and Controls Installed = $6,500

‱ Benefits:
‱ Less Surge from Frequent Stop Starts
‱ Operation at Lower Head Reduces Energy Consumption
‱ Eliminates current surges when 75 hp pump starts
Design Calculation Pitfalls

Force Main Profile
Grease Problems

2.9 MGD Pump Station Wet Well
Pipe Clogging

Sonar Image 30” Pipe
Appearance

Town of Leesburg Goose Creek Pump Station
20 MGD to 40 MGD Expansion

Existing 20 MGD Pump Station Dry Well
Installation of Larger Pumps

Expansion to 40 MGD Pump Station Dry Well
Grit in Wet Well

100 MGD Pump Station
Conclusion
Corrosion Resistant Materials
Watertight Structures
Minimize Settlement
Check Design Calculations
Consider Grease & Grit
Energy Efficiency
Constructability

Weitere Àhnliche Inhalte

Was ist angesagt?

05 water supply system
05 water supply system05 water supply system
05 water supply systemAkepati S. Reddy
 
F2 Drainage of golf course features
F2 Drainage of golf course featuresF2 Drainage of golf course features
F2 Drainage of golf course featurestoverwater
 
Pipe water distribution system2
Pipe water distribution system2Pipe water distribution system2
Pipe water distribution system2AKHIL KM
 
Interceptors and manholes
Interceptors and manholesInterceptors and manholes
Interceptors and manholesJem Ganacia
 
Drainage system Ar 308 unit-3
Drainage system Ar 308 unit-3Drainage system Ar 308 unit-3
Drainage system Ar 308 unit-3Sudesh Chauhan
 
Water supply systems in Architecture By Minal Palve
Water supply systems in Architecture By Minal PalveWater supply systems in Architecture By Minal Palve
Water supply systems in Architecture By Minal PalveMinal Palve
 
Laying and Testing of sewer
Laying and Testing of sewerLaying and Testing of sewer
Laying and Testing of sewersathyan s
 
Hydraulic design of sewer
Hydraulic design of sewerHydraulic design of sewer
Hydraulic design of sewerBibhabasu Mohanty
 
Water distribution system
Water distribution systemWater distribution system
Water distribution systemBibhabasu Mohanty
 
Water Supply System for Town and Building
Water Supply System for Town and Building Water Supply System for Town and Building
Water Supply System for Town and Building Aroh Thombre
 
Design and Construction of Sewers And Sewer Appurtenances
Design and Construction of Sewers And Sewer AppurtenancesDesign and Construction of Sewers And Sewer Appurtenances
Design and Construction of Sewers And Sewer AppurtenancesTulsiram Bhattarai
 
Basics of golf course irrigation system
Basics of golf course irrigation systemBasics of golf course irrigation system
Basics of golf course irrigation systemNormas Yakin
 
Planning and design of building services in multi Story
Planning and design of building services in multi Story Planning and design of building services in multi Story
Planning and design of building services in multi Story Vj NiroSh
 

Was ist angesagt? (20)

05 water supply system
05 water supply system05 water supply system
05 water supply system
 
Mine dewatering technology data sheet
Mine dewatering technology data sheetMine dewatering technology data sheet
Mine dewatering technology data sheet
 
Drainage
DrainageDrainage
Drainage
 
Sewer Appurtanances
Sewer AppurtanancesSewer Appurtanances
Sewer Appurtanances
 
Drainage
DrainageDrainage
Drainage
 
L 37
L 37L 37
L 37
 
F2 Drainage of golf course features
F2 Drainage of golf course featuresF2 Drainage of golf course features
F2 Drainage of golf course features
 
Sewer appurtenances
Sewer appurtenancesSewer appurtenances
Sewer appurtenances
 
Pipe water distribution system2
Pipe water distribution system2Pipe water distribution system2
Pipe water distribution system2
 
Interceptors and manholes
Interceptors and manholesInterceptors and manholes
Interceptors and manholes
 
Drainage system Ar 308 unit-3
Drainage system Ar 308 unit-3Drainage system Ar 308 unit-3
Drainage system Ar 308 unit-3
 
Water supply systems in Architecture By Minal Palve
Water supply systems in Architecture By Minal PalveWater supply systems in Architecture By Minal Palve
Water supply systems in Architecture By Minal Palve
 
Laying and Testing of sewer
Laying and Testing of sewerLaying and Testing of sewer
Laying and Testing of sewer
 
Hydraulic design of sewer
Hydraulic design of sewerHydraulic design of sewer
Hydraulic design of sewer
 
Water distribution system
Water distribution systemWater distribution system
Water distribution system
 
Water Supply System for Town and Building
Water Supply System for Town and Building Water Supply System for Town and Building
Water Supply System for Town and Building
 
Design and Construction of Sewers And Sewer Appurtenances
Design and Construction of Sewers And Sewer AppurtenancesDesign and Construction of Sewers And Sewer Appurtenances
Design and Construction of Sewers And Sewer Appurtenances
 
Basics of golf course irrigation system
Basics of golf course irrigation systemBasics of golf course irrigation system
Basics of golf course irrigation system
 
Planning and design of building services in multi Story
Planning and design of building services in multi Story Planning and design of building services in multi Story
Planning and design of building services in multi Story
 
Sewer Appurtances
Sewer AppurtancesSewer Appurtances
Sewer Appurtances
 

Andere mochten auch

Belle View Pump Station Rehabilitation
Belle View Pump Station RehabilitationBelle View Pump Station Rehabilitation
Belle View Pump Station RehabilitationFairfax County
 
In Rural Water Alliance Pump Stations
In Rural Water Alliance Pump StationsIn Rural Water Alliance Pump Stations
In Rural Water Alliance Pump Stationsebiskis
 
Fluid Mechanics Centrifugal Pump Performance Experiment
Fluid Mechanics Centrifugal Pump Performance ExperimentFluid Mechanics Centrifugal Pump Performance Experiment
Fluid Mechanics Centrifugal Pump Performance ExperimentThomas Gross
 
Pumps and types of pumps in detail
Pumps and types of pumps in detailPumps and types of pumps in detail
Pumps and types of pumps in detailFARRUKH SHEHZAD
 
Basics of pump
Basics of pump Basics of pump
Basics of pump Hammad Akber
 
Pumps and pumping systems
Pumps and pumping systemsPumps and pumping systems
Pumps and pumping systemsPrem Baboo
 
pumps and its types-ppt
pumps and its types-pptpumps and its types-ppt
pumps and its types-pptDharmas India
 
Hydronic Basics / Primary-Secondary Pumping
Hydronic Basics / Primary-Secondary PumpingHydronic Basics / Primary-Secondary Pumping
Hydronic Basics / Primary-Secondary PumpingIllinois ASHRAE
 
Centrifugal Pump Testing Standards - Presentation by ITT
Centrifugal Pump Testing Standards - Presentation by ITTCentrifugal Pump Testing Standards - Presentation by ITT
Centrifugal Pump Testing Standards - Presentation by ITTSahyog Shishodia
 
Hvac chilled water distribution schemes
Hvac chilled water distribution schemesHvac chilled water distribution schemes
Hvac chilled water distribution schemesMazhar Sheikh
 

Andere mochten auch (12)

Belle View Pump Station Rehabilitation
Belle View Pump Station RehabilitationBelle View Pump Station Rehabilitation
Belle View Pump Station Rehabilitation
 
In Rural Water Alliance Pump Stations
In Rural Water Alliance Pump StationsIn Rural Water Alliance Pump Stations
In Rural Water Alliance Pump Stations
 
Pump system
Pump systemPump system
Pump system
 
Fluid Mechanics Centrifugal Pump Performance Experiment
Fluid Mechanics Centrifugal Pump Performance ExperimentFluid Mechanics Centrifugal Pump Performance Experiment
Fluid Mechanics Centrifugal Pump Performance Experiment
 
Pumps and types of pumps in detail
Pumps and types of pumps in detailPumps and types of pumps in detail
Pumps and types of pumps in detail
 
Basics of pump
Basics of pump Basics of pump
Basics of pump
 
Pumps and pumping systems
Pumps and pumping systemsPumps and pumping systems
Pumps and pumping systems
 
PUMPS
 PUMPS PUMPS
PUMPS
 
pumps and its types-ppt
pumps and its types-pptpumps and its types-ppt
pumps and its types-ppt
 
Hydronic Basics / Primary-Secondary Pumping
Hydronic Basics / Primary-Secondary PumpingHydronic Basics / Primary-Secondary Pumping
Hydronic Basics / Primary-Secondary Pumping
 
Centrifugal Pump Testing Standards - Presentation by ITT
Centrifugal Pump Testing Standards - Presentation by ITTCentrifugal Pump Testing Standards - Presentation by ITT
Centrifugal Pump Testing Standards - Presentation by ITT
 
Hvac chilled water distribution schemes
Hvac chilled water distribution schemesHvac chilled water distribution schemes
Hvac chilled water distribution schemes
 

Ähnlich wie Wastewater pump station_design_problems_and_solutions

PLANNING & DESIGN OF LIFT IRRIGATION.pptx
PLANNING & DESIGN OF LIFT IRRIGATION.pptxPLANNING & DESIGN OF LIFT IRRIGATION.pptx
PLANNING & DESIGN OF LIFT IRRIGATION.pptxExeEnggManchannalaDi
 
237978847 pipin-study-7
237978847 pipin-study-7237978847 pipin-study-7
237978847 pipin-study-7homeworkping3
 
Penstocks, powerhouse and tailrace
Penstocks, powerhouse and tailracePenstocks, powerhouse and tailrace
Penstocks, powerhouse and tailraceRakesh Sunari Magar
 
Pump principles
Pump principlesPump principles
Pump principlesYuri Melliza
 
Stripping of liners from pipes using hdd technology (2007)
Stripping of liners from pipes using hdd technology (2007)Stripping of liners from pipes using hdd technology (2007)
Stripping of liners from pipes using hdd technology (2007)Western Pipeway
 
WET Feature 4 - Building bigger and better - Jan_16
WET Feature 4 - Building bigger and better - Jan_16WET Feature 4 - Building bigger and better - Jan_16
WET Feature 4 - Building bigger and better - Jan_16Tim Bail
 
TRIC Trenchless LA building & safety
TRIC Trenchless LA building & safetyTRIC Trenchless LA building & safety
TRIC Trenchless LA building & safetyMEL3360
 
Presentation: AC Mitigation Case Histories
Presentation: AC Mitigation Case HistoriesPresentation: AC Mitigation Case Histories
Presentation: AC Mitigation Case HistoriesMarcellus Drilling News
 
Malay nces ppt
Malay nces pptMalay nces ppt
Malay nces ppt9888437802
 
2004 0930 Ca
2004 0930 Ca2004 0930 Ca
2004 0930 CaTRIC Tools
 
Unit I Water Distribution System.pdf
Unit I Water Distribution System.pdfUnit I Water Distribution System.pdf
Unit I Water Distribution System.pdfEcologixConsultancy
 
Hydro electric power plant lecture
Hydro electric power plant lectureHydro electric power plant lecture
Hydro electric power plant lecturec3b2a1
 
Hydraulic Ram Pump Mini-Project Report - Agriculture and Rural Development, A...
Hydraulic Ram Pump Mini-Project Report - Agriculture and Rural Development, A...Hydraulic Ram Pump Mini-Project Report - Agriculture and Rural Development, A...
Hydraulic Ram Pump Mini-Project Report - Agriculture and Rural Development, A...Fatin62c
 
Small Hydro Training Module
Small Hydro Training ModuleSmall Hydro Training Module
Small Hydro Training ModuleCookLegacy
 
pumps and pump chart basics, applications ,types etc.
pumps and pump chart basics, applications ,types  etc.pumps and pump chart basics, applications ,types  etc.
pumps and pump chart basics, applications ,types etc.shreyaskinhikar
 
production casing design considerations
production casing design considerationsproduction casing design considerations
production casing design considerationskillergog
 

Ähnlich wie Wastewater pump station_design_problems_and_solutions (20)

PLANNING & DESIGN OF LIFT IRRIGATION.pptx
PLANNING & DESIGN OF LIFT IRRIGATION.pptxPLANNING & DESIGN OF LIFT IRRIGATION.pptx
PLANNING & DESIGN OF LIFT IRRIGATION.pptx
 
237978847 pipin-study-7
237978847 pipin-study-7237978847 pipin-study-7
237978847 pipin-study-7
 
Liquid Piping Systems
Liquid Piping SystemsLiquid Piping Systems
Liquid Piping Systems
 
Penstocks, powerhouse and tailrace
Penstocks, powerhouse and tailracePenstocks, powerhouse and tailrace
Penstocks, powerhouse and tailrace
 
Pump principles
Pump principlesPump principles
Pump principles
 
Stripping of liners from pipes using hdd technology (2007)
Stripping of liners from pipes using hdd technology (2007)Stripping of liners from pipes using hdd technology (2007)
Stripping of liners from pipes using hdd technology (2007)
 
WET Feature 4 - Building bigger and better - Jan_16
WET Feature 4 - Building bigger and better - Jan_16WET Feature 4 - Building bigger and better - Jan_16
WET Feature 4 - Building bigger and better - Jan_16
 
Jet pump
Jet pumpJet pump
Jet pump
 
TRIC Trenchless LA building & safety
TRIC Trenchless LA building & safetyTRIC Trenchless LA building & safety
TRIC Trenchless LA building & safety
 
Presentation: AC Mitigation Case Histories
Presentation: AC Mitigation Case HistoriesPresentation: AC Mitigation Case Histories
Presentation: AC Mitigation Case Histories
 
Malay nces ppt
Malay nces pptMalay nces ppt
Malay nces ppt
 
2004 0930 Ca
2004 0930 Ca2004 0930 Ca
2004 0930 Ca
 
Unit I Water Distribution System.pdf
Unit I Water Distribution System.pdfUnit I Water Distribution System.pdf
Unit I Water Distribution System.pdf
 
Hydro electric power plant lecture
Hydro electric power plant lectureHydro electric power plant lecture
Hydro electric power plant lecture
 
Hydraulic Ram Pump Mini-Project Report - Agriculture and Rural Development, A...
Hydraulic Ram Pump Mini-Project Report - Agriculture and Rural Development, A...Hydraulic Ram Pump Mini-Project Report - Agriculture and Rural Development, A...
Hydraulic Ram Pump Mini-Project Report - Agriculture and Rural Development, A...
 
High rise plumbing design by aspe
High rise plumbing design by aspeHigh rise plumbing design by aspe
High rise plumbing design by aspe
 
Small Hydro Training Module
Small Hydro Training ModuleSmall Hydro Training Module
Small Hydro Training Module
 
Rehab Solutions for Today's Infrastructure
Rehab Solutions for Today's InfrastructureRehab Solutions for Today's Infrastructure
Rehab Solutions for Today's Infrastructure
 
pumps and pump chart basics, applications ,types etc.
pumps and pump chart basics, applications ,types  etc.pumps and pump chart basics, applications ,types  etc.
pumps and pump chart basics, applications ,types etc.
 
production casing design considerations
production casing design considerationsproduction casing design considerations
production casing design considerations
 

KĂŒrzlich hochgeladen

Booking open Available Pune Call Girls Nanded City 6297143586 Call Hot India...
Booking open Available Pune Call Girls Nanded City  6297143586 Call Hot India...Booking open Available Pune Call Girls Nanded City  6297143586 Call Hot India...
Booking open Available Pune Call Girls Nanded City 6297143586 Call Hot India...Call Girls in Nagpur High Profile
 
DragonBall PowerPoint Template for demo.pptx
DragonBall PowerPoint Template for demo.pptxDragonBall PowerPoint Template for demo.pptx
DragonBall PowerPoint Template for demo.pptxmirandajeremy200221
 
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service AmravatiVIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service AmravatiSuhani Kapoor
 
Chapter 19_DDA_TOD Policy_First Draft 2012.pdf
Chapter 19_DDA_TOD Policy_First Draft 2012.pdfChapter 19_DDA_TOD Policy_First Draft 2012.pdf
Chapter 19_DDA_TOD Policy_First Draft 2012.pdfParomita Roy
 
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...babafaisel
 
The history of music videos a level presentation
The history of music videos a level presentationThe history of music videos a level presentation
The history of music videos a level presentationamedia6
 
CBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call Girls
CBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call GirlsCBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call Girls
CBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call Girlsmodelanjalisharma4
 
Kurla Call Girls Pooja Nehwal📞 9892124323 ✅ Vashi Call Service Available Nea...
Kurla Call Girls Pooja Nehwal📞 9892124323 ✅  Vashi Call Service Available Nea...Kurla Call Girls Pooja Nehwal📞 9892124323 ✅  Vashi Call Service Available Nea...
Kurla Call Girls Pooja Nehwal📞 9892124323 ✅ Vashi Call Service Available Nea...Pooja Nehwal
 
VIP Kolkata Call Girl Gariahat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Gariahat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Gariahat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Gariahat 👉 8250192130 Available With Roomdivyansh0kumar0
 
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...ranjana rawat
 
Verified Trusted Call Girls Adugodi💘 9352852248 Good Looking standard Profil...
Verified Trusted Call Girls Adugodi💘 9352852248  Good Looking standard Profil...Verified Trusted Call Girls Adugodi💘 9352852248  Good Looking standard Profil...
Verified Trusted Call Girls Adugodi💘 9352852248 Good Looking standard Profil...kumaririma588
 
Call Girls in Kalkaji Delhi 8264348440 call girls ❀
Call Girls in Kalkaji Delhi 8264348440 call girls ❀Call Girls in Kalkaji Delhi 8264348440 call girls ❀
Call Girls in Kalkaji Delhi 8264348440 call girls ❀soniya singh
 
Cheap Rate ➄8448380779 ▻Call Girls In Iffco Chowk Gurgaon
Cheap Rate ➄8448380779 ▻Call Girls In Iffco Chowk GurgaonCheap Rate ➄8448380779 ▻Call Girls In Iffco Chowk Gurgaon
Cheap Rate ➄8448380779 ▻Call Girls In Iffco Chowk GurgaonDelhi Call girls
 
VIP College Call Girls Gorakhpur Bhavna 8250192130 Independent Escort Service...
VIP College Call Girls Gorakhpur Bhavna 8250192130 Independent Escort Service...VIP College Call Girls Gorakhpur Bhavna 8250192130 Independent Escort Service...
VIP College Call Girls Gorakhpur Bhavna 8250192130 Independent Escort Service...Suhani Kapoor
 
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdfThe_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdfAmirYakdi
 
Cosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable BricksCosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable Bricksabhishekparmar618
 
Peaches App development presentation deck
Peaches App development presentation deckPeaches App development presentation deck
Peaches App development presentation decktbatkhuu1
 
Top Rated Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...
Top Rated  Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...Top Rated  Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...
Top Rated Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...Call Girls in Nagpur High Profile
 

KĂŒrzlich hochgeladen (20)

Booking open Available Pune Call Girls Nanded City 6297143586 Call Hot India...
Booking open Available Pune Call Girls Nanded City  6297143586 Call Hot India...Booking open Available Pune Call Girls Nanded City  6297143586 Call Hot India...
Booking open Available Pune Call Girls Nanded City 6297143586 Call Hot India...
 
DragonBall PowerPoint Template for demo.pptx
DragonBall PowerPoint Template for demo.pptxDragonBall PowerPoint Template for demo.pptx
DragonBall PowerPoint Template for demo.pptx
 
B. Smith. (Architectural Portfolio.).pdf
B. Smith. (Architectural Portfolio.).pdfB. Smith. (Architectural Portfolio.).pdf
B. Smith. (Architectural Portfolio.).pdf
 
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service AmravatiVIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
 
Chapter 19_DDA_TOD Policy_First Draft 2012.pdf
Chapter 19_DDA_TOD Policy_First Draft 2012.pdfChapter 19_DDA_TOD Policy_First Draft 2012.pdf
Chapter 19_DDA_TOD Policy_First Draft 2012.pdf
 
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
 
The history of music videos a level presentation
The history of music videos a level presentationThe history of music videos a level presentation
The history of music videos a level presentation
 
CBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call Girls
CBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call GirlsCBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call Girls
CBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call Girls
 
Kurla Call Girls Pooja Nehwal📞 9892124323 ✅ Vashi Call Service Available Nea...
Kurla Call Girls Pooja Nehwal📞 9892124323 ✅  Vashi Call Service Available Nea...Kurla Call Girls Pooja Nehwal📞 9892124323 ✅  Vashi Call Service Available Nea...
Kurla Call Girls Pooja Nehwal📞 9892124323 ✅ Vashi Call Service Available Nea...
 
VIP Kolkata Call Girl Gariahat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Gariahat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Gariahat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Gariahat 👉 8250192130 Available With Room
 
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
 
Verified Trusted Call Girls Adugodi💘 9352852248 Good Looking standard Profil...
Verified Trusted Call Girls Adugodi💘 9352852248  Good Looking standard Profil...Verified Trusted Call Girls Adugodi💘 9352852248  Good Looking standard Profil...
Verified Trusted Call Girls Adugodi💘 9352852248 Good Looking standard Profil...
 
Call Girls in Kalkaji Delhi 8264348440 call girls ❀
Call Girls in Kalkaji Delhi 8264348440 call girls ❀Call Girls in Kalkaji Delhi 8264348440 call girls ❀
Call Girls in Kalkaji Delhi 8264348440 call girls ❀
 
Cheap Rate ➄8448380779 ▻Call Girls In Iffco Chowk Gurgaon
Cheap Rate ➄8448380779 ▻Call Girls In Iffco Chowk GurgaonCheap Rate ➄8448380779 ▻Call Girls In Iffco Chowk Gurgaon
Cheap Rate ➄8448380779 ▻Call Girls In Iffco Chowk Gurgaon
 
VIP College Call Girls Gorakhpur Bhavna 8250192130 Independent Escort Service...
VIP College Call Girls Gorakhpur Bhavna 8250192130 Independent Escort Service...VIP College Call Girls Gorakhpur Bhavna 8250192130 Independent Escort Service...
VIP College Call Girls Gorakhpur Bhavna 8250192130 Independent Escort Service...
 
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdfThe_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
 
Cosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable BricksCosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable Bricks
 
Call Girls Service Mukherjee Nagar @9999965857 Delhi đŸ«Š No Advance VVIP 🍎 SER...
Call Girls Service Mukherjee Nagar @9999965857 Delhi đŸ«Š No Advance  VVIP 🍎 SER...Call Girls Service Mukherjee Nagar @9999965857 Delhi đŸ«Š No Advance  VVIP 🍎 SER...
Call Girls Service Mukherjee Nagar @9999965857 Delhi đŸ«Š No Advance VVIP 🍎 SER...
 
Peaches App development presentation deck
Peaches App development presentation deckPeaches App development presentation deck
Peaches App development presentation deck
 
Top Rated Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...
Top Rated  Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...Top Rated  Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...
Top Rated Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...
 

Wastewater pump station_design_problems_and_solutions

  • 1. MUNICIPAL WASTEWATER PUMP STATION DESIGN PROBLEMS AND SOLUTIONS Presented at: WEFTEC 2006 Dallas, TX October 24, 2006 New England Water Environment Association Meeting Westford, MA September 12, 2006 Virginia Water Environment Association Annual Meeting Roanoke, VA May 2, 2006
  • 2. MUNICIPAL WASTEWATER PUMP STATION DESIGN PROBLEMS AND SOLUTIONS INTRODUCTION In the Northern Virginia suburbs of Washington DC rapid residential growth has resulted in the need for construction of numerous municipal wastewater pumping stations. Municipal pump stations in Northern Virginia typically are submersible type pump stations with a design capacity between from 100 gpm to 1 MGD. The design requirements for submersible type pump stations continue to evolve to address construction and operation problems. This paper identifies several of these problems and the solutions that have been implemented in the design of several recently constructed wastewater pump stations in Northern Virginia. The author has prepared this paper based on his 32 years of experience in wastewater pump station design in the Northern Virginia Area. METHODOLOGY Each of the identified pump station design problems is listed below by number with the corresponding design solution indicated under the problem. PROBLEMS AND SOLUTIONS 1. Concrete Corrosion Protection Problem: Until recently, most pump stations in Northern Virginia were constructed of concrete. Typically the wet well interior and exterior concrete surfaces received two coats of a coal tar epoxy coating to protect the concrete from the corrosion due to hydrogen sulfide in the influent sewage. Experience has indicated that concrete corrosion will result if either the coal tar epoxy is not properly applied, or is not reapplied when it deteriorates over time. It is very difficult to reapply coal tar epoxy, because usually the pump station wet well can not be taken out of service. Solution: New pump stations include a high density polyethylene (HDPE) liner on the interior of the concrete surfaces exposed to wastewater for corrosion protection. This liner is provided as an option by the precast concrete suppliers and the concrete is formed around the outside of the liner. Following installation of the lined precast concrete structure a certified welder field welds the seams and welds around pipe penetrations to assure that the HDPE liner prevents sewer gas from attacking the concrete. Another alternative is to utilize precast polymer concrete structures. Polymer concrete utilizes epoxy to bind the aggregate instead of cement. Thus the polymer concrete is not susceptible to corrosion due to sewer gas. Contact: Jeff Chapin, P.E. 8401 Arlington Boulevard Fairfax, VA 22031 Phone: (703) 849-0555 Fax: (703) 849-0623
  • 3. 2. Corrosion Resistant Materials: Problem: Previous pump station designs included the use of galvanized steel and coated metal components in areas susceptible to hydrogen sulfide in influent sewage. After several years the metal components corroded and had to be replaced. These items included piping, pump guide rails, supports, grating, hand rails, stairs, bar screens, bolts, weirs, ladders, slide gates and other items. Solution: Type 316 stainless steel is specified for guide rails, brackets, bolts, nuts, structural steel, supports, and stairs. Fiberglass grating and ladders are specified. Aluminum hatch covers and slide gates are still specified because they are light way and durable, but they are susceptible to corrosion over time. The exterior of ductile iron piping is epoxy coated. Corrosion resistant materials should also be specified for electrical components. 3. Pump Protection from Influent Sewage Debris Problem: Most of the older pump stations had the influent sewer entering directly into the wet well and relied on the ability of the submersible pumps to pump a 3 inch diameter solid. Some pump stations had a basket screen attached to the influent sewer inside the wet well to try to protect the pumps from damage. However, the screens have to be manually lifted out of the wet well and cleaned by hand often to be effective. Solution: In order to assure that the pumps are adequately protected, new submersible pump stations in Northern Virginia often include a comminutor vault preceding the wet well. Raw wastewater entering the pump station flows through the comminutor vault influent channel which is equipped with a grinder. The grinder is a hydraulically driven horizontal screen and cutter assembly. The rotating screen directs solids toward and into the cutters where the influent solids are ground into fine particles to protect the downstream pumps. The grinder 5hp hydraulic power pack is located in a fiberglass enclosure mounted on top of the comminutor vault. In the event the grinder must be taken out of service, slide gates are provided to direct comminutor vault influent flow to a bypass bar screen. Also, in the event flow backs up upstream of the grinder the influent channel wall has an overflow notch just upstream of the bar screen. The bar screen is constructed of stainless steel bars and must be manually cleaned with a rake. The comminutor vault is a 12 ft. diameter precast concrete manhole with an HDPE liner. Stainless steel alternating tread stairs are used for access to the bottom of the vault. All lighting and electrical equipment is explosion proof inside the vault. A ventilation fan is provided on top of the comminutor vault. 4. Pump Selection Based on Total Dynamic Head Calculations Pumps are selected based on total dynamic head (TDH) calculations which can lead to improper sizing unless the Engineer carefully considers the exact pipe inside diameter, the Williams Hazen flow coefficient (C), and the location of high points in the force main. Each of these factors is discussed as follows:
  • 4. Inside Pipe Diameter: Typically in Northern Virginia force main piping is either double cement lined ductile iron pipe or PWC pipe per AWWA C-900. The inside pipe diameter may vary considerably depending on the type of pipe selected. For long force mains extending two or more miles in length this can result in a significant difference in friction head component of the TDH. Solution: Determine the type of force main to be constructed and the exact inside pipe diameter in preparing TDH calculations. If the force main could be either ductile iron pipe, PVC or some other material, the TDH calculations should be prepared for each possible pipe material to make sure that the selected pump is adequate for all pipe materials. Williams Hazen flow coefficient (C): For new ductile iron pipe a C factor of 140 is often used in TDH calculations to estimate friction head in the force main when it is first placed in service. A C factor of 120 is often used to estimate the friction head in the force main after several years of operation. Pump selection based on a C factor of 140 alone will result in a pump that may be undersized when the force main pipe C factor decreases due to increased roughness of pipe internal surfaces over time. If the pump selection is based on a C factor of 120, the pump may pump too high a flow rate at startup because the new smooth pipe C factor is actually 140. This can result in overloading the pump motor. Also, it is important to note that field measurements of the actual C factors for old force mains which have been in continuous service for over 25 years has indicated that the C factor has decreased to approximately 100. Solution: For new pump stations, prepare TDH calculations based on the initial new pipe C factor and the anticipated C factor after the force main has been in service for several years. When expanding the capacity of existing pump stations which have been in service for many years, the actual C factor of the force main should be determined by field measurements. Problem involves a Force Main High Point near the pump station: Typically the TDH calculations are based on the entire length of force main pipe from the pump station to the discharge point. However, when pumping from one valley over a hill to a gravity sewer on the other side of the hill it is important to consider whether or not there is free fall in the down hill segment of the force main such that the downhill length of pipe does not need to be considered in the TDH calculations. If the static head from the high point to the discharge point exceeds the full flow headloss in the downhill segment of force main, sewage should flow by gravity through the force main similar to a gravity sewer instead of as a full pipe under pressure. Failure to recognize this condition in long force mains with a high point near the pump station can result in the selection of much higher capacity pumping equipment than actually required, and in significantly higher pumping rates than anticipated.
  • 5. 5. Energy Efficient Operation Problem: Common pump station design practice over the past 50 years has been to provide two pumps sized for the peak design flow rate, one of which is a standby pump. For pump stations with long force mains, the friction loss when operating at the design peak flow rate is excessive, resulting in high energy costs. Energy efficiency is becoming a very important consideration in pump station design. The Town of Purcellville East End Pump Station in Loudoun County, VA was equipped with two 75 hp submersible pumps which cycled on and off at the peak design flow rate of 600 gpm at 127 feet TDH. Sewage is pumped through an 8-inch force main, 4,572 feet long with friction headloss of 39 feet and excessive energy costs from frequent pump cycling on and off due to sewer infiltration/inflow. Solution: A small 10 hp submersible jockey pump was installed in the wet well to operate almost continuously through the day at a flow rate of approximately 100 gpm. This lower flow rate significantly reduced the friction loss and energy requirements while providing reliable service. The friction headloss was reduced from 39 feet to 2 feet. The larger pumps only operate a few times a day during peak flow periods in the morning and evening which is sufficient to flush out solids in the force main. Power costs were significantly reduced based on three years of operation. 6. Pump Station Appearance Problem: For many years pump stations were designed to be functional with little attention given to the exterior appearance and the impact on the surrounding community. Many of the new pump stations in Northern Virginia are located next to new homes costing over $700,000 or next to attractive commercial development. Standard utility buildings with barbed wire exterior fencing are often unacceptable to the developers in Northern Virginia. Solution: The pump station control building exteriors include stone faced block walls or other features to match the surrounding development architecture. Ten foot high black galvanized steel picket fence is used with an extended top slanted for security. 7. Surge Protection Problem: When the pumps cycle off or there is a power failure, high surge pressures can damage piping. Solution: Soft start/stop electrical control equipment significantly reduces surge pressures. As backup protection a surge relief valve is often installed at each pump station in the event of a power failure or a failure of the soft start/stop equipment.
  • 6. 8. Rehabilitation of Existing Pump Stations Problem: Fairfax County has a program to rehabilitate four to eight pump stations every few years under one construction contract as necessary. After approximately 20 years of service they have found that parts are no longer available for electrical controls, and pumps and valves need to be replaced. Also, the building structures, roads and electrical service are often in need of replacement. The pump station must be maintained in continuous service through construction and thus constructability issues must be identified in the design process. Solution: Based on over 15 recent pump station rehabilitation projects, a typical scope of work can be identified for construction rehabilitation. Each pump station needs to be examined separately to determine what rehabilitation measures are needed. Pumps and valves and other mechanical equipment items are replaced. Typically, dry pit submersible pumps are used to replaced shaft pumps. New electrical controls are installed. Corrosion resistant materials are installed to replace corroded materials or epoxy coatings are applied to existing surfaces. Structural and architectural improvements are identified. The construction phasing and temporary pumping requirements are identified in the contract documents for construction. An existing 20 MGD wet well/dry well pump station with vertical shaft pumps was expanded to 40 MGD capacity with dry pit submersible pumps while maintaining continuous operation. This was achieved by first installing two of the submersible pumps in the wet well and providing a temporary force main. Once this temporary pumping system was operations, all of the equipment in the dry well was replaced with new equipment. Once two of the four dry pit submersibles were installed in the dry well, the two pumps in the wet well were removed and also installed in the dry well to complete the project. 9. Prevention of Leakage into the Pump Station Structures Problem: Cracks or joints in precast concrete manhole structures used to construct new pump stations can result in groundwater leakage into the pump station which must be pumped to the treatment facility resulting in unnecessary costs and reduced capacity. It is often difficult to permanently seal such cracks or joints after construction is completed and the pump station is in service creating a confined space. This is especially true for deep pump stations. Solution: All weather butyl joint sealant materials are available for effective sealing precast concrete joints exposed to high groundwater pressures. Butyl sealants are rubber based and exhibit physical properties such as rebound, compression, low temperature and high temperature flows that are all required for long term sealing performance. This joint material was effectively used at the 50 foot deep Morris Farm Pump Station in Prince William County to prevent leakage. Other methods of sealing the joints and concrete surfaces are also available including bentonite.
  • 7. 10. Odor Control Problem: Sewage piping designed for future ultimate design flows is often way oversized for initial flows resulting in long pipe retention times and septic odors. Solution: Chemical feed addition at pump stations can help minimize odor problems throughout the downstream sewer system. BioxideÂź chemical solution has been utilized at several new pump stations to minimize odors. The BioxideÂź material utilizes the inherent ability of the facultative bacteria normally present in wastewater to metabolize hydrogen sulfide and other odor-causing, reduced sulfur containing compounds. The material provides nitrate-oxygen to the wastewater to support this biochemical mechanism. This nitrate-oxygen is applied via nitrate salts. The material shall be chemically stable, allowing continuous removal of sulfide contributed by side streams downstream of the application point. The pump station design includes a pad mounted Bioxide chemical storage tank and automatic chemical feed equipment. 11. Provisions for Future Expansion Problem: The rapid growth experienced in Northern Virginia over the past few years can result in pump stations being undersized to convey projected flow rates. If provisions for future expansion are not included in the design, the entire pump station or major components of the pump station may have to be replaced. Solution: Provisions for future expansion include the selection of pumps with higher than required motor horsepower to allow the future installation of larger diameter impellers capable of pumping increased flows. The Morris Farm Pump Station in Prince William County was almost over capacity at start up because of the addition of unanticipated sewage flows from a new elementary school which was supposed to be served by an adjacent gravity sewer system. Fortunately, by adding a larger impeller the additional flow could be accommodated without any other changes. Other considerations include sizing the force main, generator set, wet well, electrical service and other components to allow some increase in capacity without causing problems during initial operation. 12. Grit Deposition in Wet Wells Sized for Future Flow Rates Problem: The design criteria for submersible pump wet well sizing can lead to excessive grit deposition in the wet well due to initial low flow conditions. The grit can result in serious odor problems and is difficult to remove. Solution: Provide temporary solid concrete block filler in the wet well areas subject to grit deposition or provide baffle walls to reduce the wet well area during initial low flow conditions. In the future when the flows approach the design flow rate, the blocks or baffle walls can be removed. CONCLUSION The planning and design of new municipal wastewater pump stations or rehabilitation/expansion of existing pump stations requires careful consideration of potential problems and possible solutions presented above.
  • 8. Municipal Sewage Pump Station Design Problems and Solutions presented by: Jeff Chapin, PE October 24, 2006 Session 28
  • 9. Morris Farm Western Prince William County, Virginia
  • 10. Prince William County Service Authority Morris Farm Pump Station 928 GPM Capacity
  • 11. Prince William County Service Authority Morris Farm Pump Station
  • 12. Corrosion Sewer Gas Corrodes Concrete and Metal Components
  • 13. Prince William County Service Authority Morris Farm Pump Station Grinder Vault with HPDE Liner & Stainless Steel Stairs
  • 14. Prince William County Service Authority Morris Farm Pump Station Grinder
  • 15. Prince William County Service Authority Morris Farm Pump Station Grinder Hydraulic Power Drive
  • 16. Prince William County Service Authority Morris Farm Pump Station Bypass Bar Screen
  • 17. Prince William County Service Authority Morris Farm Pump Station Wet Well
  • 18. Prince William County Service Authority Morris Farm Pump Station Valve Vault
  • 19. Prince William County Service Authority Morris Farm Pump Station Control Building & Standby Generator
  • 20. Prince William County Service Authority Morris Farm Pump Station Control Building Panels
  • 21. Odor Control Prince William County Service Authority Morris Farm Pump Station Bioxide Tank
  • 22. Construction Problems Commuter Vault Wet Well Valve Vault Meter Vault Potential for Differential Settlement Potential for Water Leakage Typical Submersible Pump Station Section View Prince William County, Virginia
  • 23. Watertight Structures 250 gpm Camp Glenkirk Pump Station
  • 24. Rock Excavation Prince William County Service Authority Broad Run Pump Station Rock Saw
  • 25. Potential Problems & Solutions Lift Chain Enters Volute Short Chain Length Power Cable Excessive Flexing Short Cable Length Cavitation With 2 Pumps Running Check 2 Pump Curve At Low Speed Pump Head Does Not Overcome System Head Check Pump Curve At Low Speed Air Entrainment From Concentric Reducer On Pump Suction Piping Use Eccentric Reducer
  • 26. Energy Efficiency Improvement at Purcellville East End Pump Station ‱ Original Pump System ‱ ‱ ‱ ‱ ‱ ‱ Two 75 hp Submersible Pumps 600 GPM Pumping Rate Significant Infiltration & Inflow 4,572 Feet of 8-inch Force Main Friction Headloss = 39 feet Excessive Surge With Frequent Pump Starts
  • 28. Energy Efficiency Improvement at Purcellville East End Pump Station ‱ Improvements: ‱ ‱ ‱ ‱ Added a new 10 hp submersible pump Rated 120 gpm at 90 feet TDH Friction Headloss = 2 feet Cost of Pump and Controls Installed = $6,500 ‱ Benefits: ‱ Less Surge from Frequent Stop Starts ‱ Operation at Lower Head Reduces Energy Consumption ‱ Eliminates current surges when 75 hp pump starts
  • 30. Grease Problems 2.9 MGD Pump Station Wet Well
  • 31. Pipe Clogging Sonar Image 30” Pipe
  • 32. Appearance Town of Leesburg Goose Creek Pump Station
  • 33. 20 MGD to 40 MGD Expansion Existing 20 MGD Pump Station Dry Well
  • 34. Installation of Larger Pumps Expansion to 40 MGD Pump Station Dry Well
  • 35.
  • 36. Grit in Wet Well 100 MGD Pump Station
  • 37. Conclusion Corrosion Resistant Materials Watertight Structures Minimize Settlement Check Design Calculations Consider Grease & Grit Energy Efficiency Constructability