Underwood Pool Project

Selectmen Meeting
February 10, 2014
KEY PLAN
CONCORD AVENUE

PROJECT GOALS

COTTAGE STREET

• REPLACE A FAILING POOL AND NONCODE COMPLIANT BATHHOUSE
• CREATE A MULTI-GENERATIONAL POOL
• CODE COMPLIANT, PLEASANT
RESTROOMS AND STAFF FACILITIES
• RESPECT AND PRESERVE HISTORIC
VALUE OF SITE
• IMPROVE PARK ACCESS
• IMPROVE CIRCULATION & SAFETY
• ENHANCE CONNECTIONS TO
SURROUNDING COMMUNITY
• OUTDOOR AMENITIES TO ENCOURAGE
COMMUNITY PARTICIPATION
WELLINGTON
SCHOOL
NEW DROP OFF AREA

CONCORD AVE

BUS STOP

NEW TREES

RECONFIGURED
PARKING AREA

FENCE LINE

LAWN
AREA

EAST
BATHHOUSE

LAP LANES

DIVING

COTTAGE STREET

WEST
BATHHOUSE

FAMILY
POOL

PICNIC AREA

LAWN
AREA

FENCE LINE

NEW TREE
LINE

NEW SIDEWALK
EXTENSION TO
SCHOOL STREET
CONCORD AVENUE
DROP-OFF
NEW DROP-OFF
BUS STOP

NEW TREE

PERMEABLE PAVERS

SEATWALL
SIGN
CONCORD AVE

NEW SIDEWALK (OPTIONAL)
SPECIMEN TREES REGULARLY
PLANTED IN LAWN (SELECTIVE
REMOVAL OF UNHEALTHY AND
INVASIVE TREES)
COTTAGE STREET

COTTAGE STREET

EXISTING SIDEWALK

COTTAGE STREET REGULARLY SPACED TREE OPTION

MYRTLE STREET (PRECEDENT)
PLUMBING REQUIREMENTS
PER MASS STATE PLUMBING AND DPH CODES
BASED ON SIZE OF POOL

TOTAL NUMBER OF BATHERS:
MEN: 323
WOMEN: 323

TOTAL REQUIRED FIXTURES:
SHOWERS:
TOILETS:

16
16

646
EAST BATH HOUSE

PLUMBING REQUIREMENTS
EAST BATH HOUSE
TOTAL PROVIDED FIXTURES:
SHOWERS: 8
TOILETS:
6
WEST BATH HOUSE

PLUMBING REQUIREMENTS
EAST BATH HOUSE
TOTAL PROVIDED FIXTURES:
SHOWERS: 8
TOILETS:
8 + 2 URINALS
PROJECT CONSTRUCTION COSTS
Construction Elements
Bathhouse Buildings
Two Swimming Pools
Site Work
General Conditions OH&P

$950,000
$1,425,000
$895,603
$741,812

Includes Design/Estimating Contingency

Escalation
Subtotal Construction

$149,908
$4,162,323

Town’s Construction Contingency $249,739
TOTAL CONSTUCTION COST $4,412,062
TOTAL PROJECT COST
Total Construction Cost

$4,412,062

Project Soft Costs
Design Fee
$296,000
OPM & Clerk
$259,655
Testing, Printing, Insurance, etc. $99,000
Soft Cost Contingency
$65,466
Furniture and Equipment
F&E Contingency

$62,000
$6,200

TOTAL PROJECT COST

$5,200,000
Total Construction Cost

$5,200,000

Funding:
CPA 2013

$298,000

CPA 2014- Proposed

$2,000,000

Debt Exclusion Amount

$2,902,000

Weitere ähnliche Inhalte

Was ist angesagt?

MICA Kilisut Harbor Restoration Project Presentation- January 20th, 2014
MICA Kilisut Harbor Restoration Project Presentation- January 20th, 2014MICA Kilisut Harbor Restoration Project Presentation- January 20th, 2014
MICA Kilisut Harbor Restoration Project Presentation- January 20th, 2014Sarah Doyle
 
Cubbon Park recharge wells completion report
Cubbon Park recharge wells completion reportCubbon Park recharge wells completion report
Cubbon Park recharge wells completion reportbiometrust
 
Unravelling Urban Design project 2
Unravelling Urban Design project 2Unravelling Urban Design project 2
Unravelling Urban Design project 2Ka Long Bryan Wong
 
Waterbury Downtown October 29 2009
Waterbury Downtown October 29 2009Waterbury Downtown October 29 2009
Waterbury Downtown October 29 2009lizschlegel
 
Franklin, MA: DPW Upcoming Projects
Franklin, MA: DPW Upcoming ProjectsFranklin, MA: DPW Upcoming Projects
Franklin, MA: DPW Upcoming ProjectsFranklin Matters
 
1209 Orion Beach Award
1209 Orion Beach Award1209 Orion Beach Award
1209 Orion Beach AwardGreg Abbott
 
Chorley Park Trail Connection Accessibility - January 21, 2015
Chorley Park Trail Connection Accessibility - January 21, 2015Chorley Park Trail Connection Accessibility - January 21, 2015
Chorley Park Trail Connection Accessibility - January 21, 2015Toronto Public Consultation Unit
 
Crespi Campus Modernization Presentation
Crespi Campus Modernization PresentationCrespi Campus Modernization Presentation
Crespi Campus Modernization PresentationChris Neil
 
Draft rehoboth beach reopening plan 14 may 2020
Draft rehoboth beach reopening plan   14 may 2020Draft rehoboth beach reopening plan   14 may 2020
Draft rehoboth beach reopening plan 14 may 2020rehobothbeachde
 
Sunset cove phase 2 advocacy
Sunset cove phase 2 advocacySunset cove phase 2 advocacy
Sunset cove phase 2 advocacyecowatchers
 

Was ist angesagt? (20)

MICA Kilisut Harbor Restoration Project Presentation- January 20th, 2014
MICA Kilisut Harbor Restoration Project Presentation- January 20th, 2014MICA Kilisut Harbor Restoration Project Presentation- January 20th, 2014
MICA Kilisut Harbor Restoration Project Presentation- January 20th, 2014
 
Cubbon Park recharge wells completion report
Cubbon Park recharge wells completion reportCubbon Park recharge wells completion report
Cubbon Park recharge wells completion report
 
Belmont Community Association -- 3-10-16
Belmont Community Association -- 3-10-16Belmont Community Association -- 3-10-16
Belmont Community Association -- 3-10-16
 
Multi-tasking Landscapes
Multi-tasking LandscapesMulti-tasking Landscapes
Multi-tasking Landscapes
 
Unravelling Urban Design project 2
Unravelling Urban Design project 2Unravelling Urban Design project 2
Unravelling Urban Design project 2
 
Saltaire trees quiz
Saltaire trees quizSaltaire trees quiz
Saltaire trees quiz
 
Waterbury Downtown October 29 2009
Waterbury Downtown October 29 2009Waterbury Downtown October 29 2009
Waterbury Downtown October 29 2009
 
Item #9 ppt trolley stop
Item #9   ppt trolley stopItem #9   ppt trolley stop
Item #9 ppt trolley stop
 
Franklin, MA: DPW Upcoming Projects
Franklin, MA: DPW Upcoming ProjectsFranklin, MA: DPW Upcoming Projects
Franklin, MA: DPW Upcoming Projects
 
Chorley Park Trail Connecton - Working Group Meeting #3
Chorley Park Trail Connecton - Working Group Meeting #3Chorley Park Trail Connecton - Working Group Meeting #3
Chorley Park Trail Connecton - Working Group Meeting #3
 
1209 Orion Beach Award
1209 Orion Beach Award1209 Orion Beach Award
1209 Orion Beach Award
 
Abergeldie Marine
Abergeldie MarineAbergeldie Marine
Abergeldie Marine
 
Chorley Park Trail Connection Accessibility - January 21, 2015
Chorley Park Trail Connection Accessibility - January 21, 2015Chorley Park Trail Connection Accessibility - January 21, 2015
Chorley Park Trail Connection Accessibility - January 21, 2015
 
King-Liberty Pedestrian / Cycling Bridge
King-Liberty Pedestrian / Cycling Bridge King-Liberty Pedestrian / Cycling Bridge
King-Liberty Pedestrian / Cycling Bridge
 
Crespi Campus Modernization Presentation
Crespi Campus Modernization PresentationCrespi Campus Modernization Presentation
Crespi Campus Modernization Presentation
 
Draft rehoboth beach reopening plan 14 may 2020
Draft rehoboth beach reopening plan   14 may 2020Draft rehoboth beach reopening plan   14 may 2020
Draft rehoboth beach reopening plan 14 may 2020
 
Bicycle way
Bicycle wayBicycle way
Bicycle way
 
Pdf online
Pdf onlinePdf online
Pdf online
 
Sunset cove phase 2 advocacy
Sunset cove phase 2 advocacySunset cove phase 2 advocacy
Sunset cove phase 2 advocacy
 
Green to Blue: Dying lakes
Green to Blue: Dying lakesGreen to Blue: Dying lakes
Green to Blue: Dying lakes
 

Andere mochten auch

ECE 311 WEEK 5 FINAL PAPER
ECE 311 WEEK 5 FINAL PAPERECE 311 WEEK 5 FINAL PAPER
ECE 311 WEEK 5 FINAL PAPERhwacer123
 
Прэзентацыя вікідапаможніка, верасень, 2015
Прэзентацыя вікідапаможніка, верасень, 2015Прэзентацыя вікідапаможніка, верасень, 2015
Прэзентацыя вікідапаможніка, верасень, 2015zabej
 
Drinking with the horses
Drinking with the horsesDrinking with the horses
Drinking with the horsesnetc2012
 
How to like your facebook presence
How to like your facebook presenceHow to like your facebook presence
How to like your facebook presencenetc2012
 
Datasheet Fluke 1000FLT. Hubungi PT. Siwali Swantika 021-45850618
Datasheet Fluke 1000FLT. Hubungi PT. Siwali Swantika 021-45850618Datasheet Fluke 1000FLT. Hubungi PT. Siwali Swantika 021-45850618
Datasheet Fluke 1000FLT. Hubungi PT. Siwali Swantika 021-45850618PT. Siwali Swantika
 
Encuentro 8: El aula expandida la producción colaborativa en red
Encuentro 8: El aula expandida la producción colaborativa en redEncuentro 8: El aula expandida la producción colaborativa en red
Encuentro 8: El aula expandida la producción colaborativa en redCarmen Leal
 
Кукла и другие строки
Кукла и другие строкиКукла и другие строки
Кукла и другие строкиAlexandr Asargaev
 
RHBC 265: God's Perfect Playbook
RHBC 265: God's Perfect PlaybookRHBC 265: God's Perfect Playbook
RHBC 265: God's Perfect Playbookrhbc
 

Andere mochten auch (11)

ECE 311 WEEK 5 FINAL PAPER
ECE 311 WEEK 5 FINAL PAPERECE 311 WEEK 5 FINAL PAPER
ECE 311 WEEK 5 FINAL PAPER
 
πολύχρωμες διαδρομές
πολύχρωμες διαδρομέςπολύχρωμες διαδρομές
πολύχρωμες διαδρομές
 
Прэзентацыя вікідапаможніка, верасень, 2015
Прэзентацыя вікідапаможніка, верасень, 2015Прэзентацыя вікідапаможніка, верасень, 2015
Прэзентацыя вікідапаможніка, верасень, 2015
 
Drinking with the horses
Drinking with the horsesDrinking with the horses
Drinking with the horses
 
How to like your facebook presence
How to like your facebook presenceHow to like your facebook presence
How to like your facebook presence
 
Datasheet Fluke 1000FLT. Hubungi PT. Siwali Swantika 021-45850618
Datasheet Fluke 1000FLT. Hubungi PT. Siwali Swantika 021-45850618Datasheet Fluke 1000FLT. Hubungi PT. Siwali Swantika 021-45850618
Datasheet Fluke 1000FLT. Hubungi PT. Siwali Swantika 021-45850618
 
Rotina tuba
Rotina tubaRotina tuba
Rotina tuba
 
Tabela brix
Tabela brixTabela brix
Tabela brix
 
Encuentro 8: El aula expandida la producción colaborativa en red
Encuentro 8: El aula expandida la producción colaborativa en redEncuentro 8: El aula expandida la producción colaborativa en red
Encuentro 8: El aula expandida la producción colaborativa en red
 
Кукла и другие строки
Кукла и другие строкиКукла и другие строки
Кукла и другие строки
 
RHBC 265: God's Perfect Playbook
RHBC 265: God's Perfect PlaybookRHBC 265: God's Perfect Playbook
RHBC 265: God's Perfect Playbook
 

Ähnlich wie Selectmen meeting 021014 final

Water Works Open House Presentation, Revised Design Concept - May 1st 2017
Water Works Open House Presentation, Revised Design Concept - May 1st 2017Water Works Open House Presentation, Revised Design Concept - May 1st 2017
Water Works Open House Presentation, Revised Design Concept - May 1st 2017Minneapolis Parks Foundation
 
Marie Reed Elementary School - Excerpts From The CFA Presentation (February 1...
Marie Reed Elementary School - Excerpts From The CFA Presentation (February 1...Marie Reed Elementary School - Excerpts From The CFA Presentation (February 1...
Marie Reed Elementary School - Excerpts From The CFA Presentation (February 1...DC Department of General Services
 
View Royal Open House Boards Final
View Royal Open House Boards FinalView Royal Open House Boards Final
View Royal Open House Boards FinalKeltie Chamberlain
 
Marie Reed Community Meeting Presentation (October 22, 2015)
Marie Reed Community Meeting Presentation (October 22, 2015)Marie Reed Community Meeting Presentation (October 22, 2015)
Marie Reed Community Meeting Presentation (October 22, 2015)DC Department of General Services
 
Kellen Kyger Portfolio with Revit 013117
Kellen Kyger Portfolio with Revit 013117Kellen Kyger Portfolio with Revit 013117
Kellen Kyger Portfolio with Revit 013117Kellen Kyger
 
2015 State College Borough Construction Projects
2015 State College Borough Construction Projects2015 State College Borough Construction Projects
2015 State College Borough Construction ProjectsCourtney Hayden
 
Community Works Fact Sheet 2014
Community Works Fact Sheet 2014Community Works Fact Sheet 2014
Community Works Fact Sheet 2014James Wisker
 
Erie Bayfront Master Plan
Erie Bayfront Master PlanErie Bayfront Master Plan
Erie Bayfront Master PlanDavid VanAmburg
 
Clifton Avenue Streetscape Design - Posters
Clifton Avenue Streetscape Design - PostersClifton Avenue Streetscape Design - Posters
Clifton Avenue Streetscape Design - PostersJake Henderson
 
Multi-use Pathway Wetlands Trail Boardwalk & Pavement Rehabilitation
Multi-use Pathway Wetlands Trail Boardwalk & Pavement RehabilitationMulti-use Pathway Wetlands Trail Boardwalk & Pavement Rehabilitation
Multi-use Pathway Wetlands Trail Boardwalk & Pavement Rehabilitationcitygb
 
Case StudyManaging Projects from Start to CompletionThe Rivers.docx
Case StudyManaging Projects from Start to CompletionThe Rivers.docxCase StudyManaging Projects from Start to CompletionThe Rivers.docx
Case StudyManaging Projects from Start to CompletionThe Rivers.docxtroutmanboris
 
Fulton Market Task Force presentation #3 12.03.14
Fulton Market Task Force presentation #3 12.03.14Fulton Market Task Force presentation #3 12.03.14
Fulton Market Task Force presentation #3 12.03.14West Central Association
 
Portfolio_RobinMassingill_2015
Portfolio_RobinMassingill_2015Portfolio_RobinMassingill_2015
Portfolio_RobinMassingill_2015Robin Massingill
 
2015 Bond Election: Recommended Transportation & Parks Projects
2015 Bond Election: Recommended Transportation & Parks Projects2015 Bond Election: Recommended Transportation & Parks Projects
2015 Bond Election: Recommended Transportation & Parks ProjectsCity of College Station
 
Fulton Market Streetscape Public Meeting 12/10/2014
Fulton Market Streetscape Public Meeting 12/10/2014Fulton Market Streetscape Public Meeting 12/10/2014
Fulton Market Streetscape Public Meeting 12/10/2014West Central Association
 
A5 Chicago Ave Project Plan
A5 Chicago Ave Project PlanA5 Chicago Ave Project Plan
A5 Chicago Ave Project Plancityofevanston
 

Ähnlich wie Selectmen meeting 021014 final (20)

Water Works Open House Presentation, Revised Design Concept - May 1st 2017
Water Works Open House Presentation, Revised Design Concept - May 1st 2017Water Works Open House Presentation, Revised Design Concept - May 1st 2017
Water Works Open House Presentation, Revised Design Concept - May 1st 2017
 
Muskogee Hope Workshop Results
Muskogee Hope Workshop ResultsMuskogee Hope Workshop Results
Muskogee Hope Workshop Results
 
Marie Reed Elementary School - Excerpts From The CFA Presentation (February 1...
Marie Reed Elementary School - Excerpts From The CFA Presentation (February 1...Marie Reed Elementary School - Excerpts From The CFA Presentation (February 1...
Marie Reed Elementary School - Excerpts From The CFA Presentation (February 1...
 
View Royal Open House Boards Final
View Royal Open House Boards FinalView Royal Open House Boards Final
View Royal Open House Boards Final
 
Marie Reed Community Meeting Presentation (October 22, 2015)
Marie Reed Community Meeting Presentation (October 22, 2015)Marie Reed Community Meeting Presentation (October 22, 2015)
Marie Reed Community Meeting Presentation (October 22, 2015)
 
Kellen Kyger Portfolio with Revit 013117
Kellen Kyger Portfolio with Revit 013117Kellen Kyger Portfolio with Revit 013117
Kellen Kyger Portfolio with Revit 013117
 
2015 State College Borough Construction Projects
2015 State College Borough Construction Projects2015 State College Borough Construction Projects
2015 State College Borough Construction Projects
 
Community Works Fact Sheet 2014
Community Works Fact Sheet 2014Community Works Fact Sheet 2014
Community Works Fact Sheet 2014
 
Erie Bayfront Master Plan
Erie Bayfront Master PlanErie Bayfront Master Plan
Erie Bayfront Master Plan
 
Clifton Avenue Streetscape Design - Posters
Clifton Avenue Streetscape Design - PostersClifton Avenue Streetscape Design - Posters
Clifton Avenue Streetscape Design - Posters
 
Portfolio_4-5
Portfolio_4-5Portfolio_4-5
Portfolio_4-5
 
Multi-use Pathway Wetlands Trail Boardwalk & Pavement Rehabilitation
Multi-use Pathway Wetlands Trail Boardwalk & Pavement RehabilitationMulti-use Pathway Wetlands Trail Boardwalk & Pavement Rehabilitation
Multi-use Pathway Wetlands Trail Boardwalk & Pavement Rehabilitation
 
Case StudyManaging Projects from Start to CompletionThe Rivers.docx
Case StudyManaging Projects from Start to CompletionThe Rivers.docxCase StudyManaging Projects from Start to CompletionThe Rivers.docx
Case StudyManaging Projects from Start to CompletionThe Rivers.docx
 
Fulton Market Task Force presentation #3 12.03.14
Fulton Market Task Force presentation #3 12.03.14Fulton Market Task Force presentation #3 12.03.14
Fulton Market Task Force presentation #3 12.03.14
 
Bath, Maine Design And Resiliency Team (DART) Project
Bath, Maine Design And Resiliency Team (DART) ProjectBath, Maine Design And Resiliency Team (DART) Project
Bath, Maine Design And Resiliency Team (DART) Project
 
Portfolio_RobinMassingill_2015
Portfolio_RobinMassingill_2015Portfolio_RobinMassingill_2015
Portfolio_RobinMassingill_2015
 
2015 Bond Election: Recommended Transportation & Parks Projects
2015 Bond Election: Recommended Transportation & Parks Projects2015 Bond Election: Recommended Transportation & Parks Projects
2015 Bond Election: Recommended Transportation & Parks Projects
 
Cox.CutSheets2015
Cox.CutSheets2015Cox.CutSheets2015
Cox.CutSheets2015
 
Fulton Market Streetscape Public Meeting 12/10/2014
Fulton Market Streetscape Public Meeting 12/10/2014Fulton Market Streetscape Public Meeting 12/10/2014
Fulton Market Streetscape Public Meeting 12/10/2014
 
A5 Chicago Ave Project Plan
A5 Chicago Ave Project PlanA5 Chicago Ave Project Plan
A5 Chicago Ave Project Plan
 

Selectmen meeting 021014 final

  • 1. Underwood Pool Project Selectmen Meeting February 10, 2014
  • 2.
  • 3.
  • 4. KEY PLAN CONCORD AVENUE PROJECT GOALS COTTAGE STREET • REPLACE A FAILING POOL AND NONCODE COMPLIANT BATHHOUSE • CREATE A MULTI-GENERATIONAL POOL • CODE COMPLIANT, PLEASANT RESTROOMS AND STAFF FACILITIES • RESPECT AND PRESERVE HISTORIC VALUE OF SITE • IMPROVE PARK ACCESS • IMPROVE CIRCULATION & SAFETY • ENHANCE CONNECTIONS TO SURROUNDING COMMUNITY • OUTDOOR AMENITIES TO ENCOURAGE COMMUNITY PARTICIPATION WELLINGTON SCHOOL
  • 5. NEW DROP OFF AREA CONCORD AVE BUS STOP NEW TREES RECONFIGURED PARKING AREA FENCE LINE LAWN AREA EAST BATHHOUSE LAP LANES DIVING COTTAGE STREET WEST BATHHOUSE FAMILY POOL PICNIC AREA LAWN AREA FENCE LINE NEW TREE LINE NEW SIDEWALK EXTENSION TO SCHOOL STREET
  • 6. CONCORD AVENUE DROP-OFF NEW DROP-OFF BUS STOP NEW TREE PERMEABLE PAVERS SEATWALL SIGN
  • 7. CONCORD AVE NEW SIDEWALK (OPTIONAL) SPECIMEN TREES REGULARLY PLANTED IN LAWN (SELECTIVE REMOVAL OF UNHEALTHY AND INVASIVE TREES) COTTAGE STREET COTTAGE STREET EXISTING SIDEWALK COTTAGE STREET REGULARLY SPACED TREE OPTION MYRTLE STREET (PRECEDENT)
  • 8.
  • 9. PLUMBING REQUIREMENTS PER MASS STATE PLUMBING AND DPH CODES BASED ON SIZE OF POOL TOTAL NUMBER OF BATHERS: MEN: 323 WOMEN: 323 TOTAL REQUIRED FIXTURES: SHOWERS: TOILETS: 16 16 646
  • 10. EAST BATH HOUSE PLUMBING REQUIREMENTS EAST BATH HOUSE TOTAL PROVIDED FIXTURES: SHOWERS: 8 TOILETS: 6
  • 11. WEST BATH HOUSE PLUMBING REQUIREMENTS EAST BATH HOUSE TOTAL PROVIDED FIXTURES: SHOWERS: 8 TOILETS: 8 + 2 URINALS
  • 12.
  • 13.
  • 14.
  • 15. PROJECT CONSTRUCTION COSTS Construction Elements Bathhouse Buildings Two Swimming Pools Site Work General Conditions OH&P $950,000 $1,425,000 $895,603 $741,812 Includes Design/Estimating Contingency Escalation Subtotal Construction $149,908 $4,162,323 Town’s Construction Contingency $249,739 TOTAL CONSTUCTION COST $4,412,062
  • 16. TOTAL PROJECT COST Total Construction Cost $4,412,062 Project Soft Costs Design Fee $296,000 OPM & Clerk $259,655 Testing, Printing, Insurance, etc. $99,000 Soft Cost Contingency $65,466 Furniture and Equipment F&E Contingency $62,000 $6,200 TOTAL PROJECT COST $5,200,000
  • 17. Total Construction Cost $5,200,000 Funding: CPA 2013 $298,000 CPA 2014- Proposed $2,000,000 Debt Exclusion Amount $2,902,000