Introduction to Construction Industry
Final Project Report
Name: Chong Yu Xuan (0317950)
Kong Zhen Chung (0319528)
Lecturer: Pn. Hasmanira Mokhtar
Content
1.) Introduction
2.) Suggestion and Proposal
3.) Rationale and Benefits
4.) Site analysis and observation
5.) Sketch plan
6.) Introduction to the site
7.) Site Plan
8.) Authority Procedures
9.) Costing
Introduction
In a group work of 2 people Chong Yu Xuan and Kong Zhen Chung. We are
required to find a specific land within Taylor Lakeside Campus to initiate a small
construction project. Size of the chosenland should not be more then
30mx30m.We chooseto proposeafood and beverage area idea for our site. As a
group , we are required to producea project brief on the construction.
Suggestion and proposal
For this project , we decided to proposea 24/7 food and beverage (dining area) that
provide full meals at our site. The dining area will have a restaurant that sells
economical and also healthy foods.
Rationaleand Benefits
Rationale
According to our survey and research many students usually does their
assignments till late night in the studios and classrooms of block E. The only eatery
available till late night are “Mamak” and seven eleven for snacks. These eatery are
oily and unhealthy which will cause health problems after overconsumption.
Furthermore, the food and beverages in Taylor’s Lakeside Campus are overpriced
and unsuitable for student ,all the more reason for an economical eatery.
Benefits
This dining area in our site can bring much benefits to Taylor’s community
including:
1. Students around Block C/D/E do not need to walk long distance to the
commercial block to have a meal.
2. Enjoy beautiful scenery around that area.
3. Make use of the empty space.
4. Creating more business in the campus and improve social issues.
5. Economical food help students with financial burdens
6. Add choices to food variety in University compound
Site Analysis
The site we had chosen is on the roof garden at level 2, right at the end of Block E.
Our site is approximately 27m x 15m. It is a public spaceroof terrace and an open
spacewith only a partial roof by the side. It has railing of 1.2 meters high along the
side of the site. There is a roof of 3 meters extending out from the right railing of
the site. To the south, there is a car park area and a sportcourt. To the west, there is
a view of the opposite roofterrace of the same level. To the east, there is a view of
large trees and residential area. There is a view of the Taylor’s lake on the south-
west
The site is located at Taylor’s lakeside campus, Block E, Level 2, balcony.
Key Plan
Location Plan
Floor Plan
In our site, it is free from air pollution, this is because our site is surrounded by
the car park spaces which is away from the roads. Our site also located at higher
level than the car park spaces. Thewind strength in our site is average because our
site is attached to the block E building. Our site is located at block E, level 2. The
temperature in our site is normal because there are slow wind blowing toward our
site and our site is avoid from sun except in the afternoon half of our site will
explored by the sunlight. The only sound pollution faced in our site are the
condenserof the air conditional attached to the wall of buildings beside our site.
In front of the balcony, it’s a car park and
this is the view from our site looking
towards the car park.
The railing around the perimeter of the
balcony. It’s a 1m tall railing around the
balcony and it’s lifted by 15cm concretestep.
Sun Orientation
The sunlight will only reach the balcony
when afternoon 12pm to 2pm. Most area of
the site is shaded.
Full Site view from the entrance, as you can
see it is empty and unused
Block E, view from balcony.
Human Traffic
The entrance is wide, no traffic congestion
as this place is not used for anything
ProposedSite Introduction
After complete this project, our site had finally become a food and beverage area. It consists a
kitchen at the corner of our site. There will also be a bar beside the kitchen. The purpose that we
build a bar in it is to serve different types of drinks for the customers.
Rationale:
Students can dine at this area without walking very long distance to the
commercial block.
Zoning
Restaurant
Dine area
Leisure and sightseeing area
Site Plan
Door Benches Outdoorumbrella Table Potted plant
Kitchen Bar
Authority Procedure
Developmentorder
Submit and obtain Development Approval through OSC
Builderscan now apply for constructionpermitsthroughOSC 1Submission (singleentry). OSC will then refer the submissionst o
the Planning Department,Building Department, Engineering Department, Fire Department, SewerageAgency, Water Agency and
the TelecommunicationOperators.
OSC will issue the development approval (Planningaprrovals, Building approvals, Engineering approvals, Fire safety plan
endorsements, water approvals, sewerage works approvalsand Telecommunicationsapprovals) to the builder. Whileall formscan
be obtainedonline at jprb.dbkl.gov.my/Pentadbir/MuatTurunBorangOSC/MTBorang11.asp, the filing hasstill to be done inperson
at the OSC.
Builder will submit and obtain approval throughOSC for the following documents:
• Planningplan
• Building plan
• Engineering plan(earthwork, road & drainageplan, roadexcavation permit & street lightingplan)
• Landscape plan
• Water supply plan
• Sewerage plan
• Infrastructure communicationplan
• Fire safety plan
Estimated Processing Costs
1. Planning plan = MYR 500.00
2. Building plan= MYR 1,300.
3. Engineering plan = MYR 100.00
Developmentorder
4. Water supply plan = MYR 1,000.00
1. Submission to Local Authority through OSC
2. Obtain Development Order (DO) from Planning Department
3. Obtain Water Approval
4. Obtain Sewerage Approval
5. Obtain Fire Safety (Arch) Comment
6. Obtain Earthwork Approval
7. Obtain Road and Drainage Approval
8. Obtain Landscape Approval
9. Obtain Street Lighting Approval
10. Obtain MSMA and SPAH Approvals
11. Obtain Building Plan Approval
12. Obtain Fire Safety (M&E) Approval
Agency: Kuala Lumpur City Hall’sOne Stop Centre (OSC)
Submit pre-construction notifications to OSC
Under OSC 1Submission, all notificationsare submittedvia OSC. OSC will then distribute notificationsto the relevant agencies
such as:
• Building Department (B Form - notification to start buildingwork)
• Engineering Department (B Form - notificationto start earthwork)
• Sewerage CertifyingAgency (IWK) (PDC 6 Form - notificationto start sewerage work)
Agency: Kuala Lumpur City Hall’sOne Stop Centre (OSC)
Request final utilities inspections through OSC
Under OSC 1Submission, the builder hasto request for inspectionsvia OSC. OSC will arrange andcoordinate inspectionsand
connectionsschedule with relevant agencies
1. TELCO connection = MYR495.00
2. Water connection = MYR 30.00
3. Fire safety inspection = MYR 111.00
Agency: Kuala Lumpur City Hall’sOne Stop Centre (OSC)
Receive Road and Drainage Final Inspection
Once the road and drainage workshas been completed, the builder will request the Road andDrainage clearance letter from the
EngineeringDepartmentof CHKL. The builder hasto submit a construction report notification and by signing form G 17, the
Engineer certifiesthat all workswere carried out accordingto regulations. Form G17 will be filedalong withForm F (Certif icateof
Completion andCompliance (CCC) via OSC to the Engineering Department.
Agency: Sewerage Certifying Agency (IWK)
Obtain Road and Drainage Clearance Letter
Developmentorder
A date for the inspection will beset-up prior to the issuance of clearanceletter for the road and drainagework
Agency: Sewerage Certifying Agency (IWK)
Receive Sewage Final Inspection
The Sewerage CertifyingAgency (IWK) will carry out an inspection of the sewerage system and issue to the builder a clearance
letter for sewerage.
Agency: Sewerage Certifying Agency (IWK)
Obtain Sewage ClearanceLetter
Once the inspectionhasbeen carried out, a clearance letter isissued to the Builder. Thisclearance letter will allow the E ngineer to
issue the Certificate of Completionand compliance(CCC).
Agency: Sewerage Certifying Agency (IWK)
Receive Fire SafetyFinal Inspection
Fire and Rescue Department will carry out fire safety inspection
Agency: Fire and Rescue Department
Obtain Fire Safety Final Letter
Fire and Rescue Department will issue to the builder the clearance letter for fire safety
Agency: Fire Department
Receive Water Inspection
Water Authority SYABAS will conduct an onsite inspectionof the works and make the connection to the public pipe.
Agency: Water Authority SYABAS
Submit Water Test and Commissioning (T&C) Report
Water Authority SYABAS will conduct an onsite inspectionof the works and make the connection to the public pipe.
Agency: Water Authority SYABAS
Obtain Water Clearance Letter
The Water Authority SYABAS will issue a clearance letter to the builder and install thewater meter at the same time for water
connection.
Agency: Water Authority SYABAS
Builder’s Principal Submitting Person files the Certificate of Completion and compliance (CCC)
The Builder’sPrincipal Submitting Person (professional|architect) will issue Certificateof Completion andcompliance (Form F -
CCC) to the Builder/Owner and2 copiesof the CCC will be filedat the OSC for the BuildingDepartment(JRBB) and the Board o f
Architects/Engineers(LAM/LJM).
Agency: Building Department and Board of Architectvia OSC.
Obtain Water Connection
Agency: Water Authority SYABAS
Obtain Telco Connection
Costing
Description Single unitprice Quantity Prices
Restaurant
Restaurant RM20000 1 RM20000
Table RM120 40 RM480
Chairs RM25 200 RM5000
Kitchenutensils - - RM8000
Lighting RM30 10 RM300
Outdoor
Pottedplant RM25 30 RM750
Advertisementboard RM1300 2 RM2600
Outdoorumbrella RM150 10 RM1500
Total RM38630

Weitere ähnliche Inhalte

Was ist angesagt?

Bcon Report
Bcon Report Bcon Report
Bcon Report En Huey
 
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee MeetingBrentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee MeetingCrosstown TO
 
Ali adel 2.3.2021 gra portfolio
Ali adel 2.3.2021 gra portfolioAli adel 2.3.2021 gra portfolio
Ali adel 2.3.2021 gra portfoliossuser8e3a8e
 
Pharmacy to Kennedy Construction Liaison Committee Meeting - March 2018
Pharmacy to Kennedy Construction Liaison Committee Meeting - March 2018Pharmacy to Kennedy Construction Liaison Committee Meeting - March 2018
Pharmacy to Kennedy Construction Liaison Committee Meeting - March 2018Crosstown TO
 
minor project report on design of residential building
minor project report on design of residential buildingminor project report on design of residential building
minor project report on design of residential buildingtushar garg
 
Chaplin - Avenue Construction Liaison Committee - June 2018
Chaplin - Avenue Construction Liaison Committee - June 2018Chaplin - Avenue Construction Liaison Committee - June 2018
Chaplin - Avenue Construction Liaison Committee - June 2018Crosstown TO
 
Proposal of commercial area
Proposal of commercial area Proposal of commercial area
Proposal of commercial area Jamie Lee
 
Spring Virtual Open - Central West - April 21, 2021
Spring Virtual Open - Central West - April 21, 2021Spring Virtual Open - Central West - April 21, 2021
Spring Virtual Open - Central West - April 21, 2021Crosstown TO
 
Summer training report in civil engineering
Summer training report in civil engineeringSummer training report in civil engineering
Summer training report in civil engineeringalok0025
 
East Virtual Open House
East Virtual Open HouseEast Virtual Open House
East Virtual Open HouseCrosstown TO
 
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - March 2019
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - March 2019Eglinton & Mount Pleasant Construction Liaison Committee Meeting - March 2019
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - March 2019Crosstown TO
 
Central open house - oct 2019
Central open house - oct 2019Central open house - oct 2019
Central open house - oct 2019Crosstown TO
 
Leaside open house sep 2014 slides
Leaside open house sep 2014   slidesLeaside open house sep 2014   slides
Leaside open house sep 2014 slidesCrosstown TO
 
Eglinton and Mount Pleasant Construction Liaison Committee Meeting - Jan 2019
Eglinton and Mount Pleasant Construction Liaison Committee Meeting - Jan 2019Eglinton and Mount Pleasant Construction Liaison Committee Meeting - Jan 2019
Eglinton and Mount Pleasant Construction Liaison Committee Meeting - Jan 2019Crosstown TO
 
Fairbank & Oakwood Stations Construction Liaison Committee - Feb 2018
Fairbank & Oakwood Stations Construction Liaison Committee - Feb 2018Fairbank & Oakwood Stations Construction Liaison Committee - Feb 2018
Fairbank & Oakwood Stations Construction Liaison Committee - Feb 2018Crosstown TO
 
Construction Of Multistoreyed Building
Construction Of Multistoreyed BuildingConstruction Of Multistoreyed Building
Construction Of Multistoreyed BuildingSahla Fathima
 
Design of residential building
Design of residential buildingDesign of residential building
Design of residential buildingtushar garg
 
Fall Open House: Mount Dennis - Caledonia
Fall Open House: Mount Dennis - CaledoniaFall Open House: Mount Dennis - Caledonia
Fall Open House: Mount Dennis - CaledoniaCrosstown TO
 

Was ist angesagt? (20)

cv nour
cv nourcv nour
cv nour
 
Bcon Report
Bcon Report Bcon Report
Bcon Report
 
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee MeetingBrentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
 
Ali adel 2.3.2021 gra portfolio
Ali adel 2.3.2021 gra portfolioAli adel 2.3.2021 gra portfolio
Ali adel 2.3.2021 gra portfolio
 
Pharmacy to Kennedy Construction Liaison Committee Meeting - March 2018
Pharmacy to Kennedy Construction Liaison Committee Meeting - March 2018Pharmacy to Kennedy Construction Liaison Committee Meeting - March 2018
Pharmacy to Kennedy Construction Liaison Committee Meeting - March 2018
 
minor project report on design of residential building
minor project report on design of residential buildingminor project report on design of residential building
minor project report on design of residential building
 
Chaplin - Avenue Construction Liaison Committee - June 2018
Chaplin - Avenue Construction Liaison Committee - June 2018Chaplin - Avenue Construction Liaison Committee - June 2018
Chaplin - Avenue Construction Liaison Committee - June 2018
 
Proposal of commercial area
Proposal of commercial area Proposal of commercial area
Proposal of commercial area
 
Spring Virtual Open - Central West - April 21, 2021
Spring Virtual Open - Central West - April 21, 2021Spring Virtual Open - Central West - April 21, 2021
Spring Virtual Open - Central West - April 21, 2021
 
Summer training report in civil engineering
Summer training report in civil engineeringSummer training report in civil engineering
Summer training report in civil engineering
 
East Virtual Open House
East Virtual Open HouseEast Virtual Open House
East Virtual Open House
 
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - March 2019
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - March 2019Eglinton & Mount Pleasant Construction Liaison Committee Meeting - March 2019
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - March 2019
 
Building bye laws (1)
Building bye laws (1)Building bye laws (1)
Building bye laws (1)
 
Central open house - oct 2019
Central open house - oct 2019Central open house - oct 2019
Central open house - oct 2019
 
Leaside open house sep 2014 slides
Leaside open house sep 2014   slidesLeaside open house sep 2014   slides
Leaside open house sep 2014 slides
 
Eglinton and Mount Pleasant Construction Liaison Committee Meeting - Jan 2019
Eglinton and Mount Pleasant Construction Liaison Committee Meeting - Jan 2019Eglinton and Mount Pleasant Construction Liaison Committee Meeting - Jan 2019
Eglinton and Mount Pleasant Construction Liaison Committee Meeting - Jan 2019
 
Fairbank & Oakwood Stations Construction Liaison Committee - Feb 2018
Fairbank & Oakwood Stations Construction Liaison Committee - Feb 2018Fairbank & Oakwood Stations Construction Liaison Committee - Feb 2018
Fairbank & Oakwood Stations Construction Liaison Committee - Feb 2018
 
Construction Of Multistoreyed Building
Construction Of Multistoreyed BuildingConstruction Of Multistoreyed Building
Construction Of Multistoreyed Building
 
Design of residential building
Design of residential buildingDesign of residential building
Design of residential building
 
Fall Open House: Mount Dennis - Caledonia
Fall Open House: Mount Dennis - CaledoniaFall Open House: Mount Dennis - Caledonia
Fall Open House: Mount Dennis - Caledonia
 

Ähnlich wie FNBE April 2014 Construction Project Report

Assignment (1)
Assignment (1)Assignment (1)
Assignment (1)Lwj Welson
 
Assignment (1)
Assignment (1)Assignment (1)
Assignment (1)Lwj Welson
 
Building Construction and Technology
Building Construction and TechnologyBuilding Construction and Technology
Building Construction and TechnologySultan M Muzahir
 
CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016Ali Issa
 
ICI FINAL REPORT PDF
ICI FINAL REPORT PDFICI FINAL REPORT PDF
ICI FINAL REPORT PDFClement Seong
 
Ici final project (proposal 2) (1)
Ici final project (proposal 2) (1)Ici final project (proposal 2) (1)
Ici final project (proposal 2) (1)jinlieww
 
Ici final project proposal 2
Ici final project proposal 2Ici final project proposal 2
Ici final project proposal 2harrygirn
 
fnbe0414- Ici final project proposal
fnbe0414- Ici final project proposal fnbe0414- Ici final project proposal
fnbe0414- Ici final project proposal harrygirn
 
Chaplin and Avenue Stations Open House - October 2017
Chaplin and Avenue Stations Open House - October 2017Chaplin and Avenue Stations Open House - October 2017
Chaplin and Avenue Stations Open House - October 2017Crosstown TO
 
ARC 425 - LECTURE RESOURCE 1 - Const Mgt.pdf
ARC 425 - LECTURE RESOURCE 1  - Const Mgt.pdfARC 425 - LECTURE RESOURCE 1  - Const Mgt.pdf
ARC 425 - LECTURE RESOURCE 1 - Const Mgt.pdfFaruq42
 

Ähnlich wie FNBE April 2014 Construction Project Report (20)

Ici final 2
Ici final 2Ici final 2
Ici final 2
 
Ici final 2
Ici final 2Ici final 2
Ici final 2
 
Assignment (1)
Assignment (1)Assignment (1)
Assignment (1)
 
Assignment (1)
Assignment (1)Assignment (1)
Assignment (1)
 
induarial trainin report
induarial trainin reportinduarial trainin report
induarial trainin report
 
Building Construction and Technology
Building Construction and TechnologyBuilding Construction and Technology
Building Construction and Technology
 
VACATION WORK REPORT 2
VACATION WORK REPORT 2VACATION WORK REPORT 2
VACATION WORK REPORT 2
 
CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016
 
ICI FINAL REPORT PDF
ICI FINAL REPORT PDFICI FINAL REPORT PDF
ICI FINAL REPORT PDF
 
ICI FINAL REPORT
ICI FINAL REPORTICI FINAL REPORT
ICI FINAL REPORT
 
Ici final project (proposal 2) (1)
Ici final project (proposal 2) (1)Ici final project (proposal 2) (1)
Ici final project (proposal 2) (1)
 
Ici final project proposal 2
Ici final project proposal 2Ici final project proposal 2
Ici final project proposal 2
 
fnbe0414- Ici final project proposal
fnbe0414- Ici final project proposal fnbe0414- Ici final project proposal
fnbe0414- Ici final project proposal
 
Chaplin and Avenue Stations Open House - October 2017
Chaplin and Avenue Stations Open House - October 2017Chaplin and Avenue Stations Open House - October 2017
Chaplin and Avenue Stations Open House - October 2017
 
ARC 425 - LECTURE RESOURCE 1 - Const Mgt.pdf
ARC 425 - LECTURE RESOURCE 1  - Const Mgt.pdfARC 425 - LECTURE RESOURCE 1  - Const Mgt.pdf
ARC 425 - LECTURE RESOURCE 1 - Const Mgt.pdf
 
Project
Project Project
Project
 
Short termim workplan_20100602_part3
Short termim workplan_20100602_part3Short termim workplan_20100602_part3
Short termim workplan_20100602_part3
 
ICI Magazine
ICI MagazineICI Magazine
ICI Magazine
 
Magazine
MagazineMagazine
Magazine
 
OP YADAV PROJECT
OP YADAV PROJECTOP YADAV PROJECT
OP YADAV PROJECT
 

FNBE April 2014 Construction Project Report

  • 1. FNBE April 2014 Introduction to Construction Industry Final Project Report Name: Chong Yu Xuan (0317950) Kong Zhen Chung (0319528) Lecturer: Pn. Hasmanira Mokhtar
  • 2. Content 1.) Introduction 2.) Suggestion and Proposal 3.) Rationale and Benefits 4.) Site analysis and observation 5.) Sketch plan 6.) Introduction to the site 7.) Site Plan 8.) Authority Procedures 9.) Costing
  • 3. Introduction In a group work of 2 people Chong Yu Xuan and Kong Zhen Chung. We are required to find a specific land within Taylor Lakeside Campus to initiate a small construction project. Size of the chosenland should not be more then 30mx30m.We chooseto proposeafood and beverage area idea for our site. As a group , we are required to producea project brief on the construction.
  • 4. Suggestion and proposal For this project , we decided to proposea 24/7 food and beverage (dining area) that provide full meals at our site. The dining area will have a restaurant that sells economical and also healthy foods.
  • 5. Rationaleand Benefits Rationale According to our survey and research many students usually does their assignments till late night in the studios and classrooms of block E. The only eatery available till late night are “Mamak” and seven eleven for snacks. These eatery are oily and unhealthy which will cause health problems after overconsumption. Furthermore, the food and beverages in Taylor’s Lakeside Campus are overpriced and unsuitable for student ,all the more reason for an economical eatery.
  • 6. Benefits This dining area in our site can bring much benefits to Taylor’s community including: 1. Students around Block C/D/E do not need to walk long distance to the commercial block to have a meal. 2. Enjoy beautiful scenery around that area. 3. Make use of the empty space. 4. Creating more business in the campus and improve social issues. 5. Economical food help students with financial burdens 6. Add choices to food variety in University compound
  • 7. Site Analysis The site we had chosen is on the roof garden at level 2, right at the end of Block E. Our site is approximately 27m x 15m. It is a public spaceroof terrace and an open spacewith only a partial roof by the side. It has railing of 1.2 meters high along the side of the site. There is a roof of 3 meters extending out from the right railing of the site. To the south, there is a car park area and a sportcourt. To the west, there is a view of the opposite roofterrace of the same level. To the east, there is a view of large trees and residential area. There is a view of the Taylor’s lake on the south- west The site is located at Taylor’s lakeside campus, Block E, Level 2, balcony.
  • 11. In our site, it is free from air pollution, this is because our site is surrounded by the car park spaces which is away from the roads. Our site also located at higher level than the car park spaces. Thewind strength in our site is average because our site is attached to the block E building. Our site is located at block E, level 2. The temperature in our site is normal because there are slow wind blowing toward our site and our site is avoid from sun except in the afternoon half of our site will explored by the sunlight. The only sound pollution faced in our site are the condenserof the air conditional attached to the wall of buildings beside our site. In front of the balcony, it’s a car park and this is the view from our site looking towards the car park. The railing around the perimeter of the balcony. It’s a 1m tall railing around the balcony and it’s lifted by 15cm concretestep. Sun Orientation The sunlight will only reach the balcony when afternoon 12pm to 2pm. Most area of the site is shaded.
  • 12. Full Site view from the entrance, as you can see it is empty and unused Block E, view from balcony. Human Traffic The entrance is wide, no traffic congestion as this place is not used for anything
  • 13. ProposedSite Introduction After complete this project, our site had finally become a food and beverage area. It consists a kitchen at the corner of our site. There will also be a bar beside the kitchen. The purpose that we build a bar in it is to serve different types of drinks for the customers. Rationale: Students can dine at this area without walking very long distance to the commercial block.
  • 15. Site Plan Door Benches Outdoorumbrella Table Potted plant Kitchen Bar
  • 16.
  • 17. Authority Procedure Developmentorder Submit and obtain Development Approval through OSC Builderscan now apply for constructionpermitsthroughOSC 1Submission (singleentry). OSC will then refer the submissionst o the Planning Department,Building Department, Engineering Department, Fire Department, SewerageAgency, Water Agency and the TelecommunicationOperators. OSC will issue the development approval (Planningaprrovals, Building approvals, Engineering approvals, Fire safety plan endorsements, water approvals, sewerage works approvalsand Telecommunicationsapprovals) to the builder. Whileall formscan be obtainedonline at jprb.dbkl.gov.my/Pentadbir/MuatTurunBorangOSC/MTBorang11.asp, the filing hasstill to be done inperson at the OSC. Builder will submit and obtain approval throughOSC for the following documents: • Planningplan • Building plan • Engineering plan(earthwork, road & drainageplan, roadexcavation permit & street lightingplan) • Landscape plan • Water supply plan • Sewerage plan • Infrastructure communicationplan • Fire safety plan Estimated Processing Costs 1. Planning plan = MYR 500.00 2. Building plan= MYR 1,300. 3. Engineering plan = MYR 100.00
  • 18. Developmentorder 4. Water supply plan = MYR 1,000.00 1. Submission to Local Authority through OSC 2. Obtain Development Order (DO) from Planning Department 3. Obtain Water Approval 4. Obtain Sewerage Approval 5. Obtain Fire Safety (Arch) Comment 6. Obtain Earthwork Approval 7. Obtain Road and Drainage Approval 8. Obtain Landscape Approval 9. Obtain Street Lighting Approval 10. Obtain MSMA and SPAH Approvals 11. Obtain Building Plan Approval 12. Obtain Fire Safety (M&E) Approval Agency: Kuala Lumpur City Hall’sOne Stop Centre (OSC) Submit pre-construction notifications to OSC Under OSC 1Submission, all notificationsare submittedvia OSC. OSC will then distribute notificationsto the relevant agencies such as: • Building Department (B Form - notification to start buildingwork) • Engineering Department (B Form - notificationto start earthwork) • Sewerage CertifyingAgency (IWK) (PDC 6 Form - notificationto start sewerage work) Agency: Kuala Lumpur City Hall’sOne Stop Centre (OSC) Request final utilities inspections through OSC Under OSC 1Submission, the builder hasto request for inspectionsvia OSC. OSC will arrange andcoordinate inspectionsand connectionsschedule with relevant agencies 1. TELCO connection = MYR495.00 2. Water connection = MYR 30.00 3. Fire safety inspection = MYR 111.00 Agency: Kuala Lumpur City Hall’sOne Stop Centre (OSC) Receive Road and Drainage Final Inspection Once the road and drainage workshas been completed, the builder will request the Road andDrainage clearance letter from the EngineeringDepartmentof CHKL. The builder hasto submit a construction report notification and by signing form G 17, the Engineer certifiesthat all workswere carried out accordingto regulations. Form G17 will be filedalong withForm F (Certif icateof Completion andCompliance (CCC) via OSC to the Engineering Department. Agency: Sewerage Certifying Agency (IWK) Obtain Road and Drainage Clearance Letter
  • 19. Developmentorder A date for the inspection will beset-up prior to the issuance of clearanceletter for the road and drainagework Agency: Sewerage Certifying Agency (IWK) Receive Sewage Final Inspection The Sewerage CertifyingAgency (IWK) will carry out an inspection of the sewerage system and issue to the builder a clearance letter for sewerage. Agency: Sewerage Certifying Agency (IWK) Obtain Sewage ClearanceLetter Once the inspectionhasbeen carried out, a clearance letter isissued to the Builder. Thisclearance letter will allow the E ngineer to issue the Certificate of Completionand compliance(CCC). Agency: Sewerage Certifying Agency (IWK) Receive Fire SafetyFinal Inspection Fire and Rescue Department will carry out fire safety inspection Agency: Fire and Rescue Department Obtain Fire Safety Final Letter Fire and Rescue Department will issue to the builder the clearance letter for fire safety Agency: Fire Department Receive Water Inspection Water Authority SYABAS will conduct an onsite inspectionof the works and make the connection to the public pipe. Agency: Water Authority SYABAS Submit Water Test and Commissioning (T&C) Report Water Authority SYABAS will conduct an onsite inspectionof the works and make the connection to the public pipe. Agency: Water Authority SYABAS Obtain Water Clearance Letter The Water Authority SYABAS will issue a clearance letter to the builder and install thewater meter at the same time for water connection. Agency: Water Authority SYABAS Builder’s Principal Submitting Person files the Certificate of Completion and compliance (CCC) The Builder’sPrincipal Submitting Person (professional|architect) will issue Certificateof Completion andcompliance (Form F - CCC) to the Builder/Owner and2 copiesof the CCC will be filedat the OSC for the BuildingDepartment(JRBB) and the Board o f Architects/Engineers(LAM/LJM). Agency: Building Department and Board of Architectvia OSC. Obtain Water Connection Agency: Water Authority SYABAS Obtain Telco Connection
  • 20. Costing Description Single unitprice Quantity Prices Restaurant Restaurant RM20000 1 RM20000 Table RM120 40 RM480 Chairs RM25 200 RM5000 Kitchenutensils - - RM8000 Lighting RM30 10 RM300 Outdoor Pottedplant RM25 30 RM750 Advertisementboard RM1300 2 RM2600 Outdoorumbrella RM150 10 RM1500 Total RM38630