Definitions
• Agile - Agile methods emphasize face-to-face
  communication over written documents when the team is
  all in the same location

• OPM - The purpose of Organizational Performance
  Management (OPM) is to proactively manage the
  organization’s performance to meet its business objectives
Specific Goal and Practice Summary
• SG 1 Manage Business Performance
   • SP 1.1     Maintain Business Objectives
   • SP 1.2     Analyze Process Performance Data
   • SP 1.3     Identify Potential Areas for Improvement
• SG 2 Select Improvements
   •   SP 2.1   Elicit Suggested Improvements
   •   SP 2.2   Analyze Suggested Improvements
   •   SP 2.3   Validate Improvements
   •   SP 2.4   Select and Implement Improvements for Deployment
• SG 3 Deploy Improvements
   • SP 3.1     Plan the Deployment
   • SP 3.2     Manage the Deployment
   • SP 3.3     Evaluate Improvement Effects
Definitions
• High Maturity - focuses on continually improving process
  performance through incremental and innovative process
  and technological improvements. The organization’s
  quality and process performance objectives are established,
  continually revised to reflect changing business objectives
  and organizational performance, and used as criteria in
  managing process improvement. The effects of deployed
  process improvements are measured using statistical and
  other quantitative techniques and compared to quality and
  process performance objectives
The Solution We Chose

   Strategic Policy
     Deployment
        (SPD)
Strategic Policy Deployment
• Combination of:
  •   Clear & Aligned Priorities
  •   Behavior Changes
  •   Change in Thinking (PDCA)
  •   Elimination of Waste

  …to achieve Business Results
Strategic Policy Deployment

• A process to focus upon Goals, that cut across the
    corporation
•   Aligns & links resources & action in pursuit of those
    Goals.
•   Enables progress towards the Goals to be measured
•   Enables rapid root cause corrective action if results
    vary from goals
•   Drives process improvement
•   Individuals & teams get clarity on their impact upon
    the Goals
•   It becomes the yearly implementation of our long term
    strategic planning process.
Policy Deployment as a Tool

Policy Deployment is an effective tool to use for answering the following
questions:
    • How do we identify our critical goals?
    • How do we develop plans and align our activities?
    • How do we communicate our goals and activities level by level?
    • How do we align the abundant talent of our team members on the
      critical few?
    • How do we sustain our activities?
    • How do we quickly change course when required?
    • How do we learn from our experience?
Magnitude of Change
• Behavior Change
   • Discipline
   • Emphasis on how the organization will deliver the
     priorities
   • Catchball to understand the priorities and the means to
     deliver them
   • Gemba – look for evidence the plan is proceeding and
     in control
• Clear and Aligned Priorities
   • Start with top management priorities and link/translate
     at every level
   • Critical few metrics match Excel commitments
   • Must deselect
Achieving Enterprise-wide Alignment
                                                               • Clear vision and focus (“what”
            Develop
                      Annual        Plan                  Do     and “how”)
                      Strategy                                 • 3-Year business objectives          Ensure
                                        Act          Check     • Measures of success
                      Review                                                                         Alignment:

                                                               • Quantified business objectives
                                                                                                     Management
                      Annual            Plan           Do      • Integrated cross-organizational
                                                                                                     EXCEL goals
                      Commitment                                 performance plans and funding
                                         Act         Check
                                                                 (Corporate, Group, BU, SPG,         Performance
Catchball




                      Plan
            Deploy




                                                                 Shared Services, Departments)       Commitment
                                                                                                     Plans (PCP’s)
                      Policy            Plan          Do       • Specific strategic initiatives to
                      Deployment                                 achieve business objectives
                                         Act         Check                                           Employee
                      Plan                                     • Clear responsibility,
                                                                 accountability and measurable
                                                                                                     Development
                                                                 outcomes                            Plans (EDP’s)
                      Improvement        Plan         Do


                      Tracking            Act       Check
                                                               • Performance reviewed frequently     Performance
            Execute




                                                                 with focus on gap closure.
                                                                                                     Appraisals
                      Management          Plan       Do
                                                               • Root causes of performance gaps
                                           Act      Check

                      by Fact                                    understood                          Rewards
                                           Plan     Do
                                                               • Empowered employees taking
                      Countermeasures         Act   Check        action through Kaizen
                                                                 methodology
Highway
                                                                           Your
                                                                           Destination
                                                                           (Vision)



                        Keep improvement efforts
                        focussed on the ‘road’
                        not out here !


                                                               Use continuous improvement
                                                               to remove the small obstacles
                                                               on an ongoing basis
The ‘road’ is typically strewn
with obstacles (boulders)
some are large, some are small




                                       Use policy deployment to remove
  Your                                 the big boulders one at a time
  Start Point
  (Present situation)
Strategic Policy Deployment
                             Process
                        Step 1
                        Choose the Focus             Act    Plan


                                                    Check      Do
                        Step 2
Strategic Focus




                        Align the Organization



                        Step 3
                        Implement the Plan

                                                 Operational
                                                 Focus
                        Step 4
                           frequently
                        Review and Improve
The Forms Link…
                                                                                                                                                                                                                                                                                                                                                                                                                    Data Graph 1                                             Data Graph 2                                         Data Graph 3
                                                                                                                                                                                                                                                                                                                                                                                                                                        when improvement
                                                                                                                                                                                                                                                                                                                                                                                                                                        expected to be seen
                                                                                                                                                                                                                                                                                                                                                                                                                                            goal

                                                                                                                                                              PD Tracking                                     Date
                                                                                                                                                                                                                                                                  By                                       ORGANIZATION                                     YEAR
                                                                                                                                                              Priorities this Team                       Targets this Team




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               MBF for
                                                                                                                                                                     Priority 1                               Target Priority 1
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        root cause
                                                                                                                                                                     Priority 2                               Target Priority 2
                                                                                                                                                                     Priority 3                               Target Priority 3
                                                                                                                                                                                                                                                                                                                                                                                                2002     2003       Targets                  2004
                                                                                                                                                                     Priority 4                               Target Priority 4                                                                                                                                                                 ACT      ACT     2004    2006        TAV     YTD      JAN     FEB      MAR      APR      MAY       JUN      JUL        AUG      SEP     OCT      NOV      DEC
                                                                                                                                                                                                                                                                                                                                                                                                                                   TARGET
PD Matrix - Alignment                                                                                                                                                                      200X-1       200X
                                                                                                                                                                                                                                                                                                                                                                                                                                     ACT

                                                                                      ORGANIZATION                                  YEAR         Link            Driver Num bers           Actual      Target                    Jan          Feb           Mar        Apr             May       Jun           Jul             Aug       Sep         Oct   Nov   Dec
                                                                                                                                                                                                                                                                                                                                                                                                                                     VAR


       Date                                 By                                                                                                Priority X or
                                                                                                                                                                                                                       plan
                                                                                                                                                                                                                                                                                                                                                                                                Prioritized Root Cause                 Counter-measures                   Who               When
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          Process Capability
                                                                                                                                                                      Metric 1                         Target 1




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               red items
                                                                                                                                                                                                                     actual                                                                                                                                                                                                                                                                                Predictive Impact             Status/Results
                                                                                                                                              Supporting
                                                                                                                                                                                                                         +/-                                                                                                                                                                                                                                                                                      primary
                                                 PRIORITIES DEPLOYED FROM ABOVE        TARGET               TEAMS                                                                                                                                                                                                                                                                                      most impactful                   crisp & concrete                  ONE               specific                                          actual vs
                                                                                                                                                                                                                       plan                                                                                                                                                                                                                 activities                                                            metrics
                                                                                                                                              Priority X or                                                                                                                                                                                                                                                                                                              person              date                                               goal
                                             1                                                                                                                        Metric 2                         Target 2      actual
                                                                                                                                              Supporting
                                                                                                                                                                                                                     ytd +/-
                                            2                                                                                                                                                                          plan
                                                                                                                                              Priority X or
                                                                                                                                                                      Metric 3                         Target 3      actual
                                            3                                                                                                 Supporting                                                                                                                                                                                                                                               least impactful
                                                                                                                                                                                                                     ytd +/-
                                            4                                                                                                                                                                          plan
                                                                                                                                              Priority X or
                                                                                                                                                                      Metric 4                         Target 4      actual
                                             5                                                                                                Supporting
                                                                                                                                                                                                                     ytd +/-
                                            6                                                                                                                                                                          plan
                                                                                                                                              Priority X or
                                                                                                                                                                      Metric 5                         Target 5      actual
                                             7                                                                                                Supporting
                                                                                                                                                                                                                     ytd +/-
                                            8                                                                                                                                                                          plan
                                                                                                                                              Priority X or
                                                                                                                                                                      Metric 6                         Target 6      actual                                                                                                                                                                                                                                                                                                     Data Graph 1                                         Data Graph 2
                                            9                                                                                                 Supporting                                                                                                                                                                                                                                                                                                                                                                                           when improvement
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 Data Graph 3
                                                                                                                                                                                                                     ytd +/-                                                                                                                                                                                                                                                                                                                       expected to be seen
                                            10                                                                                                                                                                         plan                                                                                                                                                                                                                                                                                                                            goal
                                                                                                                                              Priority X or
                                                                                                                                                                      Metric 7                         Target 7      actual
                                                                                                                                              Supporting
                                                                                                                                                                                                                     ytd +/-
                                                                                                                                                                                                                       plan
                                                                                                                                              Priority X or
                                                                                                                                                                      Metric 8                         Target 8      actual
   1   2   3   4   5   6   7   8   9   10        PRIORITIES FOR THIS ORGANIZATION      TARGET                                                 Supporting                                                                                                                                                                                                                                                                                                                                                                                                                                                                             root cause
                                                                                                                                                                                                                     ytd +/-
                                                              Priority 1            Target Priority 1   A                                                                                                              plan
                                                                                                                                              Priority X or                                                                                                                                                                                                                                                                                                                                              2002      2003         Targets                2004
                                                                                                                                                                      Metric 9                         Target 9      actual                                                                                                                                                                                                                                                                              ACT       ACT       2004    2006       TAV    YTD      JAN      FEB   MAR      APR     MAY      JUN   JUL     AUG     SEP   OCT      NOV      DEC
                                                             Priority 2             Target Priority 2   B                                     Supporting
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              TARGET
                                                                                                                                                                                                                     ytd +/-
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                ACT
                                                             Priority 3             Target Priority 3   C
                                                                                                                                              Priority X or
                                                                                                                                                                                                                       plan                                                                                                                                                                                                                                                                                                                     VAR
                                                                                                                                                                      Metric 10                       Target 10      actual
                                                             Priority 4             Target Priority 4   D                                     Supporting                                                                                                                                                                                                                                                                                                                                                                                                                                                                 Process Capability
                                                                                                                                                                                                                     ytd +/-                                                                                                                                                                                                                                                                               Prioritized Root Cause                 Counter-measures               Who                When
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               Predictive Impact      Status/Results
                                                                                                                                                                                                                       plan
                                                                                                                                              Priority X or
                                                                                                                                                                      Metric 11                       Target 11      actual                                                                                                                                                                                                                                                                                                                       crisp & concrete               ONE                specific         primary               actual vs
                                                                                                                                              Supporting                                                                                                                                                                                                                                                                                                                                                        most impactful
                                                   PRIORITIES FOR LEVEL BELOW          TARGET               TEAMS   D   C   B   A                                                                                    ytd +/-                                                                                                                                                                                                                                                                                                                          activities                person               date            metrics                 goal
                                                                                                                                                                                                                       plan
                                                                                                                                              Priority X or
                                                                                                                                                                      Metric 12                       Target 12      actual
                                                                                                                                              Supporting
                                                                                                                                                                                                                     ytd +/-
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                least impactful




                                                                                                                                                                    Tracking Sheet

                                                                                                                                                                                                                                                                                                 ◊   Review or Milestone


                                                                                                                                                              2005 Action Plan                                                                                                                                             2006
                                                                                                                                                              Key Focus Area and Link to                                                                                     Benefit
                                                                                                                                                              Goals                        Sponsor   Leader       Projects/Tactics in each Key Focus Area                      $M        Costs   J     F   M    A    M     J    Jy   A   S   O   N   D




                   Alignment Sheet                                                                                                                                                                                                                                                                                                                                                        Data Graph 1
                                                                                                                                                                                                                                                                                                                                                                                                                when improvement
                                                                                                                                                                                                                                                                                                                                                                                                                expected to be seen
                                                                                                                                                                                                                                                                                                                                                                                                                    goal
                                                                                                                                                                                                                                                                                                                                                                                                                                                     Data Graph 2                                        Data Graph 3




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                root cause


                                                                                                                                                                                                                                                                                                                                                                       2002     2003      Targets                   2004
                                                                                                                                                                                                                                                                                                                                                                       ACT      ACT    2004    2006         TAV     YTD      JAN       FEB     MAR      APR     MAY      JUN       JUL      AUG      SEP        OCT       NOV     DEC
                                                                                                                                                                                                                                                                                                                                                                                                          TARGET
                                                                                                                                                                                                                                                                                                                                                                                                            ACT
                                                                                                                                                                                                                                                                                                                                                                                                            VAR


                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               Process Capability
                                                                                                                                                                                                                                                                                                                                                                       Prioritized Root Cause                   Counter-measures                    Who             When
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  Predictive Impact               Status/Results

                                                                                                                                                                                                                                                                                                                                                                                                                crisp & concrete                                                         primary




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   MBF,
                                                                                                                                                                                                                                                                                                                                                                              most impactful                                                     ONE                specific                                          actual vs
                                                                                                                                                                                                                                                                                                                                                                                                                    activities                  person               date                metrics                        goal




                                                                                                                                                                                                                                                                                                                                                                              least impactful




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   Newspaper,
                                                                                                                                                              2005 Action Plan
                                                                                                                                                              Key Focus Area and Link to
                                                                                                                                                              Goals                        Sponsor   Leader       Projects/Tactics in each Key Focus Area
                                                                                                                                                                                                                                                                             Benefit
                                                                                                                                                                                                                                                                               $M        Costs
                                                                                                                                                                                                                                                                                                 ◊


                                                                                                                                                                                                                                                                                                 J
                                                                                                                                                                                                                                                                                                     Review or Milestone




                                                                                                                                                                                                                                                                                                       F   M    A    M
                                                                                                                                                                                                                                                                                                                           2006

                                                                                                                                                                                                                                                                                                                           J    Jy   A   S   O   N   D
                                                                                                                                                                                                                                                                                                                                                                               Major Issues and Countermeasures                                                                                      Item / problem identified
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     Countermeasure / action agreed
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   or problem
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   strip for red
                                                                                                                                                                                                                                                                                                                                                                               Unit                                                                                                                  Countermeasure / action implemented
                                                                                                                                                                                                                                                                                                                                                                               Date____________________________________                                                                              Countermeasure / action confirmed


                                                                                                                                                                                                                                                                                                                                                                               Item         Issue/Risk Area                           Countermeasure                  Who        When       Status           Remarks/Comments




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   items


                                                                                                                                           Program Plan (multiple)
Catchball
• Process to build consensus through dialog about the
  goals and how to achieve them.
• Two way communication that arrives at a collective
  wisdom on the priorities and the plans to deliver the
  results.
• Leader needs to have a vision of what is needed and
  how it may be achieved.
   • Team will provide input on the specific how.
   • The leader will confirm the plan:
       • Push the team to stretch further if the plan comes short of
         what he had in mind.
       • Question and develop understanding of the plan if the plan
         exceeds what he had in mind.
Targets
.



    All priorities require a target so they can
    be measured.
    Targets have to be achievable, challenging,
    based on reliable data, and SMART.
                      S - specific
                      M - measurable
                      A - agreed
                      R – realistic
                      T - timed
The DO Phase                                  Act    Plan


                                                      Check   Do

• Stay focused on the plan.
• Make execution of the plan as visual as possible.
• Review the plan on a regular basis.
    • Look at metrics daily/weekly
    • Formal reviews monthly
        • results vs. expected, as well as the countermeasure to
          fill the gap
• Ask why if the team is doing things that are not in the
  plan.
• Question frequently by going to see.
    • Schedule the time to look for evidence that the plan is
      proceeding and in control.
The CHECK Phase
Holding reviews maintains the discipline of the
process:
  •   Confirm progress of current activities to expectations.
  •   Confirm the results to target. Look for trends.
  •   Evaluate the plan and results.
  •   Be visual.
                                            .
  •   Hold timely, regular reviews daily/weekly/monthly, dependent
      on level.
       • Look at metrics daily/weekly
       • Hold formal reviews monthly
           • results vs. expected, countermeasures to close any gaps
  • Reviews should be disciplined and structured.                      Act     Plan


  A mini PDCA cycle takes place everyday as activities                 Check   Do

  are checked constantly.
The CHECK Phase
• Counter measures are data driven looking at
  root cause.
• Check if previously identified counter
  measures are working and on track.
• Don’t react to noise.
• Escalate issues that can not be resolved to
  the next level.
The CHECK Meeting
    The manager runs the review meeting.
.




          The manager should focus on standard work:
             •Metrics Chart
             •Action Plan
             •Corrective Action for RED Items
             •Key Items at Risk

          • Asking clarifying questions during the review
            process.
          • Making sure that each person knows what is
            expected of them to move forward.
          • Confirmation check – will this plan get us
            there?
          • Follow up at Gemba before the next review for
            key issues.
Flow of the Check Process
 The check/review process starts at the lower levels
 and cascades upwards.

                                                     Company
                                                BU


                                SPG/Unit


                Department

Work Team




    • Lower levels may check more frequently.
Check Questions

Policy Deployment – Questions to Ask
1. Do you have a plan?
2. Does the plan close the gaps to the goal?
3. Is the plan being executed on time?
4. Is the answer is no for any of these,the expected
    If the plan generating generate a countermeasure

   business results?
    Monitor effectiveness of countermeasure
Look for trends – not just
       red/green

               • Metrics chart gives an overall view
               if on track
               • Use graphs and charts to see
               what is really happening.
The ACT Phase
• If off track:
   • Review the plan and countermeasures to confirm that gap
      from the plan can be closed.
       • Is the plan itself valid or does it need to be modifid?
   • Follow up to determine if actions on the countermeasures
      have been done.
   • Go to GEMBA to check to see if progress is being made
      on critical issues
• If on track
   • Lock in the condition with standardized work
• Confirmation Check
   • Does the plan and countermeasures link to the Act Plan
      goal/vision?
   • Does it seem reasonable?
                                                     Check Do
3/14/2013
PD Matrix - Alignment
                                                                                    ORGANIZATION                               YEAR
     Date                                   By

                                                 PRIORITIES DEPLOYED FROM ABOVE       TARGET       TEAMS
                                             1

                                             2

                                             3

                                             4

                                             5

                                             6

                                             7

                                             8

                                             9

                                            10




   1   2   3   4   5   6   7   8   9   10        PRIORITIES FOR THIS ORGANIZATION     TARGET
                                                                                               A

                                                                                               B

                                                                                               C

                                                                                               D

                                                                                               E



                                                   PRIORITIES FOR LEVEL BELOW         TARGET       TEAMS   E   D   C   B   A
PD Tracking                                                       Date
                                                                                                           By                                   ORGANIZATION                               YEAR
                                 Priorities this Team                                             Target




   Link          Driver Numbers         2005 Actual 2006 Target                 Jan-06   Feb-06   Mar-06        Apr-06   May-06   Jun-06   Jul-06   Aug-06   Sep-06   Oct-06   Nov-06   Dec-06   YTD
                                                                    plan                                                                                                                               0
                                                                  act     est
 Priority X     Key Metric Priority 1                Target 1
                                                                        +/-
                                                                   qtr +/-
                                                                    plan                                                                                                                               0
                                                                  act     est
 Priority X     Key Metric Priority 2                Target 2
                                                                   ytd +/-
                                                                   qtr +/-
                                                                    plan                                                                                                                               0
                                                                  act     est
 Priority X     Key Metric Priority 3                Target 3
                                                                        +/-
                                                                   qtr +/-
                                                                    plan                                                                                                                               0
                                                                  act     est
 Priority X     Key Metric Priority 4                Target 4
                                                                        +/-
                                                                   qtr +/-
                                                                    plan                                                                                                                               0
                                                                  act     est
 Priority X     Key Metric Priority 5                Target 5
                                                                        +/-
                                                                   qtr +/-


                                                                    plan                                                                                                                               0
Priority X or                                                     act     est
                      Metric 6                       Target 6
Supporting                                                              +/-
                                                                   qtr +/-
                                                                    plan                                                                                                                               0
Priority X or                                                     act     est
                      Metric 7                       Target 7
Supporting                                                              +/-
                                                                   qtr +/-
                                                                    plan                                                                                                                               0
Priority X or                                                     act     est
                      Metric 8                       Target 8
Supporting                                                              +/-
                                                                   qtr +/-
                                                                    plan                                                                                                                               0
Priority X or                                                     act     est
                      Metric 9                       Target 9
Supporting                                                         ytd +/-
                                                                   qtr +/-
                                                                    plan                                                                                                                               0
Priority X or
                     Metric 10                       Target 10    act     est
Supporting
                                                                   ytd +/-
                                                                    plan                                                                                                                               0
Priority X or
                     Metric 11                       Target 11    act     est
Supporting
                                                                   ytd +/-
Action Plan for:                                                                           Icons for Timeline         ? Proposed Start                  ? Proposed Completion
Date:                                                                                            Below                ? Actual Start                    ?    Actual Completion



                                                                                                                                               Status


                             Responsible                          Plan Dates      Status
              Task Details
                               Person
                                           $ Cost   $ Benefit
                                                                Start    Finish    R/G     Jan      Feb         Mar   Apr       May      Jun            Jul       Aug       Sep
MBF format for Red Items
                                           Policy Deployment Improvement Target Countermeasure Analysis
                                                           Management by Fact Summary
Organization:                        Leader:                                       Target:                                              Date:


Problem Statement:
                                               What is the problem that
                                                is preventing us from
                         Data Graph 1              being on target?               Data Graph 2                                      Data Graph 3




                                                                                                           What analysis has been
                                                                                                          done to determine the root
                                                                                                            cause of the problem?




 2002      2003         Targets                  2004
 ACT       ACT       2004     2006     TAV       YTD       JAN       FEB    MAR      APR      MAY   JUN      JUL       AUG      SEP       OCT       NOV   DEC
                                     TARGET
                                       ACT
                                       VAR


Prioritization & Root Cause          Counter Measures & Activities         Who               When                              Process Capability
                                                                                                          Predictive Im pact            Status/Results
Tool (Excel Based)
       Walkthrough

We will go through a real file
  and data for discussion
Questions ?
Contact
      Kobi Vider
   K.V.P Consulting
Kobi.Vider@hotmail.com
 Phone: +972522946676

Weitere ähnliche Inhalte

Was ist angesagt?

Esoaug r12 whats_new_projects_hcm(1)
Esoaug r12 whats_new_projects_hcm(1)Esoaug r12 whats_new_projects_hcm(1)
Esoaug r12 whats_new_projects_hcm(1)dbaman
 
Instigate Capability Summary
Instigate Capability SummaryInstigate Capability Summary
Instigate Capability SummaryEricGCraig
 
Materi#2 performance management concepts
Materi#2   performance management conceptsMateri#2   performance management concepts
Materi#2 performance management conceptsMokh Afifuddin Machfudz
 
Hr Transformation Overview
Hr Transformation OverviewHr Transformation Overview
Hr Transformation OverviewMark Gavora
 
Corporater at BSC and Strategy Forum - March 2013
Corporater at BSC and Strategy Forum - March 2013Corporater at BSC and Strategy Forum - March 2013
Corporater at BSC and Strategy Forum - March 2013Pedro S. Pereira
 
Process improvement without technology investments?
Process improvement without technology investments?Process improvement without technology investments?
Process improvement without technology investments?sharedserviceslink.com
 
Val.lunz
Val.lunzVal.lunz
Val.lunzNASAPMC
 
Business Process Re‐Engineering Shivaji University Syllabus
Business Process Re‐Engineering Shivaji University SyllabusBusiness Process Re‐Engineering Shivaji University Syllabus
Business Process Re‐Engineering Shivaji University SyllabusIshwar Bulbule
 
Lean Six Sigma Project Management Oct11th2010[ (1)
Lean Six Sigma Project Management Oct11th2010[ (1)Lean Six Sigma Project Management Oct11th2010[ (1)
Lean Six Sigma Project Management Oct11th2010[ (1)Arunima Thakur
 
Starting a portfolio Quick Guide
Starting a portfolio Quick GuideStarting a portfolio Quick Guide
Starting a portfolio Quick GuideMaven
 
Business analysis and project changes
Business analysis and project changesBusiness analysis and project changes
Business analysis and project changesIIBA Romania Chapter
 
Open BI Initiative Educause11
Open BI Initiative Educause11Open BI Initiative Educause11
Open BI Initiative Educause11Thomas Danford
 
Green Portfolio Framework 7 09
Green Portfolio Framework 7 09Green Portfolio Framework 7 09
Green Portfolio Framework 7 09edf_innovex
 
Run sap assess
Run sap assessRun sap assess
Run sap assessairuegas
 
"Views on 2030" by Dr. Robin Mann
"Views on 2030" by Dr. Robin Mann"Views on 2030" by Dr. Robin Mann
"Views on 2030" by Dr. Robin MannDubai Quality Group
 
Professional Business Results & Selected Accomplishments
Professional Business Results & Selected AccomplishmentsProfessional Business Results & Selected Accomplishments
Professional Business Results & Selected Accomplishmentsmjleib
 
June 21 2012 Process Performance Metrics Presentation
June 21 2012 Process Performance Metrics PresentationJune 21 2012 Process Performance Metrics Presentation
June 21 2012 Process Performance Metrics Presentationgmasiuk
 
Introduction To Solleva Group
Introduction To Solleva GroupIntroduction To Solleva Group
Introduction To Solleva Groupevanslyke
 
Management control systems jsb 606 part3
Management control systems jsb 606 part3Management control systems jsb 606 part3
Management control systems jsb 606 part3Debasis Das
 

Was ist angesagt? (20)

Esoaug r12 whats_new_projects_hcm(1)
Esoaug r12 whats_new_projects_hcm(1)Esoaug r12 whats_new_projects_hcm(1)
Esoaug r12 whats_new_projects_hcm(1)
 
Instigate Capability Summary
Instigate Capability SummaryInstigate Capability Summary
Instigate Capability Summary
 
Materi#2 performance management concepts
Materi#2   performance management conceptsMateri#2   performance management concepts
Materi#2 performance management concepts
 
Hr Transformation Overview
Hr Transformation OverviewHr Transformation Overview
Hr Transformation Overview
 
Corporater at BSC and Strategy Forum - March 2013
Corporater at BSC and Strategy Forum - March 2013Corporater at BSC and Strategy Forum - March 2013
Corporater at BSC and Strategy Forum - March 2013
 
Process improvement without technology investments?
Process improvement without technology investments?Process improvement without technology investments?
Process improvement without technology investments?
 
PMP Map Color Coded
PMP Map Color CodedPMP Map Color Coded
PMP Map Color Coded
 
Val.lunz
Val.lunzVal.lunz
Val.lunz
 
Business Process Re‐Engineering Shivaji University Syllabus
Business Process Re‐Engineering Shivaji University SyllabusBusiness Process Re‐Engineering Shivaji University Syllabus
Business Process Re‐Engineering Shivaji University Syllabus
 
Lean Six Sigma Project Management Oct11th2010[ (1)
Lean Six Sigma Project Management Oct11th2010[ (1)Lean Six Sigma Project Management Oct11th2010[ (1)
Lean Six Sigma Project Management Oct11th2010[ (1)
 
Starting a portfolio Quick Guide
Starting a portfolio Quick GuideStarting a portfolio Quick Guide
Starting a portfolio Quick Guide
 
Business analysis and project changes
Business analysis and project changesBusiness analysis and project changes
Business analysis and project changes
 
Open BI Initiative Educause11
Open BI Initiative Educause11Open BI Initiative Educause11
Open BI Initiative Educause11
 
Green Portfolio Framework 7 09
Green Portfolio Framework 7 09Green Portfolio Framework 7 09
Green Portfolio Framework 7 09
 
Run sap assess
Run sap assessRun sap assess
Run sap assess
 
"Views on 2030" by Dr. Robin Mann
"Views on 2030" by Dr. Robin Mann"Views on 2030" by Dr. Robin Mann
"Views on 2030" by Dr. Robin Mann
 
Professional Business Results & Selected Accomplishments
Professional Business Results & Selected AccomplishmentsProfessional Business Results & Selected Accomplishments
Professional Business Results & Selected Accomplishments
 
June 21 2012 Process Performance Metrics Presentation
June 21 2012 Process Performance Metrics PresentationJune 21 2012 Process Performance Metrics Presentation
June 21 2012 Process Performance Metrics Presentation
 
Introduction To Solleva Group
Introduction To Solleva GroupIntroduction To Solleva Group
Introduction To Solleva Group
 
Management control systems jsb 606 part3
Management control systems jsb 606 part3Management control systems jsb 606 part3
Management control systems jsb 606 part3
 

Andere mochten auch

A tecnologia na educação jessica
A tecnologia na educação jessicaA tecnologia na educação jessica
A tecnologia na educação jessicajulianabastosdasilva
 
A tecnologia na educação jessica
A tecnologia na educação jessicaA tecnologia na educação jessica
A tecnologia na educação jessicajulianabastosdasilva
 
A tecnologia na educação jessica
A tecnologia na educação jessicaA tecnologia na educação jessica
A tecnologia na educação jessicajulianabastosdasilva
 
Menopausia y patología asociada
Menopausia y patología asociadaMenopausia y patología asociada
Menopausia y patología asociadaLuis Lucero
 
Satélites artificiales
Satélites artificialesSatélites artificiales
Satélites artificialesACayonRuano
 
Aula 1 - parte 2 Alteraçoes Estruturais
Aula 1 - parte 2 Alteraçoes EstruturaisAula 1 - parte 2 Alteraçoes Estruturais
Aula 1 - parte 2 Alteraçoes Estruturaisaivilsilveira
 

Andere mochten auch (9)

A tecnologia na educação jessica
A tecnologia na educação jessicaA tecnologia na educação jessica
A tecnologia na educação jessica
 
Analisis de ratios
Analisis de ratiosAnalisis de ratios
Analisis de ratios
 
A tecnologia na educação jessica
A tecnologia na educação jessicaA tecnologia na educação jessica
A tecnologia na educação jessica
 
A TECNOLOGIA NA EDUCAÇÃO.
A TECNOLOGIA NA EDUCAÇÃO.A TECNOLOGIA NA EDUCAÇÃO.
A TECNOLOGIA NA EDUCAÇÃO.
 
A tecnologia na educação jessica
A tecnologia na educação jessicaA tecnologia na educação jessica
A tecnologia na educação jessica
 
Menopausia y patología asociada
Menopausia y patología asociadaMenopausia y patología asociada
Menopausia y patología asociada
 
Satélites artificiales
Satélites artificialesSatélites artificiales
Satélites artificiales
 
Aula 1 - parte 2 Alteraçoes Estruturais
Aula 1 - parte 2 Alteraçoes EstruturaisAula 1 - parte 2 Alteraçoes Estruturais
Aula 1 - parte 2 Alteraçoes Estruturais
 
MATRIZ ANSOFF
MATRIZ ANSOFFMATRIZ ANSOFF
MATRIZ ANSOFF
 

Ähnlich wie Design your business processes to embrace people

kpi for the malaysian government
kpi for the malaysian governmentkpi for the malaysian government
kpi for the malaysian governmentHj Arriffin Mansor
 
MCKinney Rogers Corporate overview
MCKinney Rogers Corporate overview  MCKinney Rogers Corporate overview
MCKinney Rogers Corporate overview McKinney Rogers Ltd
 
NG BB 54 Sustain the Gain
NG BB 54 Sustain the GainNG BB 54 Sustain the Gain
NG BB 54 Sustain the GainLeanleaders.org
 
Introduction To KPIs
Introduction To KPIsIntroduction To KPIs
Introduction To KPIsAlastairs1
 
It smf pack pk slides
It smf pack pk slidesIt smf pack pk slides
It smf pack pk slidesPeter Karran
 
Ariba Knowledge Nuggets: Supplier Performance Management Part 2
Ariba Knowledge Nuggets: Supplier Performance Management Part 2Ariba Knowledge Nuggets: Supplier Performance Management Part 2
Ariba Knowledge Nuggets: Supplier Performance Management Part 2SAP Ariba
 
Lean project management
Lean project management Lean project management
Lean project management John Bun
 
Latihan keusahawanan kaedah baru
Latihan keusahawanan   kaedah baruLatihan keusahawanan   kaedah baru
Latihan keusahawanan kaedah baruHj Arriffin Mansor
 
Salesforce CRM 7 domains of Success
Salesforce CRM 7 domains of SuccessSalesforce CRM 7 domains of Success
Salesforce CRM 7 domains of SuccessKevin Sherman
 
LSS Idea Generation to Project Execution
LSS Idea Generation to Project ExecutionLSS Idea Generation to Project Execution
LSS Idea Generation to Project ExecutionAnand Subramaniam
 
Implementing UnBalanced Scorecard
Implementing UnBalanced ScorecardImplementing UnBalanced Scorecard
Implementing UnBalanced ScorecardTathagat Varma
 
Brantley.wayne
Brantley.wayneBrantley.wayne
Brantley.wayneNASAPMC
 
Governance Maturity Assessment Report
Governance Maturity Assessment ReportGovernance Maturity Assessment Report
Governance Maturity Assessment Reportsmcasas
 
Check Point Brochure 5 Governance Sprints 2012[1]
Check Point Brochure   5 Governance Sprints 2012[1]Check Point Brochure   5 Governance Sprints 2012[1]
Check Point Brochure 5 Governance Sprints 2012[1]Project Adventure Inc
 
Results Based Monitoring and Evaluation
Results Based Monitoring and EvaluationResults Based Monitoring and Evaluation
Results Based Monitoring and EvaluationMadhawa Waidyaratna
 
Lean sixsigmaproject managementoct11th2010[ (1)
Lean sixsigmaproject managementoct11th2010[ (1)Lean sixsigmaproject managementoct11th2010[ (1)
Lean sixsigmaproject managementoct11th2010[ (1)Arunima Thakur
 

Ähnlich wie Design your business processes to embrace people (20)

Strategic management ppt
Strategic management pptStrategic management ppt
Strategic management ppt
 
kpi for the malaysian government
kpi for the malaysian governmentkpi for the malaysian government
kpi for the malaysian government
 
MCKinney Rogers Corporate overview
MCKinney Rogers Corporate overview  MCKinney Rogers Corporate overview
MCKinney Rogers Corporate overview
 
NG BB 54 Sustain the Gain
NG BB 54 Sustain the GainNG BB 54 Sustain the Gain
NG BB 54 Sustain the Gain
 
Managing performance effectively in Contact Centres
Managing performance effectively in Contact CentresManaging performance effectively in Contact Centres
Managing performance effectively in Contact Centres
 
Introduction To KPIs
Introduction To KPIsIntroduction To KPIs
Introduction To KPIs
 
It smf pack pk slides
It smf pack pk slidesIt smf pack pk slides
It smf pack pk slides
 
Ariba Knowledge Nuggets: Supplier Performance Management Part 2
Ariba Knowledge Nuggets: Supplier Performance Management Part 2Ariba Knowledge Nuggets: Supplier Performance Management Part 2
Ariba Knowledge Nuggets: Supplier Performance Management Part 2
 
Lean project management
Lean project management Lean project management
Lean project management
 
Measuring Strategic Performance
Measuring Strategic PerformanceMeasuring Strategic Performance
Measuring Strategic Performance
 
Latihan keusahawanan kaedah baru
Latihan keusahawanan   kaedah baruLatihan keusahawanan   kaedah baru
Latihan keusahawanan kaedah baru
 
Salesforce CRM 7 domains of Success
Salesforce CRM 7 domains of SuccessSalesforce CRM 7 domains of Success
Salesforce CRM 7 domains of Success
 
LSS Idea Generation to Project Execution
LSS Idea Generation to Project ExecutionLSS Idea Generation to Project Execution
LSS Idea Generation to Project Execution
 
Coaching for action
Coaching for actionCoaching for action
Coaching for action
 
Implementing UnBalanced Scorecard
Implementing UnBalanced ScorecardImplementing UnBalanced Scorecard
Implementing UnBalanced Scorecard
 
Brantley.wayne
Brantley.wayneBrantley.wayne
Brantley.wayne
 
Governance Maturity Assessment Report
Governance Maturity Assessment ReportGovernance Maturity Assessment Report
Governance Maturity Assessment Report
 
Check Point Brochure 5 Governance Sprints 2012[1]
Check Point Brochure   5 Governance Sprints 2012[1]Check Point Brochure   5 Governance Sprints 2012[1]
Check Point Brochure 5 Governance Sprints 2012[1]
 
Results Based Monitoring and Evaluation
Results Based Monitoring and EvaluationResults Based Monitoring and Evaluation
Results Based Monitoring and Evaluation
 
Lean sixsigmaproject managementoct11th2010[ (1)
Lean sixsigmaproject managementoct11th2010[ (1)Lean sixsigmaproject managementoct11th2010[ (1)
Lean sixsigmaproject managementoct11th2010[ (1)
 

Mehr von Kobi Vider

Visual management controls systems techniques
Visual management controls systems techniquesVisual management controls systems techniques
Visual management controls systems techniquesKobi Vider
 
Risk management process diagram
Risk management process diagramRisk management process diagram
Risk management process diagramKobi Vider
 
Customer service quality perception the mutual commitments importance
Customer service quality perception the mutual commitments importanceCustomer service quality perception the mutual commitments importance
Customer service quality perception the mutual commitments importanceKobi Vider
 
Kaizen team leader guide
Kaizen team leader guideKaizen team leader guide
Kaizen team leader guideKobi Vider
 
Process asset library as process improvement and knowledge sharing tool
Process asset library as process improvement and knowledge sharing toolProcess asset library as process improvement and knowledge sharing tool
Process asset library as process improvement and knowledge sharing toolKobi Vider
 
Kaizen – road map to world class processes
Kaizen – road map to world class processesKaizen – road map to world class processes
Kaizen – road map to world class processesKobi Vider
 
Customer value management
Customer value managementCustomer value management
Customer value managementKobi Vider
 
Customer perception of product quality
Customer perception of product qualityCustomer perception of product quality
Customer perception of product qualityKobi Vider
 
Six sigma as foundation to cmmi
Six sigma as foundation to cmmiSix sigma as foundation to cmmi
Six sigma as foundation to cmmiKobi Vider
 
Understanding the impact of certain uncertain event using bayesian network
Understanding the impact of  certain uncertain event using bayesian networkUnderstanding the impact of  certain uncertain event using bayesian network
Understanding the impact of certain uncertain event using bayesian networkKobi Vider
 
Interpretation and lesson learned from high maturity implementation of cmmi svc
Interpretation and lesson learned from high maturity implementation of cmmi svcInterpretation and lesson learned from high maturity implementation of cmmi svc
Interpretation and lesson learned from high maturity implementation of cmmi svcKobi Vider
 
Game theory bbn and qfd
Game theory bbn and qfdGame theory bbn and qfd
Game theory bbn and qfdKobi Vider
 
Cross constellations v1
Cross constellations v1Cross constellations v1
Cross constellations v1Kobi Vider
 
Base your initial m&a to ppm, qpm, car
Base your initial m&a to ppm, qpm, carBase your initial m&a to ppm, qpm, car
Base your initial m&a to ppm, qpm, carKobi Vider
 
Process performance models case study
Process performance models case studyProcess performance models case study
Process performance models case studyKobi Vider
 
Lesson learned cross constellations multi models process improvement
Lesson learned cross constellations multi models process improvement Lesson learned cross constellations multi models process improvement
Lesson learned cross constellations multi models process improvement Kobi Vider
 
Using cmmi svc to lead cross constellations effort
Using cmmi svc to lead cross constellations effortUsing cmmi svc to lead cross constellations effort
Using cmmi svc to lead cross constellations effortKobi Vider
 
Assuring assessments leaders team member’s quality and qualification
Assuring assessments leaders  team member’s quality and qualification Assuring assessments leaders  team member’s quality and qualification
Assuring assessments leaders team member’s quality and qualification Kobi Vider
 
Cmmi configuration management interpretation kit
Cmmi configuration management interpretation kitCmmi configuration management interpretation kit
Cmmi configuration management interpretation kitKobi Vider
 
Software testing by risk management
Software testing by risk managementSoftware testing by risk management
Software testing by risk managementKobi Vider
 

Mehr von Kobi Vider (20)

Visual management controls systems techniques
Visual management controls systems techniquesVisual management controls systems techniques
Visual management controls systems techniques
 
Risk management process diagram
Risk management process diagramRisk management process diagram
Risk management process diagram
 
Customer service quality perception the mutual commitments importance
Customer service quality perception the mutual commitments importanceCustomer service quality perception the mutual commitments importance
Customer service quality perception the mutual commitments importance
 
Kaizen team leader guide
Kaizen team leader guideKaizen team leader guide
Kaizen team leader guide
 
Process asset library as process improvement and knowledge sharing tool
Process asset library as process improvement and knowledge sharing toolProcess asset library as process improvement and knowledge sharing tool
Process asset library as process improvement and knowledge sharing tool
 
Kaizen – road map to world class processes
Kaizen – road map to world class processesKaizen – road map to world class processes
Kaizen – road map to world class processes
 
Customer value management
Customer value managementCustomer value management
Customer value management
 
Customer perception of product quality
Customer perception of product qualityCustomer perception of product quality
Customer perception of product quality
 
Six sigma as foundation to cmmi
Six sigma as foundation to cmmiSix sigma as foundation to cmmi
Six sigma as foundation to cmmi
 
Understanding the impact of certain uncertain event using bayesian network
Understanding the impact of  certain uncertain event using bayesian networkUnderstanding the impact of  certain uncertain event using bayesian network
Understanding the impact of certain uncertain event using bayesian network
 
Interpretation and lesson learned from high maturity implementation of cmmi svc
Interpretation and lesson learned from high maturity implementation of cmmi svcInterpretation and lesson learned from high maturity implementation of cmmi svc
Interpretation and lesson learned from high maturity implementation of cmmi svc
 
Game theory bbn and qfd
Game theory bbn and qfdGame theory bbn and qfd
Game theory bbn and qfd
 
Cross constellations v1
Cross constellations v1Cross constellations v1
Cross constellations v1
 
Base your initial m&a to ppm, qpm, car
Base your initial m&a to ppm, qpm, carBase your initial m&a to ppm, qpm, car
Base your initial m&a to ppm, qpm, car
 
Process performance models case study
Process performance models case studyProcess performance models case study
Process performance models case study
 
Lesson learned cross constellations multi models process improvement
Lesson learned cross constellations multi models process improvement Lesson learned cross constellations multi models process improvement
Lesson learned cross constellations multi models process improvement
 
Using cmmi svc to lead cross constellations effort
Using cmmi svc to lead cross constellations effortUsing cmmi svc to lead cross constellations effort
Using cmmi svc to lead cross constellations effort
 
Assuring assessments leaders team member’s quality and qualification
Assuring assessments leaders  team member’s quality and qualification Assuring assessments leaders  team member’s quality and qualification
Assuring assessments leaders team member’s quality and qualification
 
Cmmi configuration management interpretation kit
Cmmi configuration management interpretation kitCmmi configuration management interpretation kit
Cmmi configuration management interpretation kit
 
Software testing by risk management
Software testing by risk managementSoftware testing by risk management
Software testing by risk management
 

Design your business processes to embrace people

  • 1. Design Your Business Processes to Embrace People in an Agile Approach and Support High Maturity (OPM)
  • 2. Definitions • Agile - Agile methods emphasize face-to-face communication over written documents when the team is all in the same location • OPM - The purpose of Organizational Performance Management (OPM) is to proactively manage the organization’s performance to meet its business objectives
  • 3. Specific Goal and Practice Summary • SG 1 Manage Business Performance • SP 1.1 Maintain Business Objectives • SP 1.2 Analyze Process Performance Data • SP 1.3 Identify Potential Areas for Improvement • SG 2 Select Improvements • SP 2.1 Elicit Suggested Improvements • SP 2.2 Analyze Suggested Improvements • SP 2.3 Validate Improvements • SP 2.4 Select and Implement Improvements for Deployment • SG 3 Deploy Improvements • SP 3.1 Plan the Deployment • SP 3.2 Manage the Deployment • SP 3.3 Evaluate Improvement Effects
  • 4. Definitions • High Maturity - focuses on continually improving process performance through incremental and innovative process and technological improvements. The organization’s quality and process performance objectives are established, continually revised to reflect changing business objectives and organizational performance, and used as criteria in managing process improvement. The effects of deployed process improvements are measured using statistical and other quantitative techniques and compared to quality and process performance objectives
  • 5. The Solution We Chose Strategic Policy Deployment (SPD)
  • 6. Strategic Policy Deployment • Combination of: • Clear & Aligned Priorities • Behavior Changes • Change in Thinking (PDCA) • Elimination of Waste …to achieve Business Results
  • 7. Strategic Policy Deployment • A process to focus upon Goals, that cut across the corporation • Aligns & links resources & action in pursuit of those Goals. • Enables progress towards the Goals to be measured • Enables rapid root cause corrective action if results vary from goals • Drives process improvement • Individuals & teams get clarity on their impact upon the Goals • It becomes the yearly implementation of our long term strategic planning process.
  • 8. Policy Deployment as a Tool Policy Deployment is an effective tool to use for answering the following questions: • How do we identify our critical goals? • How do we develop plans and align our activities? • How do we communicate our goals and activities level by level? • How do we align the abundant talent of our team members on the critical few? • How do we sustain our activities? • How do we quickly change course when required? • How do we learn from our experience?
  • 9. Magnitude of Change • Behavior Change • Discipline • Emphasis on how the organization will deliver the priorities • Catchball to understand the priorities and the means to deliver them • Gemba – look for evidence the plan is proceeding and in control • Clear and Aligned Priorities • Start with top management priorities and link/translate at every level • Critical few metrics match Excel commitments • Must deselect
  • 10. Achieving Enterprise-wide Alignment • Clear vision and focus (“what” Develop Annual Plan Do and “how”) Strategy • 3-Year business objectives Ensure Act Check • Measures of success Review Alignment: • Quantified business objectives Management Annual Plan Do • Integrated cross-organizational EXCEL goals Commitment performance plans and funding Act Check (Corporate, Group, BU, SPG, Performance Catchball Plan Deploy Shared Services, Departments) Commitment Plans (PCP’s) Policy Plan Do • Specific strategic initiatives to Deployment achieve business objectives Act Check Employee Plan • Clear responsibility, accountability and measurable Development outcomes Plans (EDP’s) Improvement Plan Do Tracking Act Check • Performance reviewed frequently Performance Execute with focus on gap closure. Appraisals Management Plan Do • Root causes of performance gaps Act Check by Fact understood Rewards Plan Do • Empowered employees taking Countermeasures Act Check action through Kaizen methodology
  • 11. Highway Your Destination (Vision) Keep improvement efforts focussed on the ‘road’ not out here ! Use continuous improvement to remove the small obstacles on an ongoing basis The ‘road’ is typically strewn with obstacles (boulders) some are large, some are small Use policy deployment to remove Your the big boulders one at a time Start Point (Present situation)
  • 12. Strategic Policy Deployment Process Step 1 Choose the Focus Act Plan Check Do Step 2 Strategic Focus Align the Organization Step 3 Implement the Plan Operational Focus Step 4 frequently Review and Improve
  • 13. The Forms Link… Data Graph 1 Data Graph 2 Data Graph 3 when improvement expected to be seen goal PD Tracking Date By ORGANIZATION YEAR Priorities this Team Targets this Team MBF for Priority 1 Target Priority 1 root cause Priority 2 Target Priority 2 Priority 3 Target Priority 3 2002 2003 Targets 2004 Priority 4 Target Priority 4 ACT ACT 2004 2006 TAV YTD JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC TARGET PD Matrix - Alignment 200X-1 200X ACT ORGANIZATION YEAR Link Driver Num bers Actual Target Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec VAR Date By Priority X or plan Prioritized Root Cause Counter-measures Who When Process Capability Metric 1 Target 1 red items actual Predictive Impact Status/Results Supporting +/- primary PRIORITIES DEPLOYED FROM ABOVE TARGET TEAMS most impactful crisp & concrete ONE specific actual vs plan activities metrics Priority X or person date goal 1 Metric 2 Target 2 actual Supporting ytd +/- 2 plan Priority X or Metric 3 Target 3 actual 3 Supporting least impactful ytd +/- 4 plan Priority X or Metric 4 Target 4 actual 5 Supporting ytd +/- 6 plan Priority X or Metric 5 Target 5 actual 7 Supporting ytd +/- 8 plan Priority X or Metric 6 Target 6 actual Data Graph 1 Data Graph 2 9 Supporting when improvement Data Graph 3 ytd +/- expected to be seen 10 plan goal Priority X or Metric 7 Target 7 actual Supporting ytd +/- plan Priority X or Metric 8 Target 8 actual 1 2 3 4 5 6 7 8 9 10 PRIORITIES FOR THIS ORGANIZATION TARGET Supporting root cause ytd +/- Priority 1 Target Priority 1 A plan Priority X or 2002 2003 Targets 2004 Metric 9 Target 9 actual ACT ACT 2004 2006 TAV YTD JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Priority 2 Target Priority 2 B Supporting TARGET ytd +/- ACT Priority 3 Target Priority 3 C Priority X or plan VAR Metric 10 Target 10 actual Priority 4 Target Priority 4 D Supporting Process Capability ytd +/- Prioritized Root Cause Counter-measures Who When Predictive Impact Status/Results plan Priority X or Metric 11 Target 11 actual crisp & concrete ONE specific primary actual vs Supporting most impactful PRIORITIES FOR LEVEL BELOW TARGET TEAMS D C B A ytd +/- activities person date metrics goal plan Priority X or Metric 12 Target 12 actual Supporting ytd +/- least impactful Tracking Sheet ◊ Review or Milestone 2005 Action Plan 2006 Key Focus Area and Link to Benefit Goals Sponsor Leader Projects/Tactics in each Key Focus Area $M Costs J F M A M J Jy A S O N D Alignment Sheet Data Graph 1 when improvement expected to be seen goal Data Graph 2 Data Graph 3 root cause 2002 2003 Targets 2004 ACT ACT 2004 2006 TAV YTD JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC TARGET ACT VAR Process Capability Prioritized Root Cause Counter-measures Who When Predictive Impact Status/Results crisp & concrete primary MBF, most impactful ONE specific actual vs activities person date metrics goal least impactful Newspaper, 2005 Action Plan Key Focus Area and Link to Goals Sponsor Leader Projects/Tactics in each Key Focus Area Benefit $M Costs ◊ J Review or Milestone F M A M 2006 J Jy A S O N D Major Issues and Countermeasures Item / problem identified Countermeasure / action agreed or problem strip for red Unit Countermeasure / action implemented Date____________________________________ Countermeasure / action confirmed Item Issue/Risk Area Countermeasure Who When Status Remarks/Comments items Program Plan (multiple)
  • 14. Catchball • Process to build consensus through dialog about the goals and how to achieve them. • Two way communication that arrives at a collective wisdom on the priorities and the plans to deliver the results. • Leader needs to have a vision of what is needed and how it may be achieved. • Team will provide input on the specific how. • The leader will confirm the plan: • Push the team to stretch further if the plan comes short of what he had in mind. • Question and develop understanding of the plan if the plan exceeds what he had in mind.
  • 15. Targets . All priorities require a target so they can be measured. Targets have to be achievable, challenging, based on reliable data, and SMART. S - specific M - measurable A - agreed R – realistic T - timed
  • 16. The DO Phase Act Plan Check Do • Stay focused on the plan. • Make execution of the plan as visual as possible. • Review the plan on a regular basis. • Look at metrics daily/weekly • Formal reviews monthly • results vs. expected, as well as the countermeasure to fill the gap • Ask why if the team is doing things that are not in the plan. • Question frequently by going to see. • Schedule the time to look for evidence that the plan is proceeding and in control.
  • 17. The CHECK Phase Holding reviews maintains the discipline of the process: • Confirm progress of current activities to expectations. • Confirm the results to target. Look for trends. • Evaluate the plan and results. • Be visual. . • Hold timely, regular reviews daily/weekly/monthly, dependent on level. • Look at metrics daily/weekly • Hold formal reviews monthly • results vs. expected, countermeasures to close any gaps • Reviews should be disciplined and structured. Act Plan A mini PDCA cycle takes place everyday as activities Check Do are checked constantly.
  • 18. The CHECK Phase • Counter measures are data driven looking at root cause. • Check if previously identified counter measures are working and on track. • Don’t react to noise. • Escalate issues that can not be resolved to the next level.
  • 19. The CHECK Meeting The manager runs the review meeting. . The manager should focus on standard work: •Metrics Chart •Action Plan •Corrective Action for RED Items •Key Items at Risk • Asking clarifying questions during the review process. • Making sure that each person knows what is expected of them to move forward. • Confirmation check – will this plan get us there? • Follow up at Gemba before the next review for key issues.
  • 20. Flow of the Check Process The check/review process starts at the lower levels and cascades upwards. Company BU SPG/Unit Department Work Team • Lower levels may check more frequently.
  • 21. Check Questions Policy Deployment – Questions to Ask 1. Do you have a plan? 2. Does the plan close the gaps to the goal? 3. Is the plan being executed on time? 4. Is the answer is no for any of these,the expected If the plan generating generate a countermeasure business results? Monitor effectiveness of countermeasure
  • 22. Look for trends – not just red/green • Metrics chart gives an overall view if on track • Use graphs and charts to see what is really happening.
  • 23. The ACT Phase • If off track: • Review the plan and countermeasures to confirm that gap from the plan can be closed. • Is the plan itself valid or does it need to be modifid? • Follow up to determine if actions on the countermeasures have been done. • Go to GEMBA to check to see if progress is being made on critical issues • If on track • Lock in the condition with standardized work • Confirmation Check • Does the plan and countermeasures link to the Act Plan goal/vision? • Does it seem reasonable? Check Do
  • 25. PD Matrix - Alignment ORGANIZATION YEAR Date By PRIORITIES DEPLOYED FROM ABOVE TARGET TEAMS 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 PRIORITIES FOR THIS ORGANIZATION TARGET A B C D E PRIORITIES FOR LEVEL BELOW TARGET TEAMS E D C B A
  • 26. PD Tracking Date By ORGANIZATION YEAR Priorities this Team Target Link Driver Numbers 2005 Actual 2006 Target Jan-06 Feb-06 Mar-06 Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 YTD plan 0 act est Priority X Key Metric Priority 1 Target 1 +/- qtr +/- plan 0 act est Priority X Key Metric Priority 2 Target 2 ytd +/- qtr +/- plan 0 act est Priority X Key Metric Priority 3 Target 3 +/- qtr +/- plan 0 act est Priority X Key Metric Priority 4 Target 4 +/- qtr +/- plan 0 act est Priority X Key Metric Priority 5 Target 5 +/- qtr +/- plan 0 Priority X or act est Metric 6 Target 6 Supporting +/- qtr +/- plan 0 Priority X or act est Metric 7 Target 7 Supporting +/- qtr +/- plan 0 Priority X or act est Metric 8 Target 8 Supporting +/- qtr +/- plan 0 Priority X or act est Metric 9 Target 9 Supporting ytd +/- qtr +/- plan 0 Priority X or Metric 10 Target 10 act est Supporting ytd +/- plan 0 Priority X or Metric 11 Target 11 act est Supporting ytd +/-
  • 27. Action Plan for: Icons for Timeline ? Proposed Start ? Proposed Completion Date: Below ? Actual Start ? Actual Completion Status Responsible Plan Dates Status Task Details Person $ Cost $ Benefit Start Finish R/G Jan Feb Mar Apr May Jun Jul Aug Sep
  • 28. MBF format for Red Items Policy Deployment Improvement Target Countermeasure Analysis Management by Fact Summary Organization: Leader: Target: Date: Problem Statement: What is the problem that is preventing us from Data Graph 1 being on target? Data Graph 2 Data Graph 3 What analysis has been done to determine the root cause of the problem? 2002 2003 Targets 2004 ACT ACT 2004 2006 TAV YTD JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC TARGET ACT VAR Prioritization & Root Cause Counter Measures & Activities Who When Process Capability Predictive Im pact Status/Results
  • 29. Tool (Excel Based) Walkthrough We will go through a real file and data for discussion
  • 31. Contact Kobi Vider K.V.P Consulting Kobi.Vider@hotmail.com Phone: +972522946676