SlideShare ist ein Scribd-Unternehmen logo
1 von 8
Downloaden Sie, um offline zu lesen
Seneca Valley Senior Project
                                             Project Proposal

Part I. Laying the Foundation
   A. Refer to your Paper Proposal and restate your area of interest and explain what new and additional information you
      have learned since completing your research.

        In doing my research paper, I have learned that children with a terminally ill disease are socially withdrawn
        because of being excluded.




   B.    What questions about this area of study do you hope to answer through completing a project? In other words, what
        information will completing a project provide that the research paper did not?

        My project will teach me if children with a terminally ill disease are socially withdrawn. The project will also
        provide me experience with children and the opportunity to provide them with social interactions.




   C. What were your initial project ideas from your Paper Proposal?

        I thought about volunteering at a children’s hospital or possibly holding a trampoline-a-thon over the weekend
        to raise money for Make a Wish organization.


   D. Are these ideas still feasible? If yes, how so? If not, why?

        My ideas are still feasible because I am really focusing on the volunteer project. I have spoken to a director at
        the hospital and they are in need of a project volunteer.


   E. As specifically as possible, suggest at least two different project ideas related to your area of interest. These may be
        your initial project ideas from the paper proposal, revisions of those ideas, or something completely new. Complete the
        following table supplying adequate information for each project idea. The following is a description of the information
        required for each project idea.
Product                 Board Area                    Adult                           Expense                       Time
                                      List which Board Area
                                                                   Resource                   Consider the finances you       Consider your
           Identify the product
                                        best describes your                                   may need to complete your      schedule: school,
          that would be created                                  Name at least one
                                    research and project. See                                 project. What are they and    work, social, family,
               for each project                                 specific adult whose
                                       description of Board                                     how will you meet the      and the time demands
            listed. This is what                                expertise could help
                                       Areas in this manual.                                            costs?                of each project.
             classroom teacher                                   guide you through
                                   1. Academic/Humanities                                                                   Which project better
             and Senior Board                                   this project. Briefly
                                   2. Academic/Sciences                                                                       meets your time
             judges will use to                                   explain how this
                                   3. Career/Entrepreneur                                                                  management abilities?
            assess your project.                                person’s knowledge
                                   4. Mechanical Design/
                                                                   can help you.
                                      Construction              (The adult must be at least
                                   5. School/Community           21 years of age and not a
                                      Service &                     parent or relative.)
                                   Improvement
                                   6. Visual/Performing
                                   Arts
            Volunteer at           Community Service Mr. Smith who                                1. Prizes $30    6 hours
            Children’s             and Improvement   has conducted                                2. Games $15     shadowing a
            Hospital and                             fundraising for                              3. Invitations   nurse.
Project     have four                                many                                            $5             9 hours
            activity days                            organizations.                                                planning
  #1        for the                                  George Lump                              Total $50.00 paid in activities –
            children.                                who is the                               full by me.          games, snacks
            Scrapbook of                             Financial                                                     and prizes
            my                                       Director of                                                   8 hrs. at activity
            experiences.                             Children’s                                                    (1 hr. for each
            Survey of                                Hospital                                                      activity; .5 hrs.
            children’s                                                                                             to set-up; .5 hrs.
            interests.                                                                                             to clean up.)
                                                                                                                   Total: 23 hrs.
           Hold a                  Community Service Mr. Smith who                                1. Trampoline    4 hrs. setting up
          trampoline-              and Improvement   has conducted                                    $450         the trampoline
          athon to raise                             fundraising for                              2. Place         8 hrs. acquiring
Project   money for                                  many                                             $50-100      people and
          Children’s                                 organizations.                               3. Refreshments having them sign
 #2       Hospital.                                  George Lump                                      $20          waivers
          Video and                                  who is the                                                    3 hrs. acquiring
          Certificate of                             Financial                                Total $585 paid in   donations for
          donation.                                  Director of                              full by me           refreshments and
                                                     Children’s                                                    other costs
                                                     Hospital                                                      15 hrs. for the
                                                                                                                   trampoline-athon
                                                                                                                   Total: 30 hrs.
I do not have a
               third project
               idea at this
Project        time.

 #3
(optional)




             F. Based on your answers above, identify the project you wish to complete for senior project. Elaborate
                on information provided in the table; explain all parts of project, stages of completion, and products.

                 Volunteering at Children’s Hospital and planning 4 social activities for the children will be
                 the best project choice for me given the time and the cost of the project. This project will
                 take a great deal of time management, planning skills, and interpersonal skills. I will start by
                 volunteering at the hospital, which will include shadowing Miss Robinson, a nurse. At that
                 time she will introduce me to the children and teach me how to work and socialize with the
                 children. I will shadow Miss Robinson for 2 hrs. on 3/1/05, 3/8/05, and 3/22/05. After
                 shadowing Miss Robinson I will hold an activity for the children. The activity will take
                 place in the playroom so the children do not have to leave the floor. The activities that I will
                 have will be organized by me with the assistance of Harry Kamp. Each activity will be an
                 hour long but the children will have to register for the activity before they can attend. To
                 decide on activities I will survey the children to see what their interests are. The activities
                 will include such things as games, reading or movies. The activities will be held after I
                 shadow Miss Robinson on 3/1/05, 3/8/05 and 3/22/05. They will last for one hr. The final
                 activity day will occur on 3/29/05 and will be an activity and a party for the children. This
                 activity will last for two hrs. and the children will receive personal invitations to attend the
                 party.


             G. Beyond the required Project Verification and Project Log, list specifically how you will verify your project
                and the steps you took to complete this project for the judges and your classroom teacher. As
                verification of the Project component is a student’s responsibility, list specific examples of verification
                you will supply.
                 (Verification can be in the form of emails, certificates, letters written and received, permission slips, photographs, videos, receipts, programs, audience
                 feedback, etc.)


             I will be creating a scrapbook for my project and the children will be journaling about their
             experience with me. I will be presenting excerpts from the journal and will document the
             children’s feelings about feeling accepted and their opinions about the activities that I have
             planned for them
Part II. Building Supports

   If you are doing something that requires the approval and/or assistance of a business, club, agency,
   church, or instructor other than your mentor, you must specifically identify your contact person(s), your
   agreed upon course of action, and any additional information that explains the arrangements you have
   made to complete your project.

   Example: Glory Days…

   I will be discussing with the Director of Children’s Hospital my schedule and setting the exact times and
   dates for meetings. His name is Harry Kamp, as noted above. His number is 724-287-7596.


Part III. Paying Attention to Details

   A. Attach completed Project time line to proposal.
Part IV. Approval!

Date Project Submitted _____________________

Student’s signature ____________________________ Parent/Guardian signature____________________

Project Conference Date _________________________

Comments or Questions:




_____ Project Approved

_____ Project Approved with Reservation

_____ Project Revision Requested                    resubmit work by __________


   Teacher Signature _________________________                      Date _______________
Project Time Line
                              Project Time Line



Part 1 – Brainstorm               Part 1 – Tasks Completed
       List below tasks already completed in the planning or initial stages of your project. Note
       Brainstorm date of completion remaining materials or sources used.
       approximate below any and all and explain tasks needed to successfully complete your project.
Be sure to break larger tasks into the smaller steps. (For example: It is not enough to list as a task,
“Set up rehearsal schedule.” What do you need to get done to set up a rehearsal schedule?
Develop a phone chain, construct a calendar of dates, contact and set up a Used to rehearse, etc.)
                       Task                               Materials/Sources place                Date
        You may include any tasks already completed. Consider ALL aspects of the project and
product including materials, mentor meetings, interviews, phone calls, emails, classes, construction,
research, etc.

       -   Form a survey (pass out survey, collect survey, record data)
       -   Get parent permission letters for pictures
       -   Get a scrapbook and supplies
       -   Keep journal of shadowing experiences
       -   Plan activities for each date
       -   Get supplies for the activities
       -   Make invitations for final party
       -   Complete scrapbook for the final party to share with the children
                                          Part 2 – Brainstorm

        Brainstorm below any and all remaining tasks needed to successfully complete your project. Be sure
to break larger tasks into the smaller steps. Consider ALL aspects of the project and product including
materials, mentor meetings, interviews, phone calls, emails, classes, construction, research, etc.
Part 2 – Time line
       Review, organize, and prioritize the tasks in Step 1. List each task below in anticipated order
of completion and estimate the time you will need to complete the task. Be sure to refer to the
calendar of Senior Project due dates and any personal commitments.

                                  Task                               Estimated        Anticipated
                                                                       Time to        Completion
                                                                      Complete            Date
Form a survey (pass out survey, collect survey, record data)        5 hrs.          2/26/05

Get parent permission letters for pictures (write the letter)       3 hrs.          2/28/05

Get a scrapbook and supplies                                        20 mins.        2/28/05

Keep journal of shadowing experiences                               2 hrs.          3/30/05

Plan activities for each date                                       9 hrs.          Thurs. before each
                                                                                    activity
Get supplies for the activities                                     20 mins. each    Fri. before each
                                                                    activity         activity
Make invitations for final party                                    20 mins.        3/23/05

Complete scrapbook for the final party to share with the children   4 hrs.          3/25/05

Conduct the activities with the children                            1 hr.           3/29/05




(Add more rows as necessary.)

Notes/Thoughts:
Mentor Questions


•   Why did you choose this person to help you with your project? What special skills or abilities does he/she have?
•   When did you meet with him/her? What was his/her reaction to what you are planning? What advice did he/she
    offer?
•   If you would choose this adult as your mentor for the project, how accessible is he/she? (A minimum of three
    mentor meetings is required) Are there specific things that this adult has already agreed to assist you with?

    I chose Mr. Harry Kamp as my mentor because he is the Activities Coordinator for
Children’s Hospital. He plans weekly activities for the children in the entire hospital. He
also ensures that the children have books, toys, and movies to enjoy. He will be helpful
because he can ensure that I am completing all of the steps needed to have a successful
activity.
         I met with Mr. Kamp on February 1, 2005 at 3:00 in his office at the Children’s
Hospital. He was excited that he will have someone doing his job for the Saturday’s in
the month of May. He told me that it is important to schedule activities that the children
would enjoy and be interested in rather than an activity that would just be easy for me to
plan. He told me that it will be time consuming to plan this many activities because of
the many health issues you must consider.
         Mr. Kamp is available to meet with me every Saturday before or after the
scheduled activity. Along with this, we have exchanged email addresses so we can
remain in contact throughout the weeks. Mr. Kamp needs to constantly know what
activities I will be planning to make sure that we are able to include the majority of the
children. Mr. Kamp is very willing to assist me in completing a successful senior project.
He has already agreed to assist me with planning activities that will be appropriate for all
of the children. He will also assist me with gathering the health information needed to
ensure this.

Weitere ähnliche Inhalte

Ähnlich wie Project proposal

School of Galen Project management Training
School of Galen Project management TrainingSchool of Galen Project management Training
School of Galen Project management TrainingÜmitcan Ünver
 
[Challenge:Future] Dream Your Future
[Challenge:Future] Dream Your Future[Challenge:Future] Dream Your Future
[Challenge:Future] Dream Your FutureChallenge:Future
 
DiscoverE Leading Kids Through A Successful Engineering Experience
DiscoverE Leading Kids Through A Successful Engineering ExperienceDiscoverE Leading Kids Through A Successful Engineering Experience
DiscoverE Leading Kids Through A Successful Engineering ExperienceDiscoverE
 
Slvrsf judges training2017
Slvrsf judges training2017Slvrsf judges training2017
Slvrsf judges training2017Lucy Adams
 
Slvrsf Judges Training 2016
Slvrsf Judges Training 2016Slvrsf Judges Training 2016
Slvrsf Judges Training 2016Lucy Adams
 
Satisfaction
SatisfactionSatisfaction
Satisfactionsmakam
 
Satisfaction
SatisfactionSatisfaction
Satisfactionsmakam
 
Shannel’s GLO Portfolio
Shannel’s GLO PortfolioShannel’s GLO Portfolio
Shannel’s GLO Portfolioshaaannel
 
Pallid Sturgeon Research Project
Pallid Sturgeon Research ProjectPallid Sturgeon Research Project
Pallid Sturgeon Research ProjectBrenda Zerr
 
Equation for design by committee
Equation for design by committeeEquation for design by committee
Equation for design by committeeQ7 Associates
 
Though there is still much to learn, you have been considering found.docx
Though there is still much to learn, you have been considering found.docxThough there is still much to learn, you have been considering found.docx
Though there is still much to learn, you have been considering found.docxbrockdebroah
 
Dario Nardi | Brain Savvy Trust | Trust Conference 2014
Dario Nardi | Brain Savvy Trust | Trust Conference 2014Dario Nardi | Brain Savvy Trust | Trust Conference 2014
Dario Nardi | Brain Savvy Trust | Trust Conference 2014Talent Dynamics
 
Taking the pain out of communications planning
Taking the pain out of communications planningTaking the pain out of communications planning
Taking the pain out of communications planningCharityComms
 
SW4085 Session 1
SW4085 Session 1SW4085 Session 1
SW4085 Session 1ZoeORiordan
 
G7 module 12-q4_07022021 (1)
G7 module 12-q4_07022021 (1)G7 module 12-q4_07022021 (1)
G7 module 12-q4_07022021 (1)CarolLizardo1
 

Ähnlich wie Project proposal (20)

HG-G6-Q1-Mod1-RTP.pdf
HG-G6-Q1-Mod1-RTP.pdfHG-G6-Q1-Mod1-RTP.pdf
HG-G6-Q1-Mod1-RTP.pdf
 
School of Galen Project management Training
School of Galen Project management TrainingSchool of Galen Project management Training
School of Galen Project management Training
 
[Challenge:Future] Dream Your Future
[Challenge:Future] Dream Your Future[Challenge:Future] Dream Your Future
[Challenge:Future] Dream Your Future
 
DiscoverE Leading Kids Through A Successful Engineering Experience
DiscoverE Leading Kids Through A Successful Engineering ExperienceDiscoverE Leading Kids Through A Successful Engineering Experience
DiscoverE Leading Kids Through A Successful Engineering Experience
 
Slvrsf judges training2017
Slvrsf judges training2017Slvrsf judges training2017
Slvrsf judges training2017
 
Slvrsf Judges Training 2016
Slvrsf Judges Training 2016Slvrsf Judges Training 2016
Slvrsf Judges Training 2016
 
Satisfaction
SatisfactionSatisfaction
Satisfaction
 
Satisfaction
SatisfactionSatisfaction
Satisfaction
 
Hg g8-q1-module-1
Hg g8-q1-module-1Hg g8-q1-module-1
Hg g8-q1-module-1
 
Shannel’s GLO Portfolio
Shannel’s GLO PortfolioShannel’s GLO Portfolio
Shannel’s GLO Portfolio
 
Pallid Sturgeon Research Project
Pallid Sturgeon Research ProjectPallid Sturgeon Research Project
Pallid Sturgeon Research Project
 
Equation for design by committee
Equation for design by committeeEquation for design by committee
Equation for design by committee
 
Though there is still much to learn, you have been considering found.docx
Though there is still much to learn, you have been considering found.docxThough there is still much to learn, you have been considering found.docx
Though there is still much to learn, you have been considering found.docx
 
Right Time, Right Strategy
Right Time, Right StrategyRight Time, Right Strategy
Right Time, Right Strategy
 
Dario Nardi | Brain Savvy Trust | Trust Conference 2014
Dario Nardi | Brain Savvy Trust | Trust Conference 2014Dario Nardi | Brain Savvy Trust | Trust Conference 2014
Dario Nardi | Brain Savvy Trust | Trust Conference 2014
 
Trust 20min
Trust 20minTrust 20min
Trust 20min
 
Verbal Power Plan
Verbal Power PlanVerbal Power Plan
Verbal Power Plan
 
Taking the pain out of communications planning
Taking the pain out of communications planningTaking the pain out of communications planning
Taking the pain out of communications planning
 
SW4085 Session 1
SW4085 Session 1SW4085 Session 1
SW4085 Session 1
 
G7 module 12-q4_07022021 (1)
G7 module 12-q4_07022021 (1)G7 module 12-q4_07022021 (1)
G7 module 12-q4_07022021 (1)
 

Mehr von Seneca Valley School District (20)

Twelve angry men project
Twelve angry men projectTwelve angry men project
Twelve angry men project
 
Twelve angry men act iii
Twelve angry men act iiiTwelve angry men act iii
Twelve angry men act iii
 
The heros journey
The heros journeyThe heros journey
The heros journey
 
Tbaf quiz
Tbaf quizTbaf quiz
Tbaf quiz
 
Tbaf and ob quiz
Tbaf and ob quizTbaf and ob quiz
Tbaf and ob quiz
 
Surrealistic dream
Surrealistic dreamSurrealistic dream
Surrealistic dream
 
Study guide lof
Study guide   lofStudy guide   lof
Study guide lof
 
Speech syllabus
Speech syllabusSpeech syllabus
Speech syllabus
 
Sg trans.
Sg   trans.Sg   trans.
Sg trans.
 
Sf short story assignment
Sf short story assignmentSf short story assignment
Sf short story assignment
 
Sc activities
Sc activitiesSc activities
Sc activities
 
Romanticism
RomanticismRomanticism
Romanticism
 
Realism
RealismRealism
Realism
 
Realism
RealismRealism
Realism
 
Reading log
Reading logReading log
Reading log
 
Rap's daughter
Rap's daughterRap's daughter
Rap's daughter
 
Rapp's daughter quiz
Rapp's daughter quizRapp's daughter quiz
Rapp's daughter quiz
 
Rappaccini daughter
Rappaccini daughterRappaccini daughter
Rappaccini daughter
 
Quiz on chapters 9 10 tkam
Quiz on chapters 9 10 tkamQuiz on chapters 9 10 tkam
Quiz on chapters 9 10 tkam
 
Project proposals
Project proposalsProject proposals
Project proposals
 

Kürzlich hochgeladen

5 charts on South Africa as a source country for international student recrui...
5 charts on South Africa as a source country for international student recrui...5 charts on South Africa as a source country for international student recrui...
5 charts on South Africa as a source country for international student recrui...CaraSkikne1
 
Unveiling the Intricacies of Leishmania donovani: Structure, Life Cycle, Path...
Unveiling the Intricacies of Leishmania donovani: Structure, Life Cycle, Path...Unveiling the Intricacies of Leishmania donovani: Structure, Life Cycle, Path...
Unveiling the Intricacies of Leishmania donovani: Structure, Life Cycle, Path...Dr. Asif Anas
 
KARNAADA.pptx made by - saransh dwivedi ( SD ) - SHALAKYA TANTRA - ENT - 4...
KARNAADA.pptx  made by -  saransh dwivedi ( SD ) -  SHALAKYA TANTRA - ENT - 4...KARNAADA.pptx  made by -  saransh dwivedi ( SD ) -  SHALAKYA TANTRA - ENT - 4...
KARNAADA.pptx made by - saransh dwivedi ( SD ) - SHALAKYA TANTRA - ENT - 4...M56BOOKSTORE PRODUCT/SERVICE
 
Diploma in Nursing Admission Test Question Solution 2023.pdf
Diploma in Nursing Admission Test Question Solution 2023.pdfDiploma in Nursing Admission Test Question Solution 2023.pdf
Diploma in Nursing Admission Test Question Solution 2023.pdfMohonDas
 
What is the Future of QuickBooks DeskTop?
What is the Future of QuickBooks DeskTop?What is the Future of QuickBooks DeskTop?
What is the Future of QuickBooks DeskTop?TechSoup
 
Education and training program in the hospital APR.pptx
Education and training program in the hospital APR.pptxEducation and training program in the hospital APR.pptx
Education and training program in the hospital APR.pptxraviapr7
 
Optical Fibre and It's Applications.pptx
Optical Fibre and It's Applications.pptxOptical Fibre and It's Applications.pptx
Optical Fibre and It's Applications.pptxPurva Nikam
 
SOLIDE WASTE in Cameroon,,,,,,,,,,,,,,,,,,,,,,,,,,,.pptx
SOLIDE WASTE in Cameroon,,,,,,,,,,,,,,,,,,,,,,,,,,,.pptxSOLIDE WASTE in Cameroon,,,,,,,,,,,,,,,,,,,,,,,,,,,.pptx
SOLIDE WASTE in Cameroon,,,,,,,,,,,,,,,,,,,,,,,,,,,.pptxSyedNadeemGillANi
 
CHUYÊN ĐỀ DẠY THÊM TIẾNG ANH LỚP 11 - GLOBAL SUCCESS - NĂM HỌC 2023-2024 - HK...
CHUYÊN ĐỀ DẠY THÊM TIẾNG ANH LỚP 11 - GLOBAL SUCCESS - NĂM HỌC 2023-2024 - HK...CHUYÊN ĐỀ DẠY THÊM TIẾNG ANH LỚP 11 - GLOBAL SUCCESS - NĂM HỌC 2023-2024 - HK...
CHUYÊN ĐỀ DẠY THÊM TIẾNG ANH LỚP 11 - GLOBAL SUCCESS - NĂM HỌC 2023-2024 - HK...Nguyen Thanh Tu Collection
 
The basics of sentences session 10pptx.pptx
The basics of sentences session 10pptx.pptxThe basics of sentences session 10pptx.pptx
The basics of sentences session 10pptx.pptxheathfieldcps1
 
How to Send Emails From Odoo 17 Using Code
How to Send Emails From Odoo 17 Using CodeHow to Send Emails From Odoo 17 Using Code
How to Send Emails From Odoo 17 Using CodeCeline George
 
How to Add Existing Field in One2Many Tree View in Odoo 17
How to Add Existing Field in One2Many Tree View in Odoo 17How to Add Existing Field in One2Many Tree View in Odoo 17
How to Add Existing Field in One2Many Tree View in Odoo 17Celine George
 
The Stolen Bacillus by Herbert George Wells
The Stolen Bacillus by Herbert George WellsThe Stolen Bacillus by Herbert George Wells
The Stolen Bacillus by Herbert George WellsEugene Lysak
 
10 Topics For MBA Project Report [HR].pdf
10 Topics For MBA Project Report [HR].pdf10 Topics For MBA Project Report [HR].pdf
10 Topics For MBA Project Report [HR].pdfJayanti Pande
 
Over the counter (OTC)- Sale, rational use.pptx
Over the counter (OTC)- Sale, rational use.pptxOver the counter (OTC)- Sale, rational use.pptx
Over the counter (OTC)- Sale, rational use.pptxraviapr7
 
3.26.24 Race, the Draft, and the Vietnam War.pptx
3.26.24 Race, the Draft, and the Vietnam War.pptx3.26.24 Race, the Draft, and the Vietnam War.pptx
3.26.24 Race, the Draft, and the Vietnam War.pptxmary850239
 
Riddhi Kevadiya. WILLIAM SHAKESPEARE....
Riddhi Kevadiya. WILLIAM SHAKESPEARE....Riddhi Kevadiya. WILLIAM SHAKESPEARE....
Riddhi Kevadiya. WILLIAM SHAKESPEARE....Riddhi Kevadiya
 
How to Create a Toggle Button in Odoo 17
How to Create a Toggle Button in Odoo 17How to Create a Toggle Button in Odoo 17
How to Create a Toggle Button in Odoo 17Celine George
 

Kürzlich hochgeladen (20)

5 charts on South Africa as a source country for international student recrui...
5 charts on South Africa as a source country for international student recrui...5 charts on South Africa as a source country for international student recrui...
5 charts on South Africa as a source country for international student recrui...
 
Unveiling the Intricacies of Leishmania donovani: Structure, Life Cycle, Path...
Unveiling the Intricacies of Leishmania donovani: Structure, Life Cycle, Path...Unveiling the Intricacies of Leishmania donovani: Structure, Life Cycle, Path...
Unveiling the Intricacies of Leishmania donovani: Structure, Life Cycle, Path...
 
KARNAADA.pptx made by - saransh dwivedi ( SD ) - SHALAKYA TANTRA - ENT - 4...
KARNAADA.pptx  made by -  saransh dwivedi ( SD ) -  SHALAKYA TANTRA - ENT - 4...KARNAADA.pptx  made by -  saransh dwivedi ( SD ) -  SHALAKYA TANTRA - ENT - 4...
KARNAADA.pptx made by - saransh dwivedi ( SD ) - SHALAKYA TANTRA - ENT - 4...
 
Diploma in Nursing Admission Test Question Solution 2023.pdf
Diploma in Nursing Admission Test Question Solution 2023.pdfDiploma in Nursing Admission Test Question Solution 2023.pdf
Diploma in Nursing Admission Test Question Solution 2023.pdf
 
Prelims of Kant get Marx 2.0: a general politics quiz
Prelims of Kant get Marx 2.0: a general politics quizPrelims of Kant get Marx 2.0: a general politics quiz
Prelims of Kant get Marx 2.0: a general politics quiz
 
What is the Future of QuickBooks DeskTop?
What is the Future of QuickBooks DeskTop?What is the Future of QuickBooks DeskTop?
What is the Future of QuickBooks DeskTop?
 
Education and training program in the hospital APR.pptx
Education and training program in the hospital APR.pptxEducation and training program in the hospital APR.pptx
Education and training program in the hospital APR.pptx
 
Optical Fibre and It's Applications.pptx
Optical Fibre and It's Applications.pptxOptical Fibre and It's Applications.pptx
Optical Fibre and It's Applications.pptx
 
SOLIDE WASTE in Cameroon,,,,,,,,,,,,,,,,,,,,,,,,,,,.pptx
SOLIDE WASTE in Cameroon,,,,,,,,,,,,,,,,,,,,,,,,,,,.pptxSOLIDE WASTE in Cameroon,,,,,,,,,,,,,,,,,,,,,,,,,,,.pptx
SOLIDE WASTE in Cameroon,,,,,,,,,,,,,,,,,,,,,,,,,,,.pptx
 
CHUYÊN ĐỀ DẠY THÊM TIẾNG ANH LỚP 11 - GLOBAL SUCCESS - NĂM HỌC 2023-2024 - HK...
CHUYÊN ĐỀ DẠY THÊM TIẾNG ANH LỚP 11 - GLOBAL SUCCESS - NĂM HỌC 2023-2024 - HK...CHUYÊN ĐỀ DẠY THÊM TIẾNG ANH LỚP 11 - GLOBAL SUCCESS - NĂM HỌC 2023-2024 - HK...
CHUYÊN ĐỀ DẠY THÊM TIẾNG ANH LỚP 11 - GLOBAL SUCCESS - NĂM HỌC 2023-2024 - HK...
 
The basics of sentences session 10pptx.pptx
The basics of sentences session 10pptx.pptxThe basics of sentences session 10pptx.pptx
The basics of sentences session 10pptx.pptx
 
How to Send Emails From Odoo 17 Using Code
How to Send Emails From Odoo 17 Using CodeHow to Send Emails From Odoo 17 Using Code
How to Send Emails From Odoo 17 Using Code
 
How to Add Existing Field in One2Many Tree View in Odoo 17
How to Add Existing Field in One2Many Tree View in Odoo 17How to Add Existing Field in One2Many Tree View in Odoo 17
How to Add Existing Field in One2Many Tree View in Odoo 17
 
The Stolen Bacillus by Herbert George Wells
The Stolen Bacillus by Herbert George WellsThe Stolen Bacillus by Herbert George Wells
The Stolen Bacillus by Herbert George Wells
 
10 Topics For MBA Project Report [HR].pdf
10 Topics For MBA Project Report [HR].pdf10 Topics For MBA Project Report [HR].pdf
10 Topics For MBA Project Report [HR].pdf
 
Over the counter (OTC)- Sale, rational use.pptx
Over the counter (OTC)- Sale, rational use.pptxOver the counter (OTC)- Sale, rational use.pptx
Over the counter (OTC)- Sale, rational use.pptx
 
3.26.24 Race, the Draft, and the Vietnam War.pptx
3.26.24 Race, the Draft, and the Vietnam War.pptx3.26.24 Race, the Draft, and the Vietnam War.pptx
3.26.24 Race, the Draft, and the Vietnam War.pptx
 
Riddhi Kevadiya. WILLIAM SHAKESPEARE....
Riddhi Kevadiya. WILLIAM SHAKESPEARE....Riddhi Kevadiya. WILLIAM SHAKESPEARE....
Riddhi Kevadiya. WILLIAM SHAKESPEARE....
 
How to Create a Toggle Button in Odoo 17
How to Create a Toggle Button in Odoo 17How to Create a Toggle Button in Odoo 17
How to Create a Toggle Button in Odoo 17
 
March 2024 Directors Meeting, Division of Student Affairs and Academic Support
March 2024 Directors Meeting, Division of Student Affairs and Academic SupportMarch 2024 Directors Meeting, Division of Student Affairs and Academic Support
March 2024 Directors Meeting, Division of Student Affairs and Academic Support
 

Project proposal

  • 1. Seneca Valley Senior Project Project Proposal Part I. Laying the Foundation A. Refer to your Paper Proposal and restate your area of interest and explain what new and additional information you have learned since completing your research. In doing my research paper, I have learned that children with a terminally ill disease are socially withdrawn because of being excluded. B. What questions about this area of study do you hope to answer through completing a project? In other words, what information will completing a project provide that the research paper did not? My project will teach me if children with a terminally ill disease are socially withdrawn. The project will also provide me experience with children and the opportunity to provide them with social interactions. C. What were your initial project ideas from your Paper Proposal? I thought about volunteering at a children’s hospital or possibly holding a trampoline-a-thon over the weekend to raise money for Make a Wish organization. D. Are these ideas still feasible? If yes, how so? If not, why? My ideas are still feasible because I am really focusing on the volunteer project. I have spoken to a director at the hospital and they are in need of a project volunteer. E. As specifically as possible, suggest at least two different project ideas related to your area of interest. These may be your initial project ideas from the paper proposal, revisions of those ideas, or something completely new. Complete the following table supplying adequate information for each project idea. The following is a description of the information required for each project idea.
  • 2. Product Board Area Adult Expense Time List which Board Area Resource Consider the finances you Consider your Identify the product best describes your may need to complete your schedule: school, that would be created Name at least one research and project. See project. What are they and work, social, family, for each project specific adult whose description of Board how will you meet the and the time demands listed. This is what expertise could help Areas in this manual. costs? of each project. classroom teacher guide you through 1. Academic/Humanities Which project better and Senior Board this project. Briefly 2. Academic/Sciences meets your time judges will use to explain how this 3. Career/Entrepreneur management abilities? assess your project. person’s knowledge 4. Mechanical Design/ can help you. Construction (The adult must be at least 5. School/Community 21 years of age and not a Service & parent or relative.) Improvement 6. Visual/Performing Arts Volunteer at Community Service Mr. Smith who 1. Prizes $30 6 hours Children’s and Improvement has conducted 2. Games $15 shadowing a Hospital and fundraising for 3. Invitations nurse. Project have four many $5 9 hours activity days organizations. planning #1 for the George Lump Total $50.00 paid in activities – children. who is the full by me. games, snacks Scrapbook of Financial and prizes my Director of 8 hrs. at activity experiences. Children’s (1 hr. for each Survey of Hospital activity; .5 hrs. children’s to set-up; .5 hrs. interests. to clean up.) Total: 23 hrs. Hold a Community Service Mr. Smith who 1. Trampoline 4 hrs. setting up trampoline- and Improvement has conducted $450 the trampoline athon to raise fundraising for 2. Place 8 hrs. acquiring Project money for many $50-100 people and Children’s organizations. 3. Refreshments having them sign #2 Hospital. George Lump $20 waivers Video and who is the 3 hrs. acquiring Certificate of Financial Total $585 paid in donations for donation. Director of full by me refreshments and Children’s other costs Hospital 15 hrs. for the trampoline-athon Total: 30 hrs.
  • 3. I do not have a third project idea at this Project time. #3 (optional) F. Based on your answers above, identify the project you wish to complete for senior project. Elaborate on information provided in the table; explain all parts of project, stages of completion, and products. Volunteering at Children’s Hospital and planning 4 social activities for the children will be the best project choice for me given the time and the cost of the project. This project will take a great deal of time management, planning skills, and interpersonal skills. I will start by volunteering at the hospital, which will include shadowing Miss Robinson, a nurse. At that time she will introduce me to the children and teach me how to work and socialize with the children. I will shadow Miss Robinson for 2 hrs. on 3/1/05, 3/8/05, and 3/22/05. After shadowing Miss Robinson I will hold an activity for the children. The activity will take place in the playroom so the children do not have to leave the floor. The activities that I will have will be organized by me with the assistance of Harry Kamp. Each activity will be an hour long but the children will have to register for the activity before they can attend. To decide on activities I will survey the children to see what their interests are. The activities will include such things as games, reading or movies. The activities will be held after I shadow Miss Robinson on 3/1/05, 3/8/05 and 3/22/05. They will last for one hr. The final activity day will occur on 3/29/05 and will be an activity and a party for the children. This activity will last for two hrs. and the children will receive personal invitations to attend the party. G. Beyond the required Project Verification and Project Log, list specifically how you will verify your project and the steps you took to complete this project for the judges and your classroom teacher. As verification of the Project component is a student’s responsibility, list specific examples of verification you will supply. (Verification can be in the form of emails, certificates, letters written and received, permission slips, photographs, videos, receipts, programs, audience feedback, etc.) I will be creating a scrapbook for my project and the children will be journaling about their experience with me. I will be presenting excerpts from the journal and will document the children’s feelings about feeling accepted and their opinions about the activities that I have planned for them
  • 4. Part II. Building Supports If you are doing something that requires the approval and/or assistance of a business, club, agency, church, or instructor other than your mentor, you must specifically identify your contact person(s), your agreed upon course of action, and any additional information that explains the arrangements you have made to complete your project. Example: Glory Days… I will be discussing with the Director of Children’s Hospital my schedule and setting the exact times and dates for meetings. His name is Harry Kamp, as noted above. His number is 724-287-7596. Part III. Paying Attention to Details A. Attach completed Project time line to proposal.
  • 5. Part IV. Approval! Date Project Submitted _____________________ Student’s signature ____________________________ Parent/Guardian signature____________________ Project Conference Date _________________________ Comments or Questions: _____ Project Approved _____ Project Approved with Reservation _____ Project Revision Requested resubmit work by __________ Teacher Signature _________________________ Date _______________
  • 6. Project Time Line Project Time Line Part 1 – Brainstorm Part 1 – Tasks Completed List below tasks already completed in the planning or initial stages of your project. Note Brainstorm date of completion remaining materials or sources used. approximate below any and all and explain tasks needed to successfully complete your project. Be sure to break larger tasks into the smaller steps. (For example: It is not enough to list as a task, “Set up rehearsal schedule.” What do you need to get done to set up a rehearsal schedule? Develop a phone chain, construct a calendar of dates, contact and set up a Used to rehearse, etc.) Task Materials/Sources place Date You may include any tasks already completed. Consider ALL aspects of the project and product including materials, mentor meetings, interviews, phone calls, emails, classes, construction, research, etc. - Form a survey (pass out survey, collect survey, record data) - Get parent permission letters for pictures - Get a scrapbook and supplies - Keep journal of shadowing experiences - Plan activities for each date - Get supplies for the activities - Make invitations for final party - Complete scrapbook for the final party to share with the children Part 2 – Brainstorm Brainstorm below any and all remaining tasks needed to successfully complete your project. Be sure to break larger tasks into the smaller steps. Consider ALL aspects of the project and product including materials, mentor meetings, interviews, phone calls, emails, classes, construction, research, etc.
  • 7. Part 2 – Time line Review, organize, and prioritize the tasks in Step 1. List each task below in anticipated order of completion and estimate the time you will need to complete the task. Be sure to refer to the calendar of Senior Project due dates and any personal commitments. Task Estimated Anticipated Time to Completion Complete Date Form a survey (pass out survey, collect survey, record data) 5 hrs. 2/26/05 Get parent permission letters for pictures (write the letter) 3 hrs. 2/28/05 Get a scrapbook and supplies 20 mins. 2/28/05 Keep journal of shadowing experiences 2 hrs. 3/30/05 Plan activities for each date 9 hrs. Thurs. before each activity Get supplies for the activities 20 mins. each Fri. before each activity activity Make invitations for final party 20 mins. 3/23/05 Complete scrapbook for the final party to share with the children 4 hrs. 3/25/05 Conduct the activities with the children 1 hr. 3/29/05 (Add more rows as necessary.) Notes/Thoughts:
  • 8. Mentor Questions • Why did you choose this person to help you with your project? What special skills or abilities does he/she have? • When did you meet with him/her? What was his/her reaction to what you are planning? What advice did he/she offer? • If you would choose this adult as your mentor for the project, how accessible is he/she? (A minimum of three mentor meetings is required) Are there specific things that this adult has already agreed to assist you with? I chose Mr. Harry Kamp as my mentor because he is the Activities Coordinator for Children’s Hospital. He plans weekly activities for the children in the entire hospital. He also ensures that the children have books, toys, and movies to enjoy. He will be helpful because he can ensure that I am completing all of the steps needed to have a successful activity. I met with Mr. Kamp on February 1, 2005 at 3:00 in his office at the Children’s Hospital. He was excited that he will have someone doing his job for the Saturday’s in the month of May. He told me that it is important to schedule activities that the children would enjoy and be interested in rather than an activity that would just be easy for me to plan. He told me that it will be time consuming to plan this many activities because of the many health issues you must consider. Mr. Kamp is available to meet with me every Saturday before or after the scheduled activity. Along with this, we have exchanged email addresses so we can remain in contact throughout the weeks. Mr. Kamp needs to constantly know what activities I will be planning to make sure that we are able to include the majority of the children. Mr. Kamp is very willing to assist me in completing a successful senior project. He has already agreed to assist me with planning activities that will be appropriate for all of the children. He will also assist me with gathering the health information needed to ensure this.