2. We start every day at 9.00. We
make our daily the meeting and
division of labor are set. we'll
check the jobs to be done and
we will check the work
efficiency of employees
3.
4. We calculated the cost of our
projects are prepared in advance.
Missing materials are taken at
affordable prices. and we begin to
project
5. Project cost control is in the
development stage
Unnecessary use of materials and detailed project
planning, work is done at the beginning unnecessary
cost increases. Therefore, especially in a lump sum
value of work in excess of the contract and specification
requirements will result in the use of materials and
workmanship and details of the system shall be avoided
Before hiring of projects to be prepared to the finest
detail, in practice largely prevents the formation of
unnecessary costs. Therefore, with the implementation
of projects to catch up with all the details must be
provided.
6. Material purchases when making..
First, plan the use of materials must be removed, use of
materials compatible with the plan in accordance with a
purchase plan purchases to be made.
Materials to be purchased should be compared with the
budget proposal, the choice of materials conforming to
the technical specifications and should be considered
more suitable alternatives must be sought.
Emergency purchases are usually made from the closest
place without considering price. Therefore, without
requiring the purchase planning, emergency purchases
should be made, the minimum stock levels should be
determined.
7. Time and cost control
Time to loss of consciousness is a waste of money all
employees should have.
Timely execution of the works will be adversely affected by
price increases likely to be costly if you have the budget
price than necessary measures should be taken against
this situation.
Time work can not be done by extending the duration of
the construction site construction work, an increase in
fixed costs, thus adversely affected should be permitted
to profit, with further work on the delayed works
achieving the targets should be achieved.