TRADITIONAL MODEL LIMITATIONS ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
WORKING AND SAFETY STOCK Safety Stock QUANTITY TIME B Q + S S Working  Stock Working  Stock
IDEAL INVENTORY MODEL B Q + S S QUANTITY Order  Lot  Order  Lot Placed  Received  Placed  Received Safety Stock Reorder  Point Lead Time TIME
Q + S S Lead Time Lead Time Lead Time REALISTIC INVENTORY MODEL TIME B QUANTITY Stockout
SAFETY STOCK VERSUS SERVICE LEVEL .50  1.00 high SAFETY  STOCK low SERVICE  LEVEL  (Probability of no stockouts)
STATISTICAL CONSIDERATIONS     max M 0 M ) M ( M P 0 M d ) M ( M f CONTINUOUS  DISCRETE VARIABLE  DISTRIBUTIONS  DISTRIBUTIONS M                   max M 1 B M ) M ( P ) B M ( B M d ) M ( f ) B M ( Quantity Stockout Expected max M 1 B M ) M ( P B M d ) M ( f max M 0 M ) M ( P 2 ) M M ( 0 M d ) M ( f 2 ) M M ( Variance Demand Time Lead    2 E(M > B) P(M > B) B =  reorder point in units. M = lead time demand in units (a random variable). f(M) = probability density  function of  lead time demand. P(M) = probability of a lead time demand of  M units.     = standard deviation of lead time demand Demand Time Lead Mean Probability of  a  Stockout
PROBABILISTIC  LEAD  TIME  DEMAND DEMAND  DURING  LEAD  TIME  (M) PROBABILITY OF A STOCKOUT,  P(M>B) SAFETY STOCK REORDER POINT PROBABILITY  P(M) 0 M B
NORMAL  PROBABILITY  DENSITY  FUNCTION    2 ) ( 2 2 / 2 ) ( M M e M f    Lead Time Demand (M) M =  1 - F(B)  =  P(M >B) f(M) f(B) B Area   stockout a of probability B M P B F function distribution cumulative M d M f B F function density probability M f B = > = - = = =    ) ( ) ( 1 ) ( ) ( ) (
POISSON DISTRIBUTION LEAD TIME DEMAND  (M) PROBABILITY  P(M) 0.00 0.10 0.20 0.30 0.40 0 4 8 12 16 20 24 M=2 M=4 M=6 M=8 M=10 M=1 P(M) = M  M  e -   M M!
NEGATIVE  EXPONENTIAL  DISTRIBUTION LEAD TIME DEMAND  (M) PROBABILITY DENSITY F(M) 0 1/M f(M)  =  e  M/M M
NEGATIVE  EXPONENTIAL DISTRIBUTION 0.0 0.5 1.0 1.5 2.0 2.5 0 2 4 6 8 10 12 LEAD  TIME  DEMAND  (M) PROBABILITY DENSITY  f(M) M=1 M=2 M=3 M=0.5 M=5 f(M)  =  e  M/M M
INDEPENDENT DEMAND : PROBABILISTIC MODELS LOT SIZE :     2CR / H REORDER POINT  :  B = M + S I.  KNOWN  STOCKOUT  COST A.  Obtain Lead Time Demand Distribution   constant demand, constant lead time variable demand, constant lead time constant demand, variable lead time variable demand, variable lead time B.   Stockout Cost backorder cost / unit lost sale cost / unit II.  SERVICE LEVEL A.   Service per Order Cycle
Demand   Probability   Demand  Probability   Lead time   Probability first week   second week   demand   (col. 2)(col. 4) (D)   P(D)   (D)   P(D)   (M)   P(M) 1   0.60   1  0.60   2  0.36 3  0.30  4  0.18 4  0.10  5  0.06 3  0.30  1  0.60  4  0.18 3  0.30  6  0.09 4  0.10  7  0.03 4  0.10  1  0.60  5  0.06 3  0.30  7  0.03 4  0.10  8  0.01 CONVOLUTIONS (variable demand/week  and  constant lead time of  2 weeks)
Lead time  demand (M)   Probability P(M) 0  0 1  0 2  0.36 3  0   4  0.36 5  0.12 6   0.09 7   0.06 8    0.01 1.00
INVENTORY RISK ( VARIABLE DEMAND, CONSTANT LEAD TIME ) J S 0 W Q + S -W B TIME QUANTITY L P(M>B) Q = order quantity B = reorder point L = lead time S = safety stock B - S = expected lead time demand B - J = minimum lead time demand B + W = maximum lead time demand P(M>B) = probability of a stockout J
SAFETY STOCK :  BACKORDERING M B S M d M f M M d M f B M d M f M B S - =           ) ( ) ( ) ( ) ( ) ( ) ( ) ( 0 0 0
BACKORDERING Cost Stockout Cost Holding TC S + = B M P Q AR H dB dTC S     0 ) ( B M E Q AR H M B     ) ( ) (  M d M f B M Q AR SH     ) ( ) ( ) ( B AR HR s P B M P    ) ( ) (
TC s  =  (B - M)H  +   E(M > B)  =   B = 67   E(M > B) =   = (68- 67).08 + (69- 67).03 + (70- 67).01 = .17 units TC s  = (67- 65)(2)(.30)  +  =  1.20 + 2.04   =  $3.24 B = 68   E(M > B) =   = (69- 68).03 + (70- 68).01 = .05 units TC s  = (68- 65)(2)(.30)  +  =  1.80 + 0.60  =  $2.40 AR E(M>B) Q 2(3600)(.05) 600  2(3600)(.17) 600    + = - 70 1 68 ) ( ) 68 ( M M P M     max 1 ) ( ) ( M B M M P B M  + = - 70 1 67 ) ( ) 67 ( M M P M
B = 69   E(M > B) =   =  (70- 69).01 = .01 units TC s  =  (69- 65)(2)(.30)  +  =  2.40 + 0.12 =  $2.52  + = - 70 1 69 ) ( ) 69 ( M M P M 2(3600)(.01) 600   Therefore, the lowest cost reorder point is 68 units  with an expected annual cost of safety stock of $2.40.
SAFETY STOCK : LOST SALES ) ( ) ( 0 M d M f M B S B - =  ) ( B M E M B S > + - = ) ( ) ( M d M f B M M B B - + - =   ) ( ) ( ) ( ) ( 0 M d  M f M B M d M f M B B - - - =    
LOST SALES Cost Stockout Holding Cost TC S  = HQ AR HQ s P B M P  = =  ) ( ) ( B M P H Q AR H dB dTC S =          = 0 ) (   B M E Q AR H B M E M B      = ) ( ) ( M d M f B M Q AR SH B - + =   ) ( ) ( B M E H Q AR H M B           = ) ( ) (
INVENTORY RISK (CONSTANT  DEMAND,  VARIABLE  LEAD  TIME) Q + S S B L m L QUANTITY TIME P(M > B) 0 L = expected lead time P(M > B) = probability of a stockout B  -  S = expected lead time demand Q = order quantity B = reorder point S = safety stock L m  = maximum lead time
J S 0 Q + S - W B QUANTITY L m INVENTORY RISK (VARIABLE  DEMAND,  VARIABLE  LEAD  TIME) L TIME P(M >B) P(M > B) = probability of a stockout B -  S = expected lead time demand B + W = maximum lead time demand Q = order quantity B = reorder point S = safety stock L = expected lead time L m  = maximum lead time B  -  J = minimum lead time demand
VARIABLE DEMAND / VARIABLE LEAD TIME L D D L      2 2 2 2 ,[object Object],L D M  L D D D L L D M          2 2 2 2 2 ,[object Object],L
SERVICE  PER  ORDER  CYCLE c c SL B M P B M P cycles order of no total stockout a with cycles of no SL  =  >  =  = 1 ) ( ) ( 1 . . 1
IMPUTED  STOCKOUT COSTS ) ( ) ( / cost B M P R HQ A AR HQ B M P unit Backorder        ) ( ) ( 1 ) ( / B M P R B M P HQ A HQ AR HQ B M P unit sales cost Lost        
SAFETY  STOCK :  1 WEEK  TIME  SUPPLY (Normal Distribution : Lead Time = 4 weeks) Weekly Demand   Safety   Stock   D    D   1000  100   1000   5.00  0 1000   200   1000   2.50  0.0062 1000  300  1000   1.67  0.0480 1000   400  1000   1.25  0.1057 1000  500   1000   1.00   0.1587   4 1000 D S Z     S P(M>B)
PROBABILISTIC  LOGIC Service Levels Service/units demanded,  E(M>B) = Q(1 - SL U ) E(M>B) =    E(Z) Convolution over lead time Multiply dist. by demand, M = DL,    = D  L  Analytical Combination / Monte Carlo simulation Service/cycle, P(M>B) = 1 - SL c Variable demand, variable lead time Variable demand, constant lead time Constant demand, variable lead time Lost Sale,  P(M>B) = HQ / (AR+HQ) Backordering, P(M>B) = HQ / AR Lead time  demand distribution ? Known stockout costs ? No Yes Yes No Start
RISK :  FIXED ORDER SIZE SYSTEMS FOSS Order  Quantity (Q) Reorder  Point (B) Set by Management EOQ EPQ Service Level Per Cycle Per Units Demanded Known  Stockout   Cost Lost Sale Backorder Per Outage Per Unit Per Outage Per Unit

Weitere ähnliche Inhalte

Was ist angesagt?

Was ist angesagt? (9)

CLIM Fall 2017 Course: Statistics for Climate Research, Spatial Data: Models ...
CLIM Fall 2017 Course: Statistics for Climate Research, Spatial Data: Models ...CLIM Fall 2017 Course: Statistics for Climate Research, Spatial Data: Models ...
CLIM Fall 2017 Course: Statistics for Climate Research, Spatial Data: Models ...
 
Ceske budevice
Ceske budeviceCeske budevice
Ceske budevice
 
r for data science 2. grammar of graphics (ggplot2) clean -ref
r for data science 2. grammar of graphics (ggplot2)  clean -refr for data science 2. grammar of graphics (ggplot2)  clean -ref
r for data science 2. grammar of graphics (ggplot2) clean -ref
 
Matlab plotting
Matlab plottingMatlab plotting
Matlab plotting
 
2016 SMU Research Day
2016 SMU Research Day2016 SMU Research Day
2016 SMU Research Day
 
20090622 Bp Study#22
20090622 Bp Study#2220090622 Bp Study#22
20090622 Bp Study#22
 
Chem ex2 1082
Chem ex2 1082Chem ex2 1082
Chem ex2 1082
 
Chem ex1 1082
Chem ex1 1082Chem ex1 1082
Chem ex1 1082
 
kmaps
 kmaps kmaps
kmaps
 

Andere mochten auch

The method of traditional health care
The method of traditional health careThe method of traditional health care
The method of traditional health caresuricruise
 
Violence in the workplace
Violence in the workplaceViolence in the workplace
Violence in the workplacekhaneducation
 
Fixed order size system
Fixed order size systemFixed order size system
Fixed order size systemkhaneducation
 
Time management hs 1
Time management hs 1Time management hs 1
Time management hs 1khaneducation
 
History and traditional system of medicine.
History and traditional system of medicine.History and traditional system of medicine.
History and traditional system of medicine.ritamchoudhury
 

Andere mochten auch (9)

The method of traditional health care
The method of traditional health careThe method of traditional health care
The method of traditional health care
 
Thoughts
ThoughtsThoughts
Thoughts
 
Violence in the workplace
Violence in the workplaceViolence in the workplace
Violence in the workplace
 
Fixed order size system
Fixed order size systemFixed order size system
Fixed order size system
 
Time management hs 1
Time management hs 1Time management hs 1
Time management hs 1
 
Tqm points
Tqm pointsTqm points
Tqm points
 
History and traditional system of medicine.
History and traditional system of medicine.History and traditional system of medicine.
History and traditional system of medicine.
 
TRADITIONAL MEDICINES
TRADITIONAL MEDICINESTRADITIONAL MEDICINES
TRADITIONAL MEDICINES
 
Folk medicine
Folk medicineFolk medicine
Folk medicine
 

Ähnlich wie Traditional model limitations

Inventory Man2
Inventory Man2Inventory Man2
Inventory Man2ajithsrc
 
Inventory managementppt@ doms
Inventory managementppt@ doms Inventory managementppt@ doms
Inventory managementppt@ doms Babasab Patil
 
3. good inventory-management-edited-ppt
3. good  inventory-management-edited-ppt3. good  inventory-management-edited-ppt
3. good inventory-management-edited-pptshahidch44
 
An Inventory Management System for Deteriorating Items with Ramp Type and Qua...
An Inventory Management System for Deteriorating Items with Ramp Type and Qua...An Inventory Management System for Deteriorating Items with Ramp Type and Qua...
An Inventory Management System for Deteriorating Items with Ramp Type and Qua...ijsc
 
Productions & Operations Management Chapter 12
Productions & Operations Management Chapter 12Productions & Operations Management Chapter 12
Productions & Operations Management Chapter 12jncgw5t6xq
 
Tut 2 laplace transforms
Tut 2 laplace transformsTut 2 laplace transforms
Tut 2 laplace transformsdivyan456
 
Fast Identification of Heavy Hitters by Cached and Packed Group Testing
Fast Identification of Heavy Hitters by Cached and Packed Group TestingFast Identification of Heavy Hitters by Cached and Packed Group Testing
Fast Identification of Heavy Hitters by Cached and Packed Group TestingRakuten Group, Inc.
 
International Journal of Mathematics and Statistics Invention (IJMSI)
International Journal of Mathematics and Statistics Invention (IJMSI)International Journal of Mathematics and Statistics Invention (IJMSI)
International Journal of Mathematics and Statistics Invention (IJMSI)inventionjournals
 

Ähnlich wie Traditional model limitations (12)

Inventory management
Inventory managementInventory management
Inventory management
 
Goods16
Goods16Goods16
Goods16
 
Inventry..
Inventry..Inventry..
Inventry..
 
Inventory Man2
Inventory Man2Inventory Man2
Inventory Man2
 
Aggregate Planning
Aggregate PlanningAggregate Planning
Aggregate Planning
 
Inventory managementppt@ doms
Inventory managementppt@ doms Inventory managementppt@ doms
Inventory managementppt@ doms
 
3. good inventory-management-edited-ppt
3. good  inventory-management-edited-ppt3. good  inventory-management-edited-ppt
3. good inventory-management-edited-ppt
 
An Inventory Management System for Deteriorating Items with Ramp Type and Qua...
An Inventory Management System for Deteriorating Items with Ramp Type and Qua...An Inventory Management System for Deteriorating Items with Ramp Type and Qua...
An Inventory Management System for Deteriorating Items with Ramp Type and Qua...
 
Productions & Operations Management Chapter 12
Productions & Operations Management Chapter 12Productions & Operations Management Chapter 12
Productions & Operations Management Chapter 12
 
Tut 2 laplace transforms
Tut 2 laplace transformsTut 2 laplace transforms
Tut 2 laplace transforms
 
Fast Identification of Heavy Hitters by Cached and Packed Group Testing
Fast Identification of Heavy Hitters by Cached and Packed Group TestingFast Identification of Heavy Hitters by Cached and Packed Group Testing
Fast Identification of Heavy Hitters by Cached and Packed Group Testing
 
International Journal of Mathematics and Statistics Invention (IJMSI)
International Journal of Mathematics and Statistics Invention (IJMSI)International Journal of Mathematics and Statistics Invention (IJMSI)
International Journal of Mathematics and Statistics Invention (IJMSI)
 

Mehr von khaneducation

Uco bank poexam,2006reasoningpaper
Uco bank poexam,2006reasoningpaperUco bank poexam,2006reasoningpaper
Uco bank poexam,2006reasoningpaperkhaneducation
 
Uco bank p[1].o.exam2006objectiveenglishpaper
Uco bank p[1].o.exam2006objectiveenglishpaperUco bank p[1].o.exam2006objectiveenglishpaper
Uco bank p[1].o.exam2006objectiveenglishpaperkhaneducation
 
The top 10 tips for dealing with employee problem behavior
The top 10 tips for dealing with employee problem behavior The top 10 tips for dealing with employee problem behavior
The top 10 tips for dealing with employee problem behavior khaneducation
 
The law of the seed hs
The law of the seed hsThe law of the seed hs
The law of the seed hskhaneducation
 
The 7 s formula for sales succes
The 7 s formula for sales succesThe 7 s formula for sales succes
The 7 s formula for sales succeskhaneducation
 
Team leadership do'nt do it
Team leadership do'nt do itTeam leadership do'nt do it
Team leadership do'nt do itkhaneducation
 
Pharmprocess0405 predmaint
Pharmprocess0405 predmaintPharmprocess0405 predmaint
Pharmprocess0405 predmaintkhaneducation
 
Nine characteristics of a target customer
Nine characteristics of a target customerNine characteristics of a target customer
Nine characteristics of a target customerkhaneducation
 
Managing the people aspects
Managing the people aspectsManaging the people aspects
Managing the people aspectskhaneducation
 

Mehr von khaneducation (20)

Uco bank poexam,2006reasoningpaper
Uco bank poexam,2006reasoningpaperUco bank poexam,2006reasoningpaper
Uco bank poexam,2006reasoningpaper
 
Uco bank p[1].o.exam2006objectiveenglishpaper
Uco bank p[1].o.exam2006objectiveenglishpaperUco bank p[1].o.exam2006objectiveenglishpaper
Uco bank p[1].o.exam2006objectiveenglishpaper
 
Three envelopes
Three envelopesThree envelopes
Three envelopes
 
The top 10 tips for dealing with employee problem behavior
The top 10 tips for dealing with employee problem behavior The top 10 tips for dealing with employee problem behavior
The top 10 tips for dealing with employee problem behavior
 
The law of the seed hs
The law of the seed hsThe law of the seed hs
The law of the seed hs
 
The 7 s formula for sales succes
The 7 s formula for sales succesThe 7 s formula for sales succes
The 7 s formula for sales succes
 
Test
TestTest
Test
 
Teambuilding
TeambuildingTeambuilding
Teambuilding
 
Team leadership do'nt do it
Team leadership do'nt do itTeam leadership do'nt do it
Team leadership do'nt do it
 
Tarun pareek
Tarun pareekTarun pareek
Tarun pareek
 
Servicequality hs
Servicequality hsServicequality hs
Servicequality hs
 
Sandandstone
SandandstoneSandandstone
Sandandstone
 
Ritu mishra(cv)
Ritu mishra(cv)Ritu mishra(cv)
Ritu mishra(cv)
 
Purva[1]
Purva[1]Purva[1]
Purva[1]
 
Pharmprocess0405 predmaint
Pharmprocess0405 predmaintPharmprocess0405 predmaint
Pharmprocess0405 predmaint
 
Odi i
Odi iOdi i
Odi i
 
Noti ras 08
Noti ras 08Noti ras 08
Noti ras 08
 
Nine characteristics of a target customer
Nine characteristics of a target customerNine characteristics of a target customer
Nine characteristics of a target customer
 
Motivation1
Motivation1Motivation1
Motivation1
 
Managing the people aspects
Managing the people aspectsManaging the people aspects
Managing the people aspects
 

Kürzlich hochgeladen

Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxLoriGlavin3
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxLoriGlavin3
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .Alan Dix
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsPixlogix Infotech
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenHervé Boutemy
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningLars Bell
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.Curtis Poe
 
Rise of the Machines: Known As Drones...
Rise of the Machines: Known As Drones...Rise of the Machines: Known As Drones...
Rise of the Machines: Known As Drones...Rick Flair
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024Lonnie McRorey
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLScyllaDB
 
A Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersA Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersNicole Novielli
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024Stephanie Beckett
 
Scale your database traffic with Read & Write split using MySQL Router
Scale your database traffic with Read & Write split using MySQL RouterScale your database traffic with Read & Write split using MySQL Router
Scale your database traffic with Read & Write split using MySQL RouterMydbops
 
Moving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfMoving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfLoriGlavin3
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebUiPathCommunity
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxLoriGlavin3
 
What is Artificial Intelligence?????????
What is Artificial Intelligence?????????What is Artificial Intelligence?????????
What is Artificial Intelligence?????????blackmambaettijean
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity PlanDatabarracks
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxLoriGlavin3
 
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESSALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESmohitsingh558521
 

Kürzlich hochgeladen (20)

Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptx
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and Cons
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache Maven
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine Tuning
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.
 
Rise of the Machines: Known As Drones...
Rise of the Machines: Known As Drones...Rise of the Machines: Known As Drones...
Rise of the Machines: Known As Drones...
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
 
A Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersA Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software Developers
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024
 
Scale your database traffic with Read & Write split using MySQL Router
Scale your database traffic with Read & Write split using MySQL RouterScale your database traffic with Read & Write split using MySQL Router
Scale your database traffic with Read & Write split using MySQL Router
 
Moving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfMoving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdf
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio Web
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
 
What is Artificial Intelligence?????????
What is Artificial Intelligence?????????What is Artificial Intelligence?????????
What is Artificial Intelligence?????????
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity Plan
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
 
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESSALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
 

Traditional model limitations

  • 1.
  • 2. WORKING AND SAFETY STOCK Safety Stock QUANTITY TIME B Q + S S Working Stock Working Stock
  • 3. IDEAL INVENTORY MODEL B Q + S S QUANTITY Order Lot Order Lot Placed Received Placed Received Safety Stock Reorder Point Lead Time TIME
  • 4. Q + S S Lead Time Lead Time Lead Time REALISTIC INVENTORY MODEL TIME B QUANTITY Stockout
  • 5. SAFETY STOCK VERSUS SERVICE LEVEL .50 1.00 high SAFETY STOCK low SERVICE LEVEL (Probability of no stockouts)
  • 6. STATISTICAL CONSIDERATIONS     max M 0 M ) M ( M P 0 M d ) M ( M f CONTINUOUS DISCRETE VARIABLE DISTRIBUTIONS DISTRIBUTIONS M                   max M 1 B M ) M ( P ) B M ( B M d ) M ( f ) B M ( Quantity Stockout Expected max M 1 B M ) M ( P B M d ) M ( f max M 0 M ) M ( P 2 ) M M ( 0 M d ) M ( f 2 ) M M ( Variance Demand Time Lead  2 E(M > B) P(M > B) B = reorder point in units. M = lead time demand in units (a random variable). f(M) = probability density function of lead time demand. P(M) = probability of a lead time demand of M units.  = standard deviation of lead time demand Demand Time Lead Mean Probability of a Stockout
  • 7. PROBABILISTIC LEAD TIME DEMAND DEMAND DURING LEAD TIME (M) PROBABILITY OF A STOCKOUT, P(M>B) SAFETY STOCK REORDER POINT PROBABILITY P(M) 0 M B
  • 8. NORMAL PROBABILITY DENSITY FUNCTION    2 ) ( 2 2 / 2 ) ( M M e M f    Lead Time Demand (M) M = 1 - F(B) = P(M >B) f(M) f(B) B Area   stockout a of probability B M P B F function distribution cumulative M d M f B F function density probability M f B = > = - = = =    ) ( ) ( 1 ) ( ) ( ) (
  • 9. POISSON DISTRIBUTION LEAD TIME DEMAND (M) PROBABILITY P(M) 0.00 0.10 0.20 0.30 0.40 0 4 8 12 16 20 24 M=2 M=4 M=6 M=8 M=10 M=1 P(M) = M M e - M M!
  • 10. NEGATIVE EXPONENTIAL DISTRIBUTION LEAD TIME DEMAND (M) PROBABILITY DENSITY F(M) 0 1/M f(M) = e  M/M M
  • 11. NEGATIVE EXPONENTIAL DISTRIBUTION 0.0 0.5 1.0 1.5 2.0 2.5 0 2 4 6 8 10 12 LEAD TIME DEMAND (M) PROBABILITY DENSITY f(M) M=1 M=2 M=3 M=0.5 M=5 f(M) = e  M/M M
  • 12. INDEPENDENT DEMAND : PROBABILISTIC MODELS LOT SIZE :  2CR / H REORDER POINT : B = M + S I. KNOWN STOCKOUT COST A. Obtain Lead Time Demand Distribution constant demand, constant lead time variable demand, constant lead time constant demand, variable lead time variable demand, variable lead time B. Stockout Cost backorder cost / unit lost sale cost / unit II. SERVICE LEVEL A. Service per Order Cycle
  • 13. Demand Probability Demand Probability Lead time Probability first week second week demand (col. 2)(col. 4) (D) P(D) (D) P(D) (M) P(M) 1 0.60 1 0.60 2 0.36 3 0.30 4 0.18 4 0.10 5 0.06 3 0.30 1 0.60 4 0.18 3 0.30 6 0.09 4 0.10 7 0.03 4 0.10 1 0.60 5 0.06 3 0.30 7 0.03 4 0.10 8 0.01 CONVOLUTIONS (variable demand/week and constant lead time of 2 weeks)
  • 14. Lead time demand (M) Probability P(M) 0 0 1 0 2 0.36 3 0 4 0.36 5 0.12 6 0.09 7 0.06 8 0.01 1.00
  • 15. INVENTORY RISK ( VARIABLE DEMAND, CONSTANT LEAD TIME ) J S 0 W Q + S -W B TIME QUANTITY L P(M>B) Q = order quantity B = reorder point L = lead time S = safety stock B - S = expected lead time demand B - J = minimum lead time demand B + W = maximum lead time demand P(M>B) = probability of a stockout J
  • 16. SAFETY STOCK : BACKORDERING M B S M d M f M M d M f B M d M f M B S - =           ) ( ) ( ) ( ) ( ) ( ) ( ) ( 0 0 0
  • 17. BACKORDERING Cost Stockout Cost Holding TC S + = B M P Q AR H dB dTC S     0 ) ( B M E Q AR H M B     ) ( ) (  M d M f B M Q AR SH     ) ( ) ( ) ( B AR HR s P B M P    ) ( ) (
  • 18. TC s = (B - M)H + E(M > B) = B = 67 E(M > B) = = (68- 67).08 + (69- 67).03 + (70- 67).01 = .17 units TC s = (67- 65)(2)(.30) + = 1.20 + 2.04 = $3.24 B = 68 E(M > B) = = (69- 68).03 + (70- 68).01 = .05 units TC s = (68- 65)(2)(.30) + = 1.80 + 0.60 = $2.40 AR E(M>B) Q 2(3600)(.05) 600 2(3600)(.17) 600  + = - 70 1 68 ) ( ) 68 ( M M P M     max 1 ) ( ) ( M B M M P B M  + = - 70 1 67 ) ( ) 67 ( M M P M
  • 19. B = 69 E(M > B) = = (70- 69).01 = .01 units TC s = (69- 65)(2)(.30) + = 2.40 + 0.12 = $2.52  + = - 70 1 69 ) ( ) 69 ( M M P M 2(3600)(.01) 600 Therefore, the lowest cost reorder point is 68 units with an expected annual cost of safety stock of $2.40.
  • 20. SAFETY STOCK : LOST SALES ) ( ) ( 0 M d M f M B S B - =  ) ( B M E M B S > + - = ) ( ) ( M d M f B M M B B - + - =   ) ( ) ( ) ( ) ( 0 M d M f M B M d M f M B B - - - =    
  • 21. LOST SALES Cost Stockout Holding Cost TC S  = HQ AR HQ s P B M P  = =  ) ( ) ( B M P H Q AR H dB dTC S =          = 0 ) (   B M E Q AR H B M E M B      = ) ( ) ( M d M f B M Q AR SH B - + =   ) ( ) ( B M E H Q AR H M B           = ) ( ) (
  • 22. INVENTORY RISK (CONSTANT DEMAND, VARIABLE LEAD TIME) Q + S S B L m L QUANTITY TIME P(M > B) 0 L = expected lead time P(M > B) = probability of a stockout B - S = expected lead time demand Q = order quantity B = reorder point S = safety stock L m = maximum lead time
  • 23. J S 0 Q + S - W B QUANTITY L m INVENTORY RISK (VARIABLE DEMAND, VARIABLE LEAD TIME) L TIME P(M >B) P(M > B) = probability of a stockout B - S = expected lead time demand B + W = maximum lead time demand Q = order quantity B = reorder point S = safety stock L = expected lead time L m = maximum lead time B - J = minimum lead time demand
  • 24.
  • 25. SERVICE PER ORDER CYCLE c c SL B M P B M P cycles order of no total stockout a with cycles of no SL  =  >  =  = 1 ) ( ) ( 1 . . 1
  • 26. IMPUTED STOCKOUT COSTS ) ( ) ( / cost B M P R HQ A AR HQ B M P unit Backorder        ) ( ) ( 1 ) ( / B M P R B M P HQ A HQ AR HQ B M P unit sales cost Lost        
  • 27. SAFETY STOCK : 1 WEEK TIME SUPPLY (Normal Distribution : Lead Time = 4 weeks) Weekly Demand Safety Stock D  D 1000 100 1000 5.00 0 1000 200 1000 2.50 0.0062 1000 300 1000 1.67 0.0480 1000 400 1000 1.25 0.1057 1000 500 1000 1.00 0.1587 4 1000 D S Z     S P(M>B)
  • 28. PROBABILISTIC LOGIC Service Levels Service/units demanded, E(M>B) = Q(1 - SL U ) E(M>B) =  E(Z) Convolution over lead time Multiply dist. by demand, M = DL,  = D  L Analytical Combination / Monte Carlo simulation Service/cycle, P(M>B) = 1 - SL c Variable demand, variable lead time Variable demand, constant lead time Constant demand, variable lead time Lost Sale, P(M>B) = HQ / (AR+HQ) Backordering, P(M>B) = HQ / AR Lead time demand distribution ? Known stockout costs ? No Yes Yes No Start
  • 29. RISK : FIXED ORDER SIZE SYSTEMS FOSS Order Quantity (Q) Reorder Point (B) Set by Management EOQ EPQ Service Level Per Cycle Per Units Demanded Known Stockout Cost Lost Sale Backorder Per Outage Per Unit Per Outage Per Unit