Detroit Public Schools Property Transaction: New Center Complex


Objective: Consolidate Detroit Public Schools’ Central Office and Information
Technology staffs into a cost-effective, efficient, safe working environment while
simultaneously ensuring adequate parking for employees and convenient access to
parents and guardians of DPS students, many of whom rely on public transportation.

Rationale: The former School Center Building (Maccabees Building) and adjacent Marie
Donnelson Building, which previously housed DPS administration, were in severe
disrepair because of deferred maintenance.
    • Repairs to address significant safety/code issues; malfunctioning elevators;
       crumbling exterior stonework; roof, window, mechanical and PA system repairs
       were estimated to be at least $11 million.
    • Even if these repairs had been made, operational expenses were an estimated
       $3.5 to 4million per year.
    • Furthermore, the district was partially subsidizing parking to the tune of $360,000
       per year because there were only 105 DPS parking spaces vs. the needed 700.
    • An attempt was made to provide parking for all staff at a new parking garage
       through a partnership with DIA, Science Center and others and would have cost
       DPS approx. $11.3 million. DIA backed out of the arrangement and they owned
       the land for this proposed garage.

Course of Action: The properties that best met the district’s various needs were located
in the New Center Area of Detroit. Aside from downtown, this is the most accessible
location for all Detroiters.

   •   DPS purchased a five-floor condominium in the Fisher Building and 720 parking
       spots worth $13 million for a total of $24.1 million. Because of existing long-term
       leases on some of those floors, transitions space was provided in the Kahn and
       other New Center buildings until those leases expired.
   •   Five DPS properties were sold to Wayne State University for a total of $9.12
       million and approx. $7.8 million was available to partially offset the cost of
       consolidating DPS central office and IT staff in the New Center Complex.
   •   DPS staff relocated in 2002 to the New Center Complex (Fisher, Albert Kahn and
       New Center).
   •   The consolidation and move reduced the space requirement by approx. 51,762
       square feet, or 16 percent.
   •   The sale of the School Center Building and purchase of the Fisher Building office
       condominium were disclosed to the DPS Reform Board Chairman, the sitting
       governor and the state treasurer in 2002, a year before the sale closed.
   •   Miller Canfield began legal work on the transaction in January 2002, more than a
       year before the sale closed in February 2003.
   •   All Capital Improvement Program expenditures – including the Fisher
       condominium purchase – were approved by the state treasurer and
       independently audited annually by the accounting firm of Plante and Moran.
Cost Savings/Return on Investment: The purchase of the five-floor condominium at
the Fisher Building will provide $13.8 million of operating savings to DPS in the first 10
years vs. remaining in the School Center Building and purchasing an additional 600
parking spots, making the necessary repairs and paying for operations costs. The entire
Fisher Condo transaction has a payback of about six years and with all lease
considered a payback of about ten years.
    • The costs for both capital and operations associated with staying in the
        Maccabees Building would have been $57 million over 10 years compared to
        $55.3 million over 10 years for the Fisher space, which includes 720 parking
        spaces and no charge for common area maintenance, security, heat, and
        maintenance/repair costs. (See Item A)
    • At 65 percent efficiency, the DPS purchase, including common space and after
        subtracting $13 million for 720 parking spaces, equals $52 per square foot, not
        the $182 per square foot that the current emergency financial manager has
        publicly stated. Furthermore, the figure of $52 per square foot is not adjusted for
        the fact that there is no charge for security, heat, and maintenance.
    • Currently, total operating costs after the move to the New Center Complex,
        including all leases, is about $1.7 million per year plus electricity. In 2013, the net
        annual operating savings from consolidating and downsizing the DPS
        headquarters will be about $3.2 million per year…inperpetuity.
    • The current $1.7 million annual lease cost for all space in the New Center area
        represents 0.14 percent of DPS’ 2008-2009 fiscal year expenditures.


Item A: DPS Headquarters Relocation: 10-Year Comparative Analysis

New Center Complex Relocation
Cost of five-floor Fisher condominium with 720 parking spots: $24.1M
Build out: $17M
Electric: $3M
Leases, including parking deck and Welcome Center $19M
Offset for sale of School Center Building (Maccabees and other properties): $7.8M
Total cost first 10 years: $55.3M

Remain at School Center Building
Repair and renovation of Maccabees and Marie Donnelson buildings: $11M to $14 M
Operating costs: $3.5M to $4.0 M per year
Parking (600 additional spots near DIA or other facility): $11.3M
Total cost first 10 years: $57.3M

Notes:
   • Fees and costs for a site to conduct professional development not included in
       figures for remaining at School Center Building but would be necessary
   • Analysis mixes capital and operating dollars




                                             ###
Detroit Public Schools Property Transaction: New Center Complex

Weitere ähnliche Inhalte

Andere mochten auch

Detroit Public Schools Testimony Opening Statement
Detroit Public Schools Testimony Opening StatementDetroit Public Schools Testimony Opening Statement
Detroit Public Schools Testimony Opening StatementKenneth Burnley
 
Seo And Landing Pages
Seo And Landing PagesSeo And Landing Pages
Seo And Landing Pagesmarcuhlig
 
Burnley DPS Testimony Closing Statement
Burnley DPS Testimony Closing StatementBurnley DPS Testimony Closing Statement
Burnley DPS Testimony Closing StatementKenneth Burnley
 
Detroit Public Schools Property Transaction: Heilmann Site
Detroit Public Schools Property Transaction: Heilmann SiteDetroit Public Schools Property Transaction: Heilmann Site
Detroit Public Schools Property Transaction: Heilmann SiteKenneth Burnley
 
Detroit Public Schools Property Transaction: Cass Tech Land Acquisition
Detroit Public Schools Property Transaction: Cass Tech Land AcquisitionDetroit Public Schools Property Transaction: Cass Tech Land Acquisition
Detroit Public Schools Property Transaction: Cass Tech Land AcquisitionKenneth Burnley
 
SEO is as Dead as a Zombie!
SEO is as Dead as a Zombie!SEO is as Dead as a Zombie!
SEO is as Dead as a Zombie!Nicholas Duddy
 

Andere mochten auch (7)

Detroit Public Schools Testimony Opening Statement
Detroit Public Schools Testimony Opening StatementDetroit Public Schools Testimony Opening Statement
Detroit Public Schools Testimony Opening Statement
 
Seo And Landing Pages
Seo And Landing PagesSeo And Landing Pages
Seo And Landing Pages
 
Burnley DPS Testimony Closing Statement
Burnley DPS Testimony Closing StatementBurnley DPS Testimony Closing Statement
Burnley DPS Testimony Closing Statement
 
SEO for the future!
SEO for the future!SEO for the future!
SEO for the future!
 
Detroit Public Schools Property Transaction: Heilmann Site
Detroit Public Schools Property Transaction: Heilmann SiteDetroit Public Schools Property Transaction: Heilmann Site
Detroit Public Schools Property Transaction: Heilmann Site
 
Detroit Public Schools Property Transaction: Cass Tech Land Acquisition
Detroit Public Schools Property Transaction: Cass Tech Land AcquisitionDetroit Public Schools Property Transaction: Cass Tech Land Acquisition
Detroit Public Schools Property Transaction: Cass Tech Land Acquisition
 
SEO is as Dead as a Zombie!
SEO is as Dead as a Zombie!SEO is as Dead as a Zombie!
SEO is as Dead as a Zombie!
 

Ähnlich wie Detroit Public Schools Property Transaction: New Center Complex

DPS Thorn Apple Valley Transaction
DPS Thorn Apple Valley TransactionDPS Thorn Apple Valley Transaction
DPS Thorn Apple Valley TransactionKenneth Burnley
 
Property Assessed Clean Energy (PACE) Program
Property Assessed Clean Energy (PACE) ProgramProperty Assessed Clean Energy (PACE) Program
Property Assessed Clean Energy (PACE) Programlerchearly
 
Fmx Application2010
Fmx Application2010Fmx Application2010
Fmx Application2010RCHerrin
 
Financing energy upgrades for k 12 schools - u.s. dept. of energy
Financing energy upgrades for k 12 schools - u.s. dept. of energyFinancing energy upgrades for k 12 schools - u.s. dept. of energy
Financing energy upgrades for k 12 schools - u.s. dept. of energyTNenergy
 
7.24.2013 toledo lucas port authority case study
7.24.2013 toledo lucas port authority case study7.24.2013 toledo lucas port authority case study
7.24.2013 toledo lucas port authority case studyKristina Klimovich
 
Nashville Energy report-Fitch (2002)
Nashville Energy report-Fitch (2002)Nashville Energy report-Fitch (2002)
Nashville Energy report-Fitch (2002)Jim Gilliland
 
Specialized Tax Strategies - Using engineering, design and costing to seize t...
Specialized Tax Strategies - Using engineering, design and costing to seize t...Specialized Tax Strategies - Using engineering, design and costing to seize t...
Specialized Tax Strategies - Using engineering, design and costing to seize t...Capital Review Group
 
Rockingham 2020
Rockingham 2020Rockingham 2020
Rockingham 2020James May
 
Downtown & Infill Tax Increment Districts: Strategies for Success
Downtown & Infill Tax Increment Districts: Strategies for SuccessDowntown & Infill Tax Increment Districts: Strategies for Success
Downtown & Infill Tax Increment Districts: Strategies for SuccessVierbicher
 
Solutions Overview: Charter School Energy
Solutions Overview: Charter School EnergySolutions Overview: Charter School Energy
Solutions Overview: Charter School EnergyCharter School Capital
 
Philadelphia Stormwater GPC presentation 10.25
Philadelphia Stormwater GPC presentation 10.25Philadelphia Stormwater GPC presentation 10.25
Philadelphia Stormwater GPC presentation 10.25Green Parking Council
 
Ham Lake Grand Stay Overview 2016
Ham Lake Grand Stay Overview 2016Ham Lake Grand Stay Overview 2016
Ham Lake Grand Stay Overview 2016Paul Reese
 
HVAC Financing at Penn South - 2013 Presentation
HVAC Financing at Penn South - 2013 PresentationHVAC Financing at Penn South - 2013 Presentation
HVAC Financing at Penn South - 2013 Presentationpennsouthoffice
 
Launching Your Project Using Sophisticated Real Estate Development Strategies
Launching Your Project Using Sophisticated Real Estate Development StrategiesLaunching Your Project Using Sophisticated Real Estate Development Strategies
Launching Your Project Using Sophisticated Real Estate Development Strategieslerchearly
 
Bemidji Guaranteed Energy Savings Program
Bemidji Guaranteed Energy Savings ProgramBemidji Guaranteed Energy Savings Program
Bemidji Guaranteed Energy Savings ProgramUniversity of Minnesota
 
7.16.2013 green financesf prologis case study
7.16.2013 green financesf prologis case study7.16.2013 green financesf prologis case study
7.16.2013 green financesf prologis case studyKristina Klimovich
 
Mayor's City Hall Complex Cost Review
Mayor's City Hall Complex Cost ReviewMayor's City Hall Complex Cost Review
Mayor's City Hall Complex Cost Reviewrehobothbeachde
 

Ähnlich wie Detroit Public Schools Property Transaction: New Center Complex (20)

DPS Thorn Apple Valley Transaction
DPS Thorn Apple Valley TransactionDPS Thorn Apple Valley Transaction
DPS Thorn Apple Valley Transaction
 
Property Assessed Clean Energy (PACE) Program
Property Assessed Clean Energy (PACE) ProgramProperty Assessed Clean Energy (PACE) Program
Property Assessed Clean Energy (PACE) Program
 
Fmx Application2010
Fmx Application2010Fmx Application2010
Fmx Application2010
 
Financing energy upgrades for k 12 schools - u.s. dept. of energy
Financing energy upgrades for k 12 schools - u.s. dept. of energyFinancing energy upgrades for k 12 schools - u.s. dept. of energy
Financing energy upgrades for k 12 schools - u.s. dept. of energy
 
7.24.2013 toledo lucas port authority case study
7.24.2013 toledo lucas port authority case study7.24.2013 toledo lucas port authority case study
7.24.2013 toledo lucas port authority case study
 
Greenscape Corporate Presentation
Greenscape Corporate PresentationGreenscape Corporate Presentation
Greenscape Corporate Presentation
 
Nashville Energy report-Fitch (2002)
Nashville Energy report-Fitch (2002)Nashville Energy report-Fitch (2002)
Nashville Energy report-Fitch (2002)
 
Specialized Tax Strategies - Using engineering, design and costing to seize t...
Specialized Tax Strategies - Using engineering, design and costing to seize t...Specialized Tax Strategies - Using engineering, design and costing to seize t...
Specialized Tax Strategies - Using engineering, design and costing to seize t...
 
Rockingham 2020
Rockingham 2020Rockingham 2020
Rockingham 2020
 
Downtown & Infill Tax Increment Districts: Strategies for Success
Downtown & Infill Tax Increment Districts: Strategies for SuccessDowntown & Infill Tax Increment Districts: Strategies for Success
Downtown & Infill Tax Increment Districts: Strategies for Success
 
Solutions Overview: Charter School Energy
Solutions Overview: Charter School EnergySolutions Overview: Charter School Energy
Solutions Overview: Charter School Energy
 
Philadelphia Stormwater GPC presentation 10.25
Philadelphia Stormwater GPC presentation 10.25Philadelphia Stormwater GPC presentation 10.25
Philadelphia Stormwater GPC presentation 10.25
 
Ham Lake Grand Stay Overview 2016
Ham Lake Grand Stay Overview 2016Ham Lake Grand Stay Overview 2016
Ham Lake Grand Stay Overview 2016
 
Commercial Case Studies
Commercial Case StudiesCommercial Case Studies
Commercial Case Studies
 
HVAC Financing at Penn South - 2013 Presentation
HVAC Financing at Penn South - 2013 PresentationHVAC Financing at Penn South - 2013 Presentation
HVAC Financing at Penn South - 2013 Presentation
 
Launching Your Project Using Sophisticated Real Estate Development Strategies
Launching Your Project Using Sophisticated Real Estate Development StrategiesLaunching Your Project Using Sophisticated Real Estate Development Strategies
Launching Your Project Using Sophisticated Real Estate Development Strategies
 
Bemidji Guaranteed Energy Savings Program
Bemidji Guaranteed Energy Savings ProgramBemidji Guaranteed Energy Savings Program
Bemidji Guaranteed Energy Savings Program
 
7.16.2013 green financesf prologis case study
7.16.2013 green financesf prologis case study7.16.2013 green financesf prologis case study
7.16.2013 green financesf prologis case study
 
SHEIKH SARAI HOUSING & LAURIE BAKER LOW COST CONSTRUCTION.pdf
SHEIKH SARAI HOUSING & LAURIE BAKER LOW COST CONSTRUCTION.pdfSHEIKH SARAI HOUSING & LAURIE BAKER LOW COST CONSTRUCTION.pdf
SHEIKH SARAI HOUSING & LAURIE BAKER LOW COST CONSTRUCTION.pdf
 
Mayor's City Hall Complex Cost Review
Mayor's City Hall Complex Cost ReviewMayor's City Hall Complex Cost Review
Mayor's City Hall Complex Cost Review
 

Kürzlich hochgeladen

USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...Postal Advocate Inc.
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4MiaBumagat1
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for BeginnersSabitha Banu
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Celine George
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...Nguyen Thanh Tu Collection
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17Celine George
 
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxQ4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxlancelewisportillo
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4JOYLYNSAMANIEGO
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)lakshayb543
 
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxBarangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxCarlos105
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Celine George
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxVanesaIglesias10
 
Food processing presentation for bsc agriculture hons
Food processing presentation for bsc agriculture honsFood processing presentation for bsc agriculture hons
Food processing presentation for bsc agriculture honsManeerUddin
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Celine George
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfTechSoup
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxAshokKarra1
 

Kürzlich hochgeladen (20)

YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptxYOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for Beginners
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17
 
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxQ4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
 
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxBarangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptx
 
Raw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptxRaw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptx
 
Food processing presentation for bsc agriculture hons
Food processing presentation for bsc agriculture honsFood processing presentation for bsc agriculture hons
Food processing presentation for bsc agriculture hons
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptx
 

Detroit Public Schools Property Transaction: New Center Complex

  • 1. Detroit Public Schools Property Transaction: New Center Complex Objective: Consolidate Detroit Public Schools’ Central Office and Information Technology staffs into a cost-effective, efficient, safe working environment while simultaneously ensuring adequate parking for employees and convenient access to parents and guardians of DPS students, many of whom rely on public transportation. Rationale: The former School Center Building (Maccabees Building) and adjacent Marie Donnelson Building, which previously housed DPS administration, were in severe disrepair because of deferred maintenance. • Repairs to address significant safety/code issues; malfunctioning elevators; crumbling exterior stonework; roof, window, mechanical and PA system repairs were estimated to be at least $11 million. • Even if these repairs had been made, operational expenses were an estimated $3.5 to 4million per year. • Furthermore, the district was partially subsidizing parking to the tune of $360,000 per year because there were only 105 DPS parking spaces vs. the needed 700. • An attempt was made to provide parking for all staff at a new parking garage through a partnership with DIA, Science Center and others and would have cost DPS approx. $11.3 million. DIA backed out of the arrangement and they owned the land for this proposed garage. Course of Action: The properties that best met the district’s various needs were located in the New Center Area of Detroit. Aside from downtown, this is the most accessible location for all Detroiters. • DPS purchased a five-floor condominium in the Fisher Building and 720 parking spots worth $13 million for a total of $24.1 million. Because of existing long-term leases on some of those floors, transitions space was provided in the Kahn and other New Center buildings until those leases expired. • Five DPS properties were sold to Wayne State University for a total of $9.12 million and approx. $7.8 million was available to partially offset the cost of consolidating DPS central office and IT staff in the New Center Complex. • DPS staff relocated in 2002 to the New Center Complex (Fisher, Albert Kahn and New Center). • The consolidation and move reduced the space requirement by approx. 51,762 square feet, or 16 percent. • The sale of the School Center Building and purchase of the Fisher Building office condominium were disclosed to the DPS Reform Board Chairman, the sitting governor and the state treasurer in 2002, a year before the sale closed. • Miller Canfield began legal work on the transaction in January 2002, more than a year before the sale closed in February 2003. • All Capital Improvement Program expenditures – including the Fisher condominium purchase – were approved by the state treasurer and independently audited annually by the accounting firm of Plante and Moran.
  • 2. Cost Savings/Return on Investment: The purchase of the five-floor condominium at the Fisher Building will provide $13.8 million of operating savings to DPS in the first 10 years vs. remaining in the School Center Building and purchasing an additional 600 parking spots, making the necessary repairs and paying for operations costs. The entire Fisher Condo transaction has a payback of about six years and with all lease considered a payback of about ten years. • The costs for both capital and operations associated with staying in the Maccabees Building would have been $57 million over 10 years compared to $55.3 million over 10 years for the Fisher space, which includes 720 parking spaces and no charge for common area maintenance, security, heat, and maintenance/repair costs. (See Item A) • At 65 percent efficiency, the DPS purchase, including common space and after subtracting $13 million for 720 parking spaces, equals $52 per square foot, not the $182 per square foot that the current emergency financial manager has publicly stated. Furthermore, the figure of $52 per square foot is not adjusted for the fact that there is no charge for security, heat, and maintenance. • Currently, total operating costs after the move to the New Center Complex, including all leases, is about $1.7 million per year plus electricity. In 2013, the net annual operating savings from consolidating and downsizing the DPS headquarters will be about $3.2 million per year…inperpetuity. • The current $1.7 million annual lease cost for all space in the New Center area represents 0.14 percent of DPS’ 2008-2009 fiscal year expenditures. Item A: DPS Headquarters Relocation: 10-Year Comparative Analysis New Center Complex Relocation Cost of five-floor Fisher condominium with 720 parking spots: $24.1M Build out: $17M Electric: $3M Leases, including parking deck and Welcome Center $19M Offset for sale of School Center Building (Maccabees and other properties): $7.8M Total cost first 10 years: $55.3M Remain at School Center Building Repair and renovation of Maccabees and Marie Donnelson buildings: $11M to $14 M Operating costs: $3.5M to $4.0 M per year Parking (600 additional spots near DIA or other facility): $11.3M Total cost first 10 years: $57.3M Notes: • Fees and costs for a site to conduct professional development not included in figures for remaining at School Center Building but would be necessary • Analysis mixes capital and operating dollars ###