Six Sigma in Action:
                   Demonstrating Customer Value




Master Black Belt: Steven Bonacorsi
Six Sigma in Action:
                                                                                                       Data Conversion Cycle Time
Customer Profile – GE Aircraft Engines, Evandale, OH
Business Problem & Impact                                                                                                                 Process Capability – Before
The data conversion process within the install process can take up to 5                                                              P ro c e s s C ap ab ility A nalys is fo r T o tal T im e
or 6 hours to complete, requiring extra resources for refresh and installs.
                                                                                                                                                                      USL
                                                                                           Proc es s Data

Measure & Analyze                                                                 USL
                                                                                  Target
                                                                                                         120.000
                                                                                                                   *
                                                                                                                                                                                                                                        ST
                                                                                                                                                                                                                                        LT
                                                                                  LSL                              *
Data Collection: Cycle times were measured (average was 90                        Mean
                                                                                  Sample N
                                                                                                            90.740
                                                                                                                  30
minutes), then segmented by time of day, type and size of files, etc. to          StDev (ST)             64.1700
                                                                                  StDev (LT)             75.7250
identify and isolate root causes.
Root Causes: File sizes, network traffic, and obsolete compression                Cp
                                                                                     Potential (ST) Capability
                                                                                                                   *
                                                                                  CPU                           0.15
processes were determined to be the major causes of process defects               CPL                              *
                                                                                  Cpk                           0.15
Improve & Control                                                                 Cpm                              *
                                                                                                                               -100               0                100              200                 300              400
Network issues were completely eliminated by utilizing direct PC                       Ov erall (LT) Capability                Obs erv ed Perf ormanc e             Ex pec ted ST Perf ormanc e             Ex pec ted LT Perf ormanc e
                                                                                  Pp                               *        PPM < LSL                     *        PPM < LSL                      *        PPM < LSL                      *
connection to a mobile laptop and network crossover cables during                 PPU                           0.13        PPM > USL         Process Capability – After
                                                                                                                                               266666.67           PPM > USL                  0.00         PPM > USL                  0.00
                                                                                  PPL                              *        PPM Total          266666.67           PPM Total                  0.00         PPM Total                  0.00
setup. The ITS project leader developed the QuickBack 32 application to           Ppk                           0.13                                                                                               USL
                                                               Process Data                                                         Process Capability Analysis Total Time
address data compression issues.                           USL            120.000                                                                                                                                                ST
                                                                           T arget                          *                                                                                                                    LT
Results/Benefits                                                           LSL
                                                                           Mean                     10.825
                                                                                                            *


Drastically improved cycle time, decreasing it from an average of 90 to 30
                                                              Sample N

10 minutes. Span (longest cycle time) was reduced from 291 to 33 8.15756
                                                              StDev (ST )
                                                              StDev (LT )         8.66795

minutes. which lead to dramatic productivity savings for GEAE and ITS.
                                                               Potential (ST ) Capability
Because one less technician was required for the PC install Cp process, the               *

client achieved a productivity savings of over $83,000 annually, in
                                                              CPU
                                                              CPL
                                                                                      4.46
                                                                                          *
addition to the cost avoidance of over $90,000 from not having to hire 4.46
                                                              Cpk
                                                              Cpm                         *
additional personnel and an extra delivery van as originally scheduled.                                                        0            20                40           60          80             100          120
Also, end users were more satisfied with the overall install process.
                                                                Overall (LT ) Capability                                  Observed Performance                 Expected ST Performance                 Expected LT Performance
                                                                           Pp                               *          PPM < LSL                   *          PPM < LSL                   *           PPM < LSL                   *
                                                                           PPU                         4.20            PPM > USL               0.00           PPM > USL               0.00            PPM > USL               0.00

Increased client’s staffing productivity by $83K while improving performance!
                                                                           PPL
                                                                           Ppk                         4.20
                                                                                                            *          PPM T otal              0.00           PPM T otal              0.00            PPM T otal              0.00

More Related Content

More from Kevin Egan

Serrver Imaging Six Sigma Case Study
Serrver Imaging Six Sigma Case StudySerrver Imaging Six Sigma Case Study
Serrver Imaging Six Sigma Case StudyKevin Egan
 
Sms Integration Six Sigma Case Study
Sms Integration Six Sigma Case StudySms Integration Six Sigma Case Study
Sms Integration Six Sigma Case StudyKevin Egan
 
Ticket Accuracy Six Sigma Case Study
Ticket Accuracy   Six Sigma Case StudyTicket Accuracy   Six Sigma Case Study
Ticket Accuracy Six Sigma Case StudyKevin Egan
 
Qaa paul nelson
Qaa   paul nelsonQaa   paul nelson
Qaa paul nelsonKevin Egan
 
Pharma iq mediakit1
Pharma iq mediakit1Pharma iq mediakit1
Pharma iq mediakit1Kevin Egan
 
Jack Welch Speak - PEXN
Jack Welch Speak - PEXNJack Welch Speak - PEXN
Jack Welch Speak - PEXNKevin Egan
 
ISLSS Offerings
ISLSS OfferingsISLSS Offerings
ISLSS OfferingsKevin Egan
 

More from Kevin Egan (7)

Serrver Imaging Six Sigma Case Study
Serrver Imaging Six Sigma Case StudySerrver Imaging Six Sigma Case Study
Serrver Imaging Six Sigma Case Study
 
Sms Integration Six Sigma Case Study
Sms Integration Six Sigma Case StudySms Integration Six Sigma Case Study
Sms Integration Six Sigma Case Study
 
Ticket Accuracy Six Sigma Case Study
Ticket Accuracy   Six Sigma Case StudyTicket Accuracy   Six Sigma Case Study
Ticket Accuracy Six Sigma Case Study
 
Qaa paul nelson
Qaa   paul nelsonQaa   paul nelson
Qaa paul nelson
 
Pharma iq mediakit1
Pharma iq mediakit1Pharma iq mediakit1
Pharma iq mediakit1
 
Jack Welch Speak - PEXN
Jack Welch Speak - PEXNJack Welch Speak - PEXN
Jack Welch Speak - PEXN
 
ISLSS Offerings
ISLSS OfferingsISLSS Offerings
ISLSS Offerings
 

Data Conversion Cycle Time Six Sigma Case Study

  • 1. Six Sigma in Action: Demonstrating Customer Value Master Black Belt: Steven Bonacorsi
  • 2. Six Sigma in Action: Data Conversion Cycle Time Customer Profile – GE Aircraft Engines, Evandale, OH Business Problem & Impact Process Capability – Before The data conversion process within the install process can take up to 5 P ro c e s s C ap ab ility A nalys is fo r T o tal T im e or 6 hours to complete, requiring extra resources for refresh and installs. USL Proc es s Data Measure & Analyze USL Target 120.000 * ST LT LSL * Data Collection: Cycle times were measured (average was 90 Mean Sample N 90.740 30 minutes), then segmented by time of day, type and size of files, etc. to StDev (ST) 64.1700 StDev (LT) 75.7250 identify and isolate root causes. Root Causes: File sizes, network traffic, and obsolete compression Cp Potential (ST) Capability * CPU 0.15 processes were determined to be the major causes of process defects CPL * Cpk 0.15 Improve & Control Cpm * -100 0 100 200 300 400 Network issues were completely eliminated by utilizing direct PC Ov erall (LT) Capability Obs erv ed Perf ormanc e Ex pec ted ST Perf ormanc e Ex pec ted LT Perf ormanc e Pp * PPM < LSL * PPM < LSL * PPM < LSL * connection to a mobile laptop and network crossover cables during PPU 0.13 PPM > USL Process Capability – After 266666.67 PPM > USL 0.00 PPM > USL 0.00 PPL * PPM Total 266666.67 PPM Total 0.00 PPM Total 0.00 setup. The ITS project leader developed the QuickBack 32 application to Ppk 0.13 USL Process Data Process Capability Analysis Total Time address data compression issues. USL 120.000 ST T arget * LT Results/Benefits LSL Mean 10.825 * Drastically improved cycle time, decreasing it from an average of 90 to 30 Sample N 10 minutes. Span (longest cycle time) was reduced from 291 to 33 8.15756 StDev (ST ) StDev (LT ) 8.66795 minutes. which lead to dramatic productivity savings for GEAE and ITS. Potential (ST ) Capability Because one less technician was required for the PC install Cp process, the * client achieved a productivity savings of over $83,000 annually, in CPU CPL 4.46 * addition to the cost avoidance of over $90,000 from not having to hire 4.46 Cpk Cpm * additional personnel and an extra delivery van as originally scheduled. 0 20 40 60 80 100 120 Also, end users were more satisfied with the overall install process. Overall (LT ) Capability Observed Performance Expected ST Performance Expected LT Performance Pp * PPM < LSL * PPM < LSL * PPM < LSL * PPU 4.20 PPM > USL 0.00 PPM > USL 0.00 PPM > USL 0.00 Increased client’s staffing productivity by $83K while improving performance! PPL Ppk 4.20 * PPM T otal 0.00 PPM T otal 0.00 PPM T otal 0.00