SlideShare a Scribd company logo
1 of 34
Engineer
Mohamed Esmat Abdelrazek
PMP
Project Management
professional
Organizational Influences on Project Management
The organizational culture, style, and structure influence how
projects are performed.
An organization’s degree of project management maturity and
its project management systems can also influence the project
Organizational Structure
Organizational structure is an enterprise environmental
factor which can affect the availability of resources and
influence how projects are conducted
Functional organization
Functional
manager
staff
staff
Functional
manager
staff
staff
Functional
manager
staff
staff
Functional
manager
staff
staff
C.E.O
Weak Matrix organization
Functional
manager
staff
staff
Functional
manager
staff
staff
Functional
manager
staff
staff
Functional
manager
staff
staff
C.E.O
Expeditor or
coordinator
Balanced Matrix organization
Functional
manager
staff
Project
manager
Functional
manager
staff
staff
Functional
manager
staff
staff
Functional
manager
staff
staff
C.E.O
Strong Matrix organization
Manager of
project managers
Project
manager
Project
manager
Functional
manager
staff
staff
Functional
manager
staff
staff
Functional
manager
staff
staff
C.E.O
organizationProjectized
Project
manager
Staff
Staff
Project
manager
Staff
Staff
Project
manager
Staff
Staff
Project
manager
Staff
Staff
C.E.O
Organizational influences on Projects
Functional
Matrix
Projectized
Weak matrix
Balanced
matrix
Strong
matrix
PM Authority
Little or
None
Limited
Low to
Moderate
Moderate To
High
High To
almost total
Resource
Availability
Little or
None
Limited
Low to
Moderate
Moderate To
High
High To
almost total
Who Controls
The Project
Budget
Functional
Manager
Functional
Manager Mixed
Project
manager
Project
manager
Let us start…….
Question :
how to formally authorize
the project?
:Answer
Develop
project charter
-
-Business Case
-Project Statement of Work
-Contract
-Devolp project charter
initiating
•Develop Project charter
• The process of developing a document that formally
authorizes a project or a phase
•Inputs
• Project statement of
work
• Business case
• Contract
• Enterprise environmental
factors
• Organizational process
assets
Tools &
Techniques
1. Expert judgment
Outputs
1. Project charter
• Statement of Work
• narrative description of products or services
to be delivered by the project contain
• Business need
• Product scope description
• Strategic plan
Business Case
• Provide the necessary information from business
standpoint to determine whether or not the project is
worth the required investment.
Enterprise Environmental Factors
Organizational culture and structure , Government or
industry standards
product standards, quality standards, and
workmanship standards),
Infrastructure (e.g., existing facilities and capital
equipment),
Existing human resources (e.g., skills, disciplines, and
knowledge, such as design,
development, law, contracting, and purchasing),
Personnel administration (e.g., hiring and firing
guidelines, employee performance reviews, and
training records),
Company work authorization systems,
Marketplace conditions,/
Organizational process assets
-Organizational policies as they
pertain to scope planning and
management
- Organizational procedures related
to scope planning and management
-Historical information about
previous projects, lesson learned
project archives
Project charter contents
-Project purpose & justification.
-Objectives and their success criteria
-High level requirements that satisfy
stakeholder needs, wants, and expectation.
- Business need, high level product
description, or product requirements.
-Assigned project manager and authority
level.
-Summary milestone schedule.
- Summary budget
- Name of sponsor or those authorizing the
project
- Functional organizations and their
participation.
-Organizational, environmental & external
assumptions.
Question :
What is the next
step?
:Answer
Identify
Stakeholder
Identify Stakeholder
• The process of identifying all people or organizations impacted by the project,
and documenting relevant information regarding their interest, involvement,
and impact on project success.
Inputs
1. Project charter
2. Procurement
documents
3. Enterprise
environmental factors
4. Organizational process
assets
Tools &
Techniques
1. Stakeholder analysis
2. Expert judgment
Outputs
1. Stakeholder register
2. Stakeholder
management strategy
Stakeholder Analysis
• A technique of systematically gathering and analyzing quantitative &
qualitative information to determine whose interests should be taken
into account throughout the project.
Output of Identify Stakeholder
• Stakeholder Register
Stakeholder Stakeholder interest(s) in
the project
Assessment of impact Potential strategies for gaining
support or reducing obstacles
Name
Contact
Information
Role in
Project
Department/
Supervisor
Company Impact Influence Main expectations
Attitude about
the project
Major requirement
• Stakeholder Management Strategy
- Defines an approach to increase the support and minimize negative impacts of
stakeholder.
- The information could be too sensitive to be shared.
- A common way of representing is by using a stakeholder analysis matrix.
QUESTIONS?
1-Which of the following is not a project?
a. Running an election campaign for a political candidate.
b. Building a bridge over a river.
c. Pilot aircraft for a United flight.
d. Writing a book on Project Management
2. Which of these is not one of the triple constraint of
a project?
A-Scope
b. Resources
c. Time
d. Cost
3-Which of the following is NOT a characteristic of a
project?
A- Constrained by limited resources
B- Planned, executed, and controlled
C- Creates a unique product or service
D- Ongoing and repetitive
4-You are managing the release of a new drug in
the market. Your role is that of a:
A- Functional Manager, because you have good functional
knowledge of the pharmaceutical industry
B- Project Manager, because you are creating a unique product
within specific time schedules
C- Operations Manager, because you have to do several repetitive
tasks
D- Program Manager, because you have to manage several
projects to do your job effectively
5-What is the purpose of a project charter?
A-To formally authorize a project or a phase and document initial
requirements which satisfy the stakeholder’s needs and
expectations.
B-To document how the project will be planned, executed,
monitored/controlled, and closed.
C-To link the project, which is going to be planned, executed, and
monitored/controlled to the ongoing work of the organization.
D-To describe the process of performing the work defined in the
project management plan in order to achieve the project’s
objectives.
6-During a planning meeting, a discussion takes
place on which resource will be assigned to perform
an activity that will be fast-tracked. As the project
manager, you decide to assign Fred to the activity.
What type of organizational structure is this?
A. Functional organization
B. Projectized organization
C. Matrix organization
D. Balanced Matrix organization
7- Who should be responsible for defining
project objective?
A- Project manager
B- sponsor
C-Project management team
D-Stakeholders
8- a difference between the requirements is
best resolved in favor for the:
A- project manager
B- stakeholders
C- sponsor
D- customer
9- which of the following is not example of a
Project?
A- Issuing monthly invoices
B- Implementation of a new Software Program
C-Design of a new department store
D- Construction of a bridge
10- in a projectized organization the project
Team
A- reportes to many bosses
B- has no loyalty to project
C- reports to functional manager
D- has no loyalty to organization
Thank you

More Related Content

What's hot

Duties of project manager
Duties of project managerDuties of project manager
Duties of project managerAdnan Yaseen
 
Human aspect of project
Human aspect of projectHuman aspect of project
Human aspect of projectddcom001
 
What is project management
What is project managementWhat is project management
What is project managementBilalChoudhary14
 
Андрій Татчин “Будуючи ПМО з нуля”
Андрій Татчин “Будуючи ПМО з нуля”Андрій Татчин “Будуючи ПМО з нуля”
Андрій Татчин “Будуючи ПМО з нуля”Lviv Startup Club
 
The project manager and business analyst partnership - ensuring project success
The project manager and business analyst partnership - ensuring project successThe project manager and business analyst partnership - ensuring project success
The project manager and business analyst partnership - ensuring project successMark Troncone MBA, PMP, CBAP, ITILv3, CSM
 
3 proj plan handouts
3 proj plan handouts3 proj plan handouts
3 proj plan handoutsTony
 
PMO 3.0 - Next Gen Lean Model - Doug Floyd
PMO 3.0 - Next Gen Lean Model - Doug FloydPMO 3.0 - Next Gen Lean Model - Doug Floyd
PMO 3.0 - Next Gen Lean Model - Doug Floyddvfloyd
 
Organization Chart & Project Responsibilities
Organization Chart & Project ResponsibilitiesOrganization Chart & Project Responsibilities
Organization Chart & Project ResponsibilitiesChris Garbett
 
Project Stakeholder Management - PMBOK6
Project Stakeholder Management - PMBOK6Project Stakeholder Management - PMBOK6
Project Stakeholder Management - PMBOK6Agus Suhanto
 
he Principles of Effective Project, Programme and Portfolio Management Govern...
he Principles of Effective Project, Programme and Portfolio Management Govern...he Principles of Effective Project, Programme and Portfolio Management Govern...
he Principles of Effective Project, Programme and Portfolio Management Govern...AXELOS Global Best Practice
 
10 critical factors for success of a project
10 critical factors for success of a project10 critical factors for success of a project
10 critical factors for success of a projectZilicus
 
Business Analyst Job Profile coepd
Business Analyst Job Profile   coepdBusiness Analyst Job Profile   coepd
Business Analyst Job Profile coepdCOEPD HR
 

What's hot (20)

13 project stakeholders management
13 project stakeholders management13 project stakeholders management
13 project stakeholders management
 
Project Management
Project Management Project Management
Project Management
 
Duties of project manager
Duties of project managerDuties of project manager
Duties of project manager
 
Human aspect of project
Human aspect of projectHuman aspect of project
Human aspect of project
 
PMO 2.0 - The Strategic Focused PMO
PMO 2.0 - The Strategic Focused PMOPMO 2.0 - The Strategic Focused PMO
PMO 2.0 - The Strategic Focused PMO
 
What is project management
What is project managementWhat is project management
What is project management
 
Андрій Татчин “Будуючи ПМО з нуля”
Андрій Татчин “Будуючи ПМО з нуля”Андрій Татчин “Будуючи ПМО з нуля”
Андрій Татчин “Будуючи ПМО з нуля”
 
The project manager and business analyst partnership - ensuring project success
The project manager and business analyst partnership - ensuring project successThe project manager and business analyst partnership - ensuring project success
The project manager and business analyst partnership - ensuring project success
 
Project management
Project managementProject management
Project management
 
Project Management
Project ManagementProject Management
Project Management
 
3 proj plan handouts
3 proj plan handouts3 proj plan handouts
3 proj plan handouts
 
Project management
Project management   Project management
Project management
 
PMO 3.0 - Next Gen Lean Model - Doug Floyd
PMO 3.0 - Next Gen Lean Model - Doug FloydPMO 3.0 - Next Gen Lean Model - Doug Floyd
PMO 3.0 - Next Gen Lean Model - Doug Floyd
 
Andrea LTwerberg Resume
Andrea LTwerberg ResumeAndrea LTwerberg Resume
Andrea LTwerberg Resume
 
Organization Chart & Project Responsibilities
Organization Chart & Project ResponsibilitiesOrganization Chart & Project Responsibilities
Organization Chart & Project Responsibilities
 
Project Stakeholder Management - PMBOK6
Project Stakeholder Management - PMBOK6Project Stakeholder Management - PMBOK6
Project Stakeholder Management - PMBOK6
 
Chapt15
Chapt15Chapt15
Chapt15
 
he Principles of Effective Project, Programme and Portfolio Management Govern...
he Principles of Effective Project, Programme and Portfolio Management Govern...he Principles of Effective Project, Programme and Portfolio Management Govern...
he Principles of Effective Project, Programme and Portfolio Management Govern...
 
10 critical factors for success of a project
10 critical factors for success of a project10 critical factors for success of a project
10 critical factors for success of a project
 
Business Analyst Job Profile coepd
Business Analyst Job Profile   coepdBusiness Analyst Job Profile   coepd
Business Analyst Job Profile coepd
 

Viewers also liked

Project Scope Management,PMP Chapter 5,PMBOK,PMP Exam Preparation training
Project Scope Management,PMP Chapter 5,PMBOK,PMP Exam Preparation trainingProject Scope Management,PMP Chapter 5,PMBOK,PMP Exam Preparation training
Project Scope Management,PMP Chapter 5,PMBOK,PMP Exam Preparation trainingJustAcademy
 

Viewers also liked (18)

Session 4 4th edition PMP
Session   4 4th edition PMPSession   4 4th edition PMP
Session 4 4th edition PMP
 
Session 21 4th edition PMP
Session 21 4th edition PMPSession 21 4th edition PMP
Session 21 4th edition PMP
 
Session 7 4th edition PMP
Session 7 4th edition PMPSession 7 4th edition PMP
Session 7 4th edition PMP
 
Session 16 4th edition
Session 16 4th editionSession 16 4th edition
Session 16 4th edition
 
Session 15 4th edition PMP
Session 15 4th edition PMPSession 15 4th edition PMP
Session 15 4th edition PMP
 
Session 19 4th edition PMP
Session  19 4th edition PMPSession  19 4th edition PMP
Session 19 4th edition PMP
 
Session 18 -2 PMP 4th edition
Session 18 -2  PMP 4th editionSession 18 -2  PMP 4th edition
Session 18 -2 PMP 4th edition
 
Session 10 4th edition PMP
Session   10 4th edition PMPSession   10 4th edition PMP
Session 10 4th edition PMP
 
Session 8 4th edition PMP
Session 8 4th edition PMPSession 8 4th edition PMP
Session 8 4th edition PMP
 
Session 13 4th edition PMP
Session 13 4th edition PMPSession 13 4th edition PMP
Session 13 4th edition PMP
 
Session 12 4th edition PMP
Session  12 4th edition PMPSession  12 4th edition PMP
Session 12 4th edition PMP
 
Session 3 4th edition
Session   3 4th editionSession   3 4th edition
Session 3 4th edition
 
Session 20 4th edition PMP
Session 20 4th edition PMPSession 20 4th edition PMP
Session 20 4th edition PMP
 
Session 9 4th edition PMP
Session 9 4th edition PMPSession 9 4th edition PMP
Session 9 4th edition PMP
 
Session 22 4th edition PMP
Session 22 4th edition PMPSession 22 4th edition PMP
Session 22 4th edition PMP
 
Session 18 4th edition PMP
Session 18 4th edition PMPSession 18 4th edition PMP
Session 18 4th edition PMP
 
Session 14 4th edition PMP
Session  14 4th edition PMPSession  14 4th edition PMP
Session 14 4th edition PMP
 
Project Scope Management,PMP Chapter 5,PMBOK,PMP Exam Preparation training
Project Scope Management,PMP Chapter 5,PMBOK,PMP Exam Preparation trainingProject Scope Management,PMP Chapter 5,PMBOK,PMP Exam Preparation training
Project Scope Management,PMP Chapter 5,PMBOK,PMP Exam Preparation training
 

Similar to Session 2 PMP 4TH edition

PMBOK_5th_Project Management Framework
PMBOK_5th_Project Management FrameworkPMBOK_5th_Project Management Framework
PMBOK_5th_Project Management FrameworkHossam Maghrabi
 
Part 02 Connecting Business Strategy and Project Management
Part 02 Connecting Business Strategy and Project ManagementPart 02 Connecting Business Strategy and Project Management
Part 02 Connecting Business Strategy and Project ManagementLilis Rusliyawati
 
ICT4GOV PROJECT MANAGEMENT
ICT4GOV PROJECT MANAGEMENTICT4GOV PROJECT MANAGEMENT
ICT4GOV PROJECT MANAGEMENTJohn Macasio
 
Challenging Aspects of Modern Project Management
Challenging Aspects of Modern Project ManagementChallenging Aspects of Modern Project Management
Challenging Aspects of Modern Project ManagementYamanta Raj Niroula, PMP
 
(Fall2016)Lecture2.pptx
(Fall2016)Lecture2.pptx(Fall2016)Lecture2.pptx
(Fall2016)Lecture2.pptxgarkapifye
 
Final Class Presentation on Project Audit and Closure.ppt
Final Class Presentation on Project Audit and Closure.pptFinal Class Presentation on Project Audit and Closure.ppt
Final Class Presentation on Project Audit and Closure.pptGeorgeKabongah2
 
Project management slide show
Project management slide showProject management slide show
Project management slide showTanvir Anwar
 
Project Management: More Caught Than Taught
Project Management: More Caught Than TaughtProject Management: More Caught Than Taught
Project Management: More Caught Than Taughtedward_uy
 
PMP Training - 01 introduction to framework
PMP Training - 01 introduction to frameworkPMP Training - 01 introduction to framework
PMP Training - 01 introduction to frameworkejlp12
 
Project management processes Groups
Project management processes GroupsProject management processes Groups
Project management processes GroupsSourabh Kumar
 
Project Planning and Management Notes
Project Planning and Management NotesProject Planning and Management Notes
Project Planning and Management NotesHaris Hassan
 
Introduction of Project management ppt
Introduction of Project management pptIntroduction of Project management ppt
Introduction of Project management pptSourabh Kumar
 
Project Management Framework.pptx
Project Management Framework.pptxProject Management Framework.pptx
Project Management Framework.pptxvamsnrsfdevuqsrtmy
 
Project report submitted in IIM Calcutta
Project report submitted in IIM CalcuttaProject report submitted in IIM Calcutta
Project report submitted in IIM CalcuttaRAJESH KUMAR SHARMA
 
BPP Training on Project Management - Day 1
BPP Training on Project Management - Day 1BPP Training on Project Management - Day 1
BPP Training on Project Management - Day 1Imoh Etuk
 
PMEC Study Material.pdf
PMEC Study Material.pdfPMEC Study Material.pdf
PMEC Study Material.pdfMrUmairKhan1
 

Similar to Session 2 PMP 4TH edition (20)

PMBOK_5th_Project Management Framework
PMBOK_5th_Project Management FrameworkPMBOK_5th_Project Management Framework
PMBOK_5th_Project Management Framework
 
Part 02 Connecting Business Strategy and Project Management
Part 02 Connecting Business Strategy and Project ManagementPart 02 Connecting Business Strategy and Project Management
Part 02 Connecting Business Strategy and Project Management
 
ICT4GOV PROJECT MANAGEMENT
ICT4GOV PROJECT MANAGEMENTICT4GOV PROJECT MANAGEMENT
ICT4GOV PROJECT MANAGEMENT
 
Challenging Aspects of Modern Project Management
Challenging Aspects of Modern Project ManagementChallenging Aspects of Modern Project Management
Challenging Aspects of Modern Project Management
 
(Fall2016)Lecture2.pptx
(Fall2016)Lecture2.pptx(Fall2016)Lecture2.pptx
(Fall2016)Lecture2.pptx
 
Final Class Presentation on Project Audit and Closure.ppt
Final Class Presentation on Project Audit and Closure.pptFinal Class Presentation on Project Audit and Closure.ppt
Final Class Presentation on Project Audit and Closure.ppt
 
Setting up a project framework phase 1 june 20162
Setting up a project framework phase 1 june 20162Setting up a project framework phase 1 june 20162
Setting up a project framework phase 1 june 20162
 
Project Planning and Management
Project Planning and ManagementProject Planning and Management
Project Planning and Management
 
Project management slide show
Project management slide showProject management slide show
Project management slide show
 
Project Management: More Caught Than Taught
Project Management: More Caught Than TaughtProject Management: More Caught Than Taught
Project Management: More Caught Than Taught
 
PMP Training - 01 introduction to framework
PMP Training - 01 introduction to frameworkPMP Training - 01 introduction to framework
PMP Training - 01 introduction to framework
 
project management concepts
project management conceptsproject management concepts
project management concepts
 
Project management processes Groups
Project management processes GroupsProject management processes Groups
Project management processes Groups
 
UNIT-2.pptx
UNIT-2.pptxUNIT-2.pptx
UNIT-2.pptx
 
Project Planning and Management Notes
Project Planning and Management NotesProject Planning and Management Notes
Project Planning and Management Notes
 
Introduction of Project management ppt
Introduction of Project management pptIntroduction of Project management ppt
Introduction of Project management ppt
 
Project Management Framework.pptx
Project Management Framework.pptxProject Management Framework.pptx
Project Management Framework.pptx
 
Project report submitted in IIM Calcutta
Project report submitted in IIM CalcuttaProject report submitted in IIM Calcutta
Project report submitted in IIM Calcutta
 
BPP Training on Project Management - Day 1
BPP Training on Project Management - Day 1BPP Training on Project Management - Day 1
BPP Training on Project Management - Day 1
 
PMEC Study Material.pdf
PMEC Study Material.pdfPMEC Study Material.pdf
PMEC Study Material.pdf
 

Recently uploaded

原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证jdkhjh
 
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchRashtriya Kisan Manch
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingCIToolkit
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsCIToolkit
 
Shaping Organizational Culture Beyond Wishful Thinking
Shaping Organizational Culture Beyond Wishful ThinkingShaping Organizational Culture Beyond Wishful Thinking
Shaping Organizational Culture Beyond Wishful ThinkingGiuseppe De Simone
 
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)jennyeacort
 
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024Giuseppe De Simone
 
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsFrom Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsCIToolkit
 
How-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionHow-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionCIToolkit
 
From Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light AssessmentFrom Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light AssessmentCIToolkit
 
The Final Activity in Project Management
The Final Activity in Project ManagementThe Final Activity in Project Management
The Final Activity in Project ManagementCIToolkit
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixCIToolkit
 
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...CIToolkit
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insightWayne Abrahams
 
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramBeyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramCIToolkit
 
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic TraitsDigital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic TraitsHannah Smith
 

Recently uploaded (16)

原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
 
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield Metrics
 
Shaping Organizational Culture Beyond Wishful Thinking
Shaping Organizational Culture Beyond Wishful ThinkingShaping Organizational Culture Beyond Wishful Thinking
Shaping Organizational Culture Beyond Wishful Thinking
 
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
 
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
 
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsFrom Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
 
How-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionHow-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem Resolution
 
From Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light AssessmentFrom Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light Assessment
 
The Final Activity in Project Management
The Final Activity in Project ManagementThe Final Activity in Project Management
The Final Activity in Project Management
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
 
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insight
 
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramBeyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
 
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic TraitsDigital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
 

Session 2 PMP 4TH edition

  • 2. Organizational Influences on Project Management The organizational culture, style, and structure influence how projects are performed. An organization’s degree of project management maturity and its project management systems can also influence the project Organizational Structure Organizational structure is an enterprise environmental factor which can affect the availability of resources and influence how projects are conducted
  • 6. Strong Matrix organization Manager of project managers Project manager Project manager Functional manager staff staff Functional manager staff staff Functional manager staff staff C.E.O
  • 8. Organizational influences on Projects Functional Matrix Projectized Weak matrix Balanced matrix Strong matrix PM Authority Little or None Limited Low to Moderate Moderate To High High To almost total Resource Availability Little or None Limited Low to Moderate Moderate To High High To almost total Who Controls The Project Budget Functional Manager Functional Manager Mixed Project manager Project manager
  • 9. Let us start……. Question : how to formally authorize the project? :Answer Develop project charter
  • 10. - -Business Case -Project Statement of Work -Contract -Devolp project charter
  • 11. initiating •Develop Project charter • The process of developing a document that formally authorizes a project or a phase •Inputs • Project statement of work • Business case • Contract • Enterprise environmental factors • Organizational process assets Tools & Techniques 1. Expert judgment Outputs 1. Project charter
  • 12. • Statement of Work • narrative description of products or services to be delivered by the project contain • Business need • Product scope description • Strategic plan Business Case • Provide the necessary information from business standpoint to determine whether or not the project is worth the required investment.
  • 13. Enterprise Environmental Factors Organizational culture and structure , Government or industry standards product standards, quality standards, and workmanship standards), Infrastructure (e.g., existing facilities and capital equipment), Existing human resources (e.g., skills, disciplines, and knowledge, such as design, development, law, contracting, and purchasing), Personnel administration (e.g., hiring and firing guidelines, employee performance reviews, and training records), Company work authorization systems, Marketplace conditions,/
  • 14. Organizational process assets -Organizational policies as they pertain to scope planning and management - Organizational procedures related to scope planning and management -Historical information about previous projects, lesson learned project archives
  • 15. Project charter contents -Project purpose & justification. -Objectives and their success criteria -High level requirements that satisfy stakeholder needs, wants, and expectation. - Business need, high level product description, or product requirements. -Assigned project manager and authority level. -Summary milestone schedule. - Summary budget - Name of sponsor or those authorizing the project - Functional organizations and their participation. -Organizational, environmental & external assumptions.
  • 16.
  • 17. Question : What is the next step? :Answer Identify Stakeholder
  • 18. Identify Stakeholder • The process of identifying all people or organizations impacted by the project, and documenting relevant information regarding their interest, involvement, and impact on project success. Inputs 1. Project charter 2. Procurement documents 3. Enterprise environmental factors 4. Organizational process assets Tools & Techniques 1. Stakeholder analysis 2. Expert judgment Outputs 1. Stakeholder register 2. Stakeholder management strategy
  • 19. Stakeholder Analysis • A technique of systematically gathering and analyzing quantitative & qualitative information to determine whose interests should be taken into account throughout the project.
  • 20. Output of Identify Stakeholder • Stakeholder Register Stakeholder Stakeholder interest(s) in the project Assessment of impact Potential strategies for gaining support or reducing obstacles Name Contact Information Role in Project Department/ Supervisor Company Impact Influence Main expectations Attitude about the project Major requirement • Stakeholder Management Strategy - Defines an approach to increase the support and minimize negative impacts of stakeholder. - The information could be too sensitive to be shared. - A common way of representing is by using a stakeholder analysis matrix.
  • 21.
  • 22.
  • 24. 1-Which of the following is not a project? a. Running an election campaign for a political candidate. b. Building a bridge over a river. c. Pilot aircraft for a United flight. d. Writing a book on Project Management
  • 25. 2. Which of these is not one of the triple constraint of a project? A-Scope b. Resources c. Time d. Cost
  • 26. 3-Which of the following is NOT a characteristic of a project? A- Constrained by limited resources B- Planned, executed, and controlled C- Creates a unique product or service D- Ongoing and repetitive
  • 27. 4-You are managing the release of a new drug in the market. Your role is that of a: A- Functional Manager, because you have good functional knowledge of the pharmaceutical industry B- Project Manager, because you are creating a unique product within specific time schedules C- Operations Manager, because you have to do several repetitive tasks D- Program Manager, because you have to manage several projects to do your job effectively
  • 28. 5-What is the purpose of a project charter? A-To formally authorize a project or a phase and document initial requirements which satisfy the stakeholder’s needs and expectations. B-To document how the project will be planned, executed, monitored/controlled, and closed. C-To link the project, which is going to be planned, executed, and monitored/controlled to the ongoing work of the organization. D-To describe the process of performing the work defined in the project management plan in order to achieve the project’s objectives.
  • 29. 6-During a planning meeting, a discussion takes place on which resource will be assigned to perform an activity that will be fast-tracked. As the project manager, you decide to assign Fred to the activity. What type of organizational structure is this? A. Functional organization B. Projectized organization C. Matrix organization D. Balanced Matrix organization
  • 30. 7- Who should be responsible for defining project objective? A- Project manager B- sponsor C-Project management team D-Stakeholders
  • 31. 8- a difference between the requirements is best resolved in favor for the: A- project manager B- stakeholders C- sponsor D- customer
  • 32. 9- which of the following is not example of a Project? A- Issuing monthly invoices B- Implementation of a new Software Program C-Design of a new department store D- Construction of a bridge
  • 33. 10- in a projectized organization the project Team A- reportes to many bosses B- has no loyalty to project C- reports to functional manager D- has no loyalty to organization