COFFERDAM

Coffer – large strong box for valuables; sunken panel or box


1. A temporary watertight enclosure that is pumped dry to expose the bottom of
   a body of water so that construction, as of piers, may be undertaken.

2. A watertight chamber attached to the side of a ship to facilitate repairs below
   the water line.

3. A water tight enclosure pumped dry to permit work below the water line eg
   for the construction of underwater foundations for bridges, piers (Oxford
   Dictionary)



          What is a Cofferdam?
A cofferdam is a type of watertight construction designed to facilitate
construction projects in areas which are normally submerged, such as
bridges and piers.

A cofferdam is installed in the work area and water is pumped out to expose the
bed of the body of water so that workers can construct structural supports, enact
repairs, or perform other types of work in a dry environment. In some regions of
the world, a cofferdam is better known as a caisson.

Working inside a cofferdam can be hazardous if it is installed improperly or not
safely pressurized, but advances in engineering have led to increased safety for
workers using this unique work environment.

A variety of materials can be used to construct a cofferdam, which is truly a feat
of engineering. Although a cofferdam is a temporary structure, it must reliably
hold water back from the work area and also withstand very high pressures in
order to be safe, and the construction of cofferdams is often used as a project for
engineers learning their craft.

The most basic type of cofferdam uses sheet metal, which is pounded into the
bed of the body of water to create a watertight wall. Next, pumps are used to pull
water out of the enclosure so that it will be dry.
Some cofferdams are built from wood or concrete, while others use a double
walled mechanism, with filler made from aggregate materials in between the two
walls.

The walls of a cofferdam can extend all the way to the surface of the water,
leaving it open at the top, or it can be built as an enclosed structure.

In very deep water, enclosed and pressurized cofferdams are used for worker
safety, while in shallower bodies of water, an open cofferdam can be used.
Workers access a closed cofferdam through hatches and tubes, and care is
taken to make sure that the air supply is consistent and the pressure is kept at a
normal level.

Shipwrights and repair yards also use a form of portable cofferdam, which can be
attached to the side of a ship to enact repairs below the waterline. At sea, this
can be a useful way to quickly address potential problems until the ship is taken
into dry dock for more long-term repair. Minor repairs can be undertaken with a
portable cofferdam in a shipyard to avoid the expense of hauling the ship into dry
dock for the work to be completed.


COFFERDAM AND DEWATERING

2.04.01--Description: Work under this item shall consist of the design and
construction of cofferdams as and where shown and specifically designated as
such on the plans; necessary dewatering, adjustments, repair or reconstruction;
and the removal of temporary cofferdams and related facilities.

2.04.03--Construction Methods:

1--Cofferdams : Cofferdams shall be carried to adequate depths and heights,
shall comply with Section 1.10, and shall be safe and watertight as necessary for
the proper performance of the work which must be done inside them. Cofferdams
shall be constructed so that the work can be safely carried to an elevation 600
mm lower than the elevation shown on the plans for the bottom of the structure
footing, or, if a granular fill foundation is shown on the plans, to an elevation 600
mm lower than the bottom of the granular fill foundation. The interior dimensions
of the cofferdams shall be sufficient for the unobstructed and satisfactory
ompletion of all necessary substructure work, such as pile driving, form building,
inspection and pumping. Cofferdams which become tilted or displaced prior to
the completion of all work to be done within them, shall be righted, reset, or
enlarged as may be necessary to provide the clearance for the unobstructed
performance of all necessary work, and such corrections and adjustments of
cofferdams shall be at the sole expense of the Contractor. Cofferdams shall be
completely dewatered as required to complete the work entirely in the dry, except
as specified below.
When conditions are encountered that render it impractical to dewater the
cofferdam, the Engineer may require the placing of underwater concrete of such
dimensions as will be necessary to allow the Contractor to complete the
substructure in the dry. The placement of underwater concrete shall comply with
6.01.03-10.

Cofferdams must be constructed to protect uncured masonry and concrete
against damage from a sudden rising of the water and prevent damage to
structure foundations by erosion. No part of the cofferdam which extends into the
substructure may be left in place without written permission from the Engineer.

At least 30 calendar days prior to the start of constructing or installing a
cofferdam, the Contractor shall submit to the Engineer, for his information,
detailed plans and computations of its proposal prepared by a professional
Engineer licensed in the State. The furnishing of such plans and methods shall
not serve to relieve the Contractor of its responsibility for the safety of the work
and the successful completion of the Project. The Contractor's proposal must
meet all requirements established in regulatory permits for the Project and must
also conform to the requirements of Section 1.10.

2--Dewatering: Pumping from the interior of any cofferdam shall be done in such
a manner as to preclude the possibility of water moving through uncured
masonry or concrete. During the placement of concrete or masonry, and for at
least 24 hours thereafter, any pumping shall be done from a suitable sump
located outside the horizontal limits and below the elevation of the work being
placed or as directed by the Engineer.

The pumped water must be discharged in accordance with the requirements of
Section 1.10.

Pumping to dewater a cofferdam shall not start until any underwater concrete has
sufficiently set to withstand the hydrostatic pressure created by pumping.

3--Removal of Cofferdams : Unless the Engineer directs otherwise, the
Contractor shall remove all parts of the cofferdam after completion of the
required work. This shall be done in such a way as not to disturb or otherwise
damage any permanent construction.

Sheet piling used in constructing the cofferdam may be left in place with the
approval of the Engineer, provided the piling is cut off at elevations approved in
advance by the Engineer, and the cut off portions are removed from the site.

2.04.04--Method of Measurement: Work under this item will be measured for
payment by the number of meters of cofferdam designated numerically on the
plans.
2.04.05--Basis of Payment: Payment for this work will be made at the Contract
unit price per meter for "Cofferdam and Dewatering," measured as described
above, which price shall include all costs of design, materials, equipment, labor,
work, and any related environmental controls used in dewatering operations,
which are required for the construction of cofferdams shown in the plans; of any
repair, correction, adjustment or reconstruction of such cofferdams required by
the plans; removal of obstructions; pumping and dewatering; removal of such
cofferdams and related environmental controls used in dewatering operations.

If the Engineer requires the Contractor to construct an additional cofferdam not
shown on the plans, or to enlarge a cofferdam beyond the dimensions of same
as designated on the plans, or if the Engineer accepts the

Contractor's proposal to do so as being essential for the purposes of the
Contract, the Department will revise the Contract to indicate those changes and
to designate the revised dimensions of cofferdam deemed necessary by the
Engineer. If the total number of meters of any given cofferdam as designated in
the revised Contract is greater than the number of meters designated on the
original Contract plans, the Department will pay the Contractor for the revised
number of such meters at the Contract unit price, subject to the provisions of
Articles 1.04.02 and 1.04.03.

To the extent that the Engineer allows the addition or enlargement of a cofferdam
for the convenience or other benefit of the Contractor, but does not deem that
addition or enlargement essential for the performance of the Contract work, the
Department will make no additional payment for the cofferdam or portion of the
cofferdam which the Engineer does not so deem essential. The Department shall
not in any event pay the Contractor for fewer meters of a cofferdam than were
designated on the original Contract plans unless the Department eliminates that
cofferdam in its entirety from the Contract.

Even if, however, the Contractor's plan for an additional cofferdam or
enlargement of a cofferdam deemed essential by the Engineer includes a
previously-existing structure, in no case will a previously-existing natural or built
structure, such as an abutment or an embankment, be measured for payment in
calculating the revised number of meters of cofferdam on the Project.

Any common cofferdam wall required for staged construction will be measured
for payment only once. In no case will a given length or portion of cofferdam be
measured for payment purposes more than once. Pay Item Pay Unit Cofferdam
and Dewatering m
DIAPHRAGM WALLS
                          TECHNOLOGY OVERVIEW


TABLE OF CONTENTS

   1.   INTRODUCTION
   2.   METHODS
   3.   APPLICATIONS
   4.   CONCLUSION


INTRODUCTION

Diaphragm walls are underground structural elements commonly used for
retention systems and permanent foundation walls. They can also be used as
deep groundwater barriers.

Diaphragm walls are constructed using the slurry trench technique, which was
developed in Europe and has been used in the United States since the 1940's.
The technique involves excavating a narrow trench that is kept full of an
engineered fluid or slurry. The slurry exerts hydraulic pressure against the trench
walls and acts as shoring to prevent collapse. Slurry trench excavations can be
constructed in all types of soil, even below the ground water table.
                                                                       Back to Top
METHODS

Cast-in-place diaphragm walls are usually excavated under bentonite slurry.
Various types of excavation equipment can be used depending on project
conditions, including hydraulic excavators and kelly-mounted or cable-hung clam
buckets. Depths in excess 150 feet are possible. (The Hydrofraise, a highly
specialized excavation tool, can reach depths of 500 feet.)

Diaphragm wall construction begins with the trench being excavated in
discontinuous sections or "panels". Stop-end pipes are placed vertically at each
end of the primary panel to form joints for adjacent secondary panels. Panels are
usually 8 to 20 feet long, with widths varying from 2 to 5 feet.

Once the excavation of a panel is complete, a steel reinforcement cage is placed
in the center of the panel. Concrete is poured in one continuous operation
through one or more tremie pipes that extend to the bottom of the trench. The
tremie pipes are extracted as the concrete rises; however, the discharge end of
the tremie pipe always remains embedded in the fresh concrete.

The slurry that is displaced by the concrete is saved and reused for subsequent
panel excavations. As the concrete sets, the end pipes are withdrawn. Similarly,
secondary panels are constructed between the primary panels to create a
continuous wall. The finished wall may be cantilever or require anchors or props
for lateral support.

A variation of the technique is the precast diaphragm wall. With this method, a
continuous trench, or longer panel is excavated under self-hardening cement-
bentonite slurry. The slurry is retarded to remain fluid during construction. After a
sufficent length of excavation is complete, a crane lifts the precast concrete wall
section into the trench. The cement bentonite slurry sets to form the final
composite wall. Alternately, the trench is excavated under bentonite slurry, which
is then displaced with cement bentonite slurry.
                                                                         Back to Top
APPLICATIONS

Diaphragm walls are commonly used in congested areas. They can be installed
in close proximity to existing structures with minimal loss of support to existing
foundations. In addition, construction dewatering is not required, so there is no
associated subsidence.

The cut and cover method is used to construct tunnels. Two parallel diaphragm
walls are installed and the area between the walls is excavated. Floor and roof
slabs are poured and area above the roof is backfilled.
                                                                      Back to Top
CONCLUSION

The diaphragm wall technique is a tried-and-true construction method, which
provides unequaled support of existing foundations during adjacent construction
operations. The method has many civil applications.

Weitere ähnliche Inhalte

Was ist angesagt? (20)

Cofferdam
CofferdamCofferdam
Cofferdam
 
Types of-cofferdams
Types of-cofferdamsTypes of-cofferdams
Types of-cofferdams
 
Chapter 3 caisson
Chapter 3 caissonChapter 3 caisson
Chapter 3 caisson
 
Cem 250 cofferdams
Cem 250 cofferdamsCem 250 cofferdams
Cem 250 cofferdams
 
Chapter 2 coffer-dam
Chapter 2 coffer-damChapter 2 coffer-dam
Chapter 2 coffer-dam
 
Coffer dams
Coffer damsCoffer dams
Coffer dams
 
Caisson foundation.ppt
Caisson foundation.pptCaisson foundation.ppt
Caisson foundation.ppt
 
4. COFFERDAM (ACE) 2160601 GTU
4. COFFERDAM (ACE) 2160601 GTU4. COFFERDAM (ACE) 2160601 GTU
4. COFFERDAM (ACE) 2160601 GTU
 
types of coffer dam
types of coffer dam types of coffer dam
types of coffer dam
 
Cofferdam
CofferdamCofferdam
Cofferdam
 
BCT MODULE 2 - Caisson
BCT MODULE 2 - CaissonBCT MODULE 2 - Caisson
BCT MODULE 2 - Caisson
 
Coffer dams types
Coffer dams  typesCoffer dams  types
Coffer dams types
 
Driving process of caisson
Driving  process of  caissonDriving  process of  caisson
Driving process of caisson
 
Cofferdam
CofferdamCofferdam
Cofferdam
 
Chapter 4 Drainge and maintenance of road
Chapter 4 Drainge and maintenance of roadChapter 4 Drainge and maintenance of road
Chapter 4 Drainge and maintenance of road
 
Dams, Types of dams
Dams, Types of damsDams, Types of dams
Dams, Types of dams
 
Caisson Foundation
Caisson Foundation Caisson Foundation
Caisson Foundation
 
Cofferdams_Advanced Construction Technology
Cofferdams_Advanced Construction TechnologyCofferdams_Advanced Construction Technology
Cofferdams_Advanced Construction Technology
 
Caisson types
Caisson typesCaisson types
Caisson types
 
Type of caissons
Type of caissonsType of caissons
Type of caissons
 

Andere mochten auch (14)

Dams
DamsDams
Dams
 
Broussard Brothers, Inc. Coffer Dam
Broussard Brothers, Inc. Coffer DamBroussard Brothers, Inc. Coffer Dam
Broussard Brothers, Inc. Coffer Dam
 
Caissons
CaissonsCaissons
Caissons
 
DEEP FOUNDATION
DEEP FOUNDATIONDEEP FOUNDATION
DEEP FOUNDATION
 
Caissons technology in ACCIONA Infrastructure
Caissons technology in ACCIONA InfrastructureCaissons technology in ACCIONA Infrastructure
Caissons technology in ACCIONA Infrastructure
 
Other Flood Related Products
Other Flood Related ProductsOther Flood Related Products
Other Flood Related Products
 
Pneumatisch afzinken
Pneumatisch afzinkenPneumatisch afzinken
Pneumatisch afzinken
 
1008 caissons-specification
1008 caissons-specification1008 caissons-specification
1008 caissons-specification
 
Deep foundation
Deep foundationDeep foundation
Deep foundation
 
Underpinning Principles of Presentation
Underpinning Principles of PresentationUnderpinning Principles of Presentation
Underpinning Principles of Presentation
 
Project Controls Expo - 31st Oct 2012 - Delay Analysis Letting the Evidence S...
Project Controls Expo - 31st Oct 2012 - Delay Analysis Letting the Evidence S...Project Controls Expo - 31st Oct 2012 - Delay Analysis Letting the Evidence S...
Project Controls Expo - 31st Oct 2012 - Delay Analysis Letting the Evidence S...
 
Caisson's disease
Caisson's diseaseCaisson's disease
Caisson's disease
 
TALL BUILDINGS
TALL BUILDINGSTALL BUILDINGS
TALL BUILDINGS
 
basement excavation, underpinning
basement excavation, underpinningbasement excavation, underpinning
basement excavation, underpinning
 

Ähnlich wie Coffer dams 01

Unit 37: Advanced Civil Engineering
Unit 37: Advanced Civil EngineeringUnit 37: Advanced Civil Engineering
Unit 37: Advanced Civil EngineeringSahl Buhary
 
Technical specifications for Phase 1 Wastewater Network tank interceptors
Technical specifications for Phase 1 Wastewater Network tank interceptorsTechnical specifications for Phase 1 Wastewater Network tank interceptors
Technical specifications for Phase 1 Wastewater Network tank interceptorsLaith Abdel Nabi
 
101under water conustrution.pptx
101under water conustrution.pptx101under water conustrution.pptx
101under water conustrution.pptxMEHALAS3
 
Concreting of super structure
Concreting of super structureConcreting of super structure
Concreting of super structureMinh Bui Si
 
Method statement tank base concrete pouring
Method statement  tank base concrete pouringMethod statement  tank base concrete pouring
Method statement tank base concrete pouringBharatha Rathnayke
 
EDUARDO H. PARE 10 METHODS TO AVOID WATER LEAKAGES ON BUILDING CONSTRUCTION
EDUARDO H. PARE 10 METHODS TO AVOID WATER LEAKAGES ON BUILDING CONSTRUCTIONEDUARDO H. PARE 10 METHODS TO AVOID WATER LEAKAGES ON BUILDING CONSTRUCTION
EDUARDO H. PARE 10 METHODS TO AVOID WATER LEAKAGES ON BUILDING CONSTRUCTIONEduardo H. Pare
 
Aquaurethane Extreme - Regulation 31 Approved Polyurea by LINE-X
Aquaurethane Extreme - Regulation 31 Approved Polyurea by LINE-XAquaurethane Extreme - Regulation 31 Approved Polyurea by LINE-X
Aquaurethane Extreme - Regulation 31 Approved Polyurea by LINE-XDarren Hull
 
Can I Dry Floodproof My Building?
Can I Dry Floodproof My Building?Can I Dry Floodproof My Building?
Can I Dry Floodproof My Building?CDM Smith
 
Subsea field development
Subsea field developmentSubsea field development
Subsea field developmentHamid S
 
DEMOLITION OF BUILDING
DEMOLITION OF BUILDINGDEMOLITION OF BUILDING
DEMOLITION OF BUILDINGshubhajitdua
 
Hydraulic Fracturing Understanding well construction
Hydraulic Fracturing Understanding well constructionHydraulic Fracturing Understanding well construction
Hydraulic Fracturing Understanding well constructionAndy Varoshiotis
 
Construction manual chapter 2
Construction manual chapter 2Construction manual chapter 2
Construction manual chapter 2vps1968
 
abermain.firestation
abermain.firestationabermain.firestation
abermain.firestationYousef Riad
 
Roadway Ordinance
Roadway OrdinanceRoadway Ordinance
Roadway Ordinancegscplanning
 

Ähnlich wie Coffer dams 01 (20)

Unit 37: Advanced Civil Engineering
Unit 37: Advanced Civil EngineeringUnit 37: Advanced Civil Engineering
Unit 37: Advanced Civil Engineering
 
Technical specifications for Phase 1 Wastewater Network tank interceptors
Technical specifications for Phase 1 Wastewater Network tank interceptorsTechnical specifications for Phase 1 Wastewater Network tank interceptors
Technical specifications for Phase 1 Wastewater Network tank interceptors
 
101under water conustrution.pptx
101under water conustrution.pptx101under water conustrution.pptx
101under water conustrution.pptx
 
Submarine outfalls & intakes ppt
Submarine outfalls & intakes pptSubmarine outfalls & intakes ppt
Submarine outfalls & intakes ppt
 
Concreting of super structure
Concreting of super structureConcreting of super structure
Concreting of super structure
 
Construction dewatering technology data sheet
Construction dewatering technology data sheetConstruction dewatering technology data sheet
Construction dewatering technology data sheet
 
Absorption Trenches and Beds for Drought Gardening
Absorption Trenches and Beds for Drought GardeningAbsorption Trenches and Beds for Drought Gardening
Absorption Trenches and Beds for Drought Gardening
 
Method statement tank base concrete pouring
Method statement  tank base concrete pouringMethod statement  tank base concrete pouring
Method statement tank base concrete pouring
 
EDUARDO H. PARE 10 METHODS TO AVOID WATER LEAKAGES ON BUILDING CONSTRUCTION
EDUARDO H. PARE 10 METHODS TO AVOID WATER LEAKAGES ON BUILDING CONSTRUCTIONEDUARDO H. PARE 10 METHODS TO AVOID WATER LEAKAGES ON BUILDING CONSTRUCTION
EDUARDO H. PARE 10 METHODS TO AVOID WATER LEAKAGES ON BUILDING CONSTRUCTION
 
Aquaurethane Extreme - Regulation 31 Approved Polyurea by LINE-X
Aquaurethane Extreme - Regulation 31 Approved Polyurea by LINE-XAquaurethane Extreme - Regulation 31 Approved Polyurea by LINE-X
Aquaurethane Extreme - Regulation 31 Approved Polyurea by LINE-X
 
Can I Dry Floodproof My Building?
Can I Dry Floodproof My Building?Can I Dry Floodproof My Building?
Can I Dry Floodproof My Building?
 
Column & beam
Column & beamColumn & beam
Column & beam
 
Subsea field development
Subsea field developmentSubsea field development
Subsea field development
 
DEMOLITION OF BUILDING
DEMOLITION OF BUILDINGDEMOLITION OF BUILDING
DEMOLITION OF BUILDING
 
SCC WITH KIM.PPTX
SCC WITH KIM.PPTXSCC WITH KIM.PPTX
SCC WITH KIM.PPTX
 
Hydraulic Fracturing Understanding well construction
Hydraulic Fracturing Understanding well constructionHydraulic Fracturing Understanding well construction
Hydraulic Fracturing Understanding well construction
 
Construction manual chapter 2
Construction manual chapter 2Construction manual chapter 2
Construction manual chapter 2
 
Concrete repair
Concrete repairConcrete repair
Concrete repair
 
abermain.firestation
abermain.firestationabermain.firestation
abermain.firestation
 
Roadway Ordinance
Roadway OrdinanceRoadway Ordinance
Roadway Ordinance
 

Mehr von juwes

Sxsw 2011 construction enviroment
Sxsw 2011 construction enviromentSxsw 2011 construction enviroment
Sxsw 2011 construction enviromentjuwes
 
Road
RoadRoad
Roadjuwes
 
Dw final (inside)
Dw final (inside)Dw final (inside)
Dw final (inside)juwes
 
Diaphragmwall test
Diaphragmwall testDiaphragmwall test
Diaphragmwall testjuwes
 
Cut and cover_sections
Cut and cover_sectionsCut and cover_sections
Cut and cover_sectionsjuwes
 
Wk 4 modular_lecture
Wk 4 modular_lectureWk 4 modular_lecture
Wk 4 modular_lecturejuwes
 
Wk 1 2_substructure_dewatering_bw
Wk 1 2_substructure_dewatering_bwWk 1 2_substructure_dewatering_bw
Wk 1 2_substructure_dewatering_bwjuwes
 
Wk 1 2_substructure_dewatering
Wk 1 2_substructure_dewateringWk 1 2_substructure_dewatering
Wk 1 2_substructure_dewateringjuwes
 
earth support
earth supportearth support
earth supportjuwes
 

Mehr von juwes (9)

Sxsw 2011 construction enviroment
Sxsw 2011 construction enviromentSxsw 2011 construction enviroment
Sxsw 2011 construction enviroment
 
Road
RoadRoad
Road
 
Dw final (inside)
Dw final (inside)Dw final (inside)
Dw final (inside)
 
Diaphragmwall test
Diaphragmwall testDiaphragmwall test
Diaphragmwall test
 
Cut and cover_sections
Cut and cover_sectionsCut and cover_sections
Cut and cover_sections
 
Wk 4 modular_lecture
Wk 4 modular_lectureWk 4 modular_lecture
Wk 4 modular_lecture
 
Wk 1 2_substructure_dewatering_bw
Wk 1 2_substructure_dewatering_bwWk 1 2_substructure_dewatering_bw
Wk 1 2_substructure_dewatering_bw
 
Wk 1 2_substructure_dewatering
Wk 1 2_substructure_dewateringWk 1 2_substructure_dewatering
Wk 1 2_substructure_dewatering
 
earth support
earth supportearth support
earth support
 

Coffer dams 01

  • 1. COFFERDAM Coffer – large strong box for valuables; sunken panel or box 1. A temporary watertight enclosure that is pumped dry to expose the bottom of a body of water so that construction, as of piers, may be undertaken. 2. A watertight chamber attached to the side of a ship to facilitate repairs below the water line. 3. A water tight enclosure pumped dry to permit work below the water line eg for the construction of underwater foundations for bridges, piers (Oxford Dictionary) What is a Cofferdam? A cofferdam is a type of watertight construction designed to facilitate construction projects in areas which are normally submerged, such as bridges and piers. A cofferdam is installed in the work area and water is pumped out to expose the bed of the body of water so that workers can construct structural supports, enact repairs, or perform other types of work in a dry environment. In some regions of the world, a cofferdam is better known as a caisson. Working inside a cofferdam can be hazardous if it is installed improperly or not safely pressurized, but advances in engineering have led to increased safety for workers using this unique work environment. A variety of materials can be used to construct a cofferdam, which is truly a feat of engineering. Although a cofferdam is a temporary structure, it must reliably hold water back from the work area and also withstand very high pressures in order to be safe, and the construction of cofferdams is often used as a project for engineers learning their craft. The most basic type of cofferdam uses sheet metal, which is pounded into the bed of the body of water to create a watertight wall. Next, pumps are used to pull water out of the enclosure so that it will be dry.
  • 2. Some cofferdams are built from wood or concrete, while others use a double walled mechanism, with filler made from aggregate materials in between the two walls. The walls of a cofferdam can extend all the way to the surface of the water, leaving it open at the top, or it can be built as an enclosed structure. In very deep water, enclosed and pressurized cofferdams are used for worker safety, while in shallower bodies of water, an open cofferdam can be used. Workers access a closed cofferdam through hatches and tubes, and care is taken to make sure that the air supply is consistent and the pressure is kept at a normal level. Shipwrights and repair yards also use a form of portable cofferdam, which can be attached to the side of a ship to enact repairs below the waterline. At sea, this can be a useful way to quickly address potential problems until the ship is taken into dry dock for more long-term repair. Minor repairs can be undertaken with a portable cofferdam in a shipyard to avoid the expense of hauling the ship into dry dock for the work to be completed. COFFERDAM AND DEWATERING 2.04.01--Description: Work under this item shall consist of the design and construction of cofferdams as and where shown and specifically designated as such on the plans; necessary dewatering, adjustments, repair or reconstruction; and the removal of temporary cofferdams and related facilities. 2.04.03--Construction Methods: 1--Cofferdams : Cofferdams shall be carried to adequate depths and heights, shall comply with Section 1.10, and shall be safe and watertight as necessary for the proper performance of the work which must be done inside them. Cofferdams shall be constructed so that the work can be safely carried to an elevation 600 mm lower than the elevation shown on the plans for the bottom of the structure footing, or, if a granular fill foundation is shown on the plans, to an elevation 600 mm lower than the bottom of the granular fill foundation. The interior dimensions of the cofferdams shall be sufficient for the unobstructed and satisfactory ompletion of all necessary substructure work, such as pile driving, form building, inspection and pumping. Cofferdams which become tilted or displaced prior to the completion of all work to be done within them, shall be righted, reset, or enlarged as may be necessary to provide the clearance for the unobstructed performance of all necessary work, and such corrections and adjustments of cofferdams shall be at the sole expense of the Contractor. Cofferdams shall be completely dewatered as required to complete the work entirely in the dry, except as specified below.
  • 3. When conditions are encountered that render it impractical to dewater the cofferdam, the Engineer may require the placing of underwater concrete of such dimensions as will be necessary to allow the Contractor to complete the substructure in the dry. The placement of underwater concrete shall comply with 6.01.03-10. Cofferdams must be constructed to protect uncured masonry and concrete against damage from a sudden rising of the water and prevent damage to structure foundations by erosion. No part of the cofferdam which extends into the substructure may be left in place without written permission from the Engineer. At least 30 calendar days prior to the start of constructing or installing a cofferdam, the Contractor shall submit to the Engineer, for his information, detailed plans and computations of its proposal prepared by a professional Engineer licensed in the State. The furnishing of such plans and methods shall not serve to relieve the Contractor of its responsibility for the safety of the work and the successful completion of the Project. The Contractor's proposal must meet all requirements established in regulatory permits for the Project and must also conform to the requirements of Section 1.10. 2--Dewatering: Pumping from the interior of any cofferdam shall be done in such a manner as to preclude the possibility of water moving through uncured masonry or concrete. During the placement of concrete or masonry, and for at least 24 hours thereafter, any pumping shall be done from a suitable sump located outside the horizontal limits and below the elevation of the work being placed or as directed by the Engineer. The pumped water must be discharged in accordance with the requirements of Section 1.10. Pumping to dewater a cofferdam shall not start until any underwater concrete has sufficiently set to withstand the hydrostatic pressure created by pumping. 3--Removal of Cofferdams : Unless the Engineer directs otherwise, the Contractor shall remove all parts of the cofferdam after completion of the required work. This shall be done in such a way as not to disturb or otherwise damage any permanent construction. Sheet piling used in constructing the cofferdam may be left in place with the approval of the Engineer, provided the piling is cut off at elevations approved in advance by the Engineer, and the cut off portions are removed from the site. 2.04.04--Method of Measurement: Work under this item will be measured for payment by the number of meters of cofferdam designated numerically on the plans.
  • 4. 2.04.05--Basis of Payment: Payment for this work will be made at the Contract unit price per meter for "Cofferdam and Dewatering," measured as described above, which price shall include all costs of design, materials, equipment, labor, work, and any related environmental controls used in dewatering operations, which are required for the construction of cofferdams shown in the plans; of any repair, correction, adjustment or reconstruction of such cofferdams required by the plans; removal of obstructions; pumping and dewatering; removal of such cofferdams and related environmental controls used in dewatering operations. If the Engineer requires the Contractor to construct an additional cofferdam not shown on the plans, or to enlarge a cofferdam beyond the dimensions of same as designated on the plans, or if the Engineer accepts the Contractor's proposal to do so as being essential for the purposes of the Contract, the Department will revise the Contract to indicate those changes and to designate the revised dimensions of cofferdam deemed necessary by the Engineer. If the total number of meters of any given cofferdam as designated in the revised Contract is greater than the number of meters designated on the original Contract plans, the Department will pay the Contractor for the revised number of such meters at the Contract unit price, subject to the provisions of Articles 1.04.02 and 1.04.03. To the extent that the Engineer allows the addition or enlargement of a cofferdam for the convenience or other benefit of the Contractor, but does not deem that addition or enlargement essential for the performance of the Contract work, the Department will make no additional payment for the cofferdam or portion of the cofferdam which the Engineer does not so deem essential. The Department shall not in any event pay the Contractor for fewer meters of a cofferdam than were designated on the original Contract plans unless the Department eliminates that cofferdam in its entirety from the Contract. Even if, however, the Contractor's plan for an additional cofferdam or enlargement of a cofferdam deemed essential by the Engineer includes a previously-existing structure, in no case will a previously-existing natural or built structure, such as an abutment or an embankment, be measured for payment in calculating the revised number of meters of cofferdam on the Project. Any common cofferdam wall required for staged construction will be measured for payment only once. In no case will a given length or portion of cofferdam be measured for payment purposes more than once. Pay Item Pay Unit Cofferdam and Dewatering m
  • 5. DIAPHRAGM WALLS TECHNOLOGY OVERVIEW TABLE OF CONTENTS 1. INTRODUCTION 2. METHODS 3. APPLICATIONS 4. CONCLUSION INTRODUCTION Diaphragm walls are underground structural elements commonly used for retention systems and permanent foundation walls. They can also be used as deep groundwater barriers. Diaphragm walls are constructed using the slurry trench technique, which was developed in Europe and has been used in the United States since the 1940's. The technique involves excavating a narrow trench that is kept full of an engineered fluid or slurry. The slurry exerts hydraulic pressure against the trench walls and acts as shoring to prevent collapse. Slurry trench excavations can be constructed in all types of soil, even below the ground water table. Back to Top METHODS Cast-in-place diaphragm walls are usually excavated under bentonite slurry. Various types of excavation equipment can be used depending on project conditions, including hydraulic excavators and kelly-mounted or cable-hung clam buckets. Depths in excess 150 feet are possible. (The Hydrofraise, a highly specialized excavation tool, can reach depths of 500 feet.) Diaphragm wall construction begins with the trench being excavated in discontinuous sections or "panels". Stop-end pipes are placed vertically at each end of the primary panel to form joints for adjacent secondary panels. Panels are usually 8 to 20 feet long, with widths varying from 2 to 5 feet. Once the excavation of a panel is complete, a steel reinforcement cage is placed in the center of the panel. Concrete is poured in one continuous operation through one or more tremie pipes that extend to the bottom of the trench. The tremie pipes are extracted as the concrete rises; however, the discharge end of the tremie pipe always remains embedded in the fresh concrete. The slurry that is displaced by the concrete is saved and reused for subsequent panel excavations. As the concrete sets, the end pipes are withdrawn. Similarly,
  • 6. secondary panels are constructed between the primary panels to create a continuous wall. The finished wall may be cantilever or require anchors or props for lateral support. A variation of the technique is the precast diaphragm wall. With this method, a continuous trench, or longer panel is excavated under self-hardening cement- bentonite slurry. The slurry is retarded to remain fluid during construction. After a sufficent length of excavation is complete, a crane lifts the precast concrete wall section into the trench. The cement bentonite slurry sets to form the final composite wall. Alternately, the trench is excavated under bentonite slurry, which is then displaced with cement bentonite slurry. Back to Top APPLICATIONS Diaphragm walls are commonly used in congested areas. They can be installed in close proximity to existing structures with minimal loss of support to existing foundations. In addition, construction dewatering is not required, so there is no associated subsidence. The cut and cover method is used to construct tunnels. Two parallel diaphragm walls are installed and the area between the walls is excavated. Floor and roof slabs are poured and area above the roof is backfilled. Back to Top CONCLUSION The diaphragm wall technique is a tried-and-true construction method, which provides unequaled support of existing foundations during adjacent construction operations. The method has many civil applications.