1. PHOTOGRAPHY SHOOT RISK ASSESSMENT
This is the risk assessment for at the professional club
HAZARD IN WHICH SCENE
IS THIS HAZARD
PRESENT?
PERSON WHO MAY
BE HARMED
PROPERTY THAT
COULD BE
DAMAGED
RISK CONTROLS
ALREADY INPLACE
RISK ASSESSMENT
*See chart
FURTHER ACTION
TO BE TAKEN
Weather Throughout the
filming unless the
weather is that
bad we are
forced to go
inside
Cast and crew Equipment and
possible physical
painif someone was
to injure their
person
Traffic Throughout the
filming we must
be careful of the
public traffic
because it is a
public field
Cast and crew
The building
2. Risk AssessmentChart
Hazard likelihood/Consequences RISK ASSESSMENT
VERY LIKELY TO HAPPEN or SEVERE CONSEQUENCES (ie.Someone couldget
seriouslyhurt)
EXTREME
Couldhappenormildconsequences(i.e.someone couldsufferaminor
injury)
HIGH
Unlikelytohappenorminorconsequences(i.e.productioncouldbe slightly
delayed)
MODERATE
Rarelyhappensandveryinsignificantconsequences LOW