2. Background
• 45 years supplying machined parts to the aerospace
industry.
• Recognized as a leader in machining complex hardware.
• Strong engineering team utilizing state-of-art software and
hardware.
• 2010 Boeing Silver Supplier award
3. Core Business Strategy
• Support aerospace manufacturers with highest quality and
delivery performance.
• Industry leader for machining titanium, aluminum and
composite structures
• Increase value added product deliveries.
• Achieve and maintain Gold Quality and Delivery rating
• Offer partner/risk sharing relationships.
• Dedicated to Continuous Improvement.
4. Facilities
Torrance Facility
66,000 sq. ft.
Main facility: machining, sub
assembled structures and final
source inspection.
Long Beach Facilities
Building #1: 40,000 sq. ft.
Multi-spindle rough and finish
machining of hard metals
Building #2: 36,000 sq. ft.
Material Storage, Heat Treating, Assembly
Total 142,000 sq. ft.
13. Dasco Long Beach
Three (3) Wilson 3-Spindle, 3-Axis Machines, one (1) Wilson 6-
Spindle, and an additional 6-Spindle Wilson acquired Nov.
2010 to be installed 1st quarter 2011.
14. Dasco Long Beach
Two identical Cincinnati 3-Spindle Gantries undergoing full
upgrade and rebuild in Long Beach.
16. Assembly Shop
Full capabilities for riveting, liquid shimming, metal bonding, hardware installation,
bushing and bearing installation, and maintaining critical tolerances on flight critical
components.
19. Assembled Products
Assembled
aircraft hinges (F-15
Flap and Aileron)
Sheet metal assemblies (F-5 Leading Edge Main landing gear structure (787)
Extension and Space Station Debris Shield)
25. Quality System
• ISO9001/2000 - AS9100B – third party certified.
• (2) Mitutoyo “Bright 1230” 5-Axis CMM,
118” x 48” x 40” work envelope
• Mitutoyo “Bright 916” 5-Axis CMM,
80” x 36” x 36” work envelope.
26. Management Systems
• “JobBOSS” manufacturing management software system in use
since 1998 – provides real-time data capture via barcode.
° Quote Processing
° Order Processing
° Material Control
° Shop Floor Control
° Labor Reporting
° Cost Analysis
° Shipping “With over 4,300 installations worldwide, JobBOSS
is the established leader in shop management for
° Accounting the machine shops.”
27. Production Control System
“JobBOSS” data exported to Excel reports for operations management
Active Job Report
PROD. REL
PLANNING
NC PROG.
MASTER MONTHLY SHIP PLAN
TOOLING
STATUS
Status: 1=On Time, 2=Schedule Concern, 3= Late LATE MAR APR MA
JOB NO. CUSTOMER P/N DESCRIPTION PM COMMENTS QTY DATE QTY DATE QTY DATE QTY
S2467 BAC MIL-WA 5-96763-19 HINGE ASSY JFK SEAN - HELD FOR MATERIAL PROBLEM - VIR TO BE SUBMITTED
S2468 BAC MIL-WA 5-96763-20 HINGE ASSY JFK SEAN TO MACHINE - HELD FOR MATERIAL PROBLEM - VIR TO BE SUBMITTED
S2469 BAC MIL-WA 5-96763-23 HINGE ASSY JFK SEAN TO MACHINE - HELD FOR MATERIAL PROBLEM - VIR TO BE SUBMITTED
1673 BAC MIL-WA 5HF75308-105 SUPPORT FITTING JFK X X X 1 TMG 2 3/18 2
1883 BAC MIL-WA 5HF75712-105 AFT FRAME JK STAGED FOR CNC 6/5/02
1883-NRE BAC MIL-WA 5HF75712-105 S/UP JK
1884 BAC MIL-WA 5HF75712-107 AFT FRAME JK NEED PROGRAM 2 3/22 2
1884-NRE BAC MIL-WA 5HF75712-107 NRE JK
1727 BAC MIL-WA 5HW82316-101 SUPPORT JK X X X 1 CNC - FADALMATL ON ORDER - DEL'Y 04/01/03
1725 BAC MIL-WA 5HW82316-101 STRUT SUPPORT JK X X X 1 CNC - FADAL(2) PCS STOCK
1726 BAC MIL-WA 5HW82316-102 SUPPORT JK X X X 1 CNC - FADAL(2) PCS. STOCK 5 4/7
1728 BAC MIL-WA 5HW82316-102 SUPPORT JK X X X 1 CNC - FADALMATL ON ORDER - DEL'Y 04/01/03
1873 BAC MIL-WA 5HW82492-103 SPLICE JK
1682 BAC MIL-WA 5HW82492-103 SPLICE JFK X X X 1 MATERIAL ON ORDER 2 4/15
1379 BAC MIL-WA 5HW82492-103 SPLICE JFK X X X X 1 STOCK THRU JULY - AUG/SEP NEED MACHINING
1874 BAC MIL-WA 5HW82492-104 SPLICE JK
1683 BAC MIL-WA 5HW82492-104 SPLICE JFK X X X 1 MATERIAL ON ORDER 2 4/15
1380 BAC MIL-WA 5HW82492-104 SPLICE JFK X X X X 1 STOCK THRU JULY - AUG/SEP NEED MACHINING
1875 BAC MIL-WA 5HW82492-105 SPLICE JK
1684 BAC MIL-WA 5HW82492-105 SPLICE JFK X X X 1 MATERIAL ON ORDER 2 4/15
1381 BAC MIL-WA 5HW82492-105 SPLICE JFK X X X X 1 STOCK THRU SEPT.
1382 BAC MIL-WA 5HW82492-106 SPLICE JFK X X X X 1 STOCK THRU SEPT.
1876 BAC MIL-WA 5HW82492-106 SPLICE JK
Machine Loading
9130 1704 5/24
9130 1705 5/24
9130 1706 6/14
9430 1711 5/31
9430 1712 5/31
9430 1749 6/12
9430 1750 6/12
9430 1751 7/22
9330 1761 6/14
9330 1762 6/18
9230 1758 6/18
9330 1765 7/12
9330 1766 7/12
9130 1744 7/16
9130 1745 7/16
9430 1752 7/22
9430 1753 8/12
9430 1754 8/12
9130 1748 8/26
9330 1854 8/26
9330 1855 9/25
9330 1856 10/2
9430 1844 10/2
6/3
6/3
6/5
7/2
7/2
7/9
7/9
8/8
8/6
8/6
9/4
9/4
9230 1756
9230 1759
9130 1747
9430 1843
9230 1755
9230 1757
9330 1763
9330 1764
9130 1743
9230 1760
9130 1746
9430 1842
KURAKI 05 180'S
SNK 3-SPIND. #1 11 9230/9330 9130/9430 9130/9430 9230/9330 9130/9430 9230/9330
9/4 7/9 7/9 9/4 9/4
9955843-5/-6
CIN. 5-AXIS 04 2305-101 / 1330 S2458-1/-2 2305-101 / 1330 2305-102 / 1331 2305-102 / 1331 2305-102 / 1331
7/13 7/13 9/9 8/25 9/24 10/22 10/
0055-2013 2685-104 / 2685-104 / 2685-104 / 2685-103 / 2685-103 / 2685-103 / 2685-
SNK 5-AXIS #1 / 1465 1697A 1697B 1697C 1696C 1696D 1696E 169
6/16 6/16 6/2 7/27 7/27 6/28 6/30 6/30 6/30 7/13 7/30 7/30 7/30 9/28 8/25 9/14
2675-102 / 2682-103 / 2682-103 / 2682-103 / 2675-101 / 2685-103 / 2685-103 / 2679-104 / 2679-103 / 2675-102 / 2675-102 / 2677-102 / 2677-102 / 2679-104 / 2677-101
SNK 5-AXIS #2 1319J 1694A 1694B 1694C 1688B 1696A 1696B 1323J 1692C 1689A 1689B 1691C 1321J 1693C 1690C
2685-103 / 2685-104 / 2677-101 / 2677-102 / 2685-103 / 2685-104 / 2679-103 / 2677-102 / 2677-101 / 2685-103 / 2685-104 / 268
SNK 3-SPIND. #2 1696B, C 1697A, B, C 1690C,D 1691C 1696D,E,F 1697D,E,F 1692D,E,F 1691D,E,F 1690E,F,G 1696G,H,I 1697G,H,I 169